Loading...
2010, 01-28 Permit App: 10000161 DuplexProject Number: 10000161 Inv: I Application Date: 1/28/2010 Page 1 of 3 THIS IS NOT A PERMIT Penalties will be assessed for commencing work without a permit Parcel Number: 45211.0908 Block: Lot: SiteAddress: 310 S UNION RD Owner: Name: CHUBENKO, NIKOLAY & TATYA Address: 9922 E 9TH AVE Location:: CSV SPOKANE VALLEY, WA 99206 Zoning: CMU Corridor Mixed Use Dist Water District: 011 MODERN Hold: ❑ Area: 6,750 Sq Ft Width: 0 Depth: 0 Right Of Way (ft): 0 Nbr of Bldgs: 0 Nbr of Dwellings: 0 Review Information::„,;,....... . �:,. ,... ..: Review Building Plan Review Released By: Originally Released: 1/27/2010 By: tmelbourn Landuse/Zoning/HE Conditions Released By: Project site is w/in SARP area and is conditioned to insure that SARP conditions are met. Originally Released: 1/28/2010 By: lbarlow Sewer Review Released By: Originally Released: 1/20/2010 By: jdavis Permits:'TZMAN',,,,, Operator: JD Printed By: jmm Print Date: 1/28/2010 Project Number: 10000161 Inv: I Application Date: 1/28/2010 Page 2 of 3 THIS IS NOT A PERMIT Penalties will be assessed for commencing work without a permit Building Permit Contractor: OWNER Firm: OWNER Phone: (000)000-0000 This Application: Total Project: Description Grp Tvve Notes Sa Ft Valuation Sq Ft Valuation 1&2 FAMILY R-3 VB RESIDENTI 1,170 $115,771.50 1,170 $115,771.50 AL 2ND FLOOR R-3 VB COV DECK R-3 VB GAR WOOD U-1 VB Item Description RESIDENTIAL PERMIT FEE WSBCC SURCHARGE SF PLNS RVW < 7999 SQ FT 1,731 $128,457.51 1,731 $128,457.51 16 $240.00 599 $11,381.00 3,516 $255,850.01 Fee Amount $1,867.35 $4.50 $746.94 $2,618.79 Operator: JD Printed By: jmm Print Date: 1/28/2010 16 $240.00 599 $11,381.00 Totals: 3,516 $255,850.01 Units Unit Desc 1 SELECT 1 SELECT 1 SELECT Permit Total Fees: 1,731 $128,457.51 16 $240.00 599 $11,381.00 3,516 $255,850.01 Fee Amount $1,867.35 $4.50 $746.94 $2,618.79 Operator: JD Printed By: jmm Print Date: 1/28/2010 Project Number: 10000161 Inv: 1 Application Date: 1/28/2010 Page 3 of 3 THIS IS NOT A PERMIT Penalties will be assessed for commencing work without a permit Notes: �. Fire Department approval of road/driveway access is required prior to commencement of any combustible construction. Failure to comply will result in a stop work order and removal of any combustible construction. The grass area proposed on the site plan in the front yard setback satisfies SARP 2.2.6.5 to landscape the front setback area. Therefore landscaping must be complete prior to issuance of certificate of occupancy by either placing sod, or hydro seeding. SARP 2.2.6.5 also requires the addition of at least one large tree within the front yard setback. A minimum of one shade tree shall be planted in the setback area. The tree shall not be less than 2" caliper at the time of planting. The pathway connecting the door to the driveway shall be a minimum of 5' wide pursuant to SARP 2.3.2.3.c.. Private open space shall be provided as a concrete patio placed at the rear of the unit and shall be constructed as proposed (15' W X 10' Deep). SARP 2.4.2 requires a minimum of 1 parking space /2 br + units. The hardpaved parking area proposed is adequate. In order to satisfy the SARP 2.5.4.c of 20% glazing of the streetwall area, the windows on the second floor shall be increased in size to 5'X5' as indicated on sheet 3 of 6 - Second Floor Plans. The garage door shall be essentially as shown on sheet 1 of 6 — Exterior elevations with not less than 6.5 sq. ft. of windows on each door to satisfy the 20% glazing requirements per SARP 2.5.4.c A top element shall be required at the top of the uppermost floor of the streetwall and sidewalls of the structure. The top element shall be as shown on the detail submitted 1/26/10 A final inspection by Planning shall be conducted prior to issuance of certificate of occupancy from the Building Division. The garage is acceptable as proposed due to the ambiguity of the SARP code and the connection of the building to public streets. This issue is currently being reviewe4d by staff for future implementation. FENCING & LANDSCAPING TO BE INSTALLED PRIOR TO FINAL INSPECTION FOR SHP-28- 05--MH Payment Summary Permit Type Fee Amount Invoice Amount Amount Paid Amount Owing Building Permit $2,618.79 $2,618.79 $55.70 $2,563.09 $2,618.79 $2,618.79 $55.70 $2,563.09 Disclaimer. Submittal of this application certifies the owner (or person(s) authorized by the owner) has both examined and finds the information contained within to be true and correct, and agrees that all provisions of laws and/or regulations governing this type of work will be complied with. Subsequent issuance of a permit shall not be construed to be a permit for, or an approval of, any violation of any of the provisions of the code or of any other state or local laws or ordinances. Signature: Operator: JD Printed By: jmm Print Date: 1/28/2010 S06I ane jValley* Community Development Permit Center 11703 E Sprague Ave, Suite B-3 Spokane Valley, WA 99206 (509)688-0036 FAX: (509)688-0037 www.Mokanevalley.org PERMIT NUMBER: PERMIT FEE: Residential Construction ❑ New Construction ❑ Accessory Bldg Permit Application ❑ Addition/Remodel ❑ Deck ❑ Other: SITE ADDRESS: 3 / d 3 / Z S , 46? /'62.,L/ )� C/ ASSESSORS PARCEL NO: q S Z//° 0 yD L LEGAL DESCRIPTION: Building Owner: Name: ?�/K�Ly C'hu����'/7•� G Address`: 7-2- City: �6�KlanE' LLQ'"" State: GViJ Zip'�%li�� Phone-(-S, Fax: Contact Person Name: 1,/ . ULl-7 Phone: 2-) Describe the scope of work in detail: Contractor: Name: d 14/ 1 l Address: City: State: Zip: Phone: Fax: Contractor Lic No: Exp Date: Fi7`Bus—iness Lic. No: v�- Cost of Project: $ Proposed Use:-�> **************ThP fnnnwiing MTTRT he complete: (write N/A if not applicable)********************** ---- ------ HEIGHT TO PEAK: •• -- -- - -- -- - - - DIMENSIONS: # OF STORIES: TOTAL BAABITABLE SPACE: MAIN FLOOR TO SQ. 2 FLOOR SQ. FTG: UNFIN BASEMENT SQ. FTG: IMPERVIOUS SURFACE FTG: //70 1-731 ,731 AREA: FINISHED BASEMENT GARAGE SQ. FTG: DEC V. PAT19 SQ. FTG: 30% SLOPES ON SQ. FTG: ��J r 6 -,- PROPERTY: # OF BEDROOMS: CONSTRUCTION TYPE: HEA CE: SEWER OR SEPTIC? The permitee verifies, acknowledges and agrees by their signature that: 1) If this permit is for construction of or on a dwelling, the dwelling is/will be served by potable water. 2) Ownership of this City of Spokane Valley Permit inure to the property owner. 3) The signatory is the property owner or has permission to represent the property owner in this transaction. 4) All construction is to be done in full compliance with the City of Spokane Valley Development Code. Referenced codes are available for review at the City of Spokane Valley Permit Center. 5) This City of Spokane Valley Permit is not a permit or approval for any violation of federal, state or local laws, codes or ordinances. 6) Plans or additional information may be required to be submitted, and subsequently approved before this application can be processed. SIGNATURE: Method of Paymen .� ❑ Cash ❑ Check Bankcard #: Authorized Signature: REVISED 2/15/07 DATE: ❑ Mastercard ❑ VISA Expires: VIN#: RESIDENTIAL CHECK LIST DIRECTIONS: Place a check mark in box next to each document required for complete submittal. ❑ SITE PLAN ❑ Property lines and dimensions ❑ Setbacks to property lines ❑ Direction arrow pointing North and orientation to streets ❑ Distance between buildings ❑ Proposed/existing buildings (footprint and dimensions) ❑ Right of way/easement location & sizes ❑ Utilities, septic tank/drain field locations and distances ❑ Driveway approach size and location BUILDING PLANS (3 SETS) (minimum 1/8 inch scale or completely dimensioned) ❑ Elevations (Front/Rear/Sides) with roof peak and wall height including basement: ❑ Foundation Plan (crawlspace, basement or slab on grade): ❑ Footing sizes and locations ❑ Supporting wood cripple walls or beams ❑ Perimeter concrete foundation wall sizes ❑ Thickened concrete pads supporting ❑ Crawlspace ventilation beams or girder trusses ❑ Floor Plan of each level (finished or unfinished) with dimensions: ❑ Floor Joist direction, size and spacing ❑ Window and door location and sizes ❑ Header, beam or concrete lintel sizes ❑ Window well locations if applicable ❑ Brace wall panel locations ❑ Room usage labels ❑ Water heater and furnace locations ❑ Smoke detector locations ❑ Exhaust fan locations ❑ Attic and crawl space access locations ❑ Deck or concrete patio sizes and locations ❑ Fire Wall construction ❑ Roof Plan: ❑ Engineered truss direction and spacing ❑ Rafter and over frame direction, size and spacing ❑ Wall Section Detail including: Roof ❑ Slope/ roofing material/ underlayment/ ice dam protection ❑ Sheathing size and type Ceiling ❑ Joist size and spacing Wall ❑ Height/ top plate/ stud size and spacing/ sole plate ❑ Exterior sheathing size and type Floor ❑ Joist size and spacing Foundation Wall ❑ Concrete or Masonry unit width ❑ Earth to wood separation distance Footing ❑ Size Radon ❑ Passive system with Emil vapor barrier Miscellaneous Construction Details ❑ Deck: ❑ Floor plan/ side view/ dimensions ❑ Floor Joist/ decking direction, size and spacing ❑ Ridge, eave and valley lines ❑ Beam and girder size and location ❑ Truss or rafter size, spacing & connection ❑ Attic insulation/ air space baffle/ ventilation ❑ Size of ceiling gypsum wall board ❑ Siding/ exterior house wrap/ anchor bolts ❑ Insulation, vapor barrier, gypsum wall board ❑ Sheathing or concrete floor size/ insulation ❑ Footing bottom to finished ground level depth ❑ Horizontal & vertical reinforcement if any ❑ Reinforcement if any ❑ Active system with 6 mil vapor barrier ❑ Footings/ post/ and beam size and locations ❑ Stairway tread rise & run and nosing ❑ Handrail / Guard height & spacing SPomiq Cou'uy SPOKANE COUNTY DEPARTMENT OF BUILDING & PLANNING 1026 WEST BROADWAY AVENUE • SPOKANE, WA 99260-0050 Site Information Project Information Site Address: 310 S UNION RD Project Number: 10000186 Inv: 1 Issue Date: 1/19/2010 Permit Use: SEWER CONNECTION Parcel Number: 45211.0905PTN Subdivision: CITY OF SPOKANE VALLEY Block: Lot: Zoning: UNK Unknown Owner: CHUBENKO, NIKOLAY Address: 310 S UNION RD SPOKANE VALLEY, WA 99206 Building Inspector: None Water Dist: Applicant: CHUBENKO, NIKOLAY 310 S UNION RD SPOKANE VALLEY, WA 99206 Phone: (509) 251-1750 Contact: CHUBENKO, NIKOLAY 310 S UNION RD SPOKANE VALLEY, WA 99206 Phone: (509) 251-1750 Setbacks - Front: Left: Right: Rear: Permits Group Name: Project Name: Sewer Connection Permit Contractor: A K CONSTRUCTION & EXCAVTN LLC License #: KCONSCE920J4 PROCESSING FEE $15.00 S1 SEWER CONNECTION Total Permit Fee: $125.00 $140.00 **FOR SEWER INSPECTIONS CALL THE UTILITIES DEPT AT (509) 477-3604 FROM 8:30-5:00 MONDAY -FRIDAY PRIOR TO COVER. ONE WORKING DAY NOTICE REQUIRED. PERMIT ALLOWS FOR A 30 -MINUTE INSPECTION. ADDITIONAL INSPECTION FEES APPLY AFTER 30 MINUTES. **CALL 1-800-424-5555 BEFORE YOU DIG --AT LEAST 2 WORKING DAYS IN ADVANCE. SPOKANE COUNTY CODE REQUIRES THE INSTALLER COMPLY WITH ALL REQUIREMENTS OF THE WA STATE DEPT OF LABOR & INDUSTRIES, INCLUDING THOSE RELATED TO TRENCH SAFETY. **INSTALLER IS RESPONSIBLE TO INSURE ALL WASTEWATER DRAINS ARE CONNECTED TO THE SEWER AND MAY BE REQUIRED TO PERFORM TESTS FOR VERIFICATION. INSTALLER IS TO FIELD LOCATE AND CONFIRM THE ELEVATION AND POSITION OF SEWER STUB PRIOR TO ANY OTHER EXCAVATION. **SEWER STUBS ARE TO BE CHECKED PRIOR TO CONNECTION TO ENSURE THAT THEY HAVE ACCEPTABLE GRADE AND ARE CLEAR AND UNOBSTRUCTED TO THE MAIN. SEWER LINES SHOULD BE CONSTRUCTED TO ALLOW FOR GRAVITY FLOW FROM THE LOWEST LEVEL OF THE STRUCTURE. **THE INSTALLER AND THIS PERMIT MUST BE PRESENT AT THE JOB SITE AT THE SCHEDULED INSPECTION TIME. BOTH STATE LAW RCW 19.122 AND COUNTY CODE REQUIRES THE INSTALLER TO GIVE NOTICE OF EXCAVATION TO OWNERS OF UNDERGROUND FACILITIES. Total Fees AmountPaid AmountOwinE $140.00 $140.00 $0.00 Payment Summary Tran Date Receipt # Payment Amt 1/19/2010 155 $140.00 Processed By: CUMMINGS, KATHY PERMIT Printed By: Force, Faith Page 1 of 1 NOTICE It is the responsibility of the applicant/permittee to see to it that the use described on the front of this permit complies with applicable codes and requirements and that required inspections are requested. Failure to request inspections as listed below and obtain the necessary approvals before progressing beyond the point where inspections are required may necessitate removal of certain parts of the construction at the applicant's/permittee's or property owner's expense. At a minimum, the following inspections ARE REQUIRED by County Code: 1. FOOTING - all structures, including manufactured homes when forms and reinforcement are in place and prior to placement of concrete. NOTE: This inspection includes review of the structure's setbacks from property lines. Minimum setbacks are established by County zoning regulations. Front, flanking, side and rear yard setbacks are measured from property lines. Curb lines and fence lines are not necessarily indicative of property lines. In some residential areas, the County can own as much as 20 feet of right-of-way between your property and the actual improved street/ curb. The responsibility to comply with applicable setback provisions lies solely with the permittee—neither Spokane County nor its authorized representatives assume any responsibility for the verification or location of your property lines. Please verify their location prior to locating your structure. Failure to properly locate the structure may require its relocation at the owner's/permittee's expense. 2. FOUNDATION - when forms and reinforcement are in place and prior to placement of concrete. 3. FRAMING - after all framing, bracing and blocking is in place, plumbing, mechanical rough -in inspections have been approved, and prior to concealing. 4. INSULATION - prior to the installation of drywall. 5. PLUMBING - after rough -in, before covering, and final. 6. MECHANICAL - rough -in of piping, before covering, metal chimneys before concealment, and final. 7. FINAL - all permits - when complete when complete and prior to occupancy and/or use. Please provide 24 hours notice. NOTE: In addition to inspection of the structure, this inspection includes review of site improvements (typically depicted on the approved site plan) required by ordinance or as a condition of approval of this permit. Items such as the installation of fire hydrants, fire department access, on-site drainage ('208 swales"), road improvements, parking, and landscaping are common requirements of a permit/site plan which must be completed prior to final approval of a building or issuance of a Certificate of Occupancy. 8. MANUFACTURED HOMES - foundation inspections prior to pouring pads, inspection of Blocking/Tie-downs, when completed per manufacturers installation instructions. Final Inspection approval prior to occupancy: stairs, handrails, skirting, etc., installations completed WAINSTag(s) must be affixed to the home, completed inspection record card and manufacturer's installation instructions must be available on site. 9. SEWERS - prior to cover 10. RIGHT-OF-WAY/APPROACH - prior to placement of concrete, or, if gravel approach, after completion. In addition to the above, any plumbing or mechanical systems or material which would be concealed by framing, drywall, concrete, etc., must be inspected prior to cover. Check with the department for "special inspections" in conjunction with commercial projects. FOR INSPECTIONS: TO INSURE PROMPT SERVICE, PLEASE GIVE ONE WORKING DAY/24 HOUR NOTICE . PARTS OF YOUR PROJECT MAY REQUIRE PERMITS AND INSPECTIONS FROM MORE THAN ONE AGENCY. • Building, plumbing, mechanical and fire inspections, Department • Road cuts for utilities or driveways, Division of Engineering & of Building & Planning 477-3675 Roads - 48-HOUR NOTICE REQUIRED 477-3600 or • Construction in a flood plain, Division of Engineering & Roads 477-3600 State Department of Transportation 456-3000 • Electrical wiring, State Department of Labor and Industries 324-2640 Sewer connection, Division of Utilities 477-3604 or City Public • On-site waste disposal system, Spokane Regional Health District Works Department 625-6300 324-1560 PERMIT EXPIRATION Unless otherwise noted, building, plumbing, fire and mechanical permits will be considered null and void by limitation if the work authorized by the permit is not commenced within 180 days or is stopped for a period of 180 days, unless a written request for an extension of the permit is received and approved by the Building Department prior to expiration. At a minimum an inspection should be requested at least once every 180 days to assure the validity of the permit. Please call if you have any questions. REFUNDS All requests for building permit refunds must be made in writing by the applicant/permittee (shown on the reverse) no later than 180 days after the date of fee payment. Refunds of not more than 80% of the permit fee paid may be authorized when no work has been done under the permit. No refunds may be authorized more than 180 days after fee payment. Please contact the other agencies with respect to their refund policy on all other permit types. MISTAKE? If you think we've made an error in processing this permit or find erroneous information on the permit, please bring it to our attention immediately by filing a written request for correction within 10 working days of discovery. All such requests should be directed to the Department of Building and Planning at: Spokane County Department of Building & Planning 1026 West Broadway Avenue Spokane, WA 99260 Phone: (509) 477-3675 Fax: (509) 477-4703 TDD: (509) 477-7133 REVISED 11/08 BLDG PERMIT Frc� sen ����,� '6re-,4 "?L 07 vc s - 5r,4s5y !9 :3lda 03AOdddd 'ld3a JNINNVId J- N ra N it n000� gpd@Re ..;OOOValley® 11707 E Sprague Ave Suite 106 ♦ Spokane Valley WA 99206 509.921.1000 ♦ Fax: 509.921.1008 ♦ cityha[L@spokanevalley.org January 22, 2010 Nikolay Chubenko 9922 E 9"' Ave. Spokane Valley, WA 99206 Re: Building Permit # 1000161 and Building Permit # 10000160 Dear Mr. Chubenko, I have completed my review of the foundation only permits referenced above for the duplex units located at 306, 308, 310, and 312 S Union Road. Your project is located within the Sprague and Appleway Corridors Subarea Plan (SARP). This means that special regulations apply beyond those identified within the Municipal Code. It appears that these regulations were not considered in the design of your project. I am not able to approve the foundation only permit until the following issues have been addressed: 1. The sideyard setback in the Community Boulevard zone district is a minimum of 5' if there are no living space windows (SARP 2.1.4). Pursuant to SVMC 19.40-1 Residential zone dimensional Standards (3) setbacks, when adjacent to a private road or driveway easement, are established from the inner edges of the road or driveway, and stipulates that the minimum setback from a flanking road is 5'. The unit proposed on 306 S Union must be relocated such that it provides a 5' setback from the inner edge of the easement along the west property line. 2. Pursuant to SARP 2.5.4.l.j garage and parking structure doors for all single—car wide garage facades shall be set back a minimum of 6' behind the front wall of the primary building mass. Please revise the site plan and plans accordingly for each building permit. 3. Private open space is required at a ratio of 60 square feet / per unit, which in this case means that minimally you must provide 120 square feet of open space. Required setback areas shall not be counted towards Private Open Space Provision requirements. Private open space shall be provided in the form of yards, balconies, or patios. The minimum dimensions for private open space in any single direction shall be four (4) feet if provided as part of a porch or balcony, and eight (8) feet if provided as a deck, yard, terrace, or patio. Please indicate how this requirement will be met by identifying this on each site plan. Note the materials that are proposed, i.e. wood deck, concrete patio, grassy area, etc... (SARP 2.3.2.2.c) The following details must be met prior to receiving a building permit for construction of the duplex units. It is important that you are aware of these issues at this time, since they affect the site plan, and the structure design. 4. Front setback areas shall be landscaped with plantings along the entire property frontage, excluding hard paved driveways and shall include at least one large tree. Since this is a residential use and your entry way is considered a stoop, you must provide one of the following edge treatments (SARP 2.2.6.5). Mr. Chubenko Jan 22, 2010 Page 2 a. Fenced Edge Treatment: A Fenced edge treatment is characterized by a low decorative fence constructed at or very close to the edge of the public sidewalk (in this case 5' from the access easement). b. Terraced Edge Treatment: An edge treatment characterized by a raised, planted front yard and decorative low retaining wall at, or very close in, the edge or the public access easement. c. Flush Edge Treatment: A landscaped front yard which is built at sidewalk grade ( in this case paved access) and extends to the edge of the public sidewalk(paved access easement). Identify on each site plan the area to be landscaped, the landscaping materials to be used, and the chosen edge treatment. If the edge treatment requires fencing or retaining walls note the location and materials on the plan. Chain link fences may not be utilized in the front yard setback area. A pathway connecting the public sidewalk to the front door and to any parking areas is required. Since access to the site is via a private access easement, and a public sidewalk does not exist, a pathway shall extend from the front door to the hardpaved parking area, or may extend from the front door directly to the hard paved driveway. The pathway shall be a minimum of 5' wide. (SAPP 2.3.2.3.c) Please revise the site plan. A top element is required along the streetwall and sidewall of the building. This means that a horizontal articulation (cap) shall be applied at the top of the uppermost floor of the facade, to result in termination of the face that provides an attractive completion of the upper fagade composition. The "cap" shall be architecturally integrated with any sloped roof volume that occurs above the eave line. Please revise the building plans or provide a detail. Per 2.5.4.c Overall wall composition for streetwalls shall contain at least 20%, but not more than 80% glazing in order to provide daylight into tenant space. This does not apply to side or rear walls. Based on the dimensions provided on the elevation plans the streetwall area is 816 square feet. Twenty percent would equal 163 square feet. It appears that the window area is approximately 114 square feet. Please revise the plans to show how the minimum of 20 % glazing requirement will be met. If you have any questions, I can be reached at 720-5335. Cordially, Lori Barlow Associate Planner Community Development Department Cc: Building Department — Tom Melbourne