Loading...
2013, 05-02 Permit: SW-13000583 Sewer SPOKANE COUNTY BUILDING AND PLANNING PERMIT Application Number: SW-13000583 Permit Issued Date: 05/02/2013 Expiration Date: 05/02/2014 Project Description: SEWER Project Name: SUMMERFIELD Primary Contact: ACME EXCVT&SEWER BORING CO Applicant: ACME EXCVT&SEWER BORING CO Phone: (509)228-0691 Address: 6808 S. LINKE RD. GREENACRES,WA 99016 Phone: (509)228-0691 Email: SITE INFORMATION: Site Address: 14922 E SUMMERFIELD CT Owner: MERKEL,JOHN R&KAYE L Parcel Number: 46354.2818 Address: 14922 E SUMMERFIELD CRT SPOKANE,WA 99216-1474 Phone: Assessor's Description: SUMMERFIELD EAST 1ST ADD LT 18 BLK 8 Email: Inspection Area: : (509)-477-3675 Water District:Trentwood Irrigation District Fire District: Spokane Valley Fire #3 Zoning: Land Area: 10028.8 Square Feet CONTRACTOR INFORMATION: ACMEEES963LD, Exp. 06/04/2014 ACME EXCVT&SEWER BORING CO 6808 S. LINKE RD.GREENACRES,WA 99016 (509)228-0691 DETAILS: Class Type Quantity Unit Charge Value SEWER SEWER CONNECTION 1 $125.00 $125.00 $125.00 FEE DETAIL: Processing-Utilities $26.32 Utilities Permit $125.00 Total Fee: $151.32 CONDITIONS: Possible FEMA Flood Zone Plan review fee is required for all site plan reviews conducted by Spokane Valley Fire. Inside Public Transit Benefit Area CALL 1-800-424-5555 BEFORE YOU DIG--AT LEAST 2 WORKING DAYS IN ADVANCE. SPOKANE COUNTY CODE REQUIRES THE INSTALLER COMPLY WITH ALL REQUIREMENTS OF THE WA STATE DEPT OF LABOR&INDUSTRIES, INCLUDING THOSE RELATED TO TRENCH SAFETY. SEWER PERMITS ARE VALID FOR ONE (1)YEAR FROM THE DATE OF ISSUANCE. FOR SEWER INSPECTIONS CALL THE UTILITIES DEPT AT(509)477-3604 FROM 8:30-5:00 MONDAY-FRIDAY PRIOR TO COVER. ONE WORKING DAY NOTICE REQUIRED. PERMIT ALLOWS FOR A 30-MINUTE INSPECTION.ADDITIONAL INSPECTION FEES APPLY AFTER 30 MINUTES. Date Printed:05/02/2013 09:14:40 Project Coordinator:Dawn Dompier SPOKANE COUNTY BUILDING AND PLANNING PERMIT Application Number: SW-13000583 Permit Issued Date: 05/02/2013 Expiration Date: 05/02/2014 INSTALLER IS RESPONSIBLE TO INSURE ALL WASTEWATER DRAINS ARE CONNECTED TO THE SEWER AND MAY BE REQUIRED TO PERFORM TESTS FOR VERIFICATION. INSTALLER IS TO FIELD LOCATE AND CONFIRM THE ELEVATION AND POSITION OF SEWER STUB PRIOR TO ANY OTHER EXCAVATION. SEWER STUBS AND DRY SIDE SEWERS ARE TO BE CHECKED PRIOR TO CONNECTION TO ENSURE THAT THEY HAVE ACCEPTABLE GRADE AND ARE CLEAR AND UNOBSTRUCTED. SEWER LINES SHOULD BE CONSTRUCTED TO ALLOW FOR GRAVITY FLOW FROM THE LOWEST LEVEL OF THE STRUCTURE. THE INSTALLER AND THIS PERMIT MUST BE PRESENT AT THE JOB SITE AT THE SCHEDULED INSPECTION TIME. BOTH STATE LAW RCW 19.122 AND COUNTY CODE REQUIRES THE INSTALLER TO GIVE NOTICE OF EXCAVATION TO OWNERS OF UNDERGROUND FACILITIES. Date Printed:05/02/2013 09:14:40 Project Coordinator:Dawn Dompier