Loading...
2008, 06-13 Permit App: 08002217 DeckProject Number: 08002217 Inv: I Application Date: 6/13/2008 Page 1 of 2 THIS IS NOT A PERMIT Penalties will be assessed for commencing work without a permit Project Information: - Permit Use: COVERED DECK OFF NEW ADDITION 10 X 14.5 Contact: PATTERSON, BILL & SANDEE Address: 4615 N SUNNYVALE C - S - Z: SPOKANE VALLEY, WA 99216 Setbacks: Front Left: Right: Rear: Phone: (609) 926-5252 Group Name: Site Information: Project Name: Plat Key: 003345 Name: SUNNYVALE ACRES District: East Parcel Number: 45011.0911 Block: Lot: SiteAddress: 4615 N SUNNYVALE DR Owner: Name: PATTERSON, BILL & SANDEE Address: 4615 N SUNNYVALE Location:: CSV SPOKANE VALLEY, WA 99216 Zoning: R-3 . SF Res District Water District: 134 CONSOLIDATED ID #19 Hold: ❑ Area: 1,320.00 Acres Width: 0 Depth: 0 Right Of Way (ft): 60 Nbr of Bldgs: 1 Nbr of Dwellings: 1 Review Information: Review Building Plan Review Originally Released: Landuse/Zoning/HE Conditions Released'By: 6/11/2008 By: tmelbourn Released By: Originally Released: 6/13/2008 By: tschmidt Permits:_ ..s aar,.:.. MAO Operator: jmm Printed By: jmm Print Date: 6/13/2008 Project Number: 08002217 Inv: I Application Date: 6/13/2008 Page 2 of 2 THIS IS NOT A PERMIT Penalties will be assessed for commencing work without a permit Contractor: OWNER Description Grp Type Notes COV DECK R-3 VB Item Description RESIDENTIAL PERMIT FEE ACCESSORY PLANS REVIEW WSBC SURCHARGE Notes: Payment Summa Building Permit — - - - Firm: OWNER Phone: (000) 000-0000 This Application: Total Project: Sg Ft Valuation Scl Ft Valuation 145 $2,175.00 145 $2,175.00 Totals: 145 $2,175.00 145 $2,175.00 Units Unit Desc Fee Amount 1 SELECT $83.25 1 SELECT $20.81 1 SELECT $4.50 Permit Total Fees: $108.56 Permit Type Fee Amount Invoice Amount Amount Paid Amount Owing Building Permit $108.56 $108.56 $0.00 $108.56 $108.56 $108.56 $0.00 $108.56 Disclaimer: Submittal of this application certifies the owner (or person(s) authorized by the owner) has both examined and finds the information contained within to be true and correct, and agrees that all provisions of laws and/or regulations governing this type of work will be complied with. Subsequent issuance of a permit shall not be construed to be a permit for, or an approval of, any violation of any of the provisions of the code or of any other state or local laws or ordinances. Signature: Operator: jmm Printed By: jmm Print Date: 6/13/2008 Permit Center PERMIT NUMBER: S Scrryof 11703 E Sprague Ave, Suite B-3 pokane Spokane Valley, WA 99206 PERMIT FEE: V41 (509)688-0036 FAX: (509)688-0037 kanevalley or '01 www.spo Community Development . _..._------""` Residential Construction Construction Accessory Bldg Permit Application Addition/Remodel Deck ❑ Other: SITE ADDRESS: lQ I J I v ASSESSORS PARCEL NO: ID G I I . 69) LEGAL DESCRIPTION: Building Owner: Name: IM Address: City: C� U� State: Zip Phone:5Oq � S Fax: Contact Person Name: Phone: r Describe the scope of work in detail: Proposed Use: Contractor: Name: Address: City: State: Zip: Phone: Fax: Contractor Lic No: Exp Date: City Business Lic. No: Cost of Project: $ Aii7TQ'T i,n nAmTlniP• (wri*P N/A if not ^••••••.. .. .. .. .. ......._ JL Hu 1VliV♦V HEIGHT TO PEAK: 1116 111VU1 ver vvaaa avev. DIMENSIONS: # OF STORIES: TOTAL HABITABLE SPACE: MAIN FLOOR TO SQ. 2 NLFLOOR SQ. FTG: UNFIN BASEMENT SQ. FTG: IMPERVIOUS SURFACE FTG: AREA: FINISHED BASEMENT GARAGE SQ. FTG: DECK/ OV. PATIO SQ. FTG: 30% SLOPES ON SQ. FTG: I / 9l -i- PROPERTY: # OF BEDROOMS: CONSTRUCTION TYPE: HEAT OURPE�" SEWER OR SEPTIC? The permitee verifies, acknowledges and agrees by their signature that: 1) If this permit is for construction of or on a dwelling, the dwelling is/will be served by potable water. 2) Ownership of this City of Spokane Valley Permit inure to the property owner. 3) The signatory is the property owner or has permission to represent the property owner in this transaction. 4) All construction is to be done in full compliance with the City of Spokane Valley Development Code. Referenced codes are available for review at the City of Spokane Valley Permit Center. 5) This City of Spokane Valley Permit is not a permit or approval for any violation of federal, state or local laws, codes or ordinances. 6) Plans or additional information may be required to be submitted, and subsequently approved before this application can be processed. SIGNATURE: S(�� �?�oy�� DATE: Method of Payment. ❑ Cash ❑ Check Bankcard #: Authorized Signature: REVISED 2/15/07 ❑ Mastercard ❑ VISA Expires: VIN#: SOF 11703 E Sprague Ave Suite B-3♦ Spokane Valley WA 99206 p♦ 509.688.0036 ♦ Fax: 509.688.0037 ,,;00OValle Y MX Completed Building and Mechanical Application with: Accurate address, Parcel Number and/or Legal Description, description of work, owner and contractor information, signature and date. MX Three (3) sets of plans including Site Plan, elevations, floor plans, foundation plans with details, roof plan, framing plans and details. pX Show the height of any proposed buildings or accessory structures. ❑X Floor plan for each floor: Dimension to scale(minimum 1/8") and label each room (including sq footage of house and garage on plans) show each level of existing house and square footage of any additions. MX Egress windows: Provide at least one window or exterior door approved for emergency escape or rescue from basement and in every room for sleeping. ❑X Floor framing details: Joist type, size, spacing and installation details. MX Roof framing plan and details MX Furnace and hot water heater location MX All header locations: type, size and connections pX Foundation plan ❑X Insulation information r7iDecks and Stairway details All braced wall panel types: show locations and details of installation, including engineered design Smoke detector locations 22" x 30" attic access location 18" x 24" crawl space access One-hour separation detail: between house and garage . SCITY OF -1 0000, OKane 49, P OoValleyo For City Use.Only PLUS Project Number— Project umber Project Address t. j l� 11703 E Sprague Ave Suite B-3 ♦ Spokane Valley WA 99206 509.688.0036 ♦ Fax: 509.688.0037 ♦ permitcenter@spokanevalley.org As part of our on-going commitment to customer service during the review process of your project application, we are providing you with a TARGET DATE for the initial technical application review. If for any reason we cannot meet this date, we will contact you with a revised target date. Your application review TARGET DATE is The TARGET DATE is the date we estimate your project application will have had its initial technical review. It is not the date for approval or permit issuance. Tips for a Smoother Project Application Review ➢ Submit complete, accurate plans and documents. Extra time may be required for re -submittals as project application reviewers work on multiple applications and it may be several days before they can look at your new or revised information. ➢ Designate a specific contact person to communicate with the City. While the person designated as the applicant's contact person with the City can be changed, one individual with the expertise for dealing with reviewer comments would be the best choice for the entire review process. ➢ Call staff regarding the status of your project only after the target date shown at the top of the page. Although you should be contacted on or by the target date, please feel free to contact us if you haven't heard from us by your target date. Staff may contact you before the target date if the initial review is complete. By following this procedure, you will save time and allow the reviewers to complete the work more expeditiously. Steps in the Permit Process 1. Counter Complete. Your application has been accepted as counter complete. This means all of the required documents, as indicated on your Pre -Application Checklist have been submitted or have been approved for deferred submittal. This does not prevent technical staff from requesting additional information as a result of their technical review. 2. Quality Check. The next step in the process is a quality check to make sure that the application is reviewable and free from substantive flaws that would prevent technical staff from completing the technical review once it is started. When this step is complete, your application will be routed to the appropriate staff and remain in their review queue until it comes up for review. 3. Technical Compliance. Once an application is administratively complete, it is routed to technical staff for compliance review. Depending on the type of project, technical staff may include multiple reviewers. You should be contacted by phone, fax, email, or mail by your TARGET DATE once the initial technical compliance review is complete. 4. Permit Issuance. When the technical compliance review of the application is complete, including any subsequent re - submittals, each reviewer will approve their section of the application and route it to the Permit Center. When all sections of the application are received, a Permit Specialist will process the application and contact the person specified on your application for permit pick-up. Information regarding fees and pre -construction meetings (if required) will be provided by the Permit Specialist at that time. WHITE -APPLICANT PINK - BUILDING FILE REV 9/07 � / i � \ | � | i / � | < � � \ � � -__--_--___--� PLANNINGDEPT. �' ^�. �= 4 --_-_' �/��m.��*~°��^� »� � | �/��m.��*~°��^� »� mz!J, *'°nH � w�/� z6b �n , L________--_-__ ___----'---'--�-------------------- (` � --------- - ---------- �2 -- - -- --� ---'--'--�-- —'----------------------' � .91, w~'wwo Y, .mc . . ,i � -- utw'Ca AM'-SVPyi:' PGeFSS �auG see. uuvde_.w ' i6ar, NCS A—) Fo�iaOn ia.J (2/6, 110c_ 17 V - ` 1P2 /y'9 DECKS: Ledger board requires 'h" lag bolt @ 16" o.c. with flashing behind. Guardrail 36 in. high required if floor more than 30 in. above grade. Picket spacing no more than 4 in. apart. Posts require approved base and beam connectors. Min. 24 in. frost protection to finish grade with min. 12 in. footing base. i 8"-A g, t e'uti? C-. nss eros /0,000 1-85 i i zy (OOj'T cvJStOc� C-K\ol ! oR imE€T 07VA&V JD Aclf � n—u HANDRAILS: Height of 34 — 38 inches when required by four or more risers shall be continuous the full length of stairs with the ends returned or rounded. LANDINGS: Required min. width of 36 in. or width of stairway and 36 in. travel distance. STAIRWAYS: Minimum width 36 in. with min. tread run of 10 in., max. rise of 7 3/4 in. & nosing of 3/4-1 1/4 in. Min. 6 ft. 8 in. headroom. Enclosed usable space under stairways requires 1 hour fire Drotection of %2 in. GWB Decking "on centsr. from edge of to center or be 1-Ih" simum if I-- 7'-0" maximum -- +►� .." - '— — stat basecap 1^ min. above concrete or provide treated wood r inimum 1000 psi s rooting .!—i" minimum 1000 psi concrete 3" Nal -F 36" minimum I Irpeeler Ihu provide 10 40 breoo e Io -basis cool (Maximum Height shall more ban it Yost & Beam Connection detail (interior condition) Post Cep Installed per manufacturer'@ Instruction 1 P m1n. �« leI Knee ss br brace N Ill- mho. (04) Two 1!Z" diameter leg Knep brace bolls top and bottom typical —.�.._ Post -Metal basecep " min. above concrete or eo ids treated wood 6" minimum T 24nimum it covered minimum ledger altaelunsnl owl be oohed through Post & Beam Comlection detail est cep Installed per msuureclurer's instruction Ig" min. Z4" Max. (4x4) overhang nee brsc.� Iina11e7AaneaAW7edrra9lfrMT! 15 .r&Im6'xr7almmEil r—'Icon . Tvo VZ" dimeler lag bulla lop end bnitum Irnieal Port min if, minimum itcovered 12" min ,i:�"..l.l.:..l Nelursl Grade_ 7' to daylight ' min stat basecap 1^ min. above concrete or provide treated wood r inimum 1000 psi s rooting .!—i" minimum 1000 psi concrete 3" Nal -F 36" minimum I Irpeeler Ihu provide 10 40 breoo e Io -basis cool (Maximum Height shall more ban it Yost & Beam Connection detail (interior condition) Post Cep Installed per manufacturer'@ Instruction 1 P m1n. �« leI Knee ss br brace N Ill- mho. (04) Two 1!Z" diameter leg Knep brace bolls top and bottom typical —.�.._ Post -Metal basecep " min. above concrete or eo ids treated wood 6" minimum T 24nimum it covered minimum ledger altaelunsnl owl be oohed through Post & Beam Comlection detail est cep Installed per msuureclurer's instruction Ig" min. Z4" Max. (4x4) overhang nee brsc.� Iina11e7AaneaAW7edrra9lfrMT! 15 .r&Im6'xr7almmEil r—'Icon . Tvo VZ" dimeler lag bulla lop end bnitum Irnieal 44N. SPHERE CANNOT PASSTHRpUGH FULL 30 IN. MIN GUARD HEIGHT PER SECT. R310.1 AT LANDING 341N. MIN GUARD HEIGHT PER SECT. R31 S. 130 IN. MAX FOR HANDRAIL PER SECT. R310.1 Y, J_ Hoff tltPlfl OFY M. _BB �►pl�llp�N Q � fMST OHIiR nW W YYRlN1 WOHK OPEN RISER PERMIT: ED—/ IN. SPHERE WILL NOT PASS O THROUGH OR WHERE HEIGHT OF STAIR 19 LESS THAN 30 INCHES .rte 0 MAX. RISB rl, IN. VARIATION OF RISER HEIGHTS OR TREAD DEPTHS SHALL NOT EXCEED %IN. Job Mark Quan Type Span P1 -Hl Left OH Right OH Engineering 6727 XZ 1 TR 140600 4 2- 0- 0 2- 0- 0 PATTERSON/CO C MT20 3.Ox 4.0 Ctr Ctr 0.62 O.C. From To D MT20 2.Ox 3.0 Ctr Ctr 0.37 TC Cont. 0- 0- 0 14- 6- 0 BC Cont. 0- 0- 0 14- 6- 0 4 Gable studs to be attached with 2.0x3.0 plates each end. psf-Ld Dead Live REFER TO ROBBINS ENG. GENERAL TC 7.0 30.0 NOTES AND SYMBOLS SHEET FOR BC 10.0 0.0 ADDITIONAL SPECIFICATIONS. TC+BC 17.0 30.0 Total 47.0 Spacing 24.0" NOTES: Lumber Duration Factor 1.15 Trusses Manufactured by: Plate Duration Factor 1.15 Valley Best Way TC Fb=1.15 Fc=1.10 Ft=1.10 Analysis Conforms To: DG 7-9-0 DG 7-9-0 OH Loading Total Load Reactions (Lbs) 4x4= it Down Uplift Horiz- Design checked for LL on BC A 838 215 U 36 R HO 3-15 HO 3-15 IBC/IRC-2003 and FBC 2004 (section 1607.1), 20.0 psf. B Design checked for 10 psf non- A 5.5" 1.5" concurrent LL on BC. HH 4 HH 4 4 ( * 2x311 G Wind Loads - ANSI / ASCE 7-05 *2x311 I Truss is designed as a Main Plus 1 DL Load Case(s) Wind -Force Resistance System. T Wind Speed: 90 mph *2x311 Mean Roof Height: 25 -0 ----------Top Chords---------- Exposure Category: C *2x31 Occupancy Factor : 1.00 B -C 0.42 1199 C 0.01 0.41 Building Type: Enclosed --------Bottom Chords--------- E A -D 0.44 1143 T 0.14 0.30 TC Dead Load 4.0 psf D -C 0.44 1143 T 0.14 0.30 R -------------Webs------------- Max comp. force 1199 Lbs 2-8-15 Max tens. force 1143 Lbs TC Quality Control Factor 1.25 W1 S LL Defl -0.08" in A -D L/999 TC Robbins Engineering, Inc./Online PlusTM 0 1996-2008 Version 22.0.018 Engineering - Portrait 5282008 4:12:04 PM Page 1 3x4= 3x4_ C A 3 g H D 81 J L *2x311 *2x311 2x311 *2x311 *2x311 W:508 W:508 R: 837 R: 837 U: 215 U: 215 EP 7-3-0 14-6-0 7-3-0 TC 2-0-0 7-3-0 BC EP 7-3-0 7-3-0 14-6-0 14-6-0 ALL PLATES ARE MT2020 Scale: 0.360"= 1' Robbins Engineerinq, Inc./Online Plus' APPROX. TRUSS WEIGHT: 77.7 LBS Online Plus -- Version 22.0.018 Shear // Grain in A -B 0.33 RUN DATE: 28 -MAY -08 Plates for each ply each face. CSI -Size- ----Lumber---- Plate - MT20 20 Ga, Gross Area TC 0.42 2x 4 1B Plate - MT2H 20 Ga, Gross Area BC 0.44 2x 4 1B it Type Plt Size X Y JSI WB 0.03 2x 4 DFL -#1 A MT20 3.Ox 4.0 Ctr Ctr 0.62 B MT20 4.Ox 4.0 Ctr Ctr 0.46 Brace truss as follows: C MT20 3.Ox 4.0 Ctr Ctr 0.62 O.C. From To D MT20 2.Ox 3.0 Ctr Ctr 0.37 TC Cont. 0- 0- 0 14- 6- 0 BC Cont. 0- 0- 0 14- 6- 0 4 Gable studs to be attached with 2.0x3.0 plates each end. psf-Ld Dead Live REFER TO ROBBINS ENG. GENERAL TC 7.0 30.0 NOTES AND SYMBOLS SHEET FOR BC 10.0 0.0 ADDITIONAL SPECIFICATIONS. TC+BC 17.0 30.0 Total 47.0 Spacing 24.0" NOTES: Lumber Duration Factor 1.15 Trusses Manufactured by: Plate Duration Factor 1.15 Valley Best Way TC Fb=1.15 Fc=1.10 Ft=1.10 Analysis Conforms To: BC Fb=1.10 Fc=1.10 Ft=1.10 ANSI/TPI 95 & 02 OH Loading Total Load Reactions (Lbs) Soffit psf 2.0 it Down Uplift Horiz- Design checked for LL on BC A 838 215 U 36 R per BOCA (section 1606.2.3), C 837 215 U 36 R IBC/IRC-2003 and FBC 2004 (section 1607.1), 20.0 psf. it Brg Size Required Design checked for 10 psf non- A 5.5" 1.5" concurrent LL on BC. C 5.5" 1.5" Refer to Gen Det 3 series for web bracing and plating. Plus 6 Wind Load Case(s) Wind Loads - ANSI / ASCE 7-05 Plus 1 UBC LL Load Case(s) Truss is designed as a Main Plus 1 DL Load Case(s) Wind -Force Resistance System. Wind Speed: 90 mph Membr CSI P Lbs Axl-CSI-Bnd Mean Roof Height: 25 -0 ----------Top Chords---------- Exposure Category: C A -B 0.42 1199 C 0.01 0.41 Occupancy Factor : 1.00 B -C 0.42 1199 C 0.01 0.41 Building Type: Enclosed --------Bottom Chords--------- Zone location: Exterior A -D 0.44 1143 T 0.14 0.30 TC Dead Load 4.0 psf D -C 0.44 1143 T 0.14 0.30 BC Dead Load 6.0 psf -------------Webs------------- Max comp. force 1199 Lbs D -B 0.03 316 T Max tens. force 1143 Lbs Quality Control Factor 1.25 TL Defl -0.15" in A -D L/999 LL Defl -0.08" in A -D L/999 Robbins Engineering, Inc./Online PlusTM 0 1996-2008 Version 22.0.018 Engineering - Portrait 5282008 4:12:04 PM Page 1 ` ,lob 67207 PATTERSON/CO Mark X3 an 5 Type Span P1 -Hl SCIS 140600 4 Left OH 2- 0- 0 Right OH Engineering 2- 0- 0 TC+BC 17.0 30.0 Total 47.0 Spacing 24.0" NOTES: Lumber Duration Factor 1.15 DG 7-9-0 DG 7-9-0 Valley Best Way Conn rms2To: BCFb=1 4x4- HO 3-14 HO 3-14 Soffit psf 2.0 it Down Uplift Horiz- B A 8311 215 U ,36 HH 3 HH 3 IBC/IRC-2003 and FBC 2004 1 �\ tion 1607.1), 20.0 psf. it Brg Size Required '` e ifi checked for 10 psf non- T concurrent LL on BC. Wind Loads - ANSI / ASCE 7-05 Truss is designed as a Main Plus 6 Wind Load Case(s) Wind -Force Resistance System. Plus 1 UBC LL Load Case(s) W1 Plus 1 DL Load Case(s) Mean Roof Height: 25-0 2-8-14 Exposure Category: C TC Occupancy Factor : 1.00 ----------Top Chords---------- TC 1-1-9D 3x4- B -C 0.45 2130 C 0.05 0.40 D --------Bottom Chords ---- -----.,. _...._ 3x4- A -D 0.47 20599TT 0.25 0.22 A BC 4x611 BC C D -B 0.13 856 T _12 W:508 W:508 R: 837 R: 837 U: 215 U: 215 EP TC 2-0-0 7-3-0 7-3-0 1 14-6-0 7-3-0 2-0-0 BC 7-3-0 7-3-0 EP 7-3-0 14-6-0 14-6-0 ALL PLATES ARE MP2020 Scale: 0.360"= 1' Robbins Engineerinq, Inc./Online Plus" APPROX. TRUSS WEIGHT: 67.0 LBS Online Plus -- Version 22.0.018 Hz Disp LL DL TL RUN DATE: 28 -MAY -08 it C 0.07" 0.04" 0.11" Shear // Grain in A -B 0.31 CSI -Size- TC 0.45 2x 4 1B BC 0.47 2x 4 1B WB 0.13 2x 4 DFL -#1 Brace truss as follows: O.C. From To TC Cont. 0- 0- 0 14- 6- 0 BC Cont. 0- 0- 0 14- 6- 0 Plates for each ply each face. Plate - MT20 20 Ga, Gross Area Plate - MT2H 20 Ga, Gross Area it Type Plt Size X Y JSI A MT20 3.Ox 4.0 Ctr Ctr 0.95 B MT20 4.Ox 4.0 Ctr Ctr 0.61 C MT20 3.Ox 4.0 Ctr Ctr 0.95 D MT20 4.Ox 6.0 Ctr-0.5 0.89 psf-Ld Dead Live REFER TO ROBBINS ENG. GENERAL TC 7.0 30.0 NOTES AND SYMBOLS SHEET FOR BC 10.0 0.0 ADDITIONAL SPECIFICATIONS. TC+BC 17.0 30.0 Total 47.0 Spacing 24.0" NOTES: Lumber Duration Factor 1.15 Trusses Manufactured by: TC F aD15 US I$FF 14?_ Valley Best Way Conn rms2To: BCFb=1 ANSI/TPI OH Loading Total Load Reactions (Lbs) Soffit psf 2.0 it Down Uplift Horiz- Design checked for LL on BC A 8311 215 U ,36 per BOCA (section 1606.2.3), C 838 215:'U +3 ii 1 ) %f'f '� ? 3 ; IBC/IRC-2003 and FBC 2004 1 �\ tion 1607.1), 20.0 psf. it Brg Size Required '` e ifi checked for 10 psf non- A 5.5" 1.5" concurrent LL on BC. C 5.5" 1.5" Wind Loads - ANSI / ASCE 7-05 Truss is designed as a Main Plus 6 Wind Load Case(s) Wind -Force Resistance System. Plus 1 UBC LL Load Case(s) Wind Speed: 90 mph Plus 1 DL Load Case(s) Mean Roof Height: 25-0 Exposure Category: C Menbr CSI P Lbs Axl-CSI-Bnd Occupancy Factor : 1.00 ----------Top Chords---------- Building Type: Enclosed A -B 0.45 2130 C 0.05 0.40 Zone location: Exterior B -C 0.45 2130 C 0.05 0.40 TC Dead Load 4.0 psf --------Bottom Chords ---- -----.,. _...._ BC Dead Load 6.0 psf A -D 0.47 20599TT 0.25 0.22 Max comp. force 2130 Lbs D -C 0.47 2059 T 0.25 0.22 Max tens. force 2059 Lbs -------------Webs------------- Quality Control Factor 1.25 D -B 0.13 856 T TL Defl -0.24" in A -D L/669 LL Defl -0.14" in A -D L/999 Robbins Engineering, Inc./Online Plus- 0 1996-2008 Version 22.0.018 Engineering - Portrait 5/282008 4:12:03 PM Page 1 PROVIDE DIAGRAMS AND ENGINEERING LAYOUTS FOR ROOF TRUSSES, BEAMS AND FLOOR SYSTEMS PRIOR TO FRAMING INSPECTIONS CITY COPY THIS BUILDING SUBJECT TO FIELD INSPECTION CORRECTIONS REVIEWED FCi3 ;-Q-E-: COMPLIANCE SPOKANE VALI .E- ' i11L c 01VISION �f