Loading...
1976, 01-26 Permit App: L2482 ResidenceCatty P of Spokane. Washjton BUILDING CODES DEPARTMENT, N. 811 JEFFERSON, SPOKANE, WASHINGTON 99201 APPLICATION FOR LAND USE OR STRUCTURE PERMIT ��ee GENERAL REQUIREMENTS PERMIT FEE.__!._�g_ PERMIT REQUIRED. A land use or structure permit is required by County Resolution to erect a building or structure of any kind or alter any building or structure already erected, or to change a land use. Construction mast conform with the Spokane County Building Code and Zoning Ordinance. Construction is subject to inspection. WATER. Water supply must be approved by the County and State Health Departments. Where work on water connections disturbs the surface, shoulders or ditches of County Roads, permission must be obtained from the County Engineer's Office. SEWAGE SYSTEM. Permits are required in all cases by County Resolutions Nos. 45-133 and 47.235. SET -BACK FROM PROPERTY LINES. In most zones and under most circumstances, a set -back from the front property line, of at least 25' is required, a 5' side yard, 15' side yard from a flanking street, and a 25' rear yard are required. STATE HIGHWAYS. Where the structure abuts a State Highway, clearance must be obtained pertaining to set -back and ingress and egress. COUNTY ROADS. Work on street right-of-way may not be performed until staked by County Road Department and work must be performed in accordance with stakes. Points of ingress and egress must be approved by the County Engineer. MOVING OF BUILDINGS. A permit is required to move an existing building. When a building is moved on a County or State Highway, clearance must be obtained from the County Engineer and/or State Highway Department. ACCESSORY BUILDINGS. Accessory buildings (garages, sheds, etc.) require a separate permit. RESTRICTIVE COVENANTS. Builders should check provisions of covenants or dedications and easements running with the land which are enforceable through civil action. County Officials can not bring action to enforce covenants or dedications. APPLICANT FILL IN BELOW THIS LINE Name of Owner A��� �l %Jl/G Addre Architect Address Engineer Address 4Contractor Address Legal Description 11 /1 of Pr 9rty (Gid complete dco�from deed s©�etc.EAS' iti l Phone Phone Phone II ♦l /t ll Phone 5 i AiTieiv - DESCRIPTION OF W017: New L� Addition Size of Lot Remodel Moving Sewage System Total Sq. Stories/I 1 Dimensions 7w kC.5:2 %/ 4j4 J 7� �� I��fr Rooms Baths IBasarrmentt e)412, Foundation/� , noHeat. Syste ,.. _ •e of Roofing-i'T17`� Use of Bldg. BId. Zone Fire Zone Const. (Fr., Conc., Br., etc.) Valuation Chimney / • Fireplaces.. (Kind) (Number Int. Wall Finish ,h4?y No. of Units JBedrb'ms Ft. Ext. Finish PLOT PLAN Draw sketch with dimensions showing: (1) property lines; (2) street or road locations; (3) location of existing and proposed buildings; (4) distance to property lines and streets; (5) dimensions of buildings; (6) location of sewage sys- tem and water supply lines. m NORTH RESIDENTIAL — COMMERCIAL I hereby ce as shown. SOUTH mation submitted.,11 correc ner or Agent A LAND USE OWSTRUCTURE PERMIT MUST BE ON T THIS IS NOT A PERMIT. L7 i( %to State License No. c , —4 i/-~ Ind. Ins. Acct. No. REQUIRED Plumbing Permir rw Heating Permit / .st f r Sewage Permit fv k fA Plans Received Plans Checked Plans Returned Plans Picked Up Plans Mailed no other structures located on this property except • Date PREMISES BEFORE CONSTRUCTION COMMENCES. DO NOT WRITE BELOW THIS LINE Your street address will be Sewage Permit Number Issued /Rt11ding PermitRearks YVP— The zone is Receipt /g / Issued Form 523 Bldg. Code At said time and place *interested person may appear *r against the granting of this application. SPOKANE COUNTY PLANNING COMMISSION TELEPHONE NO. 456-2274 ZONING ADJUSTOR TIME: Monday, Tanuary 19, 1976, 1:00 P.M. PLACE: Planning Commission Conference Room Public Works Building, N. 811 Jefferson (Across the hall from the office) VARIANC E 1. VE -4-76 , Frontage Requirement a. Location: Section 33, Township 25 N., Range 44, E.W.M. The W 353.1 ft of N 616.82 ft of S 1178.62 ft of SW 1/4. (Lot 3 of Preliminary Subdvn Pondra East Add) b. Applicant: F. V. Seipp S.717 Pines Spokane, WA 99206 c. Site Size: Approximately one acre d. Existing Zoning: Agricultural, established April 11, 1967 e. Variance requested: To allow aproposed residence on property having no frontage on a public road; whereas the Spokane County Zoning Ordinance requires 65 feet of continuous frontage on a public road. NOTE: The applicant's preliminary subidivison for the 5 acres in question Pondra East Addition, has received preliminary approval from the Board of Count' Commissionrs and upon filing of the final plat the property in question will have legal frontage on University road. The sponsor wants to start building on Lot 3 prior to filing of the final plat for Pondra East Addition. f. Application of Zoning Provision: Chapter 4.04, Section 4.04.040 NORTH SCALE I 1D0o) • V E - Liz 76 E3 M , 1 7 rv\ \NIN: 1 C Oat) Cr tLS rt CON''s •••• \ I \ farry 5-r-\ Cr% 1"0—V-C-sel 0),e004, bp, ii22o,12,6) 9 A)