Loading...
2011, 08-31 Permit App: 11002613 MH Project Number: 11002613 Inv: 1 Application Date: 8/31/2011 Page 1 of 2 THIS IS NOT A PERMIT Penalties will be assessed for commencing work without a permit Project Information: - "stiu sir"s, .. m Permit Use: 2011 26 X 56 MARLETTE Contact: BARNES ENTERPRISE Address: PO BOX 141617 C-S-Z: SPOKANE WA 99214 Setbacks:Front Left: Right: Rear: Phone: (509)921-9068 Group Name: Site Information Project Name: Plat Key: Name: Range District: Nort Parcel Number: 45044.0326 Block: Lot: SiteAddress: 3508 N STEGNER RD Owner:Name: KOPP,LORETTA Address: 3524 N STEGNER RD Location::CSV SPOKANE,WA 99206-4538 Zoning: MUC Mixed Use Center District Water District: 026 IRVIN Hold: U Area: 27,200 Sq Ft Width: 0 Depth: 0 Right Of Way(ft): 0 Nbr of Bldgs: 0 Nbr of Dwellings: 0 Review Landuse/Zoning/HE Conditions Released By: J Originally Released: 8/29/2011 By: KKENDAL Driveway/Approach Released By: Originally Released: 8/31/2011 By: WMCGAV Sewer Review Released By: Operator: JD Printed By: JD Print Date: 8/31/2011 Project Number: 11002613 Inv: 1 Application Date: 8/31/2011 Page 2 of 2 THIS IS NOT A PERMIT Penalties will be assessed for commencing work without a permit Approach Contractor: BARNES ENTERPRISES INC Finn: BARNES ENTERPRISES INC Address: PO BOX 141617 Phone: (509)921-9068 SPOKANE WA 99214 Item Description Units Unit Desc Fee Amount APPROACH-CONST IN ROW 1 NUMBER OF $52.00 Permit Total Fees: $52.00 Manufactured Home Contractor: BARNES ENTERPRISES INC Firm: BARNES ENTERPRISES INC Address: PO BOX 141617 Phone: (509)921-9068 SPOKANE WA 99214 Item Description Units Unit Desc Fee Amount SETTING PERMIT 2 #SECTIONS $100.00 Permit Total Fees: $100.00 Notes: E ._._ _ b �ma= a rjnT_ Approach is to be inspected by the City's ROW Inspector prior to paving. Approach to be constructed per City's Standard Plan R-114(Driveway Approach Asphalt). Payment Summary. . Permit Type Fee Amount Invoice Amount Amount Paid Amount Owing Approach $52.00 $52.00 $0.00 $52.00 Manufactured Home $100.00 $100.00 $0.00 $100.00 $152.00 $152.00 $0.00 $152.00 Disclaimer: Submittal of this application certifies the owner(or person(s)authorized by the owner)has both examined and finds the information contained within to be true and correct,and agrees that all provisions of laws and/or regulations governing this type of work will be complied with. Subsequent issuance of a permit shall not be construed to be a permit for,or an approval of,any violation of any of the provisions of the code or of any other state or local laws or ordinances. Signature: Operator: JD Printed By: JD Print Date: 8/31/2011 fu.'- Community Development Department (Staff Use Only) - r Permit Center ( ` SCIIYokane 11703 East Sprague Avenue, Suite B-3 Spokane Valley, WA 99206 PERMIT NUMBER: ' ''C�(Z\� p Valley Tel: (509) 688-0036 PERMIT FEE: Fax: (509) 688-0037 441 . ' permitcenter©spokanevallev.orq MANUFACTURED HOME PERMIT APPLICATION El OTHER • SITE ADDRESS: 3 sc. 8 y. 5-4-t&,A,2 0 . ASSESSORS PARCEL NO.: LEGAL DESCRIPTION: 54a.f PIA} O) — i 1 BUILDING/� OW,NER NAME: NAME: LonI ' T It JCRP ADDRESS: 3s'Z ce N. S)-03rt-i-1 (2-b • CITY: 5Pc A-.4. V A 11-ci STATE: e./A A . ZIP: 9.9z PHONE: 921- / 7 Z 7 FAX: CELL: CONTACT NAME: LAFe-1 , - -- -Ar"'Z �l' PHONE: l c-Q —(? Z 7 CELL: JIi if CONTRACTOR NAME: 9}--(2-n.eS ett+c2 fr;S..5 ZAC. i✓ MAILING ADDRESS: 190 QOx 1 5. 7.2..6 CITY: 5 Po P & k i j Cie J4 STATE:D L • ZIP: 99 2/5— PHONE: q / 2. /" ,176,4- FAX: 92/- O2'ref CELL: Z / -7 - 3 (06 'Z CONTRACTOR LICENSE No.: 0kA 41 CTDOs P6 EXPIRES: 6- /1-2012.CITY BUSINESS LICENSE NO.: G oz-0oo'76.r DESCRIBE THE SCOPE OF WORK IN DETAIL AND INDICATE USE: A/e w rt.,.A-44./ c,rut. MANUFACTURED HOME WIDTH: Z& /8 MANUFACTURED HOME LENGTH: SG ' YEAR OF MANUFACTURED HOME: Zoll PIT SET: V."5 SEPTIC SEWER: MANUFACTURER: ►4.•/e/ PREVIOUS ADDRESS: PROPOSED USE: 'fps, . DISCLAIMER The permitted verifies,acknowledges and agrees by their signature that: 1) if this permit is for construction or on a dwelling,the dwelling is/will be served by potable water. 2) Ownership of this City of Spokane Valley permit inure to the property owner. 3) The signatory is the property owner or has permission to represent the property owner in this transaction. 4) All construction is to be done in full compliance with the City of Spokane Valley Development code. Referenced codes are available for review at the City of Spokane Valley Permit Center. 5) The City of Spokane Valley permit is not a permit or approval for any violation of federal, state or local laws, codes or ordinances. 6) Plans or additional information may be required to be submitted and subsequently approved before this application can be processed. Signature . �� RECD yEe�ate: • - Ls- ,i CSV PERMIT CENTER ...,20&‘-7,, Project 4r Name___ ----- Updated 1-11-11 _ Page 1 of 1 http://www.spokanevalley.org/filestorage/124/938 fi - . -•_'ome_Permit_1-11-11.doc • RE , CITY OF� aidOil a MI ` AUG 31 2.011 . -velopment Engineering Valley Spokane Permit Center 11707 E Sprague Ave Suite 106 ♦ Spokane Valley WA 99206 509.921.1000 ♦ Fax: 509.921.1008 • cityhall@spokanevalley.org Approach Permit Application Review TO: Building Department Site Address: 3508 N. Stegner Rd. Project No: 11-2613 Accepted Not Accepted Approach *X Building Location Paved Access Notes: Driveway is to be inspected by the City's ROW Inspector prior to paving. *Approach to be constructed per City's Standard Plan R-114 (Driveway Approach Asphalt). Reviewed By: .1/, c Date: g/3/./// Community Development Department (Staff Use Only) Permit Center SC17Y F1 11703 East Sprague Avenue, Suite B-3 PERMIT NUMBER: i\ ' \ Spokane Valley, WA 99206 Valley Tel: (509) 688-0036 PERMIT FEE: 400xFax: (509) 688-0037 permitcenterPspokanevalley.orq APPROACH PERMIT APPLICATION PROJECT ADDRESS: iso 8 N. 5 &41 NzfL P. START DATE: ANTICIPATED COMPLETION DATE: BUILDING OWNER NAME: MAILING ADDRESS: 35 ay ItJ. 5)-8'6.-Ngla • CITY: bK ke, '/M)ej STATE:ALEA. ZIP: CONTACT PERSON NAME: £o�Z LA /<o t PHONE: To ?- 9Zc?- 17 07 FAX: CELL: CONTRACTOR NAME: (3AR/IG5 6--h-iefpn5e5 Tic. MAILING ADDRESS: P4 3 1s I ."-ZZ-47 CITY: 126/09-6 v MI(, STATE: 4..A.A ZIP: Z/3,' p PHONE: 9Z/' 90 FAX: ?lid' 9/5— CELL: e17-36 6 Z CONTRACTOR LICENSE No.: g^pie E.ro3SP6 EXPIRES: 6-(/ - P.Z. CITY BUSINESS LICENSE NO.: lad 2-x'74 3' PROJECT DESCRIPTION (Please Provide Site Sketch) AlResidential Driveway 111 Driveway El Existing Curb &Gutter• El Rural Road Section Culvert Installation 0 Sidewalk Repair/Construction Other Conditions: Bond/Insurance certification must be on file with the City. DISCLAIMER The permitted verifies,acknowledges and agrees by their signature that: 1) if this permit is for construction or on a dwelling,the dwelling is/will be served by potable water. 2) Ownership of this City of Spokane Valley permit inure to the property owner. 3) The signatory is the property owner or has permission to represent the property owner in this transaction. 4) All construction is to be done in full compliance with the City of Spokane Valley Development code. Referenced codes are available for review at the City of Spokane Valley Permit Center. 5) The City of Spokane Valley permit is not a permit or approval for any violation of federal, state or local laws, codes or ordinances. 6) Plans or additional information may be required to be submitted and subsequently approved before this application can be processed. Signature �� Date: 8- Z s-- (l FECEiVED CSV PERMIT CENTER AUG 2 5 2011 Project t#r--iL� \� Submittal Updated 1-11-11 Page 1 of 1 http://www.spokaneva I ley.org/fi Iestorage/124/938/210/948/1496/Approach_Permit_1-11-11.doc APPROACH PERMIT APPLICATION REQUIRED SKETCH INFORMATION (Revised 1/25/10) Provide required measurements (in sketch boxes), and include street name. Check all existing conditions that apply: ❑ Sidewalk ❑ Drainage Ditch ft wide ❑ Drywell (show location on sketch) ft from back of curb ❑ Other (please describe below) ❑ Streetside Swale Lu ; DISTANCE FROM z i INEAREST PROPERTY LINE LiMAY BE LEFT OR RIGHT SIDE) FT(SEE TABLE) / w� a� ix al CURB APPROACHCONCRETE RETURN 4.-4—THROAT GE EBL WING WIDTH=FT I N CURB" IF CORNER LOT, DISTANCE FROM STREET NAME CURB RETURN n FT(SEE TABLE) STREET WITH CURB wi S' DISTANCE FROM - NEAREST PROPERTY LINE MAY BE LEFT OR RIGHT SIDE) 1 137 FT(SEE TABLE) cc aI 0i ASPHALT 15'RADIUS RADIUS al APPROACH RETURN EDGE OF F-THROATWIDTH�FT----I I 1 ASPHALT (SEE TABLE) -"••••IF CORNER LOT, DISTANCE FROM STREET NAME S l[ 6-4,4 es, RADIUS RETURN 0 FT(SEE TABLE) STREET WITH ASPHALT EDGE Approach Requirements: • Maximum 2 approaches per property frontage; one on arterials. • Total width of approaches not to exceed 50% of frontage width. Residential Approaches Commercial Approaches Distance from Curb/Radius Return 15'minimum 75'minimum Separation between Approaches (measured See Page 7-27 from centerline to centerline of each None specified in City Street Standards approach) Throat Width (flat portion) 16'min., 30'max. 30'min., 40'max. Wing Width (at curb line) 4 feet typical 4 feet typical Minimum Distance from Side Property Line (@ r/w) 5.0' 5.0' Minimum Distance from Crosswalk 5' 5' Heather Morris From: Wayne McGavran Sent: Wednesday, August 31, 2011 8:17 AM To: Permit Center Cc: Scott Wallace; Rodney Pegram; Mary May Subject: RE: 11002613-APPROACH I approved this approach,today. Wayne From: Jenna Davis On Behalf Of Permit Center Sent: Wednesday, August 31, 2011 7:32 AM To: Wayne McGavran Cc: Scott Wallace; Rodney Pegram; Mary May; Permit Center Subject: 11002613 -APPROACH Thanks Jenna Davis, CUT Uermlt Specialist City of Spokane Valley 11703 F Sprague Ave ST U-3 Spokane Valley, Wa 992CC (5C9)72C--530 idavis@spokaneval ley.ort • Target Date sheet For CityUse Only PLUS Project ( OC ZC t 3 SCITY Project Address 4LCT 5L)r— Valley® v 11703 E Sprague Ave Suite B-3 • Spokane Valley WA 99206 509.720-5240 ♦ Fax: 509.688.0037 ♦ permitcenter®spokanevaUey.org As part of our on-going commitment to customer service during the review process of your project application,we are providing you with a TARGET DATE for the initial technical application review. If for any reason we cannot meet this date,we will contact you with a revised target date. Your application review TARGET DATE is \1 The TARGET DATE is the date we estimate your project application will ha a had its initial technical review. It is not the date for approval or permit issuance. Tips for a Smoother Project Application Review > Submit complete,accurate plans and documents. Extra time may be required for re-submittals as project application reviewers work on multiple applications and it may be several days before they can look at your new or revised information. > Designate a specific contact person to communicate with the City. While the person designated as the applicant's contact person with the City can be changed, one individual with the expertise for dealing with reviewer comments would be the best choice for the entire review process. > Call staff regarding the status of your project only after the target date shown at the top of the page. Although you should be contacted on or by the target date,please feel free to contact us if you haven't heard from us by your target date.Staff may contact you before the target date if the initial review is complete.By following this procedure,you will save time and allow the reviewers to complete the work more expeditiously. Steps in the Permit Process 1. Counter Complete. Your application has been accepted as counter complete. This means all of the required documents, as indicated on your Pre-Application Checklist have been submitted or have been approved for deferred submittal. This does not prevent technical staff from requesting additional information as a result of their technical review. 2. Quality Check. The next step in the process is a quality check to make sure that the application is reviewable and free from substantive flaws that would prevent technical staff from completing the technical review once it is started. When this step is complete,your application will be routed to the appropriate staff and remain in their review queue until it comes up for review. 3.Technical Compliance.Once an application is administratively complete,it is routed to technical staff for compliance review. Depending on the type of project, technical staff may include multiple reviewers. You should be contacted by phone, fax,email, or mail by your TARGET DATE once the initial technical compliance review is complete. 4. Permit Issuance. When the technical compliance review of the application is complete, including any subsequent re- submittals, each reviewer will approve their section of the application and route it to the Permit Center. When all sections of the application are received,a Permit Specialist will process the application and contact the person specified on your application for permit pick-up.Information regarding fees and pre-construction meetings(if required)will be provided by the Permit Specialist at that time. CD-003 V-7/06-21-11 Page 1 of 1 r--------- ,. . S.,_,„i, .., ,. 2$ I J \ e4' / r Z c' 1 a PPPOVED tli ,--.v. .0. a, i 4,4 i 0Lb L.) L , . , 23/ i LTE: 7.*a 11 I : 1701 ( P,'—' 1,,k\,.„.••1 t t 3Z-i , I ' I i t tt 1.1 elni , ' 7 1 i ........./..........11,..donmerro 1 I i 1 i I \ 1 1 , t 1,(....- 1 1 . 30' ' 4- . 1 litl rA V \\, ,. ;' V \ \ 7,, if '''), <---- N ..., ......, c_.. ,,_, / ,,) . _.; ..,. c.,..-.., ,, ,. ,.„ .,. 0 ..,, , RECEIVED CSV PERMIT CENTER .. , . . . .._. . AUG 2 5 nil Project# Ilh ..... Name i Submittal# ...----A-- . ".... F . . . . ,,,,,_......., .....) i 7 *1 .... N CON'A‘ 4.,t, 3c; 4:4 18 c-L, , ... .. ...... ......, .. ,..., 1 Q.\ co 4. 0 c' P "T l' <4. •...r., r-- ec"-z ;1? e•-• Z., .S" )'. ------- ......A 1 . ,... ,r, .......) ,,. \ \.,----E \,'-(- 1- \CN. c\C __', jk.(-- (._. - --- -, ' \ - QV-- • ..,_,.........._. 61. 11,. ......„..17). . 1,1,1\41 / . . _. 1 , o / L1 . .