Loading...
2012, 08-07 Permit: SW-12001926 SewerSPOKANE COUNTY BUILDING AND PLANNING PERMIT Application Number: SW -12001926 Permit Issued Date: Expiration Date: Project Description: SEWER CONNECTION Project Name: VALLEYVIEW Permit Type: SEWER Primary Contact: LARRY MILLER EXCAVATING Applicant: LARRY MILLER EXCAVATING Address: 7117 E RUTTER AVE SPOKANE, WA 99212 Phone: 509-218-3335 Email: SITE INFORMATION: Site Address: 6218 E VALLEYVIEW DR Parcel Number: 35252.0902 Subdivision: VALLEY VIEW HILLS Assessor's Description: VALLEY VIEW HILLS L2 B4 Inspection Area: Owner: Address: Phone: Email: SMITHWICK, MICHAEL / WELCH, CAROLYN 6218 E VALLEYVIEW DR SPOKANE, WA 99212 Water District: Spokane Fire District: Spokane Valley Fire County Water District #3 Zoning: Land Area: 13000 Square Feet CONTRACTOR INFORMATION: General Contractor LARRYME918DR LARRY MILLER EXCAVATING 7117 E RUTTER AVE SPOKANE, WA 99212 509-218-3335 DETAILS: Class Type Quantity Unit Charge Value SEWER SEWER CONNECTION 1 $125.00 $125.00 FEE DETAIL: Processing - Utilities Utilities Permit Total Fee: $125.00 $25.94 $125.00 $150.94 CONDITIONS: Inside Public Transit Benefit Area CALL 1-800-424-5555 BEFORE YOU DIG—AT LEAST 2 WORKING DAYS IN ADVANCE. SPOKANE COUNTY CODE REQUIRES THE INSTALLER COMPLY WITH ALL REQUIREMENTS OF THE WA STATE DEPT OF LABOR & INDUSTRIES, INCLUDING THOSE RELATED TO TRENCH SAFETY. FOR SEWER INSPECTIONS CALL THE UTILITIES DEPT AT (509) 477-3604 FROM 8:30-5:00 MONDAY -FRIDAY PRIOR TO COVER. ONE WORKING DAY NOTICE REQUIRED. PERMIT ALLOWS FOR A 30 -MINUTE INSPECTION. ADDITIONAL INSPECTION FEES APPLY AFTER 30 MINUTES. Date Printed: 08/07/2012 12:53:45 Printed by: IIS APPPOOL\ASP.NET v4.0 SPOKANE COUNTY BUILDING AND PLANNING PERMIT Application Number: SW -12001926 Permit Issued Date: Expiration Date: INSTALLER IS RESPONSIBLE TO INSURE ALL WASTEWATER DRAINS ARE CONNECTED TO THE SEWER AND MAY BE REQUIRED TO PERFORM TESTS FOR VERIFICATION. INSTALLER IS TO FIELD LOCATE AND CONFIRM THE ELEVATION AND POSITION OF SEWER STUB PRIOR TO ANY OTHER EXCAVATION. SEWER STUBS AND DRY SIDE SEWERS ARE TO BE CHECKED PRIOR TO CONNECTION TO ENSURE THAT THEY HAVE ACCEPTABLE GRADE AND ARE CLEAR AND UNOBSTRUCTED. SEWER LINES SHOULD BE CONSTRUCTED TO ALLOW FOR GRAVITY FLOW FROM THE LOWEST LEVEL OF THE STRUCTURE. THE INSTALLER AND THIS PERMIT MUST BE PRESENT AT THE JOB SITE AT THE SCHEDULED INSPECTION TIME. BOTH STATE LAW RCW 19.122 AND COUNTY CODE REQUIRES THE INSTALLER TO GIVE NOTICE OF EXCAVATION TO OWNERS OF UNDERGROUND FACILITIES. Date Printed: 08/07/2012 12:53:45 Printed by: IIS APPPOOLVISP.NET v4.0