Loading...
2012, 05-24 Permit: SW-12001414 SewerSPOKANE COUNTY BUILDING AND PLANNING PERMIT Application Number: SW -12001414 Permit Issued Date: 05/24/2012 Expiration Date: Project Description: Project Name: Permit Type: SEWER CONNECTION PONDEROSA 1ST ADDITION SEWER Primary Contact: Applicant: Address: Phone: Email: HALF MOON CONSTRUCTION & LEASING INC HALF MOON CONSTRUCTION & LEASING INC 101 E MAGNESIUM SPOKANE-, WA 99218 (509)467-3800 SITE INFORMATION: Site Address: Parcel Number: Subdivision: Assessor's Description: Inspection Area: Zoning: 4015 S SUNDOWN DR 45324.0303 HOLMES SUBDIVISION PONDEROSA 1ST ADD L3 B3 Owner: Address: Phone: Email: MOORE, FRANK J & JEANNE M 20702 E WELLESLEY AVE OTIS ORCHARDS, WA 99027-9646 Water District: Spokane Fire District: Fire District 1 County Water District #3 Land Area: 0.3444 acres / 15000 sgft CONTRACTOR INFORMATION: General Contractor HALFMCL053N8 *HALF MOON CONSTRUCTION & LEASING INC. 101 E MAGNESIUM, SUITE 200 SPOKANE, WA 99218 DETAILS: Class Type Quantity Unit Charge Value SEWER SEWER CONNECTION FEE DETAIL: Processing - Utilities Utilities Permit 1 $125.00 $125.00 Total Fee: $125.00 $25.94 $125.00 $150.94 CONDITIONS: CALL 1-800-424-5555 BEFORE YOU DIG --AT LEAST 2 WORKING DAYS IN ADVANCE. SPOKANE COUNTY CODE REQUIRES THE INSTALLER COMPLY WITH ALL REQUIREMENTS OF THE WA STATE DEPT OF LABOR & INDUSTRIES, INCLUDING THOSE RELATED TO TRENCH SAFETY. FOR SEWER INSPECTIONS CALL THE UTILITIES DEPT AT (509) 477-3604 FROM 8:30-5:00 MONDAY -FRIDAY PRIOR TO COVER. ONE WORKING DAY NOTICE REQUIRED. PERMIT ALLOWS FOR A 30 -MINUTE INSPECTION. ADDITIONAL INSPECTION FEES APPLY AFTER 30 MINUTES. Date Printed: 05/24/2012 09:59:33 Printed by: IIS APPPOOL\ASP.NET v4.0 SPOKANE COUNTY BUILDING AND PLANNING PERMIT Permit Issued Date: Application Number: SW -12001414 05/24/2012 Expiration Date: INSTALLER IS RESPONSIBLE TO INSURE ALL WASTEWATER DRAINS ARE CONNECTED TO THE SEWER AND MAY BE REQUIRED TO PERFORM TESTS FOR VERIFICATION. INSTALLER IS TO FIELD LOCATE AND CONFIRM THE ELEVATION AND POSITION OF SEWER STUB PRIOR TO ANY OTHER EXCAVATION. SEWER STUBS AND DRY SIDE SEWERS ARE TO BE CHECKED PRIOR TO CONNECTION TO ENSURE THAT THEY HAVE ACCEPTABLE GRADE AND ARE CLEAR AND UNOBSTRUCTED. SEWER LINES SHOULD BE CONSTRUCTED TO ALLOW FOR GRAVITY FLOW FROM THE LOWEST LEVEL OF THE STRUCTURE. THE INSTALLER AND THIS PERMIT MUST BE PRESENT AT THE JOB SITE AT THE SCHEDULED INSPECTION TIME. BOTH STATE LAW RCW 19.122 AND COUNTY CODE REQUIRES THE INSTALLER TO GIVE NOTICE OF EXCAVATION TO OWNERS OF UNDERGROUND FACILITIES. Date Printed: 05/24/2012 09:59:33 Printed by: IIS APPPOOL\ASP.NET v4.0