20015, 05-20 Permit: ROW-2015-0274 Water Service RepairCity of Spokane Valley
Community Development
11707 E. Sprague Ave., Suite 108
Spokane Valley, WA 99206
(509) 720-5240
permitcenterCa�spokanevalley.org
ROW -2015-0274
PROJECT NAME:
SITE ADDRESS: 1122 S ST CHARLES SPOKANE VALLEY
DE -ROW
ISSUED: 05/20/2015
EXPIRES:
PROJECT DESCRIPTION: EMERGENCY WATER SERVICE REPAIR
PARCEL:
APPLICANT: VERA WATER & POWER -INVOICE OWNER: VERA WATER & POWER -INVOICE
PO BOX 630 VERADALE, WA 99037 PO BOX 630
509-922-3929 VERADALE, WA99037
509-922-3929
OWNER ACTING AS BUILDER:
VERA WATER & POWER
PO BOX 630
VERADALE, WA 99037-0630
License: OWNER
Expires:
FEES:
Right of Way
Paid
Due
$168.00
Totals : $168.00
CONDITIONS
* Prior to excavation, it is the Contractor responsibility to contact the purveyor of any transmission pipeline that is within 100
feet of permitted work, as per RCW 19.122.033.
* * For pavement cuts, as -built drawings (using the current Inland Northwest Regional Pavement Cut Policy template) are
required to be submitted to the Right -of -Way Inspector, Scott Wallace, within 15 working days of work being completed. As-
builts shall be submitted by email (to swallace@spokanevalley.org), by Fax (509-921-1008) or by dropping off at the Permit
Center.
* * All pavement cuts within the City of Spokane Valley right-of-way shall comply with the current adopted Inland Northwest
Regional Pavement Cut Policy, or as amended.
* All pavement repairs shall be inspected by the City's ROW inspector, Scott Wallace (mobile: 509-869-5373). The
Contractor shall notify Mr. Wallace a minimum of 24 hours in advance of the paving.
* For work blocking less than 50% of a local access street the contractor, at a minimum, is required to have Construction
Ahead signs placed ahead of the work zone. Note — if it turns out that the work blocks more than 50% of a local access
street then this permit is not valid and the contractor must submit a traffic control plan to the City for review/acceptance prior
to continuance of the work. All traffic control shall follow MUTCD standards.
Printed by : Patrick Barclay on: 05/20/2015 03:52 PM
Page 1 of 2