27649 PE-1750D CONCEPT STORMWATER DRAINAGE REPORT
~
~
CONCEPT STORMWATER
~
DRAINAGE REPORT
SHELLEY L~~E 5T'ADDITION
PRELIM-INARY PLAT
Spokane,Washington
' June, 2005
Prepared by:
5ayw!rs Engineering
327 W e Ave, Suite 240
Spvkane, V1JA 99204
Ph 609-774-0300Fax 504-774-0302
This report has been prepared by bMe staff of Saywers Engtneering under the direetion of the undersigned
professional engineer whvse seal antl signature a erean. _
K
~
~ ~ ~
~
~ C#ST~~'~ A
~
~
JaFen F. Saywers, P.E. -
1
' GENERAL -
The proposed Shelley Lake 5ih Addition Preliminary Plat development consists of 58
' residential lots ranging in size from less than 8,400 ft2 to over 28,500 ft2 and 2 open
space lots located on approximately 20 acres. The proe~t is part of the Shelley Lake
PUD Preliminary Plat and is adjacent to Shelley Lake 4u, Addition. The site is located in
the city of Spokane Valley and lies in the southeast quarter of section 24, T 25 N., R 44
E., W.M., and is located within the aquifer sensitive area. A vicinity map is attached.
PURPOSE
The purpose of this drainage report is to determine the storm drainage facilities that will
be required to treat and dispose of the increase in storm water runoff for the new
development. The facilities will be designed to treat and dispose of the ten and fifty-
year storms. Stormwater will be collected and treated in a pond designed to meet the
requirements of City of Spokane Valley Ordinance No. 05-013 and disposed of through
drywells and the existing wetiands on the site. The ten and fifty-year tntensity, Duration,
and Frequency (IDF) curves from the Spokane, Medical Lake, Reardon, Cheney and
Rockford intensity curve are used for the bowstring calculations.
1
ANALYSIS METH4DOLOGY - The Rational Method, which is recommended for basins less than ten acres in size, is
' used to determine peak discharges and runoff volumes for all basins included in this
report.
TOPOGR.APHY
The site slopes generally toward the northeast with some small hills and one major rock
' outcropping with side slopes up to 80%.
SOILS .
1
As can be seen from the accompany+ng soils map from the Spokane County Soils
Survey as performed by the USDA, Soil Conservation Service (SCS), the site consists
' of soil tYPe GmB. The soil descriPtion is as follows.
GmB - Garrison very gravelly loam, 0 to 8 percent slopes: Soils within this soil type
' are forrned on 9ravellY 9lacial outwash material from a varietY of i9neous rock. These
soils are described as somewhat excessively drained. Surface runoff is stow and the
hazard of erosion is slight. Spokane County Guidelines for Stormwater ManaQement
indicate this to be a Soil Group Type B and pre-approved for drywell installation.
Hydrologic Soi/ C/assification - B
Saywers Engirleering Consultants Page 2 of 5 Shelley Lake S" Addition- Concept Drainage Report
DRAINAGE NARRATIVE
The offsite drainage which flows onto the project site has been included in caiculations
for both pre- and post-deve{oped flows. This includes flows from adjacent yards in .
Rotchford Estates and Shelley Acres as well as redirected flows from Shelley Lake 4th
Addition basin C. Bowstring worlcsheets are included in the appendix showing areas,
treatment and storage requirements and flooded width values. Flooded widths were
determined to ensure a dry roadway width of at least 12 feet for the fifty-year storm.
BASlN SUMMARY- Pre-Developed
The existing site is divided into six basins as shown on the attached pre-developed
basin map. The basins discharge to different locations offsite. However, all flow
eventually reaches the wetland channel shown at the far northeast corner of the
property. The pre-developed stormwater is either infittrated, evaporated, or runs off into
Shelley Lake.
Table 1. Pre Developed Basin Summary Table
Runoff Volume (ft3)
Basin Area (ft) 10 Year ~ 50 Year -
A ~ 28,155 34 372
B ~ 118,828 521 1,580
C ~ 343,083 2,188 4,668
D 192,306 914 2,536
E 259,587 1,458 3,477
F ~ 329,233 ~ 2,039 ~ 4,456
TOTAL ~Y 1,271,192 ~ 7,154 17,089 BAS1N SUMMARY- Post-Developed
The post developed site is divided into nineteen basins as shown on the attached basin
~ map. Each basin discharges to an inlet and is then piped to the treatment area at the
northeast comer of the property on the drainage tract. Flows from Shelley Lake 4t'
Addition 6asin C will also be included as the existing pond will be redesigned to be a
' residential lot. A Pond will be constructed to treat all flows from roadways and .
driveways and to store the required volume for the fifty-year stoRn. Each lot is assumed
to have an 1800 square foot house and 750 square foot driveway. Table 2 summarizes
the post-developed basins and a more detailed summary of each basin is provided in
the appendix. Street areas from back of curb to back of curb and the number of
driveways were calculated for each basin to determine the treatment volume for this
project.
Srrywers Engineering Consultants Page 3 of 5 Shelley Lake S``° Addition- Concept Drainage Report
Table 2. Post Develqped IBasin Summary Table
Area (ft2) Treatrnent Va~um~ ~eq'~
, Basin Pervio~,s lrr~peF►r~nus ""reatrx~e€~t To~l
~ I 16,368 13,301 I 7,901 29,669 I 206
2 I 4,536 10,446 I 5,046 14,982 -131
3 15,013 18,671 ~ 9,671 33,684 ~ 252
4 I 13*776 I W 14t993 7,793 1-28,769 203
5 166,849 ~ - I - ~ 166,849 -
6 35,279 151434 10,784 ~ 50f713 ~ 280 ~
7 36t054 9f426 5,826 45,480 152
8 15i8s4 6}852 5,052 22,736 131 ~
s I 118,153 19,202 12,002 137,355 312
10 95,188 6,377 6,377 101,565 166
11 6*890 B+008 I 4,408 I 14zss8 115
12 99r918 26,030 15,230 125,948 396
13 43,865 14,148 10TS48 58,013 274
14 I 141457 1 14,763 7,563 - 29,220 197
15 4 118,568 18,659 11,459 137,227 298 ,
16 I 35,897 1 7,321 3,721 I 43,218 97
17 39y3a2 7,350 3,750 46,652 98
18 ~ 52,014 1 14,165 8,765 66,179 . 228
19 21,851 11,014 5,614 32,865 I 146
~
C (ath ~►dd ~43,315 I 103,o~3 57,083 246,398 1r485
- _ - - .
Total 1,093,177 339a243 1971843 1,432,4201 51.191 ,
sr~RNWArER Src~RA~~ ~~QU~~~~ENTs
The storage vofume for the fifty-year stvrm was calcuMated fac each basin using the
bowstring method. The required stotage valumes ruere #hen added togetFrer #o
determine the t+vtal size of the pnnd to he cacrs#ruc#ed in the drainage tract, One
double-depth -dryvtireIE W'll be installed to drain the pond. The pand is sized to provide a -
minimum of one foot of freeboard over the fifky-year stoffm. The volume reyuirernents
are summarizei in Table 3,
5'ay}vers Enginee g Consultarxts Page 4 of 5 Shelley I.ake Y" Addition- Corrcept Drainage Reporr
Table 3. Storage Volume Summary Tabte
Required Storage Volume (ft3)
Basin 10-Year ~ 50-Year
. 1 123 310
2 ~ 0 126
3 259 505
4 156 357
5 435 881
6 263 556
7 107 287
8 0 61
9 ~ 848 1,488
10 287 599
11 0 48
12 ~ 972 1,615
13 266 563
14 153 665
15 727 1,193
16 51 206
17 67 229
18 303 623
19 87 258
C (4th Add) 4,275 7,643
Total 9,379 18,213
Table 4 summarizes the pond bottom area and volume information.
Table 4. Pond Summary Tabie
Treatment
Bottom Volume @ 6" Total Storage
Area Bottom Depth Volume Max WSEL Freeboard
(ft) Elev (ft3) (ft3) (50-yr) (ft)
9,882 2023.00 5,266 18,322 2024.54 0.96
, CONCLUSION
This report demonstrates that the proposed stormwater facilities provide sufficient
treatment and storage to meet the storm water treatment requirements of the City of
Spokane Valley.
Saywers Engineering Consultants Page 5 of 5 Shelley Lake S' Addition- Concept Drainage Report .
.
~p
!
~
~
~
VICIlvITY MAP
1
,
E.rU E rd A~j_NlapPoinl
. _ Z-'s-.,s _ i - it ' ~k ...-o~>>'•-~: .H' V ~~,Le t;y~~F
' ^ _~F. ^ • 2'{ • _ _ `{1' 5..-
3~« ` • ~ - ~+~•,,,•.r-"~~ fy " ? - alr~4..~ ~ ' r
- - ~ A " . ~ ~ - s~~ ~_,,k, ~ ~t ~
r" . ~ " ~ . • _ ~ E 1a~ssion 4~, ~1
• -'.-~:.l. • ~ -t,o " ~ ° ~ ~ 1 a ..e.~_~_~..~ + N• C
• ~ s . 1 :r=. ~ { _.ti:.__y _ c ~....--..'-.-F- _ ~C" Z~ .t~" 1
S - • ~L t .1 1.~ r ' ' t~ ~ _
! J A? 291 294 ;,,,y-,•'s
Elroadvve~ ~ ve. ? ~ d•=~~ ' - - -
L~f~i Lk~s
E Aae
" 8us
A v ~Greer~ac~e's'' E`~S~i-ague Ave-. "
_tb~ANr
O"t'~' ~i ; `J...;,``-_°~ a i::. ~ i P'~ i
E°8ttive $th:Awe _s
~-t)th; A~ie„~ ~ • - ~ ~ ^ ~ zi~~ ...~..T: ' ~ ~ •
' E' 1~~:,•Av-P__c~~--• ° 7 ~_:__~`lt.' ~ ; • y ~'s t
-~4K r
'6th ;p►~~~~a. ~ tfl
_ . ~
•i y~ ~t ' '.?~X.r ~ ~',~~d •l," ' , t r-. -•Y,•- I'.+ . , ; ` •
. LVa~ Ati1l."~: 1~,,. j,~-~ Ql'' •"'t j ~~-~_t~. Y
- - i PROJECT
T2am ~;v_G. Gl~. r'.- ~~~r - =-LOCATION ~
~3.~,
_ _ •t ` ,
(r} E,3ZA'
- ~ ~ . _Av.e___._ E .3w.Ave
i•~~::., ;41Q
- 3~~.Qp~ . _ ~i ~ , ~ : ,
`CtCSt6T Y7
V),
~#h- 14ve~•~_ CF)i yf ~ , '~l
, • ~ ..i i h " ~ . • - r ~ • t .
,4.
VICINITY MAP
~
S
SQTL
T~pNS
CULA
BpwsTgdNG
~
~ ~
~w ~ ~ m mr r mm mmw mmmm w rr r
PEAK FLOW CALCULATION PROJECT; Shelley Lake 5th Addtion BOWSTRING METHOD PROJECT: Shelley Lake 5th Addtion
10-Year Design Storm DETENTION BASIN DESIGN BASIN: A
DESIGNER; GLA
BASIN: A DATE: 21-May-05
Tot. Area 28,155 SF 0.65 Acres
Imp. Area 0 SF C= 0.9 Time Inc,rement (min) 5
Perv, Area 28,155 SF C= 0.15 Time of Conc. (min) 6.11
Wt C= 0.15 Outflow (cis) 0
Design Year Flow 10
CASE 1 Area (acres) 0.65
Impervious Area (sq ft) 0
297 ft, Overiand Flow 'C' Factor 0.15
Area " C 0.097
Ct = 0,15 Treatment Area 0
L = 291 ft.
n= 0.40 Time Time Inc, Intens. Q Devel. Vol.ln Vol.Out Storage
S= 0.0606 (min sec (inlhr) (cu ftL . (cu ft) JaU ft)
. .
~ 6.11 367 2.91 0.28 139 0 139 '
Tc = 6,11 min., by Equation 3-2 of Guidelines
5 300 3.18 0,31 124 0 124
0 ft. Gutter flow 10 600 2.24 0,22 157 0 151
15 900 1.76 0,17 174 0 174
Z1= 50.0 ForZ2 20 1200 1,45 0.14 187 0 187
Z2 = 3.5 Type B=1,0 15 1540 1.23 0,12 194 0 194
n= 0.016 Rolled = 3.5 30 1800 1,05 0.10 196 0 196
S= 0.0100 35 2100 0,91 0,09 196 0 196
40 2400 0,81 0,08 198 0 198
d= 0.0930 ft. Flow Width 4.7 ft. 45 2100 0.74 0,01 202 0 202
50 3000 0,69 0.07 209 0 209
55 3300 0,65 0.08 215 0 215
A R Q Tc Tc total I Qc BO 3600 0,61 0.06 222 0 222
, :U ,
0.23 0.05 0,28 0.00 6.11 2.91 0.28 65 3900 0,58 0.06 228 0 228
70 4200 0.56 0.05 231 0 237
Qpeak for Case 1= 0.28 cfs 75 4500 0,55 0.05 249 0 249
80 4800 0.55 0.05 262 0 262
85 5100 0.53 0,05 271 0 271
90 5404 0.50 0.05 266 0 266
CASE 2 95 5700 0.45 0.04 255 0 255
100 6000 0.49 0.05 291 0 291
Case 2 assumes a Time of Concentration less than 5 minutes so that the
peak flow =.90(Tc=5 intensity)(Imp. Area) = 0.00 cfs "05-013" TREATMENT REQUIREMENTS
Minimum "05-013" Volume Required 0 cu ft
Provided TreatmeM Volume 0 cu ft
So, the Peak flaw for the Basin is the greater of the two flows, DRYWELL REQUIREMENTS -10 YEAR DESIGN STORM
0.28 cfs Maximum Storage Required by Sowstring 291 cu ft
Provided Storage Volume 0 cu ft
Number and Type of Drywells Required 0 Singfe
0 Double
~w ~ ~ on,= mr m mmm mrr ~ rw r mm
PEAK FLOW CALCULATION PROJECT: Shelley Lake 5th Addtion BOWSTRING METHOD PROJECT: Shelley Lake 5th Addtion
10-Year Design Storm DETENTION BASiN DESIGN BASIN: B
DESIGNER; GLA
BASIN: B DATE: 27-May-05
Tot. Area 118,828 SF 2.73 Acres
Imp. Area 0 SF C= 0.9 Tlme Increment (min) 5
Perv. Area 118,828 SF C= 0,15 Time of Conc. (min) 7.85
Wt. C= 0,15 Ouiflow (cfs) 0
Design Year Flow 10
CASE 1 Area (acres) 2.13
Impervious Area (sq ft) 0
432 ft. Overland Flow 'C Factor 0,15
Area " C 0.409
Ct = 0,15 Treatment Area 0
L = 432 ft.
n= 0,40 Time Time Inc. Intena. Q Devel. VoI.In Vol.Out Storage
-
S- 0.0556 min), s
, ec~ . „ Srnmr? .Swft~. L 1 4~' ftL
1,85 411 ~ 2,56 1,05 662 0 662
Tc = 7.85 min., by Equation 3-2 of Guidelines
5 300 3.18 1.30 523 0 523
0 ft. Gutter flow 10 600 2.24 0.92 697 0 691
15 900 1,76 0.72 761 0 761
21= 50.0 ForZ2 20 1200 1,45 0.59 809 0 809
Z2 = 3.5 Type 6=1.0 25 1500 1,13 0,50 835 0 835
n= 0.016 Rolled = 3.5 30 1800 1,05 0,43 842 4 842
S= 0.0100 35 21 Q4 0.91 0.31 842 0 842
40 2400 0,81 0,33 848 0 848
d= 0.1530 ft. Flow Width 7.1 ft. 45 2700 0.74 0.30 865 0 865
50 3000 0.69 0.28 891 0 891
55 3300 0.65 0,27 919 0 919
A R Q Tc„ . Tc total I _ Qc 60 3600 0.61 0,25 945 0 945
0.63 0.08 1.05 0.40 7.85 2.56 ~ 1.05 65 3900 0.59 0.24 971 0 911
70 4200 0.56 0.23 1007 0 1007
Qpeak for Case 1= 1.05 cfs 75 4500 0.55 0.23 1057 0 1057
80 4800 0.55 0.22 1114 0 1114
85 5100 0,53 0.22 1150 0 1150
90 5400 0.50 0.20 1132 0 1132
CASE 2 95 5704 0.45 0,18 1083 0 1083
100 6000 0,49 0.20 1236 0 1236
Case 2 assumes a Time of Concentration less than 5 minutes so that the
peak flow =.90(Tc=5 iMensity)(Imp. Area) = 0.00 cfs "05-413" TREATMENT REQUIREMENTS
Minimum "05-013" Volume Required 0 cu ft
Provided Treatment Volume 0 cu ft
So, the Peak flow for the Basin is the greeter of the two flows, DRYWELL REQUIREMENTS -10 YEAR DESIGN STORM
1.05 cfa Maximum Storage Required by Bowstring 1236 cu ft
Provided Storege Volume 0 cu ft
Numbe► and Type of Drywells Required 0 Single
0 Double
mA soN A MMMA MMMMM~Mmmm
PEAK FLOW CALCULATION PROJECT: Shelley Lake 5th Addtion BOWSTRING METHOD PROJECT: Shelley lake 5th Addtion
10-Year Design Storm DETENTION BASfN DESIGN BASIN: C
DESIGNER: GLA
BASIN: C DATE; 27-May-05
Tot. Area 343,083 SF 7,88 Acres
Imp. Area 0 SF C= 0.9 Time Increment (min) 5
Perv. Area 343,083 SF C= 0.15 Time of Conc. (min) 13,93
Wt. C= 0.15 Outflow (cfs) 0
Design Year Flow 10
CASE 1 Area (acres) 7.68
Impervious Area (aq ft) 0
984 ft, Overland Flow 'C' Factor 0.15
Area' C 1.181
Ct = 0.15 Treatment Area 0
L = 984 ft. n= 0,40 Time Time Inc. Intens. Q Devel. Vol.ln Vol.Out Storage
S= 0.0427 min sec finlhr), . ~Y (cu ft) (ft (cu ft)s
. , . ,
13.93 836 1.84 2.17 2432 0 2432
Tc = 13.93 min., by Equation 3-2 of Guidelines
5 300 3.18 3.15 1509 0 1509
0 ft. Gutter flow 10 646 2,24 2.65 2129 0 2129
15 900 1,76 2,07 2455 0 2455
Z1= 50.0 ForZ2 20 1200 1,45 1,72 2548 0 2548
Z2 = 3.5 Type B=1,0 25 1500 1,23 1,45 2591 0 2591
n= 0.016 Roiled = 3.5 30 1860 1,05 1,24 2585 0 2585
S= 0.0100 35 2100 0,91 1.08 2555 0 2565
40 2400 0.81 0.96 2561 0 2561
d= 02009 ft, Flow Width 10.0 ft, 45 2100 0.74 0,87 2606 0 2606
50 3000 0.69 0.81 2613 0 2673
55 3300 0.65 0,71 2147 0 2741
A R Q Tc Tc total I Qc 60 3600 0.61 0,73 2817 0 2817
1.08 0.10~ 2.17 0.00 13.93 1.84 2.17 65 3900 0.58 0.69 2890 0 2890
70 4200 0.56 0.61 2989 4 2989
Qpeak for Case 1= 2.17 cts 75 4500 0,55 0.65 3133 0 3133
80 4800 0.55 0.65 3298 0 3298
85 5100 0.53 0.63 3400 0 3400
90 5400 0.50 0.59 3340 0 3340
CASE 2 95 5700 0,45 0.53 3193 0 3193
100 6000 4.49 0.58 3641 0 3641
Case 2 assumes a Time of Concentration less than 5 minutes so that the
peak flow =.90(Tc=5 intensity)(Imp. Area) = 0.00 cfs "05-013" TREATMENT REQUIREMENTS
, Minimum "05-413" Volume Required 0 cu ft
Provided Treatment Volume 0 cu ft
So, the Peak flow for the Basin is the greater of the two flows, DRYWELL REQUIREMENTS -10 YEAR DESIGN STORM
2,17 cfs Maximum Storage Required by Bowstring 3641 cu ft
' Provided Storage Volume 0 cu ft
Number and Type of Drywells Required 0 Single
0 Double
~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ m MIMIMM
PEAK FLOW CALCULATION PROJECT: Sheiley Lake 5th Addtion BOWSTRING METHOD , PROJECT; Shelley Lake 5th Addtion
10-Year Design Storm DETENTION BASIN DESIGN BASIN; D
DESIGNER; GLA
BASIN: D . DATE: 21-May-05
Tot, Area 192,306 SF 4.41 Acres
Imp. Area 0 SF C= 0.9 Time Increment (min) 5
Perv. Area 192,306 SF C= 0,15 Time of Conc. (min) 5.83
Wt, C= 0.15 Outflow (cfs) 0
Design Year Flow 10
CASE 1 Area (acres) 4.41
Imperoious Area (sq ft) 0
287 ft. Overland Flow 'C Factor 0.15
Area " C 0.662
Ct = 0.15 Treatment Area 0
L = 287 ft,
n= 0.40 Time Time Inc. Intens. Q Devel. Vol.ln Vol.Out Storage
S= 0.0662 m(n),,, 4inihr? cf~cu ft) (cu ft) (cxu ft~
5.83 350 2.91 . 1.97 923 0 923
Tc = 5,83 min., by Equation 3-2 of Guidelines
5 300 3.18 2,10 846 0 846
0 ft. Gutter flow 10 600 2.24 1,46 1067 0 1067
15 900 1,76 1,16 1184 0 1184
Z1= 50.4 For Z2 20 1200 1.45 0.96 1269 0 1269
Z2 = 3.5 Type B=1.0 25 1500 1,23 0,81 1318 0 1318
n= 0.016 Rolled = 3.5 30 1800 1,05 0,70 1334 0 1334
S= 0.0100 35 2100 0.91 0.60 1338 0 1336
40 2400 0.81 0.54 1350 0 1350
d= 0.1937 it, Flow Width 9.7 ft. 45 2700 0.74 0,49 1380 4 1380
50 3000 0,69 0,46 1423 0 1423
55 3300 0,65 0,43 1469 0 1469
A R Q Tc Tc total I Qc 60 3600 0.61 0,41 1512 0 1512
. , ,
1.00 0.10 1.97 0.40 5.83 2.91 ~ 1.97 65 3900 0.58 0.39 1556 0 1556
70 4200 0.56 0.37 1614 0 1614
Qpeak for Case 1= 1.91 cfs 15 4500 0,55 0.37 1695 0 1695
80 4800 0.55 0.36 1788 0 1788
85 5100 0.53 0.35 1847 0 1847
90 5400 0.50 0.33 1818 0 1818
CASE 2 . 95 5700 0.45 0.30 1740 0 1740
100 6000 0,49 0.32 1981 0 1987
Case 2 assumes a Time of Conceniration less than 5 minutes so that the
peak flow =.90(Tc=5 intensity)(Imp. Area) = 0.00 cfs "05-013" TREATMENT REQUIREMENTS
Minimum "05-013" Volume Required 0 cu ft
Provided Treatment Volume 0 cu ft
So, the Peak flow for the Basin is the greater of the two flows, DRYWELL REQUIREMENTS -10 YEAR DESIGN STORM
1,97 cfs Maximum Storage Requlred by Bowstring 1981 cu ft
Provided Storage Valume 0 cu ft
Number and Type of Drywells Required 0 Single
0 Double
~w mm rr Mon m mr mm mmm Maw = m m-
PEAK FLOW CALCULATION PROJECT: Shelley Lake 5th Addtion BOWSTRING METHOD . PROJECt: Shel4ey Lake 3th Addtion
10-Year Design Storm DETENTION BASIN DESIGN BASIN: E
DESIGNER: GLA
BASIN: E DATE: 27-May-05
Tot. Area 259,587 SF 5.95 Acres
Imp. Area 0 SF C= 0.9 Time Increment (min) 5
Perv. Area 259,587 SF C= 0.15 Time of Conc. (min) 9.78
Wt. C= 0.15 Outflow (cis) 0
Deeign Year Flow 10
CASE 1 Area (acres) 5,96
Impervious Area (sq ft) 0
600 ft. Overland Flow 'C Factor 0.95
Area " C 0.894 Ct = 0.15 Treatment Area 0
L = 600 ft.
n= 0.40 Time Time Inc, Intens, Q Devel. Vol,ln Vol.Out Storege
S= 0A517 m~n sec) in~r cfs cu ft ftcu ft
. ~ . L !cu ~ . , J, L
9.78 587 2.21 2.03 1595 0 1595
Tc = 9.78 min., by Equation 3-2 of Guidelines
5 300 3.18 2.84 1142 0 1142
0 ft. Gutter flow 10 600 224 2.00 1602 0 1602
15 900 1.16 1.57 1725 0 1725
21= 50.0 ForZ2 20 1200 1,45 1.30 1818 0 1818
7-2 = 3.5 Type B=1.0 25 1500 1,23 1.10 1861 0 1867
n= 0.016 Rolled = 3.5 30 1800 1,05 0.94 1816 0 1876
S= 0,0100 35 2100 0.91 0.81 1812 0 1812
44 2400 0,81 0.12 1881 0 1881
d= 0.1959 R. Flow Width 9.8 ft. 45 2700 0.74 0.66 1916 0 1916
50 3000 0.69 0,62 1970 0 1970
55 3300 0.65 0,56 2030 0 2030
A R Q Tc Tc total I Qc 60 3600 0.61 0,55 2085 0 2085
1.03 0.10 2,030.00 9.78 2.21 2.03 65 3900 0.58 0,52 2142 0 2142
70 4200 0,56 0.50 2219 0 2219
Qpeak for Case 1= 2.03 ds 15 4500 4.55 0,50 2328 0 2328
80 4604 0.55 0.49 2453 0 2453
85 5100 0.53 0,48 2532 0 2532
90 5400 0,50 0,44 2494 0 2490
CASE 2 95 5700 0,45 0,40 2381 0 2381
100 6000 0,49 0.44 2718 0 2718
Case 2 assumes a Time of Concentretion less than 5 minutes so that the
peak flow =.90(Tc=5 intensity)(Imp, Area) = 0.00 cfs "05-013" TREATMENT REQUIREMENTS
Minimum "05-013" Volume Required 0 cu ft
Provided Treatment Volume 0 cu ft
So, the Peak flow for the Basin is the greater af the two flows, DRYWELL REQUIREMENTS -10 YEAR DESIGN STORM
2.03 cfs Maximum Storage Required by Bowstring 2718 cu ft
Provided Storage Volume 0 cu ft
Number and Type ot Drywells Required 0 Single
0 Double
,
~r ~ t~r r~r ~ ~ ~r ~ rr ~r ~ w~ ~r rr ~ ww ~ r ~r
PEAK FLOW CALCULATION PROJECT: Shelley Lake 5th Addtion BOWSTRING METHOD PROJECT: Sheliey Lake 5th Addtion
10-Year Design Storm DETENTION BASIN DESIGN BASIN: F
DESIGNER: GLA
@ASIN; F DATE: 27-May-05
Tot. Area 329,233 SF 7,56 Acres
Imp. Area 0 SF C= 0.9 Time Increment (min) 5
Perv. Area 329,233 SF C= 0.15 Time of Conc. (min) 12.54
Wt. C= 0.15 Outflaw (cfs) 0
Design Year Flow 10
CASE 1 Area (acres) 1.56
Impervious Area (sq ft) 0
634 ft, Overland Flow 'C' Factor 0.15
Area " C 1.134
Ct = 0.15 Treatment Area 0
L = 634 ft,
n= 0.40 Time Time Inc. Intens. 0 Devel. Vol.ln Vol,Out Storage
S= 0.0252 (min) (sec) (inmr~~_ (cu ft)_ (cu ft~
12.54 752 1,96 2,22 2240 02240
Tc = 12.54 min., by Equation 3-2 of Guldelines
5 300 3.18 3.60 1448 0 1448
0 ft. Gutter flow 10 600 2,24 2.54 2043 0 2043
15 900 1.76 1.99 2300 0 2300
Z1= 50.0 For22 20 1200 1.45 1,65 2399 0 2399
Z2 = • 3,5 Type B=1.0 15 1500 1.23 1.39 2446 0 2446
n= 0.016 Rolled = 3.5 30 1800 1.05 1.19 2447 0 2441
S= 0.0100 35 2100 0.81 1,03 2433 0 2433
40 2400 0.81 0,92 2437 0 2437
d= 0.2028 R. Flow Width 10.1 ft. 45 2700 0.74 0.84 2477 0 2477
50 3000 0.69 0.78 2542 0 2542
55 3300 0.65 0.74 2616 0 2616
A R Q Tc Tc totai I Qc 60 3600 0,61 0.70 2684 0 2684
---1.10 0.10 2220.00 12.54 1.96 2.22 65 3900 4.58 0.66 2754 0 2754
70 4200 0,56 0,64 2850 0 2850
Qpeak for Case 1= 2.22 cfs ,75 4500 0.55 0,63 2988 Q 2988
80 4800 0.55 0,62 3147 0 3141
85 5100 0.53 0.61 3245 0 3245
90 5400 0.50 0.56 3189 0 3189
CASE 2 95 5700 0.45 0.51 3049 0 3049
100 6000 0.49 0,56 3479 0 3479
Case 2 assumes a Time of Conceniratlon les9 than 5 minutes so that the
peak flow =.90(Tc=5 iMensity)(Imp. Area) = 0.00 cfs "05-013" TREATMENT REQUIREMENTS
Minimum "05-013" Volume Required 0 cu ft
Provided Treatment Volume 0 cu ft
So, the Peak flow for the Basin is the greater of the two flows, DRYWELL REQUIREMENTS -10 YEAR DESIGN STORM
2,22 cfs , Maximum Storage Required by Bowstring 3479, cu ft
EProvided Storage Volume 0 cu ft
Number and Type of Drywells Required 0 Single
0 Double
~ =so m A mmA MMw~~ ~ M-1 on-M
PEAK FLOVII CALCULATION PRAJECT: Shelley Lake 5th Addtion BOWSTRING METHOD PROJECT: Shelley Lake 5!h Addlion
50•Year Qesign Storm DETENTION BASIN DESIGN BASIN: A
DESIGNER GLA
BASIN; A DATE, 27-Mey-05
Tot. Area 28,155 SF 0.65 Acres Time Increment (min) 5
Imp, Area 0 SF C= 6.9 Time of Conc. (min) 6,11
Perv. Area 28,155 SF G= 0,15 Outflow (cfs) 0
UVt. C= 0.15 Design Year Flow 50
Area (ecres) 0.65
CASE 1 Impervious Area (sq ft) 0
'C' Fector 0.15
297 ft. Overland Flow Area' C 0.097
Treatment Area 0
Ct= 0.15
L= 291 ft. Time Time Inc, Intens, Q Devel. Vol.ln Vol.Out Storage
. n= 0.40 (min) (sec) linlhrl (cu fl) (cu ft~ Jcu ft)
S= 0.0606 6.11 367 4,20 0,41 200 0 200
Tc = 6.11 min,, by Equation 3-2 of Guidellnes 5 304 4.56 0.44 178 0 178
10 600 3.21 0,31 225 0 225
0 A. Gutter flow 15 900 2,44 0,24 243 0 243
20 1200 1,98 0,19 254 0 254
t1= 50.0 ForZ2 25 1500 1,66 0.16 264 0 264
Z2 = 3,5 Type B=1,0 30 1800 1.46 0,14 272 0 272
n= 0.016 Rolled = 3,5 35 2100 1,30 0,13 280 0 280
S= 0,0100 40 2400 1.18 0.11 288 0 288
45 2700 1.06 0.11 197 0 297
d~ 0.1080 ft, Flow Width 5.4 ft, 50 3000 1.01 0.10 345 0 305
, 55 3300 0,94 0.09 312 0 312
60 3600 0,88 0.09 318 0 318
A R Q Tc Tc total I Qc 65 3900 0.63 0,08 325 0 325
~0.31 0,05 0.41 ! 0.00 6,11 4.20 0.41 70 4200 0.79 0.08 333 0 333
75 4500 0.17 0.07 345 0 345
Qpeak for Cese 1= 0.41 cfs 60 4800 0.75 0.07 360 0 360
65 5100 0.73 0,07 312 0 372
90 5400 0.70 0.07 314 0 374
95 5700 0.66 0.06 371 0 371
CASE 2 , 100 6000 0.68 0.07 404 0 404
Case 2 assumes e Time of Cancentration less than 5 minutes so that the "05-013" TREATMENT REQUIREMENTS
peak flow =.90(Tc=5 intenaity)(Imp, Area) = 0.00 cfs Minimum "05-013" Volume Required 0 cu ft
Provided Treatment Volume 0 cu ft
DRYWELL REQUIREMENTS - 50 YEAR DESIGN STORM
So,, thE Peak flow for the Basin is the greiater of the two ftows, Maximum Storage Required by Bowstring 372 cu ft
0.41 cfs Prov~ded Storage Volume 0 cu ft
Number and Type oi Drywells Required 0 Single
0 Double
~ ~ ~w ~ w ~w ~r ~ ~r ~ ~w ~ ~r ~r ~ ~r
PEAK FLOW CALCULATION PROJECT; Sheliey Lake 5th Addtion BOWSTRING METHOD PROJECT: Shelley Lake 5th Addtion
50 Year Design Storm DETENTION BASIN DESIGN BASIN: B
DESIGNER GLA
BASIN: B DATE; 27•May-05
Tot. Area 118,828 SF 2.73 Acres Time Inaement (min) 5
Imp. Area 0 SF C= 0.9 Time of Cona (min) 7.85
PeN, Area 116,828 SF C= 0.15 Outflow (ds) 0
Wt. C= 0.15 Deslgn Year Flaw 50
Area (eaes) 2.73
CASE 1 Impervious Aree (sq ft) 0
'C' Fector 0.15
432 ft. Overiand Flow Area"C 0.409
Treatment Area 0
Ci= 0.15
L= 432 ft. Time Time Ina Intens, Q Devel, Vol.In Vol.Out Storege
n = 0.40 (min) (sec~ -fiNhrl (cfs) Jai fl) (cu ft) (cu flL.
S= 0.0556 7.85 471 3.70 1.51 955 0 955
Tc a 7.85 min,, by Equation 3•2 of Guidelines 5 300 4.58 1,87 153 0 753
10 604 3.21 1,31 896 0 998
0 ft. Gutter flow 15 900 2.44 1.00 1059 0 1059
20 1200 1.98 0.81 1102 0 1102
21= 50.0 For Z2 25 1500 1.68 0,69 1139 0 1139
Z2 = 3.5 Type B=1,0 30 1800 1,46 0,60 1171 0 1171
n= 0.016 Rolled = 3.5 35 2100 1,30 0.53 1201 0 1201
S= 0.0100 40 2400 1,18 0.48 1234 0 1234
45 2700 1.08 0.44 1288 0 1268
d= 0,1752 ft. FlowWidth 8.8 ft. 50 3000 1,01 0.41 1302 0 1302
, 65 3300 0.94 0.38 1332 0 1332
r 60 3600 0.88 0,36 1357 0 1357
A R Q Tc Tc totel I Qc 65 3900 0.83 0.34 1382 0 1382
0.62 0.09 1,51 0.00 1.85 3.70 1.51 70 4200 0.79 0,33 1417 0 1417
75 4500 0.77 0.32 1469 0 1469
Qpeak for Cese 1= 1.51 cfs 80 4800 0,75 0,31 1530 0 1530
85 5100 0.73 0,30 1680 0 1580
' 90 5400 0.10 0.29 1590 0 1590
95 5700 0.66 0.27 1577 0 1571
CASE 2 100 6000 0.68 0.28 1714 0 1714
Cese 2 assumes a Time of Conoentration less tfian 5 minutes so that the "05-013" TREATMENT REQUIREMENTS
peak flow =.80(Tc=5 intensity)(Imp. Area) = 0.00 cfs Minimum "05-013" Vohime Required 0 cu ft
Provided Treatment Volume 0 cu ft
DRYWELI REQUIREMENTS - 50 YEAR DESIGN STORM
So, lhe Peak flaw for the Basin is the greater ot the iwo flows, Manimum Storege Required by Bowstnng 1580 cu ft
1.61 cfs Provided Storege Vofume 0 cu R
Number and Type oi Drywells Required 0 Single
0 Double
~ ~ ~ ~ mu"' mm
PEAK FLOW CALCULATION PROJECT: Shelley Lake 5th Addtlon BOWSTRING METHOD PROJECT: Shelley Leke 5th Addtion
50•Year Design Storm DETENTION BASIN OESIGN BASlN; C
DESIGNER GLA
• BASIN: C DATE: 27-May05
Tot. Area 343,083 SF 7.86 Acxes Time Increment (min) 5
Imp, Area 0 SF C= 0.9 Time of Conc. (min) 13.93
Pen►. Area 343,083 SF C= 0.15 Outflow (ds) 0
Wt, C= 0,15 Design Year Flow 50
Area (ecres) 7.88
CASE 1 Impervfous Area (sq ft) 0
'C Fector 0.15
984 ft. Overiand Flow Area' C 1.181
Treatment Area 0
Ct= 0,15
L= 984 ft. Time Time Inc. Intens. Q Devel. Vol.ln Vol.Out Storege
n = 0.40 .miDj._.,_.. sec _ (inlhr) (ELSL (cu fl) (cu ft) (cu ft~
S= 0.0427 13.93 836 2,57 3.04 3403 0 3403
Tc ~ 13.93 min., by Equation 3-2 ot Guidelines 5 300 4,58 5.41 2174 0 2174
10 600 3,21 3.79 3046 0 3046
0 ft. Gutter flow 15 900 2.44 - 2,88 3415 0 3415
26 1200 1,98 2.34 3473 0 3473
21= 50.0 For Z2 25 1500 1.68 1,98 3533 0 3533
Z2 = 3.5 Type B=1,4 30 1800 1.46 1,71 3593 0 3593
n= 0.016 Rolled = 3,5 35 2100 1.30 1.53 3658 0 3658
S= 0.0100 40 2400 1,18 1.39 3734 0 3734 ,
45 2700 1,08 1.28 3821 0 3821
d= 02280 ft. Flow Width 11,4 ft, 50 3000 1,01 1,19 3908 0 3908
. 55 3300 0.94 1.91 3983 0 3983
60 3600 0.68 1.04 4046 0 4046
A R Q Tc Tctatal I Qc 65 3900 0.63 0.96 4112 0 4112
1.39 0.11 3.04 0.00 13.93 2.57 3.04 70 4200 0.79 0.94 4208 8 4208 .
75 4500 0.77 0,91 4353 0 4353
apeek for Case 1= 3,04 cfs , 80 4800 0.75 0.69 4529 0 4529
` 85 5100 0.73 0.87 4686 0 4668
90 5400 0,10 0.83 4692 0 4692
95 5100 0.66 0.78 4648 0 4648
CASE 2 100 6000 0.88 0.80 5049 0 5049
Ceae 2 essumes a Time of Concentration less than 5 minutes so that the "05-013" TREATMENT REQUIREMENTS
peak flow =.90(Tc=5 intensity)(imp. Area) = 0,00 cis Minimum "05-013" Volume Required 0 cu ft
Provided Treatment Volume 0 cu ft
DRYWELL REQUIREMENTS - 50 YEAR DESIGN STORM
So, the Pesk flow for the Basin is ihe greater of the two flows, Maxamum Storage Required by Bowsiring 4668 cu ft
3.04 cfs Pmvided Storage Volume 0 cu ft
Number and Type of OryweNs Requfred 0 Single
0 Double
,
PEAK FLOW CALCULATION PROJECT: Shelley Lake 5th Addtion BOWSTRING METHOD PROJECT: Shelley Lake 5th Addtion
50-Year Design Storm DETENTION BASIN DESiGN BASIN: D
DESIGNER GLA
BASIN: D DATE: 27-May05
Toi. Area 192,306 SF 4,41 Aaes Time Inaement (min) 5
Imp, Area 0 SF C= 0,9 Time oi Conc. (min) 5.83
Perv. Area 192,306 SF C= 0.15 Oufflow (cfs) 0
Wt. C= 0.15 Qesign Year Flaw 50
Area (acxes) 4,41
CASE 1 Impervious Area (sq ft) 0
'0___ 'C' Feaor 0.15
287 ft. Overland Flow Area' C 0.662
Treatment Area 0
Ct= 0.15
L= 287 ft. Time Time Inc, Intena. Q Devel. Vol.ln Vol.Out Storage
n = 0.40 (min) (sec) (iNhr) ~tD (cu ft1 ~ (cu it) (cu 8~
S= 0.0662 5.83 350 4.29 2.84 r1332 0 1332
Tc = 5,83 min., by Equation 3-2 of Guidelines 5 300 4.58 3.03 1219 0 1219
10 600 3.21 2.12 1521 0 1527
0 ft. Gutter flow 15 900 2.44 1.62 1641 0 1647
20 1200 1,98 1.31 1730 0 1730
21= 50,0 ForZ2 25 1500 1,68 1.11 1797 0 1797
Z2 = 3.5 Type B=1,0 30 1600 1.46 0.97 1854 0 1854
n= 0.016 Rolled = 3.5 35 2100 1.30 0.86 1908 0 1908
S= 0.0100 ~ 40 2400 1,18 OJS 1964 0 1964
45 2700 -1,08 0.72 2023 0 2023
d= 0.2222 ft, Flow Width 11,1 ft, 50 3000 1,01 0.67 2080 0 2Q80
. 55 3300 0.94 0.62 2130 0 2130
60 3600 , 0.88 0.58 2111 0 2171
A R Q Tc Tc total I Qc 65 3900 0,83 0,55 2214 0 2214
1.32 0.11 2.84 0,00 5.83 4.29 2.84 70 4200 0,79 0,53 2272 0 2272
75 4500 0.77 0,51 2356 0 2358
Qpeak for Case 1= 2,84 cfa 60 4800 0,75 0.50 2456 0 2456
65 5100 0.73 0.49 2536 0 2536
90 5400 0.70 0.46 2553 0 2553
95 5700 0.66 0,44 2533 0 2533
CASE 2 100 6009 0.68 0,45 2156 0 2756
Case 2 assumes a Time of ConceMration 4eas then 5 minutea so that the "05-013" TREATMENT REQUIREMENTS
peak flow =.90(Tc=5 intensityr)(Imp, Area) = 0.00 cfs Minimum "05-013" Volume Required 0 au ft
Provided Treatment Volume 0 cu ft
DRYWELL REQUIREMENTS - 50 YEAR DESIGN STORM
So, the Peak ftow for the Basin is the greater ot the two flows, Meximum Storege Required by Bowstring 2536 w fl
2.84 cfs Provided Storage Vofume 0 cu ft
N4mber and Tjrpe oi Drywella Required 0 Single
0 Double
,
~ mm m m wMMM'="=M= mm m- m
PEAK FLOW CALCULATION PROJECT; Shelley Lake 5th Adddon BOWSTRING METHOD PROJECT: Shelley Lake Sth AddGon
50-Year Design Storm DETENTION BASIN DESIGN BASIN: E
DESIGNER GLA
BASIN: E DATE: 27-May-05
Tot. Area 259,587 SF 5.96 Aaes Time Increment (min) 5
Imp. Area 0 SF G 0.9 Time of Conc, (min) 9,78
Perv, Area 259,581 SF C= 0.15 Outflow (ds) 0
Wt C= 0.15 Design Year Flow 50
Area (acres) 5,96
CASE 1 Impervious Area (sq ft) 0
'C Fector 0,15
600 ft. Overtand Flow Area' C 0.894
Treatment Area 0
Ct= 0.15
L= 600 ft. Tlme Time Inc. lntena, Q Devel. Vol.ln Vol.Out Storage
n = 0.40 (min) (sec) (iNhr) Ccf 5
Icu fl) (cu ft) (cu ftL.
S= 0,0517 9.78 587 325 2,91 2185 0 2185
Tc = 9.78 min,, by Equation 3-2 of Guidelines 5 300 4,58 4,09 1645 0 1645
10 600 3.21 2.87 2292 0 2291
0 ft. Gutter flow 15 800 2.44 2.18 2399 0 2389
20 1200 1.96 1.77 2478 0 2478
Z1= 50.0 ForZ2 25 1500 1,66 1.50 2546 0 2546
Z2 = 3.5 Type B=1.0 30 1800 1.46 1.30 2608 0 2608
n= 0.016 Rolled = 3.5 35 2100 1.30 1.16 2669 0 2669
S= 0.0100 40 2400 1.18 1,05 2736 0 2736
' 45 2100 1.06 0.97 2809 0 2809
d= 0.2244 ft, Flow Width 11,2 ft. 50 3000 ,1.01 0.90 2880 0 2880
. 55 3300 0.94 0.84 2942 0 2942
60 3600 0.88 0,79 2594 0 2994
_ A~ R Q Tc Tc total IQc. _ 65 3900 0.83 0.74 3048 0 3048
1,35 0.11 2.91 0.00 9,78 3,25 2,91 70 4200 0.79 0,71 3124 0 3124
76 4500 0.77 0,69 3235 0 3235
Qpeek for Case 1= 2.91 cfs 80 4800 0.75 0.67 3369 0 3369
85 5100 0.73 0.66 3477 0 3477
90 5400 0.70 0.62 3497 0 3497
95 5700 0.66 0.59 3467 0 3467
CASE 2 100 6000 0,68 0.61 3169 0 3769
Case 2 assumes a Time af ConcenVation less than 5 minutes so that the "05-013" TREATMENT REQUIREMENTS
peak flow =.90(Tc=5 intensiry)(Imp. Area) = 0.00 cfs Minimum "05•013" Volume Required 0 cu ft
Provided Treatment Volume 0 cu ft
DRYWELL REQUIREMENTS - 50 YEAR DESIGN STORM
So, lhe Peak flow for the Basin Is the greater of the two flows, MaAmum Storage Required by Bowstdng 3477 cu ft
2.91 cfs Provided Storage Volume 0 cu ft
Number end Type of Oryweils Required 0 Single
0 Qouble
PEAK FLOW CALCUlATION PROJECT: Shelley Lake 5th Addtion BOWSTRING METHOD PROJECT: Shelley Lake 5th Addlion
50•Year Deslgn Storm DETENTION BASIN DESIGN BASIN: F
DESIGNER GLA
BASIN: F DATE: 27-Mey-05
Tot. Area 329,233 SF 7.56 Acres Time Increment (min) 5
imp, Area 0 SF C= 0.9 Time oi Conc. (min) 12.54
Perv. Area 329,233 SF C= 0.15 Outflow (de) 0
Wt. C= 0.15 Desfgn Year Flow 50
Area (aaes) 7.56
CASE 1 Impervious Area (aq n) 0
, ''C' Factor 0.15
634 ft. Overland Flow Area "C 1.134
Trealment Area 0
Ct= 0.15
L= 634 ft, Time Time {nc. Intens, Q Devel. Vol,ln Vol.Out Storage
cu ft
n= 0.40 (min) sec.? (inmr) cfa (cu ft) __(c._u ftL._.~._,
S= 0.0252 12,54 752 2.77 3.14 3161 0 3161
Tc = 12,54 min,, by Equation 3-2 of Guidelines 5 300 4.58 5.19 2087 0 2087
10 600 3,21 3.64 2923 0 2923
0 ft. Gutter ftow 15 900 2.44 2.77 3199 0 3199
20 1200 1.96 2.25 3269 0 3269
Z1= 50,0 For ZZ 25 1500 1.68 1.90 3337 0 3331
22 = 3.5 Type B=1,0 30 1800 9,.46 1.65 3401 0 3401
n= 0.016 RoOed = 3.5 35 2100 1.30 1.41 3468 0 3468
S= 0.0100 40 2400 1.18 ' 1.33 3545 0 3545
45 2700 , 1.08 1.23 3631 0 3831
d= 0.2307 ft. Flow Width 11.5 ft. 50 3000 1.01 1.14 3117 0 3717
, 55 3300 0.94 1.01 3792 0 3792
60 3600 0.88 1.00 3854 0 3854
A R Q Tc Tc total I Qc 65 3900 0.83 0.94 3919 0 3919
1,42 0.12 3.14 0,00 12,54 2,77 ~3.14 10 4200 0.19 0.90 4013 0 4013
75 4500 0.77 0.87 4152 0 4152
Qpeak for Case 1= 3,14 cfs 60 4800 0,75 0.85 4321 0 4321
85 5100 0.73 0.83 4456 0 4456
90 5400 0.70 0.19 4480 0 4480
95 5700 0.66 0.75 4439 0 4439
CASE 2 100 6000 0,68 0.77 4824 0 4814
Case 2 assumes a Time of ConceMration less than 5 minutes so that the °05•013" TREATMENT REQUIREMENTS
peak flow =.90(Tc=5 intensity)(Imp. Area) = 0.00 cfs Minimum "05-013" Volume Required 0 cu ft
Provided Treatment Volume 0 cu ft
DRYWEII REQUIREMENTS - 50 YEAR OESIGN STORM
So, the Peak 8ow for tthe Besin is the greater of the two flows, Maximum Storage Required by Bowstring 4456 cu ft
3.14 cfs Provided Storage Volume 0 cu ft
Number and Type of Drywells Required 0 Single
0 Double
mmm mm MMMi -Mr ~ ~ ~ ~ ~ mmm
PEAK FLOW CALCULATION PROJECT: Shelley Lake 5th Addtion BOWSTRING MEtHOD PROJECT: Shelley Lake 5th Addtion
10•Year Design Stonn DETENTION BASIN DESIGN BASIN: 1
DESIGNER; GLA
BASIN; 1 DATE: 21-May-05
Tot. Area 29,669 SF 4.68 Acres
Imp. Area 13,301 SF C= 0.9 Time Increment (min) 5
Perv. Area 16,368 SF C= 0.15 Time of Conc. (min) 5.00
Wi. C= 0.49 Outflow (cfs) 1
Design Year Flow 10
CASE 1 Area (acres) 0.68
Imperoious Area (sq ft) 13301
0 ft. Overiand Flow 'C Factor 0.49
Area * C 0.331
Ct = 0,15 Treatment Area 1,901
L = 0 ft.
n= 0.40 Time Time Inc, Intens, Q Devel, Vol.In Vol.Out Storage
S= 0.1090 ~min) (sec) ~iNhrL. t2!!~_ (cu ft) _ (cu ft) (cu ft~
5.00 300 3.18 1.05 423 '300 123
Tc = 0.00 min., by Equation 3-2 of Guidelines
5 300 3,18 1.05 423 300 123
221.55 ft. Gutter flow 10 600 2.24 0,74 521 600 -79
15 900 1.76 0.58 582 900 -318
Z1= 50.0 For72 20 1200 1,45 0,48 627 1200 -573
Z2 = 3.5 Type B=1.0 25 1504 1,23 ' 0,41 652 1540 -848
n= 0.016 Rolled = 3.5 30 1800 1.05 0.35 661 1800 •1139
S= 0.0089 35 2100 0.91 0.30 664 2100 -1436
40 2460 0.81 0.27 671 2400 -1729
, d= 0.1565 ft, Flow Width 1,8 ft. 45 2100 0.74 0.24 686 2700 -2014
. 50 3000 , 0.69 0.23 708 3000 -2292
55 3300 0,65 0.21 131 3300 •2569
A R Q Tc Tc total I Qc 60 3600 0.61 0.20 753 3600 -2847
0.660.08 1.05 2,30 5,00 3.18 ~ 1.05 65 3900 0,58 0.19 775 3900 -3125
70 4200 0.56 0.19 804 4200 -3396
Qpeak for Case 1= 1.05 cfs 75 4500 0,55 0.18 845 4540 -3655
80 4800 0.55 0.18 891 4800 •3909
85 5100 0,53 0.18 921 5100 -4119
90 5400 0.50 0.16 906 5400 -4494
CASE 2 95 5700 0.45 0.15 868 5700 -4832
100 6000 0.49 0.16 991 6000 -5009
Case 2 assumes a Time of Concenuation less than 5 minutes so that the
peak flow =,90(Tc=5 intensity)(Imp. Area) = 0.87 cfs "05-013" TREATMENT REQUIREMENTS
Minimum "05-013" Volume Required 329 cu ft
Provided Treatment Volume 5,266 cu ft
So, the Peak flow for the Besin is the greater of the Nvo flows, ORYWELL REQUIREMENTS -10 YEAR DESIGN STORM
1.05 cfs Maximum Storage Required by Bowstring 123 cu ft
Provided Storage Volume 18322 cu ft
Number and Type of Drywells Required 0 Single
1 Double
PEAK FLOW CALCULATfON PROJECT: Shelley Lake 5th Addtion BOWSTRING METHOD PROJECT; Shelley Lake 5th Addtion
10-Year Design Storm DETENTION BASIN DESIGN BASIN: 2
. DESIGNER: GLA
BASIN; 2 DATE: 27-May-05
Tot. Area 14,982 SF 0.34 Aaes
Imp. Area 10,446 SF C= 0.9 Time Increment (min) 5
Perv. Area 4,536 SF C= 0.15 Time of Conc. (min) 5.00
1Mt, C= 0.67 Outflow (cfs) 1
Design Year Flow , 10
CASE 1 Area (acres) 0.34
Impervious Area (sq ft) 10446
0 ft. Overtand Flow 'C Factor 0.67
Area " C 0.231
Ct = 0.15 Treatment Area 5,046
L = 0 ft.
n= 0.40 Time Time Inc. Intens. Q Devel. Vol.ln Vol.Out Storage
S= 0.1090 min sec, inmr (cfsl. _(cu ft) (cu n) „ 1cu ftl~
5.00 300 3.18 0.74 296 300 4
Tc = 0.00 min,, by Equation 3-2 of Guidelines
5 300 3.18 0.74 296 300 4
174 ft. Gutter flow 10 600 2.24 0.52 364 600 -236
15 900 1.16 0.41 407 900 -493
Z1= 50.0 For Z2 20 1200 1.45 0,34 438 1200 -162
Z2 = 3.5 Type B=1.0 25 1500 1.23 0.28 456 1500 -1044
n= 0.016 Rolled = 3.5 30 1800 1.05 0.24 462 1800 -1338
S= 0,0089 35 2100 0.91 0.21 464 2100 -1636
40 2400 0.81 0.19 469 2400 -1931
d= 0.1370 ft. Flow Width 6.9 ft. 45 2704 0.74 0,17 479 2700 •2221
50 3000 0.69 0.16 495 3000 •2505
55 3300 0.65 0.15 511 3300 •2789
A R Q Tc Tc total I Qc 60 3600 0.61 0.14 526 3600 -3014
0.50 0.07 0.74 9.98~ 5.00 3.18 0.74 65 3900 0,58 0.14 541 3900 •3359
70 4200 0.56 0.13 562 4200 •3638
Opeak for Case 1= 0.14 cfs 75 4500 0.55 0.13 590 4500 •3910
80 4900 0.55 0.13 623 4800 4171
85 5100 0.53 0.12 643 5100 -4457
90 5400 0,50 0.12 633 5400 -4767
CASE 2 95 5700 0.45 0.10 606 5700 -5094
100 6000 0.49 0,11 693 6000 -5307
Cese 2 assumes a Time of Concentration lesa lhan 5 minutes so that the
peak flow =.90(Tc=5 intensity)(Imp. Area) = 0,69 cfs "05-013" TREATMENT REQUIREMENTS
Minimum "05-013" Volume Required 210 cu ft
Provided Treatment Votume 5,266 cu ft
So, the Peak flow for the Basin is the greater of the two flows, DRYWELL REQUIREMENTS -10 YEAR DESIGN STORM
0.74 cfs Maximum Storege Required by Bowstring 4 cu ft
Provided Storage Volume 18322 cu ft
Number and Type of Drywells Required 0 Single
1 Double
PEAK FLOW CALCULATION PROJECT: Shelley Lake 5th Addtion BOWSTRING METH00 PROJECT: Shelley Lake 5th Addtion
10-Year Design Stocm DETEMTION BASIN DESIGN BASIN: 3
DESIGNER; GLA
BASIN; 3 DATE: 27•Mey05
Tot. Area 33,684 SF 0.17 Acres
Imp. Area 18,671 SF C= 0.9 'fime fncrement (min) 5
Perv. Area 15,013 SF C= 0.15 Time of Conc. (min) 5.00
Wt, C= 0.57 Outflow (cfs) 1
Design Year Flaw 10
CASE 1 Area (acres) 0.17
(mpervious Area (sq ft) 18671
0 ft. Overiand Flow 'C' Factor 0.51
Area' C 0.437
Ct = 0,15 Treatment Area 9,671
L = 0 ft.
n= 0.40 Time Time Inc. Intena. Q Devel. Vol.In Vol,Out Storege
S= 0.0680 minl ; _ (sec) _ (in~r) _ a (cu ft) !au ftl__., (cu ft~
5.00 900 3.18 1.39 559 300 259
Tc = 0.00 min., by Equation 3-2 of Guidelines
5 300 3.18 1.39 559 300 259
395 ft. Gutter flaw 10 600 2.24 0.98 688 600 86
15 900 1,76 0,77 769 900 -131
21= 50.0 For Z2 20 1200 1.45 0,64 828 1200 -372
Z2 = 3.5 Type B=1,0 25 1500 1,23 6.54 861 1500 -639
n= 0.016 Rolled = 3.5 30 1800 1,05 0.46 874 1800 -926
S= 0.4114 35 2100 0,91 0.40 877 2100 •1223
40 2400 0,81 0,35 886 2400 -1514
d= 0.1658 ft, Flow Width 8.3 ft, 45 2704 0,74 0.32 906 2100 -1794
50 3000 0.69 0.30 935 3000 •2065
55 3300 0.65 0.28 986 3300 -2334
A R Q Tc Tc total I Qc 60 3600 0.61 0.27 994 3600 -2606
,
0.74 0.08 1.39 3.49 5.00 3.18 1.39 65 3900 0.58 0.26 1023 3900 -2877
16 4200 0.56 0,25 1062 4200 -3138
Qpeak for Case 1= 1.39 cfs 75 4500 0.65 0.24 1116 4500 -3384
80 4804 0.55 0.24 1177 4800 -3623
85 5100 0.53 0.23 1216 5100 -3884
90 5400 0.50 0.22 1191 5400 -4203
CASE 2 95 5700 0.45 0.20 1146 5700 -4554
100 6000 0.49 0.21 1309 6000 -0691
Case 2 assumes a Time of Concentration less ihan 5 minutes so that the
peak flow =.90(Tc=5 intensity)(Imp, Area) = 1,23 cfs "05-013" TREATMENT REQUIREMENTS
. Minimum "05-013" Volume Required 403 cu ft
, Provided Treatment Volume 5,266 cu tt
So, the Peak flow for the Basin is the greater of the two flaws, DRYWELL REQUIREMENTS -10 YEAR DESIGN STORM
1.39 cfs Maximum Storage Required by Bowstdng 259 cu ft
Provided Storage Vdume 18322 ou ft
Number and Type of Drywells Required 0 Single
1 Daubie
PEAK FLOW CALCULATION PROJECT: Sheliey Lake 5th Addtion BOWSTRING METHOD PROJECT; Shelley Lake 5th Addtion
10-Year Design Storm DETENTION BASIN DESIGN BASIN: 4
DESIGNER: GLA
BASIN: 4 DATE: 21-Mey-05
Tot. Area 28,769 SF 0,66 Acres
Imp. Area 14,993 SF C= 0.9 Time Increment (min) 5
Perv. Area 13,716 SF C= 6.15 Time of Conc. (min) 5.00
Wt. C= 0,54 outflow (c1s) 1
Design Year Flow 10
CASE 1 Area (acres) 0.66
Imperviaus Area (aq ft) 14993
0 ft. Overiand Flow 'C Factor 0.54
Area • C 0.357
Ct = 0.15 TBatment Area 7,793
L = 0 ft.
n= 0.40 Time Time Inc, Intens. Q Devel. Vol,ln Vol,Out Storage
S= 0,0680 ~min) , sec (inlhrl (Cfs) (cu ft) (cu ft) . „ , (cu R~
5.00 300 3.18 1,14 458 3061' 156
Tc = 0.00 min,, by Equation 3-2 of Guidelines
5 300 3.46 1.14 456 300 156
300 ft. Gutter flow 10 . 600 2.24 0.80 562 600 -38
15 900 1.76 0.63 628 900 -272
Z1= 50.0 For Z2 20 1200 1.45 0.52 676 1200 •524
Z2 = 3.5 Type B=1.0 25 1500 1.23 0,44 703 1500 -797
n= 0.016 Roiled = 3.5 30 1800 1.05 0,38 713 1800 -1087
S= 0.0183 35 2100 0.91 0,33 716 2100 -1384
40 2400 0,81 0.29 724 2400 -1678
d= 0.1410 ft, Flaw Width 7,1 ft. 45 2100 0.74 0.26 140 2700 •1960
50 3000 0,69 0.25 163 3000 -2237
55 3300 0.65 0.23 788 3300 -2512
A R Q Tc Tc total I Qc 60 3600 0.61 0.22 812 3600 -2788
A-'.._...
18 1.14 65 3900 0,58 0.21 836 3900 •3064
0,53 0.07 1.14 2.33 5.00 3.
10 4200 0,56 0,20 867 4200 -3333
QpeakforCase 1= 1,14 cfs 75 4500 0.55 0.20 911 4504 -3589
80 4600 0,55 0.20 961 4800 -3839
85 5100 0.53 0,19 993 5100 -4107
90 5400 0.60 0.18 978 5400 4422
CASE 2 95 5100 0,45 0.16 936 5700 -4764
100 6000 0.49 0.18 1069 6000 4931
Case 2 assumes a Time of Concentration less than 5 minutes so that the .
peak flow =.90(Tc=5 intensity)(Imp. Area) = 0.98 cfs "05-013" 7REATMENT REQUIREMENTS
Minimum "05-013" Volume Required 325 cu ft
Provided 7reatment Volume 5,266 cu ft
So, the Peak flow for the Basin is the greater of the two flows, DRYWELL REQUIREMENTS -10 YEAR DESlGN STORM
1.14 cfs Maximum Storage Requlred by Bowstring 156 cu ft
Provided Storage Vdume 18322 cu ft
Number and Type of Drywells Required 0 Single
1 Dauble
PEAK FLOW CALCULATION PROJECT: Shelley Lake 5th Addtion BOWSTRING METHOD PROJECT; Shelley Lake 5th Addtion
10-Year Design Stonn OETENTION BASIN DESIGN BASIN; 5
DESIGNER; GLA
• BASIN: 5 DATE: 27-Mey-05
Tot. Area 166,849 SF 3,83 Acres
imp. Area 0 SF C= 0,9 Time Increment (min) 5
Perv. Area 166,849 SF C= 0.15 Time oi Conc. (min) 11.59
Wt C= 0.15 Outflow (cfs) 1
Design Year Flow 10
CASE 1 Area (acres) 3.83
Impervious Area (aq ft) 0
581 ft. Overland Flow 'C Factor 0.15
Area ` C 0.515
Ct = 0.15 Treatment Area 0
L = 581 fi.
n= 0.40 Time Time Inc. Intens. Q Devel. Vol.ln Vol,Out Storage
S= 0.0215 ~min) (sec): , ~inlhr) (cu ft) . . (cu ft) (cu ft~
11.59 695 2.45 1.18 1100 695 405
Tc = 11.59 min., by Equalion 3-2 of Guidelines
5 300 3,18 1,83 734 300 434
0 ft. Gutterflow 10 600 2.24 1,29 1035 600 435
15 900 1,76 1.01 1146 900 246
21= 50.0 ForZ2 20 1204 1,45 0.84 1199 1200 -1
Z2 = 3.5 Type B=1,0 25 1500 1,23 0.11 1726 1500 -274
n= 0.016 Rolled = 3.5 30 1800 1.05 0.60 1228 1800 -572
S= 0.0427 35 2100 0.91 0.52 1223 2100 -877
40 2400 0,81 0.47 1226 2400 -1174
d= 0.1217 ft, Flow Width 6.1 ft. 45 2700 0.74 0,42 1247 2700 -1453
50 3000 0.69 0.40 1281 3000 -1119
55 3300 0.65 0,37 1318 3340 -1982
A R Q Tc Tc total I Qc 60 3640 0.61 0.35 1353 3640 -2241
- - - ~ 0.00 11.59 2.05 ^ . . -
0.40 0.06_ 1,18 1,18 65 3900 0.56 0,34 1389 3900 -2511
' 10 4200 0.56 0.32 1438 4200 •2162
Qpeak for Case 1= 1.18 cfs 75 4500 0.55 0,32 1508 4500 -2992
60 4800 0.55 0.32 1589 4800 -3211
85 5100 0.53 0,31 1639 5100 -3461
90 5400 0.50 0,29 1611 5400 -3189
CASE 2 95 5700 0.45 0.26 1540 5700 -4180
100 6000 0.49 0,28 1157 8000 -4243
Case 2 assumes a Time of Concentration less than 5 minutes so that the
peak flow =,90(Tc=5 intensity)(Imp. Area) = 0,00 cfs "05-013" TREATMENT REQUIREMENTS
Minimum "05-013" Volume Required 0 cu ft
Provided Treatment Volume 5,266 cu ft
So, the Peak flow for the Basin is the greater of the two flows, DRYWELL REQUIREMENTS -10 YEAR DESIGN STORM
1,18 cfs Maximum Storage Required by Bowstring 435 cu ft
Provided Storage Volume 18322 cu ft
Number and Type of Drywells Required 0 Single
1 Double
PEAK FLOW CALCUtATION PROJECT: Shelley Lake 5th Addtion BOWSTRING METHOD PROJECT; Shelley Lake 5th Addtion
10-Year Design Storm DETENTION BASIN DESIGN BASIN; 6
DESIGNER: GLA
BASI N: 6 DATE: 27-May-05
Tot. Area 50,113 SF 1.16 Acres
Imp. Area 15,434 SF C= 0.9 Time Increment (min) 5
Pero. Area 35,279 SF C= 0.15 Time of Conc. (min) 7.65
1Nt. C= 0.38 Outflow (cfs) 1
Design Year Flow 10
CASE 1 Area (acres) 1.16
Imperoiaus Area (sq ft) 15434
245 ft. Overland Flow 'C Factor 0.38
Area " C 0.440
Ct = 0.15 Treatment Area 10,784
L = 245 ft.
n= 0.40 Time Time Inc. Intens. Q Devel. Vol,ln Vol.Out Storage
S= 0.0327 min (sec) (inlhrL (cu ftL (cu ft) (cu ftL
7.65 459 2,60 1.15 704 459 245
Tc = 6.55 min., by Equatiorl3•2 of Guidelines
5 300 3.18 1.40 563 300 263
228 ft. Gutter flow 10 600 2,24 0.99 146 600 146
15 900 1,76 0.77 816 900 -84 ,
Z1= 50.0 For Z2 20 1200 1.45 0.64 868 1200 -332
Z2 = 3.5 Type B=1.0 25 1500 1.23 0.54 896 1500 -604
n= 0.016 Rolled = 3.5 30 1800 1.05 0,46 904 1800 -896
S= 0.0660 35 2100 0.91 0.40 905 2100 -1195
40 2440 0.81 0,36 911 2400 •1489
d= 0.1110 ft, Flow Width 5.6 ft. 45 2700 0,74 0.33 930 2700 -1770
50 3000 0.69 0,30 957 3000 -2043
55 3300 0.65 0,29 987 3300 -2313
A R Q Tc Tc total I Qc 60 3600 0.61 0.21 1016 3600 -2584
. . . ,
0.33 0.06 1.15 1.09 7.65 2.60 1.15 65 3900 0.58 0.26 1044 3900. -2856
70 4200 0.56 0,25 1082 4200 •3118
Qpeak for Case 1= 1,15 cfs 75 4500 0.55 0.24 1136 4500 •3364
60 4800 0.55 0,24 1198 4800 -3642
85 5100 0.53 024 1237 5100 •3863
90 5400 0.50 0.22 1217 5400 -4183
CASE 2 95 5700 0.45 0.20 1165 5700 -4535
100 6000 0.49 0.22 1330 6000 -4610
Case 2 assumes a Time of Concentration less than 5 minutes so that the
peak flow =.90(Tc=5 intensity)(Imp. Area) = 1.01 cfs "05-013" TREATMENT REQUIREMENTS
Minimum "05-013" Volume Required 449 cu ft
Provided Treatment Volume 5,266 cu ft
So, the Peak flow for the Basin is the greater of the two flows, DRYWELL REQUIREMENTS -10 YEAR DESIGN STORM
1.16 cfs Maximum Storage Required by Bowstring 263 cu ft
Provided Storage Vdume 18322 cu ft
Number and Type of Drywells Required 0 Single
, 1 Double
PEAK FLOUV CALCULATION PRO,IECT: Shelley Lake 5th Addtion BOWSTRING METHOD PROJECT: Shelley Lake 5th Addtion
10-Year Design Storm DETENTION BASIN DESIGN BASIN: 7
QESIGNER; GLA
BAS1N: 7 DATE: 27-May-05
Tot. Area 45,480 SF 1.04 Acres
Imp. Area 9,426 SF C= 0.9 Time Increment (min) 5
Perv, Area 36,054 SF C= 0.15 Time of Conc. (min) 8.23
Wt, C= 0.31 Outflow (cfs) 1
Design Year Flaw 10
CASE 1 Area (acres) 1.04
Impervious Area (sq ft) 9426
196 ft. Overland Flow 'C Factor 0.31
Area ` C 0.319
Ct = 0.15 7reatment Area 5,826
L = 196 ft
n= 0.40 Time Time Inc. Intens. Q Devel. Vol.ln Vol.Out Storage
S= 0.0255 ~min) Jsec) Jnmr) (cfs) (cu fl) Jcu ft} ~ „ ; icu ft)
8.23 494 2,50 0.80 528 494~ 34
Tc = 6.18 min., by Equatian 3-2 of Guidelines
5 300 3,18 1.01 407 304 107
149 ft. Gutter flow 10 660 2,24 0,71 549 604 •51
• 15 900 1.76 0.56 598 900 -302
Z1= 50.0 For Z2 20 1200 1.45 0.46 634 1200 -566
Z2 = 3.5 Type B=1,0 25 1500 1.23 0.39 654 1500 -846
n= 0.016 Roiled = 3,5 30 1800 1,05 0.33 659 1800 •1141
S= 0.0050 35 2140 0.91 0.29 659 2100 -1441
40 2400 0.81 0.26 663 2400 •1737
d= 0.1575 ft. Flow Width 7.9 ft. 45 2700 0.14 0.24 678 2700 -2024
50 3000 0.69 0.22 696 3000 -2304
55 3300 0.65 0.21 716 3300 -2582
A R Q Tc Tc total I Qc 60 3600 0.61 0.20 738 3600 •2862
. , . . .
0.66 0.08 0.80 2.06 8.23 2.50 0.80 65 3900 0.58 0.19 758 3900 -3142
70 4200 0,56 0.18 786 4200 -3414
Qpeak for Case 1= 0.80 cfs 75 4500 0.55 0.18 825 4500 -3675
80 4800 0.55 0.18 870 4800 •3930
85 5100 0.53 0.17 898 5100 -4202
90 5400 0.50 0.16 883 5400 -4517
CASE 2 95 5700 0.45 0.14 845 5700 -4855
100 6000 0.49 0,16 965 6004 -5035
Case 2 asaumes a Time of Concentration less than 5 minutes so that the
peak flow =,90(Tc=5 intensity)(lmp. Area) = 0,62 cfs "05-013" TREATMENT REQUIREMENTS
' Mfnimum "05-013" Volume Required 243 cu ft
Provided TreatmeM Volume 5,266 cu ft
So, the Peak flow for the Basin is the greater of the two flows, ~ DRYWELL REQUIREMENTS -10 YEAR DESIGN STORM
0.80 cfs Maximum Storage Required by Bowstring 101 cu ft
Provided Storage Volume 18322 cw ft
Number and Type of Drywells Required 0 Single
1 Double
PEAK FLOW CALCULATION PROJECT; Shelley Lake 5th Addtion BOWSTRING METHOD PROJECT: Shelley Lake 5th Addtion
10•Year Design Stortn DETENTION BASIN DESIGN BASIN: 8
DESIGNER; GLA
BASIN: 8 DATE: 27-Mey-05
Tot. Area 22,736 SF 0.52 Acres
Imp, Area 6,852 SF C= 0.9 Time Increment (min) 5
Perv. Area 15,884 SF C= 0,15 Time of Conc. (min) 9.03
Wt. C= 0.38 OutRow (cfs) 1
Design Year Flow 10
CASE 1 Area (aaes) 0,52
Impervious Area (sq ft) 6852
. 246 ft. Overland Flow 'C Factor 0.38
Area * C 0,196
Ct = 0.15 Treatment Area 5,052
L = 246 ft,
n= 0.40 Time Time Inc, Intens, Q Devel. Vol.ln Vol,Out Storage
S= 0A244 ~min) (sec) (inlhr) (cu ft) (cu ft).
_(cu ft)
9.03 542 2.37 0.47 339 542 •203
Tc = 7.17 min., by Equation 3-2 of Guidelines
5 340 3,18 0,62 251 300 .49
118 ft. Gutter flow 10 600 2,24 0.44 345 604 -255
15 900 1,76 0.34 313 900 -527
Z1= 50.0 ForZ2 20 1200 1,45 0.29 395 1200 -805
Z2 = 3.5 Type B=1,0 25 1500 1.23 0.24 406 1500 •1094
n= 0.016 Roiled = 3.5 30 1800 1.05 0.21 409 1800 •1391
S= 0,0050 35 2100 0.91 0.18 408 2100 -1692
40 2400 0.81 0,16 411 2400 •1989
d= 0,1290 ft. Flow Width 6.5 ft. 45 2700 0.14 0.15 418 2700 •2282
50 3000 0.69 0.14 430 3000 -2570
55 3300 0.65 0.13 444 3300 •2856
A R Q Tc Tctotal I Qc 64 3600 0.61 0,12 458 3600 •3144
0,45 0.06 0.47 1.86 9.03 2.37 0.47 65 3900 0.58 0.11 469 3900 -3431
70 4200 0.56 0.11 485 4200 -3715
Qpeak for Case 1= 0.47 cfs 75 4500 0.55 0.11 510 4500 -3990
80 4800 0,55 0.11 537 4800 -4263
85 5100 0,53 0.10 554 5100 -4546
90 5400 0,50 0.10 545 5400 -4855
CASE 2 95 5700 0.45 0.09 522 5700 -5178
100 6000 0A9 0.16 595 6000 -5405
Case 2 assumes a Time of Concentradon less than 5 minutes so that the
peak flow =.90(Tc=5 intensity)(Imp. Area) = 0.45 cfs ~ "05-013" TREATMENT REQUIREMENTS
Minimum "05-013" Volume Required 211 cu ft
Provided Treatment Volume 5,266 cu ft
So, the Peak Flow for the Basin is the greater of the two flow$, DRYWELL REQUIREMENTS • 10 YEAR DESIGN STORM
0.47 cfs Maximum Storage Required by Bowstring -49 cu ft
Provided Storage Vdume 18322 cu ft
Number and 7ype of Drywells Required 0 Single
1 Double
PEAK FLOW CALCULATION PROJECT: Shelley Lake 5th Addtion BOWSTRING METHOD PROJECT; Shelley lake 5th Addtion
10-Year Design Storm DETENTION BASIN DESIGN BASIN: 9
DESIGNER: GLA
BASIN: 9 DATE: 27-May-05
Tot, Area 137,355 SF 3.15 Acres
Imp. Area 19,202 SF C= 0.9 Time Increment (min) 5
Perv. Area 118,153 SF C= 0.15 Time of Conc. (min) 11.90
Wt. C= 0.25 Outflow (cfs) 1
Design Year Flow 10
CASE 1 Area (acres) 3.15
Impervious Area (sq ft) 19202
431 ft. Overland Flow 'C Factor 0.25
Area' C 0,804
Ct = 0.15 Treatment Area 12,002
L = 431 ft.
n= 0.40 Time Time Inc. Intens. Q Deve►. Vol.ln Vol,Out Storage
S= 0.0311 min) sec: inA~r (cu R~_._ (cu ft) (cu ftL.
11.90 714 2.02 1,63 1555 ~ 714 841
Tc 5.86 min., by Equation 3-2 of Guidelines
5 300 3.18 2,55 1026 304 726
296 ft.Gutterflow 10 604 2,24 1,80 1448 600 848
15 900 1.76 1.41 1612 900 112
Z1 = 50.0 ForZ2 20 1200 1,45 1.17 1685 1200 485
Z2 = 3.5 Type B=1.0 25 1500 1,23 0.99 1721 1500 221
n= 0,016 Rolled = 3.5 30 1800 1.05 0.84 1723 1800 -77
S= 0.0068 35 2100 0.91 0.73 1115 2100 -385
40 2400 0.81 0,65 1119 2400 -681
d= 0.1942 ft. Flow Width 9.7 ft. 45 2700 0.74 0,59 1748 2700 -952
• 50 3000 0.69 0.55 1795 3000 -1205
55 3300 0.65 0.52 1847 3300 -1433
A R Q Tc Tc total I oc 60 3600 0.61 0.49 1896 3600 -1704
II ,J. . _ L_....~
1,01 0,10 1.63 3,05 11.90 2.02 1.63 65 3900 0.58 0.41 1946 3900 -1954
10 4200 0.56 0.45 2014 4200 -2186
Qpeak for Case 1= 1,63 cfs 75 4500 0.55 0.45 2112 4500 •2388
80 4800 0.55 0.44 2225 4800 -2575
, 85 5100 0.53 0.43 2295 5100 -2805
90 5400 0.50 0.40 2255 5400 -3145
CASE 2 95 5700 0.45 0.36 2157 5700 •3543
100 6400 0,49 0.39 2461 6000 -3539
Case 2 assumes a Time of Concentration less than 5 minutes so that the
peak flow =,90(Tc=5 intensity)(Imp. Area) = 1.26 cfs "05-013" TREATMENT REQUIREMENTS
` Minimum "05-013" Volume Required 500 cu ft
Provided Treatment Volume 5,266 cu R
So, the Peak flow for the Basin is the greater of the iwo flows, DRYWELL REQUIREMENTS -10 YEAR DESIGN STORM
1,63 efs Maximum Starage Required by Bowstring 848 cu ft
Provided Storage Volume 18322 cu ft
Number and Type of Drywells Required 0 Single
1 Double
PEAK FLOW CALCULATION PROJECT: Shelley Lake 5th Addtlon BOWSTRING METH00 PROJECT: Shelley Lake 5th Addiion
. 10-Year Design Storm DETENTION BAS1N DESIGN BASIN: 10
DESIGNER: GLA
BASIN: 10 DATE: 27-May-05
Tot. Area 101,565 SF 2,33 Acres
Imp. Area 6,377 SF C= 0.9 Time Increment (min) 5
Perv. Area 95,188 SF C= 0,15 Time of Conc. (min) 8.93
Wt, C= 0,20 Outflow (cfs) 1
Design Year Flow 10
CASE 1 Area (aaes) 2.33
Impervious Area (aq ft) 6371
335 ft, Overland Flow 'C Factor 0.20
Area • C 0,460
Ct = 0.15 Treatment Area 6,377
L = 335 ft,
n= 0.40 Time Time Inc, Intens. Q Devel. Vol.ln Vol,Out Storage
S= 0,0403 Jmfn) (sec) lnlhr) (~%j i (cu ft) (cu ft) ~(cu it~
8.83 530 2,41 1.11 785 r 530 255
Tc = 7.43 min., by Equation 3-2 of Guidelines
5 300 3.18 1.46 587 340 287
246 ft, Gutterflow 10 600 2,24 1,03 863 600 203
' 15 900 1,76 4.81 871 900 '-29
Z1= 50.0 For Z2 20 1200 1,45 0.61 922 1200 -278
Z2 = 3.5 Type B=1.0 25 1540 1,23 0.56 949 1500 -551
n= 0.016 Rolled = 3.5 30 1800 1,05 0.48 955 1800 -845
S= 0.0427 35 2100 0,91 0.42 954 2100 •1146
40 2400 0,81 0.31 960 2400 •1440
d= 0.1190 ft. Flow Width 6,0 ft. 45 2700 0.14 0.34 976 2700 •1722
50 3000 0.69 0,32 1007 3000 -1993
55 3300 0.65 0.34 1038 3300 -2262
A R Q Tc Tc total I Qc , 60 3600 0.61 0.28 1067 3600 -2533
0.38 0.06 1.11 1.40 ~ 8.83 2.41 ~ 1.11 65 3900 0.58 0.27 1096 3900 -2804
70 4200 0.56 0.26 1136 4200 -3064
Qpeak for Case 1= 1.11 cfs 15 4500 0.55 0,25 1192 4500 -3308
80 4800 0.55 0.25 1256 4800 -3544
85 5100 0.53 0,25 1291 5100 -3803
90 5400 0.50 0.23 - 1275 5400 -4125
CASE 2 95 5700 0.45 0.21 1220 5100 -4480
100 6000 0.49 0.23 1393 6000 -4601
Case 2 assumes a Time of Concentration less than 5 minutes so that the
peak flow =.90(Tc=5 intensity)(Imp. Area) = 0.42 cfs "05-013" TREATMENT REQUIREMENTS
Minimum "05-013" Volume Required 266 cu ft
Provided Treatment Volume 5,266 cU ft
So, the Peak flow for the Basin is the greater of the two flows, DRYWELL REQUIREMENTS -10 YEAR DESIGN STORM
1.11 cis Maxtimum Storage Required by Bowstring 287 cu ft
Provided Storage Valume 18322 cu ft
Number and Type of DryweNs Required 0 Single
1 Dauble
■r mm mwr w~ m mm mr mm m mos ~ mm
PEAK FLOW CALCULATION PROJECT: Shelley Lake 5th Addtion BOWSTRING METHOD PROJECT: Shelley Lake 5th Addtion
10-Year Design Storm DETENTION BASIN DESIGN BASIN: 11 . DESIGNER; GLA
BASiN; 11 DATE: 21-Mey-05
Tot. Area 14,898 SF 0.34 Acres
Imp. Area 8,008 SF C= 0.9 Time Increment (min) 5
Penr. Area 6,890 SF C= 0.15 Time ot Conc. (min) 5.00
Wt. C= 0.55 Outflow (cfs) 1
Design Year Flow 10
CASE 1 Area (acres) 0,34
Impervioua Area (sq ft) 8008
0 fl. Overland Flow 'C Factor 0.55
Area ` C 0.189
Ct = 0.15 Treatment Area 4,408
L = 0 ft, . ' '
n= 0.40 Time Time Inc. Intena. Q Devel. Vol.in Vol.Out Storage
S= 0.0473 min , (sec) (inlhr) _ (cfs)-'. (au ft) icu ft).. $cu ft~
. .
, , ; 5.00 300 3.18 ~0.60 242 300 •58
Tc = 0,00 min., by Equation 3-2 of Guidelines
5 300 3.18 0.64 242 300 -58
253 ft. Gutter flow 10 600 2.24 0,42 298 600 -302
15 900 1.76 0,33 333 900 •567
21= 50.0 ForZ2 20 1200 1,45 0.21 358 1200 -842
Z2 = 3.5 Type B=1.0 25 1500 1,23 0.23 372 1500 -1128
n= 0.016 Rolled = 3.5 30 1800 1,05 0.20 379 1800 -1422
S= 0.0079 35 2100 0.91 0.17 379 2100 •1121
40 2400 0.81 0.15 383 2400 -2017
d= 0.1300 ft. Flow Width 6,5 ft. 45 2700 0.74 0.14 392 2700 -2308
50 3000 0.69 0,13 404 3000 -2596
55 3300 0,65 0.12 418 3300 •2862
A R Q Tc Tc total I Qc 64 3600 0.61 0,12 430 3600 •3170
0,45 0.06 0.60 3.16 5.00 3.18 0.60 65 3900 0.58 0.11 443 3904 -3457
70 4200 0.56 0,11 459 . 4200 -3141
Qpeak for Case 1= 0.60 cfs 75 4500 0.55 0.10 483 4540 4017
80 4800 0.55 0,10 509 4800 4291
85 5100 0.53 0,10 526 5100 4574
90 5400 0,50 0.09 518 5400 -4882
CASE 2 95 5700 0.45 0.09 496 5700 -5204
100 6000 0.49 0.09 566 6000 -5434
Case 2 assumes a Time of Concentration leas than 5 minutes so that the
peak flow =.90(Tc=5 intensity)(Imp. Area) = 0.53 cfs "05-013" TREATMENT REQUIREMENTS
Minimum "05-013" Volume Required 184 cu ft
Provided Treatment Volume 5,266 cu ft
So, the Peak flaw for the Basin is the greater of the two flows, ORYWELL REQUIREMENTS -10 YEAR DESIGN STORM
0.60 cfs Maximum Storege Required by Bowstring -58 cu ft
Provided Storage Vofume 18322 cu ft
Number and Type of Drywells Required 0 Single
1 Double
=mom
PEAK FLOW CALCULATION PROJECT: Shelley Lake 5th Addtion BOWSTRING METHOD PROJECT: Shelley Lake 5th Addtion
10•Year Design Storm DETENTIOtV BASIN DESIGN BASIN: 12
QESIGNER: GLA
BASIN: 12 DATE: 27-May-05
Tot, Area 125,948 SF 2.89 Acres
Imp. Area 26,030 SF C= 0.9 Time Inaement (min) 5
Perv. Area 99,918 SF C= 0.15 , Time of Conc. (min) 8,60
Wt, C= 0.31 Outflow (cfs) 1
Design Year Flow 10
CASE 1 Area (acres) 2.89
Impervious Area (sq ft) 26030
218 ft. Overland Flow 'C' Fedor 0.31
Area " C 0.882
Ct = 0,15 Treatment Area 15,230
L = 218 ft, ~
n= 0.40 Time Time Inc. Intens. Q Devel. Vol.ln Vol.Out Storage
S= 0.0321 min sec) fiNhr) „ (cu ft) (cu L
~
8,60 516 2,44 ~ 2,15 1489 516 912 ft
Tc = 6.14 min., by Equation 3-2 af Guidelines
5 300 3.18 2,80 1126 300 826
228 ft. Gutter flow 10 600 2.24 1.98 1533 600 933
15 900 1.16 1,55 1665 900 165
21 = 50,0 ForZ2 20 1200 1.45 1.28 1763 1200 563
Z2 = 3.5 Type B=1.0 25 1500 1,23 1.08 1816 1500 316
n= 0,016 Rolled = 3.5 30 1800 1.06 0.93 1829 1800 29
S= 0.0050 35 2100 0,91 0.80 1828 2140 •272
40 2400 0.81 0.71 1839 2400 -561
d= 0.2280 ft, Flow Width 11.4 ft, 45 2700 0.74 0.65 1874 2700 -826
50 3000 0.69 0.61 1929 3000 -1471
55 3300 0.65 0.57 1989 3300 -1311
A R Q Tc Tc total I Qc 60 3600 0.61 0.54 2044 3600 •1556
1.39 0.11 2.15 2.46 8.60 2.44 2.15 65 3900 0,58 0.52 2101 3900 -1799
70 4200 0.56 0.50 2177 4200 •2023
Qpeak for Case 1= 2.15 cfs 75 4500 0.55 0.49 2285 4500 •2215
80 4800 0,55 0.48 2409 4800 -2391
85 5100 0.53 0.41 2486 5100 •2614
90 5400 0.50 0.44 2446 5400 •2954
CASE 2 95 5700 0.45 0.40 2340 5700 •3360
100 6004 0.49 0.43 2671 6000 •3329
Case 2 assumes a Time of Cancentration less than 5 minutes so that the
peak flow =.90(Tc=5 intensityr)(Imp. Area) = 1.71 cfs "05-013" TREATMENT REQUIREMENTS
Minimum "05-013" Volume Required 635 cu ft
Provided Treatment Volume 5,266 cu ft
So, the Peak flow for the Basin is the greater of the two flows, DRYWELL REQUIREMENTS -10 YEAR DESIGN STORM
2.15 cfs Manimum Storage Required by Bowstnng 972 cu ft
Provided Storage Volume 18322 cu ft
Number and Type of Drywells Required 0 Single
1 Double
~ M M M M = M M' M M1 M ON M M = M =
PEAK FLOW CALCULATION PROJECT: Sheiley Lake 5th Addtipn BOWSTRING METHOD PROJECT; Shelley Lake 5th Addtion
14-Year Design Storm DETENTION BASIN DESIGN BASIN: 13
DESIGNER: GLA
BASIN; 13 DATE: 21-May-05
Tot. Area 58,013 SF 1,33 Acres
Imp. Area 14,148 SF C= 0.9 Time Increment (min) 5
Perv. Area 43,865 SF C= 0.15 , Time of Cortc. (min) 8.22
Wt, C= 0.33 Outflow (cfs) 1
Design Year Flow 10
CASE 1 Area (acres) 1,33
ImpeNious Area (sq ft) 14148
224 ft. Overland Flow 'C Factor 0.33
Area " C 0.443
Ct = 0.15 Treatment Area 10,548
L = 224 ft,
n= 0.40 Time Time Inc. Intens. Q Devel. Vol.in Vol,Out Storage
S= 0.0313 min} (sec) 0Nhrj6_ {cu ftL. a~ft „ ~ftL
8.22 493 2.50 1.11 733 493 240
Tc = 6.29 min., by Equation 3-2 of Guidelines
5 300 3,18 1,41 566 300 266
184 ft. Gutter flow 10 600 2,24 0.99 763 600 163
15 900 1.76 4,78 831 900 -69
Z1= 50.0 ForZ2 20 1200 1,45 0.64 881 1200 -319
Z2 = 3.5 Type B=1,0 25 1500 1,23 0.54 909 1500 -591
n= 0,016 Rolled = 3.5 30 1800 1.05 0.47 916 1800 -884
S= 0.0079 35 2100 0.91 0.40 916 2100 -1184
40 2400 0.81 0.36 922 2400 -1478
d= 0.1635 ft, Flow Width 8.2 ft. 45 2700 0,74 0,33 940 2700 -1160
50 3000 0.69 0,31 967 3000 -2033
55 3300 0.65 0.29 998 3300 -2302
A R Q Tc Tc total I Qc 60 3600 0.61 0.21 1026 3600 •2574
0.72 0.08 1.11 1.93 8.22 2.50 1.11 65 3900 0.58 0.26 1054 3900 -2846
TO 4260 0.56 0,25 1493 4200 •3147
Qpeak for Case 1= 1,11 cfs , 15 4500 0.55 0.25 1147 4500 •3353
80 4800 0.55 0.24 1209 4800 •3591
85 5100 0.53 0.24 1248 5100 -3852
90 5400 0.50 0,22 1228 5400 4172
CASE 2 95 5700 0.45 0,20 1175 5100 -4525
100 6000 0.49 0.22 1341 6040 4659
Case 2 assumes a Time of Concentration less than 5 minutes so that the
peak flow =.90(Tc=5 intensity)(Imp. Area) = 0.93 cfs "05-013" TREATMENT REQUIREMENTS
Minimum "05-013" Volume Required 440 cu ft
Provided Treatment Volume 5,266 cu ft
So, the Peak flow for the Basin is the greater of the Nvo flows, DRYWELL REQUIREMENTS -10 YEAR DESIGN STORM
1.11 cfs Maximum Storage Required by Bowstring 266 cu ft
Provided Storage Volume 18322 cu ft
Number and Type oi Drywells Required 0 Single
1 Double
PEAK FLOW CALCULATION PROJECT: Shelley Lake 5th Addtion BOWSTRING METHOD PROJECT: Sheltey Lake 5th Addtion
10•Year Design Storm DETENTION BASIN DESIGN BASIN; 14
DESIGNER; GLA
BASIN; 14 QATE: 27-May-05
Tot. Area 29,220 SF 0.61 Acres
Imp, Area 14,763 SF C= 0.9 Time Increment (min) 5
Pero. Area 14,457 SF C= 0,15 Time of Conc. (min) 13,Q4
Wt. C= 0.53 Outflow (cfs) 1
Qesign Year Flow 10
CASE 1 Area (acres) 0.67
Impervious Area (sq ft) 14763
141 ft. Overland Flow 'C Factor 0.53
Area * C 0.355
Ct = 0.15 Treatment Area 7,563
L = 141 R, n= 0,40 Time Time Inc. Intens. Q Devel. Vol.ln Vol.Out Storage
S= 0.0035 ~min) _ (sec) (inlhr) (cu ft) _ (cu ft) „ (cu ft~
13.04 782 1.91 0.68 112 782 -71
Tc = 9.20 min., by Equation 3-2 of Guidelines
5 340 3.18 1.13 453 300 153
295 R. Gutter flow 10 600 2,24 0,80 639 600 39
15 900 1.76 0.62 726 900 •174
Z1= 50.0 ForZ2 20 1200 1,45 0.52 158 1200 -444
Z2 = 3.5 Type B=1.0 25 1500 1.23 0.44 770 1500 •730
n= 0.016 Rolled = 3.5 30 1800 1.05 0.37 170 1800 -1030
S= 0,0065 35 2100 0.91 0.32 765 2100 -1335
40 2400 0.81 0.29 766 2400 -1634
d= 0.1410 ft. Flow Width 7.1 ft, 45 2700 0.14 0.26 776 2740 •1922
50 3000 0.69 0.24 798 3000 -2202
55 3300 0.65 0.23 821 3300 -2479
A R Q Tc Tc total I Qc 60 3600 0.61 0.22 842 3600 -2758
~0.53 0.07 0.68 3.84 13.04 1.91 0.68 65 3900 0.58 0.21 864 3900 •3036
70 4200 0.56 0.24 894 4200 -3306
apeak for Case 1= 0.68 cts 75 4500 0.55 0.20 937 4500 -3563
80 4800 0.55 0.19 987 4800 •3813
85 5100 0.53 0.19 1018 5100 -4082
90 5400 0.50 0.18 1000 5400 4400
CASE 2 95 5700 0.45 0.16 956 5700 4744
100 6000 0.49 0.17 1090 6000 4910
Case 2 assumes a Time of Concentration less than 5 minutes so that the
peak flow =.90(Tc=5 intensity)(Imp. Area) = 0.97 cfs "05-013" TREATMENT REQUIREMENTS
Minimum "05-013" Volume Required 315 cu tt
Provided Treatment Volume 5,266 cu ft
So, the Peak flow for the Basin is the greater of the iwo flows, DRYWELL REQUIREMENTS -10 YEAR DESIGN STORM
0.97 cfs Maximum Storage Required by Bowstring 153 cu ft
Provided Storage Vdume 18322 cu ft
Number and Type of Drywells Required 0 Single
1 Double
~ m ~ m -M A ~ ~ ~ ~ ~ ~ M. m am- m m m
PEAK FLOW CALCULATION PROJECT: Shelley Lake 5th Addtion BOWSTRING METHOD PROJECT: Shelley Lake 5th Addtion
10-Year Design Storm DETENTION BASIN DESIGN BASIN: 15
DESIGNER: GlA
BASIN: 15 DATE: 27-May-05
Tot, Area 137,227 SF 3.15 Acres
Imp. Area 18,659 SF C= 0.9 Time Increment (min) 5
Pero. Area 118,568 SF C= 0.15 Time of Conc. (min) 5.23
Wt. C= 0.25 Outflow (cfs) 1
Design Year Flow 10
CASE 1 Area (acres) 3.15
Impervious Area (sq ft) 18659
150 ft. Overland Flow 'C Factor 0.25
Area' C 0.794
Ct = 0.15 Treatment Area 11,459
L = 150 ft.
n= 0.40 Time Time Inc, Intens. Q Devel. Vol,in Vol.Out Storage
S= 0.0630 , min jseci iNhr) (~ftj . (cu ft) (cu ft) ~cu ft
5.23 314 3.12 2.47 1041 314 127
Tc = 4.01 min., by Equation 3-2 of Guidelines
5 300 3.18 2.52 1014 300 114
152 ft. Gutter flow 10 600 2,24 1,78 1257 600 657
15 900 1.76 1.39 1403 900 503
Z1= 50.0 For Z2 20 1200 1,45 1,15 1508 1200 308
Z2 = 3.5 Type B=1.0 25 1500 1.23 0.98 1567 1500 67
n= 0.016 Rolled = 3.5 30 1800 1,05 0.83 1589 1800 -211
S= 0.0100 35 2100 0.91 0.72 1595 2100 -505
40 2400 0,81 0.64 1611 2440 •789
d= 02110 ft, Flow Width 10.6 ft, 45 2700 0,74 0,59 1647 2700 -1053
50 3000 0,69 0.55 1699 3000 -1301
55 3364 0.65 0.52 1155 3300 •1545
A R Q Tc Tctotal I Qc 60 3640 0.61 0.49 1807 3600 •1793
1.19 0.11 2.47 1,22 ~ 5.23 3.12 2.47 65 3900 0.58 0.46 1859 3900 •2041
70 4200 0.56 0.45 1929 4200 •2271
Qpeak for Case 1= 2.47 cfs 75 4500 0.55 0.44 2027 4500 -2473
80 4800 0.55 0,44 2138 4844 -2662
85 5100 0.53 0.42 2209 5100 -2891
90 5400 0.50 0.39 2174 5400 •3226
CASE 2 95 5700 0.45 0.36 2081 5700 •3619
100 6000 0.49 0.39 2378 6000 -3622
Case 2 assumes a Time of Concentration less than 5 minutes so that the
peak flow =.90(Tc=5 intensity)(Imp. Area) = 1.22 cfs 1105-013" TREATMENT REQUIREMENTS
Minimum "05-413" Volume Required 477 cu ft
Provided Treatment Volume 5,266 cu ft
So, the Peak flow for the Basin is the greater of the two flows, DRYWELL REDUIREMENTS -10 YEAR OESIGN STORM
2.47 cfs Maximum Storage Required by Bowstring 727 cu ft
Provided Storage Volume 18322 cu ft
Number and Type of Drywells Required 0 Single
t Double
r ~ MWMrr ~ ~ "MMMMMMM
PEAK FLOW CALCULATION PROJECT: Shelley Lake 5th Addtion BOWSTRING METHOD PROJECT; Shelley Lake 5th Addtion
10•Year Design Storm DETENTION BASIN DESIGN BASIN: 16
DESIGNER; GLA
BASIN: 16 DATE: 27-May-05
Tot. Area 43,218 SF 0.99 Acres
Imp. Area 7,321 SF C= 0.9 Time Increment (min) 5
Perv. Area 35,897 SF C= 0.15 Time of Conc. (min) 5.95
Wt. C= 0,28 Outflow (cfs) 1
Design Year Flow 10
CASE 1 Area (acres) 0.99
impervious Area (sq R) 7321
148 ft. Overland Flow 'C Fector 0.26
Area' C 0.215
Ct = 0.15 Treatment Area 3,721
L = 14$ ft,
n= 0.40 Time Time Inc. Intens. Q Devel. Vol,ln Vol.Out Storage
S= 0,0642 (min) f sec~ (inlhr) icft_ ~cu ft.~--~cu ft~, (cu ft)
5.95357 2,94 0.81 387 357 30
Tc = 3.96 min., by Equation 3-2 af Guidelines
5 300 3.18 0,87 351 300 51
145 ft. Gutter flow ~ 10 600 2.24 0.62 444 600 -156
15 900 1,76 0.48 493 900 401
21= 50,0 ForZ2 20 1200 1,45 0.40 528 1200 •672
ZZ = 3.5 Type B=1.0 25 1500 1.23 0.34 548 1500 -952
n= 0.016 Rolled = 3,5 30 1800 1.05 0,29 554 1800 -1246
S= 0.0050 35 2100 0.91 0.25 556 2100 •1544
40 2400 0,81 0.22 561 2400 -1839
d= 0,1580 ft. Flow Width 7.9 ft. 45 2700 0,74 0.20 573 2700 •2121
54 3000 0.69 0.19 591 3000 -1409
55 3300 0.65 0.18 610 3300 -2690
A R Q Tc Tc total I Qc 60 3604 0.61 0,11 628 3600 -2912
0.67 0. 0 5.95 2.94 0.81 65 3900 0,58 0.16 646 3900 -3254
08 0,81 2.0
70 4200 0.56 0.16 670 4200 -3530
Qpeak for Case 1= 0.81 cfs 75 4500 0.55 0.15 704 4500 -3796
80 4800 0.55 0.15 743 4800 4051
85 5100 0.53 0.15 767 5100 4333
90 5400 0.50 0.14 755 5400 -0645
CASE 2 95 5700 0.45 0.12 723 5100 -0911
100 6000 0.49 0.13 825 6004 •5175
Case 2 assumea a Time of Concentrabon less than 5 minutes so that the
peak flow =.90(Tc=5 intensity)(Imp. Area) = 0.48 cfs "05-013" TREATMENT REQUIREMENTS
Minimum "05-013" Volume Required 155 cu ft
Provided Treatment Volume 5,266 cu ft
So, the Peak flaw for the Besin is the greater of tfie iwo flows, DRYWELL REQUIREMENTS -10 YEAR DESIGN STORM
0.81 cfs Maximum Storage Required by Bowstring 51 cu ft
Provided Storage Volume 18322 cu ft
Number and Type of Drywells Required 0 Single
, ~ 1 Double
~ w m r m mm r wmwMr ~w mm-w mm
PEAK FLOW CALCULATION PROJECT: Shelley Lake 5th Addtion BOWSTRING METHOD PROJECT: Shelley Lake 5th Addtion
10-Year Design Storm DETENTION BASIN DESlGN BASIN; 17
DESIGNER; GlA
BASIN: 17 DATE: 27-May-05
Tot. Area 46,652 SF 1,01 Acres
Imp. Area 7,350 SF C= 0,9 Time Increment (min) 5
Perv. Area 39,302 SF C= 0.15 Time of Conc. (min) 5.98
Wt, C= 0.27 Outflow (cfs) 1
Design Year Flow 10
CASE 1 Area (acres) 1A7
Impervious Area (sq ft) 7350
148 f1. Overland Flow 'C Factor 0.27
Area' C 0.287
Ct = 0,15 Treatment Area 3,750
L = 148 fl.
n= 0.40 Time Time Inc. Intens. Q Dsvel. Vol.ln Vol,Out Storage
S= 0.0642 .1mmj; sec). (inlhr)....... ~cu ft) Icu ft)
- . .
5,98 359 2,94" 0.84 406 359 47
Tc = 3,96 min,, by Equation 3-2 of Guidelines
5 300 3,18 0,91 367 300 87
148 ft. Gutter flow 10 600 2.24 0,64 465 600 -135
15 900 1.76 0,50 515 900 -385
21 = 50.0 For Z2 20 1200 1.45 0.42 552 1200 -648
Z2 = 3.5 Type B=1.0 25 1500 1.23 0.35 572 1500 -928
n= 0.016 Rolled = 3.5 30 . 1800 1.05 0.30 579 1800 •1221
S= 0.0050 35 2100 0.91 026 581 2100 -1519
40 2400 0.81 0,23 586 2400 -1814
d= 0.1600 R. Flow Width 8,0 ft. 45 2700 0.74 0.21 599 2700 -2101
. 50 3000 0.69 0.20 618 3000 -2382
55 3300 0,65 0.19 638 3300 •2662
A R Q Tc Tc total I Qc 60 3600 0.61 0.18 656 3600 •2944
. . . < < -
0.68 0.08 0.84 2.02 5.98 2.94 0.84 65 3900 0.56 0.17 675 3900 -3225
. 70 4200 0.55 0,16 700 4200 -3500
Qpeak for Case 1= 0.84 cfa 15 4500 0.55 0.16 736 4500 -3764
80 4800 0.55 0.16 776 4840 -1024
85 5100 0.53 0.15 802 5100 -4298
90 5400 0.50 0.14 789 5400 -4611
CASE 2 95 5700 0,45 0.13 755 5700 -4945
100 6000 0.49 0.14 862 6000 -5138
Case 2 assumes a Time of Concentration leas than 5 minutes so that the
peak flow =.90(Tc=5 intensity)(Imp. Area) = 0.48 cfs "05-013" TREATMENT REQUIREMENTS
. Minimum "05-013" Volume Required 156 cu ft
Provided Treatment Volume 5,266 au ft
So, the Peak flow for the Basin is the greater of the two flows, DRYWEII REQUIREMENTS -10 YEAR DESIGN STORM
0.84 cfs Maximum Storage Required by Bowstring 67 cu ft
Provided Storage Volume 18322 cu ft
Number and Type of Drywells Required 0 Single
1 Double
w ~ ~ ~ ~ ~ m m m rr m m~ m so mm
PEAK f LOW CALCULATION PROJECT: Shelley Lake 5th Addtion BOWSTRIkG METHOD PROJECT: Shelley Lake 5th Addtion
10-Year Design Storm DETENTION BAS1N DESIGN BASIN; 18
DESIGNER: GLA
BASI N: 18 DATE: 27-Mey-05
Tot. Area 66,179 SF 1.52 Acres
Imp. Area 14,165 SF C= 0.9 Time Increment (min) 5
Perv. Area 52,014 SF C= 0.15 Time of Conc. (min) 7.13
Wt. C= 0,31 Outflow (cfs) 1
Design Year Flaw 10
CASE 1 Area (eaes) 1.52
Impervious Area (sq ft) 14165
260 ft. Overland Flow 'C Factor 0.31
Area " C 0.472
Ct = 0.15 Treatment Area 8,765
L = 260 ft.
n= 0.40 Time Time Inc. Intens. Q Devel. Vol.ln Vol.Out Storage
S= 0,0680 ~mint (sec) Pnlhr) (cfs) , (cu ft) (cu ft) (cu ft~
7.13 428 2,70 1.27 729 ~ 428 301
Tc = 5,45 min., by EquaGon 3-2 of Guidelines
5 300 3.18 1.50 603 300 303
213 ft. Gutter flow 10 800 2.24 1.06 186 600 188
15 900 1.76 0.83 866 900 -34
21= 50,0 ForZ2 20 1200 1.45 0.69 923 1200 -277
Z2 = 3.5 Type 8=1,0 25 1500 1.23 0.58 954 1500 -546
n= 0,016 Ralled = 3.5 30 1800 1.05 0.50 964 1800 -836
S= 0.0165 35 2100 0.91 0.43 965 2100 -1135
40 2400 0.81 0.38 972 2400 -1428
d= 0.1495 n. Flow Width 7.5 ft. 45 2700 0.74 0.35 992 2100 -1706
50 3000 0.69 0,32 1022 3000 •1978
55 3300 0.65 0,31 1055 3300 -2245
A R Q Tc Tc total I Qc 60 3600 0.61 0.29 1085 3600 •2515
0.60 0A7 1,27 1.68 1.13 2,70 ~ 1.27 65 3900 0.58 0.28 1116 3900 -2184
10 4200 4.56 0.27 1151 4200 •3043
Qpeak for Case 1= 1.27 cfs 75 4540 0.55 0.26 1215 4500 -3285
' 84 4800 0.55 0,26 1281 4800 -3519
85 5100 0.53 0.25 1323 5100 •3777
90 5400 0.50 0.23 1301 5400 -4099
CASE 2 95 5700 0.45 0,21 1245 5700 -4455
100 6000 0.49 0.23 1422 6000 -4578
Case 2 assumes a Time of Concentration less than 5 minutes so that the
peak flow =.90(Tc--5 intensity)(Imp. Area) = 0.93 cfs 1105-013" tREATMENT REQUIREMENTS
Minimum "05-013" Volume Required 365 cu ft
Provided Treatment Volume 5,266 cu ft
So, the Peak ftow for the Basin is the greater of the two flows, DRYWELL REQUIREMENTS -10 YEAR DESIGN STORM
1.27 cfs Maximum Storage Required by Bowstring 303 cu ft
Provided Storage Volume 18322 cu ft
Number end Type of Drywells Required 0 Single
1 Double
PEAK FLOW CALCULATION PROJECT: Shelley Lake 5th Addtion BOWSTRIMG METHOD PROJECT: Sheiley Lake 5th Addtion
10-Year Design Storm DETENTION BASIN DESIGN BAStN: 19
DESIGNER: GLA
BASIN: 19 DATE: 27-May-05
Tot. Area 32,865 SF 0.15 Acres
Imp. Area 11,014 SF C= 0.9 Time Increment (min) 5
Perv. Area 21,851 SF C= 0.15 Time of Conc. (min) 5.42
Wt. C= 0.40 Outflow (cfs) 1
Design Year Flow 10
CASE 1 Area (acres) 0.75
Impervious Area (sq ft) 11014
111 ft, Overland Fiow 'C Factor 0,40
Area " C 0.303
Ct = 0.15 Treatment Area . 5,614
L = 111 R.
n= 0.40 Time Time Inc, Intens, Q Devel. Vol.in Vo1.0ut Storege
s= 0,0899 min> 4secL _ 4in/hrL (i~ -.(cu ft) (cu ft). . .
5.42 325 3.07 0.93 405 325 80
Tc = 3.01 min., by Equation 3-2 of Guidelines ,
5 300 3.18 0.96 381 300 87
203 ft. Gutter flow 10 600 2.24 0.68 482 600 -118
15 900 1,76 0.53 537 940 -363
Z1= 50.0 For Z2 20 1200 1.45 0.44 577 1200 -623
Z2 = 3.5 Type B=1,0 25 1500 1,23 0.37 599 1500 •901
n= 0,016 Rolled = 3.5 30 1800 1.05 0.32 607 1800 -1193
S= 0.0068 35 2100 0.91 0.28 610 1100 -1490
40 2400 0,81 0,25 615 2400 -1785
d= 0.1570 R. Flow Width 7.9 ft. 45 2700 0.74 022 629 2700 -2071
50 3000 0.69 0.21 649 3000 -2351
55 3300 0,65 0.20 670 3300 -2630
A R Q Tc Tc total I- Qc 60 3600 0.81 0.19 690 3800 -2914
. - - - - -
0.66 0.08 ~0.93 2.41 5.42 3.07 0.93 65 3900 0.58 0.18 710 3900 -3190
70 4200 0.56 0.11 136 4200 -3464
Qpeak for Case 1= 0,93 cfs 75 4500 0.55 0.17 774 4500 -3126
80 4600 0,55 0.17 816 4800 -3984
85 5100 0,53 0.16 843 5100 -4257
90 5400 0.50 0.15 830 5400 -4570
CASE 2 95 5100 0.45 0.14 795 5700 -4905
100 6000 0,49 0.15 908 6000 -5092
Case 2 assumes a Time of ConcenUation less than 5 minutes so that the
peak flow =,90(Tc=5 intensity)(Imp. Area) = 0.72 cfs "05-013" TREATMENT REQUIREMENTS
Minimum "05-013" Volume Required 234 cu ft
Provided Treatment Volume 5,266 cu ft
So, the Peak flow for the 8asin is the greater of the two flows, DRYWELL REQUIREMENTS -10 YEAR DESIGN STORM ,
0.93 cfs ` Maximum Storage Required by Bowstnng 81 cu ft
Provided Storage Volume 18322 cu ft
Number and Type of Drywells Required 0 Single
, 1 Double
r i m m m m m m m m m m m m r m m m r
PEAK FLOW CALCULATION PROJECT; Shelley Lake 5th Addtion BOWSTRING METHOD PROJECT: Shelley Lake 5th Addtion
10•Year Design Storm DETENTION BASIN DESIGN BASIN: C(4th Addition)
DESIGNER: GLA
BASIN: C(4th Addition) DATE; 27-May-05
Tot. Area 246,398 SF 5.68 Aaes
Imp. Area 103,083 3F C= 0.9 Time Increment (min) 5
Pero. Area 143,315 SF C= 0.15 Time of Conc. (min) 10.98
Wt. C= 0.46 Outflow (cfs) 1
Deaign Year Flow 10
CASE 1 Area (acres) 5.66
fmpervious Area (sq ft) 103083
114 R. Overland Flow 'C Factor 0.46
Area " C 2,623
Ct = 0.15 Treatment Area 58,083
L = 114 n.
n= 0,40 Time Time Inc, Intens. Q Devel. Vol.ln Vol.Out Storage
S= 0,0080 min) (sec) (inthr) ~ (cu,ftL. (cu ft) {cu ft~
10.98 659 2,12 5.57 4913 659 4255
Tc = 6.32 min., by Equation 3-2 of Guidelines
. 5 300 3,18 8,34 3351 300 3051
773 ft. Gutter flow 10 600 2,24 5.88 4721 600 4127
15 900 1.76 4.80 5175 900 4275
Z1= 50.0 ForZ2 20 1200 1,45 3.81 5429 1200 4229
Z2 = 3.5 Type B=1,0 25 1500 1.23 3,22 5558 1500 4058
n= 0,016 Rolled = 3.5 30 1800 1,05 2.15 5574 1804 3774
S= 0.0125 35 2100 0,91 2.39 5553 2100 3453
40 2400 0.81 2,12 5572 2400 3172
d= 0.2745 ft. Flow Width 13.7 ft. 45 2700 0.74 1,94 5669 2700 2969
50 3000 0.69 1.81 5825 3000 2825
55 3300 0.65 1.70 5996 3300 2698
A R Q Tc Tc total I Qc 60 3600 0.61 1.61 6159 3604 2559
65 3900 0.58 1.53 6324 3900 2424
2.02 0.14 5.57-. . 4.66 10.98 2,12 . 5.57 ,
70 4200 0.56 1.48 6548 4200 2348
Qpeak for Case 1= 5.57 cfs 75 4500 0.55 1.45 6889 4500 2369
80 4800 0.55 1.44 7236 4800 2436
85 5100 4,53 1.40 7464 5100 2364
90 5400 0.50 1.30 7338 5400 1938
CASE 2 95 5700 0,45 1,18 7018 5700 1318
100 6000 0.49 1,29 8408 6000 2008
Case 2 assumes a'Time of Concentration less than 5 minutes so that the
peak flow :;,90(Tc=5 intensity)(Imp. Area) = 6,77 cfs 4 "05-413" TREATMENT REQUIREMENTS
Minimum "05-013" Volume Required 2,420'cu ft
Provided Treatment Volume 5,266 cu ft
So, the Peak flow for the Basin is the greater of the two flows, DRYWELL REQUIREMENTS -10 YEAR DESIGN STORM
6,77 cfs Maximum Storage Required by Bowstring 4275 cu ft
Provided 5torage Vdume 18322 cu ft
Number and Type of Drywells Required 0 Single
1 Double
PEAK FLOW CALCULATION PROJECT; Shelley Lake 5th Addtion BOWSTRING METHOD PROJECT: Shelley Leke 5th Addtfon
50•Year Design Storm DETENTION BASIN DESIGN BASIN: 1
OESIGNER GLA
BASIN: 1 DATE: 27•Mey-05
Tot. Area 29,669 SF ' 0.68 Aaes Time Inaemeni (min) 5
Imp, Area 13,301 SF G 0,9 Time of Cona (mfn) 5.00
Pero. Area 16,368 SF C= 0,15 Outflow (ds) 1
Wt. C= 0.49 Design Year Flow 50
Area (acres) 0.68
CASE 1 Impervious Area (sq ft) 13301
'C Fector 0.49
0 ft. Overiand Flow Area' C 0.331
TreatmentArea 7,901
Ct= 0.15
L= 0 ft. Time Time Inc, IMens. Q Devel, Vol.ln Vol,Out Storage
n= 0.40 (min) sec (in/hr)ft1 (cu ft) (cu flL.
S= 0.1090 5.00 300 4.56 1.52 610 300 310
Tc = 0.00 min., by Equation 3-2 of Guidelines 5 300 4.58 1.52 610 304 310
10 600 3.21 1.06 146 600 146
221.55 ft. Gutter flow 15 900 2.44 0,81 810 900 -90
20 1200 1.98 0,66 854 1200 -346
Z1= 50.0 For Z2 25 1500 1.68 0.56 889 1500 -611
22 = 3.5 Type B=1,0 30 1800 1.46 0.48 919 1800 -881
n= 0.016 Rolled = 3.5 35 2100 1.30 0,43 947 2100 -1153
S= 0.0089 40 2400 1.18 0.39 916 2400 -1424
45 2700 1.08 0,36 1006 2700 -1694
d= 0,1795 ft. Flow Width 9.0 ft. 50 3000 1.01 0.33 1435 3000 -1965
. 55 3300 0.94 0.31 1060 3300 •1240
60 3600 0.88 0.29 1081 3600 •2519
A R Q Tc Tc total I Qc 65 3900 0.83 028 1102 3900 -2798
~ 0.86 0.09 1,52 2.10 5.00 4.58 1.52 70 4200 0,79 0.26 1132 4200 •3088
75 4500 0.77 0.26 1174 4500 -3326
Opeak for Case 1= 1,52 cfa 80 4800 0.15 0.25 1224 4800 -3576
85 5100 0.73 0.24 1264 5100 -3836
90 5400 0,70 0.23 1273 5400 -4127
95 5700 0.66 022 1283 5700 -4437
CASE 2 100 6000 0.68 0.23 1374 6000 4626 '
Case 2 assumes a Time of Conoeniration less than 5 minutes so lhat the "05-013" TREATMENT REflUIREMENTS
peak flow =.90(Tc--5 intensity)(imp. Area) ~ 1,26 cfs Minimum "05-013" Vo►ume Required 206 cu ft
Provided TreatmeM Volume 5,266 cu ft
DRYWELL REQUIREMENTS - 50 YEAR DESIGN STORM
So, the Peak flow for the Basin is the greater of the two flows, Maxlmum Storage Requfred by Bowstring 310 cu ft
1.52 cfs Provided Storege Volume 18322 cu ft
Number end Type of Drywells Required 0 Single
1 Double
PF.AK FLOW CALCULATION PROJECT: Shelley Lake 5th Addtion BOWSTRING METHOD PROJECT; Shelley Lake 5th Addtion
SaYear Design Storm DETENTION BASIN DESIGN BASIN: 2
DESIGNER GlA
BASIN; 2 DATE: 21•May-05
7ot. Area 14,982 SF 0.34 Aaes Time Inaement (min) 5
imp, Area 10,446 SF C= 0,9 Time of Conc. (min) 5.00
Perv, Area 4,536 SF C= 0.15 Outflow (ds) 1
Wt. C= 0.67 Design Year Flow 50
Area (eaes) 0.34
CASE 1 Impervfous Area (sq ft) 10446
`C Fector 0.67
0 ft. Overiand Flow Area' C 0.231
TreaMent Area 5,046
Ct = 0.15
L= 0 fl. Time Time Inc. Intens, Q Devel. Vol.in Vol.Oul Storege
n = 0.40 (min) „~sec)Lnmr,~_,Cfs} (cu ft) _ (cu ft) fcu ft~
S= 0.1090 5.00 300 4,56 1,06 426 300 126
Tc = 0.00 min., by Equation 3-2 of Guidelines 5 300 4,58 1,06 426 300 126
10 600 3.21 0,74 521 600 •79
174 ft. Gutter ftow 15 900 2.44 0.57 566 900 -334
20 1200 1.98 0,46 397 1200 -603
Z1= 50.0 Fot Z2 25 1500 1.68 0,39 822 1500 -678
Z2 = 3.5 Type B=1.0 30 1600 1.46 0.34 642 1800 • 1156
n= 0.016 Roiled = 3,5 35 2100 1,30 0.30 662 2100 -1438
S= 0.0089 40 2400 1,18 0.27 682 2400 -1716
45 2700 1.08 0.25 703 2700 -1997
d= 0.1570 ft. Flow Width 7.9 fl. 54 3000 1.01 0.23 723 3000 -2277
. 55 3300 0.94 0.22 741 3300 -2559
60 3500 0.88 0.20 755 3600 -2845 ,
A R Q Tc Tc total I Qc 65 3900 0.83 0.19 771 3900 -3129
0.66 0,08 1.06 1.80 5.00 4.56 1,06 70 4200 0.79 0.18 791 4200 -3409
75 4500 0.77 0.18 820 4500 -3680
Qpeek for Ceae 1= 1.06 cfs 80 4800 0.75 0,17 855 4800 -3945
85 5100 0,73 0.17 884 5100 -4216
99 5400 0.70 0.16 89D 5400 -4510
95 5700 0.66 0.15 883 5700 -4811
CASE 2 100 6000 0.68 0.16 961 6000 -5039
Case 2 assumes a Time oi ConcentraUon less than 5 minutes so that the "05-013" TREATMENT REQUIREMENTS
peak flow =.90(Tc=5 intensity)(Imp. Area) = 0.99 cfs Mlnimum "05-013" Volume Required 131 cu ft
Provided Treaiment Volume 5,266 cu ft
DRYWELL REQUIREMENTS - 50 YEAR DESIGN STORM
So, the Peak ilow for the Besin is the grealer of the two flows, Meximum Storege Required by Bowstring 126 cu ft
1.06 cfs Provided Storage Volume 18322 cu ft
Number and Type of Drywells Required 0 Single
1 Double
PEAK FLOW CALCULATION PROJECt; Shelley Lake Sth Addtion BOWSTRING METHOD PROJECT: Shelley Lake 5th Addtion
50•Year Qesign Storm DETENTION BASIN DESIGN BASIN; 3
DESIGNER GLA
BASIN; 3 ' DATE; 27-Mey-05
Tot. Area 33,684 SF 0.77 Acres Time Inaement (min) 5
Imp. Aree 18,671 SF G 0.9 Time of Conc. (min) 5.00
Perv. Area 15,013 Sf C= 0.15 Outftaw (ds) 1
Wt, C= 0.57 Design Year Flow 50
Area (eaes) 0.17
CASE 1 Imperviaus Area (sq ft) 18671
'C' Factor 0,57
0 ft. Overiand Flow Area "C 0,437
Treatmem Area 9,671
Ct = 0.15
L= 0 ft, Time Time Inc. Intens, Q Devel. Vol.ln Vol.Out Storege
n= 0.40 ~Lminfinlhr~ (cfs) (cu ft) - (cu ft~.._~T
.
S= 0,0680 , 5.00 300 ~4,58 2.00 805 300 505
Tc = 0.00 min,, by Equation 3-2 of Guidelines S 300 4.58 2.00 805 300 505
10 600 3.21 1,40 985 600 385
395 ft. Gutter flow 15 900 2.44 1.07 1010 900 170
20 1200 1,98 0.81 1128 1200 -72 .
Z1= 50.0 ForZ2 25 1500 1,88 0,73 1175 1500 -325
Z2 = 3.5 Type B=1.0 30 1800 1.46 0.64 1214 1800 -586
n= 0.016 Rolled = 3,5 35 2100 1.30 0.57 1251 2100 -849
S= 0.0114 40 2400 1,18 0.52 1289 2400 •1111
45 2700 1.08 0.47 1328 2700 -1372
d= 0.1900 fl. Flow Width 9.5 ft. 50 3000 1.01 0.44 1367 3000 -1633
. 55 3300 0.94 0.41 1400 3300 -1900
60 3600 0,88 0,39 1428 3600 -2172
A R Q Tc Tc totel I Qc 65 3900 0,83 0.36 1456 3900 -2444
0.97 0.09 2.00 3,19 5.00 4.58 2.00 70 4200 0,79 0.35 1495 4200 -2705
75 4500 0.77 0.34 1550 4500 •2950
Qpeak for Case 1= 2.00 cfs 90 4800 0,75 0.33 1617 4800 -31 B3
85 5100 0.73 0.32 1670 5100 -3430
90 5400 0,70 0.31 1681 5400 -3716
95 5700 0.86 0.29 1669 5700 -4031
CASE 2 100 6000 0.68 0.30 1815 6000 -4186
=0_=--=
Cese 2 assumes a Time of Conceniration less then 5 minutes so that the "05-013" TREATMENT REQUIREMENTS
peak flow =,90(Tc=5 intensity)(Imp. Area) = 1,11 cfs Minimum "05-013" Volume Required 252 cu ft
Provided Treatment Volume 5,266 cu ft
DRY4VELl REQUIREMENTS - 50 YEAR DESIGN STORM
So, the Peak flow for the Basin is the greater of the two flows, Mayumum Storage Required by Bowstnng 505 cu ft
2.00 cfs Provided Storage Volume 18322 cu ft Number end Type oi Drywells Required 0 Single
1 Dauble
PEAK FLOW CALCULATION PROJECT; Shelley Lake Sth Addtion BOWSTRING METHOD PROJECT; Shelley Leke 5th Adduon
60•Year Deslgn Storm DETENTION BASIN DESIGN BASIN: 4
DESIGNER GLA
BASIN: 4 DATE: 21•May-05
Tot, Area 28,769 SF 0.66 Acres Time Inaement (min) 5
Imp. Area 14,993 SF C= 0.9 Time oi Conc. (min) 5,00
Perv, Area 13,776 SF C= 0.15 Outflow (cfs) 1
Wt. C= 0,54 Design Year Flow 50
Anee (ecres) 0.66
CASE 1 Imperoious Area (sq ft) 14993
'C' Fector 0.54
, 0 ft. Overland Flow Area"C 0,357
Treatmeni Area 7,793
Ct ~ 0,15
L= fL Time Time Inc, Intens. Q Devel, Vol.in Vol,Out Starege n = 0.40 (min) (sec) (iNhr) (cu fl) (cu ft) liu ft~ _
S= 0.0680 5.00 300 4,58 1,64 651 300 357
Tc = 0.00 min., by Equation 3-2 of Guidelines 5 300 4.58 1,64 657 300 357
10 600 3.21 1,15 804 600 204
300 ft. Gutter flow 15 900 1.44 0,87 874 900 -26
20 1200 1,98 0.71 921 1200 -279
Z1= 50.0 For Z2 25 1500 1.68 0,60 959 1500 -541
Z2 = 3.5 Type B=1.0 30 1800 1,46 0.52 991 1800 -609
n= 0.016 Rolled = 3,5 35 2100 1,34 0.46 1021 2100 -1079
S= 0.4183 40 2400 1.18 0.42 1052 2400 -1348
45 2700 1.08 0.39 1085 2700 -1615
d= 0.1615 ft, Flow Wldth 8.1 ft, 50 3000 1.01 0.36 1116 3000 -1884
, 55 3340 0.94 0.34 1143 3300 -1157
60 3600 0.88 0.31 1166 3600 -2434
A R Q Tc Tc totel I Qc 65 3900 0.83 0.30 1189 3900 -2711
0.70 0.08 1.64 2.13 5.00 4,58 1.64 TO 4200 0.79 0,28 1221 4200 -2979
75 4500 0.77 0.28 1266 4540 -3234
Qpeak for Case 1= 1.64 cfa 80 4800 0.75 0,27 1320 4800 •3480
. 85 5100 0.73 0.26 1364 5100 -3736
90 5400 0.70 0.25 1313 5400 -4027
95 5700 4.66 0.23 1353 5700 -4337
CASE 1 100 8000 0,68 0,24 1482 6000 -4518
Case 2 assumes a Time of Cancentretion less then 5 minutes so thet the "05-013" TREATMENT REQUIREMENTS
peak flow =.90(Tc=5 intensfty)(Imp. Area) = 1,42 cfs Mlnimum "05-013" Voiume Required 203 cu ft
Provided Treatrnent Volume 5,266. cu ft
DRYWELL REQUIREMENTS - 54 YEAR DESIGN STORM
So, the Peak flow for the Basin is the greater oi the Mro flows, Maximum Storage Required by Bowstring 357 cu ft
1.64 cis Provided Storage Volume 18322 cu ft
Number and Type oi Drywells Required 0 Single
1 Double
~ ~ m m m mr m mmr .r m m m mm mm
PFAK FLOW CALCULATION PROJECT; Shelley Lake 5th Addtion BOWSTRING METHOD PROJECT: Shelley Lake 5th Addtion
50•Year Design Storm DETENTION BASIN DESIGN BASIN: • 5
DESIGNER GLA
BASIN; 5 DATE; 27-May-05
' Tot, Area 166,849 SF 3.83 Acres Time Inaement (min) 5
Imp. Area 0 SF C= 0.9 Time of Conc. (min) 11.59
Perv. Area 166,849 SF C= 0,15 " Outflow (ds) 1 '
Wt, C= 0.15 Desfgn Year Flow 50
Area (acxes) 3.83
CASE 1 Impervious Aree (sq fl) 0
'C' Factor 0.15
581 ft. Overland Flow Area"C 0.575
Treatment Area 0
Ct= 0.15
L= 581 fl. Time Time Inc, Intens, Q Devel. Vol.ln Vol.Out Storege
n= 0.40 (min) sec I inmr)__.__(9fs) (cu R~ (a~ ft) .,~cu ft)
ai
S= 0.0275 11,59 695 2,92 1.68 1581 695 866
Tc = 11.59 min,, by Equation 3-2 of Guidelines 5 300 4.58 2.63 1057 300 151
10 600 3,21 1.84 1481 600 881
0 ft. Gutter flow 15 900 2.44 1,40 1594 900 694
20 1200 1.98 1,14 1635 1200 435
Z1= 50.0 For Z2 25 1500 1.68 0,96 1672 1500 172
Z2 = 3,5 Type B=1,0 ~ 30 1800 1,46 0,64 1107 1800 -93
n= 0.016 Rolled = 3.5 35 2100 1,30 0.75 1143 2100 •351
S= 0.0427 40 2400 1,18 0.69 1784 2400 -616
45 2700 1.08 0.62 1828 2700 -672
d= 0.1390 ft, FlowWidth 7.0 ft. 50 3000 1,01 0.58 1873 3000 -1127
55 3300 0.94 0.54 1911 3300 -1389
60 3600 0.88 0.51 1943 3600 -1657
A R Q Tc Tc total I Qc 65 3900 0.83 0,48 1977 3900 •1923
0.52 0.07 1,68 0.00 ~ 11.59 1,92 1.68 70 4200 0.79 0.46 2025 4200 -2175
75 4500 0.77 0.44 2096 4500 -2404
Qpeak for Case 1= 1.68 cfs 80 4800 0.75 0.43 2182 4800 •2618
85 5100 0.73 0.42 2250 5100 •2850
90 5400 0.70 0.40 2263 5400 •3137
95 5700 0.66 0.38 2242 5700 -3458
CASE 2 100 6000 0,66 0.39 2437 6000 -3563
Cese 2 assumea a Time of Concenlration less than 5 minutes so that the "05-013" TREATMENT REQUIREMENTS
peak Bow =,90(Tc=5 intensity)(Imp, Area) = 0,00 cfs Minimum "05-013" Volume Required 0 cu fl
Provided Trealment Volume 5,266 cu ft ,
DRYWELL REQUIREMENTS - 50 YEAR OESIGN STORM
So, the Peak flow for the Basin is the greater of the two flows, Maxfmum Storege Required by Bowstring 881 cu ft
1.66 cfs Provided Storege Volume 18322 cu fl
Number and Type of Drywells Required 0 Single
1 Doubfe
PEAK FLOW CALCULATION PROJECT: Shelley Lake 5th Addtion BOWSTRING METHOD PROJECT: Shelley Lake 5th Addtion
50-Year Design Storm DETENTION BASIN DESIGN BASiN; fi
DESIGNER GLA
BASIN: 6 DATE: 27•May05
Tot. Area 50,713 SF 1.16 Acres Time Increment (m(n) 5
Imp. Area 15,434 SF C= 0.9 Time of Conc. (min) 1.53
Perv. Area 35,279 SF C= 0.15 Outflow (cfs) 1
Wt. C= 0,38 Desfgn Year Flow 50
Area (acres) 1.16
CASE 1 Impervious Ares (sq ft) 15434
'C' Factor 0,38
245 ft. Overland Flow Area "C 0.440
Treatment Area 10,184
Ct= 0.15
L= 245 fl. Time Time Inc, Intens. Q Devel. Vol.ln Vol.Out Storege
n = 0.40 (minl (sec) inlhI..r) (cfs)~(cU ft) _ _ ~cu ft) (cu ft)
S= 0.0321 7.53 452 3.78 1.67 1008 452 556
Tc = 6.55 min., by Equation 3-2 of Guidelines 5 300 4.58 2.02 811 300 511
10 600 3.21 1.41 1084 600 464
228 ft, Gutterflow 15 900 2.44 1,08 1133 900 233
20 1200 1.98 0.87 1181 1200 •19
Z1= 50.0 ForZ2 25 1500 1,68 0.14 1221 1500 -219
Z2 = 3.5 Type B=1,0 30 1800 1,46 0.64 1255 1800 -645 ,
n= 0.016 Rolled = 3.5 35 2100 1.30 0.57 1289 2100 -811
S= 0.4660 40 2400 1.18 0.52 1324 2400 -1076
45 2100 1.08 0.48 1362 2100 -1338
d= 0.1323 ft. Flow Width 6.6 ft, 50 3000 1.01, 0.44 1399 3000 -1601
55 3300 0,94 0,41 1431 3300 -1669
60 3600 0,88 0.39 1457 3600 -2143
A R Q Tc Tc total I Qc 65 3900 0.83 0.37 1485 3900 -2415
0.47 0,07 1.83 0,97 7,53 ~8.78 1.67 70 4200 0.79 0,35 1523 4200 •2671
75 4540 0.77 0.34 1578 4500 -2922
Qpeak for Case 1= 1.67 cfs 60 4800 0.75 0.33 1645 4800 -3155
85 5100 0.73 0.32 1696 5100 -3402
90 5400 0.70 0.31 1709 5400 -3691
95 5700 0.66 0.29 1695 5700 -4005
CASE 2 100 6000 0,66 0,30 1843 6000 -4157
Case 2 assumes a Time of Conoentration less than 5 minutes so that the "05-013" TREATMENT REQUIREMENTS
peak flow =.90(Tc=5 intensity)(Imp. Area) = 1.46 cfs Minimum "05-013" Volume Required 280 cu ft
Provided TreatmeM Volume 5,266 cu ft
DRYWELL REQUIREMENTS - 50 YEAR DESIGN STORM
So, the Peak ftow for the Basin is the greater of the lwo flows, Maximum 3torage Required by Bowstring 556 cw ft
1.67 cfs Provided Storage Volume 18322 cu ft
Number and Type of Drywells Required 0 Single
, 1 Double
PEAK FLOW CALCULATION PROJECT: Shelley Lake 5th Addtion ~ BOWSTRING METHOD PROJECT: Shelley Lake 5th Addtion
50•Year Design Storm DETENTION BASIN DESIGN BASIN: 7
DESIGNER GLA
BASIN: 7 DATE: 21-May-05
Tot Area 45,480 SF 1.04 Acres Time increment (min) 5
Imp, Area 9,426 SF Cr 0.9 T1me oi Conc. (min) 8.05
Perv. Area 36,054 SF C= 0,15 OuNiow (de) 1
Wt, C= 0,31 Design Year Flow 50
Area (aaes) 1.44
CASE 1 Impervious Area (sq fl) 9426
==r=== 'C' Factor 0.34
196 ft. 4vedand Flow Area' C 0.319
Treatment Area 5,826
Ct= 0,15
L= 196 R, Time Time Inc. Intens. Q Devel. Vol.ln Vol,Out Storege
n= 0.40 (min) sec jnlhr~ cfs (cu ft) a~ ft
(~cu fl
S= 0.0255 8.05 483 3.65 1.16 753 483 270
Tc = 6.18 min., by Equation 3-2 of Guidelines 5. 300 4.58 1.46 567 300 287
10 640 3.11 1.02 782 600 182
149 ft. Gutter flow 15 900 2.44 0.78 629 900 -71
20 1200 1.98 0.63 662 1200 -338
Z1= 50.0 For Z2 25 1500 1.68 0,53 890 1500 -610
Z2 = 3,5 Type B=1.0 30 1800 1,46 0.47 914 1800 -886
n= 0.016 Roiled = 3.5 35 2100 1.30 0.41 936 2109 -1162
S= 0,0050 40 2400 1.18 0.38 963 2400 -1431
45 2700 1.08 0.35 890 2700 •1110
d= 0.1810 ft. Flow Width 9.1 ft. 50 3000 1.01 4.32 1016 3000 -1984
. 55 3300 0.94 0.30 1039 3300 •2261
60 3600 0.88 0,28 1058 3600 -2542
A R Q Tc Tc total I Qc 65 3900 0.83 0.27 1076 3900 •2822
6.88 0.09 1.16 1,87 8,05 3.65 1,16 70 4200 0.79 0.25 1106 4200 -3094
75 4500 0.77 0.25 1146 4500 •3354
Qpeak for Cese 1= 1,16 cfs BO 4800 0.75 0.24 1194 4800 •3605
85 5100 0.73 0.23 1232 5100 -3868
90 5400 0,70 0.22 1240 5400 -4160
95 5100 0.66 0.21 1230 5700 -4470
CASE 2 100 6000 0.68 0,22 1331 6000 -4663
Case 2 assumes a Time oi Concentration less than 5 minutes so tlhat the "05-013" TREATMENT REQl11REMENTS
peak flow =.90(Tc=5 intensity)(Imp. Area) = 0.89 cfs Minimum "05-013" Vofume Required 152 cu ft
Proa'rded Treetment Volume 5,266 cu ft
ORYWELL REQUIREMENTS - 50 YEAR DESIGN STORM
So, the Peak flow for ihe Basin is the greater of the two flows, Maximum Storage Required by Bowstring 287 cu ft
1.16 cfs Provided Storage Vo4ume 18322 cu n
Number and Type of Drywells Required 0 S(ngle
1 Double
PEAK FLOW CALCULATION PROJECT; Shelley Lake 5th Addtion BOWSTRING METHOD PROJECT: Sheliey Lake Sth Addtion
50-Year Design Storm DETENTION BASIN DESIGN BASIN: 8
DESIGNER GLA
BASIN: 8 DATE: 27•May-05
Tot. Area 22,136 SF 0,52 Acxes Time increment (min) 5
Imp, Area 6,852 SF C= 4.9 Time of Conc. (min) 8.67
Perv. Area 15,864 SF C= 0,15 Outflow (ds) 1
Wt, C= 0.36 Design Year Flow 50
Area (acxes) 0,52
CASE 1 ImpeNious Area (sq ft) 6852
'C' Fector 0.38
246 ft. Overland Flow Area "C 0,196
Treatment Area 5,052
Ct= 0.15
t= 246 ft. Time Time Inc. Intens. Q Devel. Vol.ln Vol,Out Storege
n = 0.40 min sec (inlhr) (cu ft) fcu ft~ _
S= 0.4244 8.87 532 3.45 0.68 483 532 -49
Tc = 7.17 min., by Equaiion 3•2 of Guidelines 5 300 4,58 0.90 361 304 61
10 600 3.21 0.63 492 640 -108
118 ft. Gutter Now 15 900 2,44 0.48 518 900 -382
20 1200 1,96 0.39 537 1200 -663
Z1= 50.0 ForZ2 25 1500 1,68 0.33 553 1500 -947
Z2 = 3.5 Type B=1.0 30 1800 1.46 0.29 567 1809 -1233
n= 0.016 RoNed = 3,5 35 2100 1.30 0.25 581 2100 •1519
S= 0.0050 40 2400 1.18 0.23 596 2400 -1604
45 2700 1.08 0.21 613 2700 -2087
d= 0.1480 ft. Flow Width 7.4 fl. 50 3000 1.01 020 628 3000 -2371
55 3300 0.94 0.18 643 3300 -2657
60 3600 0.88 0,17 654 3600 -2946
A R Q Tc Tc total I Qc 65 3900 4.83 0.16 666 3909 -3234
0.59 0.01 0.68 1.70 8.87 3,45 0.68 70 4200 0.79 0.16 683 4200 -3511
15 4500 0,77 0.15 708 4500 •3792
Qpeak for Caee 1= 0.68 cfa 80 4800 0.75 0.15 737 4800 -4063
85 5100 0.73 0.14 761 5100 -4339
90 5400 4.70 0,14 765 5400 -4635
95 5700 0.66 0.13 759 5700 -4941
CASE 2 100 6000 0,68 0.13 825 6000 -5175
Case 2 assumes a Tfine of Concentration less then 5 minutes so that the "05-013" TREATMENT REQUIREMENTS
peak flow =,90(Tc=5 intensity)(Imp. Aree) = 0.65 cfs Minimum "05-013" Volume Required 131 ar ft
Provided Treatment Volume 5,266 cu ft
ORYWELL REQUIREMENTS • 50 YEAR DESIGN STORM
So, the Peak flow for the Basin is the greater of the two flows, Ma)cimum Storage Required by BowsMng 61 cu ft
0.88 ds Provided Storage Volume 18322 cu ft
Number and Type of Drywells Required 0 Single
1 DouWe
PEAK FLOW CALCULATION PROJECT: Shelley Lake 5th Addtion BOWSTRING METHOD PRQJECT; Shelley Lake 5th Addtion
50•Year Design Stonn DETENTION BASIN DESIGN BASlN; 9
DESIGNER GLA
BASIN: 9 DATE: 27-May-05
Tot. Area 131,355 SF 3.15 Aaes Time Inaement (min) 5
Imp, Area 19,202 SF C= 0.9 Tlme o( Conc. (min) 11.64
Perv, Area 118,153 SF C= 0,15 Outflow (cts) 1
Wt. C= 0,25 Desfgn Year Flow 50
Area (eaes) 3.15
CASE 1 Impervious Area (sq fl) 19202
= 'C' Fector 0.25
431 ft. Overland Flaw Area * C 0.804
Treatment Area 12,002
Ct = 0.15
L= 431 ft, Time Time Inc. Iniena. Q Devel. Vol.ln Vol.Out Storege
n= 0.40 @(min) sec (iNhr) (cu ft) (cxi ft) cu ft~
S= 0.0371 11.64 698 2.91 2.34 2187 698 1488
Tc = 8.86 min., by Equatlon 3-2 of Guidelines 5 300 4.58 3.68 1479 300 1119
10 600 3.21 2.58 2072 600 1472
296 ft. Gutter flow 15 900 2.44 1.96 2231 900 1331
20 1200 1.98 1.59 2288 1200 1088
Z1= 50.0 Fa Z2 25 1500 1.68 1.35 2340 1500 840
Z2 = 3.5 Type B=1.0 30 1800 1.46 1.17 2389 1800 589
n= 0.016 Rolled = 3.5 35 2100 1.30 1.04 2439 2100 339
S= 0.0068 40 2400 1,18 0.95 2496 2400 96
45 2700 1.08 0.87 2558 2700 -142
d= 4.2222 fl. Flow Width 11.1 fl. 50 3000 1.01 0.81 1620 3000 -384
55 3300 0.94 0.16 2674 3300 -626
60 3600 0.88 0.71 2719 3600 -881
A R Q Tc Tc total I Qc 65 3900 0.83 0.67 2186 3900 -1134
1.32 0.11 2,34 2,78 11,64 2.91 2,34 70 4200 0.19 0.64 2833 4200 -1367
75 4500 0,77 0,62 2932 4500 -1568
Qpeak for Case 1= 2.34 cfs 80 4800 0.75 0.61 3052 4800 -1748
85 5100 0.13 0.59 3148 5100 •1952
99 5400 0.10 0,56 3165 5400 -2235
95 5100 0.66 0,53 3131 5700 -2563
CASE 2 100 6000 0,68 0.55 3449 6000 •2591
--=a=aa
Case 2 assumes a Time of Concentration less lhen 5 minutes so that the "05-013" TREATMENT REQUIREMENTS
peak flow =.90(Tc=5 intensity)(Imp, Area) = 1.82 cfs Minimum "05-013" Volume Required 312 cu ft
Provided Treatment Volume 5,266 cu ft
DRYWELL REQUIREMENTS - 50 YEAR DESIGN STORM
So, the Peak flow (or the Basin is the greater of the iwo flows, Meximum Storage Required by Bowstring 1488 cu ft
4.34 cfs Provided Storage Volume 18322 cu ft
Number and Type of Drywells Required 0 Single
1 Double
~r mmm r mr r m mm r mr~ ~ ~ -mmm
PEAK FLOW CALCULATION PROJECT: Shelley Lake 5th Addtion BOWSTRING METNOD PROJECT; Shefley Lake 5th Addtion
50•Year Design Storm DETENTION BASIN DESIGN BASIW; 10
DESIGNER GLA
BASI N: 10 DATE: 27-Mey45
Tot. Area 101,565 SF 2.33 Aaes Time Incxement (min) 5
Imp. Area 6,377 SF C= 0.9 Time oi Conc. (min) 8.70
Perv. Area 95,188 SF C= 0,15 Oumaw (cfs) 1
Wt, C= 0.20 Design Year Flow 50
Area (aaes) 2.33
CASE 1 Impervioua Area (sq ft) 6377
'C' Fector 0.20
335 ft, Overiand Flow Aree"C 0,460
TreatmeM Aree 6,377
Ct= 4.15 L= 335 ft. Time Time Inc. Intens. Q Devel. Vol.ln Vol,Out Storage
n= 0.40 min (sec) (cfs) jcu l (cu ft) M(cu 111L.
S= 0,0403 8.70 522 3.49 1.60 1121 522 599
Tc = 7.43 min., by Equation 3-2 of Guidelines 5 300 4.58 2,10 846 300 546
10 600 3.21 1,47 1146 600 546
246 ft, Gutter flow 15 800 2.44 1,12 1209 900 309
20 1200 1.98 0,91 1254 1200 54
Z1= 50.0 For Z2 25 1500 1.68 0.77 1292 1500 -208
Z2 = 3,5 Type B=1.0 30 1800 1.46 0.67 1326 1800 -474
n= 0.016 Rolled = 3.5 35 2100 1,30 0.60 1359 2100 -141
S= 0.0427 40 2400 1.18 0.54 1395 2400 -1005
45 2700 1,08 0.50 1433 2700 -1261
d= 0.1365 ft. Flow Width 6.8 ft. 50 3000 1.01 0.46 1471 3000 -1519
55 3300 0.84 0,43 1503 3300 •1197
60 3600 0.88 0.41 1531 3600 -1059
A R Q Tc Tc total I Qc 65 3900 0.83 0.38 1559 3900 -2341
0.50 0.07 1.60 1,28 8.70 3.49 1.60 70 4200 0.79 0.37 1596 4200 -1602
75 4500 0,77 0,35 1655 4500 -2845
Qpeak for Case 1= 1.60 ds BO 4800 0.75 0.35 1725 4800 •3075
85 5100 0.73 0,34 1780 5100 -3320
90 5400 0,70 0.32 1191 5400 -3609
95 5700 0.68 0.30 1716 5100 -3914
CASE 2 100 6000 0.68 0.31 1931 6000 -4069
Cese 2 assumes a Time of Concentrabon less than 5 minutes so that the "05-013" TREATMENT REQUIREMENTS
peak flow =.90(To-5 intensity)(Imp. Area) = 0.60 cfs Minimum "05-013" Volume Required 166 au ft
Provided TreatmeM Volume 5,266 cu ft
DRYWELL REQUIREMENTS - 50 YEAR DESIGN STORM
So, the Peak flow for the.Basin is the greater of ihe iwo flows, Maximum Storage Required by Bowstring 599 cu ft
1.60 cfs Provided Storage Volume 18322 cu ft
Number and Type oi Drywells Required 0 Single
1 Double
rr ir m mm ms ~ w~mm mw r~ mmr mm
PEAK FLOW CALCULATION PROJECT: Shelley Lake Sth Addtion BOWSTRING METHOD PROJECT: Shelley Lake 5th Addtion
50•Year Design Storm DETENTION BASIN DESIGN BASIN; 11
DESIGNER GLA
BASI N: 11 DATE: 27-Msy-05
Tot. Area 14,898 SF 0,34 Acres Tlme Inaement (min) 5
imp, Area 8,008 SF C= 0.9 Time of Conc, (min) 5,00
Perv. Area 6,890 SF C= 0,15 Outflow (ds) 1
Wt. C= 0.55 Design Year F1ow 50
Area (ecr+es) 0.34
CASE 1 Impervious Area (sq ft) 8008
'C Fector 0.55
0 fl, Overland Flow Area"C 0.189
Treatment Area 4,448
Ct= 0.15
L= 0 ft. Time Time inc. Intens. Q Devel. Vol.in Vol,Out Storage
n= 0.40 min (sec) (INhr) -~o (au ft) (cu ft) (cu ftL-
S= 0.0473 5.00 300 4.58 0.87 348 300 48
Tc = 0.00 min., by Equetion 3-2 oi Guidelines 5 300 4.58 0,87 348 300 48
10 600 3.21 0,61 426 600 -174
253 ft. Gutter flow 15 900 2,44 0,46 463 900 -437
20 1200 1.98 0,37 486 1204 -712
Z1= 50.0 ForZ2 25 1500 1,68 0.32 508 1500 -992
Z2 = 3.5 Type B=1.0 30 1800 1,46 0.28 525 1800 -1275
n= 0,016 Rolled = 3.5 35 2100 1.34 0.25 541 2100 -1559
S= 0.0079 40 2400 1.18 0.22 557 2400 •1843
45 2700 1.08 0.21 574 2700 -2126
d= 0,1490 ft. Flow Width 7.5 ft. 50 3000 1.01 0.19 591 3000 -2409
55 3300 0.94 0,18 605 3300 -2695
60 3600 0.88 0.11 617 3600 -1983
A R Q Tc Tc total I Qc 65 3900 0.63 0.16 630 3900 -3270
- - -=A,
0.59 0.07 0.87 2.88 5.00 4.58 0,87 70 4200 0.79 0.15 646 4200 -3554
. 75 4540 0.17 0.15 670 45U0 -3830
Qpeak for Cese 1= 0.87 cfs 80 4600 0.75 0,14 699 4800 -4101
85 5100 0.13 0.14 722 5100 -4378
90 5400 0.70 0,13 127 5400 -4673
95 5700 0.66 0.12 722 5700 -4978
GASE 2 100 6000 0.68 0.13 785 6000 -5215
Case 2 assumes e Time of Concentration lesa than 5 minutes so that the "05-013" TREA7MENT REQUIREMENTS
peak flow =.90(Tc=5 intensity)(Imp. Aree) = 0.76 cfs Minimum "05-013" Volume Required 115 cu ft
Provided TreatmeM Volume 5,266 cu ft
DRYWELL REQUIREMENTS - 50 YEAR QESIGN STORM
So, the Peak flow for the Basin is the greater ot the lwo flows, Maximum Storege Required by Bowstring 48 cu ft
0.87 cfs Provided Storage Volume 18322 cu ft
Number and Type of Drywells Required 0 Single
1 Double
M. Mm r r m~ m m r m m m mmm mmm
PEAK FLOW CALCUlATION PROJECT: Sheliey Lake 5th Addtlon BOWSTRING METHOD PROJECT: Shelley Leke 5th Addtion
50•Year Design Storm DETENTION BASIN DESIGN BASIN; 12
OESIGNER GlA
BASiN: 12 QATE: 27-May-05
Tot, Area 125,948 SF 2.89 Acres Time Increment (min) 5
Imp. Area 26,030 SF C= 0.9 Time ot Conc. (min) 8.38
Perv. Area 99,918 SF C= 0.15 Outflow (cfa) 1
Wt. C= 0.31 Design Year Flaw 50
Area (acres) 2.89
CASE 1 Impervious Area (aq ft) 26030
'C Factor 0.31
218 ft. Overland Flow Area' C 0.882
Treatment Area 15,230
Ct= 0.15
L= 218 ft. Time Time Inc. Intena. Q Devel. Vol.in Vol.Out Storage
n = 0.40 min (sec) _ (iNhr) (cfs} (cu ft~ (cxr ft) (cu,ftj-_.,.
S= 0.0321 8.38 503 3.58 3.14 2118 503 1615
Tc = 6.14 min., by Equatlon 3-2 of Guidelines 5 300 4.58 4,04 1623 300 1323
10 600 3.21 2.83 2180 600 1580
228 ft. Gutterflaw 15 900 2,44 2,15 2306 900 1406
ZO 1200 1.98 1.75 2395 1200 1195
21= 50,0 ForZ2 25 1500 1,68 1.48 2410 1500 970
Z2 = 3,5 Type B=1.0 30 1800 1,46 129 2536 1800 736
n= 0.016 Rolled = 3,5 35 2100 1,30 1.15 2601 2100 501
S= 0,0050 40 2400 1,18 1.04 2670 2400 270
45 2700 1.08 0,96 2744 2100 44
d= 0.2630 ft, Flow Width 13,2 ft. 50 3000 1.01 0.89 2816 3000 -164
' 55 3300 0.94 0.83 2819 3300 -421
60 3800 0,88 0.78 2932 3600 -668
A R Q Tc , Tc total ! Qc 65 3900 0.83 0.73 2986 3900 -914
1.85 0.13 3.14 2.24 ~ 8,36 3.56 3.14 70 4100 0.79 0,70 3062 4200 -1138
75 4500 0.17 0.68 3112 4540 -1328
Qpeak far Case 1= 3.14 da 80 4800 0.75 0,66 3305 4800 -1495
65 5100 0.73 0,65 3411 5106 •1689
90 5400 0.70 0,62 3432 5400 -1968
95 5700 0.66 0,56 3404 5700 -2298
CASE 2 100 6000 0.68 0.60 3101 6000 -2299
Cese 2 assumes a Time of Cancentration less than 5 minutes so that the "05-013" TREATMENT REQUIREMENTS
peak (low =,90(Tc=5 intensityr)(Imp. Area) = 2.46 cfs Mlnimum "05-013" Volume Required 396 cu ft
Provided TreatmeM Volume 5,266 cu ft
DRYWELL REQUIREMENTS - 50 YEAR DESIGN STORM
So, tfe Peak flow for the Basin is the greater oi the two flows, Maximum Storage Required by Bowstring 1615 cu ft
3,14 cfs Pravided Siorage Volume 18322 cu ft
Number and Type of Drywells Required 0 Singie
1 Doubfe
~ ,
~r m m r m m m m in m =I s~ ~ ~ m m m m m
PEAK FLOW CALCULATION PROJECT: Shelley Lake 5th Addtion BOWSTRING METHOD PROJECT: Shelley Lake 5th Adduon
50-Year Design Storm DETENTION BASIN DESIGN BASIN; 13
DESIGNER GLA
BASIN; 13 DATE: 27-May-05
Tot. Area 58,013 SF 1,33 Acres Time inaement (min) 5
Imp. Area 14,148 SF C= 0.9 Time of Conc, (min) 8.05
Perv. Area 43,865 SF C= 0,15 OuMow (cfa) 1
Wt. C= 0.33 Design Year Flow 50
Area (aaes) 1.33
GASE 1 Impervious Area (sq ft) 14146
'C' Factor 0.33
224 it Overland Flow Area • C 0.443
Treatment Area 10,548
Ct = 0.15
L= 224 ft. Time Time Inc, Intena, Q Devel. Vol.in Vol,Out Storage
n = 0.40 . Cmin) sec Pnmr) (s (cu ftL, (ai ft) (cu ft
S= 0.0313 ~ 8.05 483 3.65 ,4 1.62 1046 483 563 <=z
Tc = 6.29 mfi., by Equation 3-2 of Guidelines 5 300 4.56 2.03 816 300 516
10 600 3,21 1,42 1088 600 486
180 R, Gutter flow 15 900 2.44 1.08 1152 900 252
20 1200 1,98 0.88 1198 1200 -2
Z1= 50.0 For Z2 25 1500 1.68 0,74 1231 1500 -283
Z2 = 3.5 Type B=1.0 30 1800 1.46 0.65 1211 1800 -529
n= 0.016 Rolled = 3.5 35 2100 1.30 0.58 13Q4 2100 -796
S= 0.0079 40 2400 1.18 0,52 1339 2400 -1061
45 2700 1.08 0.48 1376 2700 -1324
d= 0.1884 ft. Flow Width 9.4 ft. 50 3000 1,01 0.45 1413 3000 -1587
55 3300 0.94 0.42 1445 3300 -1655
60 3600 0.88 0.39 1471 3600 -2128
A R Q Tc Tc total I Qc 65 3900 0.83 0.31 1499 3900 -2401
0,95 0.09 1.62 1.75 J 8.05 3.65 1.62 70 4200 0,79 0,35 1537 4200 -2663
75 4500 0.77 0.34 1593 4500 •2907
Qpeak for Cese 1= 1.62 cfs 60 4800 0.75 0.33 1659 4800 -3141
85 5100 0,73 0.33 1113 5100 -3387
90 5400 0.70 0.31 1124 5400 -3676
95 5700 0.66 0.29 1709 5700 -3991
CASE 2 100 6000 0.68 0.30 1859 6000 -4141
Cese 2 assumes a Time of ConcenVaflan less than 5 minutes so thei the °05-013" TREATMENT REQUIREMENTS
peak flow =.90(Tc=5 intensity)(Imp, Area) = 1.34 cfs " Minimum "05-013" Volume Required 214 cu ft
Provided TreatmentVolume 5,266 cu ft
DRYWELL REQUIREMENTS - 50 YEAR DESIGN STORM
So, the Peak flow for the Basin is the greater of the two flaws, Maximum Storage Requlred by Bowstring 563 cu ft
1.62 cfs ~Provided Storage Volume 18322 cu ft
Number and Type of Drywells Required 0 Single
1 Double
~ ~ r ~r ~ ~ ~ r~ ~ ~r ~ ~ ~w ~ ~ ~ ~ ~
PEAK FLOW CALCULATION PROJECT: Shelley Lake 5th Adddon BOWSTRING METHOD PROJECT: Shelley Lake 5th Addtion
50•Year Design Storm DETENTION BASIN DESIGN BASIN: 14
DESIGNER GlA
. BASIN; 14 DATE: 27-May-05
Tot. Area 29,220 SF 0.67 Aaes Time Inaement (min) 5
lmp, Area 14,763 SF Ca 0,9 Time of Conc, (min) 12.72
Perv. Area 14,457 SF C= 0.15 Outflaw (c#s) 1
Wt. C= 0.53 Design Year Flow 50
Area (acxes) 0.67
CASE 1 Impemous Area (sq ft) 14763
'C Fector 0.53
141 fl. Overlend Flow Area "C 0.355
, Treatment Area 7,563
Ct = 0.15
L= 141 ft. Time Time Inc. Intens. Q Devel, Vol,ln Val,Out Storage
n= 0,40 min) sec. (inmr) ~
, (cu ft) , cuft cu ft
--L~.. ~ L- _zl..
S= 0.0035 12.72 763 2,14 1,40 1418 183 665
Tc = 9.20 min., by Equation 3-2 of Guidelines 5 300 4.56 1,62 653 300 353
14 600 3.21 , 1.14 915 600 315
295 ft, Gutter flow 15 900 2.44 0.87 1004 900 164
10 1200 1.98 0,10 1026 1200 •174
Z1= 50.0 For Z2 25 1500 1.68 0,59 1046 1500 -454
Z2 = 3,5 Type B=1.0 30 1800 1.46 0,52 1086 1800 -134
n= 0.016 Rolled = 3.5 35 2100 1.30 0,46 1087 2100 •1013
S= 0.0065 40 2400 1.18 0.42 1111 2400 -1289
45 2700 1.08 0,38 1138 2700 -1562
d= 0.1610 ft. Flow Width 8.1 ft. 50 3000 1.01 0.36 1165 3000 -1835
, 55 3300 0.94 0.33 1188 3300 -2111
60 3600 0.88 0.31 1207 3600 -2393
A R Q Tc Tc total I Qc 65 3900 0.83 0.30 1228 3900 -2672
0.69 0.08 0.97 3.62 12,72 2.74 0,87 70 4200 0.79 0.28 1257 4200 -2943
75 4540 0.77 027 1300 4500 -3200
Qpeak tor Cese 1= 0,97 cts 60 4800 6.75 0.27 1353 4800 -3447
85 5100 0.73 0.26 1396 5100 -3704
90 5400 0.70 0.25 1403 5400 -3997
95 5700 0.66 0.23 1390 5700 -4310
CASE 2 100 6000 0,68 0,24 1510 6000 -4490
Cese 2 assumes a Time of Concentration less than 5 minutes so that the "05•013" TREATMENT REQUIREMENTS
peak flow =,90(Tc=5 intensity)(Imp. Area) = 1.40 cis Mfnimum °05-013" Volume Required 197 cu ft
Provided Treatment Volume 5,266 cu ft
DRYWELL REQUIREMENTS - 50 YEAR DESIGN STORM
So, the Peak flow far the Basin is the greater oi the iwo flows, Maximum Storage Required by Bowstring 665 au ft
1.40 cfs Provided Starege Volume 18322 cU ft
Number and Type oi Drywells Required 0 Single
1 Double
~ ~ ~ ~ ~ ~ ~ ~ ~ r ~ ~ ~ rr w ~ ~
PEAK FLOW CALCULATION PROJECT: Shelley Lake 5th Adddon BOWSTRING METHOD PROJECT: Shelley Leke 5th Addtion
54•Year Design Storm DETENTION BASIN DESIGN BASIN: 15
DESIGNER GLA
BASIN; 15 DATE; 27-Mey-05
Tot. Area 137,227 SF 3.15 Acres Time Increment (min) 5
Imp. Area 18,659 5F C= 0,9 T'une of Conc. (min) 5.12
Pero. Area 118,566 SF C= 0,15 Outflow (cfs) 1
Wt. C= 0,25 Deslgn Year Flow 50
Area (acres) 3.15
CASE 1 Impervioua Area (sq ft) 18659
= 'C' Factor 0.25
150 ft. Overland Flow Area"C 0,794
TreatmentAree 11,459
Ct = 0.15
L = 150 ft. Time Time Inc. Intens, Q Devel. Vol.ln Vol.Out Storage
n = 0.40 (sec) (iNhrl (2!S (cu ft) (cu ft) (cu R)
.
S= 0.0630 5,12 301 4,53 3.60 1482 307 1175
Tc = 4.01 min., by Equetion 3-2 of Guidelines 5 300 4.58 3.63 1461 300 1161
10 600 3,21 2.55 1193 600 1193
152 ft. Gutter flow 15 900 2,44 1.94 1947 900 1047
20 1200 1,98 1.57 2051 1200 851
Z1= 50.0 For Z2 25 1500 1.68 1.33 2135 1500 635
Z2 = 3.5 Type B=1.0 30 1800 1.46 1.16 2206 1800 406
n= 0.016 Rolled = 3,5 35 2100 1,30 1.03 2272 2100 172
S= 0.0100 40 2400 1.18 0.93 2341 2400 -59
45 2700 1.08 0,86 2413 2700 -287
d= 0.2430 ft. Flow Width 12,2 ft. 50 3000 1.01 0.80 2482 3000 -518
, 55 3300 0.84 0.75 2542 3300 -758 80 3600 0,88 0.70 2593 3600 -1007
A R Q Tc Tc total I Qc 65 3900 0.83 0.66 2644 3900 -1256
1,58 0.12 3.60 1.11 5,12 4.53 3.60 70 4200 0.79 0.63 2714 4200 -1486
15 4500 0.77 0.61 2815 4500 -1685
Qpeak for Case 1= 3,60 cfs 80 4600 0,75 0.60 2935 4800 -1865
85 5100 0,73 0.58 3032 5100 •2468
• 90 5400 0.70 0.55 3053 5400 -2347
95 5700 0.66 0.52 3029 5700 •2671
CASE 2 " ' " 100 6000 0.68 0.54 3296 6000 •2704
Case 2 assumes a Time of Concentration less then 5 minutes so that 1he , "05-013" TREATMENT REQUiREMENTS
peak flow =.90(Tc=5 intensity)(imp. Area) = 1.77 cfs Minimum "05-013" Volume Required 298 cu ft
. Provided Treatment Volume 5,266 cu ft
DRYWELL REQUIREMENTS - 50 YEAR DESIGN STORM
So, the Peak flow for the Basin is the greater af the iwo flows, Maximum Storage Required by Bowstring 1193 cu ft
3.60 cfs Provided Storege Vofume 18322 cu ft
Number and Type of Drywells Required 0 Single
1 Double
~r ~ ~ . ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~■r ~ r r~ i ~
PEAK FLOW CALCULATION PROJECT: Shelley Lake 5th Addtion BOWSTRING METHOD PRQJECT: Shelley Lake 5th AddGon
50-Year Design Stann DETENTION BASIN DESIGN BASIN: 16
DESlGNER GLA
BASIN; 16 DATE: 21-Mey05
Tot. Area 43,218 SF 0,99 Acres Time Inaement (min) 5
Imp. Area 7,321 SF C= 0.9 Time of Conc. (min) 5.71
Petv. Area 35,897 SF C= 0,15 Outflow (ds) 1
Wt. C= 0,28 Design Year Flow 50
Area (acres) 0,99
CASE 1 Impervious Area (sq ft) 7321
'C' Facior 4.28
148 ft. Qverfend Flow Area " C 0275
TreaUnent Area 3,721
Ct= 0,15
L= 146 ft. Time Time Inc. intens. Q Devel. Voi.ln Vol.Out Storage
n = 0.40 (min) (sec) inmr (cfs) (cu ft) . (cu ft) (cu fl)-_
S= 0,0642 5.17 346 4,31 1.18 550 346 203
Tc = 3.96 min., by Equation 3-2 ot Guidelines 5 340 4.58 1.26 506 300 206
10 600 3,21 0.88 633 600 33
145 fl, Gutter flow 15 900 2,44 0.67 663 900 -217
20 1200 1,98 0.54 711 1200 -483
Z1= 50.0 For Z2 25 1500 1.68 0.46 745 1500 -755
Z1= 3.5 Type B=1.0 30 1800 1.46 0.40 769 1800 -1031
n= 0.016 Ralled = 3.5 35 2100 1.30 0.36 792 2100 •1308
S= 0.0050 40 2400 1,18 0.32 815 2400 •1585
45 2104 1.08 0.30 839 2700 -1861
d= 0.1819 ft. Flow Width 9,1 ft. 50 3000 1.01 0.28 863 3000 -2137
55 3340 0,94 0.26 884 3300 -2416
60 3600 0.88 024 901 3600 •2699
A R Q Tc Tc total I Qc 65 3900 0,83 0,23 919 3900 -2981
0.89 0.09 1.18 1.82 ~ 5.77 4,31 1,18 70 4200 0.79 0.22 943 4200 -3257
75 4500 0.77 0,21 978 4500 -3522
OpeakforCase 1= 1,18 cie 80 4800 0.75 0,21 1019 4800 -3781
85 5100 0.13 0,20 1053 5100 -4047
80 5400 0.70 0,19 1060 5400 -4344
95 5700 0.66 0.18 1051 5700 -4649
CASE 2 100 6000 0.68 0,19 1144 6000 -4856
Cese 2 assumes a Time of Conoentretion leas then 5 minutes so that the 005-013" TREATMENT REQUIREMENTS
peak flow =.90(Tc=5 intensity)(Imp. Area) = 0.69 cfs Minimum "05-013" Volume Required 91 cu ft
Provided treatmentVolume 5,266 cu ft
DRYWELL REQUIREMENTS - 50 YEAR DESIGN STORM
Sp, the Peak flow for the Besin is the greater oi the two flows, Maxumum Storage Required by Bowstring 206 cu ft
1.18 cis Provided Storege Volume 18322 ai ft
Number and Type oi Dryvuells Required 0 Single
' 1 Double
~ r rr ~ ~ w ~ ~ ~ ~r ~r ~ ~ ~ ~ ~ ~■r r ~
PEAK FLOW CALCULATION PROJECT: Shelley Lake 5th Addtion BOWSTRING METH00 PROJECT; Shelley Lake 5th Addtion
50-Year Design Storm DETENTION BASIN DESIGN BASIN: 17
DESIGNER GLA
BASIN; 17 DATE; 21-May-05
Tot. Area 46,652 SF 1.07 Acres Time Increment (min) 5
Imp. Area 7,350 SF C= 0,9 Time of Conc. (min) 5.79
Penr. Area 39,302 SF C= 0,15 Outflow (cfs) 1
Wt. C= 0.27 Design Year Flow 50
Ares (eaes) 1.07
CASE 1 Impervious Area (aq ft) 7350
'C Factor 0.21
148 ft, Overland Flow Area' C 0.287
Treatment Area 3,150 •
Ct ~ 0.15 '
L= 148 ft. Time Time Inc. Intens. Q Devel. Vol.in Vo1.0ut 1 Stotage
n= 0.40 sec (inlhr) (cfs) (cu ft) (cu ftL (cu ft,.
S= 0,0642 5.79 347 4.30 1.24 575 347 226
Tc = 3.96 min., by Equation 3-2 of Guidelines 5 300 4.58 1.31 529 300 229
10 600 3.21 0.92 661 600 61
148 ft. Gutter flow 15 900 2.44 0.10 714 900 -186
" `20 1200 1.98 0.57 750 1200 450
,
21= 50.0 For 22 25 1500 1.68 0.48 779 1500 -721
Z2 = 3.5 Type B=1.0 30 1800 1,46 0.42 844 1800 -996
n= 0.016 Rolled = 3.5 35 2100 1.30 0.37 827 2100 -1273
S= 0.0050 40 2400 1.18 0,34 852 2400 •1548
45 2700 1.08 0,31 877 2700 -1823
d= 0.1855 ft. Flow Width 9.3 ft. 50 3000 1.01 0.29 902 3000 -2098
55 3300 0.94 0.27 923 3300 •2377
60 3600 0.88 0.25 941 3600 •2659
A R Q Tc Tc totsl I Qc 65 3900 0.83 0,24 960 3900 •2940
0.92 0.09 1.24 1.83 5,79 4.30 1.24 70 4200 0,79 0,23 885 4200 -3215
75 4500 0.71 0.22 1021 4500 -3479
Qpeak for Cese 1= 1.24 cfs 80 4800 0,15 0.22 1065 4800 -3735
85 5100 0,73 0.21 1100 5100 -4000
90 5400 0.70 0,20 1101 5400 -4293
95 5700 0.66 0,19 1099 5700 -4601
CASE 2 100 6000 0.68 0,20 1195 6000 -4805
Cese 2 assumea a Time of Concentration less than 5 minutes so that the "05-013" TREATMENT REQUIREMENTS
peak flow =,90(Tc=5 intensity)(Imp. Area) = 0.70 cis Minimum "05-013" Volume Required 98 cu ft
Provided ?reatmerrt Volume 5,266 cu ft
DRYWELL REQUlREMENTS • 50 YEAR DESIGN STORM '
So, the Peak flow for the Basin is the greater of the two flows, Maxnmum Storage Required by Bowstring 229 cu ft
1.24 cfa Provided Storege Volume 18322 cu ft
Number and type oi Drywells Required 0 SingJe .
1 Double
r r ~ ~ ~ s~ ~ r ~ ~ ~ ~■r a~ ~ ~ ~ ~r ~ r
PEAK FLOW CALCULATION PROJECT; Shelley Lake 5th Addtion BOWSTRING METHOD PROJECT, Sheliey Lake 5th Addlion
50-Year Design Storm DETENTION BASIN DESIGN BAS1N; 18
DESIGNER GlA
BASIN: 18 DATE: 27-Mey-05
Tot. Area 66,179 SF 1,52 Acres Time Increment (min) 5
Imp. Area 14,165 SF C= 0.9 Time of Conc, (min) 6.91
Penr, Area 52,014 SF C= 0,15 Outflaw (cfa) 1
Wt. C= 0.31 Design Year Flow 50
Area (acres) 1.52
CASE 1 Impervious Area (sq fl) 14165
'G' Factor 0,31
260 fl, Overiand Flow Area' C 0,472
Treatment Area 8,765
Ct= 0.15 ;
L= 260 ft, Time Time Inc. Intens, Q Devel. Vol.ln Vol,Out Storage
n= 0.40 (m(n): sec (iNhr) ~ (cu ft) (cu ft) (cu R.
S= 0.0680 ~ 6.97 418 3.94 1,88 1041 418 623
Tc = 5.45 min., by Equatfon 3•2 of Guidelines 5 300 4.58 2,16 868 300 568
10 600 3.21 1.51 1123 600 523
213 ft, Gutterflow 15 900 2,44 1,15 1200 900 300
20 1200 1.98 0,93 1254 1200 54
' Z1= 50.0 For Z2 25 1500 1.68 0.79 1299 1500 -201
Z2 = 3.5 Type B=1,0 30 1800 1.46 0.69 1337 1800 -483
n= 0.016 Roned = 3,5 35 2100 1.30 0.61 1374 2100 -726
S= 0.0165 40 2400 1,18 0.56 1412 2400 -988
45 2700 1,06 0.51 1453 2700 -1247
d = 0.1727 ft. Flow Width 8,6 n. 50 3000 1,01 0,48 1493 3000 •1507
55 3300 0,94 0.44 1528 3300 •1712
60 3600 0,88 0.42 1551 3600 -2043
A R Q Tc Tc totel I Qc 65 3900 0.83 0.39 1586 3900 -2314
0.80 0.09 1.86 1,52 6.97 3,94 1,86 70 4200 0.79 0.31 1627 4200 -2513
75 4500 0,77 0.36 1687 4500 -2813
Qpeak for Case 1= 1,86 cfs SO 4809 0.75 0.36 1758 4800 -3042
85 5100 0.73 0.35 1815 5100 -3285 90 5400 0.70 0,33 1827 5400 -3573
95 5700 0.66 0,31 1812 5700 •3688
CASE 2 100 6000 0.68 0.32 1971 6000 4029
Ceae 2 assumes a Time oi ConcenVation leas thari 5 minutes so that the "05-013" TREATMENT REQUIREMENTS
peak flow =.90(Tc=5 intensity)(Imp. Area) = 1.34 cfs Minimum "05-013" Uolume Required 228 cu ft
Provided Treatment Volume 5,266 cu ft
DRYWEIL REQUIREMENTS - 50 YEAR DESIGN STORM
So, the Peak flow for ihe Basin is the greater of the two flows, Ma)dmum Storage Required by BowsMng 623 cu ft
1.86 cfs Provided Storege Volume 18322 cu ft
Number and Type ot Drywens Required 0 Singie
1 Double
mr m m~ mmm-mw mmmmmmmrr r
PEAK FLOW CALCULATION PROJECT: Shelley Lake 5th Addtion BOWSTRING METHOQ PROJECT: Shelley Lake 5th Addtion
50•Year Design Storm DETENTION BASIN DESIGN BASfN: 19
DESIGNER GLA
. BASIN: 19 DATE: 27•May05
Tot. Area 32,865 SF 0,15 Acres Time Inaement (min) 5
Imp. Area 11,014 SF C= 0,9 Time of Conc. (min) 5.19
Perv, Area 21,851 SF C= 0.15 Outflow (ds) 1
Wl. C= 0.40 Deaign Year Flow 50
Area (ecres) 0.15
CASE 1 ImpeNious Area (sq R) 11014
'C' Factor 0.40
111 ft, Overland Fiow Area `C 0,303
Treatmem Area 5,614
Ct= 0.15
L= 111 ft. Time T'ime Inc, intena. Q Devel. Vol,ln Vol.Out Storage
n = 0.40 irpin) (sac) (iNhr) (cfs) (au ft) (cu ft) (cw ft)
S= 0.0899 5.19 312 4.51 1.37 570 312 258 G=-
Tc = 3.01 min,, by Equation 3-2 of Guidelines 5 300 4.56 1.39 557 304 257
10 600 3.21 0,97 686 fi00 86
203 ft. Gutter flow 15 900 2.44 0.74 744 900 -156
20 1200 1.96 0.60 783 1200 -417
Z1= 50.0 For Z2 25 1500 1.68 0.51 815 1500 -fi65
Z2 = 3.5 Type B=1.0 30 1800 1.4fi 0.44 842 1600 -956
n= 0.016 Rolied = 3.5 35 2100 1.30 0.39 867 2100 •1233
S= 0.0068 40 1400 1,16 0.36 894 2400 -1506
45 1700 1.08 0.33 921 2700 -1779
d= 0.1816 ft. Flow Width 9.1 ft. 50 3000 1.01 0.30 947 3000 -2053
, 55 3300 0.94 0.28 970 3300 -2330
60 3600 0,88 027 989 3600 -2611
A R Q Tc Tc totel I Qc 65 3900 0.83 0.25 1009 3900 -2891
0.88 0.09 1.37 2.18 5.19 4,51 1.31 70 4200 0.79 0.24 1036 4200 -3184
75 4500 0,77 0.23 1014 4500 -3426
Qpeak for Cese 1= 1.37 cfs 80 4800 0,75 0,23 1124 4800 -3680
85 5100 0.73 022 1157 5100 •3943
90 5400 0.70 0.21 1165 5400 -4235
95 5700 0.fi6 0,20 1156 5700 -4544
CASE 2 100 6000 0.68 021 1257 6000 -4743
Cese 2 assumea a Time of ConceMretion leas than 5 minutes so Ihai the "05•013" TREATMENT REQUIREMENTS
peak flow =.90(Tc--5 intensity)(Imp, Area) = 1.04 cfs Minimum "05-013" Volume Required 146 cu ft
Provided TreatmeM Volume 5,266 cu ft
DRYWEII REQUIREMENTS - 50 YEAR DESIGN STORM
So, the Peak flow for the Basin is the greater of the two flaws, Maximum Storage Required by BawsUing 258 cu ft
1.31 cfs Provided Storage Volume 18322 cu ft
Number artd Type oi Drywells Required 0 Single
1 Double
PEAK FLOW CALCULATION PROJECT: Shelley Lake 5th Addtion BOWSTRING METHOD PROJECT; Shelley Lake 5th Addbon
50-Year Qesign Storm DETENTION BASIN DESIGN BASIN: C(4th Addition)
DESIGNER GLA
BASIN: C(4th Addi6on) DATE: 27-May-05
Tot. Area 246,398 SF 5,66 Aaes Time Inaement (min) 5
imp. Area 103,063 SF C= 0.9 Time of Conc. (min) 10.58
Pero. Area 143,315 SF C= 0.15 Outflow (cfs) 1
Wt. C= 0,46 Design Year Flow 50
Aree (eaes) 5.66
CASE 1 Impervious Area (sq n) 103083
'C' Factor 0.46
114 ft. Overland Flow Area "C 2.623
Treatment Area 58,083
Ct = 0.15
L= 114 ft. Time Time Inc. Intens. Q Devel. VoLln Vol.Out Storage
n = 0.40 (min) (sec) " inlhr . (cfsl Icu ft) (cu ft) _ (cu fl)
S= 0.0080 10.56 633 3.10 9,75 8276 633 7643
Tc = 8.32 min., by Equation 32 of Guidelines 5 300 4.58 12,01 4628 300 4528
10 600 321 8,41 6764 600 6164
773 fl. Gutter flow 15 900 2.44 6.40 7143 900 6243
20 1100 1,98 5.20 7354 1200 6154
21= 50.0 For ZZ 25 1500 1.68 4,40 7543 1500 6043
Z2 = 3.5 Type B=1,0 30 1800 1,46 3.63 7715 1600 5915
n= 0.416 Rolled = 3,5 35 2100 1.30 3.41 7888 2100 5188
S= 0,0125 40 2400 1.18 3.09 8079 2400 5679
45 2700 1.08 2.84 8288 2700 5588
. d= 0,3163 ft. FlowWidth 15.8 fl. 50 3000 1.01 2.64 8495 3000 5495
55 3300 0.94 2.47 8874 3300 5374
60 3600 0,88 2.31 8825 3600 5225
A R a Tc Tc total I Qc 65 3900 0.83 2.18 8981 3900 5481
. 2.68 0,16 8.13 4.24 10.56 3.10 8.13 70 4200 0.79 2,08 9201 4200 5001
15 4500 0.77 2.02 9526 4540 5026 •
Qpeak for Case 1= 8.13 cfs 80 4800 0.15 1.88 9919 4800 5119
85 5100 , 0.13 1.93 10233 5100 5133
90 5400 : 0.70 1.83 10292 5440 4852
95 5700 0.68 1.72 10203 5700 4503
CASE 2 100 6000 0.68 1.78 11089 6000 5089
Cese 2 asaumes a Time of Conoentretion less chen 5 minutes so that the "208" TREATMENT REQUIREMENTS
peak flow =.90(Tc=5 intensity)(imp. Area) = 9.75 cfs Minimum "05-413" Volume Required 1,511 cu ft
Provided Treatment Volume 5,266 cu ft
DRYWELL REQUIREMENTS - 50 YEAR DESIGN STORM
So, the Peak tlow ior the Basin is the greater of the two flows, Ma)dmum Slorage Required by Bowstring 7843 cu ft
9.75 cfs Provided Storege Volume 18322 cu fl
Number and Type of Drywens Required 0 Single
1 Oouble
~Y
AS~~ 5
~
~
~ ~ ~ ~s ~r ~■r ~ r n ~ ~ r~ ~ ~ ~ ~ ~ ~ i
Saywers Engineering
Basin Calculation Worksheet
512612005 Imp 0.9
Per 0.15
Shelley Lake 5th Addition
GLA
Basin Total Street Driveways Driveways Houses Houses Total Total Weighted 05-413 Area 05-413 Pond
sf sf # of sf # of sf Impervious Pervious sf Volume (cf)
I1 29~6"6'9I 5~6~ I 3, 2~Z%~0~ 3I 5 4Y0`a ~~3~3n" 1- ~ Q~4 . 909 2,,6~
3 5,400 10,446 - 4 536 1 0.671, 5,046 131 ~
2 14,9821 2,79~61 3 2,2501
. .
3 2~~z~
4 28,769 4,793 41 3,0001 4 7,200 14,9931 13,776 0.54 7,7931 2031
165 819 0 0 0 IMI JY 1fi~6,849 .15 d n
6 ~ 50,713 7,784 4 3,0001 4 7,200 17,984 32,729 0.42 10,784 280
7 4480 _ ,326 ~,2~ 1,5'0'0 2~, 0 g 9,426 3fi.,054 0 3 5,828 152
8 22,1361 4,302 1 750 1~ 1,800J 6,8521 15,8841 0,38 59052 131
13~,3 S 9„p ~ 4 7 2~1'0 1~~a0; 1 t~„ ~0.25 2 0~02 ~ 1
10 ~ 101,565 6,377 0 0 0 0~ 6,317 95,1881 0.201 6,377 166
1 1,898 2,908 2~ ,5~0 3~00 8 fl0~~ 6~8~90 0 55~ ,4~8 1 5I
12 125,9481 10,730 6 4,500~ 6 10,800 26,0301~ 99,918 0.311 15,230 396
1~ aB,Q 9~8 ~ V0 .,6~`~0"0~ 4,14$ 4~3E80 0.33 10,~48~ r74
14 29,220 4,56314r 3,0041 4 7,200 14,763 14,4571 0.53 1,5631 197
1`~ 1 w,%7 8,4~'9 4 3,00 , ~,2~U°98,659 11 5~8 0~25 59~ 298;
16 43,218 2,221 2 1,500 2 3,600 1,3211 35,897 0.281 3,721 97
18 66,179 6,5151 3 2,2501 3 5,4001 14,165 52,014 l 4.31 8,7651 228
NMI 2--' ' 35~400 1.,014 21,8;~~1~ 0.40 5,6 14'$~
32~;~5
C(4th Add) 143,3151 39,333 25 18,750 251 45,0001 103,0931 40,2321 0.69 58,0831 1,511
MOtal~~
1
V~~ ~
~
I
1
~
Post Developed Rainfall not specified
' Prepared by Saywers Engineering
HydroCADOD 7.10 sln 003380 O 2005 HydroCAD Software Solutions LLC 5127/2005
Stage-Area-Storage for Pond 1 P:
Elevation Surface Storage Elevation Surface Storage
(feet) (sq-ft) (cubic-feet) (feet) (sq-ft) (cubic-feet)
2,023.00 9,862 0 2,024.04 12,590 11,682
2,023.02 9,934 198 2,024.06 12,645 11,935
2,023.04 9,986 397 2,024.08 12,700 12,188 .
2,023.06 10,038 598 2,024.90 12,755 12,443
2,023.08 10,090 799 2,024.12 12,811 12,698
2,023.10 10,142 1,001 2,024.14 12,866 12,955
2,023.12 10,194 1,205 2,024.16 12,921 13,213
2,023.14 10,246 1,409 2,024.18 12,976 13,472
2,023.16 10,298 1,614 2,024.20 13,031 13,732
2,023.18 10,350 1,821 2,024.22 13,086 13,993
2,023.20 10,402 2,028 2,024.24 13,141 14,256
2,023.22 10,454 2,237 2,024.26 13,196 14,519
2,023.24 10,508 2,447 2,024.28 13,251 14,783
2,023.26 90,557 2,657 2,024.30 13,306 15,049
2,023.28 10,609 2,869 2,024.32 13,362 15,316
~ 2,023.30 10,661 3,082 2,024.34 13,417 15,583
2,023.32 10,713 3,295 2,024.36 13,472 15,852
2,023.34 10,765 3,510 2,024.38 13,527 16,122
2,023.36 10,817 3,726 2,024.40 13,582 16,393
2,023.38 10,869 3,943 2,024.42 13,637 16,666
2,023.40 10,921 4,161 2,024.44 13,692 16,939
2,023.42 10,973 4,380 2,024.46 13,747 17,213
2,023.44 11,025 4,600 2,024.48 13,802 17,489
2,023.46 11,077 4,821 2,024.50 13,858 17,765
2,023.48 11,129 5,043 2,024.52 13,913 18,043
2,023.50 11,181 5,266 2,024.54 13,968 18,322
2,023.52 11,233 5,490 2,024.56 14,023 18,602
- 2,023.54 111285 5,715 2,024.58 14,078 18,883 .
2,023.56 11,337 5,941 2,024.60 14,133 19,165
2,023.58 11,389 6,169 2,024.62 14,188 19,448
2,023.60 11,441 6,397 2,024.64 14,243 19,732
2,023.62 11,493 6,626 2,024.66 14,298 20,018
2,023.64 11,545 6,857 2,024.68 14,353 20,304
' 2,023.66 11,597 7,088 2,024.70 14,409 20,592
2,023.68 11,649 7,320 2,024.72 14,464 20,881
2,023.70 11,701 7,554 2,024.74 14,519 21,171
2,023.72 11,753 7,788 2,024.76 14,574 21,461
2,023.74 11,805 8,024 2,024.78 14,629 21,753
2,023.76 11,856 8,261 2,024.80 14,684 22,047
2,023.78 11,908 8,498 2,024.82 14,739 22,341 -
2,023.80 11,960 8,737 2,024.84 14,794 22,636
2,023.82 12,012 8,977 2,024.86 14,849 22,933
2,023.84 12,064 9,217 2,024.88 14,904 23,230
2,023.86 12,116 9,459 2,024.90 14,960 23,529
2,023.88 12,168 9,702 2,024.92 151015 23,829
2,023.90 12,220 9,946 2,024.94 15,070 24,129
2,023.92 12,272 10,191 2,024.96 15,125 24,431
2,023.94 12,324 10,437 2,024.98 15,180 24,734 2,023.96 12,376 10,684 2,025.00 15,235 25,039
2,023.98 12,428 10,932
2,024.00 12,480 11,181
2,024.02 12,535 11,431
~~s .
~~,s~~
~
~
l1NDERGROUND SERYICE ALERT • ~ • ~ ~ ~ ~ ~ ~ • ~
- ~ R ~ A ONE CALL NUMBE ~
, ~ . . . . . . . . . . . . .
,
, ~
I CAII TWO BUS(NESS DAYS ' BEFORE ~OU' DfG •
i I ~
I
TIME Of COnICENTRAT10iV ROUTE
.i i I ~ I ' BASlN BOUNDARY . ~ ~ I ~ I I .
i I ~ i I , • ~ I ! ~ ~ I
~ ~ /i \ ' ~ ~ i ~ 1 ~ - ~ ~ / ~ /1 ~ ~ ~ p
1 ~ ` ~ ~f ~ ~ , ~ I r .
. i ~ . , - ~ , . ~ i i ~ ; o ~ . f
~ ~ _ _ 1 I I , , ~ ~ ~~CEy _ ~
~ -r-- _snri ~ g ~ / 41M ' "r~.€__ a . I- ~ z . i ~ ~1lqy ~ ~ r--- _ 'p ~ ~i
~ ~ l ~ ~ ~ ~ ~ ~ " ~ i~ , 1 ~ GRAPHIC SCALE~ „-1 ~ ~ ~ ~ ~ ~ soun+ E o~ n~E aROaa~tr ooN , P1,AT BOUNaART ~ ~ ~ ~
/ ' I ~ TO IAKE HOAtEOYiNERS ~ 2G0 0 100 ~00 ~DO - p-' : : • . . . L . . , SOCIA 6Y STAtl1TORY W Adl~1' o `T. -T r , r"r~
I , DEED R DED UNDER ~ PROP ~ AUO. FILf . 4421769 1 , REZOHE ` \ ~
~ ~ ~ . n~ ~ r ~ , ~ ( ) ~ '
1 inch = 20o ft ~ ~ . ` • A t ~ • ~ `
• ~ ~ _ _ / k , ,
, ~ • Z ~ " ~ o _
/ F ~Ai i . . O I - Q ~ °a' .
. ~ , ,
a iN ~ ~ r ° ~ , W ~ ~ u ( ~ ~ I i • , I ~ Q, 1~~ ~ ~ . ~ ~a
Q ' ~ ~ ~ ( ~ \ ~ ~
I ~f f,, f . ~ ~ ~ ~ ~ Na~+IE. R~ob~ert Heitman, Jr. , ~ , , ~ _ ~
` m»- ~ ~ • ~ i ~i N ~ ~ ~ ADDRE~S: 8225 Narth Division St. , ~ , i, y ~ ~ r ~ r~,~ ~ , r
` _ ` / F• ,I ~ / / PHONE. 509 467'-2123' # ~ I , ~ i ~ i
f' ~ i ~ ~ ~ D ~ I
1 ~ ' \ . ~ ~ ~ i . ~ P T BOUNDARY ~ ~ / i ~ \ / / ~,p~ \ / / ~l
i ry " `s \ / ~ ~ ~ • ~y , ~
~ ~ ~ ~ s~ cor~t ~ ~ ~ ~ . ' ~ ~ -1~ ' ►~w r/~ ~✓_"'t~ ~ • , ~
~ Na.ME. John Saywers ; , ~ ~ ~ ~ ~ - ~ ' + r---------------- - ~ ~
~ I ~ ' I PLAT 80UkDARY' !p ~ . ADDRESS: 327 W~est 8fh kve. Ste. #240 , , , , A,,~~ s,~ cou?~ ~ ~ ' ~ ~ ~ ~ ' - - ~ ~
PHONE 509 744-030fl~ , ' , , ' r' . ~ ~ ~i~ ~ i ~ ~ ~ ~ i ~ ~ ~ ~ ~ ~ ~
I I ia~ , ROTCHFORO ,ACRE TRACTS , ~ ~ I , ~ NK ~ ~
~ ~ F ~a ~ . o ~ sy~ . ~
~ H F . ~ ~ , D~RAW'N BY: E~ K E D BY:
o JOB ~AME: , GLA JFS cn PRE DEVELOPED B~ASIN MAP ~ ~n ► a
~ ~ ' T N; SHELLEY LAKE 5TH ADDITION L~I~A IV n ~ SCALE. _ ~ 1 - 200
~ ~ . o ~ 3s2~a ~ ~ ~F , ~.o ~ ,
DATE F st~~ 5 27 200~5 6 ~ ~ ~ s ~ ~
sr~ ~ 4NAl ~ ~ ~ JOB NU~MBER SWEET 1 OF 1 327 W~st &h Artnue
Suitc N24A S~,WA DESCRIPTION: ~
EXPiRES 518 0~ pRAINAGE P~ANS c~ (509) ?44-0302, Fax •
~ ~ ~ ~
4 ~ . 4 . UNDERGROUNO SERVICE AIERT • , • • , , • •
ONE-CAII NUMBER . ~ ; ' 1/ ~ ~ ~ Y A
~
~ ~ ~ ~ ~ . . . . . . . . ~ .
~ ~cau ~wo eusiaESS oaYS ~ • BEFORE YOU~ 0!G •
~
~ TIME OF CONCENTRAIIQN ROUTE .
~ ,i t I I ! I I ` BASiN BOUNO~ARY ~ I ~ ~
~ i ~ i ~ \ ~ ~ ~ \ ( , ~ ~
1 , /i \ ~ ~ ~
~ I ~ ~ f ~_..p- 1 ~ ~ , ~ ~ ` ! . I i ~ 1 ti i
~ A N ~ ~ 1 , 8 SI C , ~ , ~ i 1 I a , _ . i
~ - , , _ . 4TH ~11 f _ ADD ON } y~ , ~ ~ / ~ - ~ ~w_ ~ ~ - 1 - 7'~Er • ~ . ~ . !'~Kf ~"'--~_9M~uN - f g ~
I. ~ ~1h -r.€__ ~+l. / a ~ r~a ' ~ ~ ~ ~/f"+1 I ' T~`~' \ ~ / Z f
~ 1 1 ' I r ~ GRAPHIC SCALE~ . ~ ~ , ~ , ~ , ~ , . ~ - ~ i \ i p(~AT BOU ARY ~ ~ SOUtH i OF iNE PROPERiY CONY,Et
_ .n_ , ~ 200 0 100 II00 /00 .-e" ~ . • : I-~ - . . L ~ TO . Y UKE H~lEONNFRS / a '~1' ~ r - 50CU1 8Y STAlUTORY WARftAkTY
~ , ~ I ; ~EO OED UNDER ~ ~ PROP ~ B ~ 1 I k / ~ I ~ A MiO. FlLE . 4411769 t
~ ~ ~ ~ ~ ~ ~ / ~ ' D~11 . , o ~ ~ . ~ ~
~ , ~ i snon = zoo t~ ~ ~ ~ ~ / ~ } ~ ~ M _
i . 1 ~ \ ~ ~~i~ . 1 ' ~ ~ ~ ti \ ' \ ~
I i , ~ ' , ~ . 8 ` ~ , z ~ r t , ~ o ~
y ~n ~ ~ ~ F . ~ . ~ " : ~ Q _
Q ! ~ ~ _ ~ Q ~ ~ ~ _ - _ / \ ~ L~ `(Ij
~T ~ ~ ' I w w~ 9OUAV 3 -m ~ ~ > > ' , ' I t ~ ~ ' ! ~ i \ a
Q ~ ~ ~ - ~ ~ . \ ~ l ~ ~ y. ~ e ~ ~ ~ , 1, ►
A , . ~ ~ , i ~ 1 NAME: Rob~ert Heitman, Jr. . I _ ; ~ ~
- ~ - 3 ~ ~ t . , , i n . - ~ 1 - - . . ~ ~ , ADDRESS. 8225 North Div sio St r- r o~ y
~ y ,i PHO~NE 509 467'-2123 ~ ~ ~ ~ " ' ~ ~ , # ~ ~ ~ ~ I ( ~ iii
i ~ ~ ~ ~ i ~ ~ . ~ ' ~ 1 '1 ~ i \ \ ~ ~i i i
~ , z \ , , ` ~ i i ~ ~~y l~ ~ `'~U 7i P T BOUWARY 1 ~ '~7J ' ~ ~ /
. ~ ' ~~r . 7 ~ ~ ~ / . J' ' ~ , ~ ~ ~ ~ i ~ ~ , ~ ~ ~ ~ ~ Q Y ~ /
i ~ ~ ~ ' ' ~ i i ~y _ / ~ Sf CORMER, . ~i i . . , . ~ . / • i ~ ~ . ~ ~~4•~ r~~ ~ ~~t
~ n Sa e~s ~ NaME. Joh yw _ , ~ , j - ~ ~ ~ t i I I - `
V. St . Z4O ~ I T BWNDAFY T ~ ~ AODRE~S. 327 V►~est 8~h A e. e# , , ~ , ~,R ~ ~ ~iTM nv~u~ ~ s _ ~ , ~ ~ / ~ ~ ~ i ~ ~---------------~f--`` ~ ~
PHONE 509 744-0300 ~ , , ~ , , , ~ , 1 ~ ~ , i ~ i 1 ,~Q,1 ~ ~
I ial ; ROTCHFORO ~ACRE TRAC15 ; ~ I I ~UK ~ ~
R q F w~ ~ r 4 Shi ~ ~
~ y ~ o , D~~ AW~N BY: CHECKED . BY:
J08 ~IAME: GLA JFS ~ cn POST DEVELOPED BASIN MAP Z S
~ ~ CA I: SHELLEY LAK~E 5TH A~DITION ~ LO T ~N „ , . SCALE. _ ~ 1 - 200
~ ~ o ~s2~2 ~ qF , , ~ .
c ~ ~ D~ATE, t~ ~STE ~ ersEroveuno ~J `L~ `Z~~'~J . S' , ~
S Ca,~lta~ ~ 4Nbl ~ ~ , JOB NU~(~BER SI~~ET 1 OF 1 3z7 wac 8d► Ave~e .
. Suite #240 ~ , 9pa~c,WA99209 DESCRIPTION: ~
EXPIRES 5 18 06 , DRaINAGE PLANS (309) 44-0300 (AM9) 744-0302' Fa~ ~ ~
1
0
Y ~~p
C1~1T .
~
,
.
~
A
i
/
1
~
.
Riceland Ln
~ E--2nd t~ve
lo
Spr uce ~n :3
E 4th Ave ~ / .
n
~ L
o e,
> ~
~ ~`rk ~o-~-
~
~
S ~e
~ 8th Ave c, ~
~ Q
~
. Q
I 9th Ave
~ ~ X
ro ro +
~ S ITE
~ z E llth Ave
~
"5
~ ~
Q, E 12th- Ave
- ~ ~ S Limerick Dr
L3th AvE . ~
` ~r~
7 + ~
. VI C I N ITY MAP
NOT TO SCALE
. ~
POST-DEVELOPED HYDROLOGIC CALCULATIONS
~
> N ~Cp'
~
~
. u
,
Basin C Pond C
1 .
~
Basin D
Drainage
6In, .~~SubCatr =Reach, ke Diagram for Post Developed c and d .
Prepared by Saywers Engineering 9/1412005
HydroCADra) 7.10 s/n 003380 O 2005 HydroCAD Software Solutions LLC ~
Post Developed c and d Type ll 24-hr 10-year Rainfa11=2.10"
Prepared by Saywers Engineering Page 2
HydroCADOD 7.10 s/n 003380 O 2005 HydroCAD Software Solutions LLC 9/14I2005
Time span=1.00-36.00 hrs, dt=0.05 hrs, 701 points
Runoff by SCS TR-20 method, UH=SCS
Reach routing by Stor-Ind+Trans method - Pond routing by Stor-Ind method
Subcatchment 1 S: Basin D Runoff Area=290;450 sf Runoff Depth=0.21"
, Flow Length=300' Tc=28.4 min CN=67 Runoff=0.59 cfs 4,981 cf
Subcatchment 2S: Basin C Runoff Area=246,398 sf Runoff Depth=0.47"
Flow Length=835' Tc=29.3 min CN=76 Runoff=1.91 cfs 9,570 cf
,
Total Runoff Area = 536,848 sf Runoff Volume =14,551 cf Average Runoff Depth = 0.33"
i »
~
1 -
Post Developed c and d Type ll 24-hr 50-year Rainfa11=2.40"
Prepared by Saywers Engineering Page 3
HydroCADO 7.10 s/n 003380 O 2005 HvdroCAD Software Solutions LLC 9/14/2005,
Time span=1.00-36.00 hrs, dt=0.05 hrs, 701 points
Runoff by SCS TR-20 method, UH=SCS
Reach routing by Stor-Ind+Trans method - Pond routing by Stor-Ind method
Subcatchment 1 S~ Basin D Runoff Area=290,450 sf Runoff Depth=0.32"
~ Flow Length=300' Tc=28.4 min CN=67 Runoff=1.16 cfs 7,643 cf
Subcatchment 2S: Basin CRunoff Area=246,398 sf Runoff Depth=0.63"
Flow Length=835' Tc=29.3 min CN=76 Runoff=2.78 cfs 13,035 cf
Total Runoff Area = 536,848 sf Runoff Volume = 20,678 cf Average Runoff Depth = 0.46"
~ .
~ .
,
Post Developed c and d Type 1124-hr 100-year Rainfa11=2.60"
Prepared by Saywers Engineering Page 4
. HydroCADO 7.10 s/n 003380 O 2005 HydroCAD Software Solutions LLC 9/14/2005
_ Time span=1.00-36.00 hrs, dt=0.05 hrs, 701 points
Runoff by SCS TR-20 method, UH=SCS
Reach routing by Stor-Ind+Trans method - Pond routing by Stor-Ind method
Subcatchment 1 S: Basin D Runoff Area=290,450 sf Runoff Depth=0.40"
Flow Length=300' Tc=28.4 min CN=67 Runoff=1.62 cfs 9,652 cf
Subcatchment 2S: Basin C Runoff Area=246,398 sf Runoff Depth=0.76"
Flow Length=835' Tc=29.3 min CN=76 Runotf=3.41 cfs 15,520 cf
Total Runoff Area = 536,848 sf Runoff Volume = 25,171 cf Average Runoff Depth = 0.56"
~
~
Post Developed c and d . Type 1124-hr 1 0-year Rainfa11=2.10"
Prepared by Saywers Engineering Page 5
HydroCADO 7.10 s/n 003380 O 2005 HydroCAD Software Solutions LLC 9/14/2005,
. Pond C: Pond C
Inflow Area = 536,848 sf, Inflow Depth = 0.33" for 10-year event
Inflow = 2.48 cfs @ 12.29 hrs, Volume= 14,551 cf
Outfiow = 0.65 cfs @ 13.21 hrs, Volume= 8,669 cf, Atten= 74%, Lag= 55.0 min
Primary = 0.65 cfs @ 13.21 hrs, Volume= 8,669 cf
Routing by Stor-Ind method, Time Span= 1.00-36.00 hrs, dt= 0.05 hrs _
Peak Elev= 2,023.50' @ 13.21 hrs Surf.Area=12,442 sf Storage= 5,923 cf
Plug-Flow detention time= 266.7 min calculated for 8,669 cf (60% of inflow)
~ Center-of-Mass det. time= 119.9 min ( 1,042.8 - 922.9 )
Volume Invert Avail.Storaqe Storaqe Description
_ #1 2,023.00' 45,706 cf Custom Stage Data (Prismatic)Listed below (Recalc)
Elevation Surf.Area Inc.Store Cum.Store
(feet) (sq-ft) (cubic-feet) (cubic-feet)
" 2,023.00 11,097 0 • 0
- 2,024.00 13,769 12,433 12,433
2,025.00 16,597 15,183 27,616
_ 2,026.00 19,583 18,090 45,706
Device Routinq Invert Outlet Devices ,
#1 Primary 2,023.50' 1.00 cfs ExfiItration X 2.00 when above invert
~
nmary OutFlow Max=2.00 cfs @ 13.21 hrs HW=2,023.50' (Free Discharge)
1=WiItration (Exfiltration Controls 2.00 cfs)
,
~ Post Developed c and d Type 1124-hr 10-year Rainfa11=2.10"
Prepared by Saywers Engineering Page 6
HvdroCAD@ 7.10 s/n 003380 O 2005 HydroCAD Software Solutions LLC 9/14/2005
~ Pond C: Pond C
Hydrograph
~ ~ i • i ~ E t ~ ~ _ ~ ~ a ~ . ~ ~ ~ t . ~ . i r ~ ~ ~ ~ . ' ' ~ ~ .
1 I ! • i ~ F 3 I i i , I I. I 1 ~ ! ! 1 I 1 1 1 1 I ~ 1 F I I 1 I
■ Inflow
Primary
I 1 I f I I E 's..~[Sr,,,,,,Y1~,.k~ I t f t 1 f~[ 1 F ! I I f ' 1 ! ! 1 ! f 1 I
1 1 I i S 1 I 1 1 1 I E I 1 1 1 1 1 ~
'Ared=53t i6,i48 ~f
8, , i i
I 1 F ! ~ ! I I i ~ I ! 1 I 3 ! 1 I I ! I I f f 1 I 3 i ( .
1 ) t i I I I I ~ i I i I ~ ~ 1 I t i i
. ~ - 1... ~.i.- ~ ..i 1 1 _ 4.. 1.. ~ .1 - i- -t- -E - -1 _ ~ea1c.~ E lea~-=~2r02~ ~5~Q~
1 i I ! i ! 1 I 5 I I : 1 I ! I ! e I 1 I i t ~
z-- ~E~,~,, „►,~~,~~„~to~ag~e=~923~f
i i~i
i r i f i ~ t t t t i ~ a i E ~ t ~ ~ f 1 i ~ t t ! i i I E ~ t t
' 1 I 1 I f i I t t f 1 t l 1 1 ~ I f ! i 1 I ! I 1 I I I i i V I
! 1 ~ i I i { 1 1 t E t i i ! I ~ ' 1 1 ~ ~ ~ 1 i I I I i . !
~ i I i I F ? I 1 3 1 ~ E i I 1 ! ~ i ~ ~ ! I 1 ! 1 t ~ I I E i !
i I 1 I E i 1 ! { 1 t I ~ t t i i F ~ ! 1 7 1 1 ~ I 7 3 !
v I f i ! 1 . 1 ! 3 I 1 3 ! 1 t ! ~ I . I I I 1 i I I 3 I 1
• I I 1 I 1 i I I i f 7 1 i I i I 1 I i I 1 t i F I 7 i 1 1 I k !
T ~ 1 1 1 I I 3 I t i I E i ~ e I i I : 3 1 I I i 1 i i 1 1 f . 1 I
LL ~ i 1 i I 1 i ! 1 I 9 k 1 I ! 1 I I . i 1 1 f I 1 I B 1 1 1 3 I I
' I I i 1 I ! 1 I 1 t 1 1 ! i ! 1 ~ 1 I 1 I I ( 1 ~ 1 1 + { t 1
_ 1 I f 1 I I I 1 . 9 1 1 I 1 1 1 ~ I i I f I 1 1 1 1 f f 1 1
i i i t t i i i I ~ t 1 I t ~ ~ E t I I i t I I ( I I ~ F 1 I
! 1 1 I 1 1 1 ! i I I I 7 1 E i I I 1 I 1 I k 1 I i 1 I I
6~5 .
1 1 f t I I ! f 1 I ! 1 I ! 9 1 I i i I 1 I ! I I 3 1 S 1
1 1 f f I 1 t f 1 F i ! 1 F I 1 l 1 I I . 1 I I 1 i 1 I
. i I 1 i i I 1 I I i I I I I 8 I I 1 ! I 1 I 1 1 I 1
, I I I 1 1 ( 1 a [ 1 1 ! 1 1 3 1 1 1 ! ! I I 1
i I ( t I I 1 ~ 1 1 3 ~ ~ ~ I ' I ( #
1 1 I i ~ 7 7 ! 1 1 i I
i
• ` / / ' /
0 ~
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 1920 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36
Time (hours)
. Pond C: Pond C
, Siage-Area-Storage
Surface/HorizontAtNYetted Area (sq-ft)
0 2,000 4,000 6,000 8,000 10,000 12,000 14,000 16,000 18,000 ■ Surface
~ ■ Storage
1 1 I 1 ~ I ! 1 ! 3 I i I E 1 !
2,026 t E ' a f 1 I t
E F t I i i ! 1 i i I 4 ! 1 ~ I i
- I 1 I{ I ~ i I 7 1 I . 1 1 ~ 7
I 1 I I 1 I 1 ~ I i 1 ! 1 t I 1 I
~ . , ~ j I i I 1 i I i I t ( t F ! 7 I
t i ~ ! i t k I . I ~ i ~
i i t 3 . I i ( E ~ t ~ i ~ ~
!
1 I i i 1 1 t 1 i i I { ~ I ' 1 i
~ • _ _ ~ _ t t_ - ~ - - i_ t.~ _ _ _ ~ ~ - -I - -t ~ ~ - - ~I - " - - - ^ - r - ~ 'i _ _ T ~ F, _ _ ~ _ r
~ f{ i! 1 ~ 1 1 1 I ~ ! ' 1 . T i I
i . F e 1 E I I 3 I ~ i ~ ? I 1 i
2.025- F F c ~ ! 3 I 1 f 1 1 I 1 ~
~ : i t 4 { 1 ~ 1 1 f : 1 i
i i F t 1 1 I i I I i i
~ , 7 i 1 1 1 ! I I 1 l I i ~ 1 {
O 1 1 1 f I I i i i I 1 f I
1 1 T
--tr- -rr--_ -l--.-- -r-~----i--,-- ~ i i
t'-^'f ° ~ -r-- -
w
2,024- '
' f i I I 1 I . i t ~ 1 x ! ~ ) 1 i
- i! I L I 9 I ~ 3 ~ f ! ! .
~ / ♦
. , ~
2,023- - . . .--f••r•~ .
. 0 5,000 10,000 15,000 20,000 25,000 30,000 35,000 40,000 45,000
Storage (cubtc-feei)
Post Developed c and d Type 1124-hr 10-year RainfaN=2.10"
Prepared by Saywers Engineering Page 7
HydroCADO 7.10 s/n 003380 O 2005 HydroCAD Software Solutions LLC 9/14/2005
Stage-Area-Storage for Pond C: Pond C
Elevation Surface Storage Elevation Surface Storage
(feet) (sq-ft) (cubic-feet) (feet) (sq-ft) (cubio-feet)
2,023.00 11,097 0 2,025.65 .18,538 39,035
2,023.05 11,231 558 2,025.70 18,687 39,965 '
2,023.10 11,364 1,123 2,025.75 18,837 40,904
2,023.15 11,498 1,695 2,025.80 18,986 41,849
2,023.20 11,631 2,273 2,025.85 19,135 42,802
2,023.25 11,765 2,858 2,025.90 19,284 43,763
2,023.30 11,899 3,449 2,025.95 19,434 44,731
2,023.35 12,032 4,048 2,026.00 19,583 45,706
2,023.40 12,166 4,653
2,023.45 12,299 5,264 .
2,023.50 12,433 5,883
2,023.55 12,567 6,507
2,023.60 12,700 7,139
. 2,023.65 12,834 7,778
2,023.70 12,967 8,423
2,023.75 13,101 9,074
2,023.80 13,235 9,733
2,023.85 13,368 10,398
2,023.90 13,502 11,069
2,023.95 13,635 11,748
2,024.00 13,769 12,433
2,024.05 13,910 13,125 2,024.10 14,052 13,824
2,024.15 14,193 14,530
2,024.20 14,335 15,243
2,024.25 14,476 15,964
2,024.30 14,617 16,691
2,024.35 14,759 17,425 •
2,024.40 14,900 18,167
2,024.45 15,042 18,915 "
2,024.50 15,183 19,671 2,024.55 15,324 20,434
2,024.60 15,466 21,203
2,024.65 15,607 21,980
2,024.70 15,749 22,764
2,024.75 15,890 23,555
2,024.80 16,031 24,353 2,024.85 16,173 25,158
2,024.90 16,314 25,970
2,024.95 16,456 26,790 2,025.00 16,597 27,616
2,025.05 16,746 28,450
2,025.10 16,896 29,291
2,025.15 17,045 30,139
2,025.20 17,194 30,995
2,025.25 17,344 31,859
2,025.30 17,493 32,729
2,025.35 17,642 33,608 _
2,025.40 17,791 34,494
2,025.45 17,941 35,387 '
2,025.50 18,090 36,288
2,025.55 18,239 37,196 . ,
2,025.60 18,389 38,112 .
-Post Developed c and d Type ll 24-hr 50-year Rainfall=2.40"
Prepared by Saywers Engineering Page 8
HydroCAD@ 7.10 s/n 003380 O 2005 HydroCAD Software Solutions LLC 9/14/2005
~ Pond C: Pond C
Inflow Area = 536,848 sf, Inflow Depth = 0.46" for 50-year event
Inflow = 3.92 cfs @ 12.28 hrs, Volume= 20,678 cf
Outflow = 2.00 cfs @ 12.55 hrs, Volume= 14,795 d, Atten= 49%, Lag= 16.3 min
Primary = 2.00 cfs @ 12.55 hrs, Volume= 14,795 cf
Routing by Stor-Ind method, Time Span= 1.00-36.00 hrs, dt= 0.05 hrs
Peak Elev= 2,023.51' @ 12.63 hrs Surf.Area=12,471 sf Storage= 6,060 cf
Plug-Flow detention time= 185.8 min calculated for 14,795 cf (72% of inflow)
Center-of-Mass det. time= 70.1 min ( 979.6 - 909.5 )
, Volume Invert Avail.Storaqe Storage Description #1 2,023.00' 45,706 cf Custom Stage Data (Prismatic)Listed below (Recalc)
Elevation Surf.Area Inc.Store Cum.Store
(feet) (sq-ft) (cubic-feet) (cubic-feet)
2,023.00 11,097 0 . 0 .
. 2,024.00 . 13,769 12,433 12,433
2,025.00 16,597 15,183 27,616
2,026.00 19,583 . 18,090 45,706
Device Routinq Invert Outlet Devices
#1 Primary 2,023.50' 1.00 cfs ExfiItration X 2.00 when above invert
rimary OutFlow Max=2.00 cfs @ 12.55 hrs HW=2,023.51' (Free Discharge)
1=Exfiltration (Exfiltration Controls 2.00 cfs)
Post Developed c and d Type 1124-hr 50-year Rainfal1=2.40"
Prepared by Saywers Engineering Page 9
HydroCADO 7.10 s/n 003380 O 2005 HydroCAD Software Solutions LLC 9/14/2005
Pond C: Pond C
Hydrograph
4 I. t 7 1! I.. I~ 1 I I 1 I t I I 1 t k 1 1 f I I t I 1
■ Inflow
a - -4 - I- - 0 Pllfil3
3.92 n+l
lo~ I E i I 1 I I I ! ~ I 1 ~ ~ ! e ~ -
4 Infl6~rt;Ar00=53§,84$ Of;
I 1 • ~ { ! I I I i I E i 1 I 1 i I ! ~ I I ! ! I 1 6.2 E ~ i
Pe~kt ~ Ele~r=2: 3:51 ~ -
-t_ -i- -i 1 _ L _ L _L _I _ ,
1 I 1 E i 1 I I I I 1 1 S I 1 1 I ~ I 1 1 1 ~
~toi~a~e=6,060 1~f
I i i 1
3 I I ! E I 1 I 1 I 1 1 i i i I 1 1 ! : ! f I ~ ; e { 7,
1 1 7 f 1 I I 1 ~ ~ 1 t 3 ~ ~ 1 1 3 ~ ~ I I i I 1 1 I t, i ~ 1
! I 3 6 1 1 I I 1 t 1 1 i 1 I I 1 3 1 I I 1 1 I I I 1 1 3 I 1
I I ~ t t I I I ~ ~ I ~ i t ~ I 1 i I t i I I ~ ~ ~ ~ t I i i
^ i I i 3 I I I 1 I I I ! I ! I I 1 ! i t t I 1 4 t 1 I 1 I I 1 I
i t t I i i 6 ~ 1 1 i E F 3 S + ~ ~ ~ B ~ 1 i ~ t f f I I ~ I 1 I
J2 ' r-1--~_ -1_1_T_r -r-i-1--i°q--T-f-,-i--i_7_-1_r_r_
2.00 C~ 1 f i f° 1 1 1 I f ~ i 4 1 i ~ . ~ f E E ~
; i f I 1 I F I i ~ I 1 I i [ ! 1 I I 1 I i ~ I I i i i E P i i
O 2
~ D I 1 1 i 1 E 1 ! 1 1 1 I . 1 1 I I 7 I { 7 1 I E ! { 1 l i !
! I 1 ' E . 1 I 1 i 1 E I 1 I 1 ( ~ 1 i i' ! ! ! I 1 i i i I
3 I 1 ~ I E ~ I I i ~ I 1 I . € I i I t ! I I i i I ! 1
' ~ ~ i E i ~ 1 1 I ~ - . I ~ I ~ F ~ i I 1 7 3 I 1 1 I f I
~ I 1 i t . 1 3 I 1 I . . i I I i 6 i I I E i i I I i I I 1
1 I j I 1 I 1 F i ~ I I 1 ° i I I ! i { 1 1 1 I 1 ~
~ 1 i E ! 1 i I I i 1 ! 1 { 3 9 I I ~ 3 f E 1 1 1 I 1 I
I 1 1 E 1 i i I 1 I 1 E ~ ~ I 1 I i ! 1 1 1 I 1 1
~ I 1 { ~ 1 t i I 1 I i i ! 9 I 1 I I 1 i .
e I 1 1 1 1 1 ~ 1 1 1 f
0
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36
Time (hours)
Pond C: Pond C ~
Stage-Area-Storage
~
, SurfacelHorizontalMletted Area (sq-ft)
0 2,000 4,000 6,000 8,000 10,000 12,000 14,000 16,000 18,000 ■ Surface 11
N Storage
? 3 1 I E B ! 1 f I 1 } i I
1 1 f i I I F ! 1 1 I I ~ I I i I t
2,026 1~ I I ~ t I I I ~ I 1 3 ~
1 1 i ~ 1 1 . i 1 I 1 ~ 3 I ! ! I
! 3 I I I I I I . 1 I i I i 1
j~ i i { I ~ ~ 1 I I 1 I I 1 1 1
i! I f f 1 ! j i I 1 i i I 1 I 1
i 1 1 l ! 1 I i i I ! I I ~ ~ I I
f ~ 1 i I i 1 I 1 { I 1 I I
i I I I I I 1 1 1 1 I I ~ I 1
_yi.....m....e._r.r__._
~ a I ~ 1 I t ! E ~ E 1 ! I I t
'Zro'1CJ-' I I ~ e I I { ! ~ k i I ~ ~ 1 1
^ ~ I~ I I ` . I I i 3 I 3 : I ~
~ , i, I 1 I I I ! e i ! I i 1 ~ ;
~ i E 1 f I 6 ~ I ~ I ~ I ~
~
i t 1 1 7 f ! i I i 3 1 ! I ! I I
~ I i i 3 f ! ! • I I ! 1 1 f I I !
. O i ~ I t ! . I 1 ! I I F i I f
~ ~ 1 I = ! ? ? m I i W 1 ! _ ` 1 _ - _ _ ! i _ I
~ - • _ - _ ~ _ _ ~ _ _ ~ 3_. _ ..1 ~ _ ~ ...3 ~ .P " ' ! _ _ "y ~ r.. ~ ~ _ T. r ~
E F ~ I i i I I f 1 1 f 1 I ~ I f
W
2.024' 11 ~ t ~ ; I I 1 ~ ~ ~ i i I
. I! i ~ t I 1 ! I ~ I i . I I
~ i i ~ i 1 1 ' 1 1 I 1 I ! 1 { 1 I I
I( ~ I 4 . I I i t I a f I
~ 0 J i I 1 I 1 ~ ; I 1 I i I ! ~ t 1
I 1 I f 1 I i 1 I 1 ! 1 I i ~ I 1
I 1 f 1 1 1 i I ~ I 1 ! 1 I 1 { 1 1
I ~
/ i . . I
2,U23 • J-, ~--r--f-~.--' '--~r-' 1 .
0 5,000 10,000 15,000 20,000 25,000 30,000 35,000. 40,000 45,000 '
Storage (cubic-feet) ~
Post Developed c and d Type 1124-hr 50-year Rainfa11=2.40"
Prepared by Saywers Engineering Page 10
HydroCAD4 7.10 s/n 003380 O 2005 HydroCAD Software Solutions LLC 9/14I2005
'Stage-Area-Storage for Pond C: Pond C
Elevation Surface Storage Elevation Surface Storage
- (feet) (sq-ft) (cubic-feet) (feet) (sq-ft) (cubic-feet)
2,023.00 11,097 0 • 2,025.65 18,538 39,035
2,023.05 11,231 558 2,025.70 18,687 39,965
2,023.10 11,364 1,123 2,025.75 18,837 40,904 -
2,023.15 11,498 1,695 2,025.80 18,986 41,849
2,023.20 11,631 2,273 2,025.85 19,135 42,802
2,023.25 11,765 2,858 2,025.90 19,284 43,763
2,023.30 11,899 3,449 2,025.95 19,434 44,731
- 2,023.35 12,032 4,048 2,026.00 19,583 45,706 -
2,023.40 12,166 4,653 2,023.45 12,299 5,264
2,023.50 12,433 5,883
2,023.55 12,567 6,507
2,023.60 12,700 7,139
2,023.65 12,834 7,778
2,023.70 12,967 8,423
- 2,023.75 13,101 9,074 . 2,023.80 , 13,235 9,733
2,023.85 13,368 10,398
2,023.90 13,502 11,069
2,023.95 13,635 11,748 2,024.00 13,769 12,433 ,
2,024.05 13,910 13,125
2,024.10 14,052 13,824
- 2,024.15 14,193 14,530
2,024.20 14,335 15,243
2,024.25 14,476 15,964
- 2,024.30 14,617 16,691
2,024.35 14,759 17,425
2,024.40 14,900 18,167
2,024.45 15,042 18,915
2,024.50 15,183 ' 19,671
~ 2,024.55 15,324 20,434
2,024.60 15,466 21,203
~ 2,024.65 15,607 21,980
2,024.70 - 15,749 22,764
2,024.75 15,890 23,555
2,024.80 16,031 24,353
2,024.85 16,173 25,158 2,024.90 16,314 25,970 ,
' 2,024.95 16,456 26,790
2,025.00 16,597 27,616
- 2,025.05 16,746 28,450
_ 2,025.10 16,896 29,291
2,025.15 17,045 30,139
2,025.20 17,194 30,995 . 2,025.25 17,344 31,859
2,025.30 17,493 32,729 2,025.35 17,642 33,608
2,025.40 17,791 34,494
2,025.45 17,941 35,387
2,025.50 18,090 36,288
2,025.55 18,239 37,196 .
2,025.60 18,389 38,112
Post Developed c and d Type ll 24-hr 100-year Rainfa11=2.60"
Prepared by Saywers Engineering Page 11
HydroCAD@ 7.10 s/n 003380 O 2005 HVdroCAD Software Solutions LLC 9/14/2005
Pond C: Pond C
Inflow Area = 536,848 sf, Inflow Depth = 0.56" for 100-year event
- Inflow = 5.02 cfs @ 12.27 hrs, Volume= 25,171 cf
Outfiow = 2.00 cfs @ 12.45 hrs, Volume= 19,289 cf, Atten= 60%, Lag= 10.7 min
Primary = 2.00 cfs @ 12.45 hrs, Volume= 19,289 cf
Routing by Stor-Ind method, Time Span= 1.00-36.00 hrs, dt= 0.05 hrs Peak Elev= 2,023.60' @ 12.73 hrs Surf.Area= 12,698 sf Storage= 7,129 cf
Plug-Flow detention time= 155.2 min calculated for 19,289 cf (77% of inflow)
- Center-of-Mass det. time= 55.0 min ( 957.4 - 902.4 )
Volume Invert Avail.Storaqe Storaqe Description
#1 2,023.00' 45,706 cf Custom Stage Data (Prismatic)Listed below (Recalc)
Elevation Surf.Area Inc.Store Cum.Store (feet) (sq-ft) (cubic-feet) (cubic-feet)
- 2,023.00 11,097 0 0 2,024.00 13,769 12,433 12,433
2,025.00 16,597 15,183 27,616
2,026.00 19,583 18,090 45,706 Device Routinq Invert Outlet Devices ,
#1 Primary 2,023.50' 1.00 cfs ExfiItration X 2.00 when above invert
Primary OutFlow Max=2.00 cfs @ 12.45 hrs HW=2,023.54' (Free Discharge)
t-1=ExfiItration (ExfiItration Controls 2.00 cFs)
~
Post Developed c and d Type ll 24-hr 100-year Rainfa11=2.60"
Prepared by Saywers Engineering Page 12
HydroCADO 7.10 s/n 003380 O 2005 HydroCAD Software Solutions LLC 9/14/2005
Pond C: Pond C
Hydrograph
~ ~ ~ ~ ~ ~ ~ • ~ ~ ~ ~ ~ ~ ~ ~ E, ~ ~ ~ 3~ ~ ~ ~ ~ ~ ■ Inftow 11
0 Prima
';5::U2 cfs~
f-r°i-.~_'t_'t_f."r-r_~__._i_~-~s-r-r•-r-i°-~--~-z-r1°r- ry
I 1 I t I I 1 1 t ~ I I 1 ~ ' ! !
5 ~ ~
~~flb~r ;ArOa=5P6,848 of
f 1 1 E 1 1 I t t i 1 i 1 I . 1 7 1 I 3 I I 3 i t 1 I 1 3 I I
I 1 1 E f P I ~ i t ; ; I i ! 4 1 t t Q I Q~/ ~/'~■I/~ A
1_: J_ _..1. _ L. _t~+t-!~J
1 ! ~
' 1 I I ! t I 1 1 1 3 ! 3 1 I ~ 1 I I f 3 ! I i "7 N .
' ~ i ! i ~ ! I i 3 ! ~ 1 i t 1 f 1 I ~ ~~to~a~e^ I~', 29 f
4- 1 ' 1 ! E 1 I 1 I 3 1 1 ! 1 f I B 1 I i . I 1 3 i 1 1 ! E i
i F f~•~~~ 1 I i i i 1 E i i t ~ i I~ i~~ p I I 1 1 I
I 1 f i 1 1 I I I 4 1 I 1 1 i i 1 i 3 I I 1 I I 3 1 1 I ! I !
_.i_. -e _i - v - 4• - I° -I~ -i - -t + - r _ r• --i_ -s - 1 - r f° -r - t-• -t - -S - 7 ° t - r - r -i- -i- y - -t - r - r - .
~ I I I 1 ! ' I ! ! 1 E t { 1 I t I i I 1 ! 3 1 1 ' I I i 1 I 1
~ 3_ ~ ~ ! E 1 1 I I e { I ! ` ~ i I 1 f 3 ! 1 1 1 ? i 1 I 1 i t i '
1 I ~ . I 1 1 I ~ 1 1 I ~ 1 ! 1 i i . i 1 t t ~ 1 ~ ~ I ~ i
~ I ~ 1 7 i I 1. 1 3 I I ( t . ! I 3 ! ! I 1 i i I I I i : ! 1 I
i_ j_i ~-~-`--L-~--~--I_ a_ E 1 t
U. ~~-~r _~--f_ 3 [ M I i ~ I~f 1 1 E I I 1 1 i ~ 1 1 I 1 I I I I 1 i+l I
~ ~ ~ i 3 1 I 1 00 C~~~+ I f 1 1 5 i I I 1 1 E 1 1 ~ i I t I I 3 i I I
2 1 I 1 I I I 1 ~ • I 1. I I 3 f I I t I ! 1 1 3 i ! i 1 I 3 i 1 I
I I i I t 1 1 ! i i ~ ! 1 I E E f 1 1 1 ~ I 1 1 I 1 I 1 I
1 I~ i 1 I 1 t i ~ 3 t ~ I~! t i I I i ~ i t i i! t i
~•-r-~---~-~-•r-r-r-r-i
-
~ I I ! ~ i I I i 1 ! ! 1 1 1 1 I 3 I ! 1 1 ( ! 1 I i f 1 !
1 I I I I I i i I 1 I 1 1 I . i I I ! 3 i t !
I 1 1 I I ! I 3 1 . 1 i 1 1 ! I I 1 I
" E ! ~ I 1 1 t i I 1 { i
i i
/ • / /
, ~ i • i i ' . . / ~ i i / . ,
O ~ , . .
1 2 3 4 5 6 7 6 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36
Tfine (hours)
Pond C: Pond C
Stage-Area-Storage
SurfacelHorizantalNVetted Area (sq-ft)
0 2,000 4,000 6,000 8,000 10,000 12,000 14,000 16,000 18,000 ■ Surface ~
~ ■ Storage
t 1 t j I 1 I t i 1 ~ 1 i 1 4 E 1
1 ~ E~ I ! ~ ~ ~ 1 1 I t i ' I I I
2.026-
. i f 1 ~ 1 I . I 1 1 1 I 1
1' 1 E 1 1 ~ 1 i 1 i I 7 ! E 1 1
t t t E 1 I ~ { 1 i i i l 7 ~
! t t 1 I i { i I 1 i I 1 I ~
!t I i I 1' F 1 i I t I 1 I 1
11 F i ! 1 1 I i ! I : I ' ! 1 1
2,0Zi'J I I ~ I t ~ i t ~ ~ i I t 1 f I
~ 1 I 3 I ~ i E I ~ 1 ~ 1 I ~ l ~ ~
C ~ I i 1 1 I I I I 1 I 1 I ~ I f
O 1 I 1( I ! P ! 1 I 1 I ~ I i
_T_1~_...~_...1..._
1( T i 1 I I t ! I 1 ' 1 I I 3 I I
W
2,024 i i t I ~ I I 1 • ! I ~ I ! i
~ i I I 1 ! t 1 1 E ! 1 ( ! 1
? 3 0~ 1 I ! 9 I ! 1 E 1 I I e 1 1
7~ 3~ I ~ I . f ! 1 I I ! ~ I ~
i~ 1 I ! ! i i I I t 1 1 I
3~ i f I I ~ 3 I i i 3 1 ( 1 1 f
I i I I 1 I 1 f 1 ! 1 1 i r ~ ~
~ ~ i i I 1 I I 1 f i f 1 4 i t 1 ~
i i
. / ~
2,023 ~r"'r'~"''"rf • . ,
0 5,000 10,000 15,000 20,000 25,000 30,000 35,000 40,000 45,000
Storage (cubEc-feet)
Post Developed c and d Type ll 24-hr 900-year Rainfa11=2.60"
Prepared by Saywers Engineering Page 13
HydroCADO 7.10 s/n 003380 O 2005 HydroCAD Software Solutions LLC 9/14/2005
Stage-Area-Storage for Pond C: Pond C .
Elevation Surface Storage Elevation Surface Storage
(feet) (sq-ft) (cubic-feet) (feet) (sq-ft) (cubic-feet)
2,023.00 11,097 0 2,025.65 18,538 39,035
2,023.05 • 11,231 558 2,025.70 18,687 39,965
2,023.10 11,364 1,123 2,025.75 18,837 40,904 `
2,023.15 11,498 1,695 2,025.80 18,986 41,849
2,023.20 11,631 2,273 2,025.85 19,135 42,802
2,023.25 11,765 2,858 2,025.90 19;284 43,763
2,023.30 11,899 3,449 2,025.95 19,434 44,731
2,023.35 12,032 4,048 2,026.00 19,583 45,706
2,023.40 12,166 4,653
2,023.45 12,299 5,264
2,023.50 12,433 5,883
2,023.55 12,567 6,507
2,023.60 12,700 7,139 2,023.65 12,834 7,778
2,023.70 12,967 8,423
. 2,023.75 13,101 9,074 2,023.80 13,235 9,733
2,023.85 13,368 10,398
2,023.90 13,502 11,069
2,023.95 13,635 11,748 .
2,024.00 13,769 12,433 2,024.05 13,910 13,125
2,024.10 14,052 13,824 ,
2,024.15 14,193 14,530
2,024.20 14,335 15,243 2,024.25 14,476 15,964
2,024.30 14,617 16,691
2,024.35 . 14,759 17,425
2,024.40 14,900 18,167
2,024.45 • 15,042 18,915 2,024.50 15,183 19,671
2,024.55 15,324 20,434
2,024.60 15,466 21,203
2,024.65 15,607 21,980 2,024.70 15,749 22,764
2,024.75 .15,890 23,555
2,024.80 16,031 24,353
2,024.85 16,173 25,158 ,
2,024.90 16,314 25,970
2,024.95 16,456 26,790
2,025.00 16,597 27,616
2,025.05 16,746 28,450
2,025.10 16,896 29,291
2,025.15 17,045 30,139
2,025.20 17,194 30,995
2,025.25 17,344 .31,859
2,025.30 17,493 32,729 2,025.35 17,642 33,608
2,025.40 17,791 34,494 2,025.45 17,941 35,387
2,025.50 18,090 36,288
2,025.55 18,239 37,196
2,025.60 18,389 38,112
T~pNS
CA
LIc
K~ .
~
'
Scenario: 50 Year. System Report
Lebel Jpstreambownstrean Length Section ;onsUucted Average Jpstream )ownstrean Average Additiona Total HydraulidHydraulic Rim
Node Node (ft) Size Slope Velceity ' InveR Inveri Pipe Flow System Grade Grade Elevation
2
(Rlft) (ftJs) Elevation Elevatlon Cover (cfs) Flow Line In Line Out (ft)
~,I
(ft) Ia? (R) (Cfs) (ft) (ft)
C81 , 1.29 1.29 2,038.54 2,038.52 2,038.66
P-1 CB 1 CB 2 15.00 12 inch 0.016667 1.64 2,036.76 2,036,51 0,95 1.29 2,038.52 2,036.51
Cg 2 3.29 4.58 2,038.51 ,038.35 2,038.51 P-2 CB 2 CB 3 27,00 12 inch 0.010000 5.83 2,036.51 2,036.24 1.13 ' 4.58 2,038.35 ,038.09
CB 3 - 4.23 8.81 2,038.09 ,037.69 2,038.51 r~Z
P-3 CB 3 CB 4 82.00 15 inch 0.008537 7.18 2,036.04 2,035.34 1.96 8.81 2,037.69 ,036.79
CB 4 ' 1.18 9.99 2,036.79 ,036.46 2,039.28
P-4 CB 4 CB 5 134.00 18 inch 0.010448 6.06 2,035.24 2,033.84 3.96 9.99 2,036,46 ,035.74
Cg 5 5.03 15.02 2,035.74 ,035.15 2,040.71
. .
P-5 CB 5 POND C 213.00 18 inch 0.045728 12.66 2,033.74 2,024.00 2.49 15.02 2,035.15 ,024.76
POND C . 15.02 2,024.76 ,024.76 2,025.00 ,
f
Title: Shelley Lake 4th Addition Project Engineer. Gianna Adams
StormCAD v4.1.1 (4.2013J
c:l...ldocumerltlstorm line c.stm ' Pa e 1 of 1
09/14/05 04:12:47 PM ~ Haestad Methods, Inc. 37 Brookside Road Waterbury, CT 06708 USA +1-203-755-1866 9.
Profile Scenario: 50-Year
2,042.00
i~ ~ R m: 2A 928 R~---y~ ; Rfm: 2,038.68 fl
Labe19ump:2A3626ft 2,040A0 ,
LabeI:CB5 RIm:2A~~1fl
Rim:2,040.71 I Sump;2A .01 ft
Sump:2,0332~ N 2,038A0
2,038.00
La~1:C83 (
I~ / Ri~:2,o3e.s1 n ~
sJa►a- 2.oV; -5 4 u -Lab-l:,.-, ; 2,034.00
lsbel: P-0 La I: P-3 Up. hvert 2,036.76 ft
Up Invert 2p35.24 ft Up. vert 2,036.04 ft Dn. knuert 2,038.51 ft Eleva6on (ft)
~ Dn. Invert 2,033.84 ft Dn. oeR 2,035.34 ft 1;A5A0-tt : 2,032.00
-C:134-OII`tt . 001- Size;l2irtch ;
. Size:181nch Size 151nch ~ 5:0.018667MI1
S: 0A10448 NR S: 0 08537 Nft
1,030.00
Lebel: P-2 ~
Up. fnveR 2,036.51 dl ~
Dn. Invert 2 A36.24 2,028.00
L:27.OOR ( .
Size;l2inch ,
~ p.belnvert 2,033.74~it S; 0A10000 Ntt 2,026A0
- ~ L•213.OOfl
. Size:18 inch
• ~ S: 0A45728 Ntl
2,024.00
,
Label: POND C ~
Rim: 2,025.00 ft , Sump:2A23.00ft i ` 2A~.00
Or00 0+50 1~00 1+Sp 2+00 2+50 3+00 3+50 4+00 4+50 5+00
Smdon (ft)
Proj
TfUe: Shelley Lake 4th Addition ect Engineer. Gianna Adams
StormCAO v4.1.1 (4.2013]
c:1...ldocumentlstorm line c.stm Page 1 of 1
09/14105 04:19:04 PM 0 Haes~ad Methods, Inc. 37 Brookside Road Waterbury, CT 06708 USA +1-203-755-1666 .
_ TI~N~
~~L~►
p CAL
~p ~
~ .
Pond C Rip Rap Calculations
Pipe Diameter = 18 inches
Flow Velocity = 12.68 ft/sec _
Flow Quantity = .15.02 cfs
Tailwater Depth = - 1.76 ft
D50 = 0.28 ft. 3Do = 4.5 ft
Q factor based upon Tailwater Depth 1.8Q or 3Q = 45.1 cfs
La = 35.0 ft
W=3Do+0.4La= . 18.5ft
Minimum Rip-Rap I'Ulat Thickness = 1.0 ft
Minumum Stone Diameter = 8 inches
,