2012, 05-24 Permit: SW-12001414 SewerSPOKANE COUNTY BUILDING AND PLANNING
PERMIT
Application Number: SW -12001414
Permit Issued Date:
05/24/2012
Expiration Date:
Project Description:
Project Name:
Permit Type:
SEWER CONNECTION
PONDEROSA 1ST ADDITION
SEWER
Primary Contact:
Applicant:
Address:
Phone:
Email:
HALF MOON CONSTRUCTION &
LEASING INC
HALF MOON CONSTRUCTION &
LEASING INC
101 E MAGNESIUM
SPOKANE-, WA 99218
(509)467-3800
SITE INFORMATION:
Site Address:
Parcel Number:
Subdivision:
Assessor's Description:
Inspection Area:
Zoning:
4015 S SUNDOWN DR
45324.0303
HOLMES SUBDIVISION
PONDEROSA 1ST ADD L3 B3
Owner:
Address:
Phone:
Email:
MOORE, FRANK J & JEANNE M
20702 E WELLESLEY AVE
OTIS ORCHARDS, WA 99027-9646
Water District: Spokane Fire District: Fire District 1
County Water District #3
Land Area: 0.3444 acres / 15000 sgft
CONTRACTOR INFORMATION:
General Contractor
HALFMCL053N8
*HALF MOON CONSTRUCTION & LEASING INC.
101 E MAGNESIUM, SUITE 200
SPOKANE, WA 99218
DETAILS:
Class
Type
Quantity Unit Charge Value
SEWER SEWER CONNECTION
FEE DETAIL:
Processing - Utilities
Utilities Permit
1 $125.00 $125.00
Total Fee:
$125.00
$25.94
$125.00
$150.94
CONDITIONS:
CALL 1-800-424-5555 BEFORE YOU DIG --AT LEAST 2 WORKING DAYS IN ADVANCE. SPOKANE COUNTY CODE REQUIRES THE
INSTALLER COMPLY WITH ALL REQUIREMENTS OF THE WA STATE DEPT OF LABOR & INDUSTRIES, INCLUDING THOSE
RELATED TO TRENCH SAFETY.
FOR SEWER INSPECTIONS CALL THE UTILITIES DEPT AT (509) 477-3604 FROM 8:30-5:00 MONDAY -FRIDAY PRIOR TO COVER.
ONE WORKING DAY NOTICE REQUIRED. PERMIT ALLOWS FOR A 30 -MINUTE INSPECTION. ADDITIONAL INSPECTION FEES
APPLY AFTER 30 MINUTES.
Date Printed: 05/24/2012 09:59:33
Printed by: IIS APPPOOL\ASP.NET v4.0
SPOKANE COUNTY BUILDING AND PLANNING
PERMIT
Permit Issued Date:
Application Number: SW -12001414 05/24/2012
Expiration Date:
INSTALLER IS RESPONSIBLE TO INSURE ALL WASTEWATER DRAINS ARE CONNECTED TO THE SEWER AND MAY BE REQUIRED
TO PERFORM TESTS FOR VERIFICATION. INSTALLER IS TO FIELD LOCATE AND CONFIRM THE ELEVATION AND POSITION OF
SEWER STUB PRIOR TO ANY OTHER EXCAVATION.
SEWER STUBS AND DRY SIDE SEWERS ARE TO BE CHECKED PRIOR TO CONNECTION TO ENSURE THAT THEY HAVE
ACCEPTABLE GRADE AND ARE CLEAR AND UNOBSTRUCTED. SEWER LINES SHOULD BE CONSTRUCTED TO ALLOW FOR
GRAVITY FLOW FROM THE LOWEST LEVEL OF THE STRUCTURE.
THE INSTALLER AND THIS PERMIT MUST BE PRESENT AT THE JOB SITE AT THE SCHEDULED INSPECTION TIME. BOTH STATE
LAW RCW 19.122 AND COUNTY CODE REQUIRES THE INSTALLER TO GIVE NOTICE OF EXCAVATION TO OWNERS OF
UNDERGROUND FACILITIES.
Date Printed: 05/24/2012 09:59:33
Printed by: IIS APPPOOL\ASP.NET v4.0