27211 PE-1667 LENNOX SUBDIVISION- i 1 (GfiM maASr FOOra4E Memorandum To: Bill Hemmings From: Chris Reich CA4.4-0 Date: June 26, 1996 Re: Lennox Subdivision I received a call from Gene Fisher regarding Lennox Subdivision, in particular the tapers being required on this project. According to the approved plans the taper called out is 495' as specified during the review process. Mr. Fisher called concerning some power poles that he neglected to include on the plans and how they will be very close to the proposed taper. After reviewing the plans and review comments, the distance provided was specked during the second review. The distance specified used the wrong design speed for Broadway Avenue. The posted speed limit for this portion of Broadway is 35 mph, therefore the design speed should be 40 mph. This speed requires the use of the following formula to calculate "L", length of taper: L = WS2/60 where W = lateral shift required by vehicle S = design speed For this project, L = 01)(402)/60 = 293.33'. The length of taper is also affected by the type of taper required. The following summarizes the taper types and effect on "L": Merging taper L minimum Shifting taper '/2 L minimum Shoulder taper 1/3 L minimum Therefore, the length of taper for this project along Broadway Avenue should be V2 L or 150', because it is a shifting taper. The original length requested is the result of using the wrong design speed for Broadway Avenue. I spoke with Mr. Fisher regarding the error made and the required taper length of 150'. He said this should eliminate his problem regarding the power poles. I advised him to submit revised road plans for approval. If you have any questions, let me know. ACT I ON : S SCR1 E N: ANh 0 USE-.R I D: I NQ ASSESSOR'S I:NF'ORMATI:ON DATA SCREEN U Rl S Dl C T 1: 0 N i i ~.1 :94 ROLL= RE I:' Y R ARLI:i.- = 45134,03 - 10 0WNIlR I.-YNL" I A , I NC; F:1 El D EiOOK: 00655"A OF' ~TRE::E.T' I 0034:':' N I<E::NNE:Y Ft I) I ACO: AS 93••-110;;.'. ADD11IZ1131S I OT:I:S OR CHARDS WA 99027 I AC:TV : STAT : A S I TU S I 000000 E ADDRESS UNKNOWN i ADDO : N SAf S: Y AI)DRE::S113 1 OT I TAX D'1: ST'R I COT : I'D 14 0 0 I PROP: 1000 L.E.GAL..: TR B, SF' 90--662, AUD 0-9112040298 BEING A F'TN OF" HL..K 3 VERA A'S)MT : TOTAI... MKT--L..D C:I...cS L.. I) BLDG--1 OTHER 01R mEWT1.-101) D 0 E IS)BTA: A F-1:NAL- A10%MT . 1 1, 150 1 1, 1 50 0 0 0 N $EXE'MP T I DNS : 0 TA XA1-1L.E::. 1 1 , 1 50 SAI...E••- 1 9200 (3275 DATE: 05 12 92 INST. WD TRAM. R PRICE : 29,000 G>AI...E - 1%: 9101 9825 DATE: 12 27 91 I:NST : WD IRAN: R PRICE : 25,500 ACTION: ? I GRE=EN . SUMP USER :I: D : I NQ S U M M A R Y 0 F P A R C: E L C H A R A C: T Er R I S T I C S JU::= i 1 RCS== Rh PAK== 45134.0310 YR= 94 ALTKEY:= 2956038 DYR= 94 SI'ATUc,i : ACT.1VE I...I: GAL : TR B , SP 90•-662 , AUD l91 12040298 BEING A PTN OF ELK 3 VE'RA S111)(13: 000000 A1)1)RE 'S,S UNKNOWN UT I S CIRCHARD::> TOTAL MKT-LD ( LIS)- I...D I+LDG-1 0TI-4E-R o/R AP PRA 1113 E 1) : 1 1, 15 0 1 1 , 15 0 0 0 0 Y LINT CNT . 2 ACREAGE: 2.450 LAND USE::. T1:RR FRONTAGE: 0 L 0(::% : TYPIy . LT DEPTH . 0 1.00000 S1.4 % . NO UNITS: 1.39 ZONING: P F-IYr>% : RATE . 8,000.00 NO'rE~<,*:%): F:'RE:V MKT VAL::=0000 i ' 000 NO. RE S, BLDG - YEAR BUILT: STRUC'T'URE 'T'YK'E: : NO. COM BLDG: AIR COND : BUlI...DING ID: TOTAL.. SQ F'T . F: I:REI'I..AC:E S, : NO. BEDROOMS: EXT WALL: NO. KATI°IS : STO111:E S) : 3 ~mPV 7c~ ~ AC T I CjN p R S)Cf-_.'EI- IA r, ti A I % I #M` ] L I]t}^.i SE R I ]}~~~a,J }~J I ~'~~~~~yi C"H0il~'~Rt=::~ `SCN )1 1 , 1 i 1 4 C ~ .1} L ~ / 9 ! ]f/J i ~ A E}~/ / 1 l.l.lgyy]D R E., S L.} JURISDICTION= 11 YR = 94 ROLL= RE PARCEL- -1 ~ .E > I I ,3AMF•`LE 2 1.6x_);_) . r, A FENNY L VAN I A r. a a R a n v n A9{VE ~k+W 12 > c l ~v ~ /.~}~..-1 '4~lL ~~1I~1607299 4•~DDRE SS 2 kiA F1 I N;011--4A R a w a Di_/ ~~~1=~~ p o- rt R ~-KSA EDI I"? / i 2 f'"'€I ,1 f'•.1-. Y A THE T 2 ~'.F~9 1`~~ J~ y~ 8~~ I-'I AvE=. F ~T DB{4i{NI IDDYY) f 5 q ~i AD 1~.ES i SP O K A ~~1 E WA S~i 0cS E 4 ~f 1 T? 7 A. Je S(jbkdl~,ER:S{lP D"J0,EsC) y SUBDIVISION Z0119999 SPECIAL 2 BILLS TD NC-JF4'1`G AGE". CDB 1 L- 1. - i 1\1 G 1 2 CODE-,, F i E ETE Op ,.~l YR a 1 94 RE- A P F_. ION2 I P, 17 F~ 'i-f • A 4. i~ ~~a 5 Ls 1 - . ! it "I 1._. 4..i v..ti •k d, p 3 k '4 C! y ~-s y C H A GW.•_" R E A S I 1 't n .11 9 xr- r~q..y( SALES .I. I' S f` S I 1 0 N ! 7,F~{ 1r E E 1D .y~~. +.J^. '~~'1y ~17.~.{~ Y1 i Yf•1S 1¢ y1 yy~ t M~ I LS..'••'-• I SIV.. 1 ~~'U' H' 4 l'7{.4 . { ~,C)F.f Ar K /F1 < f L~0 1 6 lfQ/''•jy4 51~•5.~ GE D rw. jjw. r....w, ~ w-+ u,. ..u 1 .e m m w _,e. .P....., ,,,n w«- ~ ! W w. _ ,......~..(.'_"'.~,.r..~...q... J~ ~'}7, 1.'.`.~. k ¢..~1.~ n R--SS •'d ~~~~M A ,49_} 5 Y I n n a n v r n r E VE {~~W r 1 23 yr~ c T. A f} E Crte} ~*~y ~~.1RTi.~~~ ~~1. D ~-'ES C * R WAE_ H IN1 GN r, n a ,4,. 5 .D(^r LISA 20202._.. E LW 3 '20DE GRP-iNTEE KOPF s I WIN . 11 CRY J ` i $AM n~ e. tS } c. I.I 1(,l, Cl • !IN:--J14fl2.li~.(♦;CSC( )(130441 !•Y ,d ~L••~~ y( ~Eai l.-Ir,EW 1 )1 ~ ~ l uL. Y•~1 t l A~.. V a..••" S.J I• 0 .ice 6 / t• / i7 1 J. 31L ~ 1 1.11:13 EM I tJ U 'LJL S ~ N .w•y~ 104 ` 13 S A l i1 '0 1 t f V 11-3 ..l..G 1fl Lti.;3"i G A~ca a C~{~ q(' ''•~1 q1 Jp; ~Ay~{ 0 {•»..1 9 V-71-14 ~ _ l cll:all =8 CI (i 10 4 )1tl S dlL~ d. i t V I I~ ~~LA4 CY91-33...T.r! L 3W M yS_:J RICI J E M11 CJl ..LN-_ li,lf't30G NIWILI_ 3 f` A? ! ~i lRl L 1: r (:I:°3 i w-# /A T - I H t 3 -1 QU I W ~ s. J I .:I ~ t._- jj ? s 11 W N OR 1.#'J'!PI9 °1CI~~ ~ ~ ~ ' ~i':~ ' ~ '_of.:)..#. I't#' ;'3#-1 t:,6-- /.f_.9 T o ,c -W-11\1 _-i3---f is ..1..d k-:1-30 t m ~ ` 1131.sN I 00 w 0 n 1311:4 El T T 9 00d 8, T 4 14n`-#oo 9~_,ocl ti ZAP I#A 9_,e: ~0:~~ 6T = ~11,7,4CI I,f?..3 I L 4 "A :3_- 1 WIN SA INN Q-00 NOW-01237311 I ' 04 G J'ltNl]:1f if l.J0Q' n .ICI#\l I(~a y .l) W,J 8 L? ° ~_:.J u 'j 1• 0 26/ y t• J.,, 111301 LJOT19 l WHOM 11 n P401 Jkj t/ t-.) 0 A;/ 'I i$/ ty Of K "T 0 l• 2) 1 IS I N0 1'SS.`#s_.._..oH_' q %I MI-N13 y ,"-4 13kJ •"1,.3 I W L l''•#1 . i J' Q 0 l• --8 -1 J. a Url 99+j(.-~ T_:..S~t,0,0 S f klapon) 11,1V I T-1 M »1..V '1sloij W1.1m' flow a Yasuo Is 1' 41FIZ3). !4 c4" --.9-0 I' oI}yl l L Pa lr oN G u LI,:N)> 6()',:.t;~, ::i,"':D I --sl1 ~ t.`~1y# 'i l-i~rt:~m »II' . 1#-1 " R !i: `1 1 0 ;~'3t~w 1' u plaM~ :CA ) ~.a 2 _ 0 ~ 11 9-- jj g r A.,1l I :.-#'JO'.I . 1`9 z it l ~ 7'tdt~'! j.,3 ti~ ,.l. d lJK9q ! 1 » 1? '»fti..? ; =1 1• Cf,l ji ~ J .j /11.3-11.1 3. his' h _.1#»#k/,„] , -:iJ. .l fal~ ~ v 11,114 t{ l~l 3 r Zcm L a."!,_'om q..~ P A *.--JV lal N1MG 7.71 WJ l d ~ .r • 1.: : ~ r. a„~ :.3 ._I ~ :h C. vi H P4 "NON-11101 r` ' ,.lid" ' :°a r: I~~ : ` ► _a,~ A°...1 Ms1 i ~ Y..". ~ _.1 CJ s ix 2.301i l:, ! ~ . • 1. #...7 a C °I{ 1k)d lll»". l ri , TWUN sic! I NUM; MORTIA PROS G. ~).j S3 p4 ]r 111M AWK301 1'~l ..j.. ~,l ._.J1 `!I ~L }~:'.Y L6 ` ~..l wit! :I~l~~ j Jt ~~~`~1 •1, 4'i .I :"~...~.•`l 6c -1 n •--1 n 1.411-~ : ola'J T 6/ t•~~J! ,o t • r a h a j t•- -t w ~s } 26/ i• La/ V 4 rls ' e o1• r~) :lj T 60 T I ti.T{i.O » QYt ~ ~.1kv :~r E A ti { ~h A " NVt _j z I .i . eN GM U\VO -I-10,1-11 M OM (207) A(1 V 1,!V l E I C.I ]:,:A 3.. 1. S I i owl Ises :373 3' old- WRIS LJd/ :IR_. j_tl _°112 i 9 ?Ff6/ *jm MV I :-ICI WS3 ~~s 1.#r~ ltl c ?..1»,iCl,:a~i°l f3 #4.C1.l NOTIGE3 _lCM0 Raman o 1 Y PAGE.- C) r FISTCD : F,,'Ec LG#__. PT TRACT VF.---RA m.9(l ENRANTOR !',i ilE ~L.A ST FIRST MI DD!_ ED GIRA NTE NOME-7n Fi RLST MIDDLE) NAME E lD'DR R AR a Z ,u ADD.- CONV I AST JURISDICTION";;; 11 RE PARCEL= 00,1," F'AGE 1~1i~ I /DD 0YY I NGTR TRA11.1 DUAL V/1 VRFY PR I CE- VALUE USE? MSG? 99) 0 1 70 Y7 3-,2 ° J' :27 `4 1 WD 0 U p ;x0kµ) t_ti „rat,) i~ - K WWI 00.•20. 9? 070 40 8 509 747 0913 ACAr1.-,GCl.Ar21c pro. 01 Adams & Clark, Inc. 9720 W. Fourth Ave. Civil Engineers * Land Surveyors* Land Planners 4 Landscape Architects Spokane, WA 99204-1702 (008) 747-4600 FAX. (509) 747-8913 TO: Spokane County Engineer FAX 3Zy- 3 N7b ATTN.: Dare Berto. PL3 DATE: 6/28197 FROM: Ron Dunsmore W. 0.: 97-092 Total Numbor of Pages (Including This Page) 1 Re: Lennox Subdivision I would We to propose changing the wording of paragraph #4 in the dedication to: Edserrient "B", as shown hereon, is a temporary ingress and egress turnaround easement for lots within this subdivision, and will be vacated when the Spokane County Engineer approves the continuation of the private road or the Tract "X" is dedicated or deeded as a public road. Please call me with comments. CONFIDENTIALITY NOTICE This hi;sirnIIc tiaiimnleolai (ai n 1Qr Me dawmente accompanying R) may comaln confidential Information belonging to the oondor. The Information Ic intended only for the use of the Individual ot entity named above, it you are not the Intended reolplent. you are hereby notifled mat any Mscloaure, copying, distribution, or the teldng of any action In roliane# nn ft rAntants of this Information Is sirletly prohibited. If you have received thls transmission iii coon. please Immediately notify our office to arrange for the return of the aooumentc, N,W74192V;&=11Ar 1.doc f~ 0 4078926 1111 mill 11111111111 012111991 of 03:32? After ]terording Return To: Sltnkane Counly Engineer Alln.: Itight of Wny Depnrbncnt Document Tide: Notice to the Publte No, I Gmmor(s): Boyd Real Estate Investments Cranlee(s): Spokane County Legal Desergruun. ors, 11WI of Sh1 or Sur. 13 Tovn•ehin 2511, Ranee 44 I' 1lM Addifinnal Legnl Descrgpton: On Panes 1-& 2 Asscssor'sTax Parcel Number, 45134.0)10 Ref"cnce Number: Leg In Date. 2-14-97 Requested by: Dnye Prepared by: RM Purpose: P 1667 rtFNo(s).: 44) IloadName(s) Shamrock.Wne SPOlG1NE COUNTY DIVISION Op ENGINEERING Sptoknnc County. Wnshington NO. I NOTICE TO THE PUBLIC IN THE MATTER Of RID WAIVER AGREEMENT AND COVENANT TO CONSTRUCT ROAD AND DEDICATE ruruitE PUBLIC RICIIT Of WAY TO COUNTY: KNOW ALL" MEN BY TTIf.SE PRESENTS. That noYD REAL ESTATE ItNES7?4nlTS being the owners of the following described lands in consideration of Mutual Benefits to be herenfter derived do for themselves, their heirs, grantees and assigns, hereby agree to: Construct a road, when so directed by the Spokane County Engineer, to serve, file lands herein descril><d in accordance with the adopted Spokane County, Road „ Svind,irds fur future public right of way 'T'ract "X Said road shall be contained in the following ulescribcd right of way: tt r PORTION OF ASSESSORS PAR E-t NOM).: 45134.0310 ' Tt1E EAST 29,00 FCET OF TIM WEST 30.00 FEET OF TRACT "n' OF SnORT PLAT 110. _90-662, AS PER SIIORT PLAT TIIEREOF RECORDED IN voLume It of SHORT PLATS, PACES 14 AND 15. Ex~ TIIE SOUTH 1.00 FOOT TIlrArOF. i TOCRTIIP.R WITIlr TIIAT PORTIOII OP SAID TRACT 'D" LYIttC IIORTIIWESTEnLY OF AN ARC.'. CONCAVE TO TIIC SOUTHEAST WITII A RADIUS OF 20.00 FEE'T', AT TIIE IIORTIIWEST CORNER TIIERF.OFn TIIE. P.NDS OF SAID ARC URIIIC TAIICF.I.•T WITII TIIE SOUTIIERLY RICIIT OP WAY LINE. OF OIlOADWAY AVENUE AND ALSO DEI7IG TANCENT WITH A LINE PARALLEL TO AND- 30.00 FEET CASTF.RLY FROM THE WEST LINE OF SAID TRACT "n III IuI~IIIuIIII(I~I~ l~llll P 9 78~ f ) ~~III~II II II~llllll G u Q I u 0212111991 03:02f 2 10.1V 6Palme co, U Deliver to Spokane County a properly signed and executed Right of Way Deed covering said right of way to accomnodalc a future County Road to Ix constructed by a County Road Improvcmcnt District (RID) in accordance with approved Spokatle County Road Slalldards. " Authorize Spokane County to include the below described property in n ]load Improvenent District (IUD) rind to support llle formation of a Road Improvement District for improvement of the road(s) described below by requesting and authorizing Spokane County to place their IL1me on a petition for fonttation of a (toad Improvement District pursuant to RCW 36.88.050, or by requesting and authorizing Spokane Costly to cast their ballot in favor of n RID being formed under the resolution meths] pursuant to RCIV 36.88.030, and/or by not filing a protest against the fornlalnon or n RID being formed tinder Ilte allema6vic resolution Inelhod provided for in RCIV 36.88.065 and Clnplcr 35.13 RCIV, If aII RID is proposed fur improvement of the road(s) described below, said owners and successors furthcr ngrec: (1) ibit the iuyvoventenls nr cutretruetiou contcntplaled within the proposed RID arc fcnsibtc, and (2) hunt the benefits to he derived froni the formation of the RID by the property included Ihcrcin, together with the amowtt of any County participation, exceed the cost and expense of fonntitm of the RID, and (3) that the propcny within the proposed RID is suRicicldly devclnpcd: provided, the owners or successors shall retain the right, as authorized under RCIV 36.88.070, to object to tiny nssessncnl(s) nit the property as n result of the improvements called for in conjunction with the formation o its IUD by either the petition or resolution method umlcr.jImptcr 36.88 RCIV and Ic appeal lIllic superior court the decision of the Board of county Co tmissiuners confinniug file final nssessnsctst roll; provided furthcr, it is recognized that actual assessments cony vary from assessment estimate so long as dey do not i exceed n figure equal to the increased true and fair value the improvement(s) add(s) to the j property. Thn'mg of the formation of said IUD or other road improvement project shall be determined by Spokane County consistent with RCIV 36.88. The street improvement authorized by the RID or other improvement project shall call for the improvement of Tract 'X' and its immediate street systcm l0 at least the minintan Spokane County Itoad standards applicable to Tract 'X' and the immediate street system at the lime the IUD, or other road improvement project is constructed. If a ntajorily or the property owners desire a higher standard of construction, e.g., gutters, underground drainage, ctc.. Ilia( standard shall prevail. I Any building constructed on any parcel abutting Tract 'x' shall be set back from Ilse 'tract n 'X' boundary by (lilt distance which equals the set back requirements of the zone. I The IUD waiver contained in Ihis agreement shall expire after ten (10) years from the date of execution below, Spokane County has no responsibility to build, improve, maintain or otherwise service the E Private roads contained within or providing service to the lands herein described. By allowing a building permit to be issued on property on a private road, Spokane County assumes no obligation for said private road and the owners hereby acknowledge that the County has no obligation of any kind of nature whatsoever to establish, examine, survey, construct, alter, repair, improve, maintain, provide drainage or snow removal on a private road. The above conditions and covclant apply to the following described property: ASSUSORS PARCEL. NO011 45134.0310 n TRACT "D" OF SHORT PLAT 110, 90-662. AS PER SIIORT PUTT TIIEREOF RECORDED IN ' VOLUME a or SHORT PUTTS. PAGES 14 AIR) 15, SPOKANE COUNTY, WASIIINGTOtI LOCATED IN TIIE NORTIIWEST QUARTER Or TIE SOUTHEAST QUARTER OF SECTION 13, j TOWNSHIP 25 IIORTII, RAIICE 44 EAST, W. rt. 2 ,r C 1P127991 0212111991 011tP W tic I 10.0) WV* C4, U This Agrecnenl applies to the improvement of S11WIROCK LAME Rr• No. 443 by grading, draining, surfacing, curbing, paving, sidewalk construction, iielnding Irnflic cuilrul facilities and related work. The undersigned owners. their heirs, successors or assigns hereby release Spokane County, and all its officers, employees and agents from any responsibility or liability for any damage whatsoever to the hereinabove described lands and improvements thereon as a result of allowing a building permit to be issued on property which is served by n private road. These requirements are and shall nm with the land and shall be binding upon the owners, their heirs, successors or assigns. 'llic Road Improvement District (RID) waiver in this agreement shall expire rifler ten (10) years from (lie dale of execilion below. IN WITNESS WIIEREOF, the undersigned has caused this instrument to be executed on this I % clay or FEDRUARY 1997 Uy. Dy: nARC•A. ROYD, VICE-PRF:SInl.NT SL'AT'E OP •WASI IINGT'ON ) COUNTY 01- SPOKANE: ) ss l certify that I know or have satisftelnry evidence Iha( MARC A. nOYo (islxrxk the individutil(s) tvho nplKnrcd Wore me, and said individual(W) acknowledged that (he/xEwo'k64) signed this instnoncnt, on onth stated that (helsbxfthry) (wns/,Av=) authorized to execute the instrument and acknnat(cdged it as the yt_CP. PRF.sinFNT • ul' n0Y0 REAL ESTATE INVESTn£NTS to be llte free and voluntary net of such pany for the uses and purposes mentioned in the instnoncnt. \ Dated this tinynf' FF.nnOARY 1947 40, N . ARY PUBLIC • NOTARY wane Fort TNESTATE OF WASHWaTIO+~ In and forliteState ofWashington, PAYUOrmtWaoN residin atTAY cau►uaea Mutes: g Spokane. . . D 'AjHE 4I,109r ' tvly appointment expires: 7 nvformslnotice to public I corp nmarylbc 3 I S P O K A N IF- OFFICE OF THE COUNTY ENGhNEER 0 Ronald C. Hormann, P.E., County Engineer C O U N -T X A DIviSION OF THE PUBLIC WORKS DEPARTMENT Dennis M. Scott, P.E., Director Date: Fv1tfe q3 SUBJECT: t~16~7 je)v~jcx sad l5-( 20V Gentlemen: A review of the road, drainage, and parking plans for the above-referenced plat, short plat, binding site plans and/or building permit has been accomplished. Areas of concern to us are indicated in red on the attached prints. Please make the corrections and resubmit them to this office in order that the review process may proceed. When the plans are resubmitted, mark all changes on the revised print in color. If you have any questions about this review, please contact us at 456-3600. Thank you. Very truly yours, Ronald C Hormann, P. E. Spokane County Engineer 70ty 1411 G~ClJLLI/~3 k\w\f\review.1 tr W. 1026 Broadway Ave ~l Edward J. tPa r., P. E. Plans Review Engineer Spokane, WA 99260-0170 (509) 456-3600 FAX (509) 456-4715 REVIEW COMMENTS SPOKANE COUNTY ENGINEER ENGINEERING SERVICES PROJECT P1667 PROJECT NAME: Lennox Subdivision REVIEW 1 REVIEWER: Ed Parry DATE: 20 Apr 93 PAGE # 1 of 2 PLANS: 1. The following items are required prior to a detailed review of the plans for this project. a. Submittal of final plat b. Written authorization from the owner for applicant to serve as the Owner's representative 2. Plans were generally unreadable, particularly in the middle of the page 3. Plans generally need to conform to formatting requirements listed in the Spokane County Road standards, e.g.: a. Indicate 100' stations on road centerline, increasing from south to north, and reading from left to right b. Indicate project start and stop stationing c. Indicate stationing equation on Broadway d. Indicate benchmark e. Clearly indicate existing & proposed Right-of-way, proposed future setaside f. Indicate extent of new paving to be provided on Broadway g. Tract "X" roads require 50' R/W h. Provide road signage plan i. Indicate topographic features in R/W etc., 4. The following items, as a minimum, must be provided prior to review of the drainage calculations: a. Extract of SCS Soils map indicating project location b. Drainage basin map (pre-developed and post-developed conditions), with T" paths, lengths, slopes, and contours at a sufficient level of detail so that drainage basins can be clearly delineated. • s REVIEW COMMENTS PROJECT P1667 REVIEW 1 DATE: 20 Apr 93 Page 2 of 2 5. Request for "R" value testing is attached 6. Guidelines for 208 lot plans are attached S P O K A N IS y OFFICE OF THE COUNTY ENGINEER • Ronald C. Hormann, P.E., County Engineer 20 April 93 Gene Fisher, P.E. N. 3422 Kenney Road Otis Orchards, WA 99027 ~ C O U N T Y A DIVISION OF THE PUBLIC WORKS DEPARTMENT Dennis M. Scott, P.E., Director SUBJECT: Soils Testing Requirements P1667 - Lennox Subdivision Dear Mr. Fisher: Additional information with respect to the subsurface soils conditions on this project is required to complete the plans review process. Specifically, representative values for soil percolation rates and soil-subgrade "R"values are necessary to evaluate the proposed storm drainage disposal system and road pavement section. The Spokane County Materials Laboratory has reviewed the proposed development plan,and has determined that a minimum of 1 Stabilometer "R" value tests is required. The information may be supplied by any qualified soils firm. The tests and methods must meet Spokane County standards, and be inspected by Spokane County personnel. Spokane County (Mr. Jim Radke; 456-3600, ext. 436) should be notified at least 24 hours in advance of all sampling and testing. Please call me at 456-3600 if you should have any questions. Sincerely, Edward J. Parry, Jr., P.E. Plan Review Engineer cc: Project file W. 1026 Broadway Ave. Spokane, WA 99260-0170 (509) 456-3600 FAX (509) 456-4715 208 INDIVIDUAL LOT PLAN GUIDELINES 1. Show location of easements on the lot. Include dimensions of drainage easement and lot bottom dimensions from lot lines. Include a description of the lot legal description such as Lot Block , NAME OF SUBDIVISION OR SHORT PLAT. The bottom elevation of the swale is also required. The station for any curb drops or sidewalk inlets should be shown on the plan drawing. If a drywell is included in the swale it should show the type of drywell, frame and grate type, elevation of the grate, and centerline station of the drywell. 2. If there is no swale on the lot but there is a drainage ditch, the ditch should be shown on the plan drawing. The ditch flow line grades should be shown along with any easement for the ditch with dimensions from property lines. 3. All lot plans should show a north arrow, scale, street name of adjacent street, curb and sidewalk if applicable or edge of asphalt if there is no curb. The lot dimensions should also be shown along with the building setback line with dimension from the front property lines shown. 4. Any easements such as power line easements which prohibit building under them should be shown on the plan drawing. Any other easements which could interfere with buildings should also be shown. Any existing buildings should be shown. 5. With each plan drawing there should be submitted a typical section drawing of a cut through the swale or ditch which best describes how the swale and/or ditch would look as constructed from a side view. The typical section should show the curb and/or sidewalk if applicable or edge of asphalt in relation to the swale, side slopes, vertical. distance from swale bottom to top of back slope of swale or ditch, vertical distance from the bottom of swale to the grate of the drywell, vertical distance from the normal gutter line to the bottom of the swale, and any applicable note or other information which would describe the proper construction of the swale and/or ditch , concrete apron, street right-of-way line, and grass sod or seeding if approved on the construction plans. 6. The lot plan and attached section sheets should be sealed, signed and dated by the engineer in a location outside of the lot drawing. 7. The scale of the drawing should be such that the lot is depicted as large as possible and still be able to show the curb line of the street. The interior of the lot should be as free as possible of notes and writing to allow the builder room to draw in his proposed house and driveway location. An example of a acceptable 208 lot plan is attached for use as a guide in preparing your drawings. CHECKLIST FOR USE IN PREPARING 208 LOT DRAWINGS PLOT PLAN 1. I have drawn the lot plan to a large enough scale to make the lot as large as possible and still be able to show the curb line and the necessary notes and certification stamp. 2. I have shown the legal description for the lot. 3. I have shown the drainage easement dimensions in relation to property lines or corners. 4. I have shown tie bottom of swale dimensions in relation to property lines or corners. 5. I have shown the bottom elevation of the swale. 6. I have shown the location of any curb, sidewalk or edge of asphalt line as applicable. 7. I have shown the name of the street adjacent to the lot being drawn. 8. I have shown the station of any curb drop/or drops that empty into the swale. 9. I have shown the type of drywell, frame and grate type, elevation of the grate, and centerline station of the drywell. 10. I have shown any required ditches, their easements on the drawing, the ditch flow line grade and required rip rap, etc. 11. I have shown a north arrow, scale, lot dimensions, and building setback lines with proper dimension. 12. I have shown any easements which could affect any future building locations and I have shown any existing buildings. 13.. I have sealed, signed and dated each drawing that is being submitted for review and in appropriate location. ATTACHED SECTION DRAWING 14. I have shown the curb and/or sidewalk or edge of asphalt in relation to the swale, sides slope, vertical distance from the bottom of the swale to the top of back slope, grate and normal flow line of the curb or edge of asphalt. 15. I have shown the concrete apron, street R.O.W. line, and grass sod or seeding if approved and any applicable notes or other information which may be necessary to describe proper construction. SUBMITTAL CHECKLIST PROJECT # jg4 , REVIEW # / REVIEWER: J DATE : ?oM f3 PROJECT: PROJECT SPONSOR: . C. Arty TEL # ' N00 PROJECT ENGINEER (Road & Drainage Plans) i:Nci TEL # Ol2y PROJECT SURVEYOR (Plat) TEL # GENERAL ITEMS YES NO N/A 1. The $100.00 fee for plans review has been paid to Spokane County for this submittal. 2. An agreement to pay fees has been submitted to Development Engineering Services. 3 I h . ave noted the plans in Plans out dates on the pink sheet in the file. 4. The plans and calculations are stamped and signed a Professional Engineer? 5. The developer has signed and approved the road and drainage plans. 6. There are no conflicts between the proposed drainfields and any drainage ditches on the plat. 7. Bowstring calculations by developer are in the file for this review. S. Vertical curve stopping sight distance calculations by developer are in file for this review. 9. Horizontal & vertical alignment sight distance calculations by developer are in file for this review. 1 10a. The file contains a Spokane County Section Map. 10b. The file contains a Spokane County Assessors's Map lOC. llb. 12. The file contains an aerial photo of the proposed project area. Project is located in urban boundary area. Project is located out of urban boundary area. List any design deviation requests 'and their status: 13. Locate the Findings and Order for the project and list any unusual conditions: ~VA X ' &)AA "4.-w - 2" JJ,/ &W _ lirl, 4mle- & t F-WAL, 4AF SUM I~~ 2 T lad 0/~ 7~> SeJ& ROAD PLAN SUBMITTAL 1. List any roads that must be designed and constructed on the project. ROAD NAME CLASSIFICATION WIDTH DESIGN MAXIMUM STOPPING SIGHT REQ'D SPEED GRADE DISTANCE 2. Planning conditions require submission of a landscape plan. (NOTE: Usually associated with PUD' s ) 3. I have checked the landscape plan against the road and storm drainage design and there are the following conflicts: 4. The following road plans have a bearing on the design of roads for this project and a copy is in the file: 5. I have sent an "R" value and percolation test request to the Construction Section with soils information and a layout of the project. "R" value text request to engineers _2D 3 (date). ~3 6. Are existing utilities shown on the plans? 7. Are proposed utilities shown on the plans? 8. Does the note "Any conflicting utilities shall be relocated prior to construction." appear on the plans? 9. Are curb design sheets provided for existing streets? 10. Does the curb design conform to Spokane County Standards of section cross slope (Between 2% and 4.5%) ? 11. Is there a street cross section shown for widening existing streets? 12. Does the proposed vertical and horizontal alignment meet Spokane County Standards? 13. Do the plans show the typical cross section for streets? 14. Do the street widths match the Findings and Order? 15. Does the typical section on the plans meet Spokane County Road Standards? 16. Is the cross slope shown, is it within our standards, and is it correct? 17. Is the type of curb shown? 18. Is the type of curb shown the proper type of curb for the road classification? 19. Does the curb shown meet Spokane County Road Standards for curbs within the public right-of- way? 20. Is the curb type consistent with the curb in the general area? 21. Has an "R" value test been performed for each soil group? 22. Do the vertical curves meet or exceed the required length for stopping sight distance? 23. Are the low points of the vertical curves at locations where water is designed to flow through an inlet or curb cut? 4 24. Are stop signs shown for all streets which intersect arterial? (Check with County Traffic Engineer if there is a question) 25. Has the intersection sight distance analysis been provided for all intersections with arterial or higher classification streets? 26. Are street name signs shown at all intersecting streets? 27. Is there a need for barriers at the end of dead end streets? 28. Is there a need for other special signing? {Check with the County Traffic Engineer) 29. Is the bench mark shown on the plans? 30. Has the Fire District approved the proposed private road turnarounds that are substandard according to our Spokane County Road Standards? 31. Are BCR, MCR, and ECR elevations shown on all curb returns? 32. Are cul-de-sac grades shown for the top of curb? 33. Are curb returns shown in the profile? 34. Are the curb return elevations correct? 35. Do the cul-de-sac grades meet county cul-de-sac standards? 36. Do the intersections meet the 2% grade requirements? 37. Does the curb return radius meet the county standard of 20 feet? 38. Transitions from end of curb to existing paving shown? 39. Is there a need for slope easements? 40. Is there a need for erosion protection? 41. Are the curb grades below the county minimum of 0.8%? 42. If curb grades are below 0.8%, has a special note been added which requires a licensed land surveyor to verify that the curb forms are at the correct plan grade prior to construction? 5 1. 2. 3. FIELD REVIEW Field investigation trip made on Report completed and put into file on Are there any existing utilities on the project site? If yes, describe. 4. Are the drainage basins on the ground the same as those that are presented in the drainage report? 5. Are there any drainage channels directed toward property? 6. Are there any drainage channels directing water through the property? 7. County roads cut off drainage as per drainage calculations? 8. If culverts under county roads, does the flow go away from or toward the project? 9. What kind of ground cover exists? 10. Describe any existing channel conditions: 11. Describe channel cross section: 12. Existing Curb Type: 6 DRAINAGE AND PLAN REVIEW CHECKLIST 1. Has a plat map been submitted which shows lot dimensions, street widths, etc.? 2. 3. 4. 5. 6. 7. Was a contour map submitted or a map with adequate spot elevations on it to properly determine drainage basins? Was a "best available" contour map submitted? Were all existing drainage courses shown? Were all the proposed drainage courses shown? Were Hydrologic calculations submitted for each basin? Were culvert calculations submitted? 8. 9. 10. Are percolation tests required for soils in this area. Were grate calculations submitted? Does the drainage report identify the SCS soil groups for the project area and for the proposed roads to be built in the project area? 11. Are ditch capacity calculations submitted for all ditches that are proposed to be used in the drainage plan? 12. For 208 design concepts, were swale floor sizing calculations made? 13. 14. 15. 16. 17. 18. For 208 design concepts, were swale volume calculations made? If a detention concept is being used, were calculations submitted? The drainage design does not propose to divert water from a natural watercourse. The drainage design does not concentrate water flow where sheet flow previously existed. No part of the plat lies within a designated 100- year Flood Plain Area. The drainage concept is compatible with planning commission requirements. 19. The 50 year frequency was used for off-site areas. 20. The difference between present and future flows is retained on the site. 7 INLETS k, 1. The inlets shown are within the stream flow. 2. Curb type inlets are shown at sags and are properly sized. Perimeter is divided by 2 for calculations where no curb opening is provided. 3. There are no long curves with flat grades which pose a problem. 4. The centerline road stations for all inlets are shown on the plans. 5. Grate type is shown on the plan and is acceptable. (Spokane County Standard inlets in county ROW, on private property other inlet type may be specified) 6. A detail drawing of the grate/curb installation is shown on the plans and includes the 2" depression and transitions as per county standards for grates that are located within county ROW. 7. A curb cut detail is shown on the plans with the new county back drop with transitions and a 2" depression for curb cuts inside county ROW. 8. The plans shows acceptable curb cut details and grate details for installations which lie within private road easements. 9. If inlets are in a gravel road or a dirt ditch a 6'x 6' A.C. apron is shown around the inlet. 10. There are no inlets shown on the high side of a road where they will do little or no good. 11. Catch basin or special manhole details are shown or a standard drawing is specified. 12. Critical low points in the drainage system have been provided with overflow easements. 208 SHALE SYSTEMS 1. The swale bottom and sides have sod or grass turf specified. 2. Swale side slopes do not exceed a 3:1 side slope. (A 2:1 side slope allowed if swale depth is less than 12" deep. Should only be allowed where constrained by obstacles) 8 3. If depth of water from bottom to drywell rim is between 6 and 8 inches, soil mixture has been specified which meets Spokane County Guidelines. 4. Drywell is located within 8 feet of the curb line. 5. Soil type is appropriate for drywells. 6. Drywell location does not conflict with underground utilities. 7. Drywell type is specified. 8. Drywell grate type is specified. 9. Bottom elevation is specified and is correct. 10. Bottom dimensions are shown and the area matches the required area from the 208 calculation for impervious areas. 11. Easements for the 208 are shown on the drainage plans and on the subdivision plat and are of adequate size to contain the 208 swale and are tied to the lot corners. 12. The side of the swale that is the furthest distance from the street should have a top of swale elevation that is higher than the highest water level of the swale. 13. If filter fabric is specified for the drywell its installation specification is adequate. 14. If 208 lot plans are required they were submitted on 15. The 208 lot plans, dimensioned to lot corners, have shown - drainage easements, - setback requirements, - bottom of swale elevation, - rim elevation if drywell are present, - curb cut lengths, -_any drainage ditches, - an attached cross section of the swale or ditch, - has left the lot area clear of writing, - shows grass sod, - shows depth from the top of the curb, - has been stamped by a professional engineer on all pages, --and is of sufficient scale to maximize the lot size to the 8 1/2" x 11" paper size. (Drawings may be on plain white paper) 16. The 208 lot plans show the lot number, block number, subdivision name, date drawn, and scale. 9 17. The swale is not located inside a future set aside area. See Findings and Order for where setasides are required. 18. 208 lot plans were approved on CULVERTS AND PIPE SYSTEMS Pjt 1. The road culverts are at the low points of stream flow. 2. The headwater was calculated for culvert entrances and is under 2 diameters for culverts under 18" in diameter and 1.5 diameters for culverts greater than 18". 3. There is a minimum of 12" of cover for all culverts and storm sewer pipes. 4. The minimum velocity within the pipe system is 4 feet per second at design flow. (Note: The County Engineer may permit lower velocities) 5. The backwater calculations show a minimum freeboard of 0.75 feet for each catch basin or manhole. 6. The minimum culvert and pipe slope is 0.5% and all pipes meet or exceed this standard. 7. 8. 9. 10. All angle points in the storm sewer system have suitable access such as a manhole for cleaning. At locations where two different pipe sizes inter the same manhole the 0.8 diameter points of each pipe are at the same elevation. (Note: Exception allowed for drop manholes) There is no downsizing of pipes in a systems of pipes that are 18" in diameter and smaller. There is a downsizing of pipes in the amount of 3" for a minimum of 100 feet in a pipe system that contains pipes that are 18" and larger in size. 11. All pipes in the pipe system are 12" and larger as per Spokane County Standards except for 10" pipe that is allowed for connection of inlets to catch basins or drywells. 12. All storm sewer pipes are located a minimum of 5 feet from a rear or side property line and have adequate easements for maintenance. 10 13. The maximum distances between inlets on the same slope should not exceed approximately 500 feet. 14. The plans show all culvert pipe types and they meet county standards for systems that lie within county ROW. (Note: The type of pipe in private systems may be a specified by the design engineer) 15. The plans show all culvert invert elevations and lengths. 16. The culverts shown are properly stationed from centerline stationing. 17. There are no conflicts with underground utilities. 18. There is no need for energy dissipation on any of the culverts outlets shown on the plans. 19. There is no need for rip rap around the culvert outlet for some or all of the culverts as proposed on the drainage plans. 20. The rip rap that is shown for the drainage plans is adequate for the culverts where erosion is a concern and the engineer has submitted acceptable rip rap design calculations. 21. Adequate drainage easements are shown for maintenance of drainage ditches or pipe systems. 22. Culverts are shown on the road plan and profile sheets. 23. Pipe anchors are shown for pipe grades greater than 15%. 24. There are no instances where water is trapped against a fill with no culvert shown. 25. Profiles and cross sections are shown on the plans for all proposed channels and ditches. 26. Ditches with eroding velocities have a proper lining for erosion protection. 27. There are easements proposed or existing for natural channels which cross the property. 28. Water will properly flow from an existing or proposed ditch on to the pavement as proposed on the drainage plans. 29. Where the ditch profile passes from cut to fill the flow has been properly disposed of. 11 30. 31, 32. 33. Ol BWI:hec An easement was provided where street drainage was diverted onto private property. The perpetual maintenance of private systems has properly been provided for. The maintenance of drainage systems within Spokane County ROW has been properly provided for. Appropriate drainage language has been provided b the reviewing engineer to the surveyor and/or engineer who is involved with the platting work. 12 (~I1v67 " LexNcsk ~bolv t At-WAA( Awl c~- Te, 0 ic;ae f-c-2et 1AAA y-.P ~ At-e } i a~Xi ~~°e7 oft ~4 t4?07 OA lt~ i iw `~`eu~ 7mtif it opesA1L sfiJt~- ~ ~ e a:.~ ~IItP~ Pop ~ ~u v,~ ~r t {o ~oefw P ol ekLt4 q L 1b V REVIEW CON ENTS SPOKANE COUNTY DIVISION OF ENGINEERING & ROADS 1026 W BROADWAY, SPOKANE WA 99260-0710 PHONE (509)456-3600 FAX (509)324-3478 n REVIEW 2 REVIEWER: PROJECT P-1667 DATE: PROJECT NAME: Lennox Subdivision Dean Franz, P.E. 28 December 1994 These comments are to be used in conjunction with the road and drainage plan redline markups, which are attached. Address all comments by revising the plans and drainage calculations, unless otherwise noted. General Comments G1) Provide a Developer's signature block for approval on each plan sheet. The Developer will need to sign and date the plans by the time the final set of plans are submitted. G2) In the Hearing Examiner's Conditions of Approval the project name is "Lennox Subdivision." The plans show the name of "Lennox Addition." The revised name of the project needs to be approved by the County Planning Dept. Otherwise, change the listed name to match the originally approved plat name. G3) Examiner's Planning condition #17 reads "Prior to approval of the road and drainage plans, you are required to coordinate with the United States Postal Service to determine the type and location of mail delivery facilities..." Provide evidence this has been accomplished and coordinated with the Planning Dept. G4) Revise the private road name to read "Shamrock Lane" in the road plans. G5) The sheet numbers are listed on ink over the plan sheets submitted. Place this numbering on the original reproducible plan set. Road and Storm Plans Lennox Lane Plan/Profile Sheet 1 1) List the bearing of the _roadwa►y. 2) List the station where the turn-around centerline will intersection the private road stationing line. REVIEW COA~IIVIENTS Page 2 of 6 28 December 1994 REVIEW # 2 PROJECT # P-1667 PROJECT NAME Lennox Subdivision 3) The plan indicates the stationing line to be located approximately 3' west of the easterly curb. The prof ile indicates the stationing line to be located along the "west pavement line." This is an apparent discrepancy. Please make the stationing line location clear, and have it match the stationing line in the profile. 4) Provide a station equation for the street intersection. 5) Provide a 20' radius paved curve return for the southwest quadrant of the intersection on Broadway & Lennox Ln (Shamrock Ln). Locate the pavement within the existing Broadway right-of-way. Also list the curve return elevations, including beginning return (BCR), middle curve return (MCR) and end curve return (ECR). 6) The road plan shows the asphalt beginning it from the west property line. The typical road cross-section shows the asphalt beginning 2' for this same dimension. The road cross-section is correct. Revise plan view dimension. 7) Provide a 12" long nose down where the curb will terminate. 8) The turn-around shows a gravel thickness of 411. Provide a minimum of 8" of gravel material. 9) Two separate drainage ditches are indicated to be flowing westerly, one in lot 3, the other in lot 7. Please label. If it is, provide and reference a typical cross-section, place within an easement and demarcate with a fence, show topography, define ditch slope and bottom elevations. 10) Turn-around a: Provide and reference a typical cross-section. b: Place it within an easement and show in the plans. c: Define the pavement elevation at the easterly -terminus=- of -,tYie~tu n- arou • r. A d : Define the location of the easterly terminus by station and off seat from private road centerline. 11) The 1208' swales are horizontally defined in the north-south direction. Please also define their locations in the east-west direction. What is the 2' dimension defining around the pond perimeter? 12) Label each 1208' swale to readily correlate with the swale table. REVIEW COMMENTS Page 3 of 6 28 December 1994 REVIEW # 2 PROJECT # P-1667 PROJECT NAME. Lennox Subdivision 13) The curb drop elevation ("invert") needs to be set at Top of curb (TC) - (0.33' + 0.17'). Please revise curb drop elevations. The bottom of pond elevations need to be set at (TC) - (0.33' + 0.801). Please revise pond elevations. This will also require the revision of the top of drywell grate elevation. 14) List _ the t~ypde,~.,of~f r_ame~and gra1tze to be• .uFs~ed• ±wAilktahvatohre-wdirequaie~lfilk . Normally when it is within a 1208' swale a Type 4 frame and grate is used. 15) Add a note that the drywell and gravel envelope is to wrapped with a geotextile fabric (AMOCO 4545 or approved equivalent). Refence this note at the drywell callouts. 16) Street signs: Add a callout requiring the Contractor to construct and install the signs per MUTCD and Spokane County standards. 17) Broadway Ave is classified as a Minor Arterial. (Per Examiner's Engineering Condition #15.) Therefore the half-street width is to be set at 22 ft. The plans show a half-street width of 20 ft. Revise. 18) 1208' Swale & Drywell Table: a: Label the next to last column to read "curb opening length"; b: Add a• nete"'-to the table to read "W & L- are,-b6ttom ofd pond ARM ~en- s01; c: Revise bottom of pond and drywell elevations per previous comments. 19) The top of the 1208' swale needs to have sand instead of gravel to accomodate a sod covering. Revise. 20) Typical Private Road Cross-Section: a: Label the plat boundary line in the detail; b: Show the tract 'x' width; c: What is the 2' and 2' dimension on the right side of the detail? 21) Curb Opening detail: In the detail reference the table. 22) F a r 23) d e For the "east curb line" profile, label the profile as "top of curb." REVIEW COMMENTS Page 4 of 6 28 December 1994 REVIEW # 2 PROJECT # P-1667 PROJECT NA1E Lennox Subdivision 24) T e_"west pavement line" profile indicates that the Type 'C' curb is to begin at STA 6+23.69. However the pical"road cross-section shows no curb along this side of the roadway: Address discrepancy. 25) Extend and show the private road profile to the centerline intersection of Broadway Ave along the stationing line. Also coordinate with the intersection equation. 26) Along the stationing profile, list the station and elevation where the existing road is to match into the new road. Broaway Ave Plan/Profile Sheet 2 27) Clearly define the curb return elevations. List the BCR, MCR and ECR elevations. Also list the BCR and ECR stationing at their respective streets. 28) There is a discrepancy in existing pavement elevations, as listed for the curb calculations versus what is shown in the plans as shown for Broadway Ave. For example, at STA 1+68.42 the plans list and edge of exist. pavement elevation = 29.46. The curb calculations provided list an edge of pavement elevation = 29.31, at this station the calculations list the centerline elevation = 29.46. Similarly, the same problem is also shown at STA 0+00. This brings into question all of the curb calculations. In the Broadway Ave profile labeled "Existing CL pavement" the elevations do not agree with the curb calculations nor the elevations listed in plan view. Please address discrepancies. 29) In the typical road cross-section for Broadway Ave show the dimensions for the sidewalk, edge of exisiting right-of-way, label centerline and proposed right-of-way line, and set-aside. 30) Where the pavement will be widened, indicate that the edge of existing asphalt is to be sawcut, and the new pavement is to match. 31) Indicate the existing, approximate 1/2 street pavement width. 32) Delete the percentage of asphalt for the roadway. WSDOT Class B asphalt addresses percentages indirectly by stating stability requirements in the mix design requirements. See WSDOT Std. Specifications Section 5-04.3. 33) As mentioned in the first review, an R-value test is to be performed and the results provided. This is used to determined structural pavement requirements. REVIEW COMMENTS 28 December 1994 REVIEW 2 PROJECT P-1667 PROJECT NAME. Lennox Subdivision Page 5 of 6 34) The minimum outgoing taper length is = WS = (11')(45 mph) = 4951. Identify at what station the taper is to begin, revise the taper length, and in the plan view reference note #1. 35) Notes: a: Revise Note #1 to make it clear that the 4" white stripe is to painted along the entire length of the tapers. b: Add a note requiring the Contractor to relocate any conflicting utilities prior to construction. c: Add a note to read "The Contractor shall employ a licensed Surveyor to verify that curb form grades are in conformance with the plans, prior to pouring of curbs." 36) At STA 0+00 the centerline profile lists a pavement elevation = 27.39. The road plan lists an elevation = 29.39 for the same location. Address discrepancy. 37) At STA 1+68.42 the centerline profile lists a pavement elevation = 29.46. The road plan lists an elevation = 29.24 for the same location. Address discrepancy. 38) At STA 1+68.42, the listed south curb line elevation = 29.46. From the listed road grade the computed elevation = 29.71. Address discrepancy. 39) At STA 0+00 the cross grade is shown to be flat. At least for the new pavement widening area, the minimum cross slope is 2.0%, max. is 4.5%. Please revise. 40) For each 1208' swale, list the minimum berm elevation. The elev. = TC*+ 0.21. Please provide. 41) Define the beginning/ending station of the incoming taper. 42) In the road plan show the existing right-of-way (r/w) width, proposed r/w width, and set-aside width. 43) Show the location of existing utilities in construction area. Show overhead power, location of power poles (if in construction area). Also show location of barb-wire fence. Indicate where the fence will need to be removed. REVIEW CO1VaMNTS Page 6 of 6 28 December 1994 REVIEW 2 PROJECT P_1667 PROJECT NAME Lennox Subdivision Draina a Calculations D1) Provide a separate drainage basin map to correspond wish t calculations. The map is to show, as a minimum: he subbasin limits of area flowing to each 1208' swale; label subbasins and correlate with calculations; time of concentration route used in the calculations; and contours or ground shots No meaningful review of the drainage calculations can occur wit-o drainage basin map. Therefore the calculations are being re` ut a without reviw. urned S P O K A N 1E C O U N T - y-OFFICE OF THE COUNTY ENGINEER • Ronald C. Hormann, P.E., County Engineer A DIVISION OF THE PUBLIC WORKS DEPARTMENT Dennis A Scott, P.E., Director December 28, 1994 Eugene F. Fisher, P.E. N. 3422 Kennedy Rd. Otis Orchards, WA 99027 Subject: Lennox Subdivision Review #2 Spokane County No. P-1667 Dear Gene: A review of the road and drainage plans for this project has been accomplished. Areas of concern to us are indicated in red on the attached prints and calculations. Please make the corrections and resubmit them to this office in order that the review process may proceed. Please provide 2 copies of plans and calculations for the project with each submittal. If you have any questions about this review, please contact us at 456-3600. Thank you. Sincerely, Spokane County Engineers L.i~ / nom, Dean Franz, P.E. Plans Review Engineer encls: Plans (1 set) Calculations (1 copy) Comments (6 pages) cc: project file 1026 W Broadway Ave. - Spokane, WA 99260-0170 • (509) 456-3600 FAX: (509) 324-3478 TDD: (509) 324-3166 REVIEW COMAMNTS SPOKANE COUNTY DIVISION OF ENGINEERING & ROADS 1026 W BROADWAY, SPOKANE WA 99260-0710 PHONE (509)456-3600 FAX (509)324-3478 REVIEW 2 REVIEWER: PROJECT P-1667 DATE: PROJECT NAME: Lennox Subdivision Dean Franz, P.E. 28 December 1994 These comments are to be used in conjunction with the road and drainage plan redline markups, which are attached. Address all comments by revising the plans and drainage calculations, unless otherwise noted. General Comments G1) Provide a Developer's signature block for approval on each plan sheet. The Developer will need to sign and date the plans by the time the final set of plans are submitted. G2) In the Hearing Examiner's Conditions of Approval the project name is "Lennox Subdivision." The plans show the name of "Lennox Addition." The revised name of the project needs to be approved by the County Planning Dept. Otherwise, change the listed name to match the originally approved plat name. G3) Examiner's Planning Condition #17 reads "Prior to approval of the road and drainage plans, you are required to coordinate with the United States Postal Service to determine the type and location of mail delivery facilities..." Provide evidence this has been accomplished and coordinated with the Planning Dept. G4) Revise the private road name to read "Shamrock Lane" in the road plans. G5) The sheet numbers are listed on ink over the plan sheets submitted. Place this numbering on the original reproducible plan set. Road and Storm Plans Lennox Lane Plan/Profile Sheet 1 1) List the bearing of the roadway. 2) List the station where the turn-around centerline will intersection the private road stationing line. REVIEW CONMENTS Page 2 of 6 28 December 1994 REVIEW # 2 PROJECT # P-1667 PROJECT NAME. Lennox Subdivision 3) The plan indicates the stationing line to be located approximately 3' west of the easterly curb. The profile indicates the stationing line to be located along the "west pavement line." This is an apparent discrepancy. Please make the stationing line location clear, and have it match the stationing line in the profile. 4) Provide a station equation for the street intersection. 5) Provide a 20' radius paved curve return for the southwest quadrant of the intersection on Broadway & Lennox Ln (Shamrock Ln). Locate the pavement within the existing Broadway right-of-way. Also list the curve return elevations, including beginning return (BCR), middle curve return (MCR) and end curve return (ECR). 6) The road plan shows the asphalt beginning 1' from the west property line. The typical road cross-section shows the asphalt beginning 2' for this same dimension. The road cross-section is correct. Revise plan view dimension. 7) Provide a 12" long nose down where the curb will terminate. 8) The turn-around shows a gravel thickness of 411. Provide a minimum of 8" of gravel material. 9) Two separate drainage ditches are indicated to be flowing westerly, one in lot 3, the other in lot 7. Please label. If it is, provide and reference a typical cross-section, place within an easement and demarcate with a fence, show topography, define ditch slope and bottom elevations. 10) Turn-around a: Provide and reference a typical cross-section. b: Place it within an easement and show in the plans. c : Define the pavement elevation at the easterly terminus of the turn- around. d: Define the location of the easterly terminus by station and offset from private road centerline. 11) The 1208' swales are horizontally defined in the north-south direction. Please also define their locations in the east-west direction. What is the 2' dimension defining around the pond perimeter? 12) Label each 1208' swale to readily correlate with the swale table. REVEEW COMMENTS Page 3 of 6 28 December 1994 REVIDEW # 2 PROJECT # P-1667 PROJECT NAME Lennox Subdivision 13) The curb drop elevation ("invert") needs to be set at Top of curb (TC) - (0.33' + 0.171). Please revise curb drop elevations. The bottom of pond elevations need to be set at (TC) - (0.33' + 0.801). Please revise pond elevations. This will also require the revision of the top of drywell grate elevation. 14) List the type of frame and grate to be used with the drywell. Normally when it is within a 1208' swale a Type 4 frame and grate is used. 15) Add a note that the drywell and gravel envelope is to wrapped with a geotextile fabric (AMOCO 4545 or approved equivalent). Refence this note at the drywell callouts. 16) Street signs: Add a callout requiring the Contractor to construct and install the signs per MUTCD and Spokane County standards. 17) Broadway Ave is classified as a Minor Arterial. (Per Examiner's Engineering condition #15.) Therefore the half-street width is to be set at 22 ft. The plans show a half-street width of 20 ft. Revise. 18) 1208' Swale & Drywell Table: a: Label the next to last column to read "curb opening length"; b: Add a note to the table to read "W & L are bottom of pond dimensions"; c: Revise bottom of pond and drywell elevations per previous comments. 19) The top of the 1208' swale needs to have sand instead of gravel to accomodate a sod covering. Revise. 20) Typical Private Road Cross-Section: a: Label the plat boundary line in the detail; b: Show the tract 'x' width; c: What is the 2' and 2' dimension on the right side of the detail? 21) Curb Opening detail: In the detail reference the table. 22) For the grade of 0.8% shown in the profile, the elevation listed at the located indicated in the plan redline is incorrect. Please revise. 23) For the "east curb line" profile, label the profile as "top of curb." REVIEW COMMENTS Page 4 of 6 28 December 1994 REVIEW # 2 PROJECT # P-1667 PROJECT NAME _Lennox Subdivision 24) The "west pavement line" profile indicates that the Type 'C' curb is to begin at STA 6+23.69. However the typical road cross-section shows no curb along this side of the roadway. Address discrepancy. 25) Extend and show the private road profile to the centerline intersection of Broadway Ave along the stationing line. Also coordinate with the intersection equation. 26) Along the stationing profile, list the station and elevation where the existing road is to match into the new road. Broaway Ave Plan/Profile Sheet 2 27) Clearly define the curb return elevations. List the BCR, MCR and ECR elevations. Also list the BCR and ECR stationing at their respective streets. 28) There is a discrepancy in existing pavement elevations, as listed for the curb calculations versus what is shown in the plans as shown for Broadway Ave. For example, at STA 1+68.42 the plans list and edge of exist. pavement elevation = 29.46. The curb calculations provided list an edge of pavement elevation = 29.31, at this station the calculations list the centerline elevation = 29.46. Similarly, the same problem is also shown at STA 0+00. This brings into question all of the curb calculations. In the Broadway Ave profile labeled "Existing CL pavement" the elevations do not agree with the curb calculations nor the elevations listed in plan view. Please address discrepancies. 29) In the typical road cross-section for Broadway Ave show the dimensions for the sidewalk, edge of exisiting right-of-way, label centerline and proposed right-of-way line, and set-aside. 30) Where the pavement will be widened, indicate that the edge of existing asphalt is to be sawcut, and the new pavement is to match. 31) Indicate the existing, approximate 1/2 street pavement width. 32) Delete the percentage of asphalt for the roadway. WSDOT Class B asphalt addresses percentages indirectly by stating stability requirements in the mix design requirements. See WSDOT Std. Specifications Section 5-04.3. 33) As mentioned in the first review, an R-value test is to be performed and the results provided. This is used to determined structural pavement requirements. REVIEW COACHENTS Page 5 of 6 28 December 1994 REVIEW # 2 PROJECT # P-1667 PROJECT NAME. Lennox Subdivision 34) The minimum outgoing taper length is = WS = (11')(45 mph) = 4951. Identify at what station the taper is to begin, revise the taper length,, and in the plan view reference note #1. 35) Notes: a: Revise Note #1 to make it clear that the 4" white stripe is to painted along the entire length of the tapers. b: Add a note requiring the Contractor to relocate any conflicting utilities prior to construction. c: Add a note to read "The Contractor shall employ a licensed Surveyor to verify that curb form grades are in conformance with the plans, prior to pouring of curbs." 36) At STA 0+00 the centerline profile lists a pavement elevation = 27.39. The road plan lists an elevation = 29.39 for the same location. Address discrepancy. 37) At STA 1+68.42 the centerline profile lists a pavement elevation = 29.46. The road plan lists an elevation = 29.24 for the same location. Address discrepancy. 38) At STA 1+68.42, the listed south curb line elevation = 29.46. From the listed road grade the computed elevation = 29.71. Address • discrepancy. 39) At STA 0+00 the cross grade is shown to be flat. At least for the new pavement widening area, the minimum cross slope is 2.0%, max. is 4.5%. Please revise. 40) For each 1208' swale, list the minimum berm elevation. The elev. = TC + 0.21. Please provide. 41) Define the beginning/ending station of the incoming taper. 42) In the road plan show the existing right-of-way (r/w) width, proposed r/w width, and set-aside width. 43) Show the location of existing utilities in construction area. Show overhead power, location of power poles (if in construction area). Also show location of barb-wire fence. Indicate where the fence will need to be removed. KUL:$ COMMENTS Page 6 of 6 28 December 1994 REVIEW # 2 PROJECT # P-1667 PROJECT NAME Lennox Subdivision Drainage Calculations D1) Provide a separate drainage basin map to correspond with the calculations. The map is to show, as a minimum: - subbasin limits of area flowing to each 1208' swale; - label subbasins and correlate with calculations; - time of concentration route used in the calculations; and - contours or ground shots No meaningful review of the drainage calculations can occur without a drainage basin map. Therefore the calculations are being returned without reviw. SUBMITTAL CHECKLIST PROJECT # - 47 REVIEW # moo. REVIEWER :~r DATE : /oZ.-oZ3 -9 sk~J/o • PROJECT: L^~L X A A&2!11Z PROJECT SPONSOR: TEL # 00 PROJECT ENGINEER (Road & Drainage Plans) r1 001 TEL (off PROJECT SURVEYOR (Plat) TEL # GENERAL ITEMS YES NO N/A x 1. The $100.00 fee for plat review has been paid to Spokane County for this submittal 2. An agreement to pay fees has been submitted to Development Engineering Services 3. The fee agreement has been signed by the project ^ owner or a principal of the developer's firm. If signed by an agent of the owner, written authorization from the owner is attached to the fee agreement 4. Review fee account is current (no invoices over 30 days outstanding) 5. I have noted the plans in, plans out dates on -the pink sheet in the file 6. If the project is a mobile home park, were the plans reviewed by Planning? i 7. 2 copies of the plans were submitted 8. 2 copies of the calculations were submitted 9. The plans are on 24" x 36" sheets ~~5 No GENERAL ITEMS"cont'd) V~( 10. X 11. X iz. 13. 14. 15. 16. 17. 18a. _ 18b. X 18c. 19. 20. 21. >C 22. i i ~C i i 23. The calculations are bound together The plans and calculations are stamped and signed by a Professional Engineer P The developer has signed and approved the road and drainage plans Are there any conflicts between the proposed drainfields and any drainage ditches on the plat Bowstring calculations by developer are in the file for this review. vertical curve stopping sight distance calculations by developer are in file for this review Horizontal & vertical alignment sight distance calculations by developer are in file for this review The engineer/developer has provided evidence of coordination with the electric utility servicing the project The file contains a Spokane County Section Map The file contains a Spokane County Assessors's Map The file contains an aerial photo of the proposed project area The file contains a corrected preliminary of the final plat map The project is located in urban boundary area The project is located in the Aquifer Sensitive Area The project plan name matches the plat name Is the entire project located outside of an identified Flood Plain Area? Is the entire project is located outside of an identified Stormwater Management Problem Area? 1) It ►~o K)/A GENEL ITEMS ( coat' d) 24. List any design deviation requests and their status: Ors 25. Locate the Findings and Order for the project and list any unusual conditions: ' ' 9/ • ' CE-r. L/ V- s 1 a~ 0 1~/ t Gt, , I C a W! v~ d~^ d ~~(4n n 8r6aJU%JCU-A 3 23. Backcheck of previous comments completed 24. All previous comments adequately addressed A) C-1) ROAD PLANS 1. List any roads that must be designed and constructed on the project. ROAD REQ'D WIDTH DESIGN MIN./MAX. STOPPING SIGHT MIVr-C~ E ~ NAME CLASS. PAVED R/W TERRAIN SPEED GRADE DISTANCE tv4n_T.7 nv~~,iaR 45 - I (a, , - ` - r Add -1;4, 14` daJ t1h ' Va ;e- gatd l~~f~ 11a 0.8/e.0 .7,0 0, 2. Planning conditions require submission of a landscape plan. (NOTE: Usually associated with PUD' s ) 3. I have checked the landscape plan against the road and storm drainage design and there are the following conflicts: 4. The following road plans have a bearing on the design of roads for this project and a copy is in the file: 5. I have sent an "R" value and percolation test request to the Construction Section with soils information and a layout of the project. "R" value test request to Designer (date). Y" ROAD PLANS (cont'd) 6. Is the bench mark shown on the plans? \ 7. Are stationing equations shown? X - - 8- _ x 9. x 10. 11. -N(01 12. 12a. Is stationing correct (south to north, west to east, reading left to right on the plan)? Are existing utilities shown on the plans (or an information copy of the utility plans submitted) ? Are proposed utilities shown on the plans (or an information copy of the utility plans submitted) ? Does the note "Any conflicting utilities shall be relocated prior to construction of roads or drainage facilities." appear on the plans? STREET WIDENING Are curb design sheets provided for widening of existing streets? ? 12b. Does the curb design conform to Spokane County Standards of section cross slope (Between 2% and 4.50)? 12c. Is there a street cross section shown for widening existing streets? 12d. Does the proposed new width match the width required in the Findings and Order? 12e. The cross-section shows: existing R/W proposed R/W future setaside 12f. 100' (min.) pavement taper into project is shown (1) There is adequate R/W for the taper to extend from the new paving width to existing pavement. (2) There is inadequate R/W for the taper to extend from the new paving width to existing pavement; taper extends from existing paving to R/W. 12g. Length of pavement taper out of project meets: x WS2 _ 60 for design speeds s 40 mph WS for design speeds > 45 mph (1 6(4¢ ) -51 11,915 ft. min. taper length approved by County Traffic Engineer ~C 12h. Transition from end of curb to existing paving is shown (curb should nose down in 1211) A Yes N o . ROAD PLANS ( cont' d) 12i. A 411-wide, white painted fogline at 12" from the edge of paving is indicated (tapers or tangents) 12j. Are the curb grades above the county minimum of 0.80? 012k, If curb grades are below 0.80, has a special note been added which requires a licensed land surveyor to verify that the curb forms are at the correct plan grade prior to construction? 13. NEW STREETS 13a. Does the proposed alignment meet Spokane County Standards? vertical slopes ' vertical curve length horizontal curve radius intersection separation X 150' on local access i 300' on arterials 13b. The plans show the typical cross section for streets 13c. Does the proposed street width match the Findings and Order? 13d. The cross-section shows: existing R/W - proposed R/W future setaside 13e. Does the typical section on the plans meet Spokane County Road Standards? cross slope is shown cross slope is within standards cross slope is correct when checked on profile 13f. Curb type: X shown ~ proper type for the road classification meets Spokane County Road Standards for curbs X within the public right-of-way consistent with the curb type in the general area 13g. Are the curb grades above the county minimum of 0.80? 7 Ck1intv3.0/Aug93 (D-~ ~03 11 RO PLANS (coot' X 1 1 1 cklistv3.0/Au993 d) 3h. If curb grades are below 0.8%, has a special note been added which requires a licensed land surveyor to verify that the curb forms are at the correct plan grade prior to construction? 14. Has an "R" value test been performed for each soil group? 4a. The pavement section is adequate for the R-value and Traffic Index for the road type 15. Locations where water is intended to flow through an inlet or curb cut are at the low point in vertical curve 16. SIGNAGE PLAN 6a. Stop signs are shown for all streets which intersect an arterial (Check with County Traffic Engineer if there is a question) 6b. Street name signs are shown at all intersecting streets 16c. Is there a need for barriers at the end of dead end streets? 16d. Is there a need for other special signing? (Check with the County Traffic Engineer) 17. Has the Fire District approved all proposed private road turnarounds that are substandard according to our Spokane County Road Standards?_ 18. CURB RETURNS 18a. Are BCR, MCR, and ECR stations/ elevations on curb returns shown on the plan? in the profile? 18b. Are the curb return elevations correct? 18c. Is there positive drainage from the road intersection to the MCR? 18d. Curb return radius meets County Standard minimum of 201 (to back of curb for rolled/wedge curbs, to face for vertical curb face types) 18e. BCR, MCR, and ECR elevations are set to allow drainage from the centerline to the curbline 8 1 Y~ JQ ROAD PLANS ( cont' d) 18f . 18f . BCR, MCR, and ECR elevations are set so that the superelevation between the intersection and the curbline is banked properly for right-hand turns into and out of the intersection roads (the road slopes from the intersection down to the f lowline) BCR, MCR, and ECR elevations at intersections without stop sign control are set so that the superelevation between the intersection and the curbline does not exceed: (ref. AASHTO) 10% (flat terrain) 8t (rolling terrain) 6% (mountainous terrain) 19. CUL-DE-SACS 19a. The cul-de-sac grades (top of curb) meet county cul-de-sac standards (lo min.) 19b. The cul-de-sac curb is shown in profile 20. INTERSECTIONS 20a. Do the intersections meet the 20 grade requirements? 20b. Wheelchair ramps are provided at intersections with sidewalks 20c. If there is a change of direction at the 1/ wheelchair ramps, are the ramps oriented so that:- ? f the ram h t ` p op o e a 51x5' pad is provided at t the required 51x5' landing zone at the bottom of the ramp is located inside of a line drawn 1' inside a line extended between the curb faces of the adjoining street at intersections? any drainage structures are located outside of the landing zone? X 20d. The intersection horizontal sight distance analysis shows that sight triangle encroachment on private property is 2' or less 21. Is there a need for slope easements? 22. Is there a need for erosion protection? ck1iatv3.0/Au993 9 ROAD PLANS (cont' d) 23. DRIVEWAYS 23a. Can a driveway slope of 8% or less be maintained between the edge of pavement and the right-of- way? V 23b. Can a driveway slope of 120 or less be maintained between the right-of-way and the building setback line? 10 cklintv3.0/Au993 y~ ~ NSA 2. NJ o' 3. 4. 5. v g DRAINAGE PLANS Has a plat map been submitted which shows lot dimensions, street widths, etc.? Was a map with contours spot elevations submitted to properly determine drainage basins? Were all existing drainage courses shown? Were all the proposed drainage courses shown? Were Hydrologic calculations submitted for each basin? (Bowstring if area s 10 acres, SCS TR-55 if area > 10 acres) Offsite (50-yr storm if undeveloped, 10-yr storm if developed) Onsite (10-yr storm) Q for entire area Q for roads only INFILTRATION POND Actual pond volume provided DETENTION POND Release to pipe system: contain 50-yr developed release at 50-yr pre-developed secondary overflow to pipe in control structure for 100-yr developed emergency overflow weir for 100-yr developed sump prior to outlet to control structure 11 min. freeboard grassed sides/floor for publicly-maintained ponds sprinkler system for publicly-maintained ponds Retained on site, no drywell: contain 100-yr developed emergency overflow for 100-yr developed 208 SWALES 208 swale floor area, volume requirements 208 swale floor area provided 208 swale volume provided cklistv3.0/Au993 11 DRAINAGE PLANS (cont'd) UNDERGROUND GRAVEL GALLERIES 1. .3 void ratio for gravel free space volume is used 2. Perc rate from field test is used to develop outflow rate - 3. 10-yr event volume is contained entirely underground i 4. 100-yr event volume is contained by a combination of underground storage and above ground storage up to 811 depth i 5. 100-yr event volume is contained by a combination of underground storage and above ground storage i exceeding 8" depth i 5a. Soil mixture is specified for water depth in pond exceeding 8" i 6. Entire gallery is wrapped in filter fabric CONVEYANCE Conveyance - pipes ditches gutter flow depth is less than gutter height Backwater - pipes, ditches Headwater - culverts - Curb drop/curb inlets on grade (fig 16), sump (fig 17) Grates - sump (fig 15), continuous grade (fig 16) Riprap - stone gradation, pad dimensions 7. Soils type is "pre-approved" (Garrison, etc.,) for drywells without percolation tests 8. Does the drainage report identify the SCS soil groups for the project area and for the proposed roads to be built in the project area? 9. The drainage design maintains sheet flow patterns i in natural watercourses i i i 10. The drainage design maintains existing sheet flow patterns without concentrating flows 12 cklistv7.0/Aug93 DRAINAGE PLANS (cont' d) 11. Does the entire plat lie outside of designated 100-year Flood Plain Area? 12. Does the entire plat lie outside of Zone "B" of the designated Flood Plain Area? 13. -Is the max. street ponding in any part of a Zone "B" less than 1'? 14. Does the plat contain appropriate language limiting the* lowermost opening in a structure located in a Zone "B" to not less than 1' above the lowest road elevation? 15. The drainage concept is compatible with planning commission requirements. 16. The difference between present and future flows is retained on the site. INLETS 1. The inlets shown are within the stream flow. 2. Inlets are shown on the low side of a road or at the low point of a vertical curve 3. Curb type inlets are shown at sags and are properly sized. Perimeter does not include the side of the - grate against the curb face (all grate types). Perimeter is divided by 2 for calculations where no curb opening (Type 1) is provided. Area = clear area _ 2 for Type 1 grates) 4. There are no long curves with flat grades which pose a problem. 5. The centerline road stations, offsets, and invert elevations for all inlets are shown on: plans profile. 6. Grate type is shown on the plan and is acceptable. (Spokane County Standard inlets in county ROW, on private property other inlet type may be specified) (Type 1: D-2; Type 2: D-4) 7. A detail drawing of the grate/curb installation is shown on the plans and includes the 2" depression and transitions as per county standards for grates that are located within county ROW, or referenced to SCRS std. detail D-S 13 cklistv3.0/Aug93 DRAINAGE PLANS ( cont' d) 8. A curb cut detail is shown on the plans with the new county back drop with transitions and a 2" depression for curb cuts inside county ROW, or referenced to SCRS std. detail B-15 9. The plans shows acceptable curb cut details and grate details for installations which lie within private road easements. 10. If inlets are in a gravel road or a dirt ditch a 6' x 6' A.C. apron is shown around the inlet. 11. Catch basin or special manhole details are shown or a standard drawing is specified. 12. Critical low points in the drainage system have been provided with overflow easements. 208 SWALE SYSTEMS 1. Is the swale located outside a future set aside area? See Findings and Order for where setasides are required. 2. The swale bottom and sides have sod or grass turf specified. 3. Swale side slopes do not exceed a 3:1 side slope. (A 2:1 side slope is allowed if swale depth is less than 12" deep. Should only be allowed where constrained by obstacles) 4. If depth of water from bottom to drywell rim is between 6 and 8 inches, soil mixture has been specified which meets Spokane County Guidelines. i 5. Drywell is: located within 8 feet of the curb line, or a maintenance access route and easement are provided 6. Drywell stationing is staggered from the inlet by at least 4' 7. Multiple drywells are located more than 30' (center-center) apart 14 ck1iatv3.0/Au993 DRAINAGE PLANS (cont' d) 8. Soil type is appropriate for drywells (perc rate a 72"/hr) if not : 8a. overflow from a swale at a low point will be directed away from building pads by an identified easement over improved ground an existing natural drainage channel covered by an easement 9. Drywell location does not conflict with underground utilities. 10. Drywell type is specified. 11. Drywell grate type is specified (Type 3 -std. detail D-7) 12. Drywell grate elevation is: below the invert at the curb inlet between 6" and 8" above the swale floor elevation 13. Does the note: "Wrap the drywell with a filter fabric (Amoco 4545 or equivalent)" appear on the plans? 14. Swale floor elevation is: specified between 6" and 8" below the drywell grate elevation at least 6" below the normal gutter flowline at the curb inlet for swale without a drywell at least 8" below the normal gutter flowline at the curb inlet for swale with a drywell 15. Swale floor i dimensions are shown minimum area is shown the area matches the required area from the 208 calculation for impervious areas. 16. Easements for the 208: are shown on the drainage plans are shown on the subdivision plat are of adequate size to contain at least 6" freeboard above the max. water surface elevation for the design storm are tied to the lot corners. 17. The side of the swale that is the furthest distance from the street should have a top of swale elevation that is higher than the highest water level of the swale. 15 6:1intv3.0/Auy93 DRAINAGE PLANS ( cont' d) 18. The invert at the curb inlet is at or above the max. water surface elevation for the design storm 19. Filter fabric is specified for the gravel envelope around the drywell 41 - is specified between the drywell and the gravel envelope installation specification is adequate. 20. Irrigation plan for County-maintained 208 swales Lot plans submitted on M kr' 208 LOT PLANS 1. Lot plans are required; submitted on 2. The 208 lot plans show: the lot number, block number, subdivision name, date drawn, scale, and north arrow. dimensions to lot corners drainage easements setback requirements swale floor elevation swale floor dimensions rim elevation if drywells are present curb cut station, offset, invert and length any drainage ditches shows depth from the top of the curb an attached cross section of the swale or ditch 3. Lot plans have been stamped by a professional engineer on all pages 4. Lot plans are of sufficient scale to maximize the lot size to the 8 1/2" x 11" paper size. (Drawings may be on plain white paper) 5. 208 lot plans were approved on CULVERTS AND PIPE SYSTEMS 1. The road culverts are at the low points of stream flow. 2. The headwater was calculated for culvert entrances and is under 2 diameters for culverts under 18" in diameter and 1.5 diameters for culverts greater than 18". 3. There is a minimum of 12" of cover for all culverts and storm sewer pipes 16 ck1istv3.0/Aug93 DRAINAGE PLANS ( cont' d) 4. The designer has provided a letter from the pipe manufacturer certifying that the intended pipe is suitable for cover less than 3' (PVC), 2' (CMP, RCP), 1' (HDPE/ADS ) or the engineer has provided trench details for upgraded pipe bedding for these areas 5. The minimum velocity within the pipe system is 4 feet per second at design flow in a backwater condition. (Note: The County Engineer may permit lower velocities) 6. The backwater calculations show a minimum freeboard of 0.75 feet for each catch basin or manhole. 7. The minimum culvert and pipe slope is 0.5o and all pipes meet or exceed this standard. 8. All angle points in the storm sewer system have suitable access such as a manhole for cleaning. 9. At locations where two different pipe sizes enter the same manhole the 0.8 diameter points of each pipe are at the same elevation. (Note: Exception allowed for drop manholes) 10. Is there any downsizing of pipes in a systems of pipes that are 18" in diameter and smaller. 11. There is a downsizing of pipes in the amount of - 3" for a minimum of 100 feet in a pipe system that contains pipes that over 18" in diameter. 12. All pipes in the pipe system are 12" and larger as per Spokane County Standards; (10" pipe that is allowed for connection of inlets to catch basins or drywells, if the length does not exceed 44 LF and the velocity is at least 4 fps). 13. All storm sewer pipes are located a minimum of 5 feet from a rear or side property line and have adequate easements for maintenance. 14. Inlets on the same slope are located so that the maximum width of spread for the gutter flow does not exceed 6' (f rom curb f ace f or Type "A" or from back of curb for Type "R") 15. The plans and profiles show all culvert pipe types, stations, offsets, lengths, and inverts 17 ck1i9tv3.0/Aug93 DRAINAGE PLANS ( cont' d) 16. Pipe materials meet county standards for systems that lie within county ROW. (Note: The type of pipe in private systems may be as specified by the design engineer) 17. The culverts shown are properly stationed from centerline stationing. _ 18. Does the drainage system configuration avoid conflicts with underground utilities? 19. Is there a need for energy dissipation on any of the culvert outlets shown on the plans? 20. Is there a need for rip rap around the culvert outlet at any of the culverts as proposed on the drainage plans. 21. The rip rap that is shown for the drainage plans is adequate for the culverts where erosion is a concern and the engineer has submitted acceptable rip rap design calculations. 22. Pipe anchors are shown for pipe grades greater than 150. 23. There are no instances where water is trapped against a fill with no culvert shown. 24. Profiles and cross sections are shown on the plans for all proposed channels and ditches. 25. Ditches with eroding velocities have a propef' lining for erosion protection. 26. Water will properly flow from an existing or proposed ditch on to the pavement as proposed on the drainage plans. 27. Where the ditch profile passes from cut to fill the flow has been properly disposed of. 18 ckliotv].0/Aug9) EASEMENTS 1. Adequate drainage easements are shown for maintenance of drainage ditches or pipe systems. 2. There are easements proposed or existing for natural channels which cross the property. 3. An easement was provided wherd street drainage was diverted onto private property. 4. The perpetual maintenance of private systems has properly been provided for. 5. The maintenance of drainage systems hin Spokane County ROW has been properly prov for. 6. Appropriate drainage language has been provided by the reviewing engineer to the surveyor and/or engineer who is involved with the platting work. 7. Pre-existing drainage easements on this parcel are not affected by this plat 8. Overflow easements are provided from swales/ponds located in low points MISCELLANEOUS 1. QC check of review completed (date) (init-. ) 2. Bond quantities for drainage item calculated (date) (init.) 3. vertical curve sight distance worksheets done (date) (init.) 4. vertical curve geometry worksheets done (date) (init.) 5. Drainage volume worksheets done (date) (init.) 6. Stamped road mylars to Permit Tech. (Sylvia/Suzanne) 7. Stamped lot plans to Admin. Asst. (Sandy) 19 Cklintv3.0/Au993 FIELD REVIEW 1. Field investigation trip made on 2. Report completed and put into file on 3. Are there any existing utilities on the project site? (Overhead power, fire hydrants, etc.) If yes, describe. 4. Are the drainage basins on the ground the same as those that are presented in the drainage report? 5. Are there any drainage channels directed toward property? 6. Are there any drainage channels directing water through the property? 7. Do County roads cut off drainage as per drainage calculations? 8. If there are culverts under county roads, does the flow go away from or toward the project? 9. What kind of ground cover exists? 10. Describe any existing channel conditions: 11. Describe channel cross section: 12. Existing Curb Type: 1 ~ LENNOX SUBDIVISION Located in: NW 41 SE4, Sec. 13, T25N, R44E, WM. INDEX 1. Summary 2. Soils Map 3. Basin 1 Drainage Calculations 4. Basin 2 Drainage Calculations 5. Broadway Curb Calculations 6. Plat Map OFFIC SPOKANE C():;~NTY ENGINEER'S 011FPCE Oh'""IGINAL PROJECT,,,, .._P SUM 17AL RETURN TO CO!'N'7 ENC!'N-PER d EXPIRES 5112/ f -Z3~ q4- SUMMARY SOILS: Map symbol GgA - garrison gravelly loam, 0-5 percent slopes. Gravelly, medium textured, somewhat excessivly drained soils in gravelly glacial out wash material. BASIN 1: Area = 0.83 acres. Area hard surface = .1527 AC. The west 65 feet to be graded, s = .0031 west to Lennox lane. The rear 100 feet to remain undisturbed. Q = .66 CF. Curb opening = 4 ft. 11208" storage = 420 CF Type "All drywell. BASIN 2: Area = 0.67 acres. Area hard surface = 0.1978 AC. The west 65 feet to be graded, s = .0031 west to Lennox lane. The rear 100 feet to remain undisturbed. Q = 0.63 CF. Curb opening = 4 ft. 11208" storage = 294 CF. Type "A" drywell. S P O I A N E MOM C O U N T Y OFFICE OF THE COUNTY ENGINEER 0 A DIVISION OF THE PUBLIC WORKS DEPARTMENT Ronald C. Hormann, P.E., County Engineer Dennis M. Scott, P.E., Director 20 April 93 Gene Fisher, P.E. N. 3422 Kenney Road Otis Orchards, WA 99027 SUBJECT: Soils Testing Requirements P1667 - Lennox Subdivision Dear Mr. Fisher: Additional information with respect to the subsurface soils conditions on this project is required to complete the plans review process. Specifically, representative values for soil percolation rates and soil-subgrade "R"values are necessary to evaluate the proposed storm drainage disposal system and road pavement section. The Spokane County Materials Laboratory has reviewed the proposed development plan,and has determined that a minimum of 1 Stabilometer "R" value tests is required. The information may be supplied by any qualified soils firm. The tests and methods must meet Spokane County standards, and be inspected by Spokane County personnel. Spokane County (Mr. Jim Radke; 456-3600, ext. 436) should be notified at least 24 hours in advance of all sampling and testing. Please call me at 456-3600 if you should have any questions. Sincerely, Edward J. Parry, Jr., P.E. Plan Review Engineer cc: Project file W. 1026 Broadway Ave. Spokane, WA 99260-0170 (509) 456-3600 FAX (509) 456-4715 1 34 sou, SURVEY TABLE 6.-Brief desc ' lions of soils and Wir Nlatp symbol DsC DsD DvD EkB Etfs EID Ern fiaB EaB3 FaG3 Em GaC3 4 Gg GgB GmB GnS GaA GRl3 GpC GpD f Soil name Dragoon stony silt loam, 0 to 30 percent slopes. 17ragoon stony silt loam, 30 t4 55 per- cent slopes. Dragoon Very rocky complex, 20 to 55 percent slopes. Eloika silt loam, 0 to 20 percent slopes. Eloika very stony silt loam, 0 tO 34 per- cent slopes. Eloika very stony silt loam, 30 to 55 percent slopes. Emdent silt loam. Freeman silt loam, 5 to 20 percetrt slopes. Freeman silt loam, 5 to 20 percent slopes, severely eroded. Freernan silt loam, 20 to 30 percent slopes, severely eroded. Fresh water marsh. Garfield silty clay loam, 0 to 30 percent slopes, severely eroded. garrison gravelly loam, 0 to 5 percent slopes. Garrison gravelly loam, 5 to 20 percent slopes. Garrison very gravelly loam, 0 to 8 percent slopes. Garrison very stony loam, 0 to 2( percent slopes. Glenrose silt loarn, 0 to 5 percent slopes Glenrose silt barn, 5 to 20 percent slopes GleDrose silt loam, 24 to 30 percen slopes. Glenrose silt loners, 30 to 55 percen slope:. Description of soil and site Similar to Dragoon silt loam, 0 to 30 percent slopes, except that the surface layer is stony. Dragoon part similar to Dragoon silt loam, 0 to 30 percent slopes, except that depth to bed- rock ranges from 10 to 20 ikxches. stock olLt- prop included in this compicx. 1VIedium-textured, well drained soil formed from glacial till containing a large amount of vol- canic ash in the surface layer; underlain by gravel at depth of 30 to 60 inches; occupies undulating, morainelike topography. Similar to EloikaLsAt loam, 0 to 20 percent slopes, I except that they are very stony throughout. Medium-textured, somewhat poorly drained, alkaline soil formed in alluvium from calcar- eous Silt, volcanic ash, and diatonite; depth to water table fluctuates from near the surf ace to about 6 feet. 'Very deep, moderately 3vell drained upland soils with medium-textured surface layer and medi- umor moderately fine textured su bs oil; formed from silt on rolling to hilly uplands. Shallow, swarm y, intermittent ponds and fringes around lakes that have a fluctuating water table. Engineeringg data is not given, as land type is too variable. 'Very deep, well-drained soil developed in loess on ridgetops and knobs on the rolling to hilly uplands in the Palouse soil area. Gravelly, mediurn-textured, somewhat exces- sively drained soils formed in gravelly glacial. outwash material from a variety of acid, igneous parent rock- on nearly level to mod- erately sloping terraces; depth to mixture of sand, gravel, and cobblestones ranges from 2;4 to 5 feet. Similar to Garrisons gravelly loam, except that the surface layer is very gravelly. M Similar to Garrison gravelly loam, except thal tho surface layer is very stony. Very deep, medium-textured, well-drained soil: fanned from acid igneous glacial till; surface f; layer influenced by loess nrncl volcanic ash; or gently rolling to steep uplands. C Classification Depth f rorn surface 1JSDA texture 0 to 24 24 to 44 44 to 53 53 to 60 0 to 26 26 to 41 41 to 60 0 to 22 1 22 to 72 0 to 8 8to23 23 to 60 0 to 15 15 to 44 44 to 60 0to15 15 to 44 44 to 60 0 to 72 Silt loam------ Gravelly loam------- Very gravelly sandy loam. Gravel Silt loam Very fine sandy loam. Sandy clay 10 am- - _ - 'Silt loam----•------ ilty clay loam__ _ - _ _ silty clay loann_ Silty Silty clay loam-----, Gravelly loans---_-_. Very gravelly loam- Sand, gravel, and Col b tones. Very gravelly loam- Very gravelly haul- Sand, ggr~aavel, and cobblestones. . . Silt loam SPOKAP~1~ CC3LJfv7Y, WASHIN~74CV Sk~E~T~ a r= r ' 1 - r - r 1 517@ r` C +tl~~ I JGIf S E' ~l~ I I k.,ak, 7k ( ~ ~r~r M1,~ . r` ';?'i•~•'{Fh' i -4y+.~^-•`~9:..' ~ 'i r I r~~' ~ • PLil1~~~' ~ A.I. ~ rl. ~1•:..,.. X98 i.] ,s .u kl ~ - - 1.=. r. +f ~ i! A-' ! f. ,•y aa.4 4 r Vrl!'~4 Cf I _ Y rte. L i 1'•'' ~ = t= I rsw".-,r•~- _.I' ,wl••. ~~iL►4YI'~ { •a~•~`~ .i:~r~%+k' rF 's.... ,y, :I a i yy - ~I.. ~~l~~~#I'~~' yys ~ " ? _ . 51µ -~L'i~f,'SIIS ~~`".'.':r; is • ~ ~ • .r,' } ~f1A I I. ,L ~ ~ p, r~ - I:~ 'T "Q~.;• .a 1,1 I - YF _.e-, s i'{,,I S:}T'~ a' ~1 y p...~„ ti • -'rte - X7115 ''e r- ..I ~ . „ ; I . ~ m ' ~ tin T ■ ,1, ~ i'~~ , i` i r. S ' 's . , . .'e..w ~ ti „Ilr ,;'zorr"~Ae~It~fG'~'`.`•=': r.+ ' 0+17$ r ~i~p~ rteyprn+rRLw'ti~ ~~d~ .h'~ V!'- 1 i _ rl n, { /T"tn it r .i ~ . - -r" a~ S f" j - , r - . rL~„ r#iix, c'- r t ~ S~:' ~ - ::flY ' - 1 ' t "s' a J*~ j . r.. r~ wiN,M'!;+_..F, ' ~y~ P ? s' i51 a4 :}.i: ,n. r. '.seF ~n~ . - r N~i~. ~s'1. a I ,SyY'r~ frp, a ihi/- Lit .^Yi~~ ~ R d L. 4 ,7~~~~ rye`,"~~ ;L: ' .4 ,:sr-:~'- I's ,yb' ,r+a •Ry Irl+ _ 'ti'• -4 ~~5 ,:~r yu ~i [ - ..,.7y~rl`- , d~~ s~°' . _ ~rx yam. I .,Sc, `ti'., • q ti~ r y S ,'l' ~/f~ ~iS. - ^vf ,Y .I' -'Y• sr^1'S ~ r ~Y N ,1 ,i'. r ' ~ r.L,': :f,';' ' L" • •i4 y i ~r'•~• ? f N Sir I T ly tlr'Je_.'Pa 1f'Y~ . t I ti I~f i~ ~ Wes. ,'1i 1r i ,v 1,~ i [ I I _ y - k`S'J A,. I 141571. 't ,.r .f~",: a 'l,~w+. r•l}I. r ~ } ~kA.:•7.'.f. ~ ~1 J,F~ i rrv' Y I~ I I''~ • )i 1. S } ' r' • '•i • - p1w , y ;r' a'r'. r 1F~ 1 rw :i .}i" ` ~,i°' r ' ~.r~ .;n v'~•^::' ;e ~i, ' ~^rs~,x,~,i'+, I ^L-~ y F "",fi,r, p' ;Y .1 }{}}i~~~~~~ 7y ~'}s, 6 ~-'f-•~, r,+• L aP'-.G v,:4 r ~ +e '1 - 'i 0 tl7 ;'!~~}.'r 1[ ~`r ~'n J` ~Y~•.7„i v~,, J.: r"!•e Y; e; °.d ; 5L ' ~ ~ . ~ ,.,r. r a~ Y~ 4. kSC~l/r `I - ` i I » ~ e' "A`'' 1' - c.~fgnv; r dA : r.. 1 ~q . 1 , ,y~~.~'iurn: T•,'. ~i I r,~ -,b': ~;ti,~y ~ ii.'' i'.. i.l r . b ' III ~ T ~ r , f • F: r~te, . L',~^F~ ; ,.F' .r .r: ~ ,S , ~ r, I: : wv kr.'' , ~ ~ ,R~;k,~J115 `'~,Ss;:E , ~,{rt ' i , - .R' • ; a..{r! GAR, s'. r L'" 41 ` I ~ L 't~.~'.~ ~I ~,i~. - 1' •1r. tp': i✓Y` ~r 1 "•'n9S il~w- +pw 4 •I {,j c-z71-,,, ,;F .14fYi l..l' red e9.1 -AIL',,. 9,~ I¢:"'_ 'i ~ ~,-a rr~' i ;iy. I fl I~g .k P 5>Wjr lr j 4. r S ~R • j• l~~rr~3~ d•~' ~r l '~F,' . rIF}iL•, "~L4,~~{. ~,'r, ~ ~`e~, •,.,fj' I}~E~r.1:~ } , I • ~ r~ ! r`4A1~ r v -,x~:,b'iy~r.w A e,~~„r fyf •.,~r} tl, - -,8 r IPM • f _ ~ j 1 . R,' i^ ~ fl N _ I 4~.yi ~ ti,' . } i i i ~ - , ~ I L llF~ ti ~q n$~ ti • ~ y r ~ ~ ~I1 a - _ . ~ J . - - - l ~ tie ~r r ~/ul a r. i'~ ~ ?r_ :Yln q ~ S Ir -Y, ~r yiJ'y^ •~Gi~..1"' L ~1~yr ' - ! 1 +-?,rH .I _ Y r,`.'~2!- V ~~lS•Y asi Y .ITT • 'i'.1''.•ri i~~ r•. . d }i, ,•.1 ar I'!'~n f'~`.;b+ ~e ~ h 1::~`:`- ~ .F fA~ - f, ~R~.~ I o ~~I ~ `',e''rhe I s ~ ~ ' ~ ~ t5., :F~'k x ~ F5'.L T~r. i . r ?~l4..: < r'~ i~ . lJl rrR. - r M } ' ~ ~ ~ r i l r • , u' ~ { ~~•r~ w"'- ~ tl n ' t:ti , ,.,n~ - ' .r- - nsi r.,. .Y .^~Zp' ~ ~a~. ; i"~+ I I' P`" ;}Fj a1 f r~ll ~r ~ 5,. _ r, I ~ R~ ;~.~~'~C ~ . .1 . n - ti - --i_i?e.l t` - - ilL:. ;,+,.....,4 y~lw,r y', IRS -r ' - Q! A5 } 1„M'rr, e 1 , r 1. - n 3':...+'l~i~y,~~, ~K e _ _ 1f ~ . r C } Ar' J~'S"."•K. y'7 • ~ " , f "~Y ~ti^~"){~y`.r`y5 7~ ~ ~ ~ _ ~ L - yF'lH.•a•Y j M iF ' i 1"• , ii ~ 1'[r RJ•~, , ~ ~ ~Y~7a,~"i .'y-~'.~rc~'~j",r'..'IG'^r`.'~,,i _ s.y •Y' {Qt"'C n•° p~J'+~ aaxxR'+}~'^~°+ d "'17i.}R- ~.1 , ~ ~ r ~r i. r a i h ~ I! 'r I {s d ~ y, ,rl, . . > i- b ~ •r^1 w ~ ~ L. .r ~ e, -VII G„ rbLJ, t, °~i~ , _ „e'4 dA7, _ • ti~{1yf LAr i `"II"I ~JX If L~ - , A••.! "a. - 9 4 1'. _ - y 7IS ~ 1~ ~54~''.. ' F y rjr'7,~ ~'L s P,i .~Y --~~r=r~___ ~ 'rs_ v ' e V {V R:I"{ I ~A q~~ _ ~;1 ,}~d;~;,~,Ae. - ~d w.T -'.-fir ■ A ~ ~ 'I I?~ s i ~ vr'``c ■r _ C "r~_.. t: C~#;J{y Y ~Y4Y. 'f~i'.", ~.f.~L grlr. ~{•4'1•i ~y~'nl~ _ ~I- Y- ti)1 ~~10 ~ ~ ~Ew~' q ~ y, ~ . l.p + :wr ~ f sj I r I 1~,~' L :ly,~ .may -i~r,. ~ t Vin.. - "~•e CYB a ~ ' I . ..t, 'I S I ~7 _ _ -".rr:'^ ~ rr~'r 'S;~•3 , 'SF g. 71 itl n r :s' ~F ~r r i b~L' I~ { a, - ~ ..r , l I ~i+ b I 'Ay - ~ r R~~ 11FE41~ ''~}k Irr~~ - t~ '"r;i'. ~ II ,•r `i 1:"xi:P U 7 t4 ~ I ~~„L, y^y'. '0..:i. r I R1; f k i. " ~+S' a ° G! - i p'S'I` , :I, r~ i , ~I k _ lid ••a''; I !r q 'I~ ~ ),a •,.a,~,;:`',f n _ : p`~' , ~ g 3...~+ ~~-I"'•.; _ - r„e 'fr _ 1C~i ; • ;~;7 ^ ;r'~.'ly., ~ 'y+~'- fl" ~ li' ~ i i~~ ,i' ,f :.I t. o ~ , :a r ~t~~ ' : ' r,1:'-.. aw I• v ^r.'r' ' f Jar'` •7 . i ~Ir► ; _ 11'1_ -mss ~ - 7l w ~ ;~''•,W x~i' ~''•7•• ~ 4; dF$ R Y :Il.;. w, ~ _o~ _ t.~.. .I a'' z%'~~` }3- ~ ~Li^.',,;~ t .y~• { ti 1. y;4~~ , r. r :iF F' ''c' ~.~n 9 .•d~r . } rC . r,. 4 Ti ~ I• Y I r A.~ I ~ ~ zM1 ~dv" I ' { ~ 1,r LT ~j, C' ry • " ~s ~ 1 II , o C ,J'7r • Ltq• - ~ ~y •~~f"W„. I . tl i. a• r • : r• ' ~ ` I • ` - ~ 1 ; ~ - r II ~ (y r tlnr:r • 1 i - ~'~s• •e + ~ ',17 a~ ~ . _ ,wn IM -i;~~ >ti ti~ 'w,illr~' rr 1 X$, ' - r'+'~~ 1 ~_r~f>. I I~ r - ' ; "a').:~-'4 N 0. qr. °ry, •K►,o- r. «;II,,~•r4. mot. -:'S,'• _ .~'„'a„~S u J■ I I - c m ~ yl' r4} $ °Y~py, ry' kw~ r: ~.~r,X. li#IrL~~-•"t •~in1~',•'~••r ~ 7 ;~G. - - • - :7 ~ [ In `h, Ir"~,°t*~:n titi -.E}wY~~f. ~ 1 ~.„~F'sr4- ti~ ~.,~s~, s ~ Sl• ~ ,i ~ ;J •,~h,~.'1 s 'f ry. .'d l f Ildl i+ #1: ~,~i h 1 .A •-Y._.1rn ; r'i.1~~Y F„1. r II)' `'h~ Ma _ , . ~ ' ~ ` ' ~ 6 J~ 4 ~w~~ti15~'~i-:>%~ r r'"~`'-'r1'~'}'kl ~~~il IT` 3 'J~~~~'; iiT: d~, _1, f ~'■Il 9 N . a~,,; e'er I ^ :.h:: + is w _ _ 't .r, ~~r y ` ~ .y,.~: m - r7~ ~'S t t:~J~'Y}}l ~ti `-V - L7`~ ^Sr .Y ~ +yd ~e,• , ~ ' d ~ [ Y ~r~ , Ss~,. A ' 7 fit', - - { f, ~ ,.~,k r. r, l l__ ■ a ~t ~ti tl' r~L+r" ~t ~ y ~ 3 Pl '~i•~Ir'!r9 [ ~ Cdr ~ ~ a. NQ ~ i.,S ~ `~~y f . -Y,7L ~r a 'U ' 11• s ~ r QG ~ ~I i h n Y '-_:.i . E ~:'i~ y,f r .a~' C' r • SPY l ~k. ~ ' f 11. 1J_ l~ a~ II4zv 1:,° '-1~- ,.klq~?, ` i" [iA~~•'.: ;~j,~:;.+~, f',., ' 4 ~`t _ ' 111, 1Y., r ~ I x I 11~;}~y''L'' y • I ~~~sr _ • - kF ~ ~ 'i.aF, fg~ F''>`• ~ :ISM i* ~ ~ l v~ ~ a }I "ri~ ~r 'Fa • ` Ae Y' i~ t~ - ,91~L - "{.r , [ - .,~IJ" , _ d i'ql "4i I~' xi~ ~ II '7 7~'ti'.~~r~. "c',:. zt:A ~'M. :j r j.r~•jj r.q ti"!'P i~ a •!ri A'. } ' ',I~ P~ ,I ' `~'~'4%,,,~. ~ ~ I~r3:: s"° ' ~fp' q~:~,l''t".r~ I- • ~l~ ~ - i i I 5 _ 11 _ I ' II. IS~I 'I,: il': ter'- ' }•y d ' k : rr.: ri: i•ri, , ~ I s~ r•4.,° ~ . ~y,~ § I Fr. M i~ ti .tt `fi~ ~,~ry j' 7' ;,s ~i yrs. r.:}',r"' 1• M' Il ^ }'.T (r.,l i• F.+ • ''r '1! '.,4~` 7r' 1e ~~F,, ~r 1,.: i a, t . Y - I --Sr~=~; :'t „r.ss•7''•iY '°r ;R~P.ry4. ry; _ ,r _ i III .i~' 71~ y ~i" w~jrh 4 Ya. ic~+c~ ~1~ - t p °I M. - .4 'I II. 31° 1. r ' ~ • ~ 7ur ~a~. m4Y' Cf•'. . , ~tl••~~ , ] .r ',`f,,'F.'iL'`~}k 3: Is LI. 1 7` ' l7 ~ .Fr r) 1 ar k ~ • ye ; .c 1 ~ •t , G1 ~ ~I i ~ I 'p~ J ~ - 1 I: +r R Ar F _ r , ,r ! r--' "`III"` soh l J~ ~e~ r,g! - r 1, l ~"'~14, ~ u. ,III ' - pI /rt: J6 - - rfOr~S 517C~f 7 1 I k 5400 Feel 4 ~ ~ ~ Mile 5~ale 1 20000 0 ' y~ 5 Y I~ ~f ilk 1_ I L.-Etj N 0~- 6,A,Slt~j -f A jk- P. - 33 2-1 e;r a 0 . lr3 - m o . l Sa-7 ) _ s ter 404 WON. 43 J` - • - ~ fill - ~ ! ~ ~ ` i . ? _ . . 4.0 ~ tt,,_,,~,y ' ,t `7("(ee ~,,_y, .w.M... .•%~....s».-...n ..-~J: • ae...;{en.., .i...•._.~. _ .w _ ..+.....j a..~..._ - - !ll.'N~-_'r- 5 ' ..b~..~ty..r. ..r.~.. ~ ~,a.. - ; _ ~ - ~..~~.s,~.... r.:....~..;,,N.#. ~ _ ~ i........~.r . M, r ~ i yg:,.w.-. µ'~`°T'...w.~'s_~'~.••.w:~~~y.r.J p•- • • 1 V•C:•'#,"..'i~'_.!P" "n.~'°^ t "y' 12 , ! ~'6.n it ' s R'F " 4 S , o ~ ~ .~L ` f ~ ~ ~ t ~ 4 ~ f i i ~ i - - f LeAJfJo-?~ a4t sr~-a' -T. CLO, 1:5r 4.-6 7 C-r:5 5 = Z'-7 -7 JF Ram h Z - i CIFS/:ff7.-., all 4 1111i~r fN i r+w }...r .y.._. ~.-...3t.....«~._-~.._` ..,t~~....d.. ..._99_..~~.. _~.__•'.f -,•-+.e-,_Y. ,._3{....._..F..~...~ ter.. i,._.,~,.t" X;Ji i •J.fi __....a_ i i "..k:. .,~lir«p . ..-•e * ._,w - J......+- ~ _ r- y~• p ~FW"v' _'w, . Z - - _,..r w1L«. w•....~.__.. .~..r..... a.~u...E '4nr.~ ..,.~-..r.y.. ..a~f d --T 'gyp .....-1 ptffLc. qo w ) _1 ~M M,Ie.-1•• y ¢ .~i f .:r.r.• _ i y... ii 1~ .,.f. f ,.,p__w_~. r. 1'`~ ~ ~,Y Ip ~rY ^ .1{ r7 ~ l~,l h.~ _ ~1 ~........r.y } 1~! ' W. ~ f ! - S a G4~~~'a r~ ~ , .Yw.F« 1•! M7 i, ' ~Ir~3~ • ~ r n.r..~lMwM.,r ' 'J .j ..,r•• t ~~+...W+.w . ~ t' ~ ~ i ` i ~ 1 row~w._. _.s - q _ .yw.. - +wf-~.... rr.~ } I}••. r _ ...tL•.~' til y} ~ r-•».. .l_ q..;wr.i+...~ ( l i } ~ iw3r `-.....It i.._..{i F .~a,--.• ~-._d w• ii.s,_.~. ...-..»•+r• _..:.4•i p wi _ _.-..3 v «•_.e . ~.._I..L_ -...~.~r.... jr. . _ _ _.~...w._.~_...... s F ~ ~ 3 L i ~ - i a z , - L' - ! ! i i i a a t i • 1-- R..«. rN_w..wt--•^~•_.Y~. 'w'ry.( ~ ..r~rf4~.-..r.4_-' ~a+«..r4+.~.~.....M+! »I ...y. BOWS•rx [ h(: Hr1110D OETENT[UN BASiN UE;S[CN Time Incremet,t (mill) Timc of Concent cation 5 ' Outflow (C.I.S.) (min) Design year • J flow (yr.) Area (acres) 3 1 t7 Area x "C.. Developed "C.• factor D , 4 O , Ul p2 t 13 Time Inc. Time Inc. 5 Intensity V in U7E (min. (sec.) (in: /hr.) (7-) V out Stocag , e (Al 60) (cu. ft.) (cu. ft.) ..(cu. ft.) (A*C*03) (see below) (outfloc:*02) (/15-/16 ) IO 1 .vc~ i ~ - v 600 2..24 .~14 L, Sg$ ~~v 15 9 UO 1.7 7 G 3 c. 2 I L t~ S X-) 4LO f.,. 20 12 00 1.45 .i. g a 2 S 1500 1.21 3 G u 3¢ 30 1800 I 45 v 1.04 3 S 2100 I 91 = ~-o 2'00 sz I I 45 2700 .14 I 50 3000 _ . 6 8 Ss 33n0 I .64 l 60 3E►UO .61 65 3900 .60 70 4 2U0 .58 75 4500 .56 AO 4800 .53 s.w 85 5100 S2 90 54()0 .50 9 5 5100 .49 I fJ 0 6 000L .48 Vin - 1.3p Q dev t for t < Tc Vin --CQ dev * t)+ 34 Q dev * Tc) for,.,t > Tc b \ / 306/6 ' .r N K. .eg!S. -,U,,. 60 C_ 00 = - 4 0,4-0 C `-7 f- 6 L h c. ~ 4 - 33 Q. 1,y 8.4 ~3 fit i olle •.,,-.-.c.^~~... .,~6_y.~,.,,,., ,rti6,c;~..o,..... ~..._f .i ~ A ...o~....o•.•{-r'_..c.- f ..f i iw•r.-.d>. - .~.,..~v.•-•....~..-._...t-...... a.. i .v,- P - • ...c:~`a w. ` . »-In._ - -a« .i....,..yf....->«e s.-ro....... ....~-.....,y.....-.-~.•.._ . ~•-~-v'-•'+f'~~' ,L- •e '~C I ^7 t ..~...._..lA.....~~...-; lM1r.-_. :5.~....4~-~ >.7.._h._- ...-,-q v~• ~ ~ „ t . fµ 4 ~ d - S { R t 3. ,t'T` j d T ~ fi l I ~ ~ ( ~ t 1 a } J r-.-- r+ ` F . 3 i r 1 ! , e, A. o- Y 1W `L, ' t, ~1 v .7 9KCY'~RA^3gRJ ' ~ i ~ 1+- q 6 Il tl 1 ! _~-•^TL.°-^_-T~~ ~ : t 1 x j ~ 'j 41 ~ ~ ~ ~ t i ....J1•-.eC >:~ye _?ss.•~--_j.>. .py -.:.-\/1.+--- . i...-.•.i..- ,i ~a°.1:,.«w.-.o.. -..,.__:-,,.,7..a~.-..... :t .,.r ......••~..ty -..~~sx'-r.'~-r.}t+'1._4:.._ -,.c.:.«..«. T., } Al : j~Y t -r '~x•~ -#--r~Y~ ...a}.., ..f-.~. .,it..~_,.j..._ .>7-rw.~ <..,_JL__- +..aE..r~.-.f<..-,..Jltv, -J...~._+.q......_.r..n.+.-y..,_., re+?....w_,w.-1""/~~'•i"..•r..la....:~,..~s.~...r.. wb...~_,r f-...... eyy_ r...4w..- ~ ;--D"'~,- ~"rav~...-.~, ..i.«. r -..1V.~i.~~h~ Pf ~ I• J ~~al N..nw.. ~rT ~ ~ ^ ~ .•a-'--h .~+M....p...'.c ~ K.. { ....-.p..... a.^f^_•---~' ~j~.c++..i., s... •.tC..-..,.>{~-~.+~.Ga•+..,"t,..a' , ,v-•s.-.•.:~.~..» A ~ .p.,. _ ~ .......i,.«.. . ._~C--~..-.~L-..._.#w-wv.-- o.-igi _+o.Y.,:._.. a.~__.....~•. ,,,...t.--"...j..-•.r4s°--. .s-.e. ...q-.-.. .a..+...`, _..i. ~.....~._.r~.s.a-T_-n >a•,~.-r.e~t~'-•_, ~ R A.«... •.....,.,1,,...,-•.im-..~.....r_ .~a.....oj.._,.-. ,..y. ~t...,y ,~..v -~-*~q~_.,..+.~.......d ..~........y.._... .~/~:"ti ~..,C-t-J►~10~ ~t~S {rJ ~ Q G c • a, _ . G X 3 . ~ o Y\ C,~-A w'A 0 10 i o -may Z' C p~,r ~.y- .fir.,,., . - _ « ,t3~• 9 POP 1.7 C, Le T 1 ~T~ ,'Tr (,~.1.+ ~-w/y'~i .y~ y a+r._ s~,-., Csl I • t KY. i t t ; 4 A 1- ' {1 F_ a 1 a ~y4 * C . ' - ~ ~ ~ 7~ •.N - r t, ~.s. .R~ .~.r ~ • rG T ~ ( 1 j C t _ J'_ ~ Lr ~ ~s' .,.d..►...~_.+ r -.a w '~.y_.~......~.. ' _.~~.~..t~.~Y., ~j,`.c„_ s i .......~...1. ~...z .__.i ~_.-._ti..._. ..f; yT u 1 t [C n y • J L r # t ? *d : .M 7 1 L ' L "1 ; t } ` ;r r % ww...v....e ,1 " S L°~s`1.. k-~.. .7...._...•~~}st . i .~..t..._ r• s•, r- - r .fir ^ -.w,{ _ ?S •t ,~11, rjv 1~ V rte. t i~~, r, t - - - n i` - ~A tr T _i~ _ i r t. rr~ • (-;T. - ' - - - _ = : t ;1 ` L ti"i ! „S t L f ~ . .40 r 5 e; •r. . . } .t F + - .9 lit S r• / Jr••~:t.cPr+Ac.._...i-Nyr.' ~~w.y~'i^•- C Mfg." 9 ~ r 1 y_'_~. w.-. rr.3.wr-• ` •-_a.•~---'-_ - ? _ - r „j i~ .~sar~-T-+_ ~7_.•.. y.p ' t e.., r_,,__ r»...._wae.*•_r~w...l r - ...w-..-......:... I.~.._- lift , i • Y _ 2 'p-~ ~ , • .}~.~Y..-r~ .n~3.++_._ 1' ..4.-... t .i._~.......~.....r..~•..~. ~ r - ..•r..••.._ ...~«...y~...~_ ~ j - 50 1 ~AW I AVW •orM' 4 L,I~N100 • BOWSTR I NC METHOD DETENTION BASiN DESIGN B-A 5) J X Time Increment (min) Time of Concentration 5 Outflow (min) (c.E.s.) Design year flow (yr.) Area (acres) p, io7 ~v Area x "C" Developed-- C.. factor 0.40 W1 91 oz t 13 Time Inc. ~4 US #6 Time Inc. -Intensity dev. U (min.) (sec.) (in:/hc.) (cQ.f.s.) V in V out Storage (A1 * 6U) (A*C*Uj (cu# ft.) (cu. ft.) '(cu. ft.) (sec below) (uutflow*U2) cq~ 10 40 ,L 35 L- °1 0 6 ) 00 2.24 ; o ' IS ' 900 1.77 4-7 1~ v L94 1A 0 20 1200 7 5 OCI 1-7 o Z3q' 1 .4 5 39 25 1500 I 2I ~ 3 ~ Y o 30 1800 . 3Z 5 45 ` , 0 g 1 .04 • LS 35 2100 .91 4p 2!400 LI .82 45 2700 .14 1 S0 3000 .68 - -l 1 55 33Qp .64 I 6~) 3600 .61 65 3900 .60 I 70 4200 .58 15 4500 56 . 80 4800 .53 85 5100 .52 40 S4()0 .50 95 5700 H ' 1 ~)U 6000 .48 Vin 1.34 * dev Vin - Q t for t < Tc (Q dew * t)+(.34 * Q dev * Tc for...t > T 306/6 \ o 4 -am low .104F.- -M ax .ARt,. FIELD INFORMATTON OFFTCE CAL CULATIONS AND DESIGN #1 !12 413 1/4 16 !I I #8 1 I! 9 N 1-MUM MAXIMUM E.P. DTST. FROM 1) TST. :,lltl~ i:l,l:V. CURB FLEV. SELECTED Z GRADF. STA. EV F JLEV. to 1. P. FROM I.-:. 1'. . 57, 51,Uf'f' (2% SLOPE ELEV. g TO CURB FROM FROM E.P. + c U1W IlEICl1.1.) CURB HEIGHT) 0400 2°1.39 Zq 1,5 I 9 z 9• z 4- z. 4- 7 2 1-3-7 ~ t3 8 •~S ~ . 35 Z ~ . 4 Z~i•3~ 2~.1 4 2°1.21 Z 43 Z9 •4~ Z'QO 0+50 23 2 ~i ~~•2~ -7_q, 5 13 Z'Zz S 41 . 2,9 1 L., (00 1.~pv 2q.4~ 2~i.ZY Z~ ,3 Z°t.5~ Zit .34- 4 •3°1 29 .37 Z°J. 4 1 I 4.1 ~-G~.4z 25 ,4~ 2.31 pc- (3 C REVIEW COMMENTS SPOKANE COUNTY DIVISION OF ENGINEERING & ROADS 1026 W BROADWAY, SPOKANE WA 99260-0710 PHONE (509)456-3600 FAX (509)324-3478 REVIEW 2 PROJECT P-1667 PROJECT NAME: Lennox Subdivision REVIEWER: Dean Franz, P.E. DATE: 28 December 1994 These comments are to be used in conjunction with the road and drainage plan redline markups, which are attached. Address all comments by revising the plans and drainage calculations, unless otherwise noted. General Comments Provide a Developer's signature block for approval on each plan sheet. The Developer will need to sign and date the plans by the time the final set of plans are submitted. ~j In the Hearing Examiner's Conditions of Approval the project name is "Lennox Subdivision." The plans show the name of "Lennox Addition." The revised name of the project needs to be approved by the County Planning Dept. Otherwise, change the listed name to match the originally approved plat name. Examiner's Planning Condition #17 reads "Prior to approval of the CG:3::)l road and drainage plans, you are required to coordinate with the United States Postal Service to determine the type and location of mail delivery facilities..." Provide evidence this has been accomplished and coordinated with the Planning Dept. l.,4) Revise the private road name to read "Shamrock Lane" in the road plans. t~ The sheet numbers are listed on ink over the plan sheets submitted. Place this numbering on the original reproducible plan set. Road and Storm Plans Lennox Lane Plan/Profile sheet 1 ✓.L) List the bearing of the roadway. List the station where the turn-around centerline will intersection the private road stationing line. 'e e REVIEW COMMENTS Page 2 of 6 28 December 1994 REVIEW # 2 PROJECT P-1667 PROJECT NAME Lennox Subdivision 3), The plan indicates the stationing line to be located approximately 3' west of the easterly curb. The prof ile indicates the stationing line to be located along the "west pavement line." This is an apparent discrepancy. Please make the stationing line location clear, and have it match the stationing line in.the profile. 4) Provide a station equation for the street intersection. Provide a 20' radius paved curve return for the southwest quadrant of the intersection on Broadway & Lennox Ln (Shamrock Ln). Locate the pavement within the existing Broadway right-of-way. Also list the curve return elevations, including beginning return (BCR), middle curve return (MCR) and end curve return (ECR). The road plan shows the asphalt beginning 1' from the west property line. The typical road cross-section shows the asphalt beginning 2' for this same dimension. The road cross-section is correct. Revise plan view dimension. Provide a 12" long nose down where the curb will terminate. The turn-around shows a gravel thickness of 411. Provide a minimum of 8" of gravel material. 9 Two separate drainage ditches are indicated to be f lowing westerly, one in lot 3, the other in lot 7. Please label. If it is, provid and reference a typical cross-section, place within an easement a demarcate with a fence, show 'topography, define ditch slope a d bottom elevations. 10) Turn-around a; Provide and reference a typical cross-section. Place it within an easement and show in the plans. Define the pavement elevation at the easterly terminus of the turn- around. Define the location of the easterly terminus by station and offset from private road centerline. 1.) lpt- The 1208' swales are horizontally defined in the north-south direction. Please also define their locations in the east-west 7 direction. 5 L c iL , What is the 2' dimension defining around the pond perimeter. t-2) Label each 1208' swale to readily correlate with the swale table. REVIEW COMMENTS Page 3 of 6 28 December 1994 REVIEW # 2 PROJECT # P-1667 PROJECT NAME Lennox Subdivision 1;') The curb drop elevation ("invert") needs to be set at Top of curb (TC).- (0.330,+ 0.17'). Please revise curb drop elevations. The bottom of pond elevations need to be set at (TC) -.(0.33' + 0.80'). Please revise pond elevations. This will also require the revision of the top of drywell grate elevation. '4Y List the type of frame and grate to be used with the drywell. Normally when it is within a 1208' swale a Type 4 frame and grate is used. ,,je Add a note that the drywell and gravel envelope is to wrapped with a geotextile fabric (AMOCO 4545 or approved equivalent). Refence this note at the drywell callouts. Street signs: Add a callout requiring the'Contractor to construct and install the signs per MUTCD and Spokane County standards. Broadway Ave is classified as a Minor Arterial. (Per Examiner's v Engineering Condition #15. Therefore the half-street width is to be set at 22 ft. The plans show a half-street width of 20 ft. Revise. 1208' Swale & Drywell Table: a;;-Label the next to last column to read "curb opening length"; ✓V.- Add a note to the table to read "W & L are bottom of pond dimensions"; r c: Revise bottom of pond and drywell elevations per previous comments. 19) The top of the 1208' swale needs to have sand instead of gravel to accomodate a sod covering. Revise. Typical Private Road Cross-Section: ' Label the plat boundary line in the detail; /Show the tract 'x' width; ",:;`-What is the 2f and 2' dimension on the right side of the detail? ✓2) Curb Opening detail: In the detail reference the table. For the grade of 0.8% shown in the profile, the elevation listed at the located indicated in the plan redline is incorrect., .Please revise. For the "east curb line" profile, label the profile as "top of curb." REVIEW COMMENTS Page 4 of 6 28 December 1994 REVIEW # 2 PROJECT # P-1667 PROJECT NAME Lennox Subdivision ~2) The "west pavement line" profile indicates that the Type 'C' curb is to begin at •STA 6+23.69. However the typical road cross-section shows no curb along this side of the roadway. Address discrepancy. Extend and show the private road profile to the centerline ..._vp intersection of Broadway Ave along the stationing line. Also coordinate with the intersection equation. Along the stationing profile, list the station and elevation where the existing road is to match into the new road. Broaway Ave Plan/Profile Sheet 2 2.7) Clearly define the curb return elevations. List the BCR, MCR and 41 ECR~elevations.,y Also list the BCR. and EC stationing at their respective streets. N; 28) There is a discrepancy in existing pavement elevations, as listed vfor the curb calculations versus what is shown in the plans as shown for Broadway Ave. For example, at STA 1+68.42 the plans list and edge of exist. pavement elevation = 29.46. The curb calculations provided list an edge of pavement elevation = 291.31, at this station the calculations list the centerline elevation = 29.46. Similarly, the same problem is also shown at STA 0+00. This brings into question all of the curb calculations. In the Broadway Ave profile labeled 11•Exi-sting - CL pavement" the elevations do not agree with the curb calculations nor the elevations listed in plan view. Please address discrepancies. In the typical road cross-section for Broadway Ave show the dimensions _for -the,,s:i.dewalk, edge of exisiting right-of-way, label centerline' and proposed right-of-way-"line, .and set-aside. wrr-0) Where the. pavement will be widened, indicate that the edge of existing .asphalt is to be sawcut,. and the new pavement: is to match. :Y) Indicate the existing, approximate 1/2 street pavement width. Delete the percentage of asphalt for the roadway. WSDOT Class B ✓ asphalt addresses indirectly by stating percentages stability requirements in the mix design requirements. See WSDOT Std. Specifications Section 5-04.3. 33)j As mentioned in the first review, an R-value test is to be performed and the results provided. This is used to determined e_x structural pavement requirements. REVIEW COMMENTS Page 5 of 6 28 December 1994 REVIEW # 2 PROJECT # P-1667 PROJECT NAME Lennox Subdivision j, The minimum outgoing taper length is = WS = (111)(45 mph) = 4951. Identify at what station the taper is to begin revise the toper length, and in the plan view reference note #1. Notes ,t Revise Note #1 to make it clear that the 4" white stripe is to painted along the entire length of the tapers. r Add a note requiring the Contractor to relocate any conflicting utilities prior to construction. Add a note to read "The Contractor shall employ a licensed Surveyor to verify that curb form grades are in conformance with the plans, prior to pouring of curbs." At STA 0+00 the centerline profile lists a pavement elevation = 27.39. The road plan lists an elevation = 29.39 for the same' location. Address discrepancy. At STA 1+68.42 the centerline profile lists a pavement elevation 29.46. The road plan lists an elevation = 29.24 for the same location. Address discrepancy. At STA 1+68.42, the listed south curb line elevation = 29.46. From ` the listed road grade the computed elevation = 29.71. Address discrepancy. G k~,-~-- iJ J 3,9,) At STA 0+00 the cross grade is shown to be flat. At least for the new pavement widening area, the minimum cross slope is 2.0%, max. is 4.50. Please revise. 'E. P, MFV.- Z" ; z°N.%5 40.) For each 12081 swale, list the minimum berm elevation. The elev. = TC + 0.21. Please provide. y41~) Define the beginning/ending station of the incoming taper. 42',) In the road plan show the existing right-of-way (r/w) width, )e proposed r/w width, and set-aside width. Ll. Show the location of existing utilities in construction area. Show overhead power, location of power poles (if in construction area). Also show location of barb-wire fence. Indicate where the fence will need to be removed. A REVIEW COMMENTS Page 6 of 6 28 December 1"4 REVIEW # 2 PROTECT # P-1667 PROJECT NAME Lennox Subdivision Dr image Calculations D1) Provide a separate drainage basin map to correspond with the calculations. The map is to show, as a minimum: subbasin limits of area flowing to each 1208' swale; label subbasins and correlate with calculations; time of concentration route used in the calculations; and contours or ground shots No meaningful review of the drainage calculations can occur without a drainage basin map. Therefore the calculations are being returned without reviw. S P O K A N E C O U N T - e-OFFICE OF THE COUNTY ENGINEER • Ronald C. Hormann, P.E., County Engineer A DIVISION OF THE PUBLIC WORKS DEPARTMENT Dennis M. Scott, P.E., Director March 8, 1995 Eugene F. Fisher, P.E. N. 3422 Kennedy Rd. Otis Orchards, WA 99027 Subject: Lennox Subdivision Review #3 Spokane County No. P-1667 Dear Eugene: A review of the road and drainage plans for this project has been accomplished. Areas of concern to us are indicated in red on the attached prints and calculations. Please make the corrections and resubmit them to this office in order that the review process may proceed. Please provide 2 copies of plans and calculations for the project with each submittal. If you have any questions about this review, please contact myself or Paul Lennemann at 456- 3600. Thank you. Sincerely, Spokane County Engineers 20 -4A Dean Franz, P.E. Plans Review Engineer encls: Plans (1 set) Calculations (1 copy) Comments (1 pages) Basin Map cc: project file 1026W Broadway Ave. - Spokane, WA 99260-0170 - (509) 456-3600 FAX: (509) 324-3478 TDD: (509) 324-3166 O-P s REVIEW COMMENTS SPOKANE COUNTY DIVISION OF ENGINEERING & ROADS 1026 W BROADWAY, SPOKANE WA 99260-0710 PHONE (509)456-3600 FAX (509)324-3478 REVIEW 3 PROJECT P-1667 PROJECT NAME: Lennox Subdivision REVIEWER: Paul Lennemann, E.I.T DATE: 8 March 1995 These comments are to be used in conjunction with the road and drainage plan redline markups, which are attached. Address all comments by revising the plans and drainage calculations, unless otherwise noted. General Comments G1. Examiner's Planning Condition #17 reads, "Prior to approval of the road and drainage plans, you are required to coordinate with the United States Postal Service to determine the type and location of mail delivery facilities...". Provide evidence this has been accomplished and coordinate with the Planning Department. Road and Storm Plans 1. Provide a station equation for the street intersection. 2. Define the location of the easterly terminus of the turn-around by station and offset. 3. The -208' swales are horizontally defined in the north-south direction. Please also define their location in the east-west direction. 4. Show the tract X width on the road cross section. 5. As mentioned in the previous reviews, an R-value test is to be performed and the results provided. 6. Address the centerline profile and plan elevation discrepancy at STA 0+00. 7. Label the existing, proposed and future right-of-way. 8. Review the type "B" curb detail. REVIEW COMMENTS Page 2 of 2 8 March 1995 REVIEW # 3 PROJECT # P-1667 PROJECT NAME Lennox Subdivision Drainage Calculations D1. Provide enough spot elevations on your basin map to clearly identify basins. D2. Show Tc routes on the basin map. D3. Include the east half of the plat in your calculations or provide calculations which verify the reduced offsite flow. D4. Provide offsite spot elevations and include in your drainage calculations all areas which drain into the plat. D5. Review the Tc calculations in the drainage report. County computed numbers do not correspond to your values. D6. 1208' volumes are calculated from the bottom area and the volume along the slope perimeter. Check your calculations and verify your volumes. D7. Calculate Q for the road runoff and Q for the entire basin. Use the larger Q for your curb cut calculations. BOWSTRING METHOD (TEN YEAR STORM DESIGN) PROJECT: P-1667 DETENTION BASIN DESIGN BASIN: 2 REVIEWER: Lennemann NUMBER OF DRYWELLS PROPOSED DATE: 07-Mar-95 1 Single (type A 0 Double (type B) Total Area (calc.) (see Ht) 1.12 Time of Conc. (calc.) (see H1) 7.37 Composite "C" (calc.) (see H1) 0.30 Time of Conc. (min) 7.37 Area (Acres) 1.1184573 C' Factor 0.30 Impervious Area (sq. ft.) 8614 Volume Provided 208: 316 storm: 255 Outflow (cfs) 0.3 Area' C" Factor 0.33 #1 #2 #3 #4 #5 #6 #7 Time Time Intensity 0 dev. Vin V out Storage Inc. Inc. (min.) (sec.) (in./hr.) (cfs) (cu. ft.) (cu. ft.) (cu. ft.) (91'60) aaa=aaa (A'C'#3) a a a (Outf.'#2) (#s 6) -----------aa3=aGaa 7.37 442.02 2.74 - 0.91 - 542 132.61 409 5 300 3.18 1.06 428 90 338 10 600 2.24 0.75 562 180 382 15 900 1.77 0.59 622 270 352 20 1200 1.45 0.49 655 360 295 25 1500 1.21 0.40 668 450 218 30 1800 1.04 0.35 678 540 138 35 2100 0.91 0.30 685 630 55 40 2400 0.82 0.27 700 720 -20 45 2700 0.74 0.25 706 810 -104 50 3000 0.68 0.23 717 900 -183 55 3300 0.64 0.21 739 990 -251 60 3600 0.61 0.20 765 1080 -315 65 3900 0.60 0.20 813 1170 -357 70 4200 0.58 0.19 844 1260 416 75 4500 0.56 0.19 871 1350 479 80 4800 0.53 0.18 878 1440 -562 85 5100 0.52 0.17 913 1530 -617 90 5400 0.50 0.17 928 1620 -692 95 5700 0.49 0.16 959 1710 -751 100 6000 0.48 0.16 987 18w -813 DRAINAGE POND CALCULATIONS Required grassy swale pond storage volume = Impervious Area x.5 inJ 12 inA. = 359 cu. ft. provided: 316 cu. ft. No Good DRYWELL REQUIREMENTS -10 YEAR D ESIGN STORM Maximum storage required by Bowstring = 409 cu. ft. provided: 255 cu. ft. No Good Number and type of Drywells Required = 1 Single TIME OF CONCENTRATION (minutes) Tc (overland) Tc (gutter) Areas "C" A'C Ct = 0.15 L2 = 133 8614 020 0.90 0.177975 Z1 = 50 40106 0.92 0.17 0.15652 L1 (A) = 65 Z2 = 4.5 0.00 0.00 0 N(A) = 0.4 B= 0.1 0.00 0.00 0 S(A) = 0.0031 n = 0.016 0.00 0.00 0 S = 0.008 0.00 0.00 0 Tc (A) = 5.99 d = 0.17 0.00 0.00 0 Total A Comp "C" LI(B) = 0 Tc (gu) = 1.37 1.12 0.30 N(B) = 0 Tc(A+B) = 5.99 S(B) = 0 Q--C'I'A= 0.91 Tc(tot.) = 7.37 Q(est.) = 1.30 Tc (B) = 0.0 Intensity = 2.74 A = 0.804525 WP = 9.3854 R = 0.0857 V = 1.61 Tc (total) = Tc (overland) + Tc (gutter) Tc(gu) = 1.37 Tc (overland) = Ct'(L1'N/S"0.5)"O.6) Q(est) = 1.30 Ct = 0.15 L1= Length of Overland Flow Holding = 4.29 N = friction factor of overland flow (A for average g rass cover) S = average slope of overland flow Tc (gutter) = Length (ft.)Nelocity (ftlsec.)/60 B = Bottom width of gutter or ditch Z1= inverse of cross slope one of ditch Z2 = inverse of cross slope two of ditch d = depth of flow in gutter (estimate, check estimate with Flow) Area = d'B+d"2/2'(Z1+Z2) Wetted perimeter= B•d+(1lsin(atn(11Z1))+11sin(atn(1fZ2))) Hydraulic Radius = R = Area/Wetted Perimeter Velocity =1.486/n'RA.667's".5 Flow = Velocily'Area n = 0.016 for asphalt s = longitudinal slope of gutter 0 Double • BOWSTRING METHOD (TEN YEAR STORM DESIGN) PROJECT: P-1667 DETENTION BASIN DESIGN BASIN: 1 R EVIEWER: Lennemann NUMBER OF DRYWELLS PRO POSED DATE: 07-Mar-95 1 Single (type A 0 Double (type B) Total Area (calc.) (see Ht) 1.47 Time of Conc. (calc.) (see HI) 8.78 Composite 'C" (talc.) (see H1) 0.25 Time of Conc. (min) 8.78 Area (Acres) 1.4655647 C Factor 0.25 Impervious Area (sq. ft.) 6650 Volume Provided 208: 300 storm: 300 Outflow (cfs) 0.3 Area' C" Factor 0.36 N #1 92 #3 #4 #5 #6 #7 Time Time Intensity Q dev. Vin V out Storage Inc. Inc. (min.) (sec.) (inJhr.) (cfs) (cu. ft.) (cu. ft.) (cu. ft.) (#1'60) (A*C*#3) - (Outf.*#2) (#546) -8.78 =====526.92 ~ ===2,41 - -----0.89 629 158.08 471 5 300 3.18 1.15 461 90 371 10 600 2.24 0.81 629 180 449 15 900 1.77 0.64 689 270 419 20 1200 1.45 0.52 721 360 361 25 1500 1.21 0.44 733 450 283 30 1800 1.04 0.38 742 540 202 35 2100 0.91 0.33 748 630 118 40 2400 0.82 0.30 763 720 43 45 2700 0.74 0.27 768 810 42 50 3000 0.68 0.25 780 900 -120 55 3300 0.64 0.23 803 990 -187 60 3600 0.61 0.22 831 1080 -249 65 3900 0.60 0.22 883 1170 -287 70 4200 0.58 0.21 916 1260 -344 75 4500 0.56 0.20 945 1350 -405 So 4800 0.53 0.19 952 1440 -488 85 5100 0.52 0.19 990 1530 -540 90 5400 0.50 0.16 1006 1620 -614 95 5700 0.49 0.18 1039 1710 -671 100 6000 0.48 0.17 1070 1800 -730 DRAINAGE POND CALCULATIONS Required grassy swale pond storage volume = Impervious Area x.5 in./ 12 inJft. = 277 cu. ft. provided: 300 cu. ft. DRYWELL REQUIREMENTS -10 YEAR DESIGN STORM Maximum storage required by Bowstring = provided Number and type of Drywells Required = OKI 471 cu. ft. 300 cu. ft. No Good 1 Single TIME OF CONCENTRATION (minutes) Tc (overland) Tc (gutter) Ct = 0.15 L2 = Z1 = L1 (A) = 65 Z2 = N(A) = 0.4 B= S(A) = 0.0031 n - s= Tc (A) = 5.99 d LI(B) = Tc (gu) _ N(B) = 0 Tc(A+B) _ S(B) _ 0 Tc(tot.) _ Tc (B) = 0.0 Intensity = 270 50 4.5 0.1 0.016 0.008 0.17 2.79 5.99 8.78 2.47 Tc (total) = Tc (overland) + Tc (gutter) Tc (overland) = Ct*(LI*N/S"0.5)"0.6) Ct = 0.15 L1= Length of Overland Flow N E friction factor of overland flow (A for average grass cover) S = average slope of overland flow Tc (gutter) = Length (ft.)Nelocity (ftJsec.)160 B = Bottom width of gutter or ditch Z1= inverse of cross slope one of ditch Z2 = inverse of cross slope two of ditch d = depth of flow in gutter (estimate, check estimate with Flow) Area = d*B+d"212*(Z1+Z2) Wetted perimeter = B*d+(11sin(atn(121))+11sin(atn(I/Z2))) Hydraulic Radius = R = ArealWetted Perimeter Velocity =1.4861n*R".667*s".5 Flow = Velocity*Area n = 0.016 for asphalt s = longitudinal slope of gutter 0 Double 0.00 0.00 0 Areas A*C 6650 0.15 0.90 0.137391 57190 1.31 0.17 0.223193 0.00 0.00 0 0.00 0.00 0 0.00 0.00 0 0.00 0.00 0 Total A Comp "C 1.47 0.25 Q=C'I'A= 0.89 Q(est.) = 1.30 A = 0.804525 WP = 9.3854 R = 0.0857 V = 1.61 Tc(gu) = 2.79 Q(est) = 1.30 Holding = 8.71 . ` (509) 927-0120 J EUGENE F. FISHER, P.E. Civil Engineering N. 3422 Kenney Road Otis Orchards, WA 99027 February 8, 1995 Mr. Dean Franz, P.E. Spokane County Division of Engineering and Roads 1026 W. Broadway Spokane, WA 99260-0710 Re: Lennox Subdivision Project No: P-1667 Dear Mr. Franz: Please find attached the third submittal for Lennox Subdivision. Item G-3: Mail delivery facilities are being discussed with the Post Office at this time. We will be submitting this information on or about February 15, 1995. Item 33: R-Value tests will be performed the week of February 15, 1995.• Eugene F. Fisher, P.E. C y LENNOX SUBDIVISION Located in: NW a, SE4, Sec. 13, T25N, R44E, WM. INDEX 1. Summary 2. Soils Map 3. Basin 1 Drainage Calculations 4. Basin 2 Drainage Calculations 5. Broadway Curb Calculations* 6. Plat Map 41 i EXwRES 5/12/ ? SUMMARY Map symbol GgA - garrison gravelly loam, SOILS: 0-5 percent slopes. somewhat textured excessivly , Gravelly, medium drained soils in gravelly glacial o ut wash material. BASIN 1: Area = 0.83 acres. hard surface = .1527 AC. Area graded, The west 65 feet to be l rear 100 The west to Lennox lane. to feet remain undisturbed. Q = .66 CF. Curb opening = 4 ft. ,,208" storage = 420 CF Type "All drywell. BASIN 2: Area = 0.67 acres. hard surface Area The west 65 fto be graded, s = .0031 west to Lennox lane. The rear 100 feet to remain undisturbed. Q = 0.63 CF. Curb opening = 4 ft. "208 1' storage = 294 CF. Type "All drywell. S P O 1< A N E OFFICE OF THE COUNTY ENGINEER a Ronald C. Hormann, P.E., County Engineer 20 April 93 Gene Fisher, P.E. N. 3422 Kenney Road Otis Orchards, WA 99027 C O U N T Y A DIVISION OF THE PUBLIC WORKS DEPARTMENT Dennis M. SCOtt, P.E., Director SUBJECT: Soils Testing Requirements P1667 - Lennox Subdivision Dear Mr. Fisher: Additional information with respect to the subsurface soils conditions on this project is required to complete the plans review process. Specifically, representative values for soil percolation rates and soil-subgrade "R"values are necessary to evaluate the proposed storm drainage disposal system and road pavement section. The Spokane County Materials Laboratory has reviewed the proposed development plan,and has determined that a minimum of 1 Stabilometer "R" value tests is required. The information may be supplied by any qualified soils firm. The tests and methods must meet Spokane County standards, and be inspected by Spokane County personnel. Spokane County (Mr. Jim Radke; 456-3600, ext. 436) should be notified at least 24 hours in advance of all sampling and testing. Please call me at 456-3600 if you should have any questions. Sincerely, Edward J. Parry, Jr., P.E. Plan Review Engineer cc: Project file W. 1026 Broadway Ave. Spokane, WA 99260-0170 (509) 456-3600 FAX (509) 456-4715 . 74 Wlap symbol DsC DsD DvD EkB EIC EID Em SOIL SURVEY TABLE 6.--Briej descriptions of soils and their Fa B FaB3 FaC3 Fm GaC3 o -f (:EgA GgB GmB GnB GpA GpB GpC GpD Soil name Description of soil and site k )ragoon stony silt loam, 0 to 30 percent slopes. r )ragoon stony silt loam, 30 to 55 per- cent slopes. Dragoon very rocky complex, 20 to 55 percent slopes. l.loika silt loam, 0 to 20 percent slopes. Eloika very stony silt loam, 0 to 30 per- cent slopes. r Eloika very stony silt loam, 30 to 55 percent slopes. E- indent silt loam. Freeman silt loam, 5 to 20 percent slopes. Freeman silt loam, 5 to 20 percent slopes, severely eroded. Freeman silt loam, 20 to 30 percent slopes, severely eroded. Fresh water marsh. Garfield silty clay loam, 0 to 30 percent slopes, severely eroded. Qarrison gravelly loam, 0 to 5 percent slopes. Garrison gravelly loam, 5 to 20 percent slopes. Garrison very gravelly loam, 0 to f percent slopes. Garrison very stony loam, 0 to 21 percent slopes. Clenrosc silt loam, 0 to 5 percent slope! Glenrose s t 0 Glenrose silt loam, 20tox 301 perr c r slope. Glenrose silt loam, 30 to 55 percer tilupe-s. imilar to Dragoon silt loam, 0 to 30 percent slopes, except that the surface layer is stony. Dragoon part similar to Dragoon silt loam, 0 to 30 percent slopes, except that depth to bed- rock ranges from 10 to 20 inches. Rock out- crop included in this complex. Medium-textured, well-drained soil formed from glacial till containing a large amount of vol- canic ash in the surface layer; underlain by gravel at depth of 30 to 60 inches; occupies undulating, morainclike topography. Similar to Eloika silt loam, 0 to 20 percent slopes, I except that they are very stony throughout. Medium-textured, somewhat poorly drained, alkaline soil formed in alluvium from calcar- eous silt, volcanic ash, and diatonite; depth to water table fluctuates from near the surface to about 6 feet. Very deep, moderately well drained upland soils with medium-textured surface layer and medi- um or moderately fine textured subsoil; formed from silt on rolling to hilly uplands. p, intermittent ponds and Shallow, swam y fringes around lakes that have a fluctuating water table. Engineering data is not given, as land type is too variable. Very deep, well-drained soil developed in loess on ridgetops and knobs on the rolling to hilly uplands in the Palouse area Gravelly, medium-textured, somewhat exces- sively drained soils formed in gravelly glacial outwash material from a variety of acid, igneous parent rock; on nearly level to mod- crately gravelsloping n rrcobblestonest ranges mixture 2~j to 5 feet. Similar to Garrison gravelly loam, except that the surface layer is very gravelly. 1 Similar to Garrison gravelly loam, except tha the surface layer is very stony. Very deep, medium-textured, well-drained soil formed from acid igneous glacial till; surfac t layer influenced by loess and volcanic ash; o gently rolling to steep uplands. t Classification Depth from surface USDA texture Jn. 0 to 24 24 to 44 44 to 53 53 to 60 0 to 26 26 to 41 41 to 60 0 to 22 22 to 72 0 to 8 8 to 23 23 to 60 0 to 15 15 to 44 44 to 60 0 to 15 15 to 44 44 to 60 0 to 72 e i Silt loam---- Gravelly loam - Very gravelly sandy loam. Gravel------------- Silt loam Very fine sandy loam. Sandy clay loam---- Silt loam silty clay loam------ silty clay loam Silty clay---_------ Silty clay loam-_--- Gravelly loam--_--- Very gravelly loam- Sand, gravel, and cobblestones. Very gravelly loam. Very gravelly loam. Sand, gravel, and cobblestones. Silt loam ,p e V j I u OD Q O C E 0 o ~ N ~ N d 'e u O. N E Z N C N Ln 4 L N N w C d O N . C ~ V ; O t N .n N C O u ~ O u a ^ N N ° co_ c ~O 4= w N p 'D E c c ~ ~ S N n O C_ c_ O no o ; c u u d a0 N Q 4 ~ ~ O O ~ V C O ~ N 4 D 1tl V E~ N v c c 1~ 4 .`^Eptj o~ ~I w l14 l4 Sc c 13 T25 ~ IZ i• N`f 4e .MCA Ggj, 0 • OUNTY, WASHINGTON - SHEET NUMBER 67 - - 4'1 L (loins sheer 58) SRA N? y., .3 290 • P ~?C~':.Y, lrir s,.". `V ir..- 1~ tic ~ rP Y , P~"' CANAL ~jM t e I _ . ~'L 1. _ 1 t :a"•:ti i tr,~ a y 'Gg. ' • • • I ~ t, ' t'i ,..•2, •j!rN•~' 't• ~^tL}I,~~ ril'l' 'fit n' 'm- } r Gnt3' , .T"•f •w .,Y• 1 r•• t ;lf l: .-f•''• Yh Y•, .a '4 'At `v. 7'~ A. •~:vrf'J .•,t,t a.t -a,f •~t ~.~t+l^•;te:~. t.-: 1 . . .t 1~.•, i ^ ll ~'f-1 rM~4~i. ~l •'v~• i' " • j 7 S : . n8 ` r t~• la 4a' .i.: @ N c I. r r a ~ f• `•Y f.t ..•`L,•...., ?6°•' r , •?',.,A ~1 « ~'~a"( F`(-'t4 t\, 'EL°.~ tf,s ,+L r lk«. N.P$A. bSay I ~Lr•wJ~oi e ' nt"t~•r4}d:v Sk~~ ..,f•q•' S•~:. r, tt s;irti' ~i :~`'S i-.j ~i-►•;~t': 1-~;r.;,»'+ ;~~i..,^a~{'rt,.,n+t,.' i:t>yti . :~.1" k+,~ ~J'jN yr♦~. ~u y i~s~1'+e.~,•.•S,n,j~ ..a~' `3,►•'R~ s, 'r~ =re• ..`.•y..~,r_',l,`'~(.+ ♦ n i.'C'y IrG7_ a„~ ra r,ir , t r;' { ~i Ly~~r."` + bt.-S'"•••:}Tw:•.~.::~y;;,~`~' t.~:%• fit, t+++a.1t~ :°'l;fG y I•r•-">t~•\r=•r`, :5.•rl• •n ►'t••:l~k° l!_K . 4 C.7R. 4s•.A~'~ ~i ASt~:'~f•~~•' ty~: e••~ •,Tl~' , ,,ifi M' :e.1f" .el:, ♦ q 'f~Y. ~„ry_ :~~N+r: t .J• ~ r ;t~:'•'i~• } f•;'',p•,~, ,e.~~. ~•1~', `►i , .'~~f i,. ~1 ":a s !T't.~`s •r+ - lr r i^ r ~I tQ~jf'~ 'if ''i !S"'r~ tlt~t'~;~et3~ J;'s: I' r ;Cr''''¢ • ~~S,,k~ 1~.5,°, GgE .weY~l. ~{w,y~ t . ~ , ~ 7..'' ~r ~ y~a4,1„.n Y]..A'. s.N♦•~rRii%y , ~ + Q~/~ ~ ~.,,.,Z,r,~•~ ,"y~".d~g. L 1 /FtCr ~'Ka.~•'•`~gLvair-Y~s~~{.~i'rr••.`•!I~! t J `~1•• +•r' y•i`j,•+~~ _Iff t' !e'F'4,, I~~ +~,;"lay=~~'t!'lr', Y y jti ~(1 ~•!rt 't~P:#'''~ , , .6 1 , N~: { Fri: -N • -It. ,i v 'W~,t •-tt.. d-!a • w -t t,7NN1`',j~j„j•~'A~. a:}jy•, .e + ♦ 'y~~ •a~7n •,'~w, t• IT .1~ ~ ,t4 R~+~4~~~~n , .a.- ~ ~.~~5•,~t+itl,1{.j~;~,,a ~t•~.~1~ '.i-,~ ` a t , m i •IS 1`.ir?"- + >d .n'~' `~Rt•+ ~R•.~;.~~;i~,~;~~'7j~~'M` 4 V~ ~ • ,.,rat.,; . ,gyp +~•'!q ~ •I t.~t. ' t ~ ' •I~F, .,rl• '1' . ~t " • I ~5 r 'r t 7 ••2R•• :~•i . ~'r . ° ' a'.." Z , / ~2 r4AL ,j~, .l, ~filr aN;,t+''l is 0~; .ar I'~•:i:~ 'IJ=~;•~~, ♦ t }r,~ _ ~ 3! a.}b`Nit .y,.•4 •-'x..11 , F b •FU~fa,r a ~ fT1,Qf•~-?'1 r ra 1., • ,1 1r. j ~ 'ir 7' .f;~` ~C t ` .1i~11% 't`Y' ima ~f' ~ - I~Y ~ S, t1r t ~ .fir-~ n •.a a•.~' 60A. I 1 + ' ,4rF wk 1, ~t,,,,;..~,"b.~1R~;'rki~iy I S't+ri 1,4 ~ "rye ,oZ ~ "}i • lt+ f~:,~'y a~;,~ ~ r,l, a~• r _ i w~i"•; ~ r'+ = t •!h Y?~.r=f~ ,st` ~i".' is f. ~I 1 ~ ' ~r t „N_c1 , ,~t •a my ke I < r• 3•,a• - i t I;-~f~ f, `•i '1'at~l/a••r.~' ~Y:s~s`.~}t,';d yt. r`1a~R'f', -N•{:r ~le ; :'•t L"~ t v 6, N :'tRf ' i ' ~I' i ; 1;y! • at p \-W J>.. fJ ' ~y ~ ti;t..,L.iti" c+~e~ e~','i: 1'` ~ • .'~'4: ; ~]a•~~.• ► . rt~t:7 a~~'1~ Y ~ ~ i•a r~ i:C c~G,~M Tti.~~ ~;;Y~'~7 JjM'•'.~'i j1p r - • tom' _ i ''lid} - :l t S. I i t r'• , .r h, t~'.t~ Y~~~II~:a`~r-/i♦\'.,. ~ 1,1 r u. w~' • ~ hi~ \yi~•' •t' L,• a4fpffi 44 CANAL Vic AN f i N, (loins sheet 76) 1 Mile 0 5000 Feel Scale 1: 20 000 t t i - - t ~ 1a'4tiF'r. --W S P O K A N E C O U N T Y F.oM OFFICE OF THE COUNTY ENGINEER • A DIVISION OF THE PUBLIC WORKS DEPARTMENT Ronald C. Hormann, P.E., County Engineer Dennis M. Scott, P.E., Director 20 April 93 Gene Fisher, P.E. N. 3422 Kenney Road Otis Orchards, WA 99027 SUBJECT: Soils Testing Requirements P1667 - Lennox Subdivision Dear Mr. Fisher: Additional information with respect to the subsurface soils conditions on this project is required to complete the plans review process. Specifically, representative values for soil percolation 'rates and soil-subgrade "R"values are necessary to evaluate the proposed storm drainage disposal system and road pavement section. The Spokane County Materials Laboratory has reviewed the proposed development plan,and has determined that a minimum of 1 Stabilometer "R" value tests is required. The information may be supplied by any qualified soils firm. The tests and methods must meet Spokane County standards, and be inspected by Spokane County personnel. Spokane County (Mr. Jim Radke; 456-3600, ext. 436) should be notified at least 24 hours in advance of all sampling and testing. Please call me at 456-3600 if you should have any questions. Sincerely, Edward J. Parry, Jr., P.E. Plan Review Engineer cc: Project file W. 1026 Broadway Ave. Spokane, WA 99260-0170 (509) 456-3600 FAX (509) 456-4715 ►-rC_. /y N V Imo' I v • I - .i I~SA 34a 0•g3 AL. 52-1 A, c- o. ~OV 44 :$r x . C r ,.~o u Fai~.~- h y .3-L (A7) A 5 = 2-7 2 ELI o ~•~3 ►~'li~ ply 5 -gcf ~z. , r3• tv Tc- V -7- . L l 1 '•-moo S 5 L i z --Q I- Lz S' OP ^0 -1 T i r• .r4 e" -,4, n rN AV, ---a ~:n U f I L Q ~Wil . ,war L&-) rJ 3 D,5 \,t-" .L BOWS*rx chi: Mr.1-110D DETENT LON BAS 111 LWS t CN Time Increment (min) 5 ~ Timc of Concentration (min) iZ M~ tna Outflow (c.f .s.) Uesikn year flow (yr. 5 Area (acres) Area x •'C•' 3 Developed "C" factor 0, 4,0 • Z O1 oz t Tlme• Inc. Time Inc. 13 'Intensity F4 Q dev V V6 P7 (min.) (sec.) (in:/hr.) , (c.f.s.) V in (cu It ) V out Storage (A1 6U) (MC1,03) ( . . see below) (cu. ft.) (outfloc:*U2) .(cu. ft.) U ( 5- 6) 10 4 V-L- 600 1~ 2.2 4 .7~1 y 50~~ ►co IS 960 0 V 1.77 "c~ G3(. L1L , -fib o ~ L - Mk• 20 1200 1.45 - , 25 L 1500 1.21 30 1800 1.04 9SU 1 35 I 2100 I _ .91 I 1 "C, A 40 200 .82 45 2700 o74 1 50 3000 _ .68 I 55 . 3300 .64 j ~ 60 3f~U0 .61 I I --J . 6S 3900 .60 70 4 2U0 .58 75 4500 .56 80 4800 .53 L_85 5100 L 90 54U0 .50 95 5700 ,g 1oU 6UUo .48 I i Vin - 1.34 * Q dev * t for t < Tc Vin - (Q dev * C)+(.34 * Q dev * Tc for_,t > Tc 306/6 4-", S1N -rv 291-~(,. 2 1~ o. 6 Ac- . ~v 3 = C- 4,4 ~ G = 0.4-0 Y ~ J u Looo~ • 7" h Py- 73 l I -Ow -(eA -IA L, I ~cr "Jo (5 a - • I ~ I l..~C-~1~J07~- I ~v~.SIN .9 .J 14 :x.59 . c F r ti 44 ~e T 2 vivo y Vol u c 4- p = Sq.a3 SSE ~o' 12- (6 1 fJ 41" a;r- S~-)e- V f = 1SZ •33 s 2:R 410 <z- A 0 aAA Wa4 z a ' , ulp~ M L dow t A► 11 FZ7 Ili rJL? BOWS*rR t N(: ; Ir:Ttt0D DETENT[Uil BASIN UE;S1Ccr Tlmc Iticremetit (mill) 'rlmc of Concentration 5 ~ Outflow (min) (c.E.s.) UesLkn year flow °'s (yr.) Area (acres) (07 tU Area x "C•• Developed "C.. factor 0. -4 o 31 ,t,4,•. a1 oz c 13 Time Inc. Time Inc. O4 v5 a6 Intensity Q dev. Uj.~ (min.) (sec.) (in:/hr.) (c.f.v.) Vin V out Stoc~ c (Al * 60) (ctn. ft.) (cu. (A*C*03) (sec bclou ft') ..(Cu. ft.) (outf.low*U2) (u 1! l~ 00 0 • . 35 2 2'G ' ° ~ z S - e 5' 6) . . (.iD IS 9U0 4j 0 1v v Zqo MA,x 1.77 20 1200 z7 o Z 3~ 1 .45 L-- 25 j 1500 1 2I 30 1800 . I • 3z 4c _ 1 v S •04 I Z8 , 3 5 2100 .91 GO 2'00 .82 , 45 z700 •7G 50 3~ o .68 I 1 55 3300 • .64 I I 6~) 3FU0 .61 65 3900 .60 70 4200 .58 75 4500 .56 I AO 4800 .53 85 5100 .52 90 54()0 •50 . 95 57011, I !1U 6000 ~ • G g ~ I VIn - 1.34 Q dev Vin t for t < Tc CQ dev * t)+(34 " Q dev * Tc for-t 306/6 > Tc 4MW FIELD INFORMATTON CALCULATTONS AND [)ESIGN #2 113 11-4 -(1 - - t,._ __---ll "I 11 ti „ if 9 t, -11M MIAXIMUM p WI ST. FROM Iii ST. CURB I:I.rv. SI• I LC•1'I:I) Z GRADF STA. ELEV. ELLV. CU L. P. FIt0M E. I'. ; '1 . ~Z SLOPE, '2% SLOPL LLLV. TO CURB !.F. I". + FROM 1'. P. + CURB HE-I Il T) CURB IILICHT) 7-L Z~.39 2~,~5 i ~ 9 6 t3 9 •',S 29.23 4 e L~ •3~ 3, o b' z ?,1.3~' 2.14 Vt5 ~ 2`►. ZCl .4L 3.45 Z~,Z3 42 zCA AIQ Zg ~ . 3 0 2q '2 c~ Zcl •3 z, r.5 5 3 2 q,3~ Zvi , cwt; 2. L 3 Z °r . (03 2. o J/~u vi •~3 u 2 S 1 ' to. LMAR a 19 9 5 TO it, ~ x y• -Y- DATE ~r log& 4) ~ er lxnz26-k :!~U&uvie'loil SIGNED {C J 7 SIGNED - ~ Redid Irm 9 4S 473 SEND PARTS I AND 3 WITH CARBON INTACT _ PAR2 3 WILL BE RETURNEE) WITH REPLY, Poky Pak {SID xul 4P473 REVIEW COMMENTS SPOKANE COUNTY DIVISION OF ENGINEERING & ROADS 1026 W BROADWAY, SPOKANE WA 99260-0710 PHONE (509)456-3600 FAX (509)324-3478 REVIEW 4 PROJECT P-1667 PROJECT NAME: Lennox Subdivision REVIEWER: Paul Lennemann, E.I.T DATE: 29 March 1995 These comments are to be used in conjunction with the road and drainage plan redline markups, which are attached. Address all comments by revising the plans and drainage.calculations, unless otherwise noted. General Comments G1. Examiner's Planning Condition #17 reads, "Prior to approval of the road and drainage plans, you are required to coordinate with the United States Postal Service to determine the type and location of mail delivery facilities...". Provide evidence this has been accomplished and coordinate with the Planning Department. Road and Storm Plans 1. Check the a station equation for the street intersection. 1. As mentioned in the previous reviews, an R-value test is to be performed and the results provided. Drainage Calculations D1. Provide enough spot elevations on your basin map to clearly identify basins. D2. Show Tc routes on the basin map. D3. Include the east half of the plat in your calculations or provide calculations which verify the reduced offsite flow. D4. Provide offsite spot elevations and include in your drainage calculations all areas which drain into the plat. D5. Review the Tc calculations in the drainage report. County computed numbers do not correspond to your values. D6. 1208' volumes are calculated from the bottom area and the volume REVIEW COMMENTS Page 2 of 2 29 March 1995 REVIEW # 3 PROJECT # P-1667 PROJECT NAME Lennox Subdivision along the slope perimeter. Check your calculations and verify your volumes. D7. Calculate Q for the road runoff and Q for the entire basin. Use the larger Q for your curb cut calculations. F'ETULEUM ^,C _T ENCE 4892401 F' _ 0 1 n fthuleum Sciencesa Inc, Asphalt Technology + Asphalt Emulsions • Polvmer Ashpalts Rheology x•81.7 N. Freya $t., 4, P.U. Btyv, 63U4 $r3t7k<1,[lC:, tiVA 99207 ,$094,59-1758 159-2401. Eugene Fisher, Q . E N . 3 2 2 Kenney Road Ot 1s Orchards, 10A 99027 t•4,irch 77 , 1994 Project t12852 Re: VJI1 1 Qy HOMIeS, R.-vta 1 iao .r he i csrfip 1 E was ca 1 ped on the -.t/4- -sieve an s<-xeened on other. sieve, si ms to rn ake ad jUstments as t'OgUi i red by the test method. SV^I0 1 1 va 1 uea were obta i nt~d which calculate to 40 1 bcs . /sq . ft. at the oo i nt the F1'-valueis reported, VISDOT test rOethod 611 regal r es the P--va 1 ire to be reported at AOU os i exudat i oii rwessur^e . San-i r) 1 e R-Va1 Ue 9, 0--47C /-4 €t~ar)ectf u 1 1 y br(Ii tA.'.0d , Kont Henderson, N 1 Cc r ! r LENNOX SUBDIVISION Located in: NW 4, SE4, Sec. 13, T25N, R44E, WM. INDEX 1. Summary 2. Soils Map 3. Basin 1 Drainage Calculations 4. Basin 2 Drainage Calculations 5. Broadway Curb Calculations 6. Plat Map ti ~G~~ F fill JG of WASI- T i cl 11592 S~ONALG 1 EXPIRES 5/12/ 5 T RECEIVED MAR 2 4 1995 SPOKARE COUNTY ENGINEER Lc;~1~07C ~~r~~T~Jvs.~ o~J (p -7 \a-) t L L M r3 U N Si J R.2 E;L o FID -j r-~ r> L c~ N. D T!-1 a ~J i' SUMMARY SOILS: Map symbol GgA - garrison gravelly loam, 0-5 percent slopes. Gravelly, medium textured, somewhat excessivly drained'soils in gravelly glacial out wash material. BASIN 1: Area = 0.83 acres. Area hard surface = •1527 AC' _ ,0031 The west 65 feet beThegraded, rear 100 feet to west to Lennox lane. remain undisturbed. Q = .66 CF. Curb opening = 4 ft. 11208" storage = 420 CF Type "All drywell. BASIN 2: Area = 0.67 acres. Area hard surface = 0.1978 AC. _ .0031 The west 65 feet to beThearear 100 feet to west to Lennox la remain undisturbed. Q = 0.63 CF. Curb opening = 4 ft. 11208" storage = 294 CF. Type "All drywell. I S P O K A N E M C O U N T Y MIN- OFFICE OF THE COUNTY ENGINEER • A DIVISION OF THE PUBLIC WORKS DEPARTMENT Ronald C. Hormann, P.E., County Engineer Dennis M. Scott, P.E., Director 20 April 93 Gene Fisher, P.E. N. 3422 Kenney Road Otis Orchards, WA 99027 SUBJECT: Soils Testing Requirements P1667 - Lennox Subdivision Dear Mr. Fisher: Additional information with respect to the subsurface soils conditions on this project is required to complete the plans review process. Specifically, representative values for soil percolation rates and soil-subgrade "R"values are necessary to evaluate the proposed storm drainage disposal system and road pavement section. The Spokane County Materials Laboratory has reviewed the proposed development plan,and has determined that a minimum of 1 Stabilometer "R" value tests is required. The information may be supplied by any qualified soils firm. The tests and methods must meet Spokane County standards, and be inspected by Spokane County personnel. Spokane County (Mr. Jim Radke; 456-3600, ext. 436) should be notified at least 24 hours in advance of all sampling and-testing. Please call me at 456-3600 if you should have any questions. Sincerely, Edward J. Parry, Jr., P.E. Plan Review Engineer cc: Project file W.1026 Broadway Ave. Spokane, WA 99260-0170 (509) 456-3600 FAX (509) 4564715 X74 lklap symbol DsC DsD DvD EkB EIC EID Em Fa B FaB3 FaC3 Fm GaC3 GgA GgB Soil name )ragoon stony silt loam, 0 to 30 percent slopes. dragoon stony silt loam, 30 to 55 per- cent slopes. Dragoon very rocky complex, 20 to 55 percent slopes. E,loika silt loath, 0 to 20 percent slopes. Floika very stony silt loam, 0 to 30 per- cent slopes. Floika very stony silt loam, 30 to 55 percent slopes. Lmdent silt loam. Freeman silt loam, 5 to 20 percent slopes. t Freeman silt loam, 5 to 20 percent slopes, severely eroded. percent Freeman silt loam, 20 to 30 pc slopes, severely eroded. Fresh water marsh. Garfield silty clay loam, 0 to 30 percent slopes, severely eroded. Garrison gravelly loam, 0 to 5 percent slopes. Garrison gravelly loam, 5 to 20 percent slopes. GmB Garrison very gravelly loath, 0 to f percent slopes. GnB Garrison very stony loam, 0 to 21 percent slopes. GpA Clenrose silt loam, 0 to 5 percent slop percent ilt 0 GpB GpC GClenrose lcnrose s percer loam, 20 to GpD slopes. Glenrose silt loam, 30 to 55 percer :duper. SOIL SURVEY TABLE 6.-Brief descriptions of soils and their Description of soil and site ,imilar to Dragoon silt loam, 0 to 30 percent slopes, except that the surface layer is stony. Dragoon part similar to Dragoon silt loam, 0 to 30 percent slopes, except that depth to bed- rock ranges from 10 to 20 inches. Rock out- crop included in this complex. Medium-textured, well-drained soil formed from glacial till containing a large amount ofn vol- canic ash in the surface layer; by gravel at depth of 30 to 60 inches; occupies undulating, morainclike topography. Similar to Eloika silt loam, 0 to 20 percent slopes, except that they are very stony throughout. Medium-textured, somewhat poorly drained, alkaline soil formed in alluvium from calca h eous silt volcanic ash, and diatonite; de to water'table fluctuates from near the surface to -about 6 feet. Very deep, moderately well drained upland soils with medium-textured surface layer and medi- um or moderately fine textured subsoil; formed from silt on rolling to hilly uplands. Shallow, swampy, intermittent ponds and fringes around lakes that have a fluctuating water table. Fngincering data is not given, as land type is too variable. Very deep, well-dmined soil developed in loess on ridgetops and kno s soil the oiling to hilly uplands in the Palouse area. Gravelly, medium-textured, somewhat exces- sively drained soils formed in gravelly glacial outwash material from a variety of acid, igneous parent rock; on nearly level to mod- onest rangesmixture erately Rloping ndrrcobtil c tdept from and sand, gravel, 2,4 to 5 feet. Similar to Garrison gravelly loam, except tha the surface layer is very gravelly. Similar to Garrison gravelly loam, except thn the surface layer is very stony. Very deep, medium-textured, well-drained soil formed from acid igneous glacial till; surfac t layer influenced by logs and volcanic ash; o gently rolling to step uplands. t classification Depth from surface USDA texture I rt. 0 to 24 Silt loam 24 to 44 Gravelly loam-_-_-__ 44 to 53 Very gravelly sandy loam. 53 to 60 Gravel------------- 0 to 2G Silt loam----------- 26 to 41 Very fine sandy loam. 41 to 60 Sandy clay loam - - - - 0 to 22 Silt loam 22 to 72 Silty clay loam------ 0 to g Silty clay loam----- y 23 to 60 loam----- Silty cla 0 to 15 Gravelly loans------ 15 to 44 Vcry gi6elly 10am- , 44 to 60 Sand, gravel, and cobblestones. t 0 to 15 Very gravelly loam- 15 to 44 loam. Very gr y 44 to 60 nd a avell Sand, gravel# and co t y 0 72 . Silt loam c tt V V m t C Y E 0 Y _Y 9 Y C Y V Y Vl C O w V C U 0 N i w w • 00 o= w N ~ E rn~ c $ V O O. j u v x • t . O O m C ~ C ,c M i V E~ c c Q! C 61 C ' A n A Z C N Ull _ L_ N C ~ O G O L N W G O u C O u d N Q! L ~ ~ Y. ~ v ~ a C ~ m C a I-ep t) C) ~ L,, UCGA I r1 ~l4 r- l4 S, c / 3 T 25 N R44 0 F% SAO -OUNTY, WASHINGTON - SHEET NUMBER 67 - ~v _ 1 1 Mile Scale 1:20 000 O 5000 feel J JVL/IC 1-- 1f- (loins sheet 76) S P O K A N E OFFICE OF THE COUNTY ENGINEER. • Ronald C. Hormann, P.E., County Engineer 20 April 93 Gene Fisher, P.E. N. 3422 Kenney Road Otis Orchards, WA 99027 'C O U N T Y A DIVISION OF THE PUBLIC WORKS DEPARTMENT Dennis M. Scott, P.E., Director SUBJECT: Soils Testing Requirements P1667 - Lennox Subdivision Dear Mr. Fisher: Additional information with respect to the subsurface soils conditions on this project is required to complete the plans review process. Specifically, representative values for soil percolation rates and soil-subgrade "R"values are necessary to evaluate the proposed storm drainage disposal system and road pavement section. The Spokane County Materials Laboratory has reviewed the proposed development plan,, and has determined that a minimum of 1 Stabilometer "R" value tests is required. The information may be supplied by any qualified soils firm. The tests and methods must meet Spokane County standards, and be inspected by Spokane County personnel. Spokane County (Mr. Jim Radke; 456-3600, ext. 436) should be notified at least 24 hours in advance of all sampling and testing. Please call me at 456-3600 if you should have any questions. Sincerely, Edward J. Parry, Jr., P.E. Plan Review Engineer cc: Project file W.1026 Broadway Ave. Spokane, WA 99260-0170 (509) 456-3600 TAX (509) 456-4715 "-L- P`"4J 7- ~A.S~~J ~ •r'r r v • I /k R- C- A... 3(p i0.83 A, c- . ykp-IEA- I~AtZ.D ~vI:. A 6 :5-0 ` I SZ7 ~a c . Ll 4133 C h. = 5~ 2-1 0, ~ov .4 G5~ ~ On- s 3J V h y Q 7o.3L d ;)0 .3~. ~.17~ a 3 2~2 X68 co /6~.•~~ r'lio-~ plL 5'cl V--L- .1-3. m i Tc- off- O a..b -j'i. / LA 1 ,o,0+ rVrj-l / 9 - 10 17 ~5 L. 2Q 3 "D L LZ M 1 t y 1 fr L Wig a -A, LENO- `,c B A.S \ k 11 BOUSTRINC MF1'11OD DETENTION BASIN UE.SICN Time laccemetit (mill) S 'time of Concentration (min) Outflow (c.f.s.) I.t Ntti~''' ~ J Ueslkn year flow (yr.) IO Area (acres) •%J Developed "C" factor O , 4o Area x "C" • 337- U1 p2 t 13 T1me- Inc. Time Inc. Intensity (min.) (sec.) (in:/hr. ) (A1 * 60) • J • • V IO 600 2.24 15 900 1 *707 14 U5 #6 Q dev. V in V out (c.f.s.) (Cu. ft.) (cu. ft.) (AAC*#3) (see below) (uutf1Uw*U2) 7 y 5 c~ 8 ~ `c U G3c. 21(. r U 7• - StoraBc (cu. ft.) -(O5-U6) -f,-1 b- M i\Y, 20 c L 1200 ~o 9 L o 0,0;- s G :,3 Jr- 1500 1.21 L-30 1800 J 1.04 J 35 L QL__j .91 c n 40 2'00 .82 L 45 2700 .74 J 50 3000- • 8 - ~ I 55 1 3300 .6 4 II ~ ~ 60 R, .()o .61 - 65 3900 .60 70 4 200 . S8 . 75 4500 S6 80 4800 S3 L_85 5100 .52 90__j 54()0 .50 95 5100 .~9 I~~u I 600'0 J .48 1 n " 1.34 " Q dev * t for t < Tc Vin tQ dev t,+ C.34 * Q dev * Tc, for_. t > Tc f ~ 306/6 Ow LIE rl) tJ C3 ;5 4-\, s l 1-,,) 'C-V C~ 1 4 G 1oVI sw- F. = 3 = •4~ C - 0 y-o ~ J i _L ( L V-~ ~ . t. - C, 'lam 'v V X31 ,17 ..c- 1•`~b~~' p~(L s S T 110' '0 A ,~S • sa, 3LI C 7_,) ~p 'IA L. 1 . r l177~~ • ~1 L, C 1J 1J 0 aP, -se~ Sr ~A- ErC~H ~S c F so~ .5 If. lve r ~'NOc.tyK ✓olu i 3 5a 54.83 s~ 4. CL 1 n •?3 1*4 6 v--t.~ . - ~1►;~ s~"a fem. o ~ r2~ D 4%0 c~o 3S9 . 0 . AWN al - t I uuus'rh INC: ; IFTiiuo DETENTION BASIN UE:S [ CN j? Time bicrer,c„t (mill) 'rime of Culic:entratlon 5 ' (min) Outfluw (c,f.s.) Design year flow (yr.) Area (acres) (07 Oevelo ed Area x "C•' P ..C'. factor 0.40 U1 ~z t 1.3 - Time Inc. Time Inc, Intensity t<4 US t16 (min.) (sec.) (in:/hr.) (cQ dev. .f .s.) y In v out . (A1 * 6U (Cu. ft.) (AACA0 (see b 1 (cu. Et.) ~ r 07: Storage (cu. ft.) 7 5 c uwj (uutfluu*U2) ) (05_ 16 00 2.24 O ~ n (o Z t Z 15 ' 900 1,71 . 4;° 1~? Zqa L MAx 20 1200 1 45 5 ~q Z-7 u Z3~. . 25 1500 1.21 ° % ~o Y o 30 1800 • 3z _ --4 C 5 35 2 100 1 .04 I • Z8 l Gp 2'00 sz - I 45 2700 .74 ' 50 I 30c)0 fib , j s s 330 . 4 6E1 3600 .61 6s 3900 .60 10 4 200 .58 75 4500 .56 I 80 4800 .53 8 5 S l 00 .52 IL 90 5400 .50 9 5 5100 .G9 I ~lU 6000 .4 8 Vln Vin - 1.3, * - Q dev dev Q t * t)+(.34 for t < Tc d * . ~ Q ev Tc fo r ..t~ Tc . 306/6 . ow L FIELD INFORMATION OFFICE CALCULATIONS AND DESIGN Sta Elev. EP LIST FROM DIST Min curb elev Max curb eLev to from ~ 4.5 slope elev 2% , EP EP to *rom EP + slope from C- rc.e curb ht EP + curb ht d-ro v 2°►.5K 2ft.38 + 11 .34 4- 3 8 -?5 Z 01 .5 -7 19 -3.5 ~ ~ ~ 9 tig . 4 4 Zq , b~ 4- so 2 9,S ro z9.3 4 I I Zq . 3 2°l , c, +75 Z9,~1 25.41 W ~ Z `1 'SO 'L°1•~3 4-00 2.1 .G` Zg,SZ 1 11 ~ ~ 2°~-~E 4- 9.48 tl 2g.5~ 2°x.80 +So ~ Z9 .G6 Zq.51 11 • z5 S~f I 1 I 9 25.4 lot .11 Gv 2?,~ Slected elev grade 2.°t-44- ?^,49 2-9-57 2q, 19 3 29.121 4.5 v 3 8 4•~ti 2 . 2 .00 Z..o C.v2c~ 5 t_oQ vv 3S REVIEW COMMENTS SPOKANE COUNTY DIVISION OF ENGINEERING & ROADS 1026 W BROADWAY, SPOKANE WA 99260-0710 PHONE (509)456-3600 FAX (509)324-3478 REVIEW 4 PROJECT P-1667 PROJECT NAME: Lennox Subdivision REVIEWER: Paul Lennemann, E.I.T DATE: 27 March 1995 These comments are to be used in conjunction with the road and drainage plan redline markups, which are attached. Address all comments by revising the plans and drainage calculations, unless otherwise noted. General Comments G1. Examiner's Planning Condition #17 reads, "Prior to approval of the road and drainage plans, you are required to coordinate with the United States Postal Service to determine the type and location of mail delivery facilities...". Provide evidence this has been accomplished and coordinate with the Planning Department. Road and Storm Plans A.~ Check the a station equation for the street intersection. Sheet 2 A p*erf As mentioned in the previous reviews, an R-value test is to be orm ed and the results provided. 2 N~o~~ iNe.~~~ 04 ~~c.1►~, Drainage Calculations AV& Provide enough spot elevations on your basin map to clearly 07dentify basins. 4.1 1 Show Tc routes on the basin map. w_ . AP&ft. Include the east half of the plat in your calculations or provide calculations which verify the reduced offsite flow. ~•Di4. Provide offsite spot elevations and include in your drainage calculations all areas which drain into the plat. 1-1411'. Review the Tc calculations in the drainage report. County computed numbers do not correspond to your values. %4b6. 1208' volumes are calculated from bo a rne a frro'the-volume APR i95 ASR t, .:6R 1 Or, REVIEW COMMENTS Page 2 of 2 27 March 1995 REVIEW # 3 PROJECT # P-1667 PROJECT NAME Lennox Subdivision along the slope perimeter. Check your calculations and verify your volumes. *7 Calculate Q for the road runoff and Q for the entire basin. Use t e larger Q for your curb cut calculations. LENNOX SUBDIVISION Located in: NW 4, SE4, Sec. 13, T25N, R44E, WM. I ND"E X 1. Summary 2. Soils Map 3. Basin 1 Drainage Calculations 4. Basin 2 Drainage Calculations 5. Broadway Curb Calculations 6. Plat Map 91 ~it~i Gam/ t~ / EXPIRES 5/12/ ? n SUMMARY SOILS: Map symbol GgA - garrison gravelly loam, 0-5 percent slopes. Gravelly, medium textured, somewhat excessivly drained soils in gravelly glacial out wash material. BASIN 1: Area = 0.83 acres. Area hard surface = .1527 AC. The west 65 feet to be graded, s = .0031 west to Lennox lane. The rear-14-0 feet to remain undisturbed. Q = .80 CF. Curb opening = ~,5 ft . "208" storage = 400 CF Type "All drywell. BASIN 2: Area = 0.67 acres. Area hard surface = 0.1978 AC. The west 65 feet to be graded, s = .0031 west to Lennox lane. The rear-160 feet to remain undisturbed. Q = 0.118 CF. Curb opening = ft. 208" storage = 3gq CF. Type "A" drywell. v 74 Map symbol DsC DsD DvD EkB EIC EID Em Fa B FaB3 FaC3 Fm SOIL SURVEY TABLE 6.-Brief descriptions of soils and their Soil name Dragoon stony silt loam, 0 to 30 percent slopes. Dragoon stony silt loam, 30 to 55 per- cent slopes. Dragoon very rocky complex, 20 to 55 percent slopes. Eloika silt loam, 0 to 20 percent slopes. Description of soil and site Similar to Dragoon silt loam, 0 to 30 percent slopes, except that the surface layer is stony. Dragoon part similar to Dragoon silt loam, 0 to 30 percent slopes, except that depth to bed- rock ranges from 10 to 20 inches. Rock out- crop included in this complex. Medium-textured, well-drained soil formed from glacial till containing a large amount of vol- canic ash in the surface layer; underlain by gravel at depth of 30 to 60 inches; occupies undulating, morainelike topography. Eloika very stony silt loam, 0 to 30 per- cent slopes. Eloika very stony silt loam, 30 to 55 percent slopes. Emdent silt loam. Freeman silt loam, 5 to 20 percent slopes. Freeman silt loam, 5 to 20 percent slopes, severely eroded. Freeman silt loam, 20 to 30 percent slopes, severely eroded. Fresh water marsh. GaC3 GgB GmB GnB GpA GpB GpC GpD Garfield silty clay loam, 0 to 30 percent slopes, severely eroded. Garrison gravelly loam, 0 to 5 percent slopes. Garnson gravelly loam, 5 to 20 percent slopes. Garrison very gravelly loam, 0 to 8 percent slopes. Garrison very stony loam, 0 to 2( percent slopes. Clenrose silt loam, 0 to 5 percent slopes Glenrose silt loam, 5 to 20 percent slopes Glenrose silt loam, 20 to 30 percen slopes. Glenrose silt loam, 30 to 55 percen slopes. Similar to Eloika silt loam, 0 to 20 percent slopes, except that they.are very stony throughout. Medium-textured, somewhat poorly drained, alkaline soil formed in alluvium from calcar- eous silt, volcanic ash, and diatonite; depth to water table fluctuates from near the surface to about 6 feet. . Very deep, moderately well drained upland soils with medium-textured surface layer and medi- um or moderately fine textured subsoil; formed from silt on rolling to hilly uplands. Shallow, swampy, intermittent ponds and fringes around lakes that have a fluctuating water table. Engineering data is not given, as land type is too variable. Very deep, well-drained soil developed in loess on ridgetops and knobs on the rolling to hilly uplands in the Palouse soil area. Gravelly, medium-textured, somewhat exces- sively drained soils formed in gravelly glacial out%vash material from a variety of acid, igneous parent rock; on nearly level to mod- erately sloping terraces; depth to mixture of sand, gravel, and cobblestones ranges from 234 to 5 feet. Similar to Garrison gravelly loam, except that the surface layer is very gravelly. Similar to Garrison gravelly loam, except that the surface layer is very stony. Very deep, medium-textured, well-drained soil: formed from acid igneous glacial till; surfac( layer influenced by loess and volcanic ash; of gently rolling to steep uplands. Classification Depth from surface USDA texture in. 0 to 24 24 to 44 44 to 53 53 to 60 0 to 26 26 to 41 41 to 60 0 to 22 22 to 72 0to8 8to23 23 to 60 0to15 15 to 44 44 to 60 0 to 15 15 to 44 44 to 60 0to72 Silt loam Gravelly loam Very gravelly sandy loam. Gravel_____________ Silt loam Very fine sandy loam. Sandy clay loam---- Silt loam Silty clay loam------ silty clay loam----_. Silty clay--------- Silty clay loam----- Gravelly loam Very gravelly loam- Sand, gravel, and cobblestones. Very gravelly loam- Very gravelly loam- Sand, gravel, and cobblestones. Silt loam f r~ LE nb 0 0-4- I &k. S I h7 Z 54. S) t~j -f 9-3 kc- tea. f~3 = 5, 2.t = m,~- fl 40 "I ~ Ioaj . o 35 d = :13S Q = a c. ~ 5 . IIA j rj- 7c- r Tc 'IV r lip SQ L` O-L S a 55 -3 L ti 16 _p - S S~ LLZ - . L Sc-~ ~ =Lam. ~ ~ • .a- t ~ ~ ~ ~ - '~m ~ t-i / S. Al (9 1 )~omva=l BO WS'rR [J~~' rjr7 I1'!it)D DETENTLON BAS 114 DFS tCif Time lncrenent (min) TimC of Concentration 5 Outflow (c.f.s.) Design year flow ? Area (acres) ` Area x "C" Developed "C" factor 0,4-o ' ,AW U1 02 t 1.3 Time Inc. ir4 4'5 Time Inc. Intensity Q dev. V In U6 trr T-- (min.) • (sec.) (in:/hr,) - V out Storage arm (A1 60) (C.f.S.) (cu. ft.) (cu. ft.) (cu. ft.) _ (sce below) (outflo *U2) (05-f16) 10 600 3 R 2.24 57 58. o S M 15- 900 ! ~v vJ 1.77 (37 20 1200 1 .45 s.15 ` 25 1500 1.21 x(02 3GvOZ 30 1800 1.04 I 4 s 35 2[00 .91 40 2 .8 j__ @ 8 45 2740 .74 I I SO 3000- . 68 . ~ 1 SS 33(?0- '64 I 6~) 3600• .61 I 5__L' 3900 .50 70 4200 .58 7s 4500 1 ,Aw .56 $0 4800 .53 'wow $ 5 5100 .52 2 ink 90 S4()0 .50 9 S L_j 5100 .49 6060 .48 Vin - 1.34 Q dev * t for t < Tc Vin -(Q dev * C)+(.34 * Q dev * Tc) for-,t > Tc J 306/6 -r\- L,E1,0 Ko 0-~ .3Ns~v,) 4 k A- C- 6 01 A c- 0.4-0 v 'V ,t~vi► Y G ~tuL 0 7L ~y Tll 57 5 - ,pit. ~ _ ~33•~ Y = _ -TQ - 1•~q ~~S A •3q 4-1 s '-Ib 'IA OK- d ~ , i Z- -N►Ao~r, 1 5t,s ",3 M. i Q, 1 ,57 ~~S d 0 .✓W'~~~ rim-..J..•~ , 5 + f Z Y\ C,\-1 9 L`` l C- i= Iso~ , rg do 1 a.. - h 3 PAC,-, - ~fo --CAS 14-4 \ - - Z~ s : t~ r•~ 0 to ' f '30wS'rx[NG I-IFT110D J DETEt1T[Uu BASJU DESIGN Time Increment (miff) Timc of Concentcatlon 5 (min) 7.S ►~"J.. Outflow (c.E.s.) Design year flow (yr.) Area (acres) (07 De elo ecl Area x P ••C.• factor. D. 0 al o2 t 13 Time Inc.4 ~S t16 Time Inc. Intensity Q dev. U7 - i (min.) V in V (sec.) (in:/hr.) out (c.E.s.) (cu. ft. Storage (A1 * 60) * ) (cu. ft.) (cu. f (A C 03) (see below (outfloc~ U2) US-p IO 600 2.24 . o ° Z 2 4S~ t~ x.8.5. 15 900 v 1.77 20 1200 1 . G S ¢q 5 Z-7 Z-25 39 Lg 3 ~o u,8 25 1500 1.21 - Z. sZq 450 30 1800 1.04 I , Z 8 5 `t',. 7q 35 2100 I .91 40 q!'00 .82 I ` 45 2700 .74 50 3r)c)0 68 IL 55 3300 .6 4 6q 3600 .61 I I 6S 3900 .60 I 70 42 0 0 . 58 75 4500 ' ,S6 80 4800 .53 ,.,,saw 85 5100 .52 90 5400 SO 95 5100 .49 I ~lU 6000 Vin 1-34 * dev - Q c for c < Tc Vin - (Q dev * t)+(.34 * Q dev * Tc for..•t > Tc . 306/6 fir M t~ x J` ?W law, FIELD INFORMATTON _ OFFI C 17 CALCULATIONS AND DESIGN _ #1 11 ~ 113 #4 11 I if 8 - ~l YIMufl1 MAXIMUM E.P. nI ST. FROM Ul ST. ':,lilt I•: 'FV. (:Intl; I:I,F,V. SFLECTE D % GRAM". STA. ELEV. ELEV. Z; to E. 1'. FROM E. 11 . _),z `LOPE' (2% SLOPE ELLV. TO CURB F110+1E E. P. + FROM I:. P. + CURL' )IEIGHT) CURB HEIGHT) (t,~ v 6400 21.39 09,15 t1 9 7.9.-i, 5. -L 47 78.E S 4.S 38 ~s Z~ .35 25,n9 1 \ ZIC7 ¢1 Z5.3~ 2. •7 8 Z~ 3~ Zq.14 1~ °1 29.23 Zg.4e Zc,,r; 3.08 ~+5o • 23 2 ~ ZEE. 3~ z~. s5 z°► .4i 3.4~ 41 . 2°t . 3 7 Z~1 • I✓ 0 z.~ .fie .3 8 +ov 2q.4~ Zq •3 -5 3 z t - ~ 29,3"] .~.so 2q,.o Z5.2~ t~ 2~i.3► Z~t.~o Z~.L3 ?A 63 2.0 bQ-%\-J\I( GI023S I L-IiEp3qo~C S\1I~