Loading...
2007, 05-07 Permit App: 07001641 AdditionProject Number: 07001641 Inv: 1 Application THIS IS NOT A PERMIT Penalties will be assessed for commencing work without a permit Date: 5/7/2007 Page 1 of 2 Project Information: Permit Use: RES ADDITION(1) 6 X 16 (1) 8 X 14. 22L 17` sF Setbacks: Front Site Information: Left: Right: Rear: Contact: Address: C - S - Z: Phone: Group Name: Project Name: PAXSON, KEN 10802 E VALLEYWAY AVE SPOKANE VALLEY WA 99206 (509) 921-2109 Plat Key: 001834 Name: OPPORTUNITY TR # 01-354 Parcel Number: 45163.0429 Block: Lot: SiteAddress: 10802 E VALLEYWAY AVE Location:: CSV Zoning: UR -3.5 Water District: Area: ,680.00 Acres Urban Residential 3.5 Width: 80 District: Nort Owner: Name: PAXSON, KEN Address: 10802 E VALLEYWAY AVE SPOKANE VALLEY WA 99206 Hold: ❑ Depth: 146 Right Of Way (ft): 40 Nbr of Bldgs: 2 Nbr of Dwellings: 1 Review Information: Review Building Plan Review Landuse/Zoning/HE Conditions Permits: ar m+rte el,ar.10T mamet Operator: JD Printed By: JD Released By: Print Date: 5/7/2007 r MQ rc S (n wd ' Ca- c ° 3 { u°" -r T 2 -1=- 1 ° 0 3- - �" v C 40 VS Cie rii -8 L s. J M 1, • V) v Ce nN C6 -44 N • 643 c M 0 OS —t 3 Sokane jVa.11eyi Community Development Residential Construction Permit Application Permit Center 11703 E Sprag ye,��� ll V E Spokane Va11e�%,WA 992.t' (509)688-0036 'M(: (509)688-003 MAY 0 — www.s.okanevalle .or PERMIT NUMBER: ' (t') \ PERMIT FEE: U 0 L I1 struction M. Addition/Remodel Other: Accessory Bldg Deck SITE ADDRESS: /O 09, E bia /U y (,car p. �/Cc/t (, 9�4' ASSESSORS PARCEL NO: 1674,3 LEGAL DESCRIPTION: Building Owner: rY CVS r - (� # OF STORIES:TOTAL / Name: is e ?t, )(5 0; (9 -3,2 -sr. �'t MAIN FLOOR TO SQ. FTG: Address:/080a E ✓, it,7 "5�, y IMPERVIOUS SURFACE AREA: City: 5,0 IJP /4,7 / State: 110 Zip: 19,e 6 Phone:S 19 _ �'9/ -51q/ Fax: CONSTRUCTION TYPE: Contact Person Name: fr n t „say-) Phone: 99/- Describe 9/- Describe the scope of work in detail: Contractor: /Mink rY CVS r - (� # OF STORIES:TOTAL / Name: (9 -3,2 -sr. �'t MAIN FLOOR TO SQ. FTG: Address: UNFIN BASEMENT SQ. FTG: IMPERVIOUS SURFACE AREA: City: State: Zip: Phone: Fax: CONSTRUCTION TYPE: Contractor Lic No: Exp Date: City Business Lic. No: Cost of Project: $ fid i /in a '6u inp s eh - tr 1 W' HOW (� !v'("go (/) x/1r' Proposed Use: i d'/,- CY).1 L, n 2 5pe **************The following MUST be complete: (write N/A if not applicable)********************** HEIGHT TO PEAK: / /5 DIMENSIONS: M)eV/aal �j) g' i �!,' # OF STORIES:TOTAL / HABITABLE SPACE: (9 -3,2 -sr. �'t MAIN FLOOR TO SQ. FTG: 2 u FLOOR SQ. FTG: UNFIN BASEMENT SQ. FTG: IMPERVIOUS SURFACE AREA: FINISHED BASEMENT SQ. FTG: GARAGE SQ. FTG: DECK/COV. PATIO SQ. FTG: 30% SLOPES ON PROPERTY: # OF BEDROOMS: CONSTRUCTION TYPE: HEAT SOURCE: SEWER OR SEPTIC? The permitee verifies, acknowledges and agrees by their signature that: 1) If this permit is for construction of or on a dwelling, the dwelling is/will be served by potable water. 2) Ownership of this City of Spokane Valley Permit inure to the property owner. 3) The signatory is the property owner or has permission to represent the property owner in this transaction. 4) All construction is to be done in full compliance with the City of Spokane Valley Development Code. Referenced codes are available for review at the City of Spokane Valley Permit Center. 5) This City of Spokane Valley Permit is not a permit or approval for any violation of federal, state or local laws, codes or ordinances. 6) Plans or additional information may be required to be submitted, and subsequently approved before this application can be SIGNATURE: Method of Payment: ❑ Cash Bankcard #: Authorized Signature: REVISED 2/15/07 0 Check 0 Mastercard Expires: DATE: 37)/( 7 ❑ VISA VIN#: 4,;Valleys 11703 E Sprague Ave Suite B-3 ♦ Spokane Valley WA 99206 509.688.0036 ♦ Fax: 509.688.0037 ♦ cityhall@spokanevalley.org Residential Plan Submittal Minimums ❑ Completed Building & Mechanical application with: Accurate address, Parcel Number and/or Legal Description, description of work, owner and contractor information, signature, and date. ❑ Two sets of plaris including Site Plan, elevations, floor plans; foundation plans With details, roof plan, framing plans & details. O Show the height of any proposed buildings or accessory structures. ❑ Floor plan for each floor: Dimension to scale (minimum 1/8") and label each Room (including sq. footage of house and garage on plans) Show each level of existing house and square footage of any additions. ❑ All braced wall panel types: show locations and details of installation, including engineered design. ❑ Egress windows: Provide at least one window or exterior door approved for Emergency escape or rescue from abasement and in every room for sleeping. ❑ Smoke detector locations ❑ 22" X 30" attic access location ❑ 18" X 24" crawl space access: ❑ One-hour separation detail: between house and garage ❑ Floor framing details: Joist type, size, spacing and installation details ❑ Roof framing plan and details ❑ Furnace and hot water heater location. ❑ All header locations: type, size, and connections O Foundation plan ❑ Insulation information PLANNING ' EPT. APPROVED BY DATE: 34b/'t'1 C or e.,ttAe_ e-;11) aX 0 V- fat VALLft‘iF i LOT WSEC TABLE 6-2 PRESCRIPTIVE REQUIREMENTS°4 FOR GROUP R OCCUPANCY CLIMATE ZONE 2 Option Glazing Area's: % of floor Glazing U -Factor Door9 U- Factor Celling2 Vaulted Ceiling Wall12 ,above Grade Wall? int Below Grade Wall? exd'' Below Grade Floors Slabs on Grade Vertical Overhead" I. 10% 0.40 0.58 0.20 R-38 R-30 R-21 inti R-21 R-12 R-30 R-10 II. 15% 0.40 0.58 0.20 R-38 R-30 R-19+ R-21 R-12 R-30 R-10 R-58 III. 17% 0.37 0.58 0.20 R-38 R-30 R-19+ R-21 R-12 R-30 R-10 R-56 IV. 25% 0.35 0.58 0.20 R-38 / R-30 / R-21 R-15 R-12 R-30 / R-10 / Group R-1 U=0.031 U=0.034 int7 / U=0.029 F=0.54 Occupancy U=0.054 Only V. Unlimited Group R-3 0.35 0.58 0.20 R-38 R-30 R-21 int7 R-21 R-12 R-30 R-10 Occupancy Only VI. Unlimited 0.32 0.58 0.20 R-38 / R-30 / R-21 R-15 R-12 R-30 / R-10 / Group R-1 U=0.031 U=0.034 int7 / U=0.029 F=0.54 Occupancy U=0.054 Only * Reference Case 0. Nominal R -values are for wood frame assemblies only or assemblies built in accordance with Section 601.1. 1. Minimum requirements for each option listed. For example, if a proposed design has a glazing ratio to the conditioned floor area of 13%, it shall comply with all of the requirements of the 15% glazing option (or higher). Proposed designs which cannot meet the specific requirements of a listed option above may calculate compliance by Chapters 4 or 5 of this Code. 2. Requirement applies to all ceilings except single rafter or joist vaulted ceilings. 3. Requirement applicable only to single rafter or joist vaulted ceilings. 4. Below grade walls shall be insulated either on the exterior to a minimum level of R-10, or on the interior to the same level as walls above grade. Exterior insulation installed on below grade walls shall be a water resistant material, manufactured for its intended use, and installed according to the manufacturer's specifications. See Section 602.2. 5. Floors over crawl spaces or exposed to ambient air conditions. 6. Required slab perimeter insulation shall be a water resistant material, manufactured for its intended use, and installed according to manufacturer's specifications. See Section 602.4. 7. Int. denotes standard framing 16 inches on center with headers insulated with a minimum of R-5 insulation. WSEC Builder's Field Guide 5th Edition COOPERATIVE EXTENSION WASHINGTON STATE UNIVERSITY till ENERGY PROGRAM 1-7 E W t L ` t L L nal • N L Q r r^?... np0 lc-v) 20� .,i .416 I Fo row., Y1 Ci SMOKE ALARMS SHALL BE INTERCON- NECTED AND HARD WIRED IN SUCH A MANNER THAT THE ACTIVATION OF ONE ALARM WILL ACTIVATE ALL ALARMS. (BEDROOMS, AREAS APPROACHING BEDROOMS, VAULTED CEILING WITH RISE OF 24. & ON EACH FLOOR) WHEN INTERIOR ALTERATIONS, REPAIRS OR ADDITIONS REQUIRING A PERMIT OCCUR, OR WHEN ONE OR MORE SLEEPING ROOMS ARE ADDED OR CREATED IN EXISTING DWELLINGS, THE DWELLING UNIT SHALL BE PROVIDED WITH SMOKE ALARMS LOCATED AS REQUIRED FOR NEW DWELLINGS. Minimum depth for frost protection in the City of Spokane Valley is 24 inches measured from the bottom of the footing to finish grade. Grade slope away from building a minimum 6 inches in first 10 feet. CONCRETETO COMPLY TO IRC TABLE 404.1.1(1) FO.UNDATIOIVWALLS - 3000 # PSI SLABS, GARAGES, CARPORTS & PORCHES - 3500 # PSI ALL FOOTINGS MUST BE CONTINUOUS I o. b d V.\ iii' v- a cJ _- Min.,4 ft Brace WallPanelsper R602.10.3'& R602.10.4 Min. 2 ft 8 in. Alternate Brace Wall Panel per R602.10.6 Min. 16, 18 or 20 in. APA Portal Frame Bracing Engineered Shear Wall Bracing 1 EMERGENCY EGRESS REQUIREMENTS I FROM SLEEPING ROOMS t) NET CLEAR OPENING. 5.7 SQUARE FEET GRADE FLOOR OPENING (MAX 44') 5.0 SQUARE FIST 2) NET Cl FAR OPENING HEIGHT 24 INCHES 31 NET CLEAR OPENING WIDTH 2O INCHES t 4) MAX FINISHED SILL HEIGHT 44' ABOVE FL R OPE RATTIIONAL GE FROM THE INSIDE OF THE ROOM WI51 E MESHAUNNCY ESCAPE & RESCUE OPENING j THE USE OF KEYS 0R TOOLS Anchor Bolts- Minimum 1/2" x 10" with 7" concrete embedment at 6' o.c. and 12" from ends of sill plates. Radon Mitigation S stem Required mi apor arner Required PROVIDE SOLID BLOCKING,UhDEB ALL.COLUMNS BEARI GWALLS AND $HEAKWALtS: . . PROVIDE DOUBLE JOINTS (MP) UNDER ALL WALLS PARALLEL .TaSPm PROVIDE:DOUBIE STUDS MN TO FourlanoN UNDER ALL HP AND GIRDER TRUSSES PROVIDE SHEAR CONNECTION FROM INTERIOR SHEAR WALLS TO TRUSSES OR JOISTS ABOVE. At/kJ (Z) ' NC '-1 J' Lim:- ew nig u-Poe..ita et/ Ttu5SPS (n4 nC` )7K‘. a d 1'x t / ' N1101.3.1— Attic insulation certification required as to • R — value or coverage. Markers, attached to trusses or rafters, required for every 300 sf of attic space with 1 inch high numbers for installed thickness of insulation. Sad vt�s 12-3 s .-vls. • !1p Coni?DSiGtRer'C'`� IA/ 1614- .-e*' Attic Ventilation 1 Sq Ft per every 300 Sq Ft of space ventilated with at least 50% in the upper portion of roof area. Attic Accessible bv22'x 30" 4 r' . p z5�� ,. r rn . G 4, • e t, CEILING: 1/2" GWB if perpendicular to rafters or trusses 24" o.c. and no water based texture used— otherwise 5/8" GWB. S h 0 Minimum depth for frost protection in the City of '" ."SSpokane Valley is 24 inches measured from the bottom of the footing to finish grade. Grade slope away from building a minimum 6 inches in first 10 feet. Li Job Q55707 Mark Rl Quan Type Span P1 -H2. Left OH Right OH 7 TR 160000 4 1- 6- 0 1- 6- 0 Engineering PAXSON/TB DG 8-6-8 4x4= DG 8-6-8 HO 3-15 HO 3-15 HH 4 S HH 4 2-11-15 - 4 TC 3x4= A TC 3x4= C me EP TC W:508 R U: 1-6-0 868 184 D B1 2x3H W:508 R: U: 8-0-0 16-0-0 8-0-0 8-0-0 Z 868 184 1-6-0 8C EP 8-0-0 I 8-0-0 8-0-0 16-0-0 16 0 0 ALL PLATES ARE MT2020 Scale: 0.348" = 1' Robbins Engineering, Inc./Online Plus' APPROX. TRUSS WEIGHT: 72.9 LOS D -B 0.08 256 T Max comp. force Quality Control Factor 1.25 Online Plus -- Version 20.0.025 RUN DATE: 02 -MAY -07 TC BC WB CSI 0.53 0.52 0.08 -Size- 2x 4 2x 4 2x 4 1B 1B DFL -STUD Brace truss as follows: O.C. - From To TC Cont. BC Cont. 0- 0- 0 16- 0- 0 0- 0- 0 16- 0- 0 Loading Live Dead (psf) TC 30.0 7.0 BC 0.0 10.0 Total 30.0 17.0 Spacing Lumber Duration Factor Plate Duration Factor 47.0 24.0" 1.15 1.15 TC Fb=1.15 Fc=1.10 Ft=1.10 BC Fb=1.10 Fc=1-.10 Ft=1.10 Plus 6 Wind Load Case(s) Jt React Uplft Size Req'd Lbs Lbs In-Sx In-Sx A 869 185 5- 8 1- 8 Hz = -39 C 869 185 5- 8 1- 8 Hz = 40 Membr CSI P Lbs Axl-CSI-Bnd Top Chords A -B 0.53 1335 C 0.02 0.51 B -C 0.53 1335 C 0.02 0.51 Bottom Chords A -D 0.52 1274 T 0.15 0.37 D -C 0.52 1274 T 0.15 0.37 Webs TL Defl -0.21" in D -C L/867 LL Defl -0.12" in D -C L/999 Shear // Grain in A -B 0.35 Plates for each ply each face. PLATING CONFORMS TO UBC. PLATE VALUES MAY BE VERIFIED WITH ROBBINS ENGINEERING. GRIP VALUES BASED ON Doug -Fir -Larch LUMBER USING GROSS AREA TEST. Plate - MT20 20 Ga, Gross Area Plate - MT2H 20 Ga, Gross Area Jt Type Plt Size X Y JSI A MT20 3.Ox 4.0 Ctr Ctr 0.76 H MT20 4.Ox 4.0 Ctr Ctr 0.62 C MT20 3.Ox 4.0 Ctr Ctr 0.76 D MT20 2.Ox 3.0 Ctr Ctr 0.38 REFER TO ROBBINS ENG. GENERAL. NOTES AND SYMBOLS SHEET FOR ADDITIONAL SPECIFICATIONS. NOTES: Trusses Manufactured by: Valley Best Way Analysis Conforms To: ANSI/TPI 95 & 02 OH Loading Soffit'psf 2.0 Wind Loads - ANSI / ASCE 7-02 Truss is designed as a Main Wind -Force Resistance System. Wind Speed: 90 mph Mean Roof Height: 25-0 Exposure Category: C Occupancy Factor : 1.00 Building Type: Enclosed Zone location: Exterior TC Dead Load : 5.0 psf BC Dead Load : 7.0 psf Robbins Engineering. IncfOnliine Plus'. 019952007 Version 20.0.025 Engineering. Pore -all 522007 424:38 AM Pape 1 1335 Lbs Job ` Q55707 Mark R2 Quan Type Span P1 -H1 Left OH Right OH 2 TR 160000 4 0 0 Engineering PAXSON/TB 2-8-4 1 DG 8-5-4 110 4 RR -3-7 4 •2x311 4x4 - R •2x311 DG 8-5-4 HO 4 RH -3-7 W:508 R 690 U 123 EP TC EP N •2x311 8-0-0 8-0-0 8-0-0 8-0-0 *2x311 +2x311 +2x311 16-0-0 8-0-0 W:508 A 870 U 175 16 0 0 8-0-0 16-0-0 ALL PLATES APE MT2020 Scale: 0.353' = 1' Robbins Engineering, Inc./Online Plus' D -C 0.69 1352 T J c: 'C IC, 0.43 36 T Online Plus -- Ve;sign; Q10.025; C -C 0.00 0 T RUN DATE: 02 -MAY,, -07,. 4j"' Webs r L D CSI'.'size-' TC 0.56 2x 4 1B V TL Defl -0.32" in A BC 0.69 2x 4 1B LL Defl -0.19" in A WB 0.10 2x 4 DFL -STUD Shear // Grain in A -A -B 0.10 304 T APPROX. TRUSS WEIGHT: 83.7 LES 0.16 0.53 Wind Speed: 90 mph 0.00 0.43 Mean Roof Height: 25-0 Exposure Category: C Occupancy Factor : 1.00 -D -D L/570 L/951 0.89 Brace 0.C. a * rc&%.) .XTTitles J�C i .'P INGCONFORMS for ply TO UBC. face. TC Cont. 0- 0- 0 16- 0- 0 PLATE VALUES MAY BE VERIFIED BC Cont. 0- 0- 0 16- 0- 0 WITH ROBBINS ENGINEERING. GRIP VALUES BASED ON Doug -Fir -Larch LUMBER USING GROSS AREA TEST. Plate - MT20 20 Ga, Gross Area Plate - MT2H 20 Ga, Gross Area X Y JSI Loading Live TC BC Dead (paf) 30.0 7.0 0.0 10.0 Total 1°3°P.,31:001 attl i pe Plt Size Spacing TaVidii i btd1'a411 P.:41(12 '4201 44..Ox 4.0 0 Plate Duration Factor 1.15 C MT20 3.Ox 4.0 TC Fb=1.15 Fc=1.10 Ft=1.10 D MT20 2.Ox 3.0 BC Fb=1.10 Fc=1.10 Ft=1.10 Ctr Ctr 0.76 Ctr Ctr 0.62 Ctr Ctr 0.76 Ctr Ctr 0.38 4 Gable studs to be attached with 2.0x3.0 plates each end. Plus 6 Wind Load Case(s) . RR#ER TO ROBBINS ENG. GENERAL Jt Reactt-Uplft Size•Req'd NOTES AND SYMBOLS SHEET FOR Lbs Lbs ISI-Sx In-Sx s ADDITIONAL SPECIFICATIONS. A 690 123 5? -8 1- 8 Hz = -35 NOTES: C 870 176 5- 8 1- 8 Trusses Manufactured by: Hz = 36 Valley Best Way Analysis Conforms To: Membr CSI P Lbs Axl-CSI-Bnd ANSI/TPI 95 & 02 Top Chords OH Loading A -8 0.56 1408 C 0.02 0.54 Soffit psf 2.0 B -C 0.56 1408 C 0.02 0.54 Refer to Gen Det 3 series for Bottom Chords web bracing and plating. A -A 0.00 0 T Wind Loads - ANSI / ASCE 7-02 A -A 0.43 36 T 0.00 0.43 Truss is designed as a Main A -D 0.69 1352 T 0.16 0.53 Wind -Force Resistance System. Robbins Engineering, Inc./Offline Plus^' 0 1996-2007 Version 20.0.025 EngineeMg - Ponraii 512/2007 9:24:39 M1 Page 1 Building Type: Enclosed Zone location: Exterior TC Dead Load : 5.0 psf BC Dead Load : 7.0 psf Max comp. force 1408 Lbs Quality Control Factor 1.25 PROVIDE DIAGRAMS AND ENGINEERING LAYOUTS FOR ROOF TRUSSES, BEAMS AND FLOOR SYSTEMS PRIOR TO FRAMING INSPECTIONS CITY COPY THIS BUILDING SUBJECT TO FIELD INSPECTION CORRECTIONS • REVIEWED FOR CODE COMPLIANCE SPOKANE VALLEY BWILDIDIVISION X