Loading...
2014, 09-12 Permit: SW-14001362 SewerSPOKANE COUNTY UTILITIES PERMIT Application Number: SW -14001362 Permit Issued Date: 09/12/2014 Expiration Date: 09/12/2015 Project Description: SEWER CONNECTION TO ACCESSORY BUILDING Project Name: EASTON Primary Contact: ENTEL, ROBERT A & LAVINA L Phone: Applicant: ENTEL, ROBERT A & LAVINA L Address: 4003 E 32ND AVE SPOKANE, WA 99223 Phone: Email: SITE INFORMATION: Site Address: Parcel Number: Assessor's Description: Inspection Area: Zoning: 11212 E VALLEY WAY 45163.0318 OPPORTUNITY PT OF B130 E95FT OF W194FT OF E1/2 EXC S379 .04FT : (509)-477-3675 Owner: Address: Phone: Email: ENTEL, ROBERT A & LAVINA L 4003 E 32ND AVE SPOKANE, WA 99223 Water District: Modern Electric Water Fire District: Spokane Valley Fire Company Land Area: 25570 Square Feet CONTRACTOR INFORMATION: OWNER, Exp. 12/31/2015 OWNER PERFORMING THE WORK SAME AS SITE ADDRESS SAME, WA 00000 DETAILS: Class Type Quantity Unit Charge Value SEWER SEWER CONNECTION 1 $125.00 $125.00 FEE DETAIL: Processing - Utilities Utilities Permit Total Fee: $26.64 $125.00 $151.64 $125.00 CONDITIONS: Plan review fee is required for all site plan reviews conducted by Spokane Valley Fire. Inside Public Transit Benefit Area ADDING RESTROOM TO GARAGE. SIGN OFF GOOD THRU 11/1/14 CALL 1-800-424-5555 BEFORE YOU DIG --AT LEAST 2 WORKING DAYS IN ADVANCE. SPOKANE COUNTY CODE REQUIRES THE INSTALLER COMPLY WITH ALL REQUIREMENTS OF THE WA STATE DEPT OF LABOR & INDUSTRIES, INCLUDING THOSE RELATED TO TRENCH SAFETY. SEWER PERMITS ARE VALID FOR ONE (1) YEAR FROM THE DATE OF ISSUANCE. FOR SEWER INSPECTIONS CALL THE UTILITIES DEPT AT (509) 477-3604 FROM 8:30-5:00 MONDAY -FRIDAY PRIOR TO COVER. ONE WORKING DAY NOTICE REQUIRED. PERMIT ALLOWS FOR A 30 -MINUTE INSPECTION. ADDITIONAL INSPECTION FEES APPLY AFTER 30 MINUTES. Date Printed: 09/12/2014 10:24:34 Project Coordinator: Dawn Dompier SPOKANE COUNTY UTILITIES PERMIT Application Number: SW -14001362 Permit Issued Date: 09/12/2014 Expiration Date: 09/12/2015 INSTALLER IS RESPONSIBLE TO INSURE ALL WASTEWATER DRAINS ARE CONNECTED TO THE SEWER AND MAY BE REQUIRED TO PERFORM TESTS FOR VERIFICATION. INSTALLER IS TO FIELD LOCATE AND CONFIRM THE ELEVATION AND POSITION OF SEWER STUB PRIOR TO ANY OTHER EXCAVATION. SEWER STUBS AND DRY SIDE SEWERS ARE TO BE CHECKED PRIOR TO CONNECTION TO ENSURE THAT THEY HAVE ACCEPTABLE GRADE AND ARE CLEAR AND UNOBSTRUCTED. SEWER LINES SHOULD BE CONSTRUCTED TO ALLOW FOR GRAVITY FLOW FROM THE LOWEST LEVEL OF THE STRUCTURE. THE INSTALLER AND THIS PERMIT MUST BE PRESENT AT THE JOB SITE AT THE SCHEDULED INSPECTION TIME. BOTH STATE LAW RCW 19.122 AND COUNTY CODE REQUIRES THE INSTALLER TO GIVE NOTICE OF EXCAVATION TO OWNERS OF UNDERGROUND FACILITIES. Date Printed: 09/12/2014 10:24:34 Project Coordinator: Dawn Dompier