Loading...
pe1870wwgdg m t t WO ■ WIRE MESH SUPPORT FENCE FOR SILT FILM FABRICS Lo FILTER FABRIC MATERIAE----- 7// 1 C-4 16. LL TAN ANY SPILLS WILL BE HANDLED ACCORDING TO D.O.E. AND D.O.H. GUIDELINES c: c Z 2 PROVIDE WASHED GRAVEL— xx CC 0 Q) BACKFILL OR COMPACTED Oak 777 . . . . . . . . . . 7// 1 C-4 16. LL TAN ANY SPILLS WILL BE HANDLED ACCORDING TO D.O.E. AND D.O.H. GUIDELINES PROVIDE WASHED GRAVEL— xx BACKFILL OR COMPACTED Oak 777 NATIVE SOIL MAINTENANCE mi- 7// 1 C-4 16. LL TAN ANY SPILLS WILL BE HANDLED ACCORDING TO D.O.E. AND D.O.H. GUIDELINES PROVIDE WASHED GRAVEL— BACKFILL OR COMPACTED NATIVE SOIL MAINTENANCE BURY BOTTOM OF------' I. THE CONTRACTOR SHALL BE RESPONSIBLE FOR INSTALLATION AND MAINTENANCE OF FILTER MATERIAL THE TEMPORARY ESC MEASURES. IN 8"xl2*' TRENCH 8" 2. SEDIMENT EARRIERS SHALL BE INSPECTED IMMEDIATELY AFTER EACH RUNOFF—PRODUCING RAINFALL AND AT LEAST DAILY DURING PROLONGED RAINFALL. 3. NECESSARY REPAIRS TO BARRIERS OR REPLACEMENT OF FILTER FABRIC SHALL BE 2 x 2 WOOD POSTS, STANDARD, ACCOMPLISHED PROMPTLY. OR BETTER, OR EQUAL 4. SEDIMENT DEPOSITS SHOULD BE REMOVED AFTER EACH RUNOFF — PRO DU Cl NO RAINFALL. SECTION DEPOSITS MUST BE REMOVED WHEN THE LEVEL OF DEPOSITION REACHES APPROXIMATELY 1/2 THE HEIGHT OF THE BARRIER, SILT FENCE DETAIL 1 5, ANY SEDIMENT DEPOSITS REMAINING IN PLACE AFTER THE ESC STRUCTURE IS NO LONGER NOT TO SCALE v J REQUIRED SHALL BE DRESSED TO CONFORM TO THE EXISTING GRADE, PREPARED AND — SEEDED. 6. ALL TEMPORARY AND PERMANENT ESC PRACTICES SHALL BE MAINTAINED AND REPAIRED As NEEDED TO ASSURE CONTINUED PERFORMANCE OF THEIR INTENDED FUNCTION. 7. ALL TEMPORARY ESC MEASURES SHALL BE REMOVED WITHIN 30 DAYS AFTER FINAL SITE STABILIZATION IS ACHIEVED OR AFTER THE TEMPORARY BMP'S ARE NO LONGER NEEDED. TRAPPED SEDIMENT SHALL BE REMOVED OR STABILIZED ON SITE. DISTURBED SOIL AREAS RESULTING FROM REMOVAL SHALL BE PERMANENTLY STABILIZED. 8. THE CONTRACTOR SHALL BE RESPONSIBLE FOR CLEANING DIRT, MUD AND OTHER CONSTRUCTION EBRIS WHICH MAY ACCUMULATE ON PAVED STREET J CET TO THE SITE AS A RESULT OF CONSTRUC11ON ACTIVITY. CLEANING SHALL BE ON AN "AS NEEDED* BASIS USING SWEEPING AND WATER TO WASH THE CONSTRUCTION DEBRIS FROM THE STREET. 9. ON—SITE DJST CONTROL SHALL BE ACCOMPLISHED BY USING WATER. APPLICA11ONS OF WATER MAY BE REQUIRED SEVERAL TIMES PER DAY DURING CONSTRUC11ON ACTIVITY. 4" TO 8" QUARRY SPALLS 12" MIN. THICKNESS EROSION & SEDIMENT CONTROL FILTER FABRIC MATERIAL IN CONTINUOUS ROLLS; USE STAPLES OR WIRE RINGS TO ATTACH FABRIC TO WIRE ELEVATION CER11FICAIION STATEMENT- I CERTIFY THAT THIS EROSION AND SEDIMENT CONTROL PLAN MEETS THE ESC REQUIREMENTS AS LISTED IN CHAPTER 4.5 OF THE SPOKANE COUNTY GUIDELINES FOR ��RMWATER MANAGEMENT. III III IIIAlllll JOHN F. SA