2014, 10-07 Permit: SW-14001491 SewerSPOKANE COUNTY UTILITIES
PERMIT
Application Number: SW -14001491 Permit Issued Date: 10/07/2014
Expiration Date: 10/07/2015
Project Description: SEWER CONNECTION (MANHOLE CUT -IN)
Project Name: SHP-0009-10/LOT 3
Primary Contact: ELLER CORPORATION
Phone: 509-226-0333
Applicant: ELLER CORPORATION
Address: PO BOX 117
NEWMAN LAKE, WA 99025
Phone: 509-226-0333
Email: linda@ellercorporation.com
SITE INFORMATION:
Site Address:
Parcel Number:
Assessor's Description:
Inspection Area:
Zoning:
11311 E SUNDOWN DR
45333.1803
SHP-09-10: LOT 3 (AFN 6092641 - PTN SW1/4
33-25-44)
: (509)-477-3675
Owner: CRAPO, DENNIS A & MELISSA A
Address: 15808 E 4TH AVE
SPOKANE VALLEY, WA 99037
Phone:
Email:
Water District: Spokane County Water Fire District: Spokane Valley Fire
District #3
Land Area: 13832 Square Feet
CONTRACTOR INFORMATION:
ELLERC*242C3, Exp. 09/30/2016
ELLER CORPORATION
PO BOX 117 NEWMAN LAKE, WA 99025
509-226-0333
linda@ellercorporation.com
DETAILS:
Class
Type
Quantity Unit Charge Value
SEWER MAIN/MANHOLE TAP/CUT-IN 1 $125.00 $125.00
FEE DETAIL:
Processing - Utilities
Utilities Permit
Total Fee:
$26.64
$125.00
$151.64
$125.00
CONDITIONS:
Plan review fee is required for all site plan reviews conducted by Spokane Valley Fire.
Possible FEMA Flood Zone
Possible Wetland On Site
Inside Public Transit Benefit Area
CALL 1-800-424-5555 BEFORE YOU DIG --AT LEAST 2 WORKING DAYS IN ADVANCE. SPOKANE COUNTY CODE REQUIRES THE
INSTALLER COMPLY WITH ALL REQUIREMENTS OF THE WA STATE DEPT OF LABOR & INDUSTRIES, INCLUDING THOSE
RELATED TO TRENCH SAFETY.
SEWER PERMITS ARE VALID FOR ONE (1) YEAR FROM THE DATE OF ISSUANCE. FOR SEWER INSPECTIONS CALL THE UTILITIES
DEPT AT (509) 477-3604 FROM 8:30-5:00 MONDAY -FRIDAY PRIOR TO COVER. ONE WORKING DAY NOTICE REQUIRED. PERMIT
ALLOWS FOR A 30 -MINUTE INSPECTION. ADDITIONAL INSPECTION FEES APPLY AFTER 30 MINUTES.
Date Printed: 10/07/2014 12:05:36 Project Coordinator: Kathy Cummings
SPOKANE COUNTY UTILITIES
PERMIT
Application Number: SW -14001491
Permit Issued Date: 10/07/2014
Expiration Date: 10/07/2015
INSTALLER IS RESPONSIBLE TO INSURE ALL WASTEWATER DRAINS ARE CONNECTED TO THE SEWER AND MAY BE REQUIRED
TO PERFORM TESTS FOR VERIFICATION. INSTALLER IS TO FIELD LOCATE AND CONFIRM THE ELEVATION AND POSITION OF
SEWER STUB PRIOR TO ANY OTHER EXCAVATION.
SEWER STUBS AND DRY SIDE SEWERS ARE TO BE CHECKED PRIOR TO CONNECTION TO ENSURE THAT THEY HAVE
ACCEPTABLE GRADE AND ARE CLEAR AND UNOBSTRUCTED. SEWER LINES SHOULD BE CONSTRUCTED TO ALLOW FOR
GRAVITY FLOW FROM THE LOWEST LEVEL OF THE STRUCTURE.
THE INSTALLER AND THIS PERMIT MUST BE PRESENT AT THE JOB SITE AT THE SCHEDULED INSPECTION TIME. BOTH STATE
LAW RCW 19.122 AND COUNTY CODE REQUIRES THE INSTALLER TO GIVE NOTICE OF EXCAVATION TO OWNERS OF
UNDERGROUND FACILITIES.
Date Printed: 10/07/2014 12:05:36 Project Coordinator: Kathy Cummings