2012, 08-08 Permit: BLD-2012-1200 Repair, Remodel SjöihhhIh11
Permit Center
ane
Valle ®
Y 11703 E Sprague Ave Suite B3 Spokane Valley WA 99206
509.720-5240 1 Fax: 509.688.0037♦email: permitcenter@spokanevalley.org
BLD-2012-1200 BLD-RES
PROJECT NAME: ISSUED: 08/08/2012
SITE ADDRESS: 3018 S UNIVERSITY RD SPOKANE VALLEY EXPIRES: 02/04/2013
PARCEL: 45294.0705
APPLICANT: CAPSTONE CONSTRUCTION COMPANY OWNER: LYNCH,SHANON L
PO BOX 388 607 BRONSON PL NE
NINE MILE FALLS,WA 99026 RENTON,WA 98056
509-325-0908
GENERAL CONTRACTOR: CAPSTONE CONSTRUCTION COMPANY License: CAPSTCC106J5
PO BOX 388 Expires: 03/01/2013
NINE MILE FALLS,WA 99026
509-325-0908
VALUATIONS: FEES: Paid Due
Entered Valuation 47306.45 $47,306.45 Building Plan Review-R3<8K $249.42 $0.00
Building Permit $623.55 $0.00
Washington State Building Code $4.50 $0.00
Council Surcharge
Total: $47,306.45 Total Due: $0.00
FIXTURES
Qty Mechanical Fixtures Qty Plumbing Fixtures
Qty Electrical Fixtures
REQUIRED INSPECTIONS
Setbacks Sheathing
Footings Rough Framing
Reinforcement Insulation
Radon Final Building Inspection
Shear/Brace Wall Framing
CONDITIONS
Printed:08-08-2012 13:44:28
Page 1 of 2
NOTICE
The ownership of a Spokane Valley Development Permit will inure to the property owner. The permit applicant, by definition, is the
property owner or an authorized agent of the property owner. It is the responsibility of the applicant/permitee that the use described on
the front of this permit complies with applicable codes and that required inspections are requested. Failure to request inspections as
listed below and obtain the necessary approvals before progressing beyond the point where inspections are required and may
necessitate removal of certain parts of the construction are at the applicant's/permittee's or property owner's expense.
At a minimum, the following inspections ARE REQUIRED by the Spokane Valley Municipal Code(SVMC):
FOOTING - when forms and reinforcements are in place and prior to placement of concrete-all structures, including manufactured
homes.
NOTE: This inspection includes review of the structures setback from property lines. Minimum setbacks are established by SVMC.
Curb lines and fence lines are not necessarily indicative of property lines. The responsibility to comply with applicable setback
provisions lies solely with the permitee-neither the City of Spokane Valley nor its authorized representatives assume any
responsibility for the verification or location of your property lines. Please verify their location prior to locating your structure.
Failure to properly locate the structure may require its relocation at the owner's/permittee's expense.
FOUNDATION -when forms and reinforcement are in place and prior to placement of concrete.
PLUMBING-after rough-in, before covering and final.
MECHANICAL-rough-in of piping, before covering, metal chimneys before concealment and final.
FRAMING -after all framing, bracing and blocking is in place, rough electrical, plumbing and mechanical systems are complete, and
prior to concealing.
FINAL-when complete and prior to occupancy and/or use; all permits require final inspection.
NOTE: In addition to inspection of the structure, this inspection includes review of site improvements (typically depicted on the
approved site plan) required by ordinance or as a condition of approval of this permit. Items such as installation of fire hydrants,
fire department access, on-site drainage (208'swales), road improvements, parking and landscaping are common requirements of
a permit/site plan which must be completed prior to final approval of a building or issuance of a Certificate of Occupancy.
MANUFACTURED HOMES-final inspection required when complete, stairs, handrails, skirting, etc. installed and prior to occupancy;
completed inspection record card must be available on site.
PLUMBING REVERSALS FOR SEWER CONNECTIONS-prior to cover
RIGHT-OF-WAY/APPROACH-prior to placement of concrete/asphalt or, if gravel approach, after completion.
In addition to the above, any plumbing or mechanical systems or material which would be concealed by framing, drywall, concrete, etc.,
must be inspected prior to cover. Check with the Building department for special inspections in conjunction with commercial projects.
State law RCW 19.122 requires that prior to any excavation the 'CALL BEFORE YOU DIG' center must be notified. Call 411 at least 3
working days in advance.
PERMIT EXPIRATION AND REFUNDS
Expirations:
Building or other permits (regulated under SVMC Chapter 24) shall expire by limitation and be declared void if a) work is not started
within 180 days of obtaining a permit, or b)work is abandoned for 180 days or more after beginning work, or c)after two years from the
date of permit issuance, regardless of whether the work is finished. If a permit is expired for time, a new permit may be obtained for
half the permit fee based on the value of the remainder of the work required to finish the original permit.
Right-of-way permits (regulated under SVMC Chapter 22) issued between April 1, and September 30, are valid for 30 days after the
date of issuance, with a one-time 30-day extension available. Right-of-way permits issued between October 1,and March 31, shall be
valid until the following April 30.
Refunds:
All refund requests must be made in writing by the original permitee to the Building Official no later than 180 days after the date of fee
payment. Full refunds will be granted for any permit issued in error. Rate of refund shall be as set forth in the City of Spokane Valley
Master Fee Schedule in effect at the time of permit application. A copy of this schedule is available at Permit Center and also available
for reference on the city website at: http://www.spokanevallev.org and search for"fees"
Owner/Agent h. Date: � / 2'
Staff Approval Date:
Community Development Department
�' Permit Center (Staff Use Only)
OF�s�g�p 11703 East Sprague Avenue, Suite B 3
SCITY
pokane Spokane Valley,WA 99206 PERMIT NUMBER:
'/alley Tel: (509) 688-0036
K Fax: (509) 688-0037 PERMIT FEE:
permitcenter@spokenevalley.orq
PERMIT CENTER PROJECT TRANSMITTAL
PLEASE PROVIDE THE FOLLOWING (REQUIRED FOR ACCEPTANCE):
Response to Review
Comments ElPLUS Project #:
Revisions to Application ❑ Parcel Number:
Other (Describe Below): ❑ Site Address: "j cR J .J Gf,z,'� �,; /z .-Z .
Route to (Please check all that apply):
Division # of Sheets/Type of Document/# of Copies Received by:
Building n VERIFIEDNITIALS
QC Check ❑
by: ❑
Dev. Engineering VERIFIED/INITIALS
111
QC Check ❑
by: ❑
Planning VERIFIED/INITIALS
❑ ❑
QC Check ❑
by: ❑
SV Fire Department VERIFIED/INITIALS
❑ ❑
QC Check ❑
by: ❑
Project Contact Information:
r-r
Name: : L\ .r� c: S ,7.14- 6� f Phone: vr�(f
' `4`' ��r; - 6'3 l3
Email:
Fax:
Relationship to Project:
Architect [1 Engineer 134 Contractor ❑ Owner/Applicant ❑ Other Design
Professional
DATE STAMP: H
.,
Effective October 28, 2007 Page 1 of 1
P:\Community Development\11 Forms\A. Building\Building forms\Permit Center Project Transmittal.1.doc
Cp4S oke Capstone Construction Co.,Inc.
CONSTRUCTION 2917 E.Francis Ave.
Spokane,WA 99208
(509)468-4981,Fax(509)468-5081
Federal TIN-91-1475627
WA Contractor Reg.-CAPSTCC106J5
Client: Shannon Lynch MGR-Scott: (509)999-1530
Property: 3018 S.University Rd. Shannon: (425)681-3306
Spokane Valley,WA 99206
Billing: 607 Bronson Place NE
Renton,WA 98056
Operator Info:
Operator: SHAYC
Estimator: Shay Cummings Business: (509)468-4981
Reference: Business: (509)991-1695
Company: Pemco-Jeff Kinder
Type of Estimate: Vehicle
Date Entered: 7/3/2012 Date Assigned:
Price List: WASP7X_JUN12
Labor Efficiency: Restoration/Service/Remodel
Estimate: LYNCH SHANNON
What follows is an estimate on the work that we have discussed. Please review&call with any questions,and let us know if we
can perform this work for you. Thank you!
Project �-z0 2-00
IIECCIVED
JUL 2 l 2012
CSVPERMITCENTER
sue ,
CA4�0�1rE Capstone Construction Co.,Inc.
CONSTRUCTION 2917 E.Francis Ave.
Spokane,WA 99208
(509)468-4981,Fax(509)468-5081
Federal TIN-91-1475627
WA Contractor Reg.-CAPSTCC106J5
LYNCH_SHANNON
Main Level
OIL 3'T r 1" Entry/Foyer Height:7'8"
T I
m E jFover 227.89 SF Walls 57.31 SF Ceiling
to to
10'11' N 285.20 SF Walls&Ceiling 57.31 SF Floor
•
6.37 SY Flooring 29.33 LF Floor Perimeter
32.33 LF Ceil.Perimeter
Missing Wall-Goes to Floor 3'X 6'8" Opens into KITCHEN
DESCRIPTION QNTY REMOVE REPLACE TOTAL
GLOBAL NOTE: At the time of inspection,no damage was found to any of the flooring surfaces. Should damage be found later
these would need to be addressed at an additional charge.
The following estimate is to repair the damage caused by a vehicle impact to the home.There are several items that cannot be
determined until the walls are opened.This includes the damage to the plumbing,roof framing,and the electrical. There could be
significant changes to the estimate depending on what is found when opened and what the inspectors will require during the process
If re-building.
1. Sheathing-plywood- 1/2"CDX 57.31 SF 0.00 1.11 63.61
The previous line item is for plywood to protect the floors from damage during the demo and framing stages.
2. Temporary shoring post-Screw jack(per 6.00 DA 0.00 28.61 171.66
day)
3. 4" x 6" x 10'-fir/larch post-material 1.00 EA 0.00 16.37 16.37
only
The previous line item is to provide temporary support for the roof to allow the framing on the front of the house to be repaired.
4. Rewire-average residence-copper 57.31 SF 0.00 2.67 153.02
wiring
The previous line item is to remove the electrical out of the damaged wall to allow the framing repairs and then re-wire to code.
5. R&R Stud wall-2"x 4"x 8'- 16" oc 5.25 LF 1.16 12.21 70.19
6. Carpenter-General Framer-per hour 4.00 HR 0.00 44.17 176.68
The previous line item is additional labor to tie the new framing into the existing.
7. R&R Batt insulation-4"-R13 40.25 SF 0.17 0.59 30.59
8. R&R 1/2"drywall-hung,taped,floated, 93.92 SF 0.28 1.31 149.34
ready for paint
9. Seal the surface area w/latex based stain 93.92 SF 0.00 0.34 31.93
blocker-one coat
10. Drywall Installer/Finisher-per hour 2.00 HR 0.00 42.93 85.86
The previous line item is additional labor to tie the new drywall into the existing.
.1. Texture drywall- smooth/skim coat 120.00 SF 0.00 0.70 84.00
LYNCH_SHANNON 7/5/2012 Page: 2
pp4 Art Capstone Construction Co.,Inc.
CONSTRUCTION 2917 E.Francis Ave.
Spokane,WA 99208
(509)468-4981,Fax(509)468-5081
Federal TIN-91-1475627
WA Contractor Reg. -CAPSTCC106J5
CONTINUED-Entry/Foyer
DESCRIPTION QNTY REMOVE REPLACE TOTAL
1) Prep wall for wallpaper 93.92 SF 0.00 0.36 33.811
it Wallpaper 93.92 SF 0.00 1.67 156.85 1
14. Paint the walls and ceiling-two coats 285.20 SF 0.00 0.56 159.71
15. R&R Exterior door-metal-insulated- 1.00 EA 14.68 235.00 249.68
flush or panel style
16. Additional charge for a retrofit exterior 1.00 EA 0.00 47.56 47.56
door
17. Exterior door sidelite-pre-attached 2.00 EA 0.00 199.06 398.12
18. Prime&paint door slab only-exterior 2.00 EA 0.00 28.98 57.96
(per side)
19. R&R Door lockset&deadbolt-exterior 1.00 EA 10.11 73.92 84.03
20. Paint door or window opening-2 coats 6.00 EA 0.00 18.58 111.48
(per side)
21. R&R Casing-2 1/4"stain grade 20.00 LF 0.35 2.55 58.00
22. R&R Screen door-metal-30" -36" - 1.00 EA 12.97 109.28 122.25
kull screen(no glass)
23. R&R Baseboard-2 1/4"stain grade 29.33 LF 0.28 2.54 82.71
24. Stain&finish baseboard 29.33 LF 0.00 0.92 26.98
25. Final cleaning-construction- 57.31 SF 0.00 0.24 13.75
Residential
Totals: Entry/Foyer 2,636.14
I--10'11" Kitchen Height:7'8"
TT 194.03 SF Walls 92.79 SF Ceiling
iat en CD co 286.82 SF Walls&Ceiling 92.79 SF Floor
°° °° 10.31 SY Flooring 24.92 LF Floor Perimeter
OF 3'-{-7'1" T 27.92 LF Ceil.Perimeter
Missing Wall 10' 11"X 7' 8" Opens into DINING_ROOM
Missing Wall-Goes to Floor 3'X 6'8" Opens into ENTRY_FOYER
DESCRIPTION QNTY REMOVE REPLACE TOTAL
26. Content Manipulation charge-per hour 5.00 HR 0.00 31.39 156.95
The previous line item is labor to move the contents that are in this room to allow the work to be performed.
LYNCH SHANNON 7/5/2012 Page: 3
ex 4co. Capstone Construction Co.,Inc.
CONSTRUCTION 2917 E.Francis Ave.
Spokane,WA 99208
(509)468-4981,Fax(509)468-5081
Federal TIN-91-1475627
WA Contractor Reg.-CAPSTCC106J5
CONTINUED-Kitchen
DESCRIPTION QNTY REMOVE REPLACE TOTAL
27. Detach&Reset Refrigerator-top 1.00 EA 0.00 0.00 33.67
freezer- 18 to 22 cf A118 v e.Reel
el
.
R&R Range hood 1.00 EA 8.48 165.97 174.45
29. Ductwork-hot or cold air-6"round 10.00 LF 0.00 12.87 128.70
30. Direct vent termination cap-galvanized 1.00 EA 0.00 201.44 201.44
The previous two line items are to install venting for the range hood that is required by code.
31. Detach&Reset Range-freestanding- 1.00 EA 0.00 0.00 53.15
electric
32. Detach&Reset Dishwasher 1.00 EA 0.00 0.00 228.94
33. Rough in plumbing-per fixture- 2.00 EA 0.00 478.45 956.90
w/PEX
The previous line item is to rough in the plumbing to the sink and the dishwasher which will need to be removed to allow the framing
to be repaired.
34. Rewire-average residence-copper 92.79 SF 0.00 2.67 247.75
wiring
fhe previous line item is to remove the electrical out of the damaged wall to allow the framing repairs and then re-wire to code.
35. R&R Outlet 6.00 EA 3.39 11.25 87.84
36. R&R S . ' c��`x 3.00 EA 3.39 11.24 43.89
(IP Detach&Reset Intercom-Master 1.00 EA 0.00 0.00 86.62
station
38. R&R Recessed light fixture 1.00 EA 7.51 102.93 110.44
39. Sheathing-plywood- 1/2"CDX 92.79 SF 0.00 1.11 103.00
The previous line item is for plywood to protect the floors from damage during the demo and framing stages.
40. Temporary shoring post-Screw jack 12.00 DA 0.00 28.61 343.32
(per day)
41. 4" x 6" x 10'-fir/larch post-material 1.00 EA 0.00 16.37 16.37
only
The previous line item is to provide temporary support for the roof to allow the framing on the front of the house to be repaired.
42. R&R Stud wall-2"x 4"x 8'- 16"oc 8.50LF 1.16 12.21 113.65
43. Carpenter-General Framer-per hour 4.00 HR 0.00 44.17 176.68
The previous line item is additional labor to tie the new framing into the existing.
44. R&R Vinyl window,horizontal sliding, 1.00 EA 15.22 230.41 245.63
12-23 sf
45. Add on for"Low E"glass b0°� 9.00 SF 0.00 1.71 15.39
R&R Window sill-stain grade /�,�� rc 3.00 LF 0.46 2.48 8.82
D Stain&finish wood window sill (,D`� I 3.00 LF 0.00 1.73 5.19
LYNCH_SHANNON 7/5/2012 Page:4
p,45 TINE Capstone Construction Co.,Inc.
CONSTRUCTION
2917 E.Francis Ave.
Spokane,WA 99208
(509)468-4981,Fax(509)468-5081
Federal TIN-91-1475627
WA Contractor Reg.-CAPSTCC 106J5
CONTINUED-Kitchen
DESCRIPTION QNTY REMOVE REPLACE TOTAL
48. R&R Batt insulation-4"-R13 65.17 SF 0.17 0.59 49.53
49. R&R 1/2"drywall-hung,taped, 194.03 SF 0.28 1.31 308.51
floated,ready for paint
50. Drywall Installer/Finisher-per hour 3.00 HR 0.00 42.93 128.79
The previous line item is additional labor to tie the new drywall into the existing.
51. Seal the walls w/latex based stain 194.03 SF 0.00 0.34 65.97
blocker-one coat
52. Texture drywall-smooth/skim coat 194.03 SF 0.00 0.70 135.82
G4 CO Prep wall for wallpaper 150.00 SF 0.00 0.36 54.00
0 Wallpaper 150.00 SF 0.00 1.67 250.50
55. P ' t e walls- and ceiling-two coats 286.82 SF 0.00 0.56 160.62cyha
1inkG Sink-d-ouble-High grade 1.00 EA 13.48 422.23 435.71
57. Sink faucet-Kitchen 1.00 EA 0.00 151.79 151.79
58. Sink strainer and drain assembly 2.00 EA 0.00 44.17 88.34
59. R&R Cabinetry-lower(base)units 17.58 LF 5.06 151.26 2,748.10
60. R&R Cabinetry-upper(wall)units 18.42 LF 5.06 111.96 2,155.51
61. R&R Cabinet panels-side,end,or back 48.00 SF 1.31 12.71 672.96
62. R&R Countertop-flat laid plastic 11.58 LF 2.91 34.37 431.70
laminate ,V9 S a404€ Cproer)
m R&R Countertop flat laid plastic 6.00 LF 2.91 41.08 263.94
aminate-Oversized
64. R&R Ceramic tile 58.75 SF 1.21 9.50 629.22
The previous line item is to replace the back splash tile to enable the replacement of the cabinets.
65. R&R Baseboard-2 1/4" stain grade 24.92 LF 0.28 2.54 70.28
66. Stain&finish baseboard 24.92 LF 0.00 0.92 22.93
67. Final cleaning-construction- 92.79 SF 0.00 0.24 22.27
Residential
Totals: Kitchen 12,385.28
LYNCH SHANNON 7/5/2012 Page:5
p,4 5 T oivt Capstone Construction Co.,Inc.
CONSTRUCTION
2917 E.Francis Ave.
Spokane,WA 99208
(509)468-4981,Fax(509)468-5081
Federal TIN-91-1475627
WA Contractor Reg.-CAPSTCC 106J5
2'61- 10" Dining Room Height:7'8"
t
T 191.19 SF Walls 95.52 SF Ceiling
L '7:
286.72 SF Walls&Ceiling 95.52 SF Floor
��"'"0 R°°'" . co
m co10.61 SY Flooring 24.42 LF Floor Perimeter
� to'11„ 1 28.42 LF Ceil.Perimeter
1-
Missing Wall-Goes to Floor 4'X 6'8" Opens into LIVING_ROOM
Missing Wall 10' 11" X 7'8" Opens into KITCHEN
DESCRIPTION QNTY REMOVE REPLACE TOTAL
68. Rewire-average residence-copper 95.52 SF 0.00 2.67 255.04
wiring
The previous line item is to remove the electrical out of the damaged wall to allow the framing repairs and then re-wire to code.
69. R&R Outlet 3.00 EA 3.39 11.25 43.92
70. R&R Switch 1.00 EA 3.39 11.24 14.63
71. Sheathing-plywood- 1/2" CDX 95.52 SF 0.00 1.11 106.03
the previous line item is for plywood to protect the floors from damage during the demo and framing stages.
72. Temporary shoring post-Screw jack 12.00 DA 0.00 28.61 343.32
(per day)
73. 4"x 6"x 10'-fir/larch post-material 1.00 EA 0.00 16.37 16.37
only
The previous line item is to provide temporary support for the roof to allow the framing on the front of the house to be repaired.
74. R&R Stud wall-2" x 4" x 8'- 16"oc 14.75 LF 1.16 12.21 197.21
75. Carpenter-General Framer-per hour 5.00 HR 0.00 44.17 220.85
The previous line item is additional labor to tie the new framing into the existing.
76. R&R Batt insulation-4" -R13 113.08 SF 0.17 0.59 85.94
77. R&R 1/2" drywall-hung,taped, 191.19 SF 0.28 1.31 303.99
floated,ready for paint
78. Seal the walls w/latex based stain 191.19 SF 0.00 0.34 65.00
blocker-one coat
79. Drywall Installer/Finisher-per hour 3.00 HR 0.00 42.93 128.79
The previous line item is additional labor to tie the new drywall into the existing.
80. Texture drywall- smooth/skim coat 191.19 SF 0.00 0.70 133.83
al c?p wall for wallpaper 191.19 SF 0.00 0.36 68.83
Q91 Wallpaper 191.19 SF 0.00 1.67 319.29
83. Paint the walls and ceiling-two coats 286.72 SF 0.00 0.56 160.56
14. Detach&Reset Vinyl window, 1.00 EA 0.00 0.00 83.26
horizontal sliding, 12-23 sf
LYNCH SHANNON 7/5/2012 Page: 6
C ‘1 "0-0ir, Capstone Construction Co.,Inc.
CONSTRUCTION 2917 E.Francis Ave.
Spokane,WA 99208
(509)468-4981,Fax(509)468-5081
Federal TIN-91-1475627
WA Contractor Reg. -CAPSTCC 106J5
CONTINUED-Dining Room
DESCRIPTION QNTY REMOVE REPLACE TOTAL
The previous line item is to detach and reset the existing vinyl window to allow the framing work.At the time of inspection there
were no visible damage.
85. R&R Window sill-stain grade 4.00 LF 0.46 2.48 11.76
86. Stain&finish wood window sill 4.00 LF 0.00 1.73 6.92
87. R&R Exterior door-metal-insulated- 1.00 EA 14.68 235.00 249.68
flush or panel style
88. Additional charge for a retrofit exterior 1.00 EA 0.00 47.56 47.56
door
89. R&R Door lockset-exterior 1.00 EA 8.43 41.25 49.68
90. Prime&paint door slab only-exterior 2.00 EA 0.00 28.98 57.96
(per side)
91. Paint door or window opening-2 coats 3.00 EA 0.00 18.58 55.74
(per side)
92. R&R Casing-2 1/4"stain grade 17.00 LF 0.35 2.55 49.30
93. R&R Baseboard-2 1/4"stain grade 24.42 LF 0.28 2.54 68.87
94. Stain&finish baseboard 24.42 LF 0.00 0.92 22.47
95. Final cleaning-construction- 95.52 SF 0.00 0.24 22.92
Residential
Totals: Dining Room 3,189.72
'ZLiving Room Height:7'8"
g
Ti
Re0m 508.72 SF Walls 275.90 SF Ceiling
a aL.votoem j"� 784.63 SF Walls&Ceiling 275.90 SF Floor
m 30.66 SY Flooring 65.83 LF Floor Perimeter
- 69.83 LF Ceil.Perimeter
m'"I'Fovlt
iiZ 1"
f12 -Li
Missing Wall-Goes to Floor 4'X 6'8" Opens into DINING_ROOM
DESCRIPTION QNTY REMOVE REPLACE TOTAL
96. Content Manipulation charge-per hour 3.00 HR 0.00 31.39 94.17
The previous line item is to move the contents in this room to allow the repairs to be done.
97. Floor protection-self-adhesive plastic 275.90 SF 0.00 0.38 104.84
film
98. Drywall tape joint/repair-per LF 34.92 LF 0.00 5.51 192.41
LYNCH SHANNON 7/5/2012 Page:7
' Cp4O4 7.O.ArE Capstone Construction Co.,Inc.
CONSTRUCTION 2917 E.Francis Ave.
Spokane,WA 99208
(509)468-4981,Fax(509)468-5081
Federal TIN-91-1475627
WA Contractor Reg.-CAPSTCC 106J5
CONTINUED-Living Room
DESCRIPTION QNTY REMOVE REPLACE TOTAL
99. Drywall Installer/Finisher-per hour 2.00 HR 0.00 42.93 85.86
The previous line item is additional labor to blend the patch into the existing.
100. Seal the surface area w/latex based 69.84 SF 0.00 0.34 23.75
stain blocker-one coat
101. Texture drywall-heavy hand texture 139.68 SF 0.00 0.53 74.03
102. Paint the ceiling-two coats 275.90 SF 0.00 0.56 154.50
103. Final cleaning-construction- 275.90 SF 0.00 0.24 66.22
Residential
Totals: Living Room 795.78
i ze 1Height:9'
-i- z3, Garage
778.50 SF Walls 464.72 SF Ceiling
In a
In
1,243.22 SF Walls&Ceiling 464.72 SF Floor
51.64 SY Flooring 86.50 LF Floor Perimeter
86.50 LF Ceil.Perimeter
123'-I Z6 H--M'
I.
DESCRIPTION QNTY REMOVE REPLACE TOTAL
104. Rewire-average residence-copper 232.36 SF 0.00 2.67 620.40
wiring
The previous line item is to remove the electrical out of the damaged wall to allow the framing repairs and then re-wire to code.
105. Temporary shoring post-Screw jack 12.00 DA 0.00 28.61 343.32
(per day)
106. 4" x 6" x 10'-fir/larch post-material 2.00 EA 0.00 16.37 32.74
only
The previous line item is to provide temporary support for the roof to allow the framing on the front of the house to be repaired.
107. R&R Stud wall-2" x 4" - 16"oc 179.25 SF 0.14 1.50 293.98
108. R&R Batt insulation-4" -R13 179.25 SF 0.17 0.59 136.23
109. R&R 5/8"drywall-hung&fire taped 79.67 SF 0.28 1.11 110.74
only
110. R&R 1/2"drywall-hung,taped, 99.00 SF 0.28 1.31 157.41
floated,ready for paint
111. Drywall Installer/Finisher-per hour 2.00 HR 0.00 42.93 85.86
he previous line item is additional labor to tie the new drywall into the existing.
LYNCH SHANNON 7/5/2012 Page: 8
OS 7'0 Capstone Construction Co.,Inc.
CONSTRUCTION
2917 E.Francis Ave.
Spokane,WA 99208
(509)468-4981,Fax(509)468-5081
Federal TIN-91-1475627
WA Contractor Reg. -CAPSTCC106J5
CONTINUED-Garage
DESCRIPTION QNTY REMOVE REPLACE TOTAL
112. Paint the surface area-two coats 210.00 SF 0.00 0.56 117.60
113. R&R Overhead door, 16'x 7'- 1.00 EA 56.18 4,896.96 4,953.14
softwood overlay
114. Paint overhead door-Large-2 coats 2.00 EA 0.00 107.65 215.30
(per side)
115. R&R Overhead(garage)door opener 1.00 EA 14.99 276.50 291.49
116. R&R Jamb and trim for overhead door 30.00 LF 0.67 5.81 194.40
unit
117. Paint double garage door opening& 2.00 EA 0.00 49.01 98.02
trim- 1 coat
118. Final cleaning-construction- 464.72 SF 0.00 0.24 111.53
Residential
Totals: Garage 7,762.16
Exterior
Exterior
DESCRIPTION QNTY REMOVE REPLACE TOTAL
119. Detach&Reset Exterior light fixture 3.00 EA 0.00 0.00 171.63
The previous line item is to detach and reset the light fixtures on the front of the house to allow the siding replacement.
120. Detach&Reset Intercom-Remote 1.00 EA 0.00 0.00 80.56
station
121. Rough in plumbing-per fixture- 1.00 EA 0.00 478.45 478.45
w/PEX
The previous line item is to rough in the plumbing for the exterior water spigot. Note that the plumbing required in this loss will
result in three different trips by the plumber to the loss.
122. R&R Exterior faucet-frost free 1.00 EA 9.19 64.96 74.15
The previous line item is to replace the exterior frost free faucet that was destroyed in the impact.
123. (Material Only)Sheathing-plywood- 350.00 SF 0.00 0.54 189.00
1/2" CDX
124. 2" x 4" x 10'#2&better Fir/Larch 15.00 EA 0.00 2.89 43.35
(material only)
125. Carpenter-General Framer-per hour 8.00 HR 0.00 44.17 353.36
The previous three line items are to build a temporary wall to secure the building during the exterior wall replacement.This includes
labor to set up and remove multiple times to allow the work to progress.
126. R&R Sheathing-plywood- 1/2"CDX 370.42 SF 0.38 1.11 551.93
R&R Brick veneer 175.00 SF 1.53 8.78 1,804.25
LYNCH SHANNON 7/5/2012 Page:9
'Cp4 Set()1 Capstone Construction Co.,Inc.
CONSTRUCTION 2917 E.Francis Ave.
Spokane,WA 99208
(509)468-4981,Fax(509)468-5081
Federal TIN-91-1475627
WA Contractor Reg.-CAPSTCC106J5
CONTINUED-Exterior
DESCRIPTION QNTY REMOVE REPLACE TOTAL
The previous line item is a rough number for the masonry that will be required.This number will need to be trued to actual invoicing.
128. General Demolition-per hour 3.00 HR 33.71 0.00 101.13
The previous line item is labor to clean up the front exterior area of the home.There is a large amount of debris that has fallen off of
the house and will need to be removed.
129. R&R Siding-beveled-pine or equal 195.00 SF 0.29 4.35 904.80
(clapboard)
130. Mask the surface area per square foot- 375.00 SF 0.00 0.15 56.25
plastic and tape-4 mil
The previous line item is to mask off the ground,brick and the two windows prior to painting the siding.
131. Seal&paint wood siding 350.00 SF 0.00 0.85 297.50
132. Brick mold-paint grade softwood- 78.00 LF 0.00 2.69 209.82
finger jointed
133. Seal&paint trim-two coats 78.00 LF 0.00 0.83 64.74
134. R&R Soffit-wood 175.00 SF 0.21 3.48 645.75
135. Soffit vent-linear 43.75 LF 0.00 5.78 252.88
136. Prime&paint exterior soffit-wood 175.00 SF 0.00 1.34 234.50
137. General Laborer-per hour 2.00 HR 0.00 31.39 62.78
The previous labor line item is labor to remove three of the existing large shrubs that are in front of the house.This is very labor
intensive to hand dig and remove these type of shrubs.
138. Tree-evergreen-3'to 4'in height 3.00 EA 0.00 134.13 402.39
139. General Laborer-per hour 16.00 HR 0.00 31.39 502.24
The previous line item is labor to remove the contaminated sod and soil in the front of the house.This is needed as there was a large
amount of gasoline and oil that was spilled on the front lawn of the home.At the time of inspection it did not appear that there is a
sprinkler system in this lawn.However if it is found that there is one installed additional costs to disconnect and repair would need to
be added at an additional cost.
140. Topsoil(per CY) 6.00 CY 0.00 18.07 108.42
141. Lawn- sod 200.00 SF 0.00 0.43 86.00
The previous two line items are to replace the soil and sod that will be removed.
Total: Exterior 7,675.88
General items
DESCRIPTION QNTY REMOVE REPLACE TOTAL
142. PERMITS AND FEES 1.00 EA 0.00 300.00 300.00
LYNCH SHANNON 7/5/2012 Page: 10
•
45 T0Art Capstone Construction Co.,Inc.
CONSTRUCTION
2917 E.Francis Ave.
Spokane,WA 99208
(509)468-4981,Fax(509)468-5081
Federal TIN-91-1475627
WA Contractor Reg.-CAPSTCC 106J5
CONTINUED-General items
DESCRIPTION QNTY REMOVE REPLACE TOTAL
143. Residential supervision-per hour 4.00 HR 0.00 52.97 211.88
The previous line item is labor to pull permits and meet with inspectors.
144. Asbestos test fee-full service asbestos 1.00 EA 0.00 357.30 357.30
survey
145. Lead test fee-self test(per sample) 1.00 EA 0.00 71.43 71.43
146. Single axle dump truck-per load- 3.00 EA 236.68 0.00 710.04
including dump fees
Totals: General items 1,650.65
Total:Exterior 9,326.53
Total: Main Level 36,095.61
Line Item Subtotals:LYNCH_SHANNON 36,095.61
Adjustments for Base Service Charges Adjustment
Heating/A.C.Mechanic 180.08
Total Adjustments for Base Service Charges: 180.08
Line Item Totals: LYNCH_SHANNON 36,275.69
Grand Total Areas:
1,900.33 SF Walls 986.25 SF Ceiling 2,886.58 SF Walls and Ceiling
986.25 SF Floor 109.58 SY Flooring 231.00 LF Floor Perimeter
0.00 SF Long Wall 0.00 SF Short Wall 245.00 LF Ceil.Perimeter
986.25 Floor Area 1,050.00 Total Area 1,900.33 Interior Wall Area
1,260.78 Exterior Wall Area 135.50 Exterior Perimeter of
Walls
0.00 Surface Area 0.00 Number of Squares 0.00 Total Perimeter Length
0.00 Total Ridge Length 0.00 Total Hip Length
LYNCH_SHANNON 7/5/2012 Page: 11
•
•pt,,--44----,216)7Art Capstone Construction Co.,Inc.
CONSTRUCTION 2917 E.Francis Ave.
Spokane,WA 99208
(509)468-4981,Fax(509)468-5081
Federal TIN-91-1475627
WA Contractor Reg.-CAPSTCC 106J5
Summary
Line Item Total 36,095.61
Total Adjustments for Base Service Charges 180.08
36,275.69
Overhead @ 10.0% x 36,222.54 3,622.25
Profit @ 10.0% x 36,222.54 3,622.25
Sales Tax @ 8.700% x 43,520.20 3,786.26
Replacement Cost Value $47,306.45
Net Claim $47,306.45
Shay Cummings
LYNCH SHANNON 7/5/2012 Page: 12
Main Level
24'
23 4 L —
Garage
12'1" • 10'11" --+
io
Canino Room
livIno Room
N
IC
Entry/Foyer
12'7' I 11'5" I 5"fl
Main Level
LYNCH SHANNON 7/5/2012 Page: 13
Main Level
24'
23' 4"
f c
0)
12' 1" 10' 11" 1 °'
v
Zh
N-
0
Urine Room
N
N Kitchen
I 1
totryITover
12'7" I 11'5"
Main Level
LYNCH SHANNON 7/26/2012 Page: 1
w
I
,A y
` ii.is 1. 4 fir. ,r... - )
1� C
011`',„ +- .°
Ry. `\tT
'T P
�
i 411:411:"
.SIM .
% . Nva. 4. w ''''7
w»
tAllill _, w ./IL
�^ r rr
.,.rte— ^• *`y,. 1" ./."N' S tly'r
*,,,, %.
,: "
i-,'.
} kms'
■ `" � r . "f a4
a -�c• y:�" ,.«,�,y• aa F r.. xw ',....j‘..
a+L, Y• s•� N:
.0;4; rip,,,,„,
R
4". -
d ^' N• << �� "min.,:& .P:4z y :� ` 1 'r �„ •- •' E; 4g,, ..
,.,.: .`.- I ‘.,14
, .: ,, ..,,,.,--k,
`Mt f e•• 'elf '44);(*‘%1:!,, , ,, „it . , ..4
l • �•
,. ....
. _ _
_ ,4
..
.:::::4... .*,,p1, 4404„,,... .44. ,;,,
44 .
..,A._,....,,,..
ki rjr'a
yl
Q. i - ♦ -L� .i^ -� -4-a.
44, ::f' 1yy - . Mv ghr . i�.c ��� ? ! h
w.
•
X''gr •f, yy
Y 3
k.
w •
et"�'12 15 .
Y•
/ / j 1 f1 ? f
T , 1• F
F
4,
}
I
,
o
3 1,
1
4.
444
•
}
I
•
0
.
x
Piff'
' fj
! r
i
t
;. :
111111114
•
. � I {tS r> -KIM
11
.. a
,v
A
.
#
,
y
,,,,k,.1„...,, ,, ,,..,:,.,,,,77.,,,,,..ii.:,.._..--,...
ft ,
F
.7,i
3:
._______tri .
—,..., . IlIF — -,;
., •
i ` \ `
SIENRP
•
y'4 . 'S S ii_ - - ` ,.
mss--h- :o
---
„ e14,14-ts'
_.„-----
-"”-
1 I '
1
at‘if dr*
-- - -,
' - ft ---- . ..x.....z..z , , .
o
,
....,J
0
N
rs.)
0
,...Jk
rs.) II
, .
— III
•P'*--
I
I . . .. .
j
. .
,., ..
Sliftk
- k\
, „.•-, ,.
• ,
- ,
...
.1
i, •.
, ..,
„... •,„ .5-, .',.,.
,....,...,...,...„.. . •,..,••
..,
....„,. ........,,,
......,.. .......„_,...... .,, „r,
."000/0/ ,..... . .
.__
,.., .
..,_
,..
, .,,.....
-,,,,,,,_
, ..
.,. ,
.,.. 4
'.1.,.
. ,
,
_
i
. ..,
,,,,,',p
,. .,,,,
.
•
'
..,
"
:'
1 4
,
, , .....-
r ,
t
1 1
,
'
./.0*
I
111
.,
T
1
I
,
,
-
,
,
,
t
'1 i '
--..... ,
.... ,
--
,
, *
arairl Ikk
. .
. ,g
, r,,ttitimp' A
.
4
. v.'
.
i
1
INEMENIMPIIIIR
Amontemmor
t.
N.,
4.,
I
- ,
- ,
...' \N
.„......0•.....m...........--------,.„....--411ftilM11.1111•11110.10mQ %
IllialliiialtinariMellia11811111261N1118263
N,
k.
IL \
Aug 04 2012 10: 37AM PROPERTY SOLUTIONS (509) 468-3235 p. 1
d
FAX TRANSMITTAL
FROM:
PROPERTY SOLUTIONS NW
P.O. PDX 655
MEAD, WA 99021
(509)467-5353 FAX(509)465-3235
TO: Jerry Clark
COMPANY: Capstone Construction Company
FAX NUMBER: 468-5081
DATE: August 4, 2012
REFERENCE: Lynch — Vehicle impact assessment
TRANSMITTED: EPORT VOCE FALCULATIONS
0 OTHER
NUMBER. OF PAGES (NOT INCLUDING THIS TRANSMITTAL PAGE): s
ORIGINAL TO FOLLOW: E'YfE5 ' W/ 0 PHOTOS
❑ INVOICE
❑ OTHER
❑ NO
PHOTOS(IF NOT INCLUDED)AVAILABLE UPON REQUEST: E� Y//ES 0 NO 0 N/A
COPY TRANSMITTED TO PROPERTY OWNER: 0 YES [�'fd0 0 N/A
CALL ME REGARDING THIS FAX: 0 TO DISCUSS COR QUESTIONS
COMMENTS:
This facsimile transmission is confidential, and intended only for the use of the individual named above. If you have
received this transmission in error, please notify us immediately. If FAX transmission is incomplete or illegible.
please contact sender,
Aug042012 10: 37AM PROPERTY SOLUTIONS (509) 468-3235 p. 3
•
P5 N POPERw 5NORTHWEST
"YOUR f ROFESSIONAL1 ESOURGt. INSPECTION.,ASSESSMENT*ANALYSIS*EVALUATION
August 4, 2012
Mr. Jerry Clark
Capstone Construction Company
Reference: Lynch
Vehicle impact assessment
Dear Mr. Clark:
On August 3, 2012, I examined the Lynch property at 3018 S. University, Spokane, WA.
No one was present during my investigation.
PURPOSE
The purpose of the investigation was to examine reported vehicle impact concerns at
the property. Of particular interest was the nature and scope of the reported vehicle
impact concerns, and determination of the appropriate scope of repair. Repair
recommendations (if any) are presented for comprehension and scope purposes only;
and require integration with the 2009 International Residential Code ("IRC) for
construction use. Specific construction details exceed the scope of this report.
Investigation of other aspects of the property was not conducted,unless specifically
noted below.
PREMISES
The subject structure is a split story frame building, constructed over a basement,
extending approximately three to seven feet below grade. A two car garage,built
over a concrete slab on grade, is attached to the structure. The building is of
unknown age, and is maintained in average condition.
INVESTIGATION OBSERVATIONS
For the purposes of this report, the front of the house is presumed to face east.All
references to direction or orientation are made relative to this presumed structure
orientation, and are not intended to establish true compass direction.
A vehicle impacted the east face of the structure. The impact was isolated to the
garage door opening, adjacent southeast wall and kitchen northeast wall.
Specifically, the garage door, southerly east wall framing and easterly south wall
framing displayed breakage and/or deformation, and the northerly east wall siding
displayed detachment.Additionally,the kitchen northerly east wall framing and
easterly north wall framing (common with the garage) displayed breakage and/or
deformation.
P.O. BOX 685 * MEAD+WA * 99021 (509)467-5353 •FAX(509)466-3235
Aug 04 2012 10: 37AM PROPERTY SOLUTIONS (509) 498-3235 p. 4
Mr. Jerry Clark
August 4,2012
page two
No breakage or deformation was observed to the garage north wall, foundation or
roof assembly. No breakage or deformation was observed to the main structure east
foundation wall or roof assembly. No breakage or deformation to the residence entry
or interior was observed. A broken basement east window and torn entry screen door
was noted.
OTHER CONSIDERATIONS
Repair of the structure is governed under Section R102.7.1 of the 2009 International
Residential Code("IRC"). That section provides for repairs to conform to the
requirements for a new structure, "... without requiring the existing structure to
comply with all of the requirements of this code ...". The IRC allows for repairs (that
meet current code)to be made, without improving or updating portions of a structure
not subject to the repair activity. Only alteration to the structure or change in
occupancy, opens the discussion of code upgrade to areas not under repair.
CONCLUSION
With a reasonable degree of certainty, based upon the above stated observations; it is
my opinion that the vehicle impact was isolated to the garage door, southeasterly
wall framing, and kitchen northeasterly wall assembly. No meaningful impairment
of the roof assembly, foundation or other portions of the structure were noted.
RECOMMENDATIONS
Recommendations represent physical repair option suggestions; and are made
without insurance coverage, or financial responsibility in mind. Repair option
suggestions do not reflect liability, financial responsibility or insurance coverage, and
do not suggest insurance coverage responsibility. Repair option suggestions are
qualitative, and require integration with the 2009 IRC for construction purposes.
The garage door south header support wall framing should be repaired in kind.The
garage door header should be reset or replaced.
The kitchen northeasterly wall framing should be reset, or sistered if broken. New
wall covering should be installed as necessary.
East wall cavity insulation may be increased by adding a 2" x 2"furring strip to the
inner side of the kitchen 2"x 4" studs. North kitchen wall insulation is likely
unnecessary, as the garage reduces exposure to exterior conditions. Furring out the
entry east wall is unnecessary, as no wall cavity is present at the entry location.
Other repair work,wall coverings, resetting cabinets, fixtures and appliances, etc,
should be completed as necessary.
LIMITATIONS
The information contained in this report is for the exclusive use of Capstone
Construction Company; and Property Solutions NW assumes no responsibility or
liability for any use of this report by other parties. This report relates solely to the
Aug 04 2012 10: 37AM PROPERTY SOLUTIONS (509) 468-3235 P. 5
Mr, Jerry Clark
August 4, 2012
page three
stated purpose of this investigation; and no representations concerning other aspects
(if any) of the circumstance, structure or site are included. The conclusions are based
on the above stated visual observations, and no destructive testing or monitoring
was performed. Recommendations (if any) contained in this report are qualitative in
nature, and require integration with the 2009 IRC for construction use. Specific
construction details exceed the scope of this report. No guarantee or warranty,
expressed or implied, is provided.
If you have questions, please contact me.
Respectfully,
+ c' ti
4 fly, pp
,
S. C. Maloney, P.E. i,° mss, �'"� �►2....
ICC Certified Building Inspector '�o,,-' ' '
PSN Wvepons\Lynch.wpd
Aug 04 2012 10: 37FIM PROPERTY SOLUTIONS (5091 468-3235 p. 6
COMPANY PROJECT
ti Property Solutions NW Lynch
■ - r P.O.Box 685 S.University
Spokane
t! Mead,WA 99021 SpokValley,WA
. SOf'Wkl rlbe•WOOD eik'SrCN
(509)467-5353 Garage door header
Aug.4,2012 09:30 Garage door header
Design Check Calculation Sheet
WoodWorks Sizer 9.2
Loads:
Load Type Distribution Pat- Location (ft] Magnitude Unit
tern Start End Start End
Dead Dead Full UDL 145.0 plf
Snow Snow Full UDL 480.0 plf
Self-weight Dead Full UDL 11,8 plf
Maximum Reactions(lbs)and Bearir C.�"'' :
G� y
Q �`` 16'1-13116"
4
0C)
0' �Q o 16'
Unfactcred: �‘i.
Dead 1265 O 1265
Snow 387 3877
Factored:
Total 5142 5142
Hearing:
Length 2.83 1.83
Min req'd 1.83 1.83
Garage dour header
Lumber n-ply,D.Fir .(N), No 1/No 2r 2x 12,3 ity(441/2"x11-114")
Supports:All-Timber-soft Beam;D FiF-L:No.2
Total length:16'1-13/16";
Lateral support:top=at supports,bottom=at supports;Repetitive factor:applied where permitted(refer to online help);
This section AILS the design check
WARNING:This section violates the following design criteria:,Bnding and deflection
Analysis vs.Allowable Stress(psi)and Deflection(in)using NDS 2005:
Criterion Analysis Value Design Value Analysis/Design '
Shear fv = 132 Fv' = 207 fv/Fv' = 0.64
Bending(+) fb = 2576 Fb' = 1099 fb/Fb' = 2.34
Dead Defl'n 0.27 = L/709 Z
Live Defl'n 0.83 = 1/231 0.53 L/350 1.55 Q
Total Defl'n 1.23 = L/155 0.80 = L/240 1.54 o?
Design Notes:
1.WoodWorks analysis and design are in accordance with the ICC International Building Code(IBC 2009), a ign Specification
(NDS 2005),and NDS Design Supplement. x,11,
2.Please verify that the default deflection limits are appropriate for your application. .V
3.Sawn lumber bending members shall be laterally supported according to the provisions of NDS Clause 4.4.1. Ip
4.BUILT-UP BEAMS:it is assumed that each ply is a single continuous member(that is,no butt joints are present)fast er securely
at intervals not exceeding 4 times the depth and that �4
each ply is equally top-loaded.Where beams are side-loaded,special fastening details may be required.
5.NOT FOR CONSTRUCTION.Calculations for evaluation purposes only.
Hug 04 2012 10: 3SRM PROPERTY SOLUTIONS (509] 488-3235 p. 7
COMPANY PROJECT
Property Solutions NW Lynch
1, W0 W1C'ks P,O.Box 885 3018 S.University
I Mead,WA 99021 Spokane Valley,WA
csom9kT.Se sari u ftw..... (509)457-5353 Garage door header
Aug.4,2012 09:29 Garage door header
Design Check Calculation Sheet
WoodWorks Sizer 9.2
Loads:
Load Type Distribution Pat- Location (ft] Magnitude Unit
tern Start End Start End
Dead Dead Full UDL 145.0 plf
Snow Snow Full UDL 480.0 plf
Self-weight Dead Full UDL 15.3 Pit
Maximum Reactions(lbs)and Bearing Le (in) :
�' �� ��� 16'2-116" t
O
c.‘:,* ‘.4.5.1'
Unfaotored: js
Dead 129 • 1295
Snow 3883 3883
Factored:
Total 5178 5178
Bearing:
Length 2.14 2.14
Min =ea'd 2.14** 2.14**
**Minimum bearing length governed by the required width of the supporting member.
i ;:¢,rrage_door-header-_
PSL;2 OE,2.0E,3-1/2"k146
Supports:All-Tirritiersoft Beam;b.Fir-L No.2
Total length:16'2-1/8";
Lateral support top=at supports, bottom=at supports;
Analysis vs.Allowable Stress(psi)and Deflection(In)using NDS 2005:
Criterion Analysis Value Design Value Analysis/Design
Shear fv = 132 Fv' = 333 fv/Fv' = 0..
Bending(+) fb = 2151 Fb' = 2604 fb/Fb' = 0.8 O�472)
Dead Defl'n 0.13 = <L/999
Live Defl'n 0.44 = L/434 0.53 = L/360 0.83 It% A,
Total Defl'n 0.66 = L/289 0.80 = L/240 0.83
lor
Design Notes: C
1.WoodWorks analysis and design are in accordance with the ICC International Building Code(IBC 2001 he rlaI Design Specification
(NDS 2005),and NDS Design Supplement. + ���/ 1-
2.
2.Please verify that the default deflection limits are appropriate for your application. }�
3.Beam is in a system of 3 or more members spaced 24"or less apart.System factors applied according to 11
4.SCL-BEAMS(Structural Composite Lumber):the attached SCL selection is for preliminary design only.For fin ign contact your
local SCL manufacturer.
5.Size factors vary from one manufacturer to another for SCL materials.They can be changed in the database edltot
6,NOT FOR CONSTRUCTION.Calculations for evaluation purposes only.