Loading...
2011, 09-02 Permit App: 11002687 Addition GarageProject Number: 11002687 Inv: 1 Application Date: 9/2/2011 Page 1 of 3 THIS IS NOT A PERMIT Penalties will be assessed for commencing work without a permit Proiect Information: Permit Use: 440 SF GARAGE ADD W/SUSPENDED GAS Contact: LEXINGTON HOMES HEATER & (2)WC (1) SINK (1) SHWR Address: P.O. BOX 141749 Setbacks: Front Left: Right: Rear: Site Information: Plat Key: 002579 Name: SUNNYVALE ADD Parcel Number: 45011.1003 Block: SiteAddress: 4716 N SUNNYVALE DR C - S - Z: SPOKANE WA 99214 Phone: (509) 924-1519 Group Name: Project Name: District: East Lot: Owner: Name: LANG, DICK Address: 4716 N SUNNYVALE DR N. Location:: CSV SPOKANE, WA 99216-1528 Zoning: R-3 SF Res District Water District: 134 CONSOLIDATED ID #19 Hold: ❑ Area: 14,000 Sq Ft Width: 0 Depth: 0 Right Of Way (ft): 0 Nbr of Bldgs: 1 Nbr of Dwellings: 1 Review Information Review Building Plan Review Released Bv: Originally Released: Landuse/Zoning/HE Conditions Originally Released: Permits: 9/1/2011 By: tmelbourn Released By: 9/1/2011 By: mpalaniuk Operator: MBB Printed By: JD Print Date: 9/2/2011 Project Number: 11002687 Inv: I Application Date: 9/2/2011 THIS IS NOT A PERMIT Penalties will be assessed for commencing work without a permit — Building Permit Contractor: Lexington Homes Inc Firm: Lexington Homes Inc Address: P O BOX 141749 Phone: (509) 924-1519 SPOKANE, WA 99214 This Application: Total Project: Description Gtr Tvae Notes Sq Ft Valuation Sq Ft Valuation GAR WOOD U-1 VB GARAGE 0 $24,000.00 0 $24,000.00 ADDITION Totals: 0 $24,000.00 0 $24,000.00 Item Description Units Unit Desc Fee Amount RESIDENTIAL PERMIT FEE 1 SELECT $377.25 ACCESSORY PLANS REVIEW 1 SELECT $94.31 WSBCC SURCHARGE 1 SELECT $4.50 Permit Total Fees: $476.06 Mechanical Permit Contractor: R & R HEATING & AIR COND INC Firm: R & R HEATING & AIR COND INC Address: 4019 E CENTRAL Phone: (509) 484-1405 SPOKANE, WA 99207 Item Description Units Unit Desc Fee Amount GAS APPLIANCE<=I00,000BTU 1 NUMBER OF $13.00 GAS PIPING 1 # OF UNITS $1.00 Permit Total Fees: $14.00 Plumbing Permit Contractor: GOLD SEAL MECHANICAL INC Firm: GOLD SEAL MECHANICAL INC Address: 5524 E BOONE AVE Phone: (509) 535-5944 SPOKANE, WA 99212 Item Description Units Unit Desc Fee Amount TOILETSBIDETS 2 NUMBER OF $12.00 SINKS 1 NUMBER OF $6.00 SHOWERS 1 NUMBER OF $6.00 Permit Total Fees: $24.00 Operator: MBB Printed By: JD Print Date: 9/2/2011 Page 2 of 3 Project Number: 11002687 Inv: 1 Application Date: 9/2/2011 Page 3 of 3 THIS IS NOT A PERMIT Penalties will be assessed for commencing work without a permit Notes: _, a_ h.r Payment Summa Permit Type Fee Amount Invoice Amount Amount Paid Amount Owing Building Permit $476.06 $476.06 $94.31 $381.75 Mechanical Permit $14.00 $14.00 $0.00 $14.00 Plumbing Permit $24.00 $24.00 $0.00 $24.00 $514.06 $514.06 $94.31 $419.75 Disclaimer: Submittal of this application certifies the owner (or person(s) authorized by the owner) has both examined and finds the information contained within to be true and correct, and agrees that all provisions of laws and/or regulations governing this type of work will be complied with. Subsequent issuance of a permit shall not be construed to be a permit for, or an approval of, any violation of any of the provisions of the code or of any other state or local laws or ordinances. Signature: Operator: MBB Printed By: JD Print Date: 9/2/2011 C[TY OC Spokane ,,,;0o0Valley Community Development Department Permit Center 11703 East Sprague Avenue, Suite B-3 Spokane Valley, WA 99206 Tel: (509) 720-2540 Fax: (509) 688-0037 perm itcenter(c spokanevaIley.org (Staff Use Only) PERMIT NUMBER: 7 PERMIT FEE: RESIDENTIAL CONSTRUCTION PERMIT APPLICATION ❑ NEW CONSTRUCTION ® ADDITION/REMODEL ❑ ACCESSORY BUILDING ❑ DECK ❑ OTHER SITE ADDRESS:4716 N. SUNNYVALE DR.����/�; ASSESSORS PARCEL NO.:45011.1003 LEGAL DESCRIPTIQAky o�Qkn[T rl✓Nrs=R BUILDING OWNER NAME:DICK LANG NAME:DICK LANG Project ADDRESS:4716 N. SUNNYVALE DR Name lG u mittal CITY:SPOKANE VALLEY STATE:WA ZiP:9906- PHONE: FAX: CELL: CONTACT NAME:BRIAN JONES PHONE: 509.924.1519 FAx:509.892.1208 CELL: 509.370.9483 CONTRACTOR NAME:LEXINGTON HOMES, INC. MAILING ADDRESS:P.O. BOX 141749 CITY:SPOKANE STATE:WA ZIP:99214 PHONE:509.924.1519 FAx:509.892.1208 CELL: CONTRACTOR LICENSE NO.:LEXINH1025JA EXPIRES:04/05/2012 CITY BUSINESS LICENSE NO. DESCRIBE THE SCOPE OF WORK IN DETAIL AND INDICATE USE & PROPOSED USE: GARAGE ADDITION 20X22; ****YOU MUST COMPLETE THE FOLLOWING**** MARK N /A IF NOT APPLICABLE Height to Peak:13' Dimensions:20x22 No. of Stories:1 Total Habitable Space:0 Main Floor SQ FT:N/A Upper Floor SQ FT:N/A Unfinished Basement SQ Finished Basement SQ FT: N/A FT: N/A Garage SQ F .440) Deck/Covered Patio SQ Impervious Surface 30% Slopes on A0iI " or4 OIL FT:N/A Area:440 Property:No No. of Bedrooms:0 Construction Type: Heat Source: Sewer or Se tic:SEWER TOTAL COST OF PROJECT: $�r,W Z DISCLAIMER The permitted verifies, acknowledges and agrees by their signature that: 1) if this permit is for construction or on a dwelling, the dwelling is/will be served by potable water. 2) Ownership of this City of Spokane Valley permit inure to the property owner. 3) The signatory is the property owner or has permission to represent the property owner in this transaction. 4) All construction is to be done in full compliance with the City of Spokane Valley Development code. Referenced codes are available for review at the City of Spokane Valley Permit Center. 5) The City of Spokane Valley permit is not -a -permit or approval for a,pf violation of federal, state or local laws, codes or ordinances. 6) Plans or additional information may be squired to b submitted and sqb quently approved before this application can be processed. Slanatu 7 Date: 13V iz Updated 1-11-11 Page 1 of 2 http://www.spokanevaIley.org/filestorage/124/938/210/948/ 1496/Building_Perm it_-_Residential_11-11-11. doc S"cfirry0E-100^__ p'oKane Uallev• Target Date sheet For City Use Only PLUS Project ; Z l Project Address 1 11703 E Sprague Ave Suite B-3 ♦ Spokane Valley WA 99206 509.720-5240 ♦ Fax: 509.688.0037 ♦ permitcenter@spokanevalley.org As part of our on-going commitment to customer service during the review process of your project application, we are providing you with a TARGET DATE for the initial technical application review. If for any reason we cannot meet this date, we will contact you with a revised target date. Your application review TARGET DATE is The TARGET DATE is the date we estimate your project application will have had its initial technical review. It is not the date for approval or permit issuance. Tips for a Smoother Project Application Review ➢ Submit complete, accurate plans and documents. project 4t_ `ZY F 7 Extra time may be required for re -submittals as project application reviewers ork'on multiple applications and it maybe several days before they can look at your new or revised information. I Submittal ➢ Designate a specific contact person to communicate with the City. While the person designated as the applicant's contact person with the City can be changed, one individual with the expertise for dealing with reviewer comments would be the best choice for the entire review process. ➢ Call staff regarding the status of your project only after the target date shown at the top of the page. Although you should be contacted on or by the target date, please feel free to contact us if you haven't heard from us by your target date. Staff may contact you before the target date if the initial review is complete. By following this procedure, you will save time and allow the reviewers to complete the work more expeditiously. Steps in the Permit Process 1. Counter Complete. Your application has been accepted as counter complete. This means all of the required documents, as indicated on your Pre -Application Checklist have been submitted or have been approved for deferred submittal. This does not prevent technical staff from requesting additional information as a result of their technical review. 2. Quality Check. The next step in the process is a quality check to make sure that the application is reviewable and free from substantive flaws that would prevent technical staff from completing the technical review once it is started. When this step is complete, your application will be routed to the appropriate staff and remain in their review queue until it comes up for review. 3. Technical Compliance. Once an application is administratively complete, it is routed to technical staff for compliance review. Depending on the type of project, technical staff may include multiple reviewers. You should be contacted by phone, fax, email, or mail by your TARGET DATE once the initial technical compliance review is complete. 4. Permit Issuance. When the technical compliance review of the application is complete, including any subsequent re - submittals, each reviewer will approve their section of the application and route it to the Permit Center. When all sections of the application are received, a Permit Specialist will process the application and contact the person specified on your application for permit pick-up. Information regarding fees and pre -construction meetings (if required) will be provided by the Permit Specialist at that time. CD -003 V-7/ 06-21-11 Page I of 1 0 0 a 100'-0" w 20._0.. ......... ............... PLANNING_DEPT. APPROVED BY . , Wim„ - DATENORTH 9 FSE EIVED CSV PE FAIT CIENTE(J AUG 3 1 2014, Project # ►dame Submittal # 0 0 T 100'-0" EXISTING CURB SUNNYVALE DRIVE 4716 N. Sunnyvale Dr LEXINGTON HOMES Spokane, WA 99216 PO BOX 141749 Block 4 / Lot 3 SPOKANE, WA 99214 Sunnyvale Addition Phone: (509) 924-1519 14,000 Sqft Fax: (509)892-1208 Parcel #45011.1003 SCALE 1 = 20' 0 0 T . Community Development Department Permit Center 11703 East Sprague Avenue, Suite B-3 [`ICSTA'okane Spokane Valley, WA 9920 Tel: (509) 720-2540 r Fax: (509) 688-0037 Valley permitcenterC�sookanevallev.org ,;.00 (Staff Use Only) PERMIT NUMBER:---- PERMIT UMBER'_ PERMIT FEE' RESIDENTIAL CONSTRUCTION PERMIT APPLICATION El NEW CONSTRUCTION ADDITION/ REMODEL ❑ ACCESSORY BUILDING [I DECK El OTHER SITE ADDRESS:4716 N. SUNNYVALE DR. ASSESSORS PARCEL N0.:45011.1003 BUILDING OWNER NAME: DICK LANG NAME:DICK LANG ADDRESS:4716 N. SUNNYVALE DR CITY:SPOKANE VALLEY PHONE: CONTACT NAME:BRIAN JONES PHONE: 509.924.1519 LEGAL DESCRIPTION: CSV PI STATE:WA# ProjeCt #,E FAX: FAx:509.892.1208 ZiP:99216 CELL: 509.370.9483 CONTRACTOR NAME:LEXINGTON HOMES, INC. MAILING ADDRESS:P.O. Box 141749 STATE:WA ZIP:99214 CITY:SPOKANE PHONE: 509.924.1519 FAX:509.892.1208 CELL: CONTRACTOR LICENSE NO.:LEXINHI025JA EXPIRES: 04/05/2012 CITY BUSINESS LICENSE NO. DESCRIBE THE SCOPE OF WORK IN DETAIL AND INDICATE USE & PROPOSED USE: GARAGEADDITION 20X221'——-- - ------------------------ Height to Peak:13' Main Floor SQ FT.N/A Garage SQ FT:440 No. of Bedrooms:0 **** YOU MUST COMPLETE THE FOLLOWING**** __ _.�� www• AMI C Dimensions:20x22 Upper Floor SQ FT:N/A Deck/Covered Patio SQ FT: N/A ction TOTAL COST OF PROJECT: $-2137W ;—;' No. of Stories:) Unfinished Basement SQ FT: N/A Impervious Surface Area:440 Heat Source: Total Habitable Space:0 Finished Basement SQ 30% Slopes on Property:No Sewer or Septic:SEWER DISCLAIMER The permitted verifies, acknowledges and agrees by their signature that: 1) if this permit is for construction or on a dwelling, the dwelling is/will be served by potable water. 2) Ownership of this City of Spokane Valley permit inure to the property owner. 3) The signatory is the property owner or has permission to represent the property owner in this transaction. 4) All construction is to be done in full compliance with the City of or review at Spokane Valley Valley permit iismnot code. emilRoreapprovdal for i arepf v olationn ofavailable ffederal, stateorlocal laws, codes oCity of Spokane rlordiley nan ordinances. Plans or additional Spokane uentl approved before this application can be processed. information may besequired to b� submitted and sy q Y pP natu Updated 1-11-11 2 J Date: �c�j f / vy� _ �,-)A/azai,)in/q48/1496/Building_Permit_-_Residential_)1-11-11.doc ..f 7 • Permit Center Sart e 11703 E Sprague Ave,Suite B-3 PERMIT NUMBER: Spokane Valley,WA 99206 4000 Valley (509)688-0036 FAX:(509)688-0037 PERMIT FEE: permitcenter@spokanevalley.org Community Development Plumbing Permit Application ❑ Commercial ❑■ Residential SITE ADDRESS: 4716 N. Sunnyvale Dr., Spokane Valley, WA 99216 Building Owner Dick Lang Name: Phone: Fax: Address: 4716 N.Sunnyvale Dr.,Spokane Valley,WA 99216 City: State: Zip: Contractor Gold Seal Hir g I v Name: Phone: �?�,_S9 4i4.. Fax: Address: 654. E , -73z5c e.. City: • 6>d _De.„ State: WA Zip: 9Cy Z License No: City Business Lic: Contact/Project Manager:Lexington Homes,Inc. Name: Phone: #OF UNITS PLUMBING FIXTURE ON A TRAP TOILETS URINALS TUBS SHOWERS(per trap) Lav/Basins,Bar,Floor,Kitchen,Laundry,Utility,Janitor,Photo,X-ray,Food, SINKS Prep/Culinary Meat DISHWASHER CLOTHES WASHER GARBAGE DISPOSAL WATER SOFTNER FLOOR DRAIN Area,Case,Coil,Trench,Condensate ROOF DRAIN/OVERFLOW DRAINS FOUNTAIN,DRINKING WATER PIPING/DRAIN-IN WASTE Installation,Alterations,Repair,Reversals WATER USING DEVICE Ice and/or Coffee maker,hose bib,steamer proofer,carbonator,swamp cooler PRIVATE SEWAGE DISPOSAL SYSTEM WATER HEATER If Gas,See Mechanical INDUSTRIAL WASTE PRETREATEMENT INCEPTORS Including traps,vents except kitchen type grease interceptors functioning as fixture traps REPAIR OR ALTERATION Water piping,drainage or vent piping ATMOSPHERIC TYPE VACUUM BREAKER BACK FLOW PROTECTIVE DEVICE Other than atmospheric type vacuum breakers MEDICAL GAS INCEPTORS i. 3,..4... �.ti i`.! fll.. -�i•V/ill CH ❑CASH ❑CHECK 0 VISA 0 MC EXPIRES: Card# VIN: SIGNATURE: v — P:\Community Development\02 Administration\03 Forms-Official Versions\Pennit Center\Plumbing Pennit Application 04-03-09 dg.doc tit • • Permit Center G" one 11703E Sprague Ave,Suite B-3 PERMIT NUMBER: F Spokane Valley,WA 99206 .000Val Icy (509)688-0036 FAX:(509)688-0037 PERMIT FEE: Community Development permitcenter n spokanevalley.org Mechanical PermitQQ�� Application nCommercial U Residential 4 1 SITE ADDRESS: + LO 1`4'1 �c& ��k)' L— i p/ Building Owner Name: '�)�. st„ c Phone: Fax: Address: ? �r St�����U �� City: State: LLQ Zip: Contractor -\fir/ Name: Phone: +6+,— Fax: Address: G.ZdZ /w , �c�d P—1.4>A- City:•,ass-L✓ yL.ti State: Zip: Z47 License No: City Business Lic: Contact/Project Manager: Lig XwaTc w Zy yyj`s S J}.j Name: `es .,,) 2'1 .S Phone: .4 S l9 #U N ITS FURNACES&SUSPENDED HEATERS-INSTALLATION OR RELOCATION Up to&including 100,000 BTU FURNACES&SUSPENDED HEATERS-INSTALLATION OR RELOCATION Over 100,000 BTU DUCT WORK SYSTEM HEAT PUMP/AIR CONDITIONER 0-3 TON AIR CONDITIONER Over 3-15 TON AIR CONDITIONER Over 15-30 TON AIR CONDITIONER Over 30-50 TON AIR CONDITIONER Over 50 TON GAS WATER HEATER GAS PIPING SYSTEM(each outlet) GAS LOG,FIREPLACE,&GAS INSERT APPLIANCE VENTS INSTALLATION,RELOCATION,REPLACEMENT REPAIRS OR ADDITIONS BOILER,COMPRESSORS,ABSORPTIONS SYSTEM 0 to 3 hp-100,000 BTU or less BOILER,COMPRESSORS,ABSORPTIONS SYSTEM Over 3-15 hp—100,001 to 500,000 BTU BOILER,COMPRESSORS,ABSORPTIONS SYSTEM Over 15—30 hp -500,001 to 1,000,000 BTU BOILER,COMPRESSORS,ABSORPTIONS SYSTEM Over 30 hp—1,000,001 to 1,750,000 BTU BOILER,COMPRESSORS,ABSORPTIONS SYSTEM Over 50 hp—over 1,750,000 BTU AIR HANDLER(DOES NOT include ducting) Each unit up to 10,000 cfm,including ducts AIR HANDLER(DOES NOT include ducting) Each unit over 10,000 cfm EVAPORATIVE COOLERS(other than portables) VENTILATION AND EXHAUST Each fan connected to a singe duct VENTILATION AND EXHAUST Each ventilation system VENTILATION AND EXHAUST Each hood served by mechanical exhaust INCINERATORS Installation or relocation of residential INCINERATORS Installation or relocation of commercial APPLIANCES Range,Clothes Washer UNLISTED APPLIANCES Under 400,000 BTU UNLISTED APPLIANCES Over 400,000 BTU HOOD Type I HOOD Type II L P STORAGE TANK WOOD OR PELLET STOVE INSERT WOOD STOVE SYSTEM—FREE STANDING EXPIRES: VIN: ❑CASH ❑CHECK 0 VISA 0 MC CARD#: SIGNATURE P:\Community Development\02 Administration\03 Forms-Official Versions\Pennit Center\Mechanical Permit Application 04-03-09 dg.doc Spokane~ i.90OValleve Target Date sheet For City Use Only PLUS Project Project Address 11703 E Sprague Ave Suite B-3 ♦ Spokane Valley WA 99206 509.720-5240 ♦ Fax: 509.688.0037 ♦ permitcenter@spokanevalley.org As part of our on-going commitment to customer service during the review process of your project application, we are providing you with a TARGET DATE for the initial technical application review. If for any reason we cannot meet this date, we will contact you with a revised target date. Your application review TARGET DATE is The TARGET DATE is the date we estimate your project application will have had its initial technical review. It is not the date for approval or permit issuance. CSV PERMIT CENTER Tips for a Smoother Project Application Re 'ew Atli 3 1 2011 ➢ Submit complete, accurate plans and documents. Project # _ Extra time may be re uired or re -submittals as project application reviewers wor Name lea I<cations and it may be Y 9 .f P J PP P PP Y several days before they can look at your new or revised information. SUL1'M,,tal # ➢ Designate a specific contact person to communicate with the City. While the person designated as the applicant's contact person with the City can be changed, one individual with the expertise for dealing with reviewer comments would be the best choice for the entire review process. ➢ Call staff regarding the status of your project only after the target date shown at the top of the page. Although you should be contacted on or by the target date, please feel free to contact us if you haven't heard from us by your target date. Staff may contact you before the target date if the initial review is complete. By following this procedure, you will save time and allow the reviewers to complete the work more expeditiously. Steps in the Permit Process 1. Counter Complete. Your application has been accepted as counter complete. This means all of the required documents, as indicated on your Pre -Application Checklist have been submitted or have been approved for deferred submittal. This does not prevent technical staff from requesting additional information as a result of their technical review. 2. Quality Check. The next step in the process is a quality check to make sure that the application is reviewable and free from substantive flaws that would prevent technical staff from completing the technical review once it is started. When this step is complete, your application will be routed to the appropriate staff and remain in their review queue until it comes up for review. 3. Technical Compliance. Once an application is administratively complete, it is routed to technical staff for compliance review. Depending on the type of project, technical staff may include multiple reviewers. You should be contacted by phone, fax, email, or mail by your TARGET DATE once the initial technical compliance review is complete. 4. Permit Issuance. When the technical compliance review of the application is complete, including any subsequent re - submittals, each reviewer will approve their section of the application and route it to the Permit Center. When all sections of the application are received, a Permit Specialist will process the application and contact the person specified on your application for permit pick-up. Information regarding fees and pre -construction meetings (if required) will be provided by the Permit Specialist at that time. CD -003 V-7/ 06-21-11 Page 1 of 1