Loading...
2015, 01-28 Permit: ROW-2015-0038 ROW City of Spokane Valley "kane Community Development .,,0Valley® 11703 E. Sprague Ave., Suite B-3 Spokane Valley, WA 99206 (509)720-5240 permitcenteraspokanevalley.org ROW-2015-0038 DE-ROW PROJECT NAME: CASCADE CABLE-CONDUIT INSTALL FOR ISSUED: 01/28/2015 SITE ADDRESS: 3407 S SUNDOWN DR SPOKANE VALLEY EXPIRES: PROJECT DESCRIPTION: INSTALL UNDERGROUND CONDUIT FOR AVISTA. EMERGENY REPAIR DUE TO FAULT IN EXISTING POWER LINE. BECUASE OF UNKNOWN LOCATION OF EXISTING UTILITIES,A TRENCH WILL BE MADE IN THE STREET Ftt8P§LIFft5JR1g/QI"IE BETWEEN HOUSES 3411 AND 3403.TEMPORARY REPAIR THAT IS MUTUALLY AGREED UPON WILL BE DONE NOW UNTIL PERMANENT REPAIR CAN BE DONE.APPROVED PER SCOTT WALLACE APPLICANT: Cascade Cable Constructors, Inc. OWNER: COOPER,V H&P E P 0 Box 638 SPOKANE,WA 99210 3407 S SUNDOWN DR 509-991-8301 SPOKANE,WA 99206-9510 GENERAL CONTRACTOR: Cascade Cable Constructors, Inc. License: CASCACC322J2 P O Box 638 Expires: 04/15/2016 SPOKANE,WA 99210 509-991-8301 FEES: Paid Due Right of Way $210.00 $0.00 Totals : $210.00 $0.00 CONDITIONS * *The traffic control plan submitted has been approved for concept only.The Contractor is responsible for determining specific signage and layout as required by the Manual on Uniform Traffic Control Devices(MUTCD),WSDOT specifications and Washington State modifications to the MUTCD.All devices shall conform to the MUTCD and WSDOT specifications. * For all permits that include road obstruction the Contractor shall notify the Spokane Valley Public Information Officer(PIO) at 509.720.5411 within 24 hours of receiving this approval. For any changes to the schedule of the road obstruction the Contractor shall notify the PIO of the change with a minimum of 48 hour notice prior to the road obstruction. The Contractor shall provide the location of the work, expected start and end times and dates of the road obstruction. The PIO will notify the newspaper, school districts, Spokane Valley Police Department, or fire dispatch as necessary. *The City of Spokane Valley may request changes as warranted by traffic conditions and motorist behavior. * If the construction zone is open to traffic before completion of final paving the Contractor shall provide warning signs, as required by the MUTCD and WSDOT specifications. *WSDOT Work Zone Traffic Control Guidelines are available at www.wsdot.wa.gov. For future submittals, please use the "Work Zone Traffic Control Plans(TC-1 —TC-18)if applicable to your project. * Prior to excavation, it is the Contractor responsibility to contact the purveyor of any transmission pipeline that is within 100 feet of permitted work, as per RCW 19.122.033. * * For pavement cuts, as-built drawings (using the current Inland Northwest Regional Pavement Cut Policy template)are required to be submitted to the Right-of-Way Inspector, Scott Wallace,within 15 working days of work being completed.As- builts shall be submitted by email (to swallace@spokanevalley.org), by Fax(509-921-1008)or by dropping off at the Permit Center. Printed by:Patrick Barclay on:01/28/2015 04:21 PM Page 1 of 2 City of Spokane Valley ` kane Community Development DE-ROW 11703 E. Sprague Ave., Suite B-3 Spokane Valley, WA 99206 ROW-2015-0038 (509)720-5240 permitcenter@sookanevalley.org * *All pavement cuts within the City of Spokane Valley right-of-way shall comply with the current adopted Inland Northwest Regional Pavement Cut Policy, or as amended. *All pavement repairs shall be inspected by the City's ROW inspector, Scott Wallace (mobile: 509-869-5373). The Contractor shall notify Mr.Wallace a minimum of 24 hours in advance of the paving. The ownership of a Spokane Valley Development Permit will inure to the property owner. The permit applicant, by definition, is the property owner or an authorized agent of the property owner. It is the responsibility of the applicant/ permittee that the use described on the front of this permit complies with applicable codes and that required inspections are requested. Failure to request inspections as listed below and obtain the necessary approvals before progressing beyond the point where inspections are required and may necessitate removal of certain parts of the construction are the applicant's/permittee's or property owner's expense. Owner/Agent Date: Staff Approval Date: Printed by:Patrick Barclay on:01/28/2015 04:21 PM Page 2of2 11703 E. Sprague Ave., Suite B-3 Receipt Number: 201500211 "Tjjnne Spokane Valley,WA 99206 Y.000Valley® (509)720-5240 permitcenter@spokanevalley.org Payer/Payee: Cascade Cable Constructors, Inc. Cashier: MSWANK Date: 01/28/2015 P 0 Box 638 Payment Type: CREDIT CARD SPOKANE WA 99210 ROW-2015-0038 RIGHT OF WAY PERMIT 3407 S SUNDOWN DR Fee Description Fee Amount Amount Paid Fee Balance Right of Way $210.00 $210.00 $0.00 ROW-2015-0038 TOTALS: $210.00 $210.00 $0.00 TOTAL PAID: $210.00 Printed 01/28/2015 16:19:00 by Mary Swank Page 1 of 1