Loading...
1990, 11-02 Professional Services Testing Reports niN +i Professional Service Industries, Inc. N Pittsburgh Testing Laboratory Division TESTEDFOR: Patterson Tool & Die PROS : Bolt Inspection N . 2921 University Road N . 2921 Univ sty Road, Spokane , WA 99206 0 ILO M - U E Fi NOV J i`'' J DATE: October 8 , 1990 OUR REPORT NO.: 726-00187-SPOKANE COUNTY Rini J I DING CODFS DEPT_ REMARKS: Bolt Inspection PSI was retained to inspect the bolted connections at the above project . All bolted connections were inspected including the connections on the existing wall . The following connections were noted as not meeting specifications : 1 . Existing wall , north connection- east side bolts are loose 2 . Center connection , east side loose bolts with bolt heads turning 3 . South connection , west side loose bolts . 4 . First line east of existing wall , south connection on west side , all bolts were loose . 5 . Back wall of new addition , 3rd from existing wall , south connection , west side has one loose bolt with head turning . All loose bolts were tensioned to 380 foot pounds . Except as noted above all connections were found to meet specifications . Due to the length of the bolts , a Skidmore-Wilhelm calibration unit could not be used . Respectfully submitted PROFESSIONAL SERVICE INDUSTRIES INC . PITTSBURGH TESTING LABORATORY DIVISION rs : jb 2-client 1-Co . Bldg Dept. PS'A 300-1 130 North Stone Street • Spokane, WA 99202 • Phone: 509/535-3571 Nei Professional Service Industries Inp. r r`711 Pittsburgh Testing Laboratory Division-6 L ,G.. REPORT OF CONCRETE COMPRESSION TEST TESTED FOR: Patterson Tool & Die PROJECT: New Addi tri R ISI)\ ( CUL-. 2) L i-�s N . 2921 University Road N . 2921 University Road Spokane , WA 99206 DATE: June 18 , 1990 OUR REPORT NO.: 726-00187-5 FIELD DATA LOCATION OF POUR: Exterior building footings DATE POURED 6-11-90 SUPPLIER Central P r e M i x TIME 3 : 30 DELIVERY TICKET NO./TRUCK NO. 29779/979 SLUMP, IN. 5 1/2" MIX NUMBER AND PROPORTIONS 1 1 1 AIR CONTENT, % 5 . 5 CEMENT AIR TEMPERATURE, °F 62 WATER CONCRETE TEMPERATURE, °F 6 0 FINE AGGREGATE DATE RECEIVED IN LAB 6-13-90 COARSE AGGREGATE FIELD DATA SUBMITTED BY PSI : r w ADMIXTURE MIX DATA SUBMITTED BY C PM COMPRESSION TEST RESULTS OBSERVATIONS SPECIMEN TEST TOTAL CYLINDER CYLINDER COMPRESSIVE LABORATORY IDENTIFICATION AGE DATE OF LOAD DIAMETER AREA STRENGTH �( Cylinders made by PSI representative. NUMBER OR SET NO. (DAYS) TEST (LBS.) (IN.) (SO.IN.) (PSI) ❑ Cylinders made by Others. 4720 1-A 7 6/18 82 , 500 6 . 0 28 . 27 2920 E Cylinders picked up by PSI representative. 2-B 28 7/9 115 ,000 6 . 0 28 . 27 4070 ❑ Cylinders delivered to PSI laboratory by others. 3-C 28 7/9 117 , 000 6 . 0 28 . 27 414 0 x Test results comply with applicable specifications. aTest results do not comply with applicable specifications. 3 O O O TYPE OF FRACTURE, IF OTHER SPECIFICATIONS 28 THAN CONICAL REMARKS: 2-client 1-Co . Bldg Dept. Respectfully submitted, Professional Service Industries,Inc. PSI A-200-4(1) 130 North Stone Street • Spokane, WA 99202 • Phone: 509/535-3571 • FAX: 509/535-1267 sib m Professional Service Industries, i10c � i 0 , fp proWit Pittsburgh Testing Laboratory Division , �f + (ri) REPORT OF CONCRETE COMPRESSION TEST TESTED FOR: Patterson Tool & Die PROJECT: New Addition '••:,(.)'-l t--:.: • N . 2921 University Road N . 2921 University Road Spokane , WA 99206 DATE: June 18 , 1990 OUR REPORT NO.: 726-00187-5 FIELD DATA LOCATION OF POUR: Exterior building footings DATE POURED 6-11-90 SUPPLIER Central P r e M i x TIME 3 : 30 DELIVERY TICKET NO./TRUCK NO. 29779/979 SLUMP, IN. 5 1/2" MIX NUMBER AND PROPORTIONS 1 1 1 AIR CONTENT, % 5 . 5 CEMENT AIR TEMPERATURE, °F 62 WATER CONCRETE TEMPERATURE, °F 6 0 FINE AGGREGATE DATE RECEIVED IN LAB 6-13-90 COARSE AGGREGATE FIELD DATA SUBMITTED BY PSI : r W ADMIXTURE MIX DATA SUBMITTED BY C P M COMPRESSION TEST RESULTS OBSERVATIONS SPECIMEN TEST TOTAL CYUNDER CYUNDER COMPRESSIVE LABORATORY IDENTIFICATION AGE DATE OF LOAD DIAMETER AREA STRENGTH ® Cylinders made by PSI representative. NUMBER OR SET NO. (DAYS) TEST (LBS.) (IN.) (SQ.IN.) (PSI) ❑ Cylinders made by Others. 4720 1-A 7 6/18 82 , 500 6 . 0 28 . 27 2920 0 Cylinders picked up by PSI representative. 2—B 28 7/9 6 . 0 28 . 27 a ic4tic dorsrs.delivered to PSI laboratory by othe 3-C 28 7/9 6 . 0 28 . 27 x0 sest.reationsomply with applicable ❑ Test results do not comply with applicable specifications. TYPE OF FRACTURE,IF OTHER SPECIFICATIONS 28 3000 THAN CONICAL REMARKS: 2-client 1-Co . Bldg Dept. • Respectfully submitted, Professional Service Industries,Inc. PSI A-200-4(1) 130 North Stone Street • Spokane, WA 99202 • Phone: 509/535-3571 • FAX: 509/535-1267 Nei Professional Service Industries, Inc. . IVi7Il Pittsburgh Testing Laboratory Division REPORT OF CONCRETE COMPRESSION TEST . TESTED FOR: Patterson Tool & Die PROJECT: New Addition N . 2921 University Road N . 2921 University Road Spokane , WA 99206 DATE: June 20 , 1990 OUR REPORT NO.: 726-00187-6 FIELD DATA LOCATION OF POUR: Pilasters on north and south sides of building DATE POURED 6-13-90 SUPPLIER Central PreMix TIME 5 : 00 DELIVERY TICKET NO./TRUCK NO. 29939/51 SLUMP, IN. 4 3/4" MIX NUMBER AND PROPORTIONS 1 1 1 AIR CONTENT, % 5 . 0 CEMENT AIR TEMPERATURE, °F 71 WATER CONCRETE TEMPERATURE, °F 65 FINE AGGREGATE DATE RECEIVED IN LAB 6-14-90 COARSE AGGREGATE FIELD DATA SUBMITTED BY PSI : rw ADMIXTURE MIX DATA SUBMITTED BY C P M COMPRESSION TEST RESULTS OBSERVATIONS SPECIMEN TEST TOTAL CYUNDER CYUNDER COMPRESSIVE LABORATORY IDENTIFICATION AGE DATE OF LOAD DIAMETER AREA STRENGTH X Cylinders made by PSI representative. NUMBER OR SET NO. (DAYS) TEST (LBS.) (IN.) (SO.IN.) (PSI) ❑ Cylinders made by Others. 4721 1-A 7 6/20 81 , 500 6 . 0 28 .27 2880 Cylinders picked up by PSI representative. 2-6 2 8 7/11 6 .0 28 . 27 ❑ bbCyly oinmdereere.delivered to PSI laboratory 3-C 28 7/11 6 . 0 28 . 27 Test resltstions.comply with applicable L� speeiflca ETest results do not comply with applicable specifications. 3 0 O O TYPE OF FRACTURE, IF OTHER SPECIFICATIONS 28 THAN CONICAL REMARKS: 2-client 1-Co . Bldg . Dept. Respectfully submitted, Professional Service Industries,Inc. PSI A-200-4(1) 130 North Stone Street • Spokane, WA 99202 • Phone: 509/535-3571 • FAX: 509/535-1267 Nt+i Professional Service Industries, Inc. 1./`7E Pittsburgh Testing Laboratory Division TESTED FOR: Patterson Tool & Die PROJECT: New Addition N . 2921 University Road Spokane, WA 99206 DATE: June 13 , 1990 OUR REPORT NO.: 726-00187- 3 REMARKS: Reinforced Concrete Inspection The reinforcing steel located in the pilasters on the north and south sides of the building were inspected according to sections 1 and 11 on A-3 and were found to be placed correctly according to plans . The contractor was informed that the debris at the bottom of the forms must be cleaned up prior to concrete placement. The contractor cleaned the forms prior to the placement. Three test cylinders were cast from Central PreMix truck #51 , ticket #29939 representing a total of 2 yards of mix #111 , 3000 psi concrete being placed in the above locations . Slump was 4 3/4" , entr . air 5 .0% . Concrete temp . was 65°F . , ambient temp . 71°F . Upon arrival of the concrete PSI observed that the slump was approximately 1/2" to 1" . Two gallons of water per yard was added on site which brought the slump up to approximately 2" . Central PreMix was contacted and asked what the maximum allowable water that could be added on site and still guarantee strength . CPM would not give a definite answer . The contractor was informed and he decided to reject the load . Respectfully submitted PROFESSIONAL SERVICE INDUSTRIES , INC . PITTSBURGH TESTING LABORATORY DIVISION rw: jb 2-client 1-Co Bldg Dept 130 North Stone Street • Spokane, WA 99202 • Phone: 509/535-3571 • FAX: 509/535-1267 PSI A-300-1 ht+i Professional Service Industries, Inc. JIJI Pittsburgh Testing Laboratory Division DAILY FIELD REPORT TESTED FOR: Patterson Tool & Die PROJECT: New Addition N . 2921 University Road Spokane , WA 99206 DATE: June 14 , 1990 OUR REPORT NO.: 726-00187- 4 WEATHER: TEMPERATURE RANGE: TO: INSPECTOR: r w TYPE OF INSPECTION BEING PERFORMED SOILS X CONCRETE FOUNDATIONS BATCH PLANT CONTROLLED FILL(COMPACTION) PLACEMENT(JOB SITE) x cylinder pickup ASPHALT OTHER BATCH PLANT PLACEMENT(JOB SITE) BRIEF RESUME OF WORK ACCOMPLISHED THIS DATE: Cylinders cast 6-13-90 were picked up and transported to the lab for curing and testing . Respectfully submitted, Professional Service Industries, Inc. 130 North Stone Street • Spokane, WA 99202 • Phone: 509/535-3571 • FAX: 509/535-1267 PSI A-300-2 h�i Professional Service Industries, In't2. i7/ Pittsburgh Testing Laboratory Division . is° J(i3G,��a3,/wry •rL) y k(-i - /0; TESTED FOR: Patterson Tool & Die PROJECT: New Addition ; fes. N . 2921 University Road N . 2921 UniversitytQdd Spokane , WA 99206 . DATE: June 1 1 , 1990 OUR REPORT NO.: 726-00187-2 REMARKS: Reinforced Concrete Inspect The reinforcing steel located in the footings was inspected according to sections 1 and 11 on A3 and notes on foundation plan AZ and was found to be placed correctly according to plans . One discrepancy was noted as the plans call for two 2 ' 6" x 2 ' 6" x 12" footing pads on the east side of the building with three #4 bars each way . The contractor has installed 4 ' x 4 ' x 12" pads with six #4 bars each way . 1 Lk ?a mR_ m4/4FAI Wptaiimp 140 z7PRgolk,erh wrfl cl1Ap4 610 sN+K1 Three test cylinders were cast from Central PreMix truck #979 , ticket #29779 representing 10 . 25 yards of mix #111 , 3000 psi concrete being placed in the above location . Slump was 5 1/2" , entr . air 5 . 5% . Concrete temp . was 60°F . , ambient temp . 62°F . Vertical wall dowels were placed at 16" on center after concrete was placed . Concrete arrived with a tested slump of 5 1/2" . Specifications call for a 3" slump . The contractor ordered a 3" slump and no water was added on site . Respectfully submitted PROFESSIONAL SERVICE INDUSTRIES , INC . PITTSBURGH TESTING LABORATORY DIVISION rw: jb 2-client 1-Co . Bldg Dept 130 North Stone Street • Spokane, WA 99202 • Phone: 509/535-3571 • FAX: 509/535-1267 PSI A-300-1