2008, 07-21 Permit App: 08002702 Garage, DeckProject Number: 08002702 Inv: 1
Application
THIS IS NOT A PERMIT
Penalties will be assessed for commencing work without a permit
Date: 7/21/2008 Page 1 of 2
Project Information:
Permit Use: ATT GAR & COV DECK ADDITION Contact: R & D DEVELOPMENT & CONST
Address: 6565 N PERRY STE J
C - S - Z: SPOKANE WA 99207
Setbacks: Front Left: Right: Rear: Phone: (509) 489-2640
Group Name:
Site Information: Project Name:
Plat Key: 000382 Name: CHESTER HILLS ADD District: Sout
Parcel Number: 45294.0310 Block:
SiteAddress: 2517 S SUNRISE RD
Location:: CSV
Lot:
Owner: Name: DUESTERHOEFT, HEINZ
Address: 2517 S SUNRISE RD
SPOKANE VALLEY, WA 99206
Zoning: R-2 SF Res Suburban District
Water District: 101 SPO CO WATER DIST#3B Hold:
Area: .00 Acres Width: 0 Depth: 0 Right Of Way (ft): 60
Nbr of Bldgs: 2 Nbr of Dwellings: 1
Review Information:
Review
Building Plan Review
Released By:
Originally Released: 7/18/2008 By: tmelbourn
Landuse/Zoning/HE Conditions
Permits:
Released By:
Originally Released: 7/14/2008 By: mharnois
Operator: JD Printed By: JD Print Date: 7/21/2008
Project Number: 08002702 Inv: 1
Contractor:
Address:
Application
THIS IS NOT A PERMIT
Penalties will be assessed for commencing work without a permit
Date: 7/21/2008
R & D DEVELOPMENT & CONST.
1818 W FRANCIS, STE 180
SPOKANE, WA 99205
Description Grp Type Notes
COV DECK R-3 VB
GARAGE U-1 VB
Item Description
RESIDENTIAL PERMIT FEE
WSBC SURCHARGE
SF PLNS RVW < 7999 SQ FT
Notes:
Building Permit
Page 2 of 2
Firm: R & D DEVELOPMENT & CONSTR
Phone: (509) 218-7565
This Application:
Su Ft Valuation
74 $1,110.00
320 $6,080.00
Total Project:
Sq Ft Valuation
74 $1,110.00
320 $6,080.00
Totals: 394 $7,190.00
Units Unit Desc
1 SELECT
1 SELECT
1 SELECT
Permit Total Fees:
394 $7,190.00
Fee Amount
$153.25
$4.50
$61.30
$219.05
Conditions of approval exist for lots served by Ponderosa Ln. A habitat management plan is on file.
See file for Ponderosa Ln. - jforry
Payment Summary:
Permit Type
Building Permit
Fee Amount Invoice Amount
$219.05 $219.05
$219.05 $219.05
Amount Paid
$0.00
$0.00
Amount Owing
$219.05
$219.05
Disclaimer:
Submittal of this application certifies the owner (or person(s) authorized by the owner) has both examined and finds the information
contained within to be true and correct, and agrees that all provisions of laws and/or regulations governing this type of work will be
complied with. Subsequent issuance of a permit shall not be construed to be a permit for, or an approval of, any violation of any of
the provisions of the code or of any other state or local laws or ordinances.
Signature:
Operator: JD Printed By: JD Print Date: 7/21/2008
(Staff Use
Only) \\
PERMIT NUMBER:
PERMIT FEE:
CITY OF SPOKANE VALLEY
Community Development Department
Permit Center
11703 East Sprague Avenue, Suite B-3
Spokane Valley, WA 99206
Tel: (509) 688-0036 r I.
Fax: (509) 688-0037
permitcenterna spokanevalley.org
RESIDENTIAL CONSTRUCTION PERMIT APPLICA
NEW CONSTRUCTION
N
ADDITION/REMODEL ACCESSORY BUILDING
DECK ED OTHER
SITE ADDRESS:2517 SOUTH SUNRISE SPOKANE VALLEY, WA 99206
ASSESSORS PARCEL NO.:45294.0310 LEGAL DESCRIPTION:CHESTER HILLS L22 B 1
BUILDING OWNER NAME:HEINZ AND JONI DUESTERHOEFT
NAME:HEINZ AND JONI DUESTERHOEFT
ADDRESS:2517 SOUTH SUNRISE
CITY:SPOKANE VALLEY
STATE: WA
Zxp:99206
PHONE:509-924-5250
FAX: CELL:
CONTACT NAME:HEINZ AND JONI DUESTERHOEFT
PHONE:
FAX: CELL:
CONTRACTOR NAME:R&D DEVELOPMENT AND CONSTRUCTION
MAILING ADDRESS:6565 N PERRY BUILDING J
CITY:SPOKANE
STATE: WA ZIP:99207
PHONE:509-489-2640 FAX:509-489-2859
CELL:218-7565
CONTRACTOR LICENSE No.:RDDEVDD957KU EXPIRES: }\i(Si,\F
Ilt l7a C'A--(.EL—j .
DESCRIBE THE SCOPE OF WORK IN DETAIL AND INDICATE USE:
GARAGE ADDITION
CITY BUSINESS LICENSE NO.: s43,,
(<)2 -"13b -a59
PROPOSED USE:
RESIDENTIAL - GARAGE
Effective October 28, 2007 Page 1 of 2
http://www.spokanevalley.org/uploads/Community_Development/Documents/Forms/Building/Residential Construction Permit
App.1.doc
2,70
****YOU MUST COMPLETE THE FOLLOWING****
Height to Peak:141 "
.
Dimensions:
16 -0"'x20'-2"
No. of Stories:1
Total Habitable
Space:1404
Main Floor SQ
FT:1404
Upper Floor SQ FT:-
Unfinished Basement
SQ FT:1404
Finished Basement
SQ FT: -
`--- ----�
Garage SQ FT:418
310 SF 000c 1-tod
Deck/ overed Patio
SQ FT: -71-/--j?-
Impervious Surface
Area:
30% Slopes on
Property:N/A
No. of Bedrooms:4
Construc ' -r""
Type:coNVENTIONAL 1
STORY
Heat Source:HOT
WATER OR STEAM
Sewer or
Septic:
TOTAL COST OF PROJECT: $30,196.00
DISCLAIMER
The permitted verifies, acknowledges and agrees by their signature that: 1) if this permit is for construction or on a dwelling, the dwelling is/will
be served by potable water. 2) Ownership of this City of Spokane Valley permit inure to the property owner. 3) The signatory is the property
owner or has permission to represent the property owner in this transaction. 4) All construction is to be done in full compliance with the City of
Spokane Valley Development code. Referenced codes are available for review at the City of Spokane Valley Permit Center. 5) The City of
Spokane Valley permit is not a permit or approval for any violation of federal, state or local laws, codes or ordinances. 6) Plans or additional
information may be required to be submitted and subsequently approved before this application can be processed.
Signature
Method of payment: ❑ Cash ® Check
Bankcard #:
Date:7/11 /08
❑ Visa 111 Mastercard
EXP: VIN#:
Authorized Signature:
Effective October 28, 2007 Page 2 of 2
http://www.spokanevalley.org/uploads/Community_Development/Documents/Forms/Building/Residential Construction Permit
App.1.doc
Sfokane~
Valley®
For City Use Only
PLUS Project Number (_% .
Project Address
_ r` Y f
11703 E Sprague Ave Suite B-3 ♦ Spokane Valley WA 99206
509.688.0036 ♦ Fax: 509.688.0037 ♦ permitcenter@spokanevalley.org
As part of our on-going commitment to customer service during the review process of your project
application, we are providing you with a TARGET DATE for the initial technical application review. If for
any reason we cannot meet this date, we will contact you with a revised target date.
Your application review TARGET DATE is
The TARGET DATE is the date we estimate your project application will have had its initial technical
review. It is not the date for approval or permit issuance.
Tips for a Smoother Project Application Review
➢ Submit complete, accurate plans and documents.
Extra time may be required for re -submittals as project application reviewers work on multiple applications and it
may be several days before they can look at your new or revised information.
➢ Designate a specific contact person to communicate with the City.
While the person designated as the applicant's contact person with the City can be changed, one individual with the
expertise for dealing with reviewer comments would be the best choice for the entire review process.
➢ Call staff regarding the status of your project only after the target date shown at the top of the page.
Although you should be contacted on or by the target date, please feel free to contact us if you haven't heard from us
by your target date. Staff may contact you before the target date if the initial review is complete. By following this
procedure, you will save time and allow the reviewers to complete the work more expeditiously.
Steps in the Permit Process
1. Counter Complete. Your application has been accepted as counter complete. This means all of the required
documents, as indicated on your Pre -Application Checklist have been submitted or have been approved for deferred
submittal. This does not prevent technical staff from requesting additional information as a result of their technical review.
2. Quality Check. The next step in the process is a quality check to make sure that the application is reviewable and free
from substantive flaws that would prevent technical staff from completing the technical review once it is started. When
this step is complete, your application will be routed to the appropriate staff and remain in their review queue until it
comes up for review.
3. Technical Compliance. Once an application is administratively complete, it is routed to technical staff for compliance
review. Depending on the type of project, technical staff may include multiple reviewers. You should be contacted by
phone, fax, email, or mail by your TARGET DATE once the initial technical compliance review is complete.
4. Permit Issuance. When the technical compliance review of the application is complete, including any subsequent re -
submittals, each reviewer will approve their section of the application and route it to the Permit Center. When all sections
of the application are received, a Permit Specialist will process the application and contact the person specified on your
application for permit pick-up. Information regarding fees and pre -construction meetings (if required) will be provided by
the Permit Specialist at that time.
WHITE -APPLICANT PINK - BUILDING FILE REV 9/07
Site Parcel Number: 45294.0310
SITE
PLAN OF RECORDAPPROVED BY: 272 �'
DATE: 7//'7/OD
PROJECT # Q 8&ta ���