Loading...
2016, 03-09 Permit: ROW-2016-0091 ROW City of Spokane Valley `rr'°F101.1"1\111ftb Community& Economic Development 11707 E. Sprague Ave., Suite 108 .. 0Valley- Spokane Valley, WA 99206 (509)720-5240 permitcenter aa..spokanevalley.orq ROW-2016-0091 DE-ROW PROJECT NAME: ISSUED: 03/09/2016 SITE ADDRESS: 2301 S PROGRESS RD SPOKANE VALLEY EXPIRES: PROJECT DESCRIPTION: EMERGENCY WATER MAIN REPAIR PARCEL: 45261.1421 APPLICANT: VERA WATER& POWER OWNER: BECKER, GERALD L&MARGARET E PO BOX 630 VERADALE,WA 99037-0630 2221 S PROGRESS RD VERADALE,WA 99037-9316 FEES: Paid Due Right of Way $210.00 Totals : $210.00 CONDITIONS * Prior to excavation, it is the Contractor responsibility to contact the purveyor of any transmission pipeline that is within 100 feet of permitted work, as per RCW 19.122.033. * Prior to performing excavation work in the Right-of-Way, permittee shall field locate existing stormwater and irrigation infrastructure through visual inspection of existing finish grade facilities. Permittee may also contact City of Spokane Valley Stormwater Utility division at(509) 720-5005 (Aaron Clary)to request maps and other available documents to clarify and assist in locating these utilities. * For work blocking less than 50% of a local access street the contractor, at a minimum, is required to have Construction Ahead signs placed ahead of the work zone. Note—if it turns out that the work blocks more than 50% of a local access street then this permit is not valid and the contractor must submit a traffic control plan to the City for review/acceptance prior to continuance of the work. All traffic control shall follow MUTCD standards. * * For pavement cuts, as-built drawings (using the current Inland Northwest Regional Pavement Cut Policy template)are required to be submitted to the Right-of-Way Inspector, Scott Wallace, within 15 working days of work being completed. As- builts shall be submitted by email (to swallace@spokanevalley.org), by Fax(509-921-1008)or by dropping off at the Permit Center. * *All pavement cuts within the City of Spokane Valley right-of-way shall comply with the current adopted Inland Northwest Regional Pavement Cut Policy, or as amended. *All pavement repairs shall be inspected by the City's ROW inspector, Scott Wallace (mobile: 509-869-5373). The Contractor shall notify Mr. Wallace a minimum of 24 hours in advance of the paving. Printed by:Patrick Barclay on:03/09/2016 12:35 PM Page 1 of 2 City of Spokane Valley cr"'°Fkae Community& Economic Development 11707 E. Sprague Ave., Suite 108 DE-ROW Valley. Spokane Valley, WA 99206 ROW-2016-0091 (509)720-5240 permitcenterasookanevalley.orq The ownership of a Spokane Valley Development Permit will inure to the property owner. The permit applicant, by definition, is the property owner or an authorized agent of the property owner. It is the responsibility of the applicant/ permittee that the use described on the front of this permit complies with applicable codes and that required inspections are requested. Failure to request inspections as listed below and obtain the necessary approvals before progressing beyond the point where inspections are required and may necessitate removal of certain parts of the construction are the applicant's / permittee's or property owner's expense. Owner/Agent Date: Staff Approval Date: Printed by:Patrick Barclay on:03/09/2016 12:35 PM Page 2 of 2