Loading...
2010, 07-29 Permit App: 10002269 Addition Project Number: 10002269 Inv: 1 Application Date: 7/29/2010 Page 1 of 2 THIS IS NOT A PERMIT Penalties will be assessed for commencing work without a permit Project Information: Permit Use: RESIDENTIAL ADDITION Contact: CHRISTIAN,STEVEN B&TAMMY J Address: 3915 N SUNDERLAND DR C-S-Z: SPOKANE VALLEY,WA 99206-4458 Setbacks:Front Left: Right: Rear: Phone: (509)926-8892 Group Name: Project Name: Site Information Plat Key: 002090 Name: Range District: Sout Parcel Number: 45325.2909 Block: Lot: SiteAddress: 3915 S SUNDERLAND RD Owner:Name: CHRISTIAN,STEVEN B&TAMM Address: 3915 N SUNDERLAND DR Location::CSV SPOKANE VALLEY,WA 99206-445 Zoning: R-2 SF Res Suburban District Water District: 098 SPO CO WATER DIST#1 Hold: ❑ Area: 14,000 Sq Ft Width: 100 Depth: 140 Right Of Way(ft): 50 Nbr of Bldgs: 0 Nbr of Dwellings: 1 Review Information: _ Review Building Plan Review Released By: Originally Released: 7/28/2010 By: tmelbourn Septic Sys Review Released By: OWNER HOOKED UP TO SEWER PER EMAIL FROM LANCE @ HEALTH Originally Released: 7/28/2010 By: Lhalsey Landuse/Zoning/HE Conditions Released By: Originally Released: 7/28/2010 By: tschmidt Permits: Operator: jmm Printed By: JD Print Date: 7/29/2010 Project Number: 10002269 Inv: 1 Application Date: 7/29/2010 Page 2 of 2 THIS IS NOT A PERMIT Penalties will be assessed for commencing work without a permit —— Building Permit Contractor: OWNER Firm: OWNER Phone: (000)000-0000 This Application: Total Project: Description Grp Type Notes Sq Ft Valuation Sa Ft Valuation COV DECK R-3 VB 338 $5,070.00 338 $5,070.00 RES ADD R-3 VB 141 $13,951.95 141 $13,951.95 Totals: 479 $19,021.95 479 $19,021.95 Item Description Units Unit Desc Fee Amount RESIDENTIAL PERMIT FEE 1 SELECT $321.25 WSBCC SURCHARGE 1 SELECT $4.50 SF PLNS RVW<7999 SQ FT 1 SELECT $128.50 Permit Total Fees: $454.25 Payment Summary: Permit Type Fee Amount Invoice Amount Amount Paid Amount Owing Building Permit $454.25 $454.25 $188.82 $265.43 $454.25 $454.25 $188.82 $265.43 Disclaimer: Submittal of this application certifies the owner(or person(s)authorized by the owner)has both examined and finds the information contained within to be true and correct,and agrees that all provisions of laws and/or regulations governing this type of work will be complied with. Subsequent issuance of a permit shall not be construed to be a permit for,or an approval of,any violation of any of the provisions of the code or of any other state or local laws or ordinances. Signature: Operator: jmm Printed By: JD Print Date: 7/29/2010 CITY Spokane (Staff Use Only PERMIT NUMBER: � ��� Valley PERMIT FEE: it F- CITY OF SPOKANE VALLEY "Si P R AT EN b't. Community Development Department Permit Center1L 20111 Avenue Suite B-3 11703 East Sprague i � ' f -� r ICS- z Spokane Valley, WA 99206 Tel: (509) 688-0036 Fax: (509) 688-0037 permitcenter@ispokanevalley.orq RESIDENTIAL CONSTRUCTION PERMIT APPLICATION El NEW CONSTRUCTION El ADDITION/REMODEL ❑ ACCESSORY BUILDING Z DECK ❑ OTHER SITE ADDRESS:3915 S. SUNDERLAND DRIVE SPOKANE VALLEY WA 99206-8629 ASSESSORS PARCEL NO.:45325.2909 LEGAL DESCRIPTION:PONDEROSA 8TH ADD LOT 9, BLK 2 BUILDING OWNER NAME:STEVEN B AND TAMMY J CHRISTIAN NAME:STEVEN B AND TAMMY J CHRISTIAN ADDRESS:3915 S SUNDERLAND DRIVE Crrv:SPOKANE VLY STATE:WA ZIP:99206-8629 PH0NE:509-926-8892 FAx:509-926-6090 CELL:509-981-1251 CONTACT NAME:STEVE CHRISTIAN PH0NE:509-926-8892 FAx:509-926-6090 CELL:509-981-1251 CONTRACTOR NAME: SELF-OWNER MAILING ADDRESS: CITY: STATE: ZIP: PHONE: FAX: CELL: CONTRACTOR LICENSE No.: EXPIRES: CITY BUSINESS LICENSE NO.: DESCRIBE THE SCOPE OF WORK IN DETAIL AND INDICATE USE: SCOPE: FAMILY ROOM ADDITION AND REPLACE EXISTING PATIO COVER WITH A ROOF ADDITIONAL LIVING SPACE PROPOSED USE: SAME AS ABOVE Fffartiva(lrfnhar 7R. 7(1(17 Pana 1 of 7 fJ ****YOU MUST COMPLETE THE FOLLOWING**** MARK N/A IF NOT APPLICABLE Height to Peak:14' Dimensions:20'x24' No. of Stories:1 Total Habitable Space:153 SQ FT Main Floor SQ FT:N/A Upper Floor SQ FT:N/A Unfinished Basement Finished Basement 14( SP ion SQ FT:N/A SQ FT:N/A Garage SQ FT:N/A Deck/ overed Patio Impervious Surface 30% Slopes on SQ FT. 3 3 8 Area: Property:No No. of Bedrooms:N/A Constru Heat Source:FA Sewer or Type:FAME Septic:sEwER TOTAL COST OF PROJECT: $30000.00 DISCLAIMER The permitted verifies,acknowledges and agrees by their signature that: 1) if this permit is for construction or on a dwelling,the dwelling is/will be served by potable water. 2) Ownership of this City of Spokane Valley permit inure to the property owner. 3) The signatory is the property owner or has permission to represent the property owner in this transaction. 4) All construction is to be done in full compliance with the City of Spokane Valley Development code. Referenced codes are available for review at the City of Spokane Valley Permit Center. 5) The City of Spokane Valley permit is not a permit or approval for any violation of federal, state or local laws, codes or ordinances. 6) Plans or additional information may be re. • . +. be submitted and subsequently approved before this application can be processed. Signatu Date: Method of payment: 0 Cash 0 Check 0 Visa ❑ Mastercard Bankcard #: EXP: VIN#: Authorized Signature: Fifer-five f)rtnher 7R_ 7nn7 Pane 7 of 7 • — — PLANNING DEPT. APPROVED a� lTID REVISIONS Si""N i f.`0 y jut t 201' e; _l�_ , DATE: 7/245/0 4:a`or'- ----- 1 E -- -- __ �,.�_—_� BL MAY IArT BE 6COPYCEED. 5,�1!'I1"?I'I.tr__._– — APU MAY NOT BE i%fD,COPED.OR 100.00 PLTEIEDNANY WAY wild T WHTTEN PICES HOR FBOM 1 i ADESCNLL Rf31TS IESERVEDEST �w c E 1 {n V? C ' w z —i i1 3 e -I ° 2 > �o WN 81 1 , hi co 3 I3� oLLe � _ 48'-6" x 24' 0" x 2l' 6" Y w0` d J L r, cliZ NEW DECK \•Sia�g�7C/ - a N N 1IN FLOOR __ I "�—n o J 1DDITION ................ o, .. ' LJJ a 0 V mx vp ia o � o O EXISTING O Z (V v RESIDENCE r, LIU g W Q ZZ ='—r-�- Q c=i� a) I— 0 .J N Z - WALKWAYIVEWAY J Ce If) _ D- 1A�� V` V 16'-8" 63'-9" I9'-1" x 1 1 MATTHEW 724 O EVERY ONE WHO WARS THESE WORDS OF MINE AND DOES m THEM WLL BE LKE A WEE cel MAN WHO BULT HS HOUSE UPON TFE ROCK..____ L— 1 1 — — 100.00' DRAWN BY _ _— -- -- — -- — C.R.S. W CHECKED BY O.n.T DATE 4-24-10 JOB NO. 1014-STC SITE PLAN SHEET NO. SCALE: I" = 20'-0" C Eli 1 For City Use Only ' CITY OF PLUS Project Number =r Project Address �` • •'''400000 a Q 11703 E Sprague Ave Suite B-3 • Spokane Valley WA 99206 509.688.0036 ♦ Fax: 509.688.0037 ♦ permitcenter@spokanevalley.org As part of our on-going commitment to customer service during the review process of your project application, we are providing you with a TARGET DATE for the initial technical application review. If for any reason we cannot meet this date, we will contact you with a revised target date. Your application review TARGET DATE is The TARGET DATE is the date we estimate your project application will have had its initial technical review. It is not the date for approval or permit issuance. Tips for a Smoother Project Application Review ➢ Submit complete, accurate plans and documents. Extra time may be required for re-submittals as project application reviewers work on multiple applications and it may be several days before they can look at your new or revised information. ➢ Designate a specific contact person to communicate with the City. While the person designated as the applicant's contact person with the City can be changed, one individual with the expertise for dealing with reviewer comments would be the best choice for the entire review process. > Call staff regarding the status of your project only after the target date shown at the top of the page. Although you should be contacted on or by the target date,please feel free to contact us if you haven't heard from us by your target date. Staff may contact you before the target date if the initial review is complete. By following this procedure,you will save time and allow the reviewers to complete the work more expeditiously. Steps in the Permit Process 1. Counter Complete. Your application has been accepted as counter complete. This means all of the required documents, as indicated on your Pre-Application Checklist have been submitted or have been approved for deferred submittal. This does not prevent technical staff from requesting additional information as a result of their technical review. 2. Quality Check. The next step in the process is a quality check to make sure that the application is reviewable and free from substantive flaws that would prevent technical staff from completing the technical review once it is started. When this step is complete, your application will be routed to the appropriate staff and remain in their review queue until it comes up for review. 3. Technical Compliance. Once an application is administratively complete, it is routed to technical staff for compliance review. Depending on the type of project, technical staff may include multiple reviewers. You should be contacted by phone,fax, email,or mail by your TARGET DATE once the initial technical compliance review is complete. 4. Permit Issuance. When the technical compliance review of the application is complete, including any subsequent re- submittals, each reviewer will approve their section of the application and route it to the Permit Center. When all sections of the application are received, a Permit Specialist will process the application and contact the person specified on your application for permit pick-up. Information regarding fees and pre-construction meetings (if required) will be provided by the Permit Specialist at that time. WHITE-APPLICANT PINK-BUILDING FILE REV 9/07