Loading...
2014, 08-27 Permit App: BLD-2014-2062 Accessory BldgSpokane .•••*Valley - Community Development Department Permit Center . 11703 East Sprague Avenue, Suite B-3 Spokane Valley,WA 99206 Tel: (509) 688-0036 Fax: (509) 688-0037 oermitcenter@sookanevailev.orq (Staff Use Only) PERMIT NUMBER: PERMIT FEE: RESIDENTIAL CONSTRUCTION PERMIT APPLICATION NEW CONSTRUCTION ID ADDITION/REMODEL j ACCESSORY BUILDING El DECK 2 El OTHER CSV PERMIT ENTER 39 SITE ADDRESS: 0.E S, Suit/Dow nl DR. 51N/A/v2 :l AL ty %f . 199c2Og ASSESSORS PARCEL NO.: 453,/, //O3 LEGAL DESCRIPTION: GRID /5o T$Pa5n/ R6.1 516.3.1 BUILDING OWNER NAME: 1..0 r 3 .81-0c j 16 05 o�i, DP/ T/D4J NAME: LLJig 4. .'s7-RdAJG.. i /✓/4C ADDRESS: 39 0 5 //�� ,s/ , 5UA/>0 %%/v �, CITY: 5 Po i'< /7/V E VA t.y STATE: It� 5-0q- so - 07358 FAx: 5AreiL PHONE: CONTACT NAME: 54m2. PHONE: CONTRACTOR NAME: Lo -r 5'/zE /9,574 s.a F) CELL: ZIP: 9 9 oY ofj 36 0- 9'ad -36 ya FAx: orr7 . � ec1 Al CELL: MAILING ADDRESS: CITY: STATE: ZIP: PHONE: FAX: CELL: CONTRACTOR LICENSE No.: EXPIRES: CITY BUSINESS LICENSE NO.: DESCRIBE THE SCOPE OF WORK IN DETAIL AND INDICATE USE & PROPOSED USE: ****YOU MUST COMPLETE THE FOLLOWING**** MARK N/A IF NOT APPLICABLE Height to Peak: 1 i f I Dimensions: No. of St9ries: Total Habitable., _ Space: Main Floor SQ FT: Upper Floor SQ FT: A f N Unfinished Basement SQ FT: At A Finished Basement stz FT: Al 1+ Garage SO FT: /,3/0 Deck/Covered Patio SQ FT: it/0 Impervious Surface Area: 30% Slopes on Property: iv /} No. of Bedrooms: Construction Type: WOOD Heat Source: MPS) Sewer or Septic: /V0 TOTAL COST OF PROJECT: $ DISCLAIMER The permitted verifies, acknowledges and agrees by their signature that: 1) if this permit is for construction or on a dwelling, the dwelling is/will be served by potable water. 2) Ownership of this City of Spokane Valley permit inure to the property owner. 3) The signatory is the property owner or has permission to represent the property owner in this transaction. 4) All construction is to be done in full compliance with the City of Spokane Valley Development code. Referenced codes are available for review at the City of Spokane Valley Permit Center. 5) The City of Spokane Valley permit is not a permit or approval for any violation of federal, state or local laws, codes or ordinances. 6) Plans or additional information may be required to be submitted and sub +r ly approved before this application can be processed. Signature Date: OP Updated 1-11-11 Page 1 of 1 http://www.spokanevalley.org/filestorage/124/938/210/948/1496/Building_Permit-_Residential_11-11-11.doc RESIDENTIAL CHECK LIST DIRECTIONS: Place a check mark in box next to each document required for complete submittal. ❑ SITE PLAN ❑ Property lines and dimensions ❑ Direction arrow pointing North and orientation to streets ❑ Proposed/existing buildings (footprint and dimensions) ❑ Utilities, septic tank/drain field locations and distances ❑ Setbacks to property lines ❑ Distance between buildings ❑ Right of way/easement location & sizes ❑ Driveway approach size and location BUILDING PLANS (3 SETS) (minimum 1/8 inch scale or completely dimensioned) ❑ Elevations (Front/Rear/Sides) with roof peak and wall height including basement: ❑ Foundation Plan (crawlspace, basement or slab on grade): ❑ Footing sizes and locations ❑ Perimeter concrete foundation wall sizes ❑ Crawlspace ventilation ❑ Supporting wood cripple walls or beams ❑ Thickened concrete pads supporting beams or girder trusses ❑ Floor Plan of each level (finished or unfinished) with dimensions: ❑ Floor Joist direction, size and spacing ❑ Header, beam or concrete lintel sizes ❑ Brace wall panel locations ❑ Water heater and furnace locations ❑ Exhaust fan locations ❑ Deck or concrete patio sizes and locations ❑ Roof Plan: ❑ Engineered truss direction and spacing ❑ Rafter and over frame direction, size and spacing ❑ Wall Section Detail including: Roof ❑ Slope/ roofing material/ underlayment/ ice dam protection ❑ Sheathing size and type Ceiling ❑ Joist size and spacing Wall ❑ Height/ top plate/ stud size and spacing/ sole plate ❑ Exterior sheathing size and type Floor ❑ Joist size and spacing Foundation Wall ❑ Concrete or Masonry unit width ❑ Earth to wood separation distance Footing ❑ Size Radon ❑ Passive system with 6mil vapor barrier Miscellaneous Construction Details ❑ Deck: ❑ Floor plan/ side view/ dimensions ❑ Floor Joist/ decking direction, size and spacing ❑ Stairway tread rise & run and nosing ❑ Window and door location and sizes ❑ Window well locations if applicable ❑ Room usage labels ❑ Smoke detector locations ❑ Attic and crawl space access locations ❑ Fire Wall construction ❑ Ridge, eave and valley lines ❑ Beam and girder size and location ❑ Truss or rafter size, spacing & connection ❑ Attic insulation/ air space baffle/ ventilation ❑ Size of ceiling gypsum wall board ❑ Siding/ exterior house wrap/ anchor bolts ❑ Insulation, vapor barrier, gypsum wall board ❑ Sheathing or concrete floor size/ insulation ❑ Footing bottom to finished ground level depth ❑ Horizontal & vertical reinforcement if any ❑ Reinforcement if any ❑ Active system with 6 mil vapor barrier ❑ Footings/ post/ and beam size and locations ❑ Handrail / Guard height & spacing SjJiiie roje#_ ! O0t `"O1.�0 RECF1VED Valley { CSV PE L 1 LW Residential Driveway PAVING WAIVER Commu ity Development — Planning Division 11703 E Sprague Ave Suite B-3 • Spokane Valley WA 99206 509.720.5026 ♦ Fax: 509.688.0037 ♦ planning@spokanevallev.org r~I(R I Spokane Valley Municipal Code (SVMC) Section 1 .40.020.8; "All residential driveway and off-street parking areas shall be paved with asphalt, Portland cement, grasscrete, paver blocks or other equivalent hard surface material". A paving waiver can only be granted if the structure you are proposing is not going to require a driveway for daily use. — OWNER INFORMATION OWNER NAME: Cil/ ' Lee(fi in 9• Sr/e0 NCT PARCEL #: 4/53 L //03 ADDRESS: 3995 S', S' 'D O w/V V/¢, CITY: \ po K4 NF Vp L L i STATE: bid ZIP: gPo i°0%C:Jgog-?2r$ F 'fiML ge-9C-3‘1( EMAIL> S)11.355 FRati77 £R, Cc2i» PART II —DETAILS OF PAVING WAIVER 1. Do you have an existing garage for parking daily use vehicles? Ft YES 1 1 NO 2. Is the proposed detached structure used for storage only? YES ❑ NO 3. Do you plan on using the detached structure to park vehicles? n YES ❑ NO If yes, then what type of vehicles? -IA'A/L£%15,7 4 2170/, L�9W'Nm eu/E'ie 4. Do you plan to conduct a business from proposed detached structure? YES 0 NO If so, what is the nature of your business? �// PART III —AUTHORIZATION I,(PRINT NAME) at i. A/rl . Re.✓G owner, hereby confirm that the information provided on this form is true and correct. I acknowledge that any change in the foregoing conditions, could require the City to impose paving requirements. I further agree to report any change in these conditions to the Spokane Valley Com r ni y • vlopment Department, Planning Division, within 30 days. Ownei ignature Date PART IV — DECISION STAFF HAS REVIEWED THE PROPOSED PAVING WAIVER ON BEHALF OF THE COMMUNIT`' DEVELOP,MNT DIRECTOR AND FIND THE REQUEST IS GRANTED AT SAID ADDRESS FOR PERMIT #: rl I(*)11, h Planning Division Staff Signature 37314\ Date Created 6/27/11 Page 1 of 1