2014, 07-15 Permit: APR-2014-0054 Approach4
Spokane
.0SValleys
City of Spokane Valley
Community Development
11703 E. Sprague Ave., Suite B-3
Spokane Valley, WA 99206
(509) 720-5240
permitcenter(6 spokanevalley.orq
APR -2014-0054 DE -APPROACH
PROJECT NAME: NEW APPROACH ISSUED: 07/15/2014
SITE ADDRESS: 6121 E VALLEYVIEW DR SPOKANE VALLEY EXPIRES:
PROJECT DESCRIPTION: CONSTRUCT APPROACH IN NEW LOCATION; EXISTING CURB CUT TO REMAIN AS PED ACCESS
PARCEL: 35252.1007
APPLICANT: Van Horn, John OWNER: PLATINUM REAL ESTATE HOLDINGS, LLC
1004 E Garden Avenue COEUR D ALENE, ID 9915 N AUSTIN LN
83814 SPOKANE, WA 99208
760-846-3967
GENERAL CONTRACTOR:
PRO CUT CNCRT CUTTING SPOK INC
P 0 Box 9284
YAKIMA, WA98908
509-484-7100
License: PROCUCC941 BL
Expires: 01/30/2016
FEES: Paid Due
Approach $52.00 $0.00
Totals :
$52.00 $0.00
CONDITIONS
* All approaches are to be inspected by the Development Engineering Inspector (John Johnson 509-599-6306) prior to
placing concrete or asphalt.
* Saw -cutting of existing curb in the right-of-way in order to create an approach is not allowed in Spokane Valley.
* Prior to excavation, it is the Contractor responsibility to contact the purveyor of any transmission pipeline that is within 100
feet of permitted work, as per RCW 19.122.033.
* Approach to be constructed per Standard Plan R-112
The ownership of a Spokane Valley Development Permit will inure to the property owner. The permit
applicant, by definition, is the property owner or an authorized agent of the property owner. It is the
responsibility of the applicant / permittee that the use described on the front of this permit complies with
applicable codes and that required inspections are requested. Failure to request inspections as listed
below and obtain the necessary approvals before progressing beyond the point where inspections are
required and may necessitate removal of certain parts of the construction are the applicant's / permittee's
or property owner's expense.
Owner/Agent Date:
t' 1
Staff Approval/ / ((J 'LC, \
Date:
Printed by : Mary May on: 07/15/2014 04:35 PM
Page 1 of 1
nye
_'alley•
11703 E. Sprague Ave., Suite B-3
Spokane Valley, WA 99206
Receipt Number: 201402051
(509) 720-5240
permitcenter@spokanevalley.org
Payer/Payee: PLATINUM REAL ESTATE HOLDINGS, LLC
9915 N AUSTIN LN
SPOKANE WA99208
Cashier: CHINSHAW
Payment Type: CREDIT CARD
Date: 07/15/2014
APR -2014-0054 APPROACH PERMIT
6121 E VALLEYVIEW DR
Fee Description
Approach
APR -2014-0054 TOTALS:
TOTAL PAID:
Printed 07/15/2014 16:35:00 by Cari Hinshaw
Fee Amount
$52.00
Amount Paid
$52.00
Fee Balance
$0.00
$52.00 $52.00
$0.00
$52.00
Page 1 of 1
TRANSITION AREA
3/8' EXPANSION JOINT
rg
-PROJECTED TOP OF CURB ELEVATION
6" PORTLAND
CEMENT CONCRETE
SECTION A -A
GENERAL NOTES
1. EXPANSION JOINT MATERIAL SHALL BE PLACED IN THE CENTER OF ALL
DRIVEWAYS OVER 20' IN WIDTH.
2, EXPANSION JOINT REQUIRED IF POUR INCLUDES ADDITIONAL DRIVEWAY
AREA,
3. PORTLAND CEMENT CONCRETE SHALL BE CLASS 3000, AIR ENTRAINED,
4. ALL EXTERNAL EDGES TO BE TROWELLED WITH 1/4" RADIUS EDGER.
5. SIDEWALK TO BE SCORED EVERY 5'. 3/8" EXPANSION JOINT TO BE
INSTALLED AT LOCATIONS WHERE SIDEWALK INTERSECTS OTHER
SIDEWALKS AND DRIVEWAYS.
6. MIN. 4" THICK CRUSHED SURFACING TOP COURSE LAYER UNDER DRIVE
APPROACH.
7. FIRST 2' OF DRIVE APPROACH (AT CURB SIDE) SHALL BE THICKENED TO
MATCH BOTTOM OF CURB.
THROAT WIDTH
DISTANCES
TYPE
MIN.
MAX.
COMM.
30'
40'
RES.
16'
30'
EXPIRES 9/29/7 0 / G
DEVELOPMENT SERVICES SENIOR ENGINEER
APPROVED FOR PUBLICATION < 2 /CI
Sj�1ots"tx2.3.
ane
....Valley
DRIVEWAY APPROACH
ADJACENT SIDEWALK
STANDARD PLAN NO.
R-112
141DE
Project
RECEIVED
itiL
I) n4
CSV PERMIT CENTER
SUB # REV. #