Loading...
1979, 06-29 Permit App: N3968 Residence Cour of Spokane, Washinon BUILDING CODES DEPARTMENT, N. 811 JEFFERSON, SPOKANE, WASHINGTON 99260 APPLICATION FOR LAND USE OR STRUCTURE PERMIT GENERAL REQUIREMENTS PERMIT FEE X21 .,X.(_-_ PERMIT REQUIRED.A land use or structure permit is required by County Resolution to erect a building or structure of any kind or alter any building or structure already erected, or to change a land use. Construction must conform with the Spokane County Building Code and Zoning Ordinance. Con- struction must have inspections. WATER. Water supply must be approved by the County and State Health Departments.Where work on water connections disturbs the surface, shoulders or ditches of County Roads,permission must be obtained from the County Engineer's Office. SEWAGE SYSTEM.Permits are required in all cases by County Resolutions Nos.45-133 and 47-235. SET-BACK FROM PROPERTY LINES. In most zones and under most circumstances, a set-back from the front property line is required. See current Spokane County Zoning Ordinance for all required set-backs. STATE HIGHWAYS. Where the structure abuts a State Highway, clearance must be obtained pertaining to set-back and ingress and egress. COUNTY ROADS.Work on street right-of-way may not be performed until staked by County Road Department and work must be performed in accordance with stakes.Points of ingress and egress must be approved by the County Engineer. MOVING OF BUILDINGS. A permit is required to move an existing building. When a building is moved on a County or State Highway, clearance must be obtained from the County Engineer and/or State Highway Department. ACCESSORY BUILDINGS.Accessory building(garages,sheds,etc.)require a separate permit. RESTRICTIVE COVENANTS. Builders should check provisions of covenants or dedications and easements running with the land which are enforceable through civil action.County Officials can not bring action to enforce covenants or dedications. APPLICANT FILL IN�n BELOWL�F THIS LINE �r Name of Owner d t v ,Address 9G� ��,�t1 I Q _ Phone 7 -4/z-2 Z_ Architect _ Address Phone Engineer_ Address Phone Contractor Address Phone Legal Description of Property Give complete description from deed, tax receipt, etc.) Parcel Number c O 3251-1.5'90at3 L Ac...,./N. 2 . Po a d et— 74-x. � '✓cl, - - DESCRIPTION OF WORK: NewAddition _ Remodel Moving Bldg. Zone ...__ Fire Zone .3 Size of Lot _ /SJ0 )c Z-_0 Sewage System '7'P//c, Const. ' (Fr., Coni c., Br., etc.) Stc3y ri*/y ,Dimensions )'l3 try 2 x` Z.' Total Sq. Ft.2 ... Valuation_� c� •• Rooms '7 Baths. Basement Pa i--'f Foundation Const. ?CT?►rif -- Chimney Fireplace (Full, part, node) ( � (Nu er Heat. System f �1 1C . Type of Roofing g 44 k lJ_ Ext. Finish ..(.1)004- Int. Wall Finish She' I2DC/� Use of Bldg. ,w�'1 d �. /1 PSP —G Gr- 4 PEc Ir✓ A- rtici-I4L:) No. of UnitsL Bedrooms ROADWAY R/W WIDTH .14451 Sb t PLOT PLAN Draw sketch with dimensions showing: (1) property lines; (2) street or road locations; (3) location of existing and proposed buildings; (4) distance to property lines and streets; (5) dimensions of buildings; (6) location of sewage sys- tem and water supply lines. NORTH State License No. 40 / r Ina. Ins. Acct. No. SC.-- '4°- G G�N.e. o l� tZhcE (REBID N - COMMERCIAL REQUIRED P by+ i0/a: Plumbing Permit Heating Permit m v+ N Sewage Permit -I - Plans Received Plans Checked Plans Returned Plans Picked Up ! Plans Mailed l I SOUTH I hereby c ify in rrmation subilitted is correct and there are no other structures located on this property except as shown. !i /km Ad . E 291979 Owner or Ag, Date A LAND USE OR STRUCTUR PERMIT MUST BE ON THE PREMISES BEFORE CONSTRUCTION COMMENCES. THIS IS NOT WAIT. PERMITS ARE NON-REFUNDABLE AND NON-TRANSFERABLE 61V 1'4- ° DO NOT WRITE BELOW THIS LINE Your street address will be S_ !ZQ / SLAPII/E- The zone is Ar4.11gICIALIVAL.—'S(/E' Sewage Permit Number Issued Building Permit /Li:WO Receipt 5-0 6.,2 7 Issued Remarks 4 ...._ .... __....._. ..- - • * It .......0. ___---,----- .___ • r1 ,•.•...,,,-. . , • i ; . 1 k . 1 , . . : 1 r7 --'-'7.--- . . . , .... 1 7/ IV •. .- .. ..,. . ! • v.. I I ' ' IC-.3 • N., t I \II I. '1 1 .,. 1 0 \ 01 i 1 1 k \ I 1 , . . i . . \ t Ce . I , i .. ,, I . I , . , a H . C Ctk 3 a . friOct e._ '`. • 0 i , 1 . .2.3f , .. _ 1 ...._______ ,. ...,,/_ . • Cat.xtkv.. 1 - • ; • g-' I, - -11_ i1 . I le \ . 1 ; I 3o . ; 1 'i • 1 ; , 1 1 • te L _ _,.. _.c..'(-4 P.. I 4 n . 0 Q. , J e. . . .. ...), . . 071 P4-, ), 10-/ _ , . 0... _ . _ . . . • 1 . 3 _Pi - -erpf2i..5eS _L.. ,-7 c.. ./ /0 ci‹ .2, (--- .., _, i ......