2012, 05-03 Permit App: APR-2012-0022 Approach41/1;Va
Community Development Department
Permit Center
11703 East Sprague Avenue, Suite B-3
Spokane Valley, WA 99206
Tel: (509) 720-5240
Fax: (509) 688-0037
permitcenterPspokanevalley.orq
fA&-2®/v-0oZ2z
(Staff Use Only)
PERMIT NUMBER:
PERMIT FEE:
APPROACH PERMIT APPLICATION
PROJECT ADDRESS: 0 7 l - kJO eAf (/U
START DATE: 5 y — 12 11 AN IPATED COMPLETION DATE:
BUILDING OWNER NAME: "Ro6
MAILING ADDRESS:,1 Z , 3 N)alio .
CITY: - cit!(mi STATE: -}rt)
7-3o-12—
ZIP: ge3f3"
CONTACT PERSON NAME: TO 14A -d --Y)5
PHONE: CL 2S/ q62 ( -I — qD
CONTRACTOR NAME:
FAX: CELL: sprme
eoct,,v1 dab ✓ r'1s ( meow v)c r
MAILING ADDRESS:
CITY:
STATE:
ZIP:
PHONE:
FAX: CELL:
CONTRACTOR LICENSE #:
EXPIRES: CITY BUSINESS LICENSE #:
PROJECT DESCRIPTION (Please Provide Site Sketch)
)g( Residential Driveway ❑ Commercial/Industrial Driveway
❑ Existing Curb & Gutter ❑ Rural Road Section
❑ Culvert Installation ❑ Sidewalk Repair/Construction
❑ Other Conditions:
Bond/Insurance certification must be on file with the City.
DISCLAIMER
The permitted verifies, acknowledges and agrees by their signature that: 1) If this permit Is for construction or on a dwelling, the dwelling Is/will be
served by potable water. 2) Ownership of this City of Spokane Valley permit Inure to the property owner. 3) The signatory is the property owner or
has permission to represent the property owner in this transaction. 4) All construction Is to be done in full compliance with the City of Spokane Valley
Development code. Referenced codes are available for review at the City of Spokane Valley Permit Center. 5) The City of Spokane Valley permit is not
a permit or approval for any violation of federal, state or local laws, codes or ordinances. 6) Plans or additional information may be required to be
submitted and subsequently approved before this application can be processed.
Signature
Date: 5 —3 —J --
P:1Community Development111 Forms\A. Building\Permit Center\Approach Permit 2-24-11.doc
Page 1 of 2
APPROACH PERMIT APPLICATION
REQUIRED SKETCH INFORMATION (Revised 1/25/10)
Provide required measurements (in sketch boxes), and include street name.
Check all existing conditions that apply:
['Sidewalk
ft wide
ft from back of curb
❑Streetside Swale
❑Drainage Ditch
❑Drywell (show location on sketch)
❑Other (please describe below)
w
zl
wI
of
CC
di
DISTANCE FROM
NEAREST PROPERTY LINE
(MAY_ BE LEFT OR RIGHT SIDE)
FT (SEE TABLE)
CONCRETE
APPROACH
CURB
1
I-4'4—THROATWIDTH IFT---I--4' -I
WING (SEE TABLE) WING
STREET NAME
STREET WITH CURB
DISTANCE FROM
NEAREST PROPERTY LINE
MAY BE LEFT OR RIGHT SIDE)
FT (SEE TABLE)
ASPHALT
APPROACH
CURB
RETURN
NIF CORNER LOT,
DISTANCE FROM
CURB RETURN
n FT (SEE TABLE)
15' RADIUS
EDGE OF 1
ASPHALT
I—THROATWIDTH fT
(SEE TABLE)
STREET NAME
STREET WITH ASPHALT EDGE
RADIUS
RETURN
NIF CORNER LOT,
DISTANCE FROM
RADIUS RETURN
OFT (SEE TABLE)
Approach Requirements:
• Maximum 2 approaches per property frontage; one on arterials.
0110/ of Frnnf�nc uriri i•I-
P:\Community Development\11 Forms\A. Building\Permit Center\Approach Permit 2-24-11.doc
Page 2 of 2
Residential
Approaches
Commercial
Approaches
Distance from Curb/Radius Return
15' minimum
75' minimum
Separation between Approaches (measured from centerline to
centerline of each approach)
None specified
See Page 7-27
in City Street Standards
Throat Width (flat portion)
16' min., 30' max.
30' min., 40' max.
Wing Width (at curb line)
4 feet typical
4 feet typical
Minimum Distance from Side Property Line (@ r/w)
5.0'
5.0'
Minimum Distance from Crosswalk
5'
5'
P:\Community Development\11 Forms\A. Building\Permit Center\Approach Permit 2-24-11.doc
Page 2 of 2
i
1,55
1
1.7
oci
A
It�
! j
'LO 0_I 1 1
!
UT!1ii`J - _ t -.
BoR1S id. EAS£h4e-t.n"_ I
(-\, V (VI AgrittA
x
Acka e So gq.ao Vett i,r' wck.
L.01' �'r �; x'/57 . -Z-