1979, 06-29 Permit App: N3968 Residence Cour of Spokane, Washinon
BUILDING CODES DEPARTMENT, N. 811 JEFFERSON, SPOKANE, WASHINGTON 99260
APPLICATION FOR LAND USE OR STRUCTURE PERMIT
GENERAL REQUIREMENTS PERMIT FEE X21 .,X.(_-_
PERMIT REQUIRED.A land use or structure permit is required by County Resolution to erect a building or structure of any kind or alter any building
or structure already erected, or to change a land use. Construction must conform with the Spokane County Building Code and Zoning Ordinance. Con-
struction must have inspections.
WATER. Water supply must be approved by the County and State Health Departments.Where work on water connections disturbs the surface, shoulders
or ditches of County Roads,permission must be obtained from the County Engineer's Office.
SEWAGE SYSTEM.Permits are required in all cases by County Resolutions Nos.45-133 and 47-235.
SET-BACK FROM PROPERTY LINES. In most zones and under most circumstances, a set-back from the front property line is required. See current
Spokane County Zoning Ordinance for all required set-backs.
STATE HIGHWAYS. Where the structure abuts a State Highway, clearance must be obtained pertaining to set-back and ingress and egress.
COUNTY ROADS.Work on street right-of-way may not be performed until staked by County Road Department and work must be performed in accordance
with stakes.Points of ingress and egress must be approved by the County Engineer.
MOVING OF BUILDINGS. A permit is required to move an existing building. When a building is moved on a County or State Highway, clearance must
be obtained from the County Engineer and/or State Highway Department.
ACCESSORY BUILDINGS.Accessory building(garages,sheds,etc.)require a separate permit.
RESTRICTIVE COVENANTS. Builders should check provisions of covenants or dedications and easements running with the land which are enforceable
through civil action.County Officials can not bring action to enforce covenants or dedications.
APPLICANT FILL IN�n BELOWL�F THIS LINE �r
Name of Owner d t v ,Address 9G� ��,�t1 I Q _ Phone 7 -4/z-2 Z_
Architect _ Address Phone
Engineer_ Address Phone
Contractor Address Phone
Legal Description of Property Give complete description from deed, tax receipt, etc.) Parcel Number c O 3251-1.5'90at3
L Ac...,./N. 2 . Po a d et— 74-x. � '✓cl, - -
DESCRIPTION OF WORK: NewAddition _ Remodel Moving Bldg. Zone ...__ Fire Zone .3
Size of Lot _ /SJ0 )c Z-_0 Sewage System '7'P//c, Const. '
(Fr., Coni c., Br., etc.)
Stc3y ri*/y ,Dimensions )'l3 try 2 x` Z.' Total Sq. Ft.2 ... Valuation_� c� ••
Rooms '7 Baths. Basement Pa i--'f Foundation Const. ?CT?►rif -- Chimney Fireplace
(Full, part, node) ( � (Nu er
Heat. System f �1 1C . Type of Roofing g 44 k lJ_ Ext. Finish ..(.1)004- Int. Wall Finish She' I2DC/�
Use of Bldg. ,w�'1 d �. /1 PSP —G Gr- 4 PEc Ir✓ A- rtici-I4L:) No. of UnitsL Bedrooms
ROADWAY R/W WIDTH .14451 Sb t
PLOT PLAN
Draw sketch with dimensions showing: (1) property lines; (2) street or road locations; (3) location of existing and
proposed buildings; (4) distance to property lines and streets; (5) dimensions of buildings; (6) location of sewage sys-
tem and water supply lines.
NORTH State License No.
40
/ r Ina. Ins. Acct. No.
SC.-- '4°- G G�N.e. o l� tZhcE
(REBID N - COMMERCIAL
REQUIRED
P by+ i0/a: Plumbing Permit
Heating Permit
m
v+ N Sewage Permit
-I -
Plans Received
Plans Checked
Plans Returned
Plans Picked Up
! Plans Mailed
l I
SOUTH
I hereby c ify in rrmation subilitted is correct and there are no other structures located on this property except
as shown.
!i /km Ad . E 291979
Owner or Ag, Date
A LAND USE OR STRUCTUR PERMIT MUST BE ON THE PREMISES BEFORE CONSTRUCTION COMMENCES.
THIS IS NOT WAIT. PERMITS ARE NON-REFUNDABLE AND NON-TRANSFERABLE
61V 1'4- ° DO NOT WRITE BELOW THIS LINE
Your street address will be S_ !ZQ / SLAPII/E- The zone is Ar4.11gICIALIVAL.—'S(/E'
Sewage Permit Number Issued Building Permit /Li:WO Receipt 5-0 6.,2 7 Issued
Remarks
4
...._ .... __....._.
..- - • * It .......0. ___---,----- .___
•
r1
,•.•...,,,-. .
, • i
; .
1 k
. 1
, .
. : 1
r7
--'-'7.--- . .
. ,
.... 1 7/ IV •.
.- .. ..,.
. !
• v.. I
I
' ' IC-.3 •
N., t
I \II
I.
'1 1
.,.
1 0 \
01 i
1 1 k \
I 1 ,
. .
i .
. \
t Ce
.
I ,
i
.. ,,
I .
I
,
. , a
H
.
C Ctk 3 a . friOct e._ '`. •
0 i
, 1 .
.2.3f , ..
_
1 ...._______ ,. ...,,/_ .
• Cat.xtkv.. 1 - •
; • g-' I, - -11_
i1 . I
le \ .
1 ;
I 3o
. ; 1 'i •
1 ; , 1 1 •
te L _
_,..
_.c..'(-4 P.. I 4 n . 0 Q. , J e. .
. .. ...),
.
. 071 P4-, ),
10-/ _ , . 0...
_ . _ . . . •
1 . 3 _Pi - -erpf2i..5eS _L.. ,-7
c.. ./ /0 ci‹ .2, (---
.., _,
i ......