Loading...
2008, 05-29 Permit App: 08002010 Pole BldgProject Number: 08002010 Inv: 1 Application THIS IS NOT A PERMIT Penalties will be assessed for commencing work without a permit Date: 5/29/2008 Page 1 of 2 Project Information: Permit Use: 24 X 24 POLE BLDG Contact: REMBRANT CONSTRUCTION Address: 5329 N STEVENS C - S - Z: SPOKANE WA 99202 Setbacks: Front Left: Right: Rear: Phone: (509) 710-8586 Group Name: Site Information: Project Name: Plat Key: 001853 Name: OPPORTUNITY PLAT # 02 District: Nort Parcel Number: 45174.2508 Block: SiteAddress: 10212 E VALLEY WAY Location:: CSV Zoning: UR -22 Water District: Area: 12,578 Sq Ft Urban Residential -22 Width: 0 Nbr of Bldgs: 0 Nbr of Dwellings: 0 Review Information: ,; :;,, Lot: Owner: Name: CARR, PATRICIA L Address: PO BOX 308 VERADALE, WA 99037-0308 Hold: ❑ Depth: 0 Right Of Way (ft): 0 Review Building Plan Review Released By: Originally Released: 5/29/2008 By: tmelbourn Landuse/Zoning/HE Conditions Permits: Released By: Originally Released: 5/29/2008 By: mpalaniuk Operator: JD Printed By: jmm Print Date: 5/29/2008 Project Number: 08002010 Inv: 1 Application THIS IS NOT A PERMIT Penalties will be assessed for commencing work without a permit Date: 5/29/2008 Page 2 of 2 Building Permit Contractor: REMBRANDT CONSTRUCTION Firm: REMBRANDT CONSTRUCTION Address: 5329 W STEVENS Phone: (509) 710-8586 SPOKANE, WA 99205 Building Characteristics Building Height 0 This Application: Total Project: Description Gr Type Notes Su Ft Valuation Sq Ft Valuation POLE BDLG U-1 VB 576 $10,944.00 576 $10,944.00 Item Description RESIDENTIAL PERMIT FEE ACCESSORY PLANS REVIEW WSBC SURCHARGE Payment Summary • Permit Type Building Permit Totals: 576 $10,944.00 576 $10,944.00 Units Unit Desc 1 SELECT 1 SELECT 1 SELECT Permit Total Fees: Fee Amount $195.25 $48.81 $4.50 $248.56 Fee Amount Invoice Amount Amount Paid Amount Owing $248.56 $248.56 $0.00 $248.56 $248.56 $248.56 $0.00 $248.56 Disclaimer: Submittal of this application certifies the owner (or person(s) authorized by the owner) has both examined and finds the information contained within to be true and correct, and agrees that all provisions of laws and/or regulations governing this type of work will be complied with. Subsequent issuance of a permit shall not be construed to be a permit for, or an approval of, any violation of any of the provisions of the code or of any other state or local laws or ordinances. Signature: Operator: JD Printed By: jmm Print Date: 5/29/2008 Spokane 4 Valley. Community Development Residential Construction Permit Application Permit Center 11703 E Sprague Ave, Suite B-3 Spokane Valley, WA 99206 (509)688-0036 FAX: (509)688-0037 www.spokanevalley.org PERMIT NUMBER:. 2Q \ 0 PERMIT FEE: in New Construction Accessory Bldg n Addition/Remodel in Deck in Other: SITE ADDRESS: /547_57/ 21,/z6,v ASSESSORS PARCEL NO: LEGAL DESCRIPTION: Building Owner: Name: F'rr, jyi a,u-/C (27-0,6 viv S7( Name: ,74...../_ afre..,• City:K 64-,----'-r' State Zip Address: p;r2 /.2 p�S TC v A LLe` G( Li City: / ij state- 1:,, JA Phone: Q _ 9 757 Fax: GAR EE Q�. FTG: JJ (rte Contact Person "7/Z — e?5-4 Name: Phone: Describe the scope of work in detail: Contractor: Name: F'rr, jyi a,u-/C (27-0,6 viv S7( Address: % /(_) ��l� �S City:K 64-,----'-r' State Zip Phone: /Q -83-6. Fax_ O F9-. Contractor Lic No: ,/ni !a ExP D::.2 7 /� c ty CiBusiness Lic. No:/CL — 72 7 - /7/S7 Cost of Project: $ ) ob (7v747‹/I/NT' (fes 7- ,e z644' Proposed Use: ************************** The followin MUST be complete: (write N/A if not applicable) .... - HEIGHT TO PEAK: DIMENSIONS: 7`fX Z'Kd' # OF STORIES: TOTAL HABITABLE SPACE: MAIN FLOOR TO SQ. FTG: 2Nu FLOOR SQ. FTG: UNFIN BASEMENT SQ. FTG: IMPERVIOUS SURFACE AREA: FINISHED BASEMENT SQ. FTG: GAR EE Q�. FTG: JJ (rte DECK/COV. PATIO SQ. FTG: 30% SLOPES ON PROPERTY: # OF BEDROOMS: CONSTRUCTION TYPE: HEAT SOURCE: SEWER OR SEPTIC? The permitee verifies, acknowledges and agrees by their signature that: 1) If this permit is for construction of or on a dwelling, the dwelling is/will be served by potable water. 2) Ownership of this City of Spokane Valley Permit inure to the property owner. 3) The signatory is the property owner or has permission to represent the property owner in this transaction. 4) All construction is to be done in full compliance with the City of Spokane Valley Development Code. Referenced codes are available for review at the City of Spokane Valley Permit Center. 5) This City of Spokane Valley Permit is not a permit or approval for any violation of federal, state or local laws, codes or ordinances. 6) Plans or additional information may be required to be submitted, and subsequently approved before this application can b: • ro essed SIGNATURE. Method of P ❑ Cash Bankcard #: nr: Authorized Signature: REVISED 2/15/07 ❑ Check ❑ Mastercard Expires: DATE: . J goy ❑ VISA VIN#: S1T11703 E Sprague Ave Suite B-3• Spokane Valley WA 99206 ♦ 509.688.0036 ♦ Fax: 509.688.0037 • (gO*Valle y 13 13 13 13 13 13 13 El 13 Completed Building and Mechanical Application with: Accurate address, Parcel Number and/or Legal Description, description of work, owner and contractor information, signature and date. Three (3) sets of plans including Site Plan, elevations, floor plans, foundation plans with details, roof plan, framing plans and details. Show the height of any proposed buildings or accessory structures. Floor plan for each floor: Dimension to scale(minimum 1/8") and label each room (including sq footage of house and garage on plans) show each level of existing house and square footage of any additions. Egress windows: Provide at least one window or exterior door approved for emergency escape or rescue from basement and in every room for sleeping. Floor framing details: Joist type, size, spacing and installation details. Roof framing plan and details Furnace and hot water heater location All header locations: type, size and connections Foundation plan Insulation information Decks and Stairway details All braced wall panel types: show locations and details of installation, including engineered design Smoke detector locations 22" x 30" attic access location 18" x 24" crawl space access One-hour separation detail: between house and garage 7/ PLANNING DEPT. APPROVED DATE: /10 / z EesT t)4 7/ /oo /0 / z ST �� `� �%9 4 a1 TDCATCT Dn1C V. NAILS EACH GIRT (FLAT) PURLIN CONNECTION METHODS: A). PURLINS MAY BE HUNG TYPICAL GIRT CONNECTION OFF THE TRUSS TOP CHORD FACES W/ STANDARD SIMPSON JOIST HANGERS NOTES FOR FLOOR PLAN INTERIOR FRAME WOOD POSTS, SEE POST SCHEDULE THIS SHEET GABLE WALL POSTS - 6' X 6' TYPICAL DOOR POSTS - 4' X 6' TYPICAL FOOTING DIMENSIONS, B = l' -8'I D = 3'-0' MAXIMUM POST SPACING 12' 0' ®3 PURLINS @ 24' D.C., BEARING OR JOIST HANGERS (TYPICAL) 1�Lil a W SPANS 12' TO 60' Z Z) S3 2A�X ,--10"`BAi"S 8 - 16.d NAILS 2- X 6' @ 24' O.C., 12' BAYS CD U t= - l7 W 0 S4 CONCRETE FOOTING, SEE SCHEDULE 2' X 6' d W a LLj UJ ROOF FASTENED TO PURLINS WITH BLOCK 1 1/2' LONG WOODFAST TEKS, 14-0 N WALLS FASTENED TO J GIRTS WITH 1' LONG _ I&:& WOODFAST TEKS. t- -3-0 8 - 16d NAILS F} 10-0"_ ¢ DOUBLE TRUSSES 24'-.-3-0 _ _NO -NO--_- BOLTING BLOCK 20-0 6'X10"_`__ DETAIL zQ TYP. GABLE END Zr-6 - TRUSS CONNECTION 24 - 3 r a 0.37 Ir o COLUMN GIRTS 6 XIV' WI2"X8 7A" 3.8 - NO 0.430.43 124" J -) 6" X G' �J a w 4'-0" NO 0.41 -0 _ 6 X6' 1 Z J J o i a J w LU 94 .70 1r-0" 6"X6"W/r'X6" 26" 3-0' NO_- 0.41 - 12-0'- 14-0 tL 26' - 3-0 NO_ 0.41 12-0 16-0 6 X6'W/2"X 6'' 26 _. a-0 - NO 0.41 XS"W/2"X6" 2T3-0 NO 0.45 1r-0" af �N a- D 2T' _..3•.3•:. - -.. NO--- 0.48 1r-0" - -j- 2T - ~v- DOUBLE TRUSSES - ----- 0.52 - z4•-0" - zr•- a�-ia' iiU A 0s7 W� 3 40 PSF LIVE LOAD POST COLUMN FOOTING KNEE BRACE CONCRETE SPACING J w¢A W X D "Er' DIA 'T' REQUIRED VOLUME, YD 10'-0" 8'-0" OF 2&' NU 1 NO 0.41 __ 10-0' _ 10-0 __ 6X6" 3-0 _-_ NO__ xl _ 26-_ �a ar 12'-0' 6'•X6"W/r'X6" 26" - 3.0'- __ �� -�NO 0.41 � N 6" X 6•' W/2" X 6" A~ 3'-0" NO 0.44 ---------- 10•,0•, 16'-0•' _..--4422_ __ 6" X 8" I vvo '-`--NO 1 �V x ---- 10'-0•' - ---- ----_ 8" W/r' X 6" --- 2T' .--- 3'-0" -- - NO 0.44 - N •N-, O _ T -w 0.44 104' - 2r-0 - - - /Z s x10"wir•x6 zr' a -a No 0.48 10.-0" 21V-0" s^ x 1r• 2r:- a• -s^ - ---No 0s2 124" 8%0" WN 30" T.W. NO 0.55 ----- 12-0" ---- 10'-0" --- -----. 6" X 6" 2422.._ 30•' - 3'-0'' QU L SINGLE TRUSS --------- 12-0" 1r-0•' --_-_-----.- 6" X 6" W/r' X 6" .. --- 30'• - 3'-0" PLAN VIEW i-� N.T.S. SEE DETAIL 1 z f 12 4 1 S2' POST COLUMN FOOTING NOTES FOR SECTION A -A CONCRETE U TYPICAL PURLIN, SEE 'FLOOR' S1 Q W X D FOOTING PLAN FOR SIZE j 1�Lil S2 TRUSS DESIGN BY OTHERS Z Z) S3 2A�X ,--10"`BAi"S 8 - 16.d NAILS 2- X 6' @ 24' O.C., 12' BAYS S = DF -L #2 GIRTS FLAT @ 24' O,C. 8 - 16d NAILS 0 S4 CONCRETE FOOTING, SEE SCHEDULE 2' X 6' (U SS EXTEND POST TO TOP OF PURLIN LLj UJ ROOF FASTENED TO PURLINS WITH BLOCK 1 1/2' LONG WOODFAST TEKS, 14-0 , WALLS FASTENED TO 3-0 GIRTS WITH 1' LONG _ I&:& WOODFAST TEKS. t- -3-0 8 - 16d NAILS F BO BUILDING SECTION A -A N.T.S. SINGLE OVERHEAD DOOR OPTION FRONT ELEVATION. N.T.S. NOTES FOR FRONT ELEVATION S1 HALF TRUSS DESIGN BY OTHERS SUPPORT PURLINS @ END TRUSS W/2' X 6' OR 2' X 8' STD JOIST HANGERS, LOWER TRUSS FOR END OVERHANG, IF REQ'D S2 2' X 10' HEADER S3 2' X 6' GIRTS @ 24' O.C., 10' BAYS, DF -L #2 2' X 6' GIRTS @ 24' D.C., 12' BAYS, DF -L #2 S4 2' X 8' FACIA BOARDS SS TREATED WOOD POSTS, SIZED PER SCHEDULE S6 TREATED 2' X 6' BOTTOM GIRT OR TREATED 2' X 10' BOTTOM GIRT NOTES FOR CONNECTION DETAIL @)Sl MANUFACTURED TRUSS TOP CHORDS TRUSS DESIGN BY TRUSS MANUFACTURER PURCI S4 MANUFACTURED TRUSS NOTCH 3ME Hpp NAfcTIpN TO PROVIDEOSTS TRUSS, SEAT, \ SS WOOD POST, SEE POST/FDOTING_CHART (g)5/8'0 BOLT THROUGH TRUSS TOP CHORDS PLUS S8 4 - 50d THREADED HARDENED NAILS IN PRE -DRILLED HOLES (So TYP, PURLIN, 2' X 6' HEM -FIR #2 @ 24' ❑, C. S9 2' X 6' EAVE GIRT 0 I cn S3 /�YII DETAIL 1 - TRUSS COLUMN CONNECTION, PURLIN SUPPORT 1„ 1 2 - 16d NAILS til (l -I 6„ 8„ OR 111 10" POST cu III - III POST LAMINATIONS NOTE: 2" X'6" LAMINATE MUST BE A TREATED MEMBER AND MUST EXTEND TO THE BOTTOM OF THE FOOTING. LAMINATE MAY`l BE SPLICED ABOVE MID HEIGHT OF COLUMN I TREATED POSTS AS SIZED PER SCHEDULE VIBRATE OR ROD CONCRETE TO OBTAIN FULL BEARING UNDISTURBED SOIL S1 DOUBLE OVERHEAD DOOR OPTION OPTIONAL FRONT ELEVATION N.T.S. SINGLE SLIDING DOOR OPTION I OPTIONAL FRONT ELEVATION 1 N.T.S. OPTIONAL FRONT ELEVATION N.T.S. SPLIT SLIDER DOOR OPTION OPTIONAL FRONT ELEVATION NOTES FOR OPTIONAL FRONT ELEVATIONS S1 HALF TRUSS DESIGN BY OTHERS S2 2' X 10' HEADER UP TO 12' 0' DORS 2' X 12' HEADER UP TO 20' 0' DOORS 2' X 12' BACKED WITH 2' X 6' UP TO 24' 0' 0 2' X 6' HEADER S4 4' X 6' DOOR POST - 8' THRU 14' WALL HEIGHT W/ 2' X 6' FACER. 6' X 6' DOOR POST - 16' & 18' WALL HEIGHT W/ 2' X 8' FACER. SS DOUBLE 2' X 6' KINGPOST IG iIII W F24IIx=Sol ,011 NOTES FOR DETAIL 2- KNEEBRACE S1 TRUSS TOP CHORD, DESIGN BY OTHERS S2 TRUSS BOTTOM CHORD, DESIGN BY OTHERS S3 2' X 6' DF -L #2 EACH SIDE 0 WOOD POST, SEE POST/FOOTING SCHEDULE SS 4 - 16d GALV, NAILS, EACH SIDE 1). KNEE BRACE REQUIRED WHERE SHOWN ON POST/FOOTING SCHEDULE, BRACE NOT REQUIRED AT GABLE END TRUSSES, 2), ALTERNATE KNEE BRACE/POST AND TRUSS/POST CONNECTION = USE 3/4'0 THRU BOLTS, EACH LOCATION. BUILDING SPECIFICATIONS: GENERAL - ALL BUILDING CONSTRUCTION SHALL CONFORM TO THE 2006 EDITION OF THE INTERNATIONAL BUILDING CODE (IBC 2006), AND ALL STATE & LOCAL BUILDING CODES. THESE SPECIFICATIONS AND PLANS ARE INTENDED FOR USE IN 30 OR 40 PSF LIVE LOAD, 85 MPH WIND SPEED, EXPOSURE B AND SEISMIC DESIGN CATEGORY C. DESIGN LOADS - ROOF LL = 40 PSF ROOF DEAD LOAD = 5 PSF* CEILING LL = 0 PSF CEILING DL = 1 PSF • ROOF DL ALLOWS FOR A MAXIMUM OF 3" THICKNESS OF FIBERGLASS INSULATION. * MAXIMUM SOIL BEARING PRESSURE = 2,000 PSF MAXIMUM SOIL BEARING PRESSURE IS BASED ON SAND, SILTY SAND, CLAYEY SAND, SILTY GRAVEL AND CLAYEY GRAVEL SOILS OR BETTER. LESSER SOIL CONDITIONS WILL REQUIRE REVIEW AND FOOTING SIZE ADJUSTMENT BY THE ENGINEER. CONCRETE - MINIMUM 28 DAY COMPRESSIVE STRENGTH F'c = 2,000 psi, 4 SACK MIX FOR FOOTINGS. CAST IN PLACE CONCRETE CONSTRUCTION SHALL CONFORM TO ACI 318-05. WOOD - STRUCTURAL LUMBER SHALL CONFORM TO DF -L #2 OR BETTER BY WWPA GRADING RULES. MAXIMUM MOISTURE CONTENT SHALL BE 19% BY WEIGHT. NAILING SHALL CONFORM TO TABLE 2304.9.1 FASTENING SCHEDULE & OTHER APPROPRIATE SECTIONS OF CHAPTER 23 OF THE IBC. ALL NAILS INTO PRESERVATIVELY TREATED WOOD SHALL BE HOT -DIPPED ZINC COATED GALVANIZED STEEL, SILICONE BRONZE, COPPER OR STAINLESS STEEL. CCA TREATED WOOD SHALL CONFORM TO THE REQUIREMENTS OF AWPA STANDARDS C-16, C-22, C-23, C-24 & C-28. POSTS FOR BUILDINGS SHALL BE AS NOTED ON THE PLANS. ALL POST MATERIALS SHALL BE HEM -FIR #2 OR BETTER, FULL DIMENSION AND GRADED BY WWPA GRADING RULES. HARDWARE SHALL BE SIMPSON OR APPROVED EQUAL. ALL BOLTS SHALL CONFORM TO ASTM A307. METAL PANELS MAY BED T I DELTA RIB STYLE GALVANIZED OR PAINTED 29 GAUL THICKNESS, S E IC KN SS E ATM A653 STRUCTURALUALITY (SQ), Fy = 80.0 ksi. ROOF PANELS SHALL BE FASTENED TO PURLINS WITH PLATED, GASKETED 1 1/2" LONG METAL Q 0 WOOD FASTENERS. WALL PANELS SHALL BE FASTENED TO GIRTS WITH PLATED, GASKETED 1" OR LONGER METAL TO WOOD FASTENERS, PANELS SHALL BE INSTALLED AND FASTENED ACCORDING TO THE MANUFACTURER'S RECOMMENDATIONS. ALTERNATE ROOFING & SIDING APPLICATIONS - BUILDING ROOF MAY BE SHEETED WITH 15/32" O.S.B. BOARD, 1/2" C -DX PLYWOOD OR OTHER APA RATED SHEETING, NAILED O 6" 0. C. W/ 8d OR 10d NAILS. FINISH COVERING FOR SHEETED ROOF MAY BE COMPOSITION ROOFING OVER 30# FELT, OR 29 GAUGE METAL ROOFING OVER 15# FELT. BUILDING MAY BE SIDED WITH 7/16" O.S.B. BOARD, 1/2" C -DX PLYWOOD, 15/32" T-111 PLYWOOD SIDING OR HARDI-PLANK. LAP SIDING MAY BE INSTALLED OVER BUILDING WRAP AND WALL SHEETING. SHEETING SHALL BE FASTENED TO GIRTS WITH 8d, NAILS O 6" 0. C., OR 1 1/2" LONG X 16 GA. STEEL STAPLES O 6" 0. C. O PANEL EDGES & INTERMEDIATE FRAMING. SOIL COMPACTION - ALL BACKFILLED SOIL BENEATH FOOTINGS SHALL BE COMPACTED WITH A VIBRATORY COMPACTOR TO 95% OF THE PROCTOR DENSITY AS DETERMINED BY ASTM A1557, METHOD D. TRUSSES SHALL BE DESIGNED BY AND BEAR THE SEAL OF AN ENGINEER REGISTERED TO PRACTICE IN THE STATE OF WASHINGTON. TRUSS LOADING: TOP CHORD LIVE LOAD = 40 PSF TOP CHORD DEAD LOAD = 5 PSF BOTTOM CHORD DEAD LOAD = 1 PSF TRUSS WEB BRACING INTERIOR OR GABLE END TRUSSES NOTES FOR TRUSS WEB BRACING: TRUSS DIAGRAMS WILL OFTEN REQUIRE WEB MEMBER BRACING, WHICH IS SHOWN ON TRUSS DRAWINGS FS THE METHOD OF TRUSS WEB BRACING SHOWN ABOVE REPLACES 1' X 4" OR 2' X 4' WEB MEMBER BRACING FOLLOW THESE INSTRUCTIONS FOR ALL WEB MEMBER BRACING TO REPLACE 'RAT -RUN' WEB lOd NAILS @ 6' O.C. Od NAILS @ 6' D.C. SHEATHING REQUIRMENTS THE FOLLOWING MINIMUM ROOF DIAPHRAGM REQUIREMENTS ARE NEEDED, ■ ROOF STEEL, 29 GAUGE GRAND -RIB III, 36' WIDTH OR EQUIVALENT ■ FIELD SCREWS, #10 x 1 1/2' AT 9' O.C. (NEXT TO HIGH RIB) • EAVE AND RIDGE PURLIN SCREWS. #14 x1 1/2' AT BOTH SIDES DF EACH MAJOR RIB THE FOLLOWING MINIMUM ENDWALL DIAPHRAGM REQUIRMENTS ARE NEEDED. ■ ENDWALL STEEL, 29 GAUGE GRAND -RIB III, 36' WIDTH OR EQUIVALENT x FIELD SCREWS- #10 x 1 1/2' @ 9' D.C. (NEXT TO HIGH RIB) BASE GIRT, END TRUSS, AND DOOR HEADER SCREWS, #14 x 1 1/2' @ BOTH SIDES OF EACH MAJOR RIB. 'X6'OR2'X8' X4 - L -BRACE L -BRACE TRUSS WEB MEMBER TRUSS WEB MEMBER ,- DIAPHRAGM SCREWS SECTION B -B SECTION B -B AT INTERIOR TRUSSES AT GABLE END TRUSS DIAPHRAGM SCREWS @ ENDWALL BASE GIRT ACROSS SS $O ENDWALL DOOR HEADERS & GABLE END TRUSS TOP CHORD, EAVE & RIDGE PURLINS ON ROOF NOTED ABOVEREWS) TYPICAL SCREW PATTERN, EXCEPT AS STEEL SHEETING SCREW PATTERNS OVERHEAD DOOR OPENING N.T.S S3 2 8 S� S5 TYPICAL ROSS BO1"TO.M CH" -"D BRACING SLIDING DOOR OPENING TYPICAL SIDE ELEVATION NOTES FOR SIDE ELEVATION N.T.S. Si 2' X 8' HEADER S2 2' X 10' HEADER FOR 10' & 12' SLIDING DORS 2' X 8' HEADER FOR 8' & SMALLER SLIDING DOORS NOTES FOR TRUSS BOTTOM CHORD BRACING e.. ` N.T.S. NOTE: ' T''4 Sl GABLE END TRUSS 1. THE NEXT LARGER SI E P � -TAY B $Ub.ShT.QjtD FOR POSTS WITH • 2" X 6" LAMINATIONS. S� DOUBLE INTERIOR TRUSSES l�L 2• ENDWALL POSTS SHALL BE 6" X 6" ROUGH CUT HEM -FIR #2 TREATI a1' 1! 7 POSTS UP TO 18'-0" WALL HEIGHT. ABOVE 18' WALL HEIGHT, ENDWALL POSTS SHALL BE 6" X 8" ROUGH CUT HEM -FIR 2 POSTS S3 2' X 4' X -BRACING @ 10'. 0' D.C. �% f'- 3. FOOTINGS FORIEN- ALL POSTS„S ALL IBE .A MINIMUM OF 2'0 X 3'-0" DEEP FOR ALL'-+NEIGHTS'�TO''18'-0"-�'A80VE 18' WALL HEIGH S4 2' X 4' BOTTOM CHORD BRACING @ 10'-0' O -C. ?. FOOTiNcssryALL'BE 24"01 X 3' =4 - DEEP OR, AS SPECIFIED BY TRUSS MANUFACTURER 4. ABOVE FOOTING-OESIGNS'ARE FOR'"POST'FRAME BUILDINGS WITH p " CONCRETE FLOORS (CONTRAINED POSTS). IF BUILDINGS WILL NOT SS TOENAIL BRACES TO TRUSSES WITH Id01CONCRETE FLOORS, INCREASE FOOTING DIAMETER X 2" & FOOTING 3 - 10d NAILS ssj DEPTH X 4". EXPIRES 1 Q 29 09 POST/FOOTING CJ LIVE LOAD POST COLUMN FOOTING KNEEBRACEI CONCRETE SPACING "H" W X D FOOTING DETAIL j VOLUME, YD N.T.S. GABLE END TRUSS 8 - 16.d NAILS 0.35 - x -� - - 8 - 16d NAILS .35 2' X 6' X 18' 3'-W'_-. BOLTING BLOCK 10-0 14-0 , TA 3-0 CORNER POST _ I&:& Gii XU. 24 -3-0 8 - 16d NAILS 0.35 10-0"_ 2` 'X 6' X 18' 24'-.-3-0 _ _NO -NO--_- BOLTING BLOCK 20-0 6'X10"_`__ DETAIL 3 TYP. GABLE END Zr-6 - TRUSS CONNECTION 24 - 3 r USE BOLTING BLOCKS BELOW 0.37 ALL CORNER COLUMN GIRTS SPLIT SLIDER DOOR OPTION OPTIONAL FRONT ELEVATION NOTES FOR OPTIONAL FRONT ELEVATIONS S1 HALF TRUSS DESIGN BY OTHERS S2 2' X 10' HEADER UP TO 12' 0' DORS 2' X 12' HEADER UP TO 20' 0' DOORS 2' X 12' BACKED WITH 2' X 6' UP TO 24' 0' 0 2' X 6' HEADER S4 4' X 6' DOOR POST - 8' THRU 14' WALL HEIGHT W/ 2' X 6' FACER. 6' X 6' DOOR POST - 16' & 18' WALL HEIGHT W/ 2' X 8' FACER. SS DOUBLE 2' X 6' KINGPOST IG iIII W F24IIx=Sol ,011 NOTES FOR DETAIL 2- KNEEBRACE S1 TRUSS TOP CHORD, DESIGN BY OTHERS S2 TRUSS BOTTOM CHORD, DESIGN BY OTHERS S3 2' X 6' DF -L #2 EACH SIDE 0 WOOD POST, SEE POST/FOOTING SCHEDULE SS 4 - 16d GALV, NAILS, EACH SIDE 1). KNEE BRACE REQUIRED WHERE SHOWN ON POST/FOOTING SCHEDULE, BRACE NOT REQUIRED AT GABLE END TRUSSES, 2), ALTERNATE KNEE BRACE/POST AND TRUSS/POST CONNECTION = USE 3/4'0 THRU BOLTS, EACH LOCATION. BUILDING SPECIFICATIONS: GENERAL - ALL BUILDING CONSTRUCTION SHALL CONFORM TO THE 2006 EDITION OF THE INTERNATIONAL BUILDING CODE (IBC 2006), AND ALL STATE & LOCAL BUILDING CODES. THESE SPECIFICATIONS AND PLANS ARE INTENDED FOR USE IN 30 OR 40 PSF LIVE LOAD, 85 MPH WIND SPEED, EXPOSURE B AND SEISMIC DESIGN CATEGORY C. DESIGN LOADS - ROOF LL = 40 PSF ROOF DEAD LOAD = 5 PSF* CEILING LL = 0 PSF CEILING DL = 1 PSF • ROOF DL ALLOWS FOR A MAXIMUM OF 3" THICKNESS OF FIBERGLASS INSULATION. * MAXIMUM SOIL BEARING PRESSURE = 2,000 PSF MAXIMUM SOIL BEARING PRESSURE IS BASED ON SAND, SILTY SAND, CLAYEY SAND, SILTY GRAVEL AND CLAYEY GRAVEL SOILS OR BETTER. LESSER SOIL CONDITIONS WILL REQUIRE REVIEW AND FOOTING SIZE ADJUSTMENT BY THE ENGINEER. CONCRETE - MINIMUM 28 DAY COMPRESSIVE STRENGTH F'c = 2,000 psi, 4 SACK MIX FOR FOOTINGS. CAST IN PLACE CONCRETE CONSTRUCTION SHALL CONFORM TO ACI 318-05. WOOD - STRUCTURAL LUMBER SHALL CONFORM TO DF -L #2 OR BETTER BY WWPA GRADING RULES. MAXIMUM MOISTURE CONTENT SHALL BE 19% BY WEIGHT. NAILING SHALL CONFORM TO TABLE 2304.9.1 FASTENING SCHEDULE & OTHER APPROPRIATE SECTIONS OF CHAPTER 23 OF THE IBC. ALL NAILS INTO PRESERVATIVELY TREATED WOOD SHALL BE HOT -DIPPED ZINC COATED GALVANIZED STEEL, SILICONE BRONZE, COPPER OR STAINLESS STEEL. CCA TREATED WOOD SHALL CONFORM TO THE REQUIREMENTS OF AWPA STANDARDS C-16, C-22, C-23, C-24 & C-28. POSTS FOR BUILDINGS SHALL BE AS NOTED ON THE PLANS. ALL POST MATERIALS SHALL BE HEM -FIR #2 OR BETTER, FULL DIMENSION AND GRADED BY WWPA GRADING RULES. HARDWARE SHALL BE SIMPSON OR APPROVED EQUAL. ALL BOLTS SHALL CONFORM TO ASTM A307. METAL PANELS MAY BED T I DELTA RIB STYLE GALVANIZED OR PAINTED 29 GAUL THICKNESS, S E IC KN SS E ATM A653 STRUCTURALUALITY (SQ), Fy = 80.0 ksi. ROOF PANELS SHALL BE FASTENED TO PURLINS WITH PLATED, GASKETED 1 1/2" LONG METAL Q 0 WOOD FASTENERS. WALL PANELS SHALL BE FASTENED TO GIRTS WITH PLATED, GASKETED 1" OR LONGER METAL TO WOOD FASTENERS, PANELS SHALL BE INSTALLED AND FASTENED ACCORDING TO THE MANUFACTURER'S RECOMMENDATIONS. ALTERNATE ROOFING & SIDING APPLICATIONS - BUILDING ROOF MAY BE SHEETED WITH 15/32" O.S.B. BOARD, 1/2" C -DX PLYWOOD OR OTHER APA RATED SHEETING, NAILED O 6" 0. C. W/ 8d OR 10d NAILS. FINISH COVERING FOR SHEETED ROOF MAY BE COMPOSITION ROOFING OVER 30# FELT, OR 29 GAUGE METAL ROOFING OVER 15# FELT. BUILDING MAY BE SIDED WITH 7/16" O.S.B. BOARD, 1/2" C -DX PLYWOOD, 15/32" T-111 PLYWOOD SIDING OR HARDI-PLANK. LAP SIDING MAY BE INSTALLED OVER BUILDING WRAP AND WALL SHEETING. SHEETING SHALL BE FASTENED TO GIRTS WITH 8d, NAILS O 6" 0. C., OR 1 1/2" LONG X 16 GA. STEEL STAPLES O 6" 0. C. O PANEL EDGES & INTERMEDIATE FRAMING. SOIL COMPACTION - ALL BACKFILLED SOIL BENEATH FOOTINGS SHALL BE COMPACTED WITH A VIBRATORY COMPACTOR TO 95% OF THE PROCTOR DENSITY AS DETERMINED BY ASTM A1557, METHOD D. TRUSSES SHALL BE DESIGNED BY AND BEAR THE SEAL OF AN ENGINEER REGISTERED TO PRACTICE IN THE STATE OF WASHINGTON. TRUSS LOADING: TOP CHORD LIVE LOAD = 40 PSF TOP CHORD DEAD LOAD = 5 PSF BOTTOM CHORD DEAD LOAD = 1 PSF TRUSS WEB BRACING INTERIOR OR GABLE END TRUSSES NOTES FOR TRUSS WEB BRACING: TRUSS DIAGRAMS WILL OFTEN REQUIRE WEB MEMBER BRACING, WHICH IS SHOWN ON TRUSS DRAWINGS FS THE METHOD OF TRUSS WEB BRACING SHOWN ABOVE REPLACES 1' X 4" OR 2' X 4' WEB MEMBER BRACING FOLLOW THESE INSTRUCTIONS FOR ALL WEB MEMBER BRACING TO REPLACE 'RAT -RUN' WEB lOd NAILS @ 6' O.C. Od NAILS @ 6' D.C. SHEATHING REQUIRMENTS THE FOLLOWING MINIMUM ROOF DIAPHRAGM REQUIREMENTS ARE NEEDED, ■ ROOF STEEL, 29 GAUGE GRAND -RIB III, 36' WIDTH OR EQUIVALENT ■ FIELD SCREWS, #10 x 1 1/2' AT 9' O.C. (NEXT TO HIGH RIB) • EAVE AND RIDGE PURLIN SCREWS. #14 x1 1/2' AT BOTH SIDES DF EACH MAJOR RIB THE FOLLOWING MINIMUM ENDWALL DIAPHRAGM REQUIRMENTS ARE NEEDED. ■ ENDWALL STEEL, 29 GAUGE GRAND -RIB III, 36' WIDTH OR EQUIVALENT x FIELD SCREWS- #10 x 1 1/2' @ 9' D.C. (NEXT TO HIGH RIB) BASE GIRT, END TRUSS, AND DOOR HEADER SCREWS, #14 x 1 1/2' @ BOTH SIDES OF EACH MAJOR RIB. 'X6'OR2'X8' X4 - L -BRACE L -BRACE TRUSS WEB MEMBER TRUSS WEB MEMBER ,- DIAPHRAGM SCREWS SECTION B -B SECTION B -B AT INTERIOR TRUSSES AT GABLE END TRUSS DIAPHRAGM SCREWS @ ENDWALL BASE GIRT ACROSS SS $O ENDWALL DOOR HEADERS & GABLE END TRUSS TOP CHORD, EAVE & RIDGE PURLINS ON ROOF NOTED ABOVEREWS) TYPICAL SCREW PATTERN, EXCEPT AS STEEL SHEETING SCREW PATTERNS OVERHEAD DOOR OPENING N.T.S S3 2 8 S� S5 TYPICAL ROSS BO1"TO.M CH" -"D BRACING SLIDING DOOR OPENING TYPICAL SIDE ELEVATION NOTES FOR SIDE ELEVATION N.T.S. Si 2' X 8' HEADER S2 2' X 10' HEADER FOR 10' & 12' SLIDING DORS 2' X 8' HEADER FOR 8' & SMALLER SLIDING DOORS NOTES FOR TRUSS BOTTOM CHORD BRACING e.. ` N.T.S. NOTE: ' T''4 Sl GABLE END TRUSS 1. THE NEXT LARGER SI E P � -TAY B $Ub.ShT.QjtD FOR POSTS WITH • 2" X 6" LAMINATIONS. S� DOUBLE INTERIOR TRUSSES l�L 2• ENDWALL POSTS SHALL BE 6" X 6" ROUGH CUT HEM -FIR #2 TREATI a1' 1! 7 POSTS UP TO 18'-0" WALL HEIGHT. ABOVE 18' WALL HEIGHT, ENDWALL POSTS SHALL BE 6" X 8" ROUGH CUT HEM -FIR 2 POSTS S3 2' X 4' X -BRACING @ 10'. 0' D.C. �% f'- 3. FOOTINGS FORIEN- ALL POSTS„S ALL IBE .A MINIMUM OF 2'0 X 3'-0" DEEP FOR ALL'-+NEIGHTS'�TO''18'-0"-�'A80VE 18' WALL HEIGH S4 2' X 4' BOTTOM CHORD BRACING @ 10'-0' O -C. ?. FOOTiNcssryALL'BE 24"01 X 3' =4 - DEEP OR, AS SPECIFIED BY TRUSS MANUFACTURER 4. ABOVE FOOTING-OESIGNS'ARE FOR'"POST'FRAME BUILDINGS WITH p " CONCRETE FLOORS (CONTRAINED POSTS). IF BUILDINGS WILL NOT SS TOENAIL BRACES TO TRUSSES WITH Id01CONCRETE FLOORS, INCREASE FOOTING DIAMETER X 2" & FOOTING 3 - 10d NAILS ssj DEPTH X 4". EXPIRES 1 Q 29 09 POST/FOOTING SCHEDULE 1r .24? SPANS, 40 PSF LIVE LOAD POST COLUMN FOOTING KNEEBRACEI CONCRETE SPACING "H" W X D "B" DIA 'T' REQUIRED VOLUME, YD X 0.35 - x -� - - .35 3'-W'_-. NO 10-0 14-0 6 XG W/2 X6" TA 3-0 0.35 _ I&:& Gii XU. 24 -3-0 _NO _ 0.35 10-0"_ -_-18.0" 6"X8• W/2 X26" 24'-.-3-0 _ _NO -NO--_- 0.35 10-0 20-0 6'X10"_`__ -24" 3•-0•• 0.35 W-6; Zr-6 - 6 X 10" 24 - 3 r ___NO- - NO 0.37 10-0- 24-0 6 XIV' WI2"X8 7A" 3.8 - NO 0.430.43 124" 8'-0" 6" X G' 26" 4'-0" NO 0.41 -0 _ 6 X6' 26 _ 34 Na- 0.41 12-0" .70 1r-0" 6"X6"W/r'X6" 26" 3-0' NO_- 0.41 - 12-0'- 14-0 -. . - 6 X6"wiz, X6" 26' - 3-0 NO_ 0.41 12-0 16-0 6 X6'W/2"X 6'' 26 _. a-0 - NO 0.41 XS"W/2"X6" 2T3-0 NO 0.45 1r-0" 20'-0" 6'• X 10" 2T' _..3•.3•:. - -.. NO--- 0.48 1r-0" 2264 6 X 10" W/r, x 6 2T - 31E••. - NO -- 0.52 -- 1r-0•• z4•-0" -- _ 6" x 1r' zr•- a�-ia' _-YEs 0s7 POST/FOOTING SCHEDULE 30' SPANS, 40 PSF LIVE LOAD POST COLUMN FOOTING KNEE BRACE CONCRETE SPACING "K• W X D "Er' DIA 'T' REQUIRED VOLUME, YD 10'-0" 8'-0" 6" X W 2&' 74' NO 0.41 __ 10-0' _ 10-0 __ 6X6" 3-0 _-_ NO__ 1 0.41 _ 26-_ 10-0' 12'-0' 6'•X6"W/r'X6" 26" - 3.0'- __ �� -�NO 0.41 10•-0" 14'-0" 6" X 6•' W/2" X 6" ZT' 3'-0" NO 0.44 ---------- 10•,0•, 16'-0•' _..--4422_ __ 6" X 8" ---- ZT• ....3:A" '-`--NO 0.44 ---- 10'-0•' - ---- ----_ 8" W/r' X 6" --- 2T' .--- 3'-0" -- - NO 0.44 _ - 10.0' k4l 6" X 10 -- 2T T -w 0.44 104' - 2r-0 - - - /Z s x10"wir•x6 zr' a -a No 0.48 10.-0" 21V-0" s^ x 1r• 2r:- a• -s^ - ---No 0s2 124" 8%0" 6" X 6" 30" T.W. NO 0.55 ----- 12-0" ---- 10'-0" --- -----. 6" X 6" 2422.._ 30•' - 3'-0'' � NO 0.55 --------- 12-0" 1r-0•' --_-_-----.- 6" X 6" W/r' X 6" .. --- 30'• - 3'-0" -- -- NO 0.55 12-014-0 6 -X NO_ 0.55 12-0- 164 ------------ 6 XIY W!2 X6 30 34 NO 0.55 124 18-0 6 X10 30 NO 0.55 --- 12-0" 20-0' 6"X 10'Y11l2"X6 _ 30" -3-0 �3•r'- NO 0.58 2224_._ 12-0" ---- 22'-0" _ 2244.-----_.. 3•4" NO 0.61 -------_---_ 6•' X 1r' ---- 30• 124" 24'-0'• 6" X 12" W(2" X 6 30" 3'-8" -YES 0.64 POSTIFOOTING SCHEDULE 36 SPANS, 40 PSF LIVE LOAD POST I COLUMNFOOTING KNEE BRACE CONCRETE SPACING '•M• W X D "B" DIA. 'T' REQUIRED VOLUME, YD 10'-0'• 8'4• 6'• X 6'•10-0 3W' T41 NO 0.51 10-0 6 kia_ �2222 w_ -3-0 ---Ra- NO 0.51 10-0 124; X6 W/2 X6 30 - 3-0 NO ` 0.51 10-0 14 -0 6 X6 �W/2 X26 30'__ 3-0 NO 0.51 -16 -0 6" x a• 30' _ 3•-0" _ Rdi_ 0.51 -18-0 e X8•W/r X6'' _ 30' _ NO_-_ 0-51 10•-0"_ _ _-3-0 _ 2222 0.51 _ 10-0 _20.0" 22-0 6'X10 W/r'X6" 30" 3 r ^NO 0.58 _. 10-0 _ 24-0 6 X 10 W!r X 6 30' 3.6 _ YES 0.64 12-0 -08 6 X6 3r' -0 3 NO 0.62 _ 124 _-010 3r'_ -6; NO 0.62 6X8 1_2-0" 1 2-0" 0.62 _12 .4-0wX811_ 4 -3-"_--3'-0_ 0.62 12-0' 16.0 di; XS"W/2"X6" 34 NO 0.62 12-0' 18-0 6'X10" 32' v4 NO 0.62 _ 32 -. 3.0 _ NO 0.62 12-0•' 22'-0" ---- 6" X 1r' - .. 3r' . _ _ NO 0.67 12-0" 24'4" 6" X 12" Wlr' X 6" _ 32"- �- ---- � 3'-6"- - NO -- 0.72 POSTIFOOTING SCHEDULE4& SPANS, 40 PSF LIVE LOAD POST COLUMN FOOTING KNEE BRACE CONCRETE SPACING "M' W X D •'B'• DIA 'T' REQUIRED VOLUME, YD 10•-0•' 84 6"X6" 30" T4' NO 0.55 _ 10-0 _ 6 XG 30___ a-0 NO 0.55 _ 10-0 _10-0 12-0 6'R iW/2 X6" 30 -_ Y- _ NO 0.55 _ 10-0 14-0 6 -i6' W/r X6" -51f_ _ 3-0 _ NO 0.55 10-0 16-0 6X8 30 3-0 _ YE§ 0.55 - --- 16'-0" 6" X e' Wl2 X 6•' 30" T-0' - NO 0.55 -'--' ---- 10•-0" :_.__._.__ ---- -.. 18'-0" 4222._. -------'-2422._.-------- 6" X 8'• W/r• X 6" 32" " 3'-0" _ NO - 0.62 10'-0" 20'-0" 2224__-_____.._. 6" X 10'• 2222_..-...___.. 32" 3•-0" _. NO. 0.62 _ 10-0' 2r-0 -- - -. 6'X10"W/2"X6 __ 32 3-0 __�_ NO 0.62 10-0' 24-0 6'X 12" - 32' 33 __ YE§�� 0.66 124 W- 6' X 6" 33' T4' NO 0.66 12-0" _.... __.__-_-__...__._-__.. 1U•-0'• 6'• X 6" W_/2" X 6" _.___._.._. 33" 424_.-. 0.66 12-0 12-0 6 xa" -5311_ _3'-0"_ _NO _ NO 0.66 124 14-0 6 XS" 33 _a-0 3-0 _ NO 0.66 12-0 -16-0 6 XB W/r X6' 33' 3-0 NO 0.66 ,e-0 18-0 6 X10 33' 3-0 NO - --',;- 0.66 12'-0" " 20%0" 6" X 10" W/2" X 6" 33" 3'-0" _ NO 0.60 222-0 s^x1r• 34 a r -_-No-- 0.74 12-0'• 24'-0" 24-44_-' W& -i'- 6" X 1r• W/2" X 6" _-... 34" 3'-6" - NO 0.82 POST/FOOTING SCHEDULE 48• TO 52' SPANS, 40 PSF LIVE LOAD POST COLUMN FOOTING KNEE BRACE CONCRETE SPACING H W X D •'B" DIA 'T' REQUIRED VOLUME, YD 104" 8-0 6 X6' 34•' 3'-0•' NO 0.70 10'-0" - - 6" X 6" 34"_ _ __ 3'-0" -N- O 0.70 124 6"X6•'W/2"X6" 34 -i4;� _ �NO 0.70 10-0' 14-0 6'X8" 34 3-0 NO 0.70 10-0" 16-0 - - 6'X8' W!r X6" 94 3-0 NO- 0.70 104 184 6'X8' W/2 X6' __ 34' 3-0 NO 0.70 10-0' 20-0 6'X10 34' 3-0 YES 0.70 zz•-0•• s•• x 10" wrr' x s" -10 34- a-0^ - -•-0" No N'• 0.70 10•-0" 21V-0",6" z ii aa" -_ _. a' -r' --__-_ No 0.74 124" F -W' 6" X 6" - 38' 3'4" NO 0.86 12-0 10-0 4 4 ;Ri;_ 6 X6'•W/2"X6" -, 38 3-0 NO 0.88 _._ 1z-0" _ 12•:0^ -- -- - - - s" x s" wrr' x s" as" -- - 3•-0" -No 0.88 -----_...-_._._ 12-0" ..-----_ 14•-0" _.--_- ------wheR--' 6" X 8" W/2" X 6" ----'--..__-4424-. - -iii;_- 38" _.----- 3'-0" -----'-_.. NO 0.88 12-0" 16'-0•' 6" X 8" W/r• X 6" -.--..-` 38" ----- 3'-0•' ------- 0.88 6" X 10" W/2" X 6" 38" 3'-0•' YES 0.88 12-0' 20-0 _.10 _. 6'• _ 6'X Wlr X 38" 3-0- ' NO� 0.88 4442 12-0' : 2Z -W' . 6" X 1r ---- 38" 3 -0' NO -_ 0.88 12-0'• 2'V-0•' 6" X 1T'� W/T: X 6;: 38;•-- -3•-3:: --- NO 0.95 POSTWOOTING SCHEDULE 54' TO 60' SPANS, 40 PSF LIVE LOAD POST COLUMN FOOTING KNEE BRACE CONCRETE SPACING "M' W X D "B" DIA 'T' REQUIRED VOLUME, YD 10'41 8w, 6•• X 6'• 38" T.0" NO 0.88 10-0 10-0 e R e W/2 X6 ig;'- ii4v 0.88 10-0 1r-0 6 X6 wir X6 38 -3-0 NO 0.88 104' 144 6 98 38 3-0 NO- 0.88 10'-0" 16'-0" - - - &'R 8" W/r' X 6"- 38" - 3 0.88 104 1814, -- v, X 101, _ 38 _'-0" 3-0 _NO NO 0.88 10-0 -k-d;_ 6 X'10 98 84 YE5 - 0.88 ...._ 10'4" 22'-0" -- 6"X10"W/2"X6" 38" 3'-0'• NO 0.88 - - 10'-0'• --- 24'-0" -..-- -- - 6•' X 1r-'- ------ 38" - - 3'-r' --- YES 0.93 124" &4' 6" X W 40" 3'-0" NO 0.97 12-0 iO4 6X6 W/2 X6- 40 34 NO 0.97 12-0 tr-0 6X8 '-I 40 -F 3- NO - 0.97 12-0 i4-0 6 X S W/2 X 6 - r 40 e13-0 _NO 0.97 12-0" 124'- i6'-0'• 181.1-T,`6iX10 6,•X10 -. ;, , ,- -- 49' , ,3'-0'• NO°_-.- -YES_ 0.97 0.97 40'x'3-0 124 6 X10 W!r X6' 40 3-0 NO 0.97 12-0 -20-0 22-0 6 X 12 42 - 3-0 YES YES 1.07 12-0" 24'-0" 6" X 1r'Wlr' X 6•' 42" 3-Z' _ NO 1.13 ,TI, r , vuliWMQBEKE ENGINEERING E. 61st Court ane, WA- 99223 Tetephone, 509-443-6186 Fax, 509-448-6582 a -mall dwambeke@msn.com LAYOUT, STRUCTURAL DETAILS AND SPECIFICATIONS POST FRAME BUILDINGS 40 PSF LIVE LOAD IBC 2006 REMBRANT CONSTRUCTION 5329 :,NORTH STEVENS SPOKANE WASHINGTON 99205 BY DATE DRAWING NO.- REV, "'DRriwN' WAMBEKE 3-20-08 REMBRANT.18C04.2006-40 `CHECKED - BY DATE DESCRIPTI❑N` ❑F CHANGE PROJECT NO. 2008 SCALE, N.T.S. SHEET, 1 OF 1 PROVIDE DIAGRAMS AND ENGINEERING LAYOUTS FOR ROOF TRUSSES, BEAMS AND FLOOR SYSTEMS PRIOR TO FRAMING INSPECTIONS CITY COPY THIS BUILDING SUBJECT TO FIELD INSPECTION CORRECTIONS 81,-6&ilat4r: REvpavEr :;OMPLIANCE SPoKANIE vk,i • F.,,f f3ci sioN .17-t PRO E DIAGR ENGIN. RING L S AND OUTS FOR ROOF T FLOOR S TEM PRIOR TO F MING SSES, EAMS AND INSPECT! CI C PY TO FIELD INSPEC REV' ORRECTIONS Oc.:qiiiPLi L.DI, G DIMS