Loading...
27694 DRAINAGE TECHNICAL REPORT ~ ~ INLAND PACIFIC ENGINEERING, INC. - ~ r R s i I I ~ ~ r I ~S ` ~S ~ ~l rt~ OF~y~ Fs4+Ir~1L ~LIr Lx-~CUM"EAry! •~r Sp~`~IE ~~~~~ITY ~.€~GI~~~i ' • ~4L ~ ~~~~~CT # ~ ~ ~ G OU I5M *-F-R. 7~+ I ~_1 ~ ~ SPOICAh1E * COElJR D'ALENE \J J ` ' t ♦ DRAINAGE TECHNICAL REPORT for the TURTLE CREEK SECOND ADDITION PLAT OCTOBER 1998 QpR~VE4 ~ SPO E COUNTY EI~tG. W.O. No. 98389 ^ BY , ~ O • ~~J. 7$ Prepared for : ^IS 7•R u CT DAHM DEVELOPMENT 12810 East Nora Avenue PERMIT REQUIRE.D ! Spokane, WA 99216 NOTIFY THE PERMIT ENGINEER a56-3soo 24 HRS. PRIOR TO CONSTRUCt10N. Prepared by: Inland Pacific Engineering Company 707 West 7`h Avenue Suite 200 Spokane, WA 99204 (509) 458-6840 DRAINAGE REPORT for the Turtle Creek Second Addition Plat Spokane County, Washington OCTOBER 1998 e'~'e ts s o 't~h's se olans a~n ca uiationcorm to a ic i~ 'a o t - S o •a - o n S~tan ar s ~or ' oad an e r ct'oa d a 'pos e oum Gdftg@es & to m" r aa gem" u d e* p do~~k~ D ave be ao ed y t~ Spo •ane ou~nty :gie-r. a~ p o~ t~ es -,a s~$Icula~tio s} or cns ~ u~ n. This report has been prepared by Ann L. Winkler and Susan K. Murphy of Inland Pacific Engineering Company under the direction of the undersigned professional engineer whose seal and signature appear hereon. A. SC Q ~oF wASy, 229, 6 Pjj4 ~ F~/sTEa~° SS~ONAL ENG EXPIRES: V7.tljq Timothy A. Schwab, P.E. : . Turtle Creek Second Addition - Drainage Narrative GENERAL Turtle Creek Second Addition is a 9.73 acre development of 28 single family residential lots located west and south of Barker Road and EigHth Avenue in the Spokane Va11ey, within Spokane County, Washington. The site is currently vacant with alfalfa as the predominant land cover and vegetation. Single family residential development lies to the north, east and west. A vicinity and location map have been included within the technical section of this document. PURPOSE The purpose of this report is to determine the extent of storm drainage facilities which will be required to dispose of the increase in stormwater runoff created by the development of the Turtle Creek Phase 2 plat. The storm drainage facilities on this project will be designed to dispose of runoff from a ten year design storm, as required by the Spokane County Guidelines for Stormwater Management for onsite basins and the 50 yeaz storm event for basins which include ' offiste areas. Calculations are included to check the adequacy of all storm drainage facilities for the 50-year storm event as a measure of safety. This development is within the Aquifer Sensitive . Area of Spokane County and is subject to '208' requirements. For this project, the 10- and 50- year values from the Spokane, Medical Lake, Reardon, Cheney and Rockford intensity curves were used, as well as the SCS iso-pluvial rainfall curves. ANALYSIS METHODOLOGY Per the Spokane County Guidelines for Stormwater Management, the Rational Method, which is recommended for basins less than ten acres in size, will be used to determine the peak d.ischarges and runoff volumes for all basins. PROJECT DESCRIPTION The Turtle Creek Second Addition plat comprises 281ots of the approved 101 lots in the approved preliminary plat. Twenty-one lots were platted previously in the Turtle Creek First Addition, for a total of 49 developed lots within the approved preliminary plat. The Turtle Creek subdivision is located in the SE 1/4 of Section 19, T. 25 N., R. 45 E., W.M. within Spokane County, Washington. TOPOGRAPHY The existing site naturally drains generally to the southwest, to Saltese Creek. The existing ditch line will allow the natural drainage route to remain in place from that point west. The general Inland Pacific Engineering Company D 1 Turtle Creek Second Addition Drainage Repori slopes within the Turtle Creek Second plat would be characterized as rolling, from 1 to 13%. For development pu.rposes, the natural slope was used for design and is maintained as much as . possible throughout the project. SOILS As can be seen from the accompanying soils map from the Spokane County Soils Survey as performed by the SCS, the site consists of three types of soils, two within the Class B type and one within the Class A type. These soil types are described as follows. GgA - Garrison gravelty loam, 0 to 5 percent slopes: Soils within this soil type are some what excessively drained soils formed in gravelly glacial outwash material from a variety of igneous rock. Surface runoff is slow, and the hazard of erosion is slight. Spokane County Guidelines for Stormwater Manaizement indicate this to be a Soil Group Type B and pre-approved for drywell installation. Hydrologic Soil Classication - B GmB - Garrison very gravelly loam, 0 to 8 percent slopes: Soils within this soil type are some what excessively drained soils formed in gravelly glacial outwash material from a variety of igneous rock. Surface runoff is slow, and the hazard of erosion is slight. GmB soils have a thinner, more gravelly surface layer than GgA soils. Spokane County Guidelines for Stormwater • Manaeement indicate this to be a Soil Group Type B and pre-approved for drywell installation. Hydrologic Soil Classification - B MaC - Marble loamy sand, 0 to 30 percent slopes: Soils within this soil type are very deep, excessively drained soils formed from sandy glaciofluvial material on dunelike, nearly level to steep terraces and terrace breaks. Surface runoff is slow, and the hazard of erosion is slight. Spokane County Guidelines for Stormwater Mana2ement indicate this to be a Soil GrQup Type A and pre-approved for drywell installation. Hydrologic Soil Classification - A DRAINAGE NARRATIVE Offsite Per Spokane County Stormwater Guidelines, a 50 year storm analysis has been done for Basins A, B, C, E, F and G as required for basins with include offsite areas. Inlaqd Pacific Engineering Company DZ Turtle Creek Second Addition Drainage Report . " Onsite . As this plat is within the aquifer sensitive area of Spokane County, all onsite and future drainage will be collected and treated using the "208" runoff inethod as described in the Spokane County Guidelines for Stormwater Management. To facilitate this analysis, Turtle Creek Second Addition was divided into 6 permanent sub-basins (A through F). Table 1 lists the basins and pond for easy reference. . , TABLE 1 . ~ . . ~ a's o al Area ~ well~in,g ~ (GA ' 'eigffld A 873,44612.01 6 2.98 0.25 B 865396\1.98 5.5 2.78 0.25 _ C 383,232\0.88 3 3.5 0.35 D 251,769\0.59 2 3.4 0.30 ' E 166,013\3.81 17.5 * 4.59 0.40 F 284,027\6.52 19.5 2.99 0.25 G 81552\0.20 .5 2.50 0.25 * Includes 8 proposed units and 9.5 future units Includes 5 proposed units and 14.5 future units "208" Calculations Within each basin the streets are divided into sub-basins by high and low roadway profiles. These facilities capture upstream stormwater runoff from the impervious street surface and direct the runoff into grassy '208' ponds. As shown on the '208' calculation worksheets included, the '208' storage volume provided is adequate to perform '208' treatment for the runoff created by the first half inch of rainfall. DRAINAGE CALCULATIONS SUMMARY Calculations have been included for Drainage Basin considerations such as Peak Flow, Time of Concentration, "208" sizing, drywell requirements, inlet sizing and curb inlets, as well as culverts and pipe flows, some of which are summarized below with the remaining calculations included ' lnland Pacific Engineering Company D3 Turtle Creek Second Addition Drainage Report . ' in the appendix. ' Within the calculation section and where it has been determined necessary for clarity, several sketches, as well as details from the plans have been incorporated to demonstrate assumptions and conclusions. BASIN DESCRIPTIONS Basins A through G Within this plat, and due to the general geographic features, a basic assumption was followed and can be used to describe each basin; namely that ponds will be of the lot pond, or tract configuration. Table No. 2- Pond and 208 Basin Summary , ~ ee : econ'~ ' ~ a~ ~n ee ~08OS ea '0$ Area ~ ~e i s~ . , - 'u. Fum- , e, a A A 71223 301 602 608 1- B B 111,714 488 976 1,012 1-"B" C C 6,116 255 510 515 1-"B" D D 69151 256 512 544 1-"A" E E 28,627 13193 2,386 2,500 2-"B" F F 47,781 1,991 3,982 4,240 2-"B" G G 23436 102 204 216 1-"B"2 1- Type A is a Spokane Standard Drywell - Single Depth, Capacity 0.3 cfs 1- Type B is a Spokane Standard Drywell - Double Depth, Capacity 1.0 cfs 2- Installed as a part of Turtle Creek Phase 1 " Inland Pacific Engineering Company D4 Turtle Creek Second Addition Drainage Report I ~ e~►tow~N . ~J ~ . , ~ + gAL t7 W W 0.9 ) ° 4 - ~AUG STA %r KissIoH MISSION ~IISSION , j - - ~ ~ c~ y NAZwEII ~ • < . UAX'4Ell ¢ < YAX4 Ell 7q 4 SINTO v _ O R+ W SNAHP BppNE ~ SPQ BooNE u BOONE N BOONE ~ ' 6 E, OESIAET =tl~l ~ A100q ~ ~E CATAL00 5ESNET CATAt00 < l p* V, • ' oRILv~ BROAOWAY ~ • • . BROADWAY _ _ _ „Serrlce, Ro~O _ _ • l ~ ~ ~ SPRI GHELJ SPRIttGFl5l0 N „ Pto9ress ALKI ALKI c~i AIKI x = c u Eka~ o a ALKI z - - ~ Q O - J W ~ ~ COwIEY pp ~ cc Z 0 V ~ eEAP~ u 1 ~ ( y VALIEY WAY Q ~ p- wA ~ ~ _ • ~ ~ 0 Pl ~-E1 Z u IXON G~~` A~~E`f s M ~ j YAIH I~IAIN I~IAIN ¢ r(AY = S Na YAIt ~ J O u t I ai 'EasIoE Z o ~ W ~ ~ ~ c ¢ • ~ ; ; ccKnacre: ~ ¢I ~ RIVERSICE • '!E N i v Jr. H.S. ~ ' o z z O 0 ,G~ o H t~ r < ~ °C uEAOO^~• ~ 1Oa ¢ d 2N0 ZND 2ND ~ z BROOKIF „ y = ~n WINUr AVE 2N0 Kp W W►-~ o3R 0 r ~ ¢ O ~u = Q ~ a ~ 0 ~ Z o 4TH ¢ Greenatres ¢ • z - Elem z 4TH AVE ~ v v < ~ ' 4TH N . . 2 4TH t STH rvn z ¢ - STM ~ u 0 u CL 67Tt . AVE ~ Y , . . • a ~ ~ CZ 1+'• Ci • ~ • ~ • • Q , . ♦ ~I ' • 11M AYE eTM ~ centr,l vaney . . : , .S. t TH C, FS 4y"E-1 ~~rH ~ u IIrM AvE ~ ~ " • ~ e .p',.. ~ W i I ~ 0 ~ ' ) ~ r I2TFt~ t¢ W ~ ~ y u S W V ZJI = O £ WI - e ~ oA ~ . ~ _ „ ° a m, • a ~ 14TN ti~ f AvE . - - - • . irn ~ .PROJECT 000 LC)CATtON . ' W ~ v • ' , 1 z u 16TH AYE , ~ . = l~ • P OA r ~ m 1fT111N ~ C's « J o q f vy 1 ~ F ~ o 0 KST AYE < 20TIi ~ tt ~S N O O P~ . . N u l~yo ~'oy 22N0 ~ ~ n ~~~'~o~ 7iNO cr ~y u ~ Q ~ t3a0 l~qO z j~ E aV E = Lc 4 Cr JRo CT 24T . t K E~q~ I 2STN 26TH / c• ERO c v ~ u SIf ~26`It ~f CT r . p j~ I w ~ t7fkGm c cc . ~ ~ z ~ F gt o C N E__j. CT'~ W = 2 Y x CC S • Q .a LN m F 9~ 32N0 AVE _ _ 32HD AvE ~ . • o 0 oJ . ¢ • ¢ s ~ w~ x i = . ~ r ~i v u ~ - 1z:rL ~ • _ ' (Jains sheet 75) ° . y,,,; a~: : . , ~z:~ ~p . - ° ~ - , - - a~ . r ;~i .,,s~ E ^k~ . G r,•: F"s- ~ GeA R'" ' '~y ,~f~ •.•i' 7 ~ :55 •pY ~ ,~i,i't,'~•~,~~~:1~(•i^7'• ~5. ~',;,:f.id'~• ~ r' k 7 + ,~,1 d- ; ' 1 ~ fl~::.~,,~y v: . a f!.~.>• x,: s~ !~.•',c ~ r..•~., 3 J y +I~ y'~~r`~ rv+• ' ~ Y+ ~ ~ •1+Y "W+~~~J :1~'~~nfi~-~~1~`:~i4.' . ' 1 ~ Y~' ~~IZ~~"~-• ~k~ S1'~ 4~ ~ . ~ r~ • J'r C~ , S ;,a'~ ~ ~ ` LO c ~i~~,.~I`~~• b ` ~ a : i` „'~a,~ , " ' . r - ti`~, . l . - . ~i,r,r,~ ~r ~~ii~ '.~K~:.. ~ ;f'l~ ~,~"'"r"~~ c2si • ~ ~ vi ~ I ~ ~ ~ f ; .k.~i: 7'i. ,at~ g-W~.y~y ~ : , 'f} ' •'t , ~ :y~§~. - t,. ~ir~ ~ w..,, i i~,± • ;;t , C7 ~ ''n`~r ~ ~ @n~'~'~}~',,~:~F; k~s+-': ~ .(~k ' :'T+-~ . . ~ xr'~ta~lu`;3'9~. ,:h r, ; s ~~W"3~~~'~,'. I~ ~ i , ;:r". w.~s 1!I~ ~"s <<e;,'rr .:i d' ' w..~ ~ , ~ : ~ . ~ '~s~,~y ~i;' ~ " ' a ' . ~ .~~,,~~,I ~ .4 , ~`•f ` " g .?,~'a'u:: . ::q~, 5 a~;';.? w, ~ r~, M ~iL~l•:~~ uL ` ~ ^ ~ i ~y,.",;.'", . , x ~w h'~ ~ ~5 ~ r,~",~~y` _~pA ~i,:~E~. ~~y~+i, ~1 • !~'4"NF'~lM.r`.y 4), ~ , rS .ir'i•.~,. Y.YF't _'1! , , ~ ~I ~~~i~~ ~',~i~~~' ~p1! ~ ~ ~~i!~ ;r~l~: 1" ~ ~ .Ar_~ ` ~I ZI`. ~ ' , d-. ~ 1 Y~:1~~&'. . . ' - y -c ~ r +T' 0., . ' J'; - ~I .~~f ~ ,~t' . p,~..., ~ ~ ~ k} .,~ti f . , ' r {r.'+~ ~'3, ; :'a'i 5,~,.~~ . 'a.',v~ , ~ i~ ` ~ • r~.. tl"',''~ r.. ~r fY , , "~~,3+k' ~ 4~~1~'2 ~ h~' ~ ~ A~^+;Z i ^'S11~n ~ . . ~ ~r~J ~ ~,~1;~f 5 ~ r' I ' ~ , t~~' i r„',~ .~t' 7~ ~ . 73 r '7~ i•~F 1.` J'7'~~ • , . i. h , t~~~~4 ~ 4'n+~k~ ~atl~:~ ~j~~ L' ~ ~ lN. N C+ .r i i ~+y:".Y;~~S ,~tlJ)~ !~,~r~ 3*" ~y' _,'~"~L5 w_~_ •rnl~[?f2 . . ~ _ y~- ' .r~.••, ~ ~y~ v! , ii. M1 j sVra~ .,.L..v~i•.~yV::~ ~ •Jh' ~;iJ' ~ 'n "4~~';~,• pr ~ .s~ 7 ~,~y ~ ',s.~, ' r`y;'~'S~'r s~ i , n ' ~ ~ . •i 'r~ w 'F614 ti ~ 6y. ~L1I~i~ .s1.,f, .'l=:- ~ ~ ~ ~~~,v'" 'r,5~ I`r~'4"~~~Ati. -t ~ . p ' ~ F; i•f4~"-•••~.;,' .+y~'K ' ~ch ~ ~~'j,l. d ~ '~C ~ d' ~ mrY . r'!? 'S~~ , y +5 T~~",~( , rv ''`~s'. 6 , ~ . {J~ ! ,l~~ ¢ . •.aG~ 1. ' ~ `~'I y~1'..~ ~ ~ ~i Lry~L~~ 4 ' ' ~y ~ Sil•"1 ~i~A~~ I 1~~~ . , . Ti :lrl ~ y ~ N~ ~a ~d~,~,5/~ ~ • a' I zY ~ ~f~"~f i..k ~,Z"~r',~ i i Y ~ L.iA7~~s~,~ "~,5~.^W,f~f'S~ .i~1 ti:~s•` r ~ •~r•• ~~1' ~~Y"+'Ml~'~ ~d I ii ~ : : Y x-' ' r. .y , ~ 1 ~ ~~I ~_'t,'C~~fv'•9 " [F~''~~,: ~i{,,+~~ ~~5i"~,:s~ ,•"j, k i '"G ~ . r7" ~ • t ,''P n~++.~' ~L 1~ 'L "~''N: .S~' , • I~ , . ~j'4~~~ a ~ 1 ~ ,~,a'~ d ; ~ ~F,~~ 1 ~ n ~LI „I~~ ~ 71R_a'„':" • 1 I`~R ' - : . - _ ~ -r',_. { ` . ' r ' bq~' ~ ~ - + A%~,.; T ,:w.. ~.~~Y~";Fa;~ .~;"~'•;t~~: •~~rrr~'ir' ' '~~§,~y3; • ~ Pt ~ ~ ~ . , ~y~~ y ;f~~ 14'' t e ,SCh~;~~,~' 'i ~ • ,f-,.{';~ . ~ ~ k~ I ~v. ~t'~ . , rr-,'' h~ ? i * f ~ . p~ r~ ~:J', ~ ' 5'~ ~ 7 i • { ~ 5:~~ ~~T+ Y~15i i y / 4~~' A. ~ '~Vt ~ i ? ~ T ~ i ~F ~ ~ ~.,o~tv ~ti. ~ r •f , e'f A ~..,.i yri r nY.:. . I^ ~ ~ ~ / ~.~4f ~'~'1h~'~~ i ' ~ I ~ ~~~ti - . ir ~j~jt~ ~ ~e\. Yy !4f]I k~ 1~ ~ fll. ~ ~ 4' ' 4'.~1~~~ • ~ ~ ~ ~ ;k.y;~ ..HN 4y'r' ~,7 ~~~~''~~3~ i~~ • 9~~_ 1k F ~ Yy " W'( T,~ *'p~ i I i5 ~ ' YS • (~.ti. ' ~ Tli'~: ' ~~•'~lP,;;'~ ,h . ~J' _(~J - 4%l~ S`; ~ 'Y . , . . ~ ~ ."'x 1~..s,~..'Y "'a ~~{A~ 1 I Z ~ ~ ~y~~~ ' a ''4 ~ 'r~ , . • f ~~:d k1'~~;~4py6"~`5'i5:.;. •tr , ' ; ~ ' W E~ ~ d .a : - ~ .J~ ~ S~aAt'' : y,!i ~f••y~ . ay'I=C,~ a.'J'''' :,~:+,t, r ' i y', r', , f`7 . : •yf;+A 1~~ w r,•l n+~ b i~'•~~b y. i I.;~i • :"~1•; +'r'~ y'Y~;;ui` y,~ ~ x+~t? F yY',1 ~`le r~~~~',,~ 4~:~~s'~i"'":,;, }•'°'a'; m ~~,r m I~. . C3. . --l~~--'-~~'_=,~: ' ~ C ~~r?~rr`~~'•-''t'~~';ek4+~ t'~:~ • ..f ~ r(a ~ - - _ ' ~ • y _ J :"a;~'~ i: ~~;;~y 6 _"u~t-`-.~a r ; , ~ ..s cei ' ~ , 'j ~ i.'~~. ~:~';~'.'".~~~~4''y•°'n~~~;~,~e:':;'w"~+d: i,. ' ~,~"^3; - :°+U:.t o~q;?; rr ~I . G7 P••••• ~ ?i 1 ' N r . .4.'t~ ~~u;7i'.Y4? ~,r a' ~a .e~''_ ~d :sa ~ - • ~ ; 1~";~~ 7'w . ~',t, tii + J+v~~ ,C~'W'7~ ~-f ~ &~'+~i' N~ ~~6~Y,k ~ i; i ' T ' ~ . . ' ~ • 4 ~ii.1°" ^ rr' . 1dV ' t3,t I~ h~i~'♦ ~'~L: ` ~ ]e i11 'f~ ~ f~. ` ~ ~~i~ ~ ' q~,~}~~ r,S y-ry, `q ~4'• i'~~~~~ ! ~ ~ ~ . ' _ . 1' ' A~, i [4$ rYA,'~f~. ft~: ~y , .".~~~r~~f F'^R+~j c` 5~*~ _ ' f . ,Y~~7 ~ ~ ~ t ~.•3dail i ~~"~°x~° ~7M~! v:X,~,y~ 1 Ira'~<'c.F , , i ~ ~ ! ,,7^r~( ' ~~i ,~L ' - [ .,~~n ~a. ; s~ . v , ~ . • ~ ' j r•;' l;~'`a.r-', ~ 's i 4., ~ .x y.11~ ` • fi'~~ '1' ~ ~I .r;, C'., ~ .r'~: ~ is `J ~ ~itn,G -P ~'.~T :1 ~.'r1~Y''~' 4 ~ .S ~ ' 5;. k. I~ : ~r~ a:'a I;!,°m r ' _ . ~ yr s :~ti r.,rl,~~~~ w~i r 7'. :-H„'~% ~~'ti'e ~ W~ 1 54'~t'~r ~ r', . vMt . k v ~ ti , •'i . { ~t,• ~ r 4 : g , ~.y ~ . ~ '~J7`7~,' ?ti;~ ~w, ~'L ^ i..~= y, )i ~ t I'` d; f ' „~~~4 r'.s .~lv~.r~~ f;,n,r,•~y°~' ~r. ~'~7 f~i. ~ ~~~I' ~~7~,,- . ''y ~j?'~L,`:~a-rimCv"~ 'VL"4ii R ~4 'a,k~`. .~IanF~;:~,.~y;, , ~ :A r- . . n ~ ~ ;~:,,i~t, i`.~'s~ ...:s:,.:;''L":.: • , L . . , , . (Joins sheet 77) , . 24r;'.' I~,.I.:,.~-5 N :3 5a~0 Feet ~ y~ 1 Mle Scaie l : 20000 1 1i;inp~• «v.nyhip, and 5sttiqn curnr:ry yllpwn 4n this map are indefini[e. 0 - - - - - - - _ 1_-~'i'- - _ - - - _ 50-year STORM BOWSTRING METHOD , PROJECT: Turtle Creek 2nd . , PEAK FLOW CALCULATION PROJECT Turtle Creek 2nd DETENTION BASIN DESIGN BASIN: A ` BASIN A DESIGNER: ALW ' Tot. Area 2.01 Acres DATE: 10114 Imp. Area 7223 SF ' C = 0.25 Time Increment (min) 5 CASE 1 Time of Conc. (min) 5.00 Outflow (cfs) 1 50 ft. Overland Flow Design Year Flow 50 Area (acres) 2.0075 Ct = 0,15 Impervious Area (sq ft) 7223 L= 50 ft. 'C' Factor 0.25 n= 0.40 '208' Volume Provided 304 S= 0,020 Area' C 0.502 Tc = 2.93 min., by Equation 3-2 of Guidelines Time Time Inc. Intens. Q Devel. Vol.ln Vol.Out Storage 160 ft. Gutter flow (min) (sec) (inlhr) (cfs) (cu ft) (cu ft) (cu ft) Z1= 50.0 5.00 300 4.58 2.30 924 300 624 Z2 = 3,5 n= 0.016 5 300 4.58 2.30 924 300 624 S= 0.011 10 600 3.20 1,61 1127 600 527 15 900 2.45 1,23 1232 900 332 d= 0.202 ft. 20 1200 1.95 0,98 1274 1200 74 25 1500 1.62 0.81 1302 1500 -198 A R Q Tc Tc total I Qc 30 1800 1.56 0.78 1489 1800 -311 35 2100 1.28 0.64 1415 2100 -685 1.09 0.10 2.30 1.26 5.00 4.58 2.30 40 2400 1.19 0.59 1488 2400 -912 45 2700 1.08 0,54 1519 2700 -1181 Qpeak for Case 1= 2.30 cfs 50 3000 0.99 0.50 1541 3000 -1459 55 3300 0.92 0.46 1571 3300 -1729 60 3600 0.87 0.44 1616 3600 -1984 CASE 2 65 3900 0.82 0.41 1647 3900 -2253 70 4200 0,80 0.40 1727 4200 -2473 Case 2 assumes a Time of Concentration less than 5 minutes so that the 75 4500 0.77 0.39 1778 4500 -2722 peak flow =.90(4.58)(Imp. Area) = 0.68 cfs 80 4800 0.75 0.38 1845 4800 -2955 85 5100 0.72 0.36 1880 5100 -3220 90 5400 0.71 0.36 1961 5400 -3439 So, the Peak flow for the Basin is the greater of the lwo flows, 95 5700 0.69 0.35 2009 5700 -3691 2.30 cfs 100 6000 0.67 0.34 2052 6000 -3948 208' DRAINAGE POND CALCULATIONS Required'208' Storage Volume = Impervious Area x.5 in I 12 inlft 301 cu ft 50 year Volume Provided 304 cu ft S'CO ~M lf UUL l~l-~l.l..~ DRYWELL REQUIREMENTS - 50 YEAR DESIGN STORM Maximum Storage Required by Bowstring 624 cu ft/ N (~08( q~ ~5(1,215~ ~ Number and Type of Drywells Required 0 Single (a ca2 CF, 1 Double (O(P2-7 6z4 INLAND PACIFIC ENGINEERING '~j'• ~ ` Cq (•S z _ 1 -7 1 C <G 50-year STORM BOWSTRING METHOD - PROJECT: Turtle Creek 2nd ~ PEAK FLOW CALCULATION PROJECT Turtle Creek 2nd DETENTION BASIN DESIGN BASIN: B . ` BASIN B DESIGNER: ALW ` Tot. Area 1.98 Acres DATE: 10l14 Imp. Area 11714 SF ` C = 0.25 Time Increment (min) 5 CASE 1 Time of Conc. (min) 5.00 Outflow (cfs) 1 50 ft. Overland Flow Design Year Flow 50 Area (acres) 1.9834 Ct = 0.15 Impervious Area (sq ft) 11714 L= 50 ft. 'C' Factor 025 n= 0.40 '208' Volume Provided 506 S= 0.020 Area' C 0.496 Tc = 2.93 min., by Equation 3-2 of Guidelines Time Time Inc. Intens. Q Devel. Vol.ln Vol,Out Storage 350 ft. Gutter flow (min) (sec) (inlhr) (cfs) (cu ft) (cu ft) (cu ft) Z1= 50.0 5.00 300 4.58 2.27 913 300 613 Z2 = 3.5 n= 0.016 5 300 4.58 2.27 913 300 613 S= 0.025 10 600 3.20 1.59 1114 600 514 15 900 2,45 1.21 1217 900 317 d= 0.172 ft. 20 1200 1.95 0.97 1259 1200 59 25 1500 1.62 0.80 1287 1500 -213 A R Q Tc Tc total I Qc 30 1800 1.56 0.77 1471 1800 -329 35 2100 1.28 0.63 1398 2100' -702 0.79 0.09 2.27 2.04 5.00 4.58 2.27 40 2400 1.19 0.59 1470 2400 -930 45 2700 1.08 0.54 1501 2700 -1199 Qpeak for Case 1= 2.27 cfs 50 3000 0.99 0.49 1523 3000 -1477 55 3300 0.92 0.46 1552 3300 -1148 60 3600 0.87 0.43 1597 3600 -2003 CASE 2 65 3900 0.82 0.41 1627 3900 -2273 70 4200 0.80 0.40 1707 4200 -2493 Case 2 assumes a Time of Concentration less than 5 minutes so that the 75 4500 0.77 0.38 1757 4500 -2743 peak flow =,90(4.58)(Imp. Area) = 1.11 cfs 80 4800 0.75 0.37 1823 4800 -2977 85 5100 0.72 0.36 1857 5100 -3243 90 5400 0.71 0.35 1931 5400 -3463 So, the Peak flow for the Basin is the greater of the iwo flows, 95 5700 0.69 0.34 1985 5700 -3715 2.27 cfs 100 6000 0.67 0.33 2027 6000 -3973 208' DRAINAGE POND CALCULATIONS Required'208' Storage Valume = Imperoious Area x,5 in ! 12 in/ft 488 cu ft 50 year Volume Provided 506 cu ft~~M DRYWELL REQUIREMENTS - 50 YEAR DESIGN STORM Maximum Storage Required by Bowstring 613 cu ft~ 10~2(,q~+ I2Z(I,ZIS~= Number and Type of Drywells Required 0 Single 10-59 CF 1 Double los~~ l013.'.ofZ.. INLAND PACIFIC ENGINEERING 50-year STORM BOWSTRING METHOD • PROJECT: Turtle Creek 2nd ~ PEAK FLOW CALCULATION PROJECT Turtle Creek 2nd DETENTION BASIN DESIGN BASIN: C BASIN C DESIGNER: ALW ~ Tot. Area 0.88 Acres DATE: 10114 Imp. Area 6116 SF C = 0.35 Time Increment (min) 5 CASE 1 Time of Conc. (min) 5.00 OutAow (cfs) 0,3 50 ft. Overland Flow Design Year Flow 50 Area (acres) 0.8777 Ct = 0.15 Impervious Area (sq ft) 6116 L= 50 ft. 'C' Factor 0.35 n= 0.40 '208' Volume Provided 257 S= 0.020 Area * C 0.307 Tc = 2.93 min., by Equation 3-2 of Guidelines Time Time Inc. Intens. Q Devel. Vol.ln Vol.Out Storage 180 ft. Gutter flow (min) (sec) (inlhr) (cfs) (cu ft) (cu ft) (cu ft) Z1= 50.0 5.00 300 4.58 1.41 566 90 476 Z2 = 3.5 n= 0.016 5 300 4.58 1.41 566 90 476 S= 0.015 10 600 3.20 0.98 690 180 510 15 900 2.45 0.75 754 270 484 d= 0.159 ft. 20 1200 1.95 0.60 780 360 420 25 1500 1.62 0.50 797 450 347 A R Q Tc Tc total I Qc 30 1800 1.56 0.48 911 540 371 35 2100 1.28 0.39 866 630• 236 0,67 0.08 1.41 1,43 5.00 4.58 1,41 40 2400 1.19 0,36 911 720 191 45 2700 1.08 0,33 930 810 120 Qpeak for Case 1= 1.41 cfs 50 3000 0.99 0,30 943 900 43 55 3300 0.92 0.28 961 990 -29 60 3600 0.87 027 989 1080 -91 CASE 2 65 3900 0.82 0.25 1008 1170 -162 70 4200 0.80 0.25 1057 1260 -203 Case 2 assumes a Time of Concentration less than 5 minutes so that the 75 4500 0.77 0.24 1089 1350 -261 peak flow =.90(4.58)(Imp. Area) = 0.58 cfs 80 4800 0.75 0.23 1129 1440 -311 85 5100 0.72 022 1151 1530 -379 90 5400 0.71 022 1200 1620 -420 So, the Peak flow for the Basin is the greater of the iwo flows, 95 5700 0.69 0.21 1230 1710 -480 1.41 cfs 100 6000 0.67 0.21 1256 1800 -544 208' DRAINAGE POND CALCULATIONS Required'208' Storage Valume = Impervious Area x.5 in 112 in/ft 255 cu ft 50 year Volume Provided 257 cu ft'~;Ttq~~ U01- u- ry\;;~7 DRYWELL REQUIREMENTS - 50 YEAR DESIGN STORM -gfZ~3V IOC-~) = Maximum Storage Required by Bowstring 510 cu ft SI~C.ei) + 850 Number and Type of Drywells Required 1 Single S~~ LF 0 Double 5c~c~ ) 5~~ a INLAND PACIFIC ENGINEERING BOWSTRfNG METHOD PROJECT; Turtle Creek 2nd "PEAK FLOW CALCULATION PROJECT Turtle Creek 2nd DETENTION BASIN DESIGN BASIN: D BASIN: D 10-Year Design Starm DESIGNER: ALW ' Tot, Area 0.59 Acres DATE: 10113 Imp. Area 6151 SF C = 0.30 Time Increment (min) 5 CASE 1 Time of Conc. (min) 5.00 Outflow (cfs) 1 60 ft. Overland Ftow Design Year Flow 10 Area (acres) 0.5916 Ct = 0.15 ImpeNious Area (sq ft) 6151 L= 60 ft. 'C' Factor 0.3 n= 0,40 '208' Volume Provided 272 S= 0.020 Area * C 0.177 Tc = 3,27 min., by Equation 3-2 of Guidelines Time Time Inc. Intens. Q Devel. Vol.in Vol.Out Storage 150 ft. Gutter flow (min) (sec) (inlhr) (cfs) (cu ft) (cu ft) (cu ft) Z1 = 50,0 For Z2 5.00 300 3.18 0.56 227 300 -73 Z2 = 3.5 Type B =1.0 n= 0.016 Rolled = 3.5 5 300 3.18 0.56 227 300 -73 S= 0.011 10 600 2.24 0.40 219 600 -321 15 900 1,77 0.31 315 900 -585 d= 0.119 ft. 20 1200 1.45 0.26 335 1200 -865 25 1500 1,21 0.21 344 1500 -1156 A R Q Tc Tc total I Qc 30 1800 1.04 - 0.18 351 .1800 -1449 . - - - 35 2100 0.91 0.16 356 2100 -1744 0.38 0.06 0.56 1.68 5.00 3,18 0.56 40 2400 0.82 0.15 364 2400 -2036 45 2700 0.74 0.13 368 2700 -2332 Qpeak for Case 1= 0.56 cfs 50 3000 0.68 0.12 374 3000 -2626 55 3300 0.64 0.11 386 3300 -2914 60 3600 0,61 0.11 401 3600 -3199 CASE 2 65 3900 0.60 0.11 426 3900 -3474 70 4200 0.58 0.10 443 4200 -3757 Case 2 assumes a Time of Concentration less than 5 minutes so that the • 75 4500 0.56 0.10 457 4500 4043 peak flow =.90(3.18)(Imp. Area) = 0.40 cfs 80 4800 0.53 0.09 461 4800 4339 85 5100 0.52 0.09 480 5100 -0620 90 5400 0.50 0.09 488 5400 -0912 So, the Peak flow for the Basin is the greater of the two flows, 95 5700 0.49 0.09 505 5700 -5195 0.56 cfs 100 6000 0.48 0.09 520 6000 -5480 208' DRAINAGE POND CALCULATIONS Required'208' Storage Volume = Impervious Area x.5 in ! 12 inlft 256 cu ft 208' Storage Volume Provided 272 cu ft DRYWELL REQUIREMENTS -10 YEAR DESIGN STORM Maximum Storage Required by Bowstring -73 cu ft Number and Type of Drywells Required 0 Single 1 Double 50-year STORM BOWSTRING METHOD PROJECT: Turtle Creek 2nd PEAK FLOW CALCULATION PROJECT Turtle Creek 2nd DETENTION BASIN DESIGN BASIN: D 4~ BASIN D DESIGNER: ALW Tot. Area 0.59 Acres DATE: 10114 , Imp. Area 6151 SF C = 0.30 Time Increment (min) 5 CASE 1 Time of Conc. (min) 5.00 Outflow (cfs) 0.3 60 ft. Overland Flow Design Year Flow 50 Area (acres) 0.5916 Ct = 0.15 Impervious Area (sq ft) 6151 L= 60 ft. 'C' Factor 0.3 n= 0.40 '208' Volume Provided 272 S= 0.020 Area' C 0.177 Tc = 3.27 min., by Equation 3-2 of Guidelines Time Time Inc. Intens. Q Devel. Vol.ln Vol.Out Storage 150 ft. Gutter flow (min) (sec) (inlhr) (cfs) (cu ft) (cu ft) (cu ft) Z1 = 50.0 5.00 300 4.58 0.81 327 90 237 Z2 = 3.5 n= 0.016 5 300 4.58 0.81 327 90 237 S= 0.011 10 600 3.20 0.57 399 180 219 15 900 2.45 0,43 436 270 166 d= 0.137 ft. 20 1200 1.95 0.35 451 360 91 25 1500 1.62 0.29 461 450 11 A R Q Tc Tc total I Qc 30 1600 1.56 0.28 527 540 -13 35 2100 1.28 023 500 630' -130 0,50 0.07 0.81 1.54 5.00 4.58 0.81 40 2400 1.19 0,21 526 720 -194 45 2700 1.08 0,19 537 810 -273 Qpeak for Case 1= 0,81 cfs 50 3000 0.99 0.18 545 900 -355 55 3300 0.92 0.16 555 990 -435 60 3600 0.87 0.15 572 1080 -508 CASE 2 65 3900 0.82 0.15 582 1170 -588 70 4200 0.80 0.14 611 1260 -649 Case 2 assumes a Time of Concentration less than 5 minutes so that the 75 4500 0.77 0.14 629 1350 -721 peak flow =.90(4.58)(Imp. Area) = 0.58 cfs 80 4800 0.75 0.13 653 1440 -787 85 5100 0.72 0.13 665 1530 -865 90 5400 0,71 0.13 693 1620 -927 So, the Peak flow for the Basin is the greater of the iwo flows, 95 5700 0.69 0.12 711 1710 -999 0.81 cfs 100 6000 0.67 0.12 726 1800 -1074 208' DRAINAGE POND CALCULATIONS' Required'208' Storage Volume = Imperoious Area x.5 in I 12 in/ft 256 cu ft 50 year Volume Provided 272 cu ft DRYWELL REQUIREMENTS - 50 YEAR DESIGN STORM Maximum Storage Required by Bowstring 237 cu ft Number and Type of Drywells Required 1 Single 0 Double INLAND PACIFIC ENGINEERING 50-year STORM BOWSTRING METHOD PROJECT: Turtle Creek 2nd PEAK FLOUV CALCULATION PROJECT Turtle Creek 2nd DETENTION BASIN DESIGN BASIN: E f: BASIN E DESIGNER: ALW Tot. Area 3.81 Acres DATE: 10l13 ~ Imp. Area 29731 SF C = 0.40 Time Increment (min) 5 CASE 1 Time of Conc. (min) 13.52 Outflow (cfs) 2 50 ft. Overland Flow Design Year Flow 50 Area (acres) 3.81 . Ct = 0.15 Impervious Area (sq ft) 29731 L= 50 ft. 'C Factor 0.4 n= 0.40 '208' Volume Provided 1250 S= 0.020 Area' C 1.524 Tc = 2.93 min., by Equation 3-2 of Guidelines Time Time Inc. Intens. Q Devel. Vol.ln Vol.Out Storage 1150 ft. Gutter flow (min) (sec) (inlhr) (cfs) (cu ft) (cu ft) (cu ft) Z1= 50.0 13.52 811 2.65 4.04 4390 1622 2768 Z2 = 3.5 n= 0.016 5 300 4,58 6.98 2806 600 2206 S= 0.005 10 600 3.20 4,88 3921 1200 2721 15 900 2.45 3.73 4390 1800 2590 d= 0.289 ft. 20 1200 1.95 2.97 4386 2400 1986 25 1500 1.62 2.47 4384 3000 1384 A R Q Tc Tc total I Qc 30 1800 1.56 2.38 4935 3600 1335 35 2100 1.28 1.95 4634 4200 . 434 2.23 0.14 4.04 10.59 13.52 2.65 4.04 40 2400 1.19 1,81 4832 4800 32 45 2700 1.08 1.65 4898 5400 -502 Qpeak for Case 1= 4.04 cfs 50 3000 0.99 1,51 4942 6000 -1058 55 3300 0.92 1.40 5013 6600 -1587 60 3600 0.87 1.33 5139 7200 -2061 CASE 2 65 3900 0.82 1.25 5218 7800 -2582 70 4200 0.80 1.22 5457 8400 -2943 Case 2 assumes a Time of Concentration less than 5 minutes so that the 75 4500 0.77 1.17 5604 9000 -3396 peak flow =.90(4.58)(Imp. Area) = 2.81 cfs 80 4800 0.75 1.14 5802 9600 -3798 85 5100 0.72 1.10 5899 10200 -4301 90 5400 0.71 1,08 6141 10800 -4659 So, the Peak flow for the Basin is the greater of the two flows, 95 5700 0.69 1,05 6284 11400 -5116 4.04 cfs 100 6000 0.67 1.02 6408 12000 -5592 208' DRAINAGE POND CALCULATIONS Required'208' Storage Volume = Impervious Area x.5 in I 12 inlft 1239 cu ft 50 year Volume Provided 1250 cu ft DRYWELL REQUIREMENTS - 50 YEAR DESIGN STORM S-MIZM UoL(,l,Yl'lG' Maximum Storage Required by Bowstring 2768 cu ft -prz-tVI DED'. Number and Type of Drywells Required 0 Single 2 Double t° f~3 $D CF / ~Z~c~~ ~3so ~ 2~~a INLAND PACIFIC ENGINEERING 2 , ~ 50-year STORM BOWSTRING METHOD• PROJECT: Turtle Creek 2nd PEAK FL01N CALCULATION PROJECT Turtle Creek 2nd DETENTION BASIN DESIGN BASIN: F BASIN F DESIGNER; ALW Tot. Area 6.61 Acres DATE: 10114 ~ Imp. Area 47781 SF C = 0.25 Time Increment (min) 5 CASE 1 Time of Conc. (min) 10.65 Outflow (cfs) 2 50 ft. Overland Flow Design Year Flow 50 Area (acres) 6.6098 Ct = 0.15 Impervious Area (sq ft) 47781 L= 50 ft. 'C' Factor 0.25 n= 0.40 '208' Volume Provided 2120 S= 0.020 Area' C 1.652 Tc = 2.93 min., by Equation 3-2 of Guidelines Time Time Inc. Intens, Q Devel, Vol.ln Vol.Out Storage 1310 ft. Gutter flow (min) (sec) (inlhr) (cfs) (cu ft) (cu ft) (cu ft) Z1= 50.0 10.65 639 3.10 5.12 4385 1279 3106 Z2 = 3.5 n= 0.016 5 340 4.58 7.57 3042 600 2442 S= 0.014 10 600 3.20 5.29 4251 1200 3051 15 900 2.45 4.05 4524 1800 2724 d= 0.260 ft. 20 1200 1.95 3.22 4567 2400 2167 25 1500 1,62 2.68 4597 3000 1597 A R Q Tc Tc total I Qc 30 1800 1,56 2.58 5200 3600 1600 35 2100 1.28 2.12 4902 420Cr 702 1.81 0.13 5.12 7.73 10.65 3,10 5.12, 40 2400 1.19 1.96 5125 4800 325 45 2700 1.08 1.78 5206 5400 -194 Glpeak for Case 1= 5.12 cfs 50 3000 0.99 1.64 5263 6000 -737 55 3300 0.92 1.52 5347 6600 -1253 60 3600 0.87 1.44 5488 7200 -1712 CASE 2 65 3900 0.82 1,36 5579 7800 -2221 70 4200 0.80 1.32 5640 8400 -2560 Case 2 assumes a Time of Concentration less than 5 minutes so that the 75 4500 0.77 1,27 6002 9000 -2998 peak flow =.90(4.58)(Imp. Area) = 4.52 cfs 80 4800 0.75 1.24 6218 9600 -3382 85 5100 0.72 1.19 6326 10200 -3674 90 5400 0.71 1.17 6591 10600 -4209 So, the Peak flow for the Basin is the greater of the two flows, 95 5700 0.69 1.14 6747 11400 -0653 5.12 cfs 100 6000 0.67 1.11 6883 12000 -5117 208' DRAINAGE POND CALCULATIONS Required'208' Storage Volume = Impervious Area x.5 in 112 inlft 1991 cu ft 50 year Volume Provided 2120 cu ft DRYWELL REQUIREMENTS - 50 YEAR DESIGN STORM Maximum Storage Required by Bowstnng 3106 cu ft~~'~N1 UO'L.LIMe Number and Type of Orywells Required 0 Single 0 ~ 2bq~1,215~- 2 Double 4240(.9) Q137 ~F INLAND PACIFIC ENGINEERING q13q }31 040.'0~'~- 50-yeat STORM BOWSTRING METHQD. PROJECT; Turile Creek 2nd P6AK FLD}JV CALCUtATION PROJECT Turtle Creek 2nd DETENTION 6ASIN DESEGh! BASIN: C BRSIN G DESIGfVER: ALW Tat. Area 0.20 Rcres DATE: 10l13 Imp. Area 2436 SF ' C = Q.25 Time fncrement (min) 5 CASE 1 Time pf Cpnc. (min) 5,00 Outflow (cfs) 1 Q f#. Overland Flow Design Year f low 50 Area (acres) 0.1963 Ct = D.9 5 ]mpervious Area (sq fi) 2438 L= Q ft. `C' Factor 0.25 n = 0.40 '208' Volume Provided 108 S= 0.020 Area ~ C O.049 Tc = 0.00 min., by Equatian 3-2 af Guidelines Time rme Inc. Inlens. Q Devel. Vvl,ln VaI.OWt Storage 150 ft. Gutter flow (min) (sec) (inlhr) (cfs) (cu tt) (cu ft) (cu ft) ZI = 50.0 ========5.00 = ===300 4.58 0.22 90 =====300 -21 D Z2 = 3.5 n= 0.016 5 300 4.58 022 90 300 -21 0 S= 0,030 10 600 3.20 0,16 190 600 -A90 15 soa 2.45 0.12 120 soa -780 d= 0.069 ft. za 1200 1.95 0.10 125 1200 -1075 25 1504 1.62 0.08 127 1500 -1373 A R Q Tc Tctotal I 30 1800 1,56 0,08 146 1800 -1654 = ~~w 35 2100 1.28 0.06 138 2100 -1962 0.13 &03 012 1 A7 5.00 4.58 6.22 40 2404 1.19 0.06 146 2400 -2254 45 2700 1.08 0.05 149 2700 -2551 Qpeak for Case 1= 4.22 cfs 50 3000 0.99 0,05 151 3000 -2849 55 3304 0.92 0.05 154 3300 -3146 60 3600 0.87 0.04 158 3800 -3442 CASE 2 65 3900 0.82 0,04 161 3900 -3739 70 4204 4.80 0.44 169 4200 -4031 Case 2 assumes a 1'ime of Concentratian less than 5 minutes so that the 75 4500 0.77 0,04 174 4500 -4326 pealc flow =,90(4.58)(Img. Area) = 0.23 & 80 4800 0.75 0,04 180 4800 -4620 85 5100 ' 0,12 0.04 184 5100 -4916 90 5400 0.71 0.03 1e2 5400 -5208 Sa, the Peak flow for #he Basin is #he greater of the two flows, 95 5700 0.69 0.03 196 51G0 -5504 0.23 cfs 100 6000 0,67 0.03 201 sooa -5799 208'DRAINAGE PONo CALCIJLATIONS Required "206° Storage Volume = Imperviaus Area x.5 in ! 12 infft 142 cu ft 54 year Volume Pravided 108 cu ft DRYVIlELL REQ4lIRENkENTS - 50 YEAR DESIGN STQRM Maximum Stnrage Required by Bouus#ring -210 cu {i Nurnber and Type af Qrywells Required 0 Single 1 Double INLANQ PACIFfC ENGINEERING 1 ~ v► i i S P O K A N E C O U N T Y DIVISION OF ENGINEERING AND ROADS • A DIVISION OF THE PUBLIC WORKS DEPARTMENT William A. Johns, P.E., County Engineer Dennis M. Scott, P.E., Director September 30, 1998 . Susan Murphy, E.I.T. Inland Pacific Engineering 707 W. 7th Avenue, Suite 200 Spokane, WA 99204 Re: Road & Drainage Comments 1 for Turtle Creek 2"d Addition, P-1753A Susan, The following items must be addressed prior to approval of the plans: 1. Please submit a typical lot plan for the "no drainage structure" swales. 2. The maintenance responsibilities for Tracts A& B need to be documented. Describe ^ who will be maintaining them, the specific duties, the approximate annual cost of such maintenance, and submit a copy of the operation and maintenance manual. 3. The temporary cul de sac on 10`h Avenue needs to be surfaced with compacted asphalt grindings. 4. Street signs need to be shown at the road intersections. 5. It appears from the drainage calculations that the only impervious areas included for the sizing of the drywells were the roadway surfaces. The front half of the houses and the driveways need to be included in these calculations. 6. The drywell rim in Pond F is shown 1.55' above the bottom of the swale. Is this what was intended? 7. The construction bond estimate for this project is $169,100.00, which I have enclosed a copy of with this letter. This bond needs to be submitted prior to finalization of the plat. As noted in your transmittal this project falls under the old road standards; therefore, the County will perform the inspection of the road and drainage construction. 1026 W. Broadway Ave. • Spokane, WA 99260-0170 •(509) 456-3640 FAX: (509) 324-3478 TDD: (509) 324-3166 Please call if you have any questions. - Sincerely, Spokane County Engineers ; Doug Busko, P.E. Spokane County Engineers c: Rich Dahm, Sponsor P-1753A Project File encl. Road Bond Estimate