Loading...
2014, 03-31 Permit: APR-2014-0005 ApproachSpokane I0Valley. City of Spokane Valley Community Development 11703 E. Sprague Ave., Suite B-3 Spokane Valley, WA 99206 (509) 720-5240 permitcenter(a�spokanevallev.orq APR -2014-0005 DE -APPROACH PROJECT NAME: STANLEY / MAHOSKY APPROACHES ISSUED: 03/31/2014 SITE ADDRESS: 4308 S UNIVERSITY RD SPOKANE VALLEY EXPIRES: PROJECT DESCRIPTION: CONSTRUCT TWO APPROACHES AT EXISTING SFR; ONE WILL INCLUDE CURB CUT PARCEL: 45324.1214 APPLICANT: Ferraro Concrete Co OWNER: STANLEY, REX /MAHOSKY, PEGGY 6663 Heron WAY NINE MILE FALLS, WA 4308 S UNIVERSITY RD 99026 SPOKANE, WA 99206 509-954-5620 GENERAL CONTRACTOR: Ferraro Concrete Co 6663 Heron WAY NINE MILE FALLS, WA 99026 509-954-5620 License: FERRACC865DR Expires: 03/19/2016 FEES: Paid Due Approach $104.00 $0.00 Totals : $104.00 $0.00 CONDITIONS * Prior to excavation, it is the Contractor?s responsibility to contact the purveyor of any transmission pipeline that is within 100? of permitted work, as per RCW 19.122.033. * 1. Approaches to be constructed pursuant to City of Spokane Valley Street Standards, Standard Plan R-112. 2. Saw cutting of existing curb to create an approach is not allowed within the City?s jurisdiction. 3. Approaches to be inspected by the City?s ROW Inspector prior to concrete placement. The ownership of a Spokane Valley Development Permit will inure to the property owner. The permit applicant, by definition, is the property owner or an authorized agent of the property owner. It is the responsibility of the applicant / permittee that the use described on the front of this permit complies with applicable codes and that required inspections are requested. Failure to request inspections as listed below and obtain the necessary approvals before progressing beyond the point where inspections are required and may necessitate removal of certain parts of the construction are the applicant's / permittee's or property owner's expense. Owner/Agent L _ Staff Approval Printed by : Bryan Happeny on: 03/31/2014 12:51 PM d� Date: 3/f 7/ J1 Date: 5/3///7 Page 1 of 1