Loading...
2014, 07-15 Permit: APR-2014-0054 Approach4 Spokane .0SValleys City of Spokane Valley Community Development 11703 E. Sprague Ave., Suite B-3 Spokane Valley, WA 99206 (509) 720-5240 permitcenter(6 spokanevalley.orq APR -2014-0054 DE -APPROACH PROJECT NAME: NEW APPROACH ISSUED: 07/15/2014 SITE ADDRESS: 6121 E VALLEYVIEW DR SPOKANE VALLEY EXPIRES: PROJECT DESCRIPTION: CONSTRUCT APPROACH IN NEW LOCATION; EXISTING CURB CUT TO REMAIN AS PED ACCESS PARCEL: 35252.1007 APPLICANT: Van Horn, John OWNER: PLATINUM REAL ESTATE HOLDINGS, LLC 1004 E Garden Avenue COEUR D ALENE, ID 9915 N AUSTIN LN 83814 SPOKANE, WA 99208 760-846-3967 GENERAL CONTRACTOR: PRO CUT CNCRT CUTTING SPOK INC P 0 Box 9284 YAKIMA, WA98908 509-484-7100 License: PROCUCC941 BL Expires: 01/30/2016 FEES: Paid Due Approach $52.00 $0.00 Totals : $52.00 $0.00 CONDITIONS * All approaches are to be inspected by the Development Engineering Inspector (John Johnson 509-599-6306) prior to placing concrete or asphalt. * Saw -cutting of existing curb in the right-of-way in order to create an approach is not allowed in Spokane Valley. * Prior to excavation, it is the Contractor responsibility to contact the purveyor of any transmission pipeline that is within 100 feet of permitted work, as per RCW 19.122.033. * Approach to be constructed per Standard Plan R-112 The ownership of a Spokane Valley Development Permit will inure to the property owner. The permit applicant, by definition, is the property owner or an authorized agent of the property owner. It is the responsibility of the applicant / permittee that the use described on the front of this permit complies with applicable codes and that required inspections are requested. Failure to request inspections as listed below and obtain the necessary approvals before progressing beyond the point where inspections are required and may necessitate removal of certain parts of the construction are the applicant's / permittee's or property owner's expense. Owner/Agent Date: t' 1 Staff Approval/ / ((J 'LC, \ Date: Printed by : Mary May on: 07/15/2014 04:35 PM Page 1 of 1 nye _'alley• 11703 E. Sprague Ave., Suite B-3 Spokane Valley, WA 99206 Receipt Number: 201402051 (509) 720-5240 permitcenter@spokanevalley.org Payer/Payee: PLATINUM REAL ESTATE HOLDINGS, LLC 9915 N AUSTIN LN SPOKANE WA99208 Cashier: CHINSHAW Payment Type: CREDIT CARD Date: 07/15/2014 APR -2014-0054 APPROACH PERMIT 6121 E VALLEYVIEW DR Fee Description Approach APR -2014-0054 TOTALS: TOTAL PAID: Printed 07/15/2014 16:35:00 by Cari Hinshaw Fee Amount $52.00 Amount Paid $52.00 Fee Balance $0.00 $52.00 $52.00 $0.00 $52.00 Page 1 of 1 TRANSITION AREA 3/8' EXPANSION JOINT rg -PROJECTED TOP OF CURB ELEVATION 6" PORTLAND CEMENT CONCRETE SECTION A -A GENERAL NOTES 1. EXPANSION JOINT MATERIAL SHALL BE PLACED IN THE CENTER OF ALL DRIVEWAYS OVER 20' IN WIDTH. 2, EXPANSION JOINT REQUIRED IF POUR INCLUDES ADDITIONAL DRIVEWAY AREA, 3. PORTLAND CEMENT CONCRETE SHALL BE CLASS 3000, AIR ENTRAINED, 4. ALL EXTERNAL EDGES TO BE TROWELLED WITH 1/4" RADIUS EDGER. 5. SIDEWALK TO BE SCORED EVERY 5'. 3/8" EXPANSION JOINT TO BE INSTALLED AT LOCATIONS WHERE SIDEWALK INTERSECTS OTHER SIDEWALKS AND DRIVEWAYS. 6. MIN. 4" THICK CRUSHED SURFACING TOP COURSE LAYER UNDER DRIVE APPROACH. 7. FIRST 2' OF DRIVE APPROACH (AT CURB SIDE) SHALL BE THICKENED TO MATCH BOTTOM OF CURB. THROAT WIDTH DISTANCES TYPE MIN. MAX. COMM. 30' 40' RES. 16' 30' EXPIRES 9/29/7 0 / G DEVELOPMENT SERVICES SENIOR ENGINEER APPROVED FOR PUBLICATION < 2 /CI Sj�1ots"tx2.3. ane ....Valley DRIVEWAY APPROACH ADJACENT SIDEWALK STANDARD PLAN NO. R-112 141DE Project RECEIVED itiL I) n4 CSV PERMIT CENTER SUB # REV. #