2011, 09-02 Permit App: 11002687 Addition GarageProject Number: 11002687 Inv: 1 Application Date: 9/2/2011 Page 1 of 3
THIS IS NOT A PERMIT
Penalties will be assessed for commencing work without a permit
Proiect Information:
Permit Use: 440 SF GARAGE ADD W/SUSPENDED GAS Contact: LEXINGTON HOMES
HEATER & (2)WC (1) SINK (1) SHWR Address: P.O. BOX 141749
Setbacks: Front Left: Right: Rear:
Site Information:
Plat Key: 002579 Name: SUNNYVALE ADD
Parcel Number: 45011.1003 Block:
SiteAddress: 4716 N SUNNYVALE DR
C - S - Z: SPOKANE WA 99214
Phone: (509) 924-1519
Group Name:
Project Name:
District: East
Lot:
Owner: Name: LANG, DICK
Address: 4716 N SUNNYVALE DR N.
Location:: CSV SPOKANE, WA 99216-1528
Zoning: R-3 SF Res District
Water District: 134 CONSOLIDATED ID #19 Hold: ❑
Area: 14,000 Sq Ft Width: 0 Depth: 0 Right Of Way (ft): 0
Nbr of Bldgs: 1 Nbr of Dwellings: 1
Review Information
Review
Building Plan Review Released Bv:
Originally Released:
Landuse/Zoning/HE Conditions
Originally Released:
Permits:
9/1/2011 By: tmelbourn
Released By:
9/1/2011 By: mpalaniuk
Operator: MBB Printed By: JD Print Date: 9/2/2011
Project Number: 11002687 Inv: I Application Date: 9/2/2011
THIS IS NOT A PERMIT
Penalties will be assessed for commencing work without a permit
— Building Permit
Contractor: Lexington Homes Inc
Firm: Lexington Homes Inc
Address: P O BOX 141749
Phone: (509) 924-1519
SPOKANE, WA 99214
This Application:
Total Project:
Description Gtr Tvae
Notes
Sq Ft Valuation
Sq Ft Valuation
GAR WOOD U-1 VB
GARAGE
0 $24,000.00
0 $24,000.00
ADDITION
Totals:
0 $24,000.00
0 $24,000.00
Item Description
Units
Unit Desc
Fee Amount
RESIDENTIAL PERMIT FEE
1
SELECT
$377.25
ACCESSORY PLANS REVIEW
1
SELECT
$94.31
WSBCC SURCHARGE
1
SELECT
$4.50
Permit Total Fees:
$476.06
Mechanical Permit
Contractor: R & R HEATING & AIR COND INC
Firm: R & R HEATING
& AIR COND INC
Address: 4019 E CENTRAL
Phone: (509) 484-1405
SPOKANE, WA 99207
Item Description
Units
Unit Desc
Fee Amount
GAS APPLIANCE<=I00,000BTU
1
NUMBER OF
$13.00
GAS PIPING
1
# OF UNITS
$1.00
Permit Total Fees: $14.00
Plumbing Permit
Contractor: GOLD SEAL MECHANICAL INC Firm: GOLD SEAL MECHANICAL INC
Address: 5524 E BOONE AVE Phone: (509) 535-5944
SPOKANE, WA 99212
Item Description Units Unit Desc Fee Amount
TOILETSBIDETS 2 NUMBER OF $12.00
SINKS 1 NUMBER OF $6.00
SHOWERS 1 NUMBER OF $6.00
Permit Total Fees: $24.00
Operator: MBB Printed By: JD Print Date: 9/2/2011
Page 2 of 3
Project Number: 11002687 Inv: 1 Application Date: 9/2/2011 Page 3 of 3
THIS IS NOT A PERMIT
Penalties will be assessed for commencing work without a permit
Notes: _, a_ h.r
Payment Summa
Permit Type Fee Amount Invoice Amount Amount Paid Amount Owing
Building Permit $476.06 $476.06 $94.31 $381.75
Mechanical Permit $14.00 $14.00 $0.00 $14.00
Plumbing Permit $24.00 $24.00 $0.00 $24.00
$514.06 $514.06 $94.31 $419.75
Disclaimer:
Submittal of this application certifies the owner (or person(s) authorized by the owner) has both examined and finds the information
contained within to be true and correct, and agrees that all provisions of laws and/or regulations governing this type of work will be
complied with. Subsequent issuance of a permit shall not be construed to be a permit for, or an approval of, any violation of any of
the provisions of the code or of any other state or local laws or ordinances.
Signature:
Operator: MBB Printed By: JD Print Date: 9/2/2011
C[TY OC
Spokane
,,,;0o0Valley
Community Development Department
Permit Center
11703 East Sprague Avenue, Suite B-3
Spokane Valley, WA 99206
Tel: (509) 720-2540
Fax: (509) 688-0037
perm itcenter(c spokanevaIley.org
(Staff Use Only)
PERMIT NUMBER: 7
PERMIT FEE:
RESIDENTIAL CONSTRUCTION PERMIT APPLICATION
❑ NEW CONSTRUCTION ® ADDITION/REMODEL ❑ ACCESSORY BUILDING
❑ DECK ❑ OTHER
SITE ADDRESS:4716 N. SUNNYVALE DR.����/�;
ASSESSORS PARCEL NO.:45011.1003 LEGAL DESCRIPTIQAky o�Qkn[T rl✓Nrs=R
BUILDING OWNER NAME:DICK LANG
NAME:DICK LANG Project
ADDRESS:4716 N. SUNNYVALE DR Name lG
u
mittal
CITY:SPOKANE VALLEY STATE:WA ZiP:9906-
PHONE: FAX: CELL:
CONTACT NAME:BRIAN JONES
PHONE: 509.924.1519 FAx:509.892.1208 CELL: 509.370.9483
CONTRACTOR NAME:LEXINGTON HOMES, INC.
MAILING ADDRESS:P.O. BOX 141749
CITY:SPOKANE STATE:WA ZIP:99214
PHONE:509.924.1519 FAx:509.892.1208 CELL:
CONTRACTOR LICENSE NO.:LEXINH1025JA EXPIRES:04/05/2012 CITY BUSINESS LICENSE
NO.
DESCRIBE THE SCOPE OF WORK IN DETAIL AND INDICATE USE & PROPOSED USE:
GARAGE ADDITION 20X22;
****YOU MUST COMPLETE THE FOLLOWING****
MARK N /A IF NOT APPLICABLE
Height to Peak:13'
Dimensions:20x22
No. of Stories:1
Total Habitable Space:0
Main Floor SQ FT:N/A
Upper Floor SQ FT:N/A
Unfinished Basement SQ
Finished Basement SQ
FT: N/A
FT: N/A
Garage SQ F .440)
Deck/Covered Patio SQ
Impervious Surface
30% Slopes on
A0iI " or4 OIL
FT:N/A
Area:440
Property:No
No. of Bedrooms:0
Construction Type:
Heat Source:
Sewer or Se tic:SEWER
TOTAL COST OF PROJECT: $�r,W Z
DISCLAIMER
The permitted verifies, acknowledges and agrees by their signature that: 1) if this permit is for construction or on a dwelling, the dwelling is/will
be served by potable water. 2) Ownership of this City of Spokane Valley permit inure to the property owner. 3) The signatory is the property
owner or has permission to represent the property owner in this transaction. 4) All construction is to be done in full compliance with the City of
Spokane Valley Development code. Referenced codes are available for review at the City of Spokane Valley Permit Center. 5) The City of
Spokane Valley permit is not -a -permit or approval for a,pf violation of federal, state or local laws, codes or ordinances. 6) Plans or additional
information may be squired to b submitted and sqb quently approved before this application can be processed.
Slanatu
7
Date: 13V iz
Updated 1-11-11 Page 1 of 2
http://www.spokanevaIley.org/filestorage/124/938/210/948/ 1496/Building_Perm it_-_Residential_11-11-11. doc
S"cfirry0E-100^__
p'oKane
Uallev•
Target Date sheet
For City Use Only
PLUS Project ; Z l
Project Address
1
11703 E Sprague Ave Suite B-3 ♦ Spokane Valley WA 99206
509.720-5240 ♦ Fax: 509.688.0037 ♦ permitcenter@spokanevalley.org
As part of our on-going commitment to customer service during the review process of your project application, we are
providing you with a TARGET DATE for the initial technical application review. If for any reason we cannot meet
this date, we will contact you with a revised target date.
Your application review TARGET DATE is
The TARGET DATE is the date we estimate your project application will have had its initial technical review. It is
not the date for approval or permit issuance.
Tips for a Smoother Project Application Review
➢ Submit complete, accurate plans and documents. project 4t_ `ZY F 7
Extra time may be required for re -submittals as project application reviewers ork'on multiple applications and it maybe
several days before they can look at your new or revised information. I Submittal
➢ Designate a specific contact person to communicate with the City.
While the person designated as the applicant's contact person with the City can be changed, one individual with the expertise
for dealing with reviewer comments would be the best choice for the entire review process.
➢ Call staff regarding the status of your project only after the target date shown at the top of the page.
Although you should be contacted on or by the target date, please feel free to contact us if you haven't heard from us by your
target date. Staff may contact you before the target date if the initial review is complete. By following this procedure, you will
save time and allow the reviewers to complete the work more expeditiously.
Steps in the Permit Process
1. Counter Complete. Your application has been accepted as counter complete. This means all of the required documents, as
indicated on your Pre -Application Checklist have been submitted or have been approved for deferred submittal. This does
not prevent technical staff from requesting additional information as a result of their technical review.
2. Quality Check. The next step in the process is a quality check to make sure that the application is reviewable and free from
substantive flaws that would prevent technical staff from completing the technical review once it is started. When this step is
complete, your application will be routed to the appropriate staff and remain in their review queue until it comes up for review.
3. Technical Compliance. Once an application is administratively complete, it is routed to technical staff for compliance review.
Depending on the type of project, technical staff may include multiple reviewers. You should be contacted by phone, fax, email,
or mail by your TARGET DATE once the initial technical compliance review is complete.
4. Permit Issuance. When the technical compliance review of the application is complete, including any subsequent re -
submittals, each reviewer will approve their section of the application and route it to the Permit Center. When all sections of the
application are received, a Permit Specialist will process the application and contact the person specified on your application for
permit pick-up. Information regarding fees and pre -construction meetings (if required) will be provided by the Permit Specialist at
that time.
CD -003 V-7/ 06-21-11 Page I of 1
0
0
a
100'-0"
w
20._0..
......... ...............
PLANNING_DEPT. APPROVED
BY . , Wim„
-
DATENORTH 9
FSE EIVED
CSV PE FAIT CIENTE(J
AUG 3 1 2014,
Project #
►dame
Submittal #
0
0
T
100'-0"
EXISTING CURB
SUNNYVALE DRIVE
4716 N. Sunnyvale Dr
LEXINGTON HOMES
Spokane, WA 99216
PO BOX 141749
Block 4 / Lot 3
SPOKANE, WA 99214
Sunnyvale Addition
Phone: (509) 924-1519
14,000 Sqft
Fax: (509)892-1208
Parcel #45011.1003 SCALE 1 = 20'
0
0
T
. Community Development Department
Permit Center
11703 East Sprague Avenue, Suite B-3
[`ICSTA'okane Spokane Valley, WA 9920
Tel: (509) 720-2540
r Fax: (509) 688-0037
Valley permitcenterC�sookanevallev.org
,;.00
(Staff Use Only)
PERMIT NUMBER:----
PERMIT
UMBER'_
PERMIT FEE'
RESIDENTIAL CONSTRUCTION PERMIT APPLICATION
El NEW CONSTRUCTION ADDITION/ REMODEL ❑ ACCESSORY BUILDING
[I DECK El OTHER
SITE ADDRESS:4716 N. SUNNYVALE DR.
ASSESSORS PARCEL N0.:45011.1003
BUILDING OWNER NAME: DICK LANG
NAME:DICK LANG
ADDRESS:4716 N. SUNNYVALE DR
CITY:SPOKANE VALLEY
PHONE:
CONTACT NAME:BRIAN JONES
PHONE: 509.924.1519
LEGAL DESCRIPTION:
CSV PI
STATE:WA# ProjeCt #,E
FAX:
FAx:509.892.1208
ZiP:99216
CELL: 509.370.9483
CONTRACTOR NAME:LEXINGTON HOMES, INC.
MAILING ADDRESS:P.O. Box 141749
STATE:WA ZIP:99214
CITY:SPOKANE
PHONE: 509.924.1519
FAX:509.892.1208 CELL:
CONTRACTOR LICENSE NO.:LEXINHI025JA
EXPIRES: 04/05/2012 CITY BUSINESS LICENSE
NO.
DESCRIBE THE SCOPE OF WORK IN DETAIL AND INDICATE USE & PROPOSED USE:
GARAGEADDITION 20X221'——--
- ------------------------
Height to Peak:13'
Main Floor SQ FT.N/A
Garage SQ FT:440
No. of Bedrooms:0
****
YOU MUST COMPLETE THE FOLLOWING****
__ _.�� www• AMI C
Dimensions:20x22
Upper Floor SQ FT:N/A
Deck/Covered Patio SQ
FT: N/A
ction
TOTAL COST OF PROJECT: $-2137W ;—;'
No. of Stories:)
Unfinished Basement SQ
FT: N/A
Impervious Surface
Area:440
Heat Source:
Total Habitable Space:0
Finished Basement SQ
30% Slopes on
Property:No
Sewer or Septic:SEWER
DISCLAIMER
The permitted verifies, acknowledges and agrees by their signature that: 1) if this permit is for construction or on a dwelling, the dwelling is/will
be served by potable water. 2) Ownership of this City of Spokane Valley permit inure to the property owner. 3) The signatory is the property
owner or has permission to represent the property owner in this transaction. 4) All construction is to be done in full compliance with the City of
or review at
Spokane Valley
Valley permit iismnot code. emilRoreapprovdal for i arepf v olationn ofavailable ffederal, stateorlocal laws, codes oCity of Spokane rlordiley nan ordinances. Plans or additional
Spokane uentl approved before this application can be processed.
information may besequired to b� submitted and sy q Y pP
natu
Updated 1-11-11
2 J
Date: �c�j f /
vy� _
�,-)A/azai,)in/q48/1496/Building_Permit_-_Residential_)1-11-11.doc
..f 7
•
Permit Center
Sart e 11703 E Sprague Ave,Suite B-3 PERMIT NUMBER:
Spokane Valley,WA 99206
4000 Valley (509)688-0036 FAX:(509)688-0037 PERMIT FEE:
permitcenter@spokanevalley.org
Community Development
Plumbing Permit Application ❑ Commercial ❑■ Residential
SITE ADDRESS: 4716 N. Sunnyvale Dr., Spokane Valley, WA 99216
Building Owner Dick Lang
Name: Phone: Fax:
Address: 4716 N.Sunnyvale Dr.,Spokane Valley,WA 99216 City: State: Zip:
Contractor Gold Seal Hir g I v
Name: Phone: �?�,_S9 4i4.. Fax:
Address: 654. E , -73z5c e.. City: • 6>d _De.„ State: WA Zip: 9Cy Z
License No: City Business Lic:
Contact/Project Manager:Lexington Homes,Inc.
Name: Phone:
#OF UNITS
PLUMBING FIXTURE ON A TRAP
TOILETS
URINALS
TUBS
SHOWERS(per trap)
Lav/Basins,Bar,Floor,Kitchen,Laundry,Utility,Janitor,Photo,X-ray,Food,
SINKS Prep/Culinary Meat
DISHWASHER
CLOTHES WASHER
GARBAGE DISPOSAL
WATER SOFTNER
FLOOR DRAIN Area,Case,Coil,Trench,Condensate
ROOF DRAIN/OVERFLOW DRAINS
FOUNTAIN,DRINKING
WATER PIPING/DRAIN-IN WASTE Installation,Alterations,Repair,Reversals
WATER USING DEVICE Ice and/or Coffee maker,hose bib,steamer proofer,carbonator,swamp cooler
PRIVATE SEWAGE DISPOSAL SYSTEM
WATER HEATER If Gas,See Mechanical
INDUSTRIAL WASTE PRETREATEMENT
INCEPTORS Including traps,vents except kitchen type grease interceptors functioning as fixture traps
REPAIR OR ALTERATION Water piping,drainage or vent piping
ATMOSPHERIC TYPE VACUUM BREAKER
BACK FLOW PROTECTIVE DEVICE Other than atmospheric type vacuum breakers
MEDICAL GAS
INCEPTORS
i. 3,..4...
�.ti i`.! fll.. -�i•V/ill CH
❑CASH ❑CHECK 0 VISA 0 MC EXPIRES:
Card# VIN:
SIGNATURE:
v —
P:\Community Development\02 Administration\03 Forms-Official Versions\Pennit Center\Plumbing Pennit Application 04-03-09 dg.doc
tit • •
Permit Center
G" one 11703E Sprague Ave,Suite B-3 PERMIT NUMBER:
F Spokane Valley,WA 99206
.000Val Icy (509)688-0036 FAX:(509)688-0037 PERMIT FEE:
Community Development permitcenter n spokanevalley.org
Mechanical PermitQQ�� Application nCommercial U Residential
4 1
SITE ADDRESS: + LO 1`4'1 �c& ��k)' L— i p/
Building Owner
Name: '�)�. st„ c Phone: Fax:
Address: ? �r St�����U �� City: State: LLQ Zip:
Contractor -\fir/
Name: Phone: +6+,— Fax:
Address: G.ZdZ /w , �c�d P—1.4>A- City:•,ass-L✓ yL.ti State: Zip: Z47
License No: City Business Lic:
Contact/Project Manager: Lig XwaTc w Zy yyj`s S J}.j
Name: `es .,,) 2'1 .S Phone: .4 S l9
#U N ITS
FURNACES&SUSPENDED HEATERS-INSTALLATION OR RELOCATION Up to&including 100,000 BTU
FURNACES&SUSPENDED HEATERS-INSTALLATION OR RELOCATION Over 100,000 BTU
DUCT WORK SYSTEM
HEAT PUMP/AIR CONDITIONER 0-3 TON
AIR CONDITIONER Over 3-15 TON
AIR CONDITIONER Over 15-30 TON
AIR CONDITIONER Over 30-50 TON
AIR CONDITIONER Over 50 TON
GAS WATER HEATER
GAS PIPING SYSTEM(each outlet)
GAS LOG,FIREPLACE,&GAS INSERT
APPLIANCE VENTS INSTALLATION,RELOCATION,REPLACEMENT
REPAIRS OR ADDITIONS
BOILER,COMPRESSORS,ABSORPTIONS SYSTEM 0 to 3 hp-100,000 BTU or less
BOILER,COMPRESSORS,ABSORPTIONS SYSTEM Over 3-15 hp—100,001 to 500,000 BTU
BOILER,COMPRESSORS,ABSORPTIONS SYSTEM Over 15—30 hp -500,001 to 1,000,000 BTU
BOILER,COMPRESSORS,ABSORPTIONS SYSTEM Over 30 hp—1,000,001 to 1,750,000 BTU
BOILER,COMPRESSORS,ABSORPTIONS SYSTEM Over 50 hp—over 1,750,000 BTU
AIR HANDLER(DOES NOT include ducting) Each unit up to 10,000 cfm,including ducts
AIR HANDLER(DOES NOT include ducting) Each unit over 10,000 cfm
EVAPORATIVE COOLERS(other than portables)
VENTILATION AND EXHAUST Each fan connected to a singe duct
VENTILATION AND EXHAUST Each ventilation system
VENTILATION AND EXHAUST Each hood served by mechanical exhaust
INCINERATORS Installation or relocation of residential
INCINERATORS Installation or relocation of commercial
APPLIANCES Range,Clothes Washer
UNLISTED APPLIANCES Under 400,000 BTU
UNLISTED APPLIANCES Over 400,000 BTU
HOOD Type I
HOOD Type II
L P STORAGE TANK
WOOD OR PELLET STOVE INSERT
WOOD STOVE SYSTEM—FREE STANDING
EXPIRES: VIN:
❑CASH ❑CHECK 0 VISA 0 MC
CARD#: SIGNATURE
P:\Community Development\02 Administration\03 Forms-Official Versions\Pennit Center\Mechanical Permit Application 04-03-09 dg.doc
Spokane~
i.90OValleve
Target Date sheet
For City Use Only
PLUS Project
Project Address
11703 E Sprague Ave Suite B-3 ♦ Spokane Valley WA 99206
509.720-5240 ♦ Fax: 509.688.0037 ♦ permitcenter@spokanevalley.org
As part of our on-going commitment to customer service during the review process of your project application, we are
providing you with a TARGET DATE for the initial technical application review. If for any reason we cannot meet
this date, we will contact you with a revised target date.
Your application review TARGET DATE is
The TARGET DATE is the date we estimate your project application will have had its initial technical review. It is
not the date for approval or permit issuance.
CSV PERMIT CENTER
Tips for a Smoother Project Application Re 'ew Atli 3 1 2011
➢ Submit complete, accurate plans and documents. Project # _
Extra time may be re uired or re -submittals as project application reviewers wor
Name lea I<cations and it may be
Y 9 .f P J PP P PP Y
several days before they can look at your new or revised information. SUL1'M,,tal #
➢ Designate a specific contact person to communicate with the City.
While the person designated as the applicant's contact person with the City can be changed, one individual with the expertise
for dealing with reviewer comments would be the best choice for the entire review process.
➢ Call staff regarding the status of your project only after the target date shown at the top of the page.
Although you should be contacted on or by the target date, please feel free to contact us if you haven't heard from us by your
target date. Staff may contact you before the target date if the initial review is complete. By following this procedure, you will
save time and allow the reviewers to complete the work more expeditiously.
Steps in the Permit Process
1. Counter Complete. Your application has been accepted as counter complete. This means all of the required documents, as
indicated on your Pre -Application Checklist have been submitted or have been approved for deferred submittal. This does
not prevent technical staff from requesting additional information as a result of their technical review.
2. Quality Check. The next step in the process is a quality check to make sure that the application is reviewable and free from
substantive flaws that would prevent technical staff from completing the technical review once it is started. When this step is
complete, your application will be routed to the appropriate staff and remain in their review queue until it comes up for review.
3. Technical Compliance. Once an application is administratively complete, it is routed to technical staff for compliance review.
Depending on the type of project, technical staff may include multiple reviewers. You should be contacted by phone, fax, email,
or mail by your TARGET DATE once the initial technical compliance review is complete.
4. Permit Issuance. When the technical compliance review of the application is complete, including any subsequent re -
submittals, each reviewer will approve their section of the application and route it to the Permit Center. When all sections of the
application are received, a Permit Specialist will process the application and contact the person specified on your application for
permit pick-up. Information regarding fees and pre -construction meetings (if required) will be provided by the Permit Specialist at
that time.
CD -003 V-7/ 06-21-11 Page 1 of 1