2015, 08-03 Permit: ROW-2015-0998 Right of WayCommunity Development Department
Permit Center
11703 East Sprague Avenue, Suite 8-3
Spokane Valley, WA 99206
Tel: (509) 688-0036
Fax: (509) 688-0037
nermltcenter0 sookaneva I lev.om
F
ff Use Only)
BER:
RIGHT OF WAY (ROW) PERMIT APPLICATION
APPROACH � PAVEMENT CUT (SEE BELOW) SIDEWALK
CURB & GUTTER WORK THROUGH MANHOLE OTHER
ROAD OBSTRUCTION [M NO ( YES (If yes, complete the following)
ook'I �f j�,,} 1 1;�tS �t % of street or # lanes that will be obstructed:
• Length of time street will be obstructed: ��
b If work closes more than 50% of a local access street, or closes any portion of an arterial street,
then a TRAFFIC PLAN IS REQUIRED (I Pre -Approved TCP Proposed:
PR03ECTADDRESS: 1225 W PARCEL NUMBER:
START DATE: a-3 -
ANTICIPATED COMPLETION DATE: 41-c
PROJECT DESCRIPTION: C1 re 90' r.. U j,4l s prrrs � Rd )
PROPERTY OR BUILDING OWNER INFORMATION (IF APPLICABLE)
NAME:
7;Y,7, 4 los-,
MAILING ADDRESS: CITY: STATE: ZIP:
fgL-PZI
FAX:
CELL:
CONTRACTOR INFORMATION L0MG45t 60-bl e
m
NAME: ,..7QnGo� MtiAAiC[L�'/+DAS Q' QQ /
MAILING ADDRESS: 30Jq N. rjow &A CITY: 5ap�gge �A�/ STATE: M9. ZIP: ! /Z%O
PHONE: 509 - 53,2 - 630 b FAX: 509-53.2-19515 CELL:
CONTRACTOR LICENSE NO.: 60 9a `7 t 4 1 EXPIRES: ' CITY BUSINESS LICENSE NO.: 5EFNt I flim
BOND/INSURANCE CERTIFICATE # (per SVMC Title 10Article 2):
CONTACT NAME: / 014A 13ren1)ap, PHONE: .2019- 683' 7959
ROW -lot s- o 4 9 S
73
Modified April 14, 2014 Page 1 of 2
http://www Spokanevalley orq/fiilestorage/124/938/210/948/1496/2831/ROWPA.doc
XM,, _ 01 u ■ • • i
NATURE OF WORK:
circle one
Gas
Electric
Water
CAN
Communication
Sewer
Other
TYPE OF CUT/REPAIR:
Asphalt
Gravel
Concrete
Other
circle one
SIZE OF CUT
w x en
STAFF TO COMPLETE:
ROAD TIER: PAVEMENT CUT POLICY APPLIES?.
nTc_r_al AIMEQ
The permitted verifies, acknowledges and agrees by their signature that: 1) If this permit Is for construction or on a dwelling, the dwelling is/will
be served by potable water. Z) Ownership of this City of Spokane Valley permit Inures to the property owner, 3) The signatory Is the property
owner or has permission to represent the property owner In this transaction. 4) All construction is to be done in full compliance with the City of
Spokane Valley Development code. Referenced codes are available for review at the City of Spokane Valley Permit Center. 5) The City of
Spokane Valley permit Is not a permit or approval for any violation of federal, state or local laws, codes or ordinances. 6) Plans or additional
Information may be required to be submitted and subsequently approved before this application can be processed.
EXPIRATION
Rlght-of-way permits Issued between April 1" and September 30•' are valid for 30 days after the date of Issuance, with a one-time 30 -day
extension available. Right-of-way permits Issued between October 1'! and March 31" are valid until the following April 3&.
licant Signature:
Date: /-3u' zo/ S
Method of payment: ❑ Cash ❑ Check ❑ Visa** ❑ Mastercard**
** If paying with credit card, the City will call for credit card information when the permit Is ready to be issued.
PLEASE FAX TO CITY OF SPOKANE VALLEY (509) 688-0037 UPON COMPLETION
Modified April 14, 2014 Page 2 of 2
http//www sNkanevalley ora/filestQraae/124/`938/21U/948/1496/2831/ROWPA doc
N
11-01-12;09:06AM;SEFNCO-Spokane
15094777198 ;5095328515 # 5/ 5
=fl to
;'�Iltllr a :;y�'�fQ0�11
1
1•iii/��F.r Ltiiy ..