2014, 07-30 Permit: SW-141001126 SewerSPOKANE COUNTY UTILITIES
PERMIT
Application Number: SW -14001126
Permit Issued Date: 07/30/2014
Expiration Date: 07/30/2015
Project Description:
Project Name:
Primary Contact:
Phone:
SEWER CONNECTION
CLEMENT U94
POUL CONSTRUCTION
509-979-5872
Applicant: POUL CONSTRUCTION
Address:
Phone:
Email:
18902 E 2ND AVE
SPOKANE VALLEY, WA 99016
509-979-5872
SITE INFORMATION:
Site Address:
Parcel Number:
407 S TSCHIRLEY RD
55192.0326
Owner:
Address:
Phone:
Assessor's Description: CORBIN ADD GRNACRES N164FT OF W130FT L7 Email:
B25
Inspection Area: : (509)-477-3675
Water District: Consolidated Irrigation
District #19
Zoning:
KOKOT,AL&WK
407 S TSCHIRLEY RD
GREENACRES, WA 99016-9320
Fire District: Spokane Valley Fire
Land Area: 21320 Square Feet
CONTRACTOR INFORMATION:
POULCC*932BQ, Exp. 01/28/2015
POUL CONSTRUCTION
18902 E 2ND AVE SPOKANE VALLEY, WA 99016
509-979-5872
DETAILS:
Class
Type
Quantity Unit Charge Value
SEWER SEWER CONNECTION
FEE DETAIL:
Processing - Utilities
Utilities Permit
Total Fee:
$26.64
$125.00
$151.64
1 $125.00 $125.00
$125.00
CONDITIONS:
Parcel within 100 feet of pipeline(s) owned by the following: (GTN)
Plan review fee is required for all site plan reviews conducted by Spokane Valley Fire.
Inside Public Transit Benefit Area
CALL 1-800-424-5555 BEFORE YOU DIG—AT LEAST 2 WORKING DAYS IN ADVANCE. SPOKANE COUNTY CODE REQUIRES THE
INSTALLER COMPLY WITH ALL REQUIREMENTS OF THE WA STATE DEPT OF LABOR & INDUSTRIES, INCLUDING THOSE
RELATED TO TRENCH SAFETY.
SEWER PERMITS ARE VALID FOR ONE (1) YEAR FROM THE DATE OF ISSUANCE. FOR SEWER INSPECTIONS CALL THE UTILITIES
DEPT AT (509) 477-3604 FROM 8:30-5:00 MONDAY -FRIDAY PRIOR TO COVER. ONE WORKING DAY NOTICE REQUIRED. PERMIT
ALLOWS FOR A 30 -MINUTE INSPECTION. ADDITIONAL INSPECTION FEES APPLY AFTER 30 MINUTES.
Date Printed: 07/30/2014 15:32:03 Project Coordinator: Dawn Dompier
SPOKANE COUNTY UTILITIES
PERMIT
Application Number: SW -14001126 Permit Issued Date: 07/30/2014
Expiration Date: 07/30/2015
INSTALLER IS RESPONSIBLE TO INSURE ALL WASTEWATER DRAINS ARE CONNECTED TO THE SEWER AND MAY BE REQUIRED
TO PERFORM TESTS FOR VERIFICATION. INSTALLER IS TO FIELD LOCATE AND CONFIRM THE ELEVATION AND POSITION OF
SEWER STUB PRIOR TO ANY OTHER EXCAVATION.
SEWER STUBS AND DRY SIDE SEWERS ARE TO BE CHECKED PRIOR TO CONNECTION TO ENSURE THAT THEY HAVE
ACCEPTABLE GRADE AND ARE CLEAR AND UNOBSTRUCTED. SEWER LINES SHOULD BE CONSTRUCTED TO ALLOW FOR
GRAVITY FLOW FROM THE LOWEST LEVEL OF THE STRUCTURE.
THE INSTALLER AND THIS PERMIT MUST BE PRESENT AT THE JOB SITE AT THE SCHEDULED INSPECTION TIME. BOTH STATE
LAW RCW 19.122 AND COUNTY CODE REQUIRES THE INSTALLER TO GIVE NOTICE OF EXCAVATION TO OWNERS OF
UNDERGROUND FACILITIES.
Date Printed: 07/30/2014 15:32:03 Project Coordinator: Dawn Dompier