2016, 04-08 Permit: APR-2016-0045 Approach Community Development Department
Permit Center (Staff Use Only)
."...
wkane 11703 East Sprague Avenue,Suite B-3 PERMIT NUMBER:
Spokane Valley,WA 99206
leyvala� Tel:(509)720-5240 PERMIT FEE:
Fax:(509)688-0037
cr
4000
permitcenter spokaneval ley.org
APPROACH PERMIT APPLICATION
PROJECT ADDRESS: Z20g 3 CoA)KI..I Cr
START DATE: t//////5-- ANTICIPATED COMPLETION DATE:
BUILDING OWNER NAME: Dan" (�A.)O/vl £
MAILING ADDRESS:
CITY: STATE: ZIP:
CONTACT PERSON NAME: DO✓ (//>Nv+u-
PHONE: V ' Fr1 — 30 b 1 FAX: CELL:
CONTRACTOR NAME:
MAILING ADDRESS: '2_.%-i Z k) Cj+Qo&)I GS E R p
CITY: M Ar STATE: („..)/49— ZIP: GI`'oZ.
PHONE: 5-0 c // (. 3/3 / FAX: 5-Del 2 7'i O(/ 7 CELL: S0 5 S're 3 —.4. y'itC;c:3
CONTRACTOR LICENSE#: 6OZSY?lig 4. EXPIRES: CITY BUSINESS LICENSE#:
PROJECT DESCRIPTION(Please Provide Site Sketch)
Residential Driveway 0 Commercial/Industrial Driveway
0 Existing Curb&Gutter r " Rural Road Section
MI Culvert Installation 0 Sidewalk Repair/Construction
0 Other Conditions:
Bond/Insurance certification must be on file with the City.
DISCLAIMER
The permitted verifies, acknowledges and agrees by their signature that: 1) if this permit is for construction or on a dwelling, the
dwelling is/will be served by potable water. 2)Ownership of this City of Spokane Valley permit inure to the property owner. 3) The
signatory is the property owner or has permission to represent the property owner in this transaction. 4) All construction is to be done
in full compliance with the City of Spokane Valley Development code. Referenced codes are available for review at the City of
Spokane Valley Permit Center. 5) The City of Spokane Valley permit is not a permit or approval for any violation of federal, state or
local laws, codes or ordinances. 6) Plans or additional information may be required to be submitted and subsequently approved
before this application can be processed.
Signature �/ � Date: /
4r -IN-0045-
773
I N6-OU45-
773
DE-001:V-1 Page 1 of 2
APPROACH PERMIT APPLICATION
REQUIRED SKETCH INFORMATION
Provide required measurements(in sketch boxes),and include street name. �-W$
Cppkl.r cf
Check all existing conditions that apply:
SidewalkD° Drainage Ditch
ft wide LDrywell(show location on sketch)
ft from back of curb 00ther(please describe below)
E Streetside Swale
DISTANCE FROM
NEAREST PROPERTY LME
LiAY BE LEFT OR RIOHT ODE)
FT(SEE TABLE)
a
aI CONCRETE
APPROACH /CURBRN
CURB WIC THRO(SEE ABT LE) FT WINO \IF CORNER LOT,
DISTANCE FROM
STREET NAME (rpm ,n ofRETURN
ti I FT(SEE TABLE)
STREET WITH CURB
w DISTANCE FROM
- NEAREST PROPERTY LINE
MAY BE LEFT OR RIGHT SIDE)
FT(SEE TABLE)
15'RADIUS
ASPHALT7-RADIUS
APPROACH RETURN
EDGE OF —BOAT WIDTH FT_ �-
(SEE TAB IF CORNER LOT,
ASPHALT
DISTANCE FROM
STREET NAME RADIUS RETURN
Q FT(SEE TABLE)
STREET WITH ASPHALT EDGE
Approach Requirements:
• Maximum 2 approaches per property frontage;one on arterials.
• Total width of approaches not to exceed 50%of frontage width.
Residential Approaches Commercial
Approaches
Distance from Curb/Radius Retum 15'minimum 75'minimum
Separation between Approaches(measured from centerline to centerline of See Page 7-27
each approach) None specified in City Street Standards
Throat Width(flat portion) 16'min.,30'max. 30'min.,40'max.
Wing Width(at curb line) 4 feet typical 4 feet typical
Minimum Distance from Side Property Line(@ r/w) 5.0' 5.0'
Minimum Distance from Crosswalk 5' 5'
DE-001:V-1 Page 2 of 2