2015-08-11 Permit App: ROW-2015-0514 Sewer hookupCommunity Development Department
Permit Center (Staff Use Only)
C-IQTY OF 11703 East Sprague Avenue, Suite B-3
Spokane Valley, WA 99206 PERMIT NUMBER:
�e Tel: (509) 688-0036
MA-Mey Fax: (509) 688-0037 PERMIT FEE:
permitcenter(a)spoka neva l lev.org
RIGHT OF WAY (ROW) PERMIT APPLICATION
❑ APPROACH ❑ PAVEMENT CUT (SEE BELOW) [❑ SIDEWALK
❑ CURB & GUTTER Q WORK THROUGH MANHOLE OTHER
ROAD OBSTRUCTION [D NO YES (if yes, complete the following)
• % of street or # lanes that will be obstructed:
• Length of time street will be obstructed:
b If work closes more than 50% of a local access street, or closes any portion of an arterial street,
then a TRAFFIC PLAN IS REQUIRED D Pre -Approved TCP Proposed:
PROJECTADDRESS: 3.04 M. 1�odaxs PARCELNUMBER: sSl�f, Z�Q4
APPLICANT'S JOB #: LOCATE TICKET #
START DATE: O -/ 2, l ANTICIPATED COMPLETION DATE: C}-13-1.5
PROJECT DESCRIPTION:
i'ca.rr hawkkp - ro ckf
PROPERTY OR BUILDING OWNER INFORMATION (IF APPLICABLE)
NAME: L arr b / qtrCITY: ADDRESS: V. [q STATE: 1*/A ZIP: Q n
01`
PHONE:
CONTRACTOR INFORMATION
MAILING ADDRAS:
PHONE:
FAX:
CITY:
FAX:
CELL:
STATE: �! � ZIP: �! ! C l 6
CELL:
CONTRACTOR LICENSE NO.: C O()ZC'(' jp/'k7EXPIRES: 1 /���� S' CITY BUSINESS LICENSE NO.:
BOND/INSURANCE CERTIFICATE # (per SVMC Title 10, Article 2):
CONTACT NAME:
E: <z,-) �7 - / % - -i :� c/ J
CSV � `Cr- IVIFI- CENTER
AUG 11
ProjectNamo _7 71
#--�o1Ji-..'�101J VSl i
Modified April 14, 2014 Page 1 of 2
P•\Community Development\11 Forms\B Development Engineering\ROWPA doc
**** IF PAVEMENT CUT, COMPLETE THE FOLLOWING ****
NATURE OF WORK:
circle one
Gas
Electric
Water
CAN
Communication
Sewer
Other
TYPE OF CUT/REPAIR:
circle one
Asphalt
Gravel
Concrete
Other
SIZE OF CUT
width x (length)
STAFF TO COMPLETE:
ROAD TIER:
PAVEMENT CUT POLICY APPLIES?
DISCLAIMER
The permitted verifies, acknowledges and agrees by their signature that: 1) if this permit is for construction or on a dwelling, the dwelling is/will
be served by potable water. 2) Ownership of this City of Spokane Valley permit inures to the property owner. 3) The signatory is the property
owner or has permission to represent the property owner in this transaction. 4) All construction is to be done in full compliance with the City of
Spokane Valley Development code. Referenced codes are available for review at the City of Spokane Valley Permit Center. 5) The City of
Spokane Valley permit is not a permit or approval for any violation of federal, state or local laws, codes or ordinances. 6) Plans or additional
information may be required to be submitted and subsequently approved before this application can be processed.
EXPIRATION
Right-of-way permits issued between April 1s` and September 30' are valid for 30 days after the date of issuance, with a one-time 30 -day
extension available. Right-of-way permits issued between October 1s` and March 31" are valid until the following April 30"
Applicant Signature:
Date: S// (/ dl's
Method of payment: ❑ Cash ❑ Check ❑ Visa** ❑ Mastercard**
** If paying with credit card, the City will call for credit card information when the permit is ready to be issued.
PLEASE FAX TO CITY OF SPOKANE VALLEY (509) 688-0037 UPON COMPLETION
Modified April 14, 2014 Page 2 of 2
PACommunity Develooment\11 Forms\B. Development Engineering\ROWPA doc