2012, 04-23 Permit: SW-12001185 SewerSPOKANE COUNTY BUILDING AND PLANNING
PERMIT
Application Number: SW -12001185
Permit Issued Date:
04/23/2012
Expiration Date:
Project Description: SEWER CONNECTION/MANHOLE TAP
Permit Type: SEWER
Primary Contact: RYAN CONSTRUCTION & EXCAVATING
Applicant: RYAN CONSTRUCTION & EXCAVATING
Address: 10404 S SPOTTED RD
CHENEY, WA 99004
Phone: (509)218-4105
Email:
SITE INFORMATION:
Site Address:
Parcel Number:
Subdivision:
Assessor's Description:
Inspection Area:
Zoning:
8420 E VALLEY WAY
45184.2901
HARRINGTON'S
ADDITION TO
HUTCHINSON
18-25-44: SPOKANE VALLEY SHORT PLAT 04-10
LOT 1 (AFN 5935818) BOOK 26 PAGES 71-72.
Water District:
Hutchinson Irrigation
District #16
Owner: IRONS, ROBERT W
Address: 1216:3 N IDAHO RD
RATHDRUM, ID 83858
Phone: 208-964-3981
Email:
Fire District: Fire District 1
Land Area: 0.19 acres / 8458 sqft
CONTRACTOR INFORMATION:
General Contractor
RYANC"'071 BH
*RYAN CONSTRUCTION
10404 S SPOTTED RD
CHENEY, WA 99004
509-218-4105
DETAILS:
Class
Type
Quantity Unit Charge Value
SEWER
SEWER
MAIN/MANHOLE TAP/CUT-IN
SEWER CONNECTION
FEE DETAIL:
Processing - Utilities
Utilities Permit
1 $125.00 $125.00
1 $125.00 $125.00
Total Fee:
$250.00
$25.94
$250.00
$275.94
CONDITIONS:
Inside Public Transit Benefit Area
Date Printed: 04/23/2012 11:27:50
Pr nted by: IIS APPPOOLIASP.NET v4.0
SPOKANE COUNTY BUILDING AND PLANNING
PERMIT
Permit Issued Date:
Application Number: SW -12001185 04/23/2012
Expiration Date:
CALL 1-800-424-5555 BEFORE YOU DIG --AT LEAST 2 WORKING DAYS IN ADVANCE. SPOKANE COUNTY CODE REQUIRES THE
INSTALLER COMPLY WITH ALL REQUIREMENTS OF THE WA STATE DEPT OF LABOR & INDUSTRIES, INCLUDING THOSE
RELATED TO TRENCH SAFETY.
FOR SEWER INSPECTIONS CALL THE UTILITIES DEPT AT (509) 477-3604 FROM 8:30-5:00 MONDAY -FRIDAY PRIOR TO COVER.
ONE WORKING DAY NOTICE REQUIRED. PERMIT ALLOWS FOR A 30 -MINUTE INSPECTION. ADDITIONAL INSPECTION FEES
APPLY AFTER 30 MINUTES.
INSTALLER IS RESPONSIBLE TO INSURE ALL WASTEWATER DRAINS ARE CONNECTED TO THE SEWER AND MAY BE REQUIRED
TO PERFORM TESTS FOR VERIFICATION. INSTALLER IS TO FIELD LOCATE AND CONFIRM THE ELEVATION AND POSITION OF
SEWER STUB PRIOR TO ANY OTHER EXCAVATION.
SEWER STUBS AND DRY SIDE SEWERS ARE TO BE CHECKED PRIOR TO CONNECTION TO ENSURE THAT THEY HAVE
ACCEPTABLE GRADE AND ARE CLEAR AND UNOBSTRUCTED. SEWER LINES SHOULD BE CONSTRUCTED TO ALLOW FOR
GRAVITY FLOW FROM THE LOWEST LEVEL OF THE STRUCTURE.
THE INSTALLER AND THIS PERMIT MUST BE PRESENT AT THE JOB SITE AT THE SCHEDULED INSPECTION TIME. BOTH STATE
LAW RCW 19.122 AND COUNTY CODE REQUIRES THE INSTALLER TO GIVE NOTICE OF EXCAVATION TO OWNERS OF
UNDERGROUND FACILITIES.
Date Printed: 04/23/2012 11:27:50
Printed by: IIS APPPOOL\ASP.NET v4.0