Loading...
2014, 10-07 Permit: SW-14001491 SewerSPOKANE COUNTY UTILITIES PERMIT Application Number: SW -14001491 Permit Issued Date: 10/07/2014 Expiration Date: 10/07/2015 Project Description: SEWER CONNECTION (MANHOLE CUT -IN) Project Name: SHP-0009-10/LOT 3 Primary Contact: ELLER CORPORATION Phone: 509-226-0333 Applicant: ELLER CORPORATION Address: PO BOX 117 NEWMAN LAKE, WA 99025 Phone: 509-226-0333 Email: linda@ellercorporation.com SITE INFORMATION: Site Address: Parcel Number: Assessor's Description: Inspection Area: Zoning: 11311 E SUNDOWN DR 45333.1803 SHP-09-10: LOT 3 (AFN 6092641 - PTN SW1/4 33-25-44) : (509)-477-3675 Owner: CRAPO, DENNIS A & MELISSA A Address: 15808 E 4TH AVE SPOKANE VALLEY, WA 99037 Phone: Email: Water District: Spokane County Water Fire District: Spokane Valley Fire District #3 Land Area: 13832 Square Feet CONTRACTOR INFORMATION: ELLERC*242C3, Exp. 09/30/2016 ELLER CORPORATION PO BOX 117 NEWMAN LAKE, WA 99025 509-226-0333 linda@ellercorporation.com DETAILS: Class Type Quantity Unit Charge Value SEWER MAIN/MANHOLE TAP/CUT-IN 1 $125.00 $125.00 FEE DETAIL: Processing - Utilities Utilities Permit Total Fee: $26.64 $125.00 $151.64 $125.00 CONDITIONS: Plan review fee is required for all site plan reviews conducted by Spokane Valley Fire. Possible FEMA Flood Zone Possible Wetland On Site Inside Public Transit Benefit Area CALL 1-800-424-5555 BEFORE YOU DIG --AT LEAST 2 WORKING DAYS IN ADVANCE. SPOKANE COUNTY CODE REQUIRES THE INSTALLER COMPLY WITH ALL REQUIREMENTS OF THE WA STATE DEPT OF LABOR & INDUSTRIES, INCLUDING THOSE RELATED TO TRENCH SAFETY. SEWER PERMITS ARE VALID FOR ONE (1) YEAR FROM THE DATE OF ISSUANCE. FOR SEWER INSPECTIONS CALL THE UTILITIES DEPT AT (509) 477-3604 FROM 8:30-5:00 MONDAY -FRIDAY PRIOR TO COVER. ONE WORKING DAY NOTICE REQUIRED. PERMIT ALLOWS FOR A 30 -MINUTE INSPECTION. ADDITIONAL INSPECTION FEES APPLY AFTER 30 MINUTES. Date Printed: 10/07/2014 12:05:36 Project Coordinator: Kathy Cummings SPOKANE COUNTY UTILITIES PERMIT Application Number: SW -14001491 Permit Issued Date: 10/07/2014 Expiration Date: 10/07/2015 INSTALLER IS RESPONSIBLE TO INSURE ALL WASTEWATER DRAINS ARE CONNECTED TO THE SEWER AND MAY BE REQUIRED TO PERFORM TESTS FOR VERIFICATION. INSTALLER IS TO FIELD LOCATE AND CONFIRM THE ELEVATION AND POSITION OF SEWER STUB PRIOR TO ANY OTHER EXCAVATION. SEWER STUBS AND DRY SIDE SEWERS ARE TO BE CHECKED PRIOR TO CONNECTION TO ENSURE THAT THEY HAVE ACCEPTABLE GRADE AND ARE CLEAR AND UNOBSTRUCTED. SEWER LINES SHOULD BE CONSTRUCTED TO ALLOW FOR GRAVITY FLOW FROM THE LOWEST LEVEL OF THE STRUCTURE. THE INSTALLER AND THIS PERMIT MUST BE PRESENT AT THE JOB SITE AT THE SCHEDULED INSPECTION TIME. BOTH STATE LAW RCW 19.122 AND COUNTY CODE REQUIRES THE INSTALLER TO GIVE NOTICE OF EXCAVATION TO OWNERS OF UNDERGROUND FACILITIES. Date Printed: 10/07/2014 12:05:36 Project Coordinator: Kathy Cummings