2012, 07-17 Permit: BLD-2012-1126 Sewer -IProject # zb
SPO NE COUNTY BUILDING AND PLANNI G RECEIVED
PERMIT JUL 1 7 2012
CSV PERMIT CENTER
Application Number: SW-12001739 Permit Issued Date:
S U B742 27)12 ri CT E V. 7 1
Expiratfon Date:
Project Description: ALTERATION TO EXISTING SEWER Primary Contact: RAY RIGGIN/HOME RUN CONSTR
Project Name: WELLESLEY MANOR Applicant: RAY RIGGIN/HOME RUN CONSTR
Permit Type: SEWER Address: 5408 N BEST RD
SPOKANE,WA 99216
Phone: 509-389-2915
Email:
SITE INFORMATION:
Site Address: 4615 N TOLFORD RD Owner: HANSEN,K A&J E
Parcel Number: 45012.1316 Address: 4615 N TOLFORD RD
SPOKANE,WA 99216-1563
Subdivision: WELLESLEY MANOR Phone:
ADDITION
Assessor's Description: NW1/4 1-25-44 WELLESLEY MANOR LT5 BLK3 Email:
ALG W/THAT PTN OF FORMER 40'ROW CANAL
IN GOV LT4 LYG NWLY OF SE LN EXTD OF LT5
BLK3 EXC THAT PTN LYG N OF FOL DESC LN:
BEG AT PT OF SWLY LN OF LT4 BLK3 OF SD W
Inspection Area:
Water District:Trentwood Fire District:Spokane Valley Fire
Irrigation District#3
Zoning: Land Area:20396 Square Feet
CONTRACTOR INFORMATION:
General Contractor
JLHAWE*222LE
J L HAWKINS EXCAVATING
9722 E NORA AVE
SPOKANE,WA 99206-0000
509-924-9025
DETAILS:
Class Type Quantity Unit Charge Value
SEWER ALTERATION TO EXISTING 1 $125.00 $125.00
$125.00
FEE DETAIL:
Processing-Utilities $25.94
Utilities Permit $125.00
Total Fee: $150.94
CONDITIONS:
Inside Public Transit Benefit Area
Date Printed:07/12/2012 10:20:10 Printed by:IIS APPPOOL\ASP.NET v4.0
f
SPOKANE COUNTY BUILDING AND PLANNING
PERMIT
Permit Issued Date:
Application Number: SW-12001739 07/12/2012
Expiration Date:
CALL 1-800-424-5555 BEFORE YOU DIG--AT LEAST 2 WORKING DAYS IN ADVANCE.SPOKANE COUNTY CODE REQUIRES THE
INSTALLER COMPLY WITH ALL REQUIREMENTS OF THE WA STATE DEPT OF LABOR&INDUSTRIES, INCLUDING THOSE
RELATED TO TRENCH SAFETY.
FOR SEWER INSPECTIONS CALL THE UTILITIES DEPT AT(509)477-3604 FROM 8:30-5:00 MONDAY-FRIDAY PRIOR TO COVER.
ONE WORKING DAY NOTICE REQUIRED.PERMIT ALLOWS FOR A 30-MINUTE INSPECTION.ADDITIONAL INSPECTION FEES
APPLY AFTER 30 MINUTES.
INSTALLER IS RESPONSIBLE TO INSURE ALL WASTEWATER DRAINS ARE CONNECTED TO THE SEWER AND MAY BE REQUIRED
TO PERFORM TESTS FOR VERIFICATION. INSTALLER IS TO FIELD LOCATE AND CONFIRM THE ELEVATION AND POSITION OF
SEWER STUB PRIOR TO ANY OTHER EXCAVATION.
SEWER STUBS AND DRY SIDE SEWERS ARE TO BE CHECKED PRIOR TO CONNECTION TO ENSURE THAT THEY HAVE
ACCEPTABLE GRADE AND ARE CLEAR AND UNOBSTRUCTED.SEWER LINES SHOULD BE CONSTRUCTED TO ALLOW FOR
GRAVITY FLOW FROM THE LOWEST LEVEL OF THE STRUCTURE.
THE INSTALLER AND THIS PERMIT MUST BE PRESENT AT THE JOB SITE AT THE SCHEDULED INSPECTION TIME.BOTH STATE
LAW RCW 19.122 AND COUNTY CODE REQUIRES THE INSTALLER TO GIVE NOTICE OF EXCAVATION TO OWNERS OF
UNDERGROUND FACILITIES.
Date Printed:07/12/2012 10:20:10 Printed by:IIS APPPOOLWSP.NET v4.0