Loading...
2011, 11-18 Permit: DE-11003670 Demo Smoke Damage • Permit Center SCITYpo4 0,Namou ne Valle ® 11703 E Sprague Ave Suite B3 Spokane Valley WA 99206 509.720-5240♦ Fax: 509.688.0037•email: permitcenter®spokanevalley.org Site Information Project Information Site Address: 2515 S TIMBERLANE DR Project Number: 11003670 Inv: 1 Issue Date: 11/18/2011 Permit Use: DEMO SMOKE DAMAGED WALLS Parcel Number: 45253.0303 Subdivision: Applicant: RIDGELINE CONSTRUCTION Block: Lot: 780 N CECIL RD ST 104 Zoning: R-2 SF Res Suburban District POST FALLS ID 83854 Phone: (208)651-4444 Owner THOMPSON,GEORGE Contact: RIDGELINE CONSTRUCTION 780 N CECIL RD ST 104 Address: 2515 S TIMBERLANE DR POST FALLS ID 83854 Phone: (208)651-4444 SPOKANE VALLEY,WA 99037 Setbacks-Front: Left: Right: Rear: Building Inspector: EAST Water Dist: VERA Group Name: Project Name: Permits Demolition Permit Contractor: RIDGELINE REMODELING LLC License#: RIDGER*915MU DEMOLITION-RESIDENTIAL 1 $46.00 Total Permit Fee: $46.00 Payment Summary Total Fees AmountPaid AmountOwing Tran Date Receipt# Payment Amt $46.00 $46.00 $0.00 11/18/2011 29159 $46.00 Processed By: DAVIS,JENNA PERMIT Printed By: MORRIS,HEATHER Page 1 of 1 NOTICE The ownership of a Spokane Valley Development Permit will inure to the property owner. The permit applicant, by definition, is the property owner or an authorized agent of the property owner. It is the responsibility of the applicant/permitee that the use described on the front of this permit complies with applicable codes and that required inspections are requested. Failure to request inspections as listed below and obtain the necessary approvals before progressing beyond the point where inspections are required and may necessitate removal of certain parts of the construction are at the applicant's/permittee's or property owner's expense. At a minimum, the following inspections ARE REQUIRED by the Spokane Valley Municipal Code(SVMC): FOOTING - when forms and reinforcements are in place and prior to placement of concrete-all structures, including manufactured homes. NOTE: This inspection includes review of the structures setback from property lines. Minimum setbacks are established by SVMC. Curb lines and fence lines are not necessarily indicative of property lines. The responsibility to comply with applicable setback provisions lies solely with the permitee-neither the City of Spokane Valley nor its authorized representatives assume any responsibility for the verification or location of your property lines. Please verify their location prior to locating your structure. Failure to properly locate the structure may require its relocation at the owner's/permittee's expense. FOUNDATION -when forms and reinforcement are in place and prior to placement of concrete. PLUMBING-after rough-in, before covering and final. MECHANICAL-rough-in of piping, before covering, metal chimneys before concealment and final. FRAMING -after all framing, bracing and blocking is in place, rough electrical, plumbing and mechanical systems are complete, and prior to concealing. FINAL-when complete and prior to occupancy and/or use; all permits require final inspection. NOTE: In addition to inspection of the structure, this inspection includes review of site improvements (typically depicted on the approved site plan) required by ordinance or as a condition of approval of this permit. Items such as installation of fire hydrants, fire department access, on-site drainage (208'swales), road improvements,parking and landscaping are common requirements of a permit/site plan which must be completed prior to final approval of a building or issuance of a Certificate of Occupancy. MANUFACTURED HOMES-final inspection required when complete, stairs, handrails, skirting, etc. installed and prior to occupancy; completed inspection record card must be available on site. PLUMBING REVERSALS FOR SEWER CONNECTIONS-prior to cover RIGHT-OF-WAY/APPROACH-prior to placement of concrete/asphalt or, if gravel approach, after completion. In addition to the above, any plumbing or mechanical systems or material which would be concealed by framing, drywall, concrete, etc., must be inspected prior to cover. Check with the Building department for special inspections in conjunction with commercial projects. State law RCW 19.122 requires that prior to any excavation the 'CALL BEFORE YOU DIG' center must be notified. Call 411 at least 3 working days in advance. PERMIT EXPIRATION AND REFUNDS Expirations: Building or other permits (regulated under SVMC Chapter 24) shall expire by limitation and be declared void if a) work is not started within 180 days of obtaining a permit, or b)work is abandoned for 180 days or more after beginning work,or c)after two years from the date of permit issuance, regardless of whether the work is finished. If a permit is expired for time, a new permit may be obtained for half the permit fee based on the value of the remainder of the work required to finish the original permit. Right-of-way permits (regulated under SVMC Chapter 22) issued between April 1, and September 30, are valid for 30 days after the date of issuance, with a one-time 30-day extension available. Right-of-way permits issued between October 1,and March 31, shall be valid until the following April 30. Refunds: All refund requests must be made in writing by the original permitee to the Building Official no later than 180 days after the date of fee payment. Full refunds will be granted for any permit issued in error. Rate of refund shall be as set forth in the City of Spokane Valley Master Fee Schedule in effect at the time of permit application. A copy of this schedule is available at Permit Center and also available for reference on the city website at: http://www.spokanevalley.orq and search for"fees" Owner/Agent Date: Staff Approval Date: - r > SCITY OF Permit Center poKane Valle Y 11703 E Sprague Ave Suite B3 Spokane Valley WA 99206 509.720-5240♦ Fax: 509.688.0037♦email: permitcenter@spokanevalley.org DE-11003670 BLD-DEMO PROJECT NAME: ISSUED: 11/18/2011 SITE ADDRESS: 2515 S TIMBERLANE DR SPOKANE VALLEY EXPIRES: 11/18/2013 PARCEL: 45253.0303 APPLICANT: CRC DESIGN&CONSTRUCTION OWNER: UNITED PROCESSING SERVICES,LLC 3628 E 16th AVE 157 S MONROE ST 157 S MONROE,SPOKANE,WA 99201 SPOKANE,WA 99201 SPOKANE VALLEY,WA 99223 509-838-1100 OWNER: UNITED PROCESSING SERVICES 2515 S TIMBERLANE DR SPOKANE VALLEY,WA 99037 509-926-1755 GENERAL CONTRACTOR: CRC DESIGN&CONSTRUCTION License: CRCDEDC881BF 3628 E 16th AVE Expires: 01/06/2014 157 S MONROE,SPOKANE,WA 99201 SPOKANE VALLEY,WA 99223 509-838-1100 VALUATIONS: FEES: Paid Due Legacy Payment $0.00 Express Permit Review $0.00 Demolition $0.00 Total: Total Due: $0.00 FIXTURES Qty Mechanical Fixtures Qty Plumbing Fixtures Qtv Electrical Fixtures REQUIRED INSPECTIONS Final Building Inspection CONDITIONS Printed:12-19-2012 11:11:14 Page t of F NOTICE The ownership of a Spokane Valley Development Permit will inure to the property owner. The permit applicant, by definition, is the property owner or an authorized agent of the property owner. It is the responsibility of the applicant/permitee that the use described on the front of this permit complies with applicable codes and that required inspections are requested. Failure to request inspections as listed below and obtain the necessary approvals before progressing beyond the point where inspections are required and may necessitate removal of certain parts of the construction are at the applicant's/permittee's or property owner's expense. At a minimum, the following inspections ARE REQUIRED by the Spokane Valley Municipal Code(SVMC): FOOTING - when forms and reinforcements are in place and prior to placement of concrete-all structures, including manufactured homes. NOTE: This inspection includes review of the structures setback from property lines. Minimum setbacks are established by SVMC. Curb lines and fence lines are not necessarily indicative of property lines. The responsibility to comply with applicable setback provisions lies solely with the permitee-neither the City of Spokane Valley nor its authorized representatives assume any responsibility for the verification or location of your property lines. Please verify their location prior to locating your structure. Failure to properly locate the structure may require its relocation at the owner's/permittee's expense. FOUNDATION-when forms and reinforcement are in place and prior to placement of concrete. PLUMBING-after rough-in, before covering and final. MECHANICAL-rough-in of piping, before covering, metal chimneys before concealment and final. FRAMING -after all framing, bracing and blocking is in place, rough electrical, plumbing and mechanical systems are complete, and prior to concealing. FINAL-when complete and prior to occupancy and/or use;all permits require final inspection. NOTE: In addition to inspection of the structure, this inspection includes review of site improvements (typically depicted on the approved site plan) required by ordinance or as a condition of approval of this permit. Items such as installation of fire hydrants, fire department access, on-site drainage(208'swales), road improvements, parking and landscaping are common requirements of a permit/site plan which must be completed prior to final approval of a building or issuance of a Certificate of Occupancy. MANUFACTURED HOMES-final inspection required when complete, stairs, handrails, skirting, etc. installed and prior to occupancy; completed inspection record card must be available on site. PLUMBING REVERSALS FOR SEWER CONNECTIONS-prior to cover RIGHT-OF-WAY/APPROACH-prior to placement of concrete/asphalt or, if gravel approach, after completion. In addition to the above, any plumbing or mechanical systems or material which would be concealed by framing, drywall, concrete, etc., must be inspected prior to cover. Check with the Building department for special inspections in conjunction with commercial projects. State law RCW 19.122 requires that prior to any excavation the 'CALL BEFORE YOU DIG' center must be notified. Call 411 at least 3 working days in advance. PERMIT EXPIRATION AND REFUNDS Expirations: Building or other permits (regulated under SVMC Chapter 24) shall expire by limitation and be declared void if a) work is not started within 180 days of obtaining a permit, or b)work is abandoned for 180 days or more after beginning work,or c)after two years from the date of permit issuance, regardless of whether the work is finished. If a permit is expired for time, a new permit may be obtained for half the permit fee based on the value of the remainder of the work required to finish the original permit. Right-of-way permits (regulated under SVMC Chapter 22) issued between April 1, and September 30, are valid for 30 days after the date of issuance, with a one-time 30-day extension available. Right-of-way permits issued between October 1,and March 31, shall be valid until the following April 30. Refunds: All refund requests must be made in writing by the original permitee to the Building Official no later than 180 days after the date of fee payment. Full refunds will be granted for any permit issued in error. Rate of refund shall be as set forth in the City of Spokane Valley Master Fee Schedule in effect at the time of permit application. A copy of this schedule is available at Permit Center and also available for reference on the city website at: http://www.spokanevalley.org and search for"fees" Owner/Agent Date: I ./ Staff Approval 4'zi'%(// - Date: UNITED PROCESSING:. SERVICES • December 19,2012 Property: 2515 S. Timberlane Dr.,Veradale,WA 99037 As the owners of Timberlane we would like to request the city of Spokane Valley to change our contractor of record to CRC Design and Construction located at 3628 E 16th Spokane WA 99223 Lic#CRCDEDC881BF. Thank you. If any questions please do not hesitate to call. Best Regards, 1 0 Alai Hurd 157 S Monroe Spokane WA 99201 • (509) 926-1755 • FAX(888)371-1020 Heather Morris From: Sarah Thomas [sarah@ridgelinecr.com] Sent: Friday, November 18, 2011 9:43 AM To: Permit Center Cc: cstuder@spokanecleanair.org Subject: 2515 S. Timberland Drive Attachments: Thompson Site Plan.pdf; Scan_Doc0015.pdf; Scan_Doc0016.pdf Mick, Here is the second asbestos report, the site plan and also the application for demo. I will forward the email from the Spokane Utilities Company as well. Please let me know if you have any questions. Thank you, Sarah Forwarded message From: Joel Doherty <-joel(alridgelinecr.com> Date: Thu, Nov 17, 2011 at 12:27 PM Subject: Thompson Site Plan To: Sarah Thomas <sarahOridgelinecr.com> I think this has everything we need. Joel Doherty Ridgeline Construction & Remodeling 208-651-4444 Sarah Thomas Administrative Assistant Ridgeline Remodeling 780 Cecil Rd. Suite 104 Post Falls ID 83854 Phone: 208-651-4444 Fax: 208-446-0956 1 \ r Heather Morris From: Sarah Thomas [sarah@ridgelinecr.com] Sent: Friday, November 18, 2011 9:44 AM To: Permit Center Subject: Fwd: S. 2515 Timber Lane, Parcel Number 45253.0303 Forwarded message From: Knudson, Chris <CKnudsonPspokanecounty.org> Date: Wed, Nov 16, 2011 at 9:45 AM Subject: S. 2515 Timber Lane, Parcel Number 45253.0303 To: "permitcenter@spokanevalley.org" <permitcenterPspokanevalley.org> Cc: "sarahfridgelinecr.com" <sarahPridgelinecr.com>, "Depner, Colin" <CDEPNER(alspokanecounty.org> In discussing, with Sarah, the above addressed parcel, the majority of work being done is inside the house due to fire. In addition, the water line will also be disconnected / turned off to eliminate the chance of any water damage. Since it appears that the residence is not being completely demolished or excavation taking place, a demolition permit for Sewer Abandonment/ Temporary Sewer Abandonment with Inspection is NOT REQUIRED. Please call with any question. Chris Knudson Spokane County Division of Utilities (509) 477-7180 Sarah Thomas Administrative Assistant Ridgeline Remodeling 780 Cecil Rd. Suite 104 Post Falls ID 83854 Phone: 208-651-4444 Fax: 208-446-0956 1 GEORGE THOMPSON SITE PLAN PARCEL NUMBER: 45253.0303 ADDRESS: 2525 S TIMBERLANE DR. VEREDALE, WA \ CAe<F'--- i,,q 768 REAR DRIVEWAY \ ry 'Y Ff N� N Z s o� Zn, tis / SEWER i / y0 / /- yP� / �P\ R‘4' �O tt � 2� ,i 042tr a Lk ti 'X08^9 S. 3 0814 i: S„.., 3 010 _ 3.17502 Matt 3 0007a �'' .' 3 050, 3.`0521 '�16 38512d_ 38103 1 30006 aria» "'j ' :4 d -3 15 - 3188+5 1.0301 }— r z i1 3.1525 3, 3OM g.6\1 ,.,22, '2 ,,,,,a alua 33302 5.0529 '' 5.095» ��., '�" t :v e fl 3Gin •'� s 7 ;e,+a x 0.0 � 0, \1: :ua Nfi 1. 30.'104 30516 3n527 '55916 , 1 888.8 ,,c SUBJECT PROPERTY ar, 0 a 030 £801 r "' 3 0106tH 3 0915 ^ .107308 T 8888 6 ,.ice \ - . MOUNTAIN CONSULTING SERVICES, LLC 9922 East Montgomery Drive,Suite 9 Spokane Valley,WA 99206 509-924-9236 509-924-2287 November 2,2011 Mr. Ken Maguire Ridgeline Construction 780 North Cecil Road, Suite 104 Post Falls, Idaho 83854 Project Number: S11-121.1 Dear Mr.Burke: Mountain Consulting Services, LLC(Mountain Consulting)is pleased to provide two(2) copies of the enclosed report for the limited asbestos survey of the suspect exterior roofing and attic insulation materials associated with the fire damaged residence located at 2515 South Timberlane Drive in Spokane Valley, Washington. Mr. Samuel W. Bailey Jr., EPA-accredited AHERA building inspector,certification BIR-10-098, and expiration 11-9-2011 conducted a limited field survey of the structure on October 31.2011. The material proven to be free of asbestos minerals is described in Section [4.41 of this report. The report must be kept on site during demolition or renovation activities for review. Thank you for choosing Mountain Consulting for these services. If you have any questions, or require any clarification concerning this report,please call me at(509) 924-9236. It was a pleasure working with you, and we look forward to working with you again in the future. Sincerely, Mo Consulting Services,LLC Sam'el W.Bailey Jr. Operations Manager sbaile}(iiniountainconsultinglic.com Heather Morris From: Sarah Thomas [sarah@ridgelinecr.com] Sent: Friday, November 18, 2011 9:27 AM To: cstuder@spokanecleanair.org Cc: Permit Center Subject: 2515 Timberline Drive L-ACM S/R Report Attachments: S11-120.1 2515 Timberline L-ACM Rpt..pdf Here is the first asbestos report that was done at 2515 Timberlane Drive. The second report will follow. Thank you, Sarah Thomas Ridgeline Construction 2086514444 Forwarded message From: Sam Bailey <sbaileyPmountainconsultingllc.com> Date: Fri, Nov 18, 2011 at 9:09 AM Subject: 2515 Timberline Drive L-ACM S/R Report To: "sarah(thridgelinecr.com" <sarahOridgelinecr.com> Sarah, Attached is a PDF copy of the limited asbestos survey report for the interior sheetrock materials present with the residence located t 2515 Timberline Drive. If you have any concerns please contact me. Thanks, Samuel W. Bailey Jr. Mountain Consulting 509-924-9236 office 509-951-6780 cell Sarah Thomas Administrative Assistant Ridgeline Remodeling 780 Cecil Rd. Suite 104 1 LIMITED ASBESTOS SURVEY FOR THE i Y INTERIOR GYPSUM WALLBOARD PANELING MATERIALS PRESENT WITH THE FIRE DAMAGED RESIDENCE LOCATED AT 2515 SOUTH TIMBERLANE DRIVE SPOKANE VALLEY, WASHINGTON Project Number: S11-120.1 I i I I � Prepared for: Burke Disaster Cleanup 955 Innovation Way, Suite B Post Falls, ID 83854 Prepared by: Mountain Consulting Services, LLC 9922 E Montgomery Drive, Suite 9 Spokane Valley, WA 99206 ? I November 1,2011 • MOUNTAIN CONSULTING SERVICES, LLC CONTENTS 1.0INTRODUCTION 1 2.0 SCOPE OF WORK 1 3.0ASSESSMENT SURVEY PARAMETERS 2 3.1 Homogeneous Areas 2 3.2 Bulk Sampling 2 3.3 Laboratory and Analytical Methods 3 4.0 RESULTS 3 4.1 Material Containing 1% or More Asbestos 4 4.2 Materials Assumed to Contain Asbestos ...4 4.3 Materials with Asbestos Concentrations of Less than <1% 4 4.4 Non-ACM Materials 4 4.5 Materials Assumed Not to Contain Asbestos 5 5.0 CONCLUSIONS AND RECOMMENDATIONS 5 5.1 Conclusions 5 5.2 Recommendations 5. 6.0 LIMITING CONDITIONS AND CLOSURE 6 6.1 Limiting Conditions . 6 6.2 Closure 6 APPENDICES A Certification and Accreditation B Bulk Sample Analysis Report C Sample Locations Drawing November 1,2011 I Mountain Consulting Services,LLC PROJECT NO:511-120.1 LIMITED ACM SURVEY LIMITED ASBESTOS SURVEY; INTERIOR GYPSUM WALLBOARD SYSTEM; FIRE DAMAGED RESIDENCE; 2515 S TIMBERLANE DRIVE; SPOKANE VALLEY, WA 1.0 INTRODUCTION Mr. Gerry Burke representing,Burke Disaster Cleanup contracted Mountain Consulting Services (Mountain Consulting),to conduct a limited asbestos survey of the suspect asbestos containing gypsum wallboard materials remaining with the interior of the fire damaged residence located at 2515 South Timberlane Drive in Spokane Valley,Washington. Mountain Consulting was requested by the client to only collect samples of the sheetrock and associated joint compound materials from the interior of the residence. Mr. Ronald A. Knutson,EPA-accredited AHERA building inspector,certification BIR-10-099, and expiration 11-9-2011 conducted a limited field survey of the identified materials on October 27, 2011. (See Appendix A for inspector certifications and laboratory accreditations). SITE DESCRIPTION The residence is a split-level wood frame structure built on a concrete foundation. At the time of inspection,the residence had experienced a fire in the attached garage/kitchen area. It was also reported by the client that an abatement of the asbestos containing ceiling texture had been completed by a licensed abatement contractor. At the time of this inspection the majority of the interior wallboard system had been removed from the structure. The client specifically asked that only the remaining interior gypsum wallboard materials system be sampled. No other suspect material or building areas of the identified residence was surveyed as part of this limited inspection activity. 2.0 SCOPE OF WORK The scope of work was designed to meet the requirements for asbestos inspection and due diligence notification in the Occupational Safety and Health Administration(OSHA)Asbestos Standard(29 CFR 1926.1101),Washington Industrial Safety&Health Act(WISHA) standards (WAC 296-62- 077),the National Emission Standards for Hazardous Air Pollutants(NESHAP;40 CFR 61), and applicable portions of the Asbestos Hazardous Emergency Response Act(AHERA)and regulations in 40 CFR 763. November 1,2011 PAGE 1 Mountain Consulting Services,LLC PROJECT NO:Si 1-120.1 LIMITED ACM SURVEY The survey was conducted through visual evaluation,classification and analysis of the suspected asbestos-containing materials (ACMs) used with the construction or remodeling of the interior gypsum wallboard paneling system present with the surveyed structure. The survey included the following tasks: ♦ Visual survey and assessment of the location and condition of suspected materials. • Collection and analysis of bulk samples from suspected asbestos containing materials. • Preparation of a report summarizing the identification and assessment of any asbestos containing materials and material found not to contain asbestos. 3.0 ASSESSMENT SURVEY PARAMETERS 3.1 HOMOGENEOUS AREAS Homogeneous materials are those considered to be consistent throughout an area based on color, texture, and construction era. For the purpose of this survey,homogeneous areas were delineated using the construction era, material composition, and material location as the primary considerations. Material appearance,texture,size,color,and analytical results may support assumptions about each material's homogeneity. 3.2 BULK SAMPLING Suspected ACMs were collected according to guidelines in 40 CFR 763.85 and were sampled to determine the type and percentage of asbestos by volume. At least one sample was collected from selected miscellaneous materials and at least three samples from thermal system insulation materials. Suspect surfacing materials were sampled according to the AHERA"3/5/7 rule." For other types of suspect materials, or materials assumed to be non-ACM,regulations require the on-site AHERA building inspector to determine the appropriate number of samples. The quantity of material present, manufacturer's labels, appearance, construction or renovation era,and inspector's expertise were used to determine the number of samples. A homogeneous material is considered to be an ACM if one or more sample results are equal to or greater than 1%asbestos. The EPA recommends that at least three samples be analyzed by polarized-light microscopy(PLM)for the following types of materials in order to prevent false negative results(less then<1% asbestos): • Materials that contain low concentrations of asbestos fibers (less then 10%); November 1,2011 PAGE 2 Mountain Consulting Services,LLC ' I PROJECT No:S11-120.1 LIMITED ACM SURVEY • Materials with asbestos fibers tightly bound in a matrix; • Materials with milled asbestos fibers(fine fibers); • Materials with hand-mixed asbestos fibers; and ♦ Materials with a combination of these characteristics. All bulk samples must have results below 1% asbestos before the material may be classified in accordance with AHERA rules as not being ACM. However,if asbestos is detected in the material at less than<1%,WISHA worker health and safety regulations still apply. 3.3 LABORATORY AND ANALYTICAL METHODS Mountain Consulting submitted for analysis two (2)initial bulk material samples collected f-om 2 different homogeneous suspect wallboard materials identified during this survey. During the analysis process the wallboard joint compound material was proven to contain asbestos and at the request of Mountain Consulting the 2 submitted materials (sheetrock&joint compound)were composited together,resulting in a third sample being analyzed for this project. All samples were submitted for analysis to Mountain Laboratories of Spokane,Washington using chain of custody procedures. Mountain Laboratories participates in the national voluntary laboratory accreditation program(NAVLAP) and is a NAVLAP accredited asbestos testing laboratory, NAVLAP code: 101890-0. All samples were analyzed to determine asbestos type and content using PLM with dispersion staining in accordance with the following methods: EPA EPA 600/R-93/116, "Method for the Determination of Asbestos in Bulk Building Materials"(July 1993). EPA "Interim Method for the Determination of Asbestos in Bulk Insulation Samples" (40 CFR Part 763, Subpart F,Appendix A;May 27, 1982). ASTM Draft"Standard Method of Testing for Asbestos Containing Materials by Polarized Light Microscopy"(ASTM Committee D22.05;January 14, 1988). 4.0 RESULTS This section describes suspect materials that were found to be or assumed to be asbestos containing. (Refer to the bulk sample analysis report in Appendix B for specific sample composition and in Appendix C for sampling locations.) November 1,2011 PAGE 3 Mountain Consulting Services,LLC • • PROJECT No:S11-120.1 LIMITED ACM SURVEY 4.1 MATERIAL CONTAINING 1% OR MORE ASBESTOS - ACMs are materials proven to contain one percent asbestos or greater. AHERA and NESHAP regulations distinguish between friable and nonfriable forms of ACM. A friable material is defined as an ACM that can be"crumbled,pulverized,or reduced to powder by hand pressure when dry." Friability is an indication of a material's ability to release asbestos fibers into the air. Regulated ACMs are defined by NESHAP as all friable ACM and nonfriable ACM that may be disturbed by renovation or demolition. No non-composite materials were found to contain greater than one percent(< 1%) asbestos during this survey. See Section 4.3 of this report for the results of composite analysis. 4.2 MATERIALS ASSUMED TO CONTAIN ASBESTOS No suspect materials were assumed to contain asbestos during this survey. 4.3 MATERIALS WITH ASBESTOS CONCENTRATIONS OF LESS THAN <1% The following sampled materials system were proven to contain less than one percent(<1%) asbestos by laboratory composite analysis. • Asbestos wallboard joint&taping mud containing 1-2% asbestos was composited with the non ACM sheetrock,resulting in the remaining wallboard paneling system present throughout the the interior of the fire damaged residence as containing<1% chrysotile asbestos. This material is not regulated for disposal however certain worker health and safety requirements still apply for removal or left in-place demolition operations. 4.4 NON-ACM MATERIALS Microscopic examination,of samples collected from the following suspect building materials, did not detect the presence of asbestos minerals: • Gypsum Wallboard Paneling(sheetrock) November 1,2011 PAGE 4 Mountain Consulting Services,LLC III PROJECT No:S11-120.1 LIMITED ACM SURVEY 4.5 MATERIALS ASSUMED NOT TO CONTAIN ASBESTOS The following materials are assumed to not contain asbestos: ♦ Wood components—framing,walls,and cabinets. • Glass—exterior and interior. • Metal—structural support,furnace/ducting, and tanks. • Fiberglass insulation—attic,walls, and pipes. 5.0 CONCLUSIONS AND RECOMMENDATIONS Our findings are based strictly on information obtained from our site observations and from sample analysis during survey activities. Consistent with our knowledge and understanding of environmental regulations,particularly as they apply to the potential liabilities associated with asbestos-containing building materials,we present the following conclusions and recommendations. 5.1 CONCLUSIONS Mountain Consulting identified that the remaining gypsum wallboard paneling system contains< 1% chrysotile asbestos. The majority of the gypsum wallboard system from within the interior of the residence had been removed at the time of the survey. The remaining wallboard materials were in poor to damaged(fire and water) condition. The majority of the remaining wallboard materials were in the kitchen area of the residence. 5.2 RECOMMENDATIONS <1% Gypsum Wallboard System: If this material will be directly sanded or similarly disturbed during renovation or modification, certified asbestos workers using wet methods, appropriate work practices, and engineering controls will be needed. Demolition or removal of this material is regulated under WISHA by the Washington State Department of Labor and Industries (L&I). For wallboard systems(sheetrock plus joint and smoothing compounds),WRD 23.30 states that "L&I will not consider the work an asbestos project"if the"wallboard system is found to contain <1%or trace asbestos." However,WRD 23.30 says that non-regulated ACM must be handled in a way that protects worker safety and health and the environment. The material must be handled using "basic asbestos work practice requirements as given in(WAC)296-62-07712(2),particularly use of wet,non-aggressive wet methods and prompt cleanup. Vacuums used must be NEPA filtered. November 1,2011 PAGE 5 Mountain Consulting Services,LLC PROJECT NO:S11-120.1 LIMITED ACM SURVEY Worker training must include asbestos awareness and hands on training as given in WAC 296-62- 07722 (5). Respiratory protection must be based on overall dust levels. A competent person must be assigned and trained under the requirements of WAC 296-62-07728." As this work is not considered an abatement project,an abatement contractor is not needed to remove the wallboard system. Demolition debris from the wallboard system can be disposed of as standard construction debris. The materials system proven to contain<1% asbestos may be disposed of in a landfill that accepts standard construction debris. ♦ If any suspect asbestos containing materials not identified in this survey are uncovered during demolition/renovation,they must be considered to contain asbestos until sampling and analysis prove otherwise. ACM must be handled in accordance with OSHA,NESHAP, and local regulations. • The building owner or tenant is required by OSHA regulations to notify all maintenance and custodial workers of the presence and location of asbestos containing materials. Maintenance and custodial work during which employees will contact but not disturb asbestos shall be performed by workers with at least 2 hours of asbestos-awareness training. • The Spokane Regional Clean Air Agency(SRCAA),the Spokane Building Department and the local fire department should be contacted regarding possible permit requirements. 6.0 LIMITING CONDITIONS AND CLOSURE 6.1 LIMITING CONDITIONS We have exercised reasonable efforts to accomplish the tasks for this project using current professional standards of the industry. To the extent that the services require subjective judgment, there can be no assurance that definitive or desired results have been obtained or that they will be usable. Although based on scientific principles,to the extent that results depend on subjective judgment,they are subject to human error. 6.2 CLOSURE The results, conclusions, and recommendations in this report were prepared following our inspection of suspected ACM at the subject property. Methods used by Mountain Consulting for this study are consistent with the standard of care and professionalism normally exercised by consultants in November 1,2011 PAGE 6 Mountain Consulting Services,LLC • PROJECT No:S11-120.1 LIMITED ACM SURVEY environmental science and engineering. The Client acknowledges that Mountain Consulting has been retained for the sole purpose of helping the Client to identify ACM,if any, associated with the subject structure(s). It is agreed that Mountain Consulting has assumed responsibility only for performing this inspection and presenting this report and conclusions to the Client. The Client acknowledges that Mountain Consulting is not acting as an"agent"for the Client,or any other user or entity,for work associated with any asbestos-containing materials. Mountain Consulting does not act or have authority to act for or in place of the Client or its successors or assigns. Mountain Consulting does not represent the Client nor does it authorize or allow any construction,renovation,remodeling,maintenance,repair, or demolition work by performing this inspection. Mountain Consulting is not a licensed contractor or licensed asbestos contractor. This report was prepared for the exclusive use of Burke Disaster Cleanup and/or representatives thereof. It may only be reproduced in full and with written approval of Mountain Consulting and is not warranted if any portion of it is separated from the original complete document. November 1,2011 PAGE 7 Mountain Consulting Services,LLC • PROJECT NO:S11-120.1 LIMITED ACM SURVEY STATEMENT OF PROFESSIONALISM Mountain Consulting Services,LLC,hereby certifies that the limited asbestos survey of the suspect asbestos containing gypsum wallboard paneling materials remaining with the interior of the fire damaged residence located at 2515 South Timberland Drive in Spokane Valley, Washington was conducted under modified protocols of 40 CFR 763.85. All policies and procedures described in 40 CFR 763 have been followed. All work and statements contained herein are certified true and correct to the best of Mountain Consulting's ability. Inspector: Date: P1 -1 --)1 Ronald A.Knutson AHERA Building Inspector Certification Number: BIR-10-099 Expiration:November 9,2011 November 1,2011 PAGE 8 Mountain Consulting Services,LLC APPENDIX A CERTIFICATIONS AND ACCREDITATION ,..,..i- ; iC. •.�-r •PILfistlitillerlig:5::Arilii r^r y .0 ..-, 'b.' ''10 s'41'd: i" ': .14� r. •♦ .��;i. .\ V 11 a ,/' \ � IN Ir�ii • �i%in nim`: 1♦ 1%�a � .YI ,moi 'r�•i r 11 1 Vit:'I�r 1 , . •r��. r , �•ry•���b .�. •I• $!'lulu r..;.�y��p...,'�. /i"i., /�a,i I,N � 11 {I . �.i1 7 /1 t{�1i1..1 r t` 1/y{I 11 11\. 1,1 a/1�s 1111\i•'1..� I{I \,�. 1,11,1,/„ \,.V.,�N• ,1 ,.\ 111,1,, .�I \. .`11 vI t \. r1�1.`.rV, \� ♦11 Jf/ V� �i i��.s \ i.�FV/r•• V � '�iV•.i J�` i\:%1�4i�".=.'.4 'IIII I\. .,J;1+ �!II\, 4:N+�IIIIJ /Ip r\.y,,.J,+ 11111\, ,ii.++` X11{�\1 �S•; SII • y:`, /�A t ;..,, 1 ., .0.�� 1\ , :t / \ !•. � \` .1 '1 {,d�..+,. u I.,. , .u j,I tT_tf• / • p 1.. / . ... 11 1. 11,1ri�rrt 1A,1�IV Is<?v;,�7H ..�.�r4.•. 1�. ��$��., .� lr'sv;a11/,,. ,��•...\ 7�1�.V�%t.•;�t(7 n!, „i+. .IP0 .�{„k tw 1,..{1'. . �;iil ! i,.h;`.;,, +p!g..., 1,`d,C1.I1, u�1i.'100 1!p.t :'�..... 1 1 v r,..1i�'')n\P'I:%..b:1�1 ...: 11 11i1�.! �.t..1I/ 1:01 11 61 111s l r ai.!r..a.�ri 1� .ua .f• �,.aN..I :\L �,tt l ,: .f•,.,` 1 :1:1 ,W pin ■�1.t:ti p+ y'1& ytl5h4n q Itl7 s: rn 411/1 1"*1111111 .P1 4•y141 {■■�� .p,.�t$4:%�v.,,. • ►.,JP..• ,cre,,. .ALt1 u�,., .�n a �...,rv,.!e.�l{.a,. ,�t n ■.1,.4r,s.e.. r+�..Rf.e � nu■ P.,. ,r4 . . 1 ,c,+.,� . r ,,�•,e. � {•.!t't¢ 1�'A .b�. n .\�:k•v r•�� „�LI.��...M.;.-off .•-q1■I Pra„�' ,r✓..1��■�.li.T,i� n a�\ i'�.X111(1Lp'1■r a..,+;+/:..nuay a,r�..nnra..�r,.diI.r+.`NIY OP•1{{Ir�,y.. C,.�.,I Ii-'a.y��r.G1{In►a�.. wl�Ali•„'•q.r. iIii :�+I� IV.:\ p►� •y.r...r.i'I ►A �, .L :°='4_Mid �t��� ��i�i. rte\! ,,I/�1 `1`1 f�4 i^0 -f/1i.'I'4 V l r.I.��1 =P lI •��..•..t\Z, 1111 .♦ 1, r il. .'� q YrrTj\;r7 ..�\I.\`#�', .�..1\I.`p_ Ij . - t�'jr9 1►�.{, ilG 1 ,�aV'1 , ► Ali Zi T. `�. - .:�:�.1�iff, .\��jJ1,, ,t �1ti I I .�I,P, � f ,��%� !� , � , r•!: �. b �' �� . .-s+r'ir.. .,�.'/il i��q:Let%i�:::,.. �� � .ai4 041 ..�, ,v. lt L1.. ii��' 1.@`1� ,1 a��:;gi y Y CF�1o.olfi:'ii�V�d�„Am.;:,-,...1....;r vi.�szA iii.0.11E Ii�ti t �' t • e.-a ` Eu�iu 1/1' .�.`._� te .. .:1%_:_ rr�.,5:. �_`.�i Lam^ ,� . r t�W y,�✓� 1.`r'. V f.��yv U=� !t"`�J 5r� .�SSV ,►�_..::Y ..,,r r/?•• -fiisi':.--.-1-#2,1 ta--4 - - �i:,.zaz_�;oat :dC-.-imf_.,._-z.r�..�,�' l;;-_-:"e ..y<i.G�r. w C�....s.. ✓rrss. a r��%l" ;`_h.r��_ 'III 1���� T.-... :,:.e{t•_-.ver=.....ate mss,. ...»��OA Ya_ e_ :a��r ' ,s vii.ra },::_ as - y .� i `r-`-`�.x��-rT l:.�v v_5.'.aE`����"a v �•'.....�L �'i:.� 7 .fir _..t! aanwow** !% `�.. �✓�,1..._�V.•/�'_ R�4 -., r 0617 iw rs OD,141 ji Ieco 7ruze& ,Dr!11��i�..:�Fja ...,...,,,,,,4t.1% A l i rJ . tgf&fietkitgratalitard/ '„J .'r 7,,,. f \'� -�IGu1DAUC p •e'er gefafini itrrlm t..`.,�� -`qty III_� I a � � I u� (,rr1h %'iA Michael D.Thomas-Administrator.7,.-3.5i3:::::7• -- •-•;,\''', av % c v._4�,���,1� -( i Ri.hard Johnson,Di - Instructor ,``-.,,� w�• ..� \\i i ! � G" r'i�Y f✓r,7�'y..�i7i�i e`= i* �i?i VGL oi,wP� CO/7�tGOf?i %����,�'--'-tib 011 __o•`";`, : AHERA Building Inspector Refresher Training41 "V� ��4._.,,,,,t4 ,.�/ `. h ,:! i, In Accordance with TSCA Title II, Date of Training: November 9, 2010 in Coeur d'Alene, ID �� s i�, ter- 4== Certification Valid through November 9, 2011 Certification Number: BIR-10-099 iE° II•r t'- -. 7045 East Greta Avenue ".141---e;111 -;,741,0 Post Falls,Idaho 83854 (208)818-0455 : �� i��^.:41.---;-: 7;;li'����[„'%%.:fie.-:i i„��:^•r i.��:�0 i hC::c �.\�:.C""'-1 u'yC.'��':T /:�\:'S: / ie wc- �l.\\ !�\ tip ;' _.S� '� 1 7 �G:�:��/•\ a "r \ __..Lug'. tip_. .iir 41:-:-.54 ��s� ��. � ssM .:i=�r r��. . ��.�..� .i/� ,..�_�,a�A. M?���a�.�L�, �a�o.;.iiI r.Aa` I,i-��a�.-,:ikl,7.��y r, iii, .y. '019.���7.iii �ti��',� �w7;uii'�1���.,..iirr�aCi 7-�i�?� ter._ c.. � �j �� � '��� F 1� ii � S �`�� r��v .�r � ��1.'; ���� / v � /' / ,,x---.1",-. r�tiwv'�`��'�����t%,� "'.='1 ����,' ,,1 Wit frig,y .fir ,IZi �d NI? 1.w gTvi., •Iis� .vr, `pkv ,f �r !�. bi✓11:7711'1' `p{17 .'-::*=,1�C..�.�i�,Z1�r.: :�'rrN,�r"4:•:.'����� ��.. ;;f�/,' ���,7 :.'i/f. :'N.7�/�ij,dy��.�/r, q.T,.�� J,��1�r.t�r 11 :(� fj �.�l.. �✓ �Y. . � � � ��lf ,._ ,..,a1Ar Y�i1i .�.�► Ylir,.)q>•► .�i iii 4�F, lair./�r�. �.f f�IA� �1•rrT•]j.1�► ��r/jj,1.A G y/r gi,.�A►. .YID f,,�A p. /rJ'r,- al\�S 1.. /�i�h '' .d' ..1\��. . %� :wV�S:{:. %� `.��j�i!.,. /�"tL��.A n!r 1�■ y r . 4111lu r .t, 11b ( ♦ a u r lJ�.. .I 1■ Irrr.S,, t. ■11.r r,.11.L . 1.. ,14 +. t 1�. 7�,A .■I 1t . .1 au 0:i �r ) �.I�■i �. ■.yIC \ .�I ., l :1r. .W :11 �t 1 ..■t rr'/iE.-:81-.•ti.1.. e,Zl ■ti 41i9S.h,.►�1 �■��:.l;;pl,• •I„r=.!r.�:Y�uIAt4,..�.l.�u nI .e•., t 11��' •!A',!.•�.�� !Joys.w •rr(:.,1.l�e. .�� {:4�v •►.r..� .� 1►'T:.1� wr'rel.�.t► �.rte>pyyy► u R. I,u•rot► + .r ;....aL�� •„ I� ■ IrI � �l Y'J.• i t0 .. .I1 •.F.:,•� ,11• n1y.. 1{■ /A .fn�i11 �r C..r1. wn .�.Jf.•,.., q{1��....t.�.p�.n..�..,,,,,,, iay.{�{.r v+e,..•^av�,�1.►., •Jc �. .. ' �.•:.+,`� v■,.. ra::le-`'J{,u.�1S.�d:•• vu{77 �.� I .•o. , I,I'4a+: .ar �� .,..,. va ., • • ..��. • .a..,,-'(''r�ii+i`?I ,1 � .••r�'1li+{:.,,\ /1. 11 ,ilrl 1+•i4\ IIi+.J:l r {{ 1V'+J.,1 I1 ijihi,1 {A1ij•. 1�■ ..O �t 1+iii4• �. .9 \■I ■ Y I+..•4 a\V �.rl 11 1/ �� AI 'A/ \I t1/ i,.y, AI{ IG +H,( \qp/ .;,,i �! 1/ ,.., � 1/ +,:� r1 Af! J.• ICI � IA.M � / ; rV � ., �1p,,,•,1 1�':.,,, 1 ,.,,, 1..��;;':•;�:"=ySy,1111 , '�i'N, A ! 1u,:✓,;!IIY ,,.. ,�1 � ,..,Ila II ; , j IfI{Ap.y, jf1�1... I 1 ...1,1 I n {t..., I u ! +'i!7uu I t�. u A ,o..n r�i�n�1i'O.,n 1Au ASI o�:.o�l�un�11,1,p.,.._I+.• ( .Ai01.1 HI ,A.{�4 A.•I .A.{11/r ,,..,r1,.A.I911! N1 .AII 11 r��t.�y,,.q,�11/. 1..1 .I{,�I�/r. 41 111 it 1+..IJVII11/r1.CHill 11�+1�i.A!! ig ,11,0 t..N,{ N A. 1.W .V ik 0..• .AII, ./. .,fi,r+ld."-..;`• t 1¢lti4". ljj,..1::: .:. ..tn��.r �...,! z..L.�.��'se' . .:,�''At.' or�1�;'••• .�. 5,,, 4N .4.9" 71 �1� \..7.op�. �7 � 42 �'.. ." .'I. I I, t.� , a.♦ , {' �µt� ,,�,..N 4., w,f 1,.! +� t.... r:.,� � '�4 � tf1! -... r t,,,� dJ.• ?i., �., Ct.,�' . 4 I .� �+.,WAN Pj,�:�1 ws{•��+ .1:�14J.4`��p{.::l�1li:•.4.A 1n.et s+- .n 1e� i k4 a. l+�. +:`.• w.1. I`:`w n+_. �u e� `:.. ,;,.. �.:. United States Department of Commerce • National Institute of Standards and Technology tim • E., • Certificate of Accreditation to ISO/IEC 17025:2005 NVLAP LAB CODE: 101890-0 Mountain Laboratories Spokane, WA is accredited by the National Voluntary Laboratory Accreditation Program for specific services, listed on the Scope of Accreditation, for: BULK ASBESTOS FIBER ANALYSIS This laboratory is accredited in accordance with the recognized International Standard ISO/IEC 17025:2005. This accreditation demonstrates technical competence for a defined scope and the operation of a laboratory quality management system (refer to joint ISO-ILAC-IAF Communique dated January 2009). � EtiT OF co,. 4i QPpC >., ✓. ��o 2011-10-01 through 2012-09-30 _�} * f A4x,,C—e_e> Effective dates �FO -�• a�Q For the National Ins ute of Standards and Technology S rgres aE NVLAP-01C(REV.2009-01-28) aQ�• � T�NOF coy4 f NILL4f ational Voluntary , LIT Laboratory Accreditation Program STATES Of P SCOPE OF ACCREDITATION TO ISO/IEC 17025:2005 Mountain Laboratories 9922 East Montgomery, Suite 13 Spokane, WA 99206 Ms. Karen L. Drader Phone: 509-922-1365 Fax: 509-922-1380 E-Mail: kdradennils@comcast.net BULK ASBESTOS FIBER ANALYSIS (PLM) NVLAP LAB CODE 101890-0 NVLAP Code Designation/Description 18/A01 EPA-600/M4-82-020: Interim Method for the Determination of Asbestos in Bulk Insulation Samples 2011-10-01 through 2012-09-30 Effective dates For the ational In tute of Standards and Technology Page 1 of 1 NVLAP-01S(REV.2005-05-19) APPENDIX B BULK SAMPLE ANALYSIS REPORT • I � KVIL.Ap Mountain Laboratories Division of Mountain Inspection&Laboratory Services,Inc. N'LIPIAB CODE 101890.0 9922 East Montgomery Suite 13 Spokane Valley,WA 99206 (509)922-1365•Fax(509)922-1380 October 28,2011 Mountain Consulting Services,LLC Ron Knutson Project: 2515 Timber Lane 9922 E.Montgomery Avenue Suite#9 Project#: S11-120.1 Spokane,WA 99206 Dear Mr.Knutson, The enclosed report details results for the analysis of the bulk sample(s) submitted to Mountain Laboratories on October 27, 2011. Mountain Laboratories is a NVLAP, NIST, Lab Code #101890-0 accredited laboratory and participates in the National Voluntary Laboratory Accreditation Program for Bulk Asbestos Analysis, governed by the National Institute for Standards and Technology. Sample results must not be used by the client to claim product certification, approval, or endorsement by NVLAP, NIST, or any agency of the Federal Government. Sample analysis was performed to determine asbestos type and content using Polarized Light Microscopy, supplemented by Dispersion Staining(PLM/DS)in accordance with the following methodology: 18/A0l EPA-600/M4-82-020: Interim Method for the Determination of Asbestos in Bulk Insulation Samples. This report includes a summary of the analytical results, chain of custody and copies of the analysts report forms used by our analysis. Analytical results are only reflective of the samples, which were tested and presented in this report. Mountain Laboratories limits warranty to proper analysis methods and take no responsibility for sample procurement. It has been our pleasure providing you with these analytical services. If you have any questions regarding this report, please do not hesitate to call Karen L. Drader or Heidi L. McCarthy at (509)922-1 65. Sincerely Q (Y/k, ki*He' i L. McCarthy boratory Manager Mountain Laboratories Mountain Inspection&Laboratory Services,Inc. Enclosure: 5070.14096.14122 PLM Light Microscopy,Phase Contrast Microscopy,PAT Participant • BULK SAMPLE ANALYSIS FOR ASBESTOS Mountain Consulting Services,LLC Ron Knutson Project:2515 Timber Lane 9922 E.Montgomery Avenue Suite#9 Project#: S11-120.1 Spokane,WA 99206 Method:PLM with Dispersion Staining Client#5070 Laboratory No. B11-14096 B11-14097 B11-14122 Sample ID No. S11-120.1-01 S11-120.1-02 Si 1-120.1-02-A Sub Sample of Sample Description Sheetrock Joint Compound S11-120.1-02— Bottom Layer Sample Treatment Teased/Crushed Teased/Crushed Teased/Crushed Heated/Dissolved Homogeneous No No Yes • • Layered Yes Yes No Fibrous Yes Yes Yes Sample Color White/Brown Black/Tan Off White Asbestos Present No No Yes Asbestos Type and N.D. N.D. Chrysotile 1-2% Percentage 1. Chrysotile 2. Amosite 3. Crocidolite 4. Other Total%Asbestos • None None 1-2% Other Fibrous Material Cellulose 10% Top Layer: In Sample Cellulose<1% Gypsum 87% Top Layer: Gypsum 98-99% Binder/Filler 3% Gypsum 59% Paint 40% Non-Fibrous Material: Other 100% Appears to have been • exposed to extreme heat. Date Analyzed:October 28,2011 _ Analyzed By:Lisa Meade Mountain Laboratories,Division of Mountain Inspection&Laboratory Services,Inc.limits warranty to proper analysis methods only and takes no responsibility for sample procurement.Mountain Laboratories,Division of Mountain Inspection&Laboratory Services,Inc.,9922 E.Montgomery,Suite#13,Spokane Washington 99206(509)922- 1365-Fax(509)922-1380. PLM has been known to miss asbestos in a small percentage of samples. Thus negative or<1%PLM results should be tested with either SEM or TEM. Client is responsible for sample separation.This report may only be reproduced in full with written approval by Mountain Laboratories. 2 of 2 Chain of Custody Rush Turn Around Time Mountain Consulting Services,LLC Bulk Sample Data Sheet X Standard Turn Around Time M1 9922 E.Montgomery,Suite 9 Spokane,Washington 99206 Inspection Date:_Sept.27,2011 Project:2515 Timber Lane, Spokane Valley, WA I Project#_S11-120.1_ Client:Burke Disaster Cleanup. Sample Material Project ID: Sample# Locationlam` 1((- Description Comments s11-120.1 01 1 �-o ! NCO) -4-o . C 4t�)- Pe-C-4 . S11-120.1 02 / 5 4 PI_ 14 /k .-o el- 0,,_::S ,f,2-..r 11-120.1 03 RELEASED B tson RECEIVF� Y:Mountain Laborator'es DELIVERY METHOD: CONDITION: ATE/ IME RECEIVED: Signature: Signaturej� 'lel i� 1ci GQ5C�- 10777/1 J V0 0/7 Page of KV(IAL-p Mountain Laboratories Division of Mountain Inspection&Laboratory Services,Inc. NVLAPLAB CODE 101890-0 9922 East Montgomery Suite 13 Spokane Valley,WA 99206 (509)922-1365•Fax(509)922-1380 October 31,2011 Mountain Consulting Services,LLC Ron Knutson Project:2515 Timber Lane 9922 E.Montgomery Avenue Suite#9 Project#: S11-120.1 Spokane,WA 99206 Dear Mr.Knutson, The enclosed report details results for the analysis of the bulk sample(s) submitted to Mountain Laboratories on October 31, 2011. Mountain Laboratories is a NVLAP,NIST, Lab Code #101890-0 accredited laboratory and participates in the National Voluntary Laboratory Accreditation Program for Bulk Asbestos Analysis, governed by the National Institute for Standards and Technology. Sample results must not be used by the client to claim product certification, approval, or endorsement by NVLAP, NIST, or any agency of the Federal Government. Sample analysis was performed to determine asbestos type and content using Polarized Light Microscopy, supplemented by Dispersion Staining(PLM/DS)in accordance with the following methodology: 18/A01 EPA-600/M4-82-020:Interim Method for the Determination of Asbestos in Bulk Insulation Samples. This report includes a summary of the analytical results, chain of custody and copies of the analysts report forms used by our analysis. Analytical results are only reflective of the samples, which were tested and presented in this report. Mountain Laboratories limits warranty to proper analysis methods and take no responsibility for sample procurement. It has been our pleasure providing you with these analytical services. If you have any questions regarding this report, please do not hesitate to call Karen L. Drader or Heidi L. McCarthy at (509)922-1365. Sincerely, Heidi L.McCarthy Laboratory Manager Mountain Laboratories Mountain Inspection&Laboratory Services,Inc. Enclosure: 5070.14185 PLM Light Microscopy,Phase Contrast Microscopy,PAT Participant i t — BULK SAMPLE ANALYSIS FOR ASBESTOS Mountain Consulting Services,LLC Ron Knutson Project: 2515 Timber Lane 9922 E.Montgomery Avenue Suite#9 Project#: S11-120.1 Spokane,WA 99206 Method:PLM with Dispersion Staining Client#5070 Laboratory No. B11-14185 • Sample ID No. S11-120.1-02-B Composite of Previously Submitted Samples Sample Description 511-120.1-01 & S11-120.1-02-A Sample Treatment Teased/Crushed Homogeneous No Layered Yes Fibrous Yes Sample Color White/Off White/Brown Asbestos Present Yes Asbestos Type and Bottom Layer: Percentage Chrysotile 1-2% 1. Chrysotile 2. Amosite Sheetrock N.D. 3. Crocidolite 4. Other Total%Asbestos *<1% Other Fibrous Material Sheetrock: In In Sample Cellulose 10% Bottom Layer: Gypsum 98-99% Non-Fibrous Material: Sheetrock: Gypsum 87% Binder/Filler 3% Date Analyzed:October 31,2011 Analyzed By:Lisa eade *As a Composite,this Sample Contains<1% Chrysotile Asbestos. Mountain Laboratories,Division of Mountain Inspection&Laboratory Services,Inc.limits warranty to proper analysis methods only and takes no responsibility for sample procurement.Mountain Laboratories,Division of Mountain Inspection&Laboratory Services,Inc.,9922 E.Montgomery,Suite#13,Spokane Washington 99206(509)922- 1365-Fax(509)922-1380. PLM has been known to miss asbestos in a small percentage of samples. Thus negative or<I%PLM results should be tested with either SEM or TEM. Client is responsible for sample separation.This report may only be reproduced in full with written approval by Mountain Laboratories. 2 of CHAIN OF CUSTODY RECORD s, , Mountain Laboratories Billing Information: Project Name: S- ►5 'II tabu- Lc-&L 9922 E.Montgomery,Suite 13 Contact Name,Address&Phone: Project No: b l 1-• r . 1 - Spokane,Washington 99206 Results: MAIL FAX PHONE PHONE 509-922-1365 FAX 509-922-1380 CLIENT: -ANALYSIS REQUIRED TURNAROUND .; (Yttcu `t -�_ s `n RUSH Same Day o w 24 HR Other: 1 n 3-5 Day j o 4 ca SAMPLE# SAMPLE DESCRIPTION/ID DATE/TIME o- i 2 —� r, , p"-., R .4.4 REMARKS RESULTS 5t1--12D d-0 ��1 ��. - u�-(� e-V%b t,tsk \ - Cl'' - iwZ- S G. (D s sit-lab ,t-o1 ..� sL1-0-D,1-t -fes I ° 1 . •SED BY: DELIVERY RECEIVED BY: COMPANY/AGENCY OR DATE/TIME CONDITION _•,afore) METHOD (SIGNATURE) AFFILIATION RECEIVED Ad .,N.,V Mountain / 1� LAd k olfri_dicat(3_ `�(3 Laboratories / 6Cfr— APPENDIX C SAMPLE LOCATIONS DRAWING i 1 BEDROOMS AREA LIVING ROOM 1 0© KITCHEN AREA • GARAGE AREA LEGEND OIndicates Location of Sampling Point oUntaia LIMITED ASBESTOS SURVEY BULK SAMPLE L❑CATIONS SITE DRAWING DRAWING No, `� (CoIISIIItiII9 SHEETROCK MATERIALS ONLY) 2515 S TIMBERLINE DR) SPOKANE VALLEY, WA 1 &Tykes OF 9922 E. Montgomery Dr1 Suite 9 DRAWN BY: CHECKED BY: PROJECT NO: 1 Spokane Valley, WA 99206 S. BAILEY R, KNUTSON Sll-1P0.1 DRAWING NOT TO SCALE DRAWINGS Telephone 509-924-9236 ( • � § 1 ( / U � \ ( [ \ ( � D \ § � � ( � \ • j (• ( 1 . � . . . \ ) . \ , • � \ � . � ( \ i ) . . . / . ) • � ) } g . Mountain Consulting Sem»6,£tC 992EgoR_eDrive,Suite 9 Spokane Valley, 50»»92&23 SCITY OF Permit Center poKane Valle ® y 11703 E Sprague Ave Suite B3 Spokane Valley WA 99206 509.720-5240♦ Fax: 509.688.0037♦email: permitcenter@spokanevalley.org DE-11003670 BLD-DEMO PROJECT NAME: ISSUED: 11/18/2011 SITE ADDRESS: 2515 S TIMBERLANE DR SPOKANE VALLEY EXPIRES: 11/18/2013 PARCEL: 45253.0303 APPLICANT: CRC DESIGN&CONSTRUCTION OWNER: UNITED PROCESSING SERVICES, LLC 3628 E 16th AVE 157 S MONROE ST 157 S MONROE,SPOKANE,WA 99201 SPOKANE,WA 99201 SPOKANE VALLEY,WA 99223 509-838-1100 OWNER: UNITED PROCESSING SERVICES 2515 S TIMBERLANE DR SPOKANE VALLEY,WA 99037 509-926-1755 GENERAL CONTRACTOR: CRC DESIGN&CONSTRUCTION License: CRCDEDC881BF 3628 E 16th AVE Expires: 01/06/2014 157 S MONROE,SPOKANE,WA 99201 SPOKANE VALLEY,WA 99223 509-838-1100 VALUATIONS: FEES: Paid Due Legacy Payment $0.00 Express Permit Review $0.00 Demolition $0.00 Total: Total Due: $0.00 FIXTURES Qty Mechanical Fixtures Qty Plumbing Fixtures Qty Electrical Fixtures REQUIRED INSPECTIONS Final Building Inspection CONDITIONS Printed:12-19-2012 11:11:14 Page I of NOTICE , The ownership of a Spokane Valley Development Permit will inure to the property owner. The permit applicant, by definition, is the property owner or an authorized agent of the property owner. It is the responsibility of the applicant/permitee that the use described on the front of this permit complies with applicable codes and that required inspections are requested. Failure to request inspections as listed below and obtain the necessary approvals before progressing beyond the point where inspections are required and may necessitate removal of certain parts of the construction are at the applicant's/permittee's or property owner's expense. At a minimum,the following inspections ARE REQUIRED by the Spokane Valley Municipal Code(SVMC): FOOTING - when forms and reinforcements are in place and prior to placement of concrete-all structures, including manufactured homes. NOTE: This inspection includes review of the structures setback from property lines. Minimum setbacks are established by SVMC. Curb lines and fence lines are not necessarily indicative of property lines. The responsibility to comply with applicable setback provisions lies solely with the permitee-neither the City of Spokane Valley nor its authorized representatives assume any responsibility for the verification or location of your property lines. Please verify their location prior to locating your structure. Failure to properly locate the structure may require its relocation at the owner's/permittee's expense. FOUNDATION -when forms and reinforcement are in place and prior to placement of concrete. PLUMBING -after rough-in, before covering and final. MECHANICAL-rough-in of piping, before covering, metal chimneys before concealment and final. FRAMING -after all framing, bracing and blocking is in place, rough electrical, plumbing and mechanical systems are complete, and prior to concealing. FINAL-when complete and prior to occupancy and/or use;all permits require final inspection. NOTE: In addition to inspection of the structure, this inspection includes review of site improvements (typically depicted on the approved site plan) required by ordinance or as a condition of approval of this permit. Items such as installation of fire hydrants, fire department access, on-site drainage (208'swales), road improvements, parking and landscaping are common requirements of a permit/site plan which must be completed prior to final approval of a building or issuance of a Certificate of Occupancy. MANUFACTURED HOMES-final inspection required when complete, stairs, handrails, skirting, etc. installed and prior to occupancy; completed inspection record card must be available on site. PLUMBING REVERSALS FOR SEWER CONNECTIONS-prior to cover RIGHT-OF-WAY/APPROACH -prior to placement of concrete/asphalt or, if gravel approach, after completion. In addition to the above, any plumbing or mechanical systems or material which would be concealed by framing, drywall, concrete, etc., must be inspected prior to cover. Check with the Building department for special inspections in conjunction with commercial projects. State law RCW 19.122 requires that prior to any excavation the 'CALL BEFORE YOU DIG' center must be notified. Call 411 at least 3 working days in advance. PERMIT EXPIRATION AND REFUNDS Expirations: Building or other permits (regulated under SVMC Chapter 24) shall expire by limitation and be declared void if a) work is not started within 180 days of obtaining a permit, or b)work is abandoned for 180 days or more after beginning work,or c)after two years from the date of permit issuance, regardless of whether the work is finished. If a permit is expired for time, a new permit may be obtained for half the permit fee based on the value of the remainder of the work required to finish the original permit. Right-of-way permits (regulated under SVMC Chapter 22) issued between April 1, and September 30, are valid for 30 days after the date of issuance, with a one-time 30-day extension available. Right-of-way permits issued between October 1,and March 31, shall be valid until the following April 30. Refunds: All refund requests must be made in writing by the original permitee to the Building Official no later than 180 days after the date of fee payment. Full refunds will be granted for any permit issued in error. Rate of refund shall be as set forth in the City of Spokane Valley Master Fee Schedule in effect at the time of permit application. A copy of this schedule is available at Permit Center and also available for reference on the city website at: http://www.spokanevalley.orq and search for"fees" Owner/Agent Date: r Staff Approval /2,4i'f:///, Date: / �r / ( �� Permit Center 00,\Immot sjoihhhhhhhh TYne Valley® 11703 E Sprague Ave Suite B3 Spokane Valley WA 99206 509.720-5240♦ Fax: 509.688.0037♦email: permitcenter@spokanevalley.org Site Information Project Information Site Address: 2515 S TIMBERLANE DR Project Number: 11003670 Inv: 1 Issue Date: 11/18/2011 Permit Use: DEMO SMOKE DAMAGED WALLS Parcel Number: 45253.0303 Subdivision: Applicant: RIDGELINE CONSTRUCTION Block: Lot: 780 N CECIL RD ST 104 Zoning R-2 SF Res Suburban District POST FALLS ID 83854 Phone: (208)651-4444 Owner: THOMPSON,GEORGE Contact: RIDGELINE CONSTRUCTION Address: 2515 S TIMBERLANE DR 780 N CECIL RD ST 104 POST FALLS ID 83854 Phone: (208)651-4444 SPOKANE VALLEY,WA 99037 Setbacks-Front: Left: Right: Rear: Building Inspector: EAST Water Dist: VERA Group Name: Project Name: Permits Demolition Permit Contractor: RIDGELINE REMODELING LLC License#: RIDGER*9I5MU DEMOLITION-RESIDENTIAL 1 $46.00 Total Permit Fee: $46.00 Payment Summary Total Fees AmountPaid AmountOwing Tran Date Receipt# Payment Amt $46.00 $46.00 $0.00 11/18/2011 29159 $46.00 Processed By: DAVIS,JENNA PERMIT Printed By: MORRIS,HEATHER Page 1 of I r NOTICE The ownership of a Spokane Valley Development Permit will inure to the property owner. The permit applicant, by definition, is the property owner or an authorized agent of the property owner. It is the responsibility of the applicant/permitee that the use described on the front of this permit complies with applicable codes and that required inspections are requested. Failure to request inspections as listed below and obtain the necessary approvals before progressing beyond the point where inspections are required and may necessitate removal of certain parts of the construction are at the applicant's/permittee's or property owner's expense. At a minimum, the following inspections ARE REQUIRED by the Spokane Valley Municipal Code(SVMC): FOOTING - when forms and reinforcements are in place and prior to placement of concrete-all structures, including manufactured homes. NOTE: This inspection includes review of the structures setback from property lines. Minimum setbacks are established by SVMC. Curb lines and fence lines are not necessarily indicative of property lines. The responsibility to comply with applicable setback provisions lies solely with the permitee-neither the City of Spokane Valley nor its authorized representatives assume any responsibility for the verification or location of your property lines. Please verify their location prior to locating your structure. Failure to properly locate the structure may require its relocation at the owner's/permittee's expense. FOUNDATION -when forms and reinforcement are in place and prior to placement of concrete. PLUMBING-after rough-in, before covering and final. MECHANICAL- rough-in of piping, before covering, metal chimneys before concealment and final. FRAMING -after all framing, bracing and blocking is in place, rough electrical, plumbing and mechanical systems are complete, and prior to concealing. FINAL-when complete and prior to occupancy and/or use;all permits require final inspection. NOTE: In addition to inspection of the structure, this inspection includes review of site improvements (typically depicted on the approved site plan) required by ordinance or as a condition of approval of this permit. Items such as installation of fire hydrants, fire department access, on-site drainage(208'swales), road improvements,parking and landscaping are common requirements of a permit/site plan which must be completed prior to final approval of a building or issuance of a Certificate of Occupancy. MANUFACTURED HOMES-final inspection required when complete, stairs, handrails, skirting, etc. installed and prior to occupancy; completed inspection record card must be available on site. PLUMBING REVERSALS FOR SEWER CONNECTIONS-prior to cover RIGHT-OF-WAY/APPROACH -prior to placement of concrete/asphalt or, if gravel approach, after completion. In addition to the above, any plumbing or mechanical systems or material which would be concealed by framing, drywall, concrete, etc., must be inspected prior to cover. Check with the Building department for special inspections in conjunction with commercial projects. State law RCW 19.122 requires that prior to any excavation the 'CALL BEFORE YOU DIG' center must be notified. Call 411 at least 3 working days in advance. PERMIT EXPIRATION AND REFUNDS Expirations: Building or other permits (regulated under SVMC Chapter 24) shall expire by limitation and be declared void if a) work is not started within 180 days of obtaining a permit, or b)work is abandoned for 180 days or more after beginning work, or c)after two years from the date of permit issuance, regardless of whether the work is finished. If a permit is expired for time, a new permit may be obtained for half the permit fee based on the value of the remainder of the work required to finish the original permit. Right-of-way permits (regulated under SVMC Chapter 22) issued between April 1, and September 30, are valid for 30 days after the date of issuance, with a one-time 30-day extension available. Right-of-way permits issued between October 1,and March 31, shall be valid until the following April 30. Refunds: All refund requests must be made in writing by the original permitee to the Building Official no later than 180 days after the date of fee payment. Full refunds will be granted for any permit issued in error. Rate of refund shall be as set forth in the City of Spokane Valley Master Fee Schedule in effect at the time of permit application. A copy of this schedule is available at Permit Center and also available for reference on the city website at: http://www.spokanevalley.orq and search for"fees" Owner/Agent Date: Staff Approval Date: