Loading...
2014, 12-04 Permit: SW-14001698 SewerSPOKANE COUNTY UTILITIES PERMIT Application Number: SW -14001698 Permit Issued Date: 12/04/2014 Expiration Date: 12/04/2015 Project Description: Project Name: Primary Contact: Phone: SEWER CONNECTION SHP-09-10 CRAPO, DENNIS A & MELISSA A Applicant: CRAPO, DENNIS A & MELISSA A Address: 15808 E 4TH AVE SPOKANE VALLEY, WA 99037 Phone: Email: SITE INFORMATION: Site Address: Parcel Number: Assessor's Description: Inspection Area: Zoning: 11303 E SUNDOWN DR 45333.1801 SHP-09-10: LOT 1 (AFN 6092641 - PTN SW1/4 33-25-44) : (509)-477-3675 Owner: CRAPO, DENNIS A & MELISSA A Address: 15808 E 4TH AVE SPOKANE VALLEY, WA 99037 Phone: Email: Water District: Spokane County Water Fire District: Spokane Valley Fire District #3 Land Area: 15720 Square Feet CONTRACTOR INFORMATION: ZEUTSE*960NF, Exp. 08/06/2016 ZEUTSCHEL EXCAVATING 5232 S BEST LN SPOKANE, WA 99206 509-979-6006 copo427@msm.com DETAILS: Class SEWER Type Quantity Unit Charge Value FEE DETAIL: Processing - Utilities Utilities Permit SEWER CONNECTION Total Fee: $26.64 $125.00 $151.64 1 $125.00 $125.00 $125.00 CONDITIONS: Possible Wetland On Site Inside Public Transit Benefit Area Possible FEMA Flood Zone Plan review fee is required for all site plan reviews conducted by Spokane Valley Fire. CALL 1-800-424-5555 BEFORE YOU DIG --AT LEAST 2 WORKING DAYS IN ADVANCE. SPOKANE COUNTY CODE REQUIRES THE INSTALLER COMPLY WITH ALL REQUIREMENTS OF THE WA STATE DEPT OF LABOR & INDUSTRIES, INCLUDING THOSE RELATED TO TRENCH SAFETY. SEWER PERMITS ARE VALID FOR ONE (1) YEAR FROM THE DATE OF ISSUANCE. FOR SEWER INSPECTIONS CALL THE UTILITIES DEPT AT (509) 477-3604 FROM 8:30-5:00 MONDAY -FRIDAY PRIOR TO COVER. ONE WORKING DAY NOTICE REQUIRED. PERMIT ALLOWS FOR A 30 -MINUTE INSPECTION. ADDITIONAL INSPECTION FEES APPLY AFTER 30 MINUTES. Date Printed: 12/04/2014 09:23:14 Project Coordinator: Dawn Dompier SPOKANE COUNTY UTILITIES PERMIT Application Number: SW -14001698 Permit Issued Date: 12/04/2014 Expiration Date: 12/04/2015 INSTALLER IS RESPONSIBLE TO INSURE ALL WASTEWATER DRAINS ARE CONNECTED TO THE SEWER AND MAY BE REQUIRED TO PERFORM TESTS FOR VERIFICATION. INSTALLER IS TO FIELD LOCATE AND CONFIRM THE ELEVATION AND POSITION OF SEWER STUB PRIOR TO ANY OTHER EXCAVATION. SEWER STUBS AND DRY SIDE SEWERS ARE TO BE CHECKED PRIOR TO CONNECTION TO ENSURE THAT THEY HAVE ACCEPTABLE GRADE AND ARE CLEAR AND UNOBSTRUCTED. SEWER LINES SHOULD BE CONSTRUCTED TO ALLOW FOR GRAVITY FLOW FROM THE LOWEST LEVEL OF THE STRUCTURE. THE INSTALLER AND THIS PERMIT MUST BE PRESENT AT THE JOB SITE AT THE SCHEDULED INSPECTION TIME. BOTH STATE LAW RCW 19.122 AND COUNTY CODE REQUIRES THE INSTALLER TO GIVE NOTICE OF EXCAVATION TO OWNERS OF UNDERGROUND FACILITIES. Date Printed: 12/04/2014 09:23:14 Project Coordinator: Dawn Dompier