2012, 08-30 Permit: SW-12002106 Sewer SPOKANE COUNTY BUILDING AND PLANNING
PERMIT
{ '
Permit Issued Date:
Application Number: SW-12002106 08/30/2012
Expiration Date:
Project Description: SEWER CONNECT ION Primary Contact: COURCHAINE EXCAVATION
Project Name: SUMMERFIELD(EAST 1ST ADD) Applicant: COURCHAINE EXCAVATION
Permit Type: SEWER Address: 19818 E SPRAGUE
yp GREENACRES,WA 99016
Phone: 509-928-0846
Email:
SITE INFORMATION:
Site Address: 14925 E SUMMERFIELD CT Owner: PAUKS T IS,C A
Parcel Number: 46354.2816 Address: 14925 E SUMMERFIELD CRT
SPOKANE,WA 99216-1474
Subdivision: SUMMERFIELD EAST Phone:
FIRST ADDITION
Assessor's Description: SUMMERFIELD EAST 1ST ADD LT 16 BLK 8 Email:
Inspection Area:
Water District:Trentwocd Fire District:Spokane Valley Fire
!rriaauon District#3
Zoning: Land Area: 10621.4 Square Feet
CONTRACTOR INFORMATION:
General Contractor
COURCC"181 R7
•
COURCHAINE EXCAVATION
19818 E SPRAGUE
GREENACRES,WA 99016
509-928-0846
DETAILS:
Class Type Quantity Unit Charge Value
SEWER SEWER CONNECTION 1 $125.00 $125.00
$125.00
FEE DETAIL:
Processing-Utilities $25.94
Utilities Permit $125.00
Total Fee: $150.94
CONDITIONS:
Inside Public Transit Benefit Area
Possible FEMA Flood Zone
Plan review fee is required for all site plan reviews conducted by Spokane Valley Fire.
Date Printed:09/30/2012 11:09:05 Printed by:IIS APPPOOL\ASP.NET v4.0
SPOKANE COUNTY BUILDING AND PLANNING
PERMIT
Permit Issued Date:
Application Number: SW-12002106 08/30/2012
Expiration Date:
CALL 1-800-424-5555 BEFORE YOU DIG--AT LEAST 2 WORKING DAYS IN ADVANCE.SPOKANE COUNTY CODE REQUIRES THE
INSTALLER COMPLY WITH ALL REQUIREMENTS OF THE WA STATE DEPT OF LABOR&INDUSTRIES, INCLUDING THOSE
RELATED TO TRENCH SAFEl'Y.
FOR SEWER INSPECTIONS CALL THE UTILITIES DEPT AT(509)477-3604 FROM 8:30-5:00 MONDAY-FRIDAY PRIOR TO COVER.
ONE WORKING DAY NOTICE REQUIRED.PERMIT ALLOWS FOR A 30-MINUTE INSPECTION.ADDITIONAL INSPECTION FEES
APPLY AFTER 30 MINUTES.
INSTALLER IS RESPONSIBLE TO INSURE ALL WASTEWATER DRAINS ARE CONNECTED TO THE SEWER AND MAY BE REQUIRED
TO PERFORM TESTS FOR VERIFICATION.INSTALLER IS TO FIELD LOCATE AND CONFIRM THE ELEVATION AND POSITION OF
SEWER STUB PRIOR TO ANY OTHER EXCAVATION.
SEWER STUBS AND DRY SIDE SEWERS ARE TO BE CHECKED PRIOR TO CONNECTION TO ENSURE THAT THEY HAVE
ACCEPTABLE GRADE AND ARE CLEAR AND UNOBSTRUCTED.SEWER LINES SHOULD BE CONSTRUCTED TO ALLOW FOR
GRAVITY FLOW FROM THE LOWEST LEVEL OF THE STRUCTURE.
THE INSTALLER AND THIS PERMIT MUST BE PRESENT AT THE JOB SITE AT THE SCHEDULED INSPECTION TIME.BOTH STATE
LAW RCW 19.122 AND COUNTY CODE REQUIRES THE INSTALLER TO GIVE NOTICE OF EXCAVATION TO OWNERS OF
UNDERGROUND FACILITIES.
Date Printed:08/30/2012 11:09:05 Printed by:IIS APPPOOL\ASP.NET v4.0