2008, 05-12 Permit App: 08001775 Demolition GarageProject Number: '08001775 Inv: 1
Application
THIS IS NOT A PERMIT
Penalties will be assessed for commencing work without a permit
Date: 5/12/2008 Page 1 of 2
Project Information:
Permit Use: DEMOLITION OF OLG GARAGE TO BUILD
NEW ONE.
Setbacks: Front
Site Information:
Plat Key:
Left: Right: Rear:
Name: Range
Parcel Number: 45184.0550
Contact: DAVIS, LEON C
Address: 8411 E VALLEY WAY
C - S - Z: SPOKANE VALELY, WA 99212
Phone: (509) 290-2016
Group Name:
Project Name: NOTICE OF INTENT #08-0120
District: Nort
Block: Lot:
SiteAddress: 8411 E VALLEY WAY
Location:: CSV
Owner: Name: DAVIS, LEON C
Address: 8411 E VALLEY WAY
SPOKANE VALELY, WA 99212
Zoning: R-3 SF Res District
Water District: 005 HUTCHINSON Hold: ❑
Area: 29,109 Sq Ft Width: 0
Nbr of Bldgs: 0 Nbr of Dwellings: 0
Review Information:
Review
Building Plan Review
Sewer Review
Permits:
Depth: 0 Right Of Way (ft): 0
Originally Released: 5/12/2008 By: JLMain
Released By:
OK PER ROGER RIVERS @ SPOKANE CTY UTILITIES VIA FAX DATED 5/12/08
Originally Released: 5/12/2008 By: JLMain
Contractor: OWNER
Item Description
Demolition Permit
Firm: OWNER
Phone: (000) 000-0000
Units Unit Desc
Fee Amount
DEMOLITION ACCESSORY 1 NUMBER OF $20.00
Permit Total Fees: $20.00
Operator: jmm Printed By: jmm Print Date: 5/12/2008
Project Number: `08001775
Notes:
Inv: 1
Application
THIS IS NOT A PERMIT
Penalties will be assessed for commencing work without a permit
Date: 5/12/2008 Page 2 of 2
Payment Summary: ,,".„trt5...
Permit Type
Demolition Permit
Fee Amount Invoice Amount
$20.00 $20.00
$20.00 $20.00
Amount Paid
$0.00
$0.00
Amount Owing
$20.00
$20.00
Disclaimer:
Submittal of this application certifies the owner (or person(s) authorized by the owner) has both examined and finds the information
contained within to be true and correct, and agrees that all provisions of laws and/or regulations governing this type of work will be
complied with. Subsequent issuance of a permit shall not be construed to be a permit for, or an approval of, any violation of any of
the provisions of the code or of any other state or local laws or ordinances.
Signature:
Operator: jmm Printed By: jmm
Print Date: 5/12/2008
Your advance notification period will begin when a completed NOI, including required fees, is received by SRCAA.
A copy of the asbestos survey, completed notification & all amendments must be available for inspection at all times at the job site. NOl
07
SRCAA NOI No.
�—z_CNOTICE
0(erse my
SPOKANE REGIONAL CLEAN AIR AGENCY (SRCAA)
1101 West College, Suite 403, Spokane, WA 99201
OF INTENT (NOI)
For Asbestos Projects and Demolition Projects
j
_
SIZ Raiadly
MAY 0 0 2008
Agency Use Only
A�
_Jency
3. ' i • ' ' WO.11; ,IFIA'..
A. Project Type:
1. 0 Asbestos Removal
2. 0 Asbestos Removal & Demolition
B. Property(If
Owner: LQ Op\
1, fit, S
Phone: at) - ZO do
available)
Fax: 7'- f '] -‘,..,73.0g
Property Owner'sq�
Mailing Address:
z�'� (i E, Ycaesew y / re
City: 5p0k4 ve, 04-lli'y
State: L,i t k
Zip: i l" -fit --
1
C. Site
Pitt EV
E. allzy tacLy u�,
City: (,(1���r
State: C
Zip: t
I�� ( kAddress:
Responsible Site
Contact Person:
e.g..w\ '', S
Job Site
Phone: S1 a---5-9 3
D. 0 Asbestos Survey
0 Material Presumed
or
If surve erformed, was asbestos found?
0 Yes j4. If "No" for any structure, attach
survey
Date Survey
Conducted: 5—�'bi
No. of Structures:
(see back if>1)
AHERA Building�y
Inspector Name:
PIA ttti V
Certification -r
Number: DLK - 1
VI
- l oa
Exp. ei-14_�a
Date: 11
E. Asbestos Project
Information:
No. of Structures:
(see back if>1)
j
1
Date: ST1,1 .0/
Completion
Date:
Wk. Days: Su M T W Th F Sa
Hours:
Total quantity
to be removed:
Ln.
Feet
Sq.
Feet
Will all asbestos
removed by project
material be 0 Yes
completion? 0 No
Will work schedule 0 Yes
fax ppm. be used? 0 No
List individual type
be removed or provide
and quantity of materials to
an attachment of same:
Abatement
Contractor:
Phone:
Fax:
Mailing
Address:
City:
State:
Zip:
F. Demolition
Information:
No. of Structures:Start
(see back if > 1) I
Date: 5-1 �� ��
LI Training Fire (List Fire
0 Ordered Demolition (attach
Dept. as demo. contractor below)
copy of Order)
Demolition
Contractor:
y t
V��
Phone:
Fax:
Mailing
Address:
City:
State:
Zip:
G. Asbestos/Demolition Project Categories:
Notificationng Period
Non -Refundable
n-Reft Fee
Does this involve a fire -damaged structure? 0 Yes No
project
I. • Owner -Occupied, Single -Family Residence Asbestos & Demolition Project *
' Owner -Occupied, Single -Family Residence Demolition Project *
Prior Notice
$30
$25010
3. 0 10 - 259 linear feet or 48 - 159 square feet (see back of form for options)
3 Days
4. 0 260 999 linear feet or 160 - 4,999 square feet
Days
5500
-
5. 0 > 1,000 linear feet or> 5,000 square feet
10 Dayssce
0
1,250ct Fee
0 Emergency Asbestos/Demolition Project (attach "owner's letter")10
Prior0i
Twice
Fee
6.
0 Alternate Means of Compliance for Friable Materials (attach plan)
DaysDas
Twice Project
Fee
7.
0 Alternate Means of Compliance for Nonfriable Materials (attach plan)
10 Y
Twice Project
8.
0 Exception for Hazardous Conditions (attach plan)
with Project
Concurrent10
Regular Project Fee
9.
0 Demolition with Nonfriable Roofing Left in Place
Days
Twice Project Fee
10.
* The two categories in G.1 apply only to owner -occupied, single-family residences, which means any non -multiple unit building containing living
space that is currently occupied (prior to and after renovation/demolition) by one family who owns the property as their domicile. One of the
be used for all other asbestos/demolition projects. For more information, contact SRCAA at (509) 477-4727.
categories must
H. Optional: List additional parties you would like copies of this NOT and/or related notices sent to (list name & fax number and/or mailing address): I
1. I certify t t the information contained in this notification and any supplemental data provided is, to the bestNOlt
y kn edge, accurate and complete.
6.--49 -CrSee
nese Review
itio
0 NOI deficient -
Attached
Date 5-Cl-Q� ?J
Representing
Signature
For demolition projects, this NOl expires 12 months from the earliest listed asbestos/demolition project start date.
Agency Use Only
_ /1
Your advance notification period will begin when a completed NOI, including required fees, is received by SRCAA.
A copy of the asbestos survey, completed notification & all amendments must be available for inspection at all times at the job site. NOl
07
May 12 2008 1:50PM SPOKRNE#COUNTY#UTILITIES 4777178 p.1
MAY 12 2008 13:08 FR 9J PERMIT CENTER 5096880037 TO 94774715 P.01r03
S1761
,„,•••WValley
Date: 5/12/2008
11703 E Sprague Are Suite B-3 i Spokane V lley WA 99206
• 509.688.0036 • Fax: 509.688.0037 4
Transmittal
111 SPOKANE COUNTY uTILRIES p r - Vers
Fax: 509-477-4715
ale Mt PERMIT CENTER
Re:
Review/Approval of Demolition Permit Application
Attn: \ Billy Urhausen
Roger Rivers
Glen Gredvig
Colin Depner
Lela Gallen
SITE ADDRESS; 8411 E VALLEYWAY AVE
PERMIT PURPOSE: DEMOLITIO a F GARAGE
t KL
1.4.454. 1S 604. Gan ne.c TZd +u CsiAn4tL Se.We? 111/A.efa
0.. ye.1-461" D flc DYlFV n* {mer rn %* Ana3 inn 4 -ion s n
1-t'41."11-611 • 1 ,,.x4:41/14)
1} /1-
5/1Z/01i
T1-5/1Z/o1i
MAY 12 2008 14:49
4777178 PAGE.01
May 12 2008 1:51PM SPOKRMEUCOUMTY#UTILITIES 4777178
MAY 12 2008 1308 FR SU PERMIT CENTER 5096880037 TO 94774715
D:' 4
c Q
It: -4- •
Irl
p.3
P.03/03
Gmaabc wiLL aE
REMOVED 4, RE6uTrr
IN NEW L OcA'rxoN
MAY 12 2008 14:49
TOTAL PAGE.03 +for
4777178 PAGE.03
ASBESTOS INSPECTION PRIOR TO
DEMOLITION OF GARAGE
LOCATED AT 8411 E. VALLEYWAY
SPOKANE VALLEY, WASHINGTON
1.0 INTRODUCTION
IRS Environmental of WA, Inc. has completed an asbestos inspection prior to Garage
demolition at 8411 E. Valleyway, Spokane Valley, Washington. The survey for asbestos
containing building materials was completed May 8th, 2008 at the request of Leon Davis.
The inspection was performed by Maureen Fay, a certified AHERA Building Inspector
under 40 CFR, Part 763, Subpart E, and Appendix C (Certification No.BIR-07-102). This
report presents the asbestos survey methods, findings, and conclusion.
2.0 PURPOSES AND SCOPE
Various local, state, and federal regulations govern the use and management of asbestos
containing materials (ACM). The codes are generally focused on preventing airborne
emissions of asbestos fibers and addressing public and worker health concerns for
exposure to asbestos during renovation and demolition projects.
3.0 SUSPECT MATERIALS TESTED FOR ASBESTOS CONTENT
The number of samples taken for any surfacing material is determined by CFR Part
763.86, which requires:
- 3 samples for each material that is present in quantities of 1,000 SF or less.
- 5 samples for each material that is present in qualities of 1,000 - 5,000 SF.
- 7 samples for each material that is present in qualities of greater than 5,000 SF.
In some cases, the inspector is allowed to use discretion and take fewer samples of
factory manufactured (not site mixed) materials such as VCT, ceiling tile, and roofing.
The following materials were tested for asbestos content at the request of the client:
4.0 SUBJECT SITE DESCRIPTION
The subject site consists of a single story garage structure. The exterior treatments of the
garage are metal siding over cedar shake siding over tar paper and the windows are wood
framed without any putty or glazing. The roof is two layers of asphalt composition with
no tar paper. Floor treatment is concrete.
Concrete
Garage floor
Tar paper
Under cedar shake siding
Asphalt composition roof layers
Garage roof
4.0 SUBJECT SITE DESCRIPTION
The subject site consists of a single story garage structure. The exterior treatments of the
garage are metal siding over cedar shake siding over tar paper and the windows are wood
framed without any putty or glazing. The roof is two layers of asphalt composition with
no tar paper. Floor treatment is concrete.
5.0 SURVEY METHODOLOGY
The scope of services included identification of suspected ACM within the specific areas
that will be impacted by upcoming demolition/ renovation activities, to bulk sample and
analyze those suspect materials and to provide a report of findings. A general walkover
examination was initially completed to plan the asbestos survey, identify functional
spaces (spatially distinct areas within the work area), and to develop a sampling scheme
for homogeneous areas of suspected ACM. Bulk samples were collected in a
representative manner by the inspector based on suspected material contents, as defined
by regulatory codes or guidance's for sampling methods and as applicable to the planned
demolition/renovation activities. The samples were placed into airtight plastic bags and
hand delivered to Mountain Laboratories at 10905 E. Montgomery Ave., Spokane, WA.
Mountain Laboratories is a NVLAP accredited laboratory for the analysis of bulk
materials using PLM.
6.0 IDENTIFIED ASBESTOS CONTAINING SAMPLES — FINDINGS
The following represents a tabulation of bulk samples which were found to contain
asbestos during the preparation of this survey and the results of their analysis.
None of the suspect materials tested contain asbestos.
7.0 REMARKS
This report represents IRS Environmental of WA, Inc., findings and conclusions based on
the scope of services agreed to by the client and within the client's schedule and budget.
All findings are based on readily available and reasonably ascertainable information on
site conditions at the time of the survey and for the known regulations in affect at that
time. The services provided include professional opinions and judgments based on
readily available information, field observations and measurements, and analytical
reports by an independent laboratory. The specific conditions and limitations of the
AHERA Building Inspector certification have influenced these results. The bulk samples
collected in connection with this survey only indicate the presence or absence of the
investigated contaminant within the discrete sample units. Although each sample was
collected from an area most likely to be affected by the contaminant and accessible to the
inspector, affected areas may exist in areas not sampled or for potential contaminants not
selected for analysis and characterization. Any analytical results included in this report
should be considered only as indicators of possible site conditions with specific statistical
significance and influenced by sampling technique and laboratory methodology.
8.0 LIMITATIONS OF THIS REPORT
We have prepared this report to aid in evaluating this property for demolition of the
garage. This report is for the exclusive use of Leon Davis, the contractor hired to
perform the demolition and IRS Environmental. This report applies only to the subject
detailed above and shall not be relied upon by any other party without the prior written
consent of the inspector that prepared the report.
IRS Environmental's work is performed in a professional manner with the best interests
of our client in mind. IRS Environmental's objective is to perform our work with care,
exercising the customary thoroughness and competence of professionals in the relevant
disciplines; in accordance with the standard for these services at the time and location
those services are rendered. It is important to recognize that even the most
comprehensive scope of services may fail to detect environmental liability on a particular
site.
Therefore, IRS Environmental cannot act as insurers and cannot "certify or underwrite"
that a site is free of environmental contamination and no expressed or implied
representation or warranty is included or intended in our reports except that our work was
performed within the limits prescribed by our client, with the customary thoroughness
and competence of our profession.
Within the limitations of scope, schedule and budget, our services have been executed in
accordance with generally accepted practices in this area at the time this report was
prepared. No other conditions, expressed or implied, should be understood. Nothing in
this report should be interpreted as legal advice; the information contained here is for
information only.
Maureen Fay
AHERA Building Inspector
Certification No. BIR -07-102
Expir. ion November 14, 2008
QtitA.GFiu
9.0 SAMPLE LIST OF MATERIALS THAT MAY BE PRESENT AND HIDDEN
ON ANY CONSTRUCTION, DEMOLITION OR RENOVATION SITE
• Window glazing
• Stucco
• Cement pipes
• Cement board/transite
• Duct tape/paper
• Furnace insulation
• Vinyl sheet flooring/mastic
• Vinyl floor tile/mastic
• Poured flooring
• Pipe insulation/fittings
• Plaster/ wall joints
• Textured paints/coatings
• Ceiling tiles/panels/mastic
• Spray -applied insulation
• Blown -in insulation
• Fireproofing
• Sink insulation
• Packing materials
• High temperature gaskets
• Lab hoods/table tops
• Sink insulation
• Elevator brake shoes
• Asphalt flooring
• Paper on backside of fiberglass
insulation
• Erkot roofing material
• Laboratory fume hoods
• Construction mastics
• Ductwork flexible connections
• Acoustical ceiling texture "popcorn"
• Electrical cloth
• Electrical wiring insulation
• Roofing shingles
• Built-up roofing
• Base flashing
• Rolled roofing
• Caulking/putties
• Incandescent light fixture backing
• Brick mortar
• Vinyl wall coverings
• Vapor barrier
• Cement roofing shingles
• Gray roofing paint
• Nicolet (white) roofing paper
• Sub flooring slip -sheet
• Mudded pipe elbow insulation
• HVAC duct insulation
• Boiler/tank insulation
• Breaching insulation
• Paper firebox in walls
• Fire doors
• Fire blankets
• Fire curtains/hose
• Electrical panel partitions
• Chalkboards
• Joint compound/wallboard
Note: This list does not include every product that may contain asbestos. It is intended as
a general guide to show which types of materials may contain asbestos.
10.0 SUGGESTED PROCEDURE FOR COMMUNICATING SURVEY
FINDINGS TO AFFECTED PARTIES
The results of this survey should be posted on site for ALL CONTRACTORS AND
SERVICE PERSONNEL to see. A copy of this report should be provided to all persons
who may come in contact with materials that are known to contain asbestos. The
following is a signed acknowledgment to be collected and signed by anyone who is
provided a copy of this report.
I acknowledge that I have read and understand the report titled:
ASBESTOS INSPECTION PRIOR TO
DEMOLITION OF GARAGE
LOCATED AT 8411 E. VALLEYWAY
SPOKANE VALLEY, WASHINGTON
I further acknowledge that hidden asbestos materials (refer to list contained in
section 9.0 of this report) may exist in concealed areas that may be exposed during
demolition. If suspect materials (refer to list contained in section 9.0 of report) are
discovered that have not been tested, I will treat these materials as asbestos until
additional testing proves otherwise.
Firm Name
Signature Name
Title
Address
Phone No. Date
APPENDIX A
RESULTS OF LABORATORY TESTING
ASBESTOS BULK SAMPLES
RiV Lq.
Mountain Laboratories
Division of Mountain Inspection & Laboratory Services, Inc.
9922 East Montgomery Suite 13
Spokane Valley, WA 99206
(509) 922-1365 • Fax (509) 922-1380
IRS Environmental
Maureen Fay
PO Box 15216
Spokane, WA 99215-5216
NVLAP LAB CODE 101890-0
May 8, 2008
Project: Davis
Project #: 10813
Dear Ms. Fay:
The enclosed report details results for the analysis of the bulk sample(s) submitted to Mountain
Laboratories on May 7, 2008. Mountain Laboratories participates in a National Voluntary Laboratory
Accreditation Program (NVLAP) for Bulk Asbestos Analysis, governed by the National Institute for
Standards and Technology (NIST)-NVLAP I.D. #101890-0. Sample results must not be used by the
client to claim endorsement by NVLAP nor any agency of the United States government. Sample
analysis was performed to determine asbestos type and content using Polarized Light Microscopy,
supplemented by Dispersion Staining (PLM/DS) in accordance with the following methodology:
18/A01 EPA -600/M4-82-020: Interim Method for the Determination of
Asbestos in Bulk Insulation Samples.
This report includes a summary of the analytical results, chain of custody and copies of the analysts
report forms used by our analysis. Analytical results are only reflective of the samples, which were
tested and presented in this report. Mountain Laboratories limits warranty to proper analysis methods
and take no responsibility for sample procurement.
It has been our pleasure providing you with these analytical services. If you have any questions
regarding this report, please do not hesitate to call us at (509) 922-1365.
Sincerely,
4/Ltj
i i L. McCarthy
He Heidi y
Laboratory Manager
Mountain Laboratories
Mountain Inspection & Laboratory Services, Inc.
Enclosure: 4001.4772.4775
Polarized Light Microscopy, NVLAP Accreditation • Phase Contrast Microscopy, PAT Participant
BULK SAMPLE ANALYSIS FOR ASBESTOS
IRS Environmental
Maureen Fay
PO Box 15216
Spokane, WA 99215-5216
•
Project: Davis
Project #: 10813
Client # 4001
Laboratory No.
B08-4772
B08-4773 "
B08-4774
Sample ID No.
10813-01
10813-02
10813-03
Sample Description
Concrete
Tar Paper
Roofing
Sample Treatment
Teased/Crushed
Teased/Dissolved/
Heated
Teased/Dissolved/
Heated
Homogeneous
Yes
Yes
No
Layered
No
No
Yes
Fibrous
Yes
Yes
Yes
Sample Color
Grey
Brown
Black/White/Green
Asbestos Present
No
No
No
Asbestos Type and
Percentage
1. Chrysotile
2. Amosite
3. Crocidolite
4. Other
N.D.
N.D.
.
N.D.
Total % Asbestos
None
None
None
Other fibrous material
In sample
Cellulose <1%
Wood <1%
Cellulose 85%
Synthetic 30%
Non -Fibrous Material:
Mica <1%
Aggregate 60%
Other 37%
Tar 15%
Aggregate 40%
Tar 30%
ld M
Date Analyzed: May 7. 2008
nayzeHy: Ltsa eade
Mountain Laboratories, Division of Mountain Inspection & Laboratory Services, Inc. limits warranty to proper analysis methods only and takes no responsibility for sample
procurement. Mountain Laboratories, Division of Mountain inspection & Laboratory Services, Inc, 9922 E. Montgomery, Suite #13, Spokane Washington 99206 (509) 922-1365
- Fax (509) 922-1380. PLM has been known to miss asbestos in a small percentage of samples. Titus negative or <1% PLM results should be tested with either SEM or TEM.
Client is responsible for sample separation. This report may only be reproduced in full with written approval by Mountain Laboratories.
Page 2 of 3
BULK SAMPLE ANALYSIS FOR ASBESTOS
IRS Environmental
Maureen Fay
PO Box 15216
Spokane, WA 99215-5216
Method: PLM with Dispersion Stainin
Project: Davis
Project #: 10813
Client # 4001
Laboratory No.
B08-4775
Sample ID No.
10813-04
Sample Description
Roofing
Sample Treatment
Teased/Dissolved/
Heated
-
Homogeneous
No
Layered
Yes
Fibrous
Yes
Sample Color
Black/White/Green
Asbestos Present
No
Asbestos Type and
Percentage
I. Chrysotile
2. Amosite
3. Crocidolite
4. Other
N.D.
Total % Asbestos
None
Other fibrous material
In sample
Cellulose 34%
Non -Fibrous Material:
Mica <1%
Aggregate 35%
Tar 30%
Date Analyzed: May 7, 2008
Analyzed Hy: Lisa Meade
Mountain Laboratories, Division of Mountain Inspection & Laboratory Services, Inc. limits warranty to proper analysis methods only and takes no responsibility for sample
procurement. Mountain Laboratories, Division of Mountain inspection & Laboratory Services, Inc, 9922 E. Montgomery, Suite #I3, Spokane Washington 99206 (509) 922-1365
- Fax (509) 922-1380. PLM has been known to miss asbestos in a small percentage of samples. Thus negative or <1% PLM results should he tested with either SEM or TEM.
Client is responsible for sample separation. This report may only be reproduced in full with written approval by Mountain Laboratories.
Page 3 of 3
Mountain Laboratories
Division of Mountain Inspection & Laboratory Services, Inc.
9922 E. Montgomery, Suite 13
Spokane, Washington 99206
PHONE: 509-922-1365
FAX: 509-922-1380
Project No. 1 ' ) 3
Project Name
Results: MAIL
CHAIN OF CUSTODY RECORD
4 - LS
PHONE
CLIENT: IRS Environmental of WA, Inc.
P.O. Box 15216
Spokane Valley, WA 99215-5216
ANALYSIS
REQUIRED i
TURNAROUND
# OF CONTAINERS
a
co
m
,�
PCM - AIR (NIOSH 7400)
LEAD -AIR, PAINT, WIPE
USH3 DAY
,,15
24 HR ' DAY
48 HR
RESULTS/REMARKS
SAMPLE #
SAMPLE DESCRIPTION / Ill
DATE/"TIME
(c ;-7)-0
(131N \ e
X
s
«U 4 f3
-o Z
. 1( ,,..- pQ-'�-
ll
)-7
--c
i24 -L-
f
l/
Y
RELEASED BY:
(si 'nature)
DELIVERY METHOD
RECEIVED BY:
(SIGNATURE)
COMPANY / AGENCY
OR AFFILIATION
DATE / TIME RECEIVED
CONDITION
% (ll2 a _ tv
fl ; �C
A I Ili
mountain
Labor atonies
Nist.,-..,.,--
Si 1 IQ:Siairvt
- --, L
DATE / TIME RECEIVED
6700
RELEASED BY:
(signature)
DELIVERY METHOD
RECEIVED BY:
(SIGNATURE)
COMPANY / AGENCY
OR AFFILIATION
CONDITION
.000Valley
11703 E Sprague Ave Suite B-3 ♦ Spokane Valley WA 99206
♦ 509.688.0036 ♦ Fax: 509.688.0037 •
Transmittal
Date: 5/12/2008
To: SPOKANE COUNTY UTILITIES
Fax: 509-477-4715
From: CSV PERMIT CENTER
Re: Review/Approval of Demolition Permit Application
Attn: Billy Urhausen
Roger Rivers
Glen Gredvig
Colin Depner
Lela Gallert
SITE ADDRESS: 8411 E VALLEYWAY AVE
PERMIT PURPOSE: DEMOLITION OF GARAGE
ctt1
a
L
017
s
GARAG-E WILL (3E
.REMovel) 4, REeuILr
IN NEJ LockT10N
93' l0"
qy' -
VASLE Ay AVE.
o�
GAPAGE WILL. ISE
REMOvFa � REWILT
IN NEW I.QCATCON