2014, 06-26 Permit App: BLD-2014-1508 Duplex 36
} ?-0 D'--t t'j Permit Center
of 11703 E Sprague Ave,Suite B-3 l I M11 N UM131 J{
1 Spokane Spokane Valley,WA 99206 Pros-'(p g MIT FEE:
Valley (509)688-0036 FAX:(509)688-0037 RECEIVED
www.spokanevalley.org
Community Development
Residential Construction '1.74 New Cons ruction Alicgary Bldg
Permit Application AdditiOrtaanodgv Pi�V' ENTER
Other: 6 U D [7 REV. 4 _
2
SITE ADDRESS: 131 i 4° C IA//e1//001
ASSESSORS PARCEL NO: LEGAL DESCRIPTION:
Building Owner:• Contractors
Name: ( _, (A�
Name: A:l� � ,S)/ Name:
wmes
Addresst371 G / p/ Address: 1320 € ["1patrl~_TA me,
FEMME , State: i Zips./ City: SPoKAiJE NiState: lok Zip:99Z*
Phone: O i_ t S3. 3 -2- Fax: Phone:(5-&0-D921-Z822 Fax{Sdi)321 -28ZZ
Contractor Lic No:`EserivisglsK Exp Date: 12.1 (pt 20ig
20)-ntaCt.i ersoII - City Business Lic.No:
�'
Name: �tiq ,, Su nSo�n
„ Phone:(56C1) $41-g%20
Describe the scope of work in detail: Cost of Project: $
Proposed Use:
**************The following MUST be complete: (write N/A if not applicable)**********************
HEIGHT TO PEAK: ,,,�:Zt DIMENSIONS:491-11" X 1,,11,, #OF STORIES: ` TOTAL HABITABLESSPACE:
MAIN FLOOR TO SQ. 2""FLOOR SQ. FTG: UNFIN BASEMENT SQ. FTG: IMPERVIOUS SURFACE
FTG: 2(0D AREA:
FINISHED BASEMENT GARAGE SQ. FTG: DECK/COV. PATIO SQ. FTG: 30%SLOPES ON
SQ. FTG: goo ` 9 Z PR.• RTY:
#OF BEDROOMS: CONSTRUCTION TYPE: HEAT SOURCE: SEWER 6 R SEPTIC?
(� 113 M LEcIiZlc WALL NF:Act
The permitee verifies,acknowledges and agrees by their signature that: 1) If this permit is for construction of or on a dwelling,the
dwelling is/will be served by potable water. 2) Ownership of this City of Spokane Valley Permit inure to the property owner. 3) The
signatory is the property owner or has permission to represent the property owner in this transaction. 4) All construction is to be done
in full compliance with the City of Spokane Valley Development Code. Referenced codes are available for review at the City of
Spokane Valley Permit Center. 5) This City of Spokane Valley Permit is not a permit or approval for any violation of federal,state or
local laws,codes or ordinances.6) Plans or additional information may be required to be submitted, and subsequently approved before
this application can be processed.
SIGNATURE: DATE:
Method of Payment:
❑ Cash 0 Check ❑ Mastercard ❑ VISA
Bankcard#: Expires: VIN#:
Authorized Signature:
REVISED 2/15/07
Target Date sheet
For City Use Only
. . ' % �Sjöline Project Address
Valley
v 11703 E Sprague Ave Suite B-3 • Spokane Valley WA 99206
509.720-5240 ♦ Fax: 509.688.0037 • permitcenter®spokanevafey.org
As part of our on-going commitment to customer service during the review process of your project application,we are
providing you with a TARGET DATE for the initial technical application review. If for any reason we cannot meet
this date,we will contact you with a revised target date.,
Your application review TARGET DATE is i�!L ` '' ` /i
The TARGET DATE is the date we estimate your project application will have had its initial technical review. It is
not the date for approval or permit issuance.
Tips for a Smoother Project Application Review
➢ Submit complete,accurate plans and documents.
Extra time may be required for re-submittals as project application reviewers work on multiple applications and it may be
several days before they can look at your new or revised information.
> Designate a specific contact person to communicate with the City.
While the person designated as the applicant's contact person with the City can be changed, one individual with the expertise
for dealing with reviewer comments would be the best choice for the entire review process.
➢ Call staff regarding the status of your project only after the target date shown at the top of the page.
Although you should be contacted on or by the target date,please feel free to contact us if you haven't heard from us by your
target date.Staff may contact you before the target date if the initial review is complete.By following this procedure,you will
save time and allow the reviewers to complete the work more expeditiously.
Steps in the Permit Process
1. Counter Complete. Your application has been accepted as counter complete. This means all of the required documents, as
indicated on your Pre-Application Checklist have been submitted or have been approved for deferred submittal. This does
not prevent technical staff from requesting additional information as a result of their technical review.
2. Quality Check. The next step in the process is a quality check to make sure that the application is reviewable and free from
substantive flaws that would prevent technical staff from completing the technical review once it is started. When this step is
complete,your application will be routed to the appropriate staff and remain in their review queue until it comes up for review.
3.Technical Compliance.Once an application is administratively complete,it is routed to technical staff for compliance review.
Depending on the type of project, technical staff may include multiple reviewers. You should be contacted by phone, fax, email,
or mail by your TARGET DATE once the initial technical compliance review is complete.
4. Permit Issuance. When the technical compliance review of the application is complete, including any subsequent re-
submittals, each reviewer will approve their section of the application and route it to the Permit Center.When all sections of the
application are received, a Permit Specialist will process the application and contact the person specified on your application for
permit pick-up.Information regarding fees and pre-construction meetings(if required)will be provided by the Permit Specialist at
that time.
CD-003 V-7/06-21-11 Page 1 of 1