Loading...
2012, 04-02 Permit: SW-12001041 Sewer SPOKANE COUNTY BUILDING AND PLANNING PERMIT • Permit Issued Date: Application Number: SW-12-001041 Expiration Date: Project Description: SEWER CONNECTION Primary Contact: WICKER CONSTRUCTION Applicant: WICKER CONSTRUCTION Permit Type: SEWER Address: 14407 E 7TH AVE SPOKANE VALLEY,WA 99037 Phone: 509-218-0046 Email: SITE INFORMATION: Site Address: 15207 E VALLEYWAY AVE Owner: HENKE, RICHARD B Parcel Number: 45144.1028 Address: 1714 S BLAKE RD SPOKANE,WA 99216-2806 Subdivision: Phone: Assessor's Description: VERA E86'OF W193.4'OF E1/2 OF BLK 55 EXC Email: N445.3'&PTN DAF; BEG AT SE COR OF W193.4' OF E1/2 OF BLK 55 TH N25'TH SELY TO A PT ON SLN197.4'EOFWLNOFEI/2THW4'TOPOB Inspection Area: Water District:Vera Fire District: Fire District 1 Irrigation District#15 Zoning: Land Area: 0.3751 acres/16340 sgft CONTRACTOR INFORMATION: General Contractor WICKECLOO9NZ WICKER CONSTRUCTION 14407 E 7TH AVE SPOKANE VALLEY,WA 99037 509-218-0046 DETAILS: Class Type Quantity Unit Charge Value SEWER SEWER CONNECTION 1 $125.00 $125.00 $125.00 FEE DETAIL: Processing-Utilities $25.94 Utilities Permit $125.00 Total Fee: $150.94 CONDITIONS: CALL 1-800-424-5555 BEFORE YOU DIG--AT LEAST 2 WORKING DAYS IN ADVANCE.SPOKANE COUNTY CODE REQUIRES THE INSTALLER COMPLY WITH ALL REQUIREMENTS OF THE WA STATE DEPT OF LABOR&INDUSTRIES, INCLUDING THOSE RELATED TO TRENCH SAFETY. Date Printed:04/02/2012 10:15:33 Printed by: IIS APPPOOL\ASP.NET v4.0 SPOKANE COUNTY BUILDING AND PLANNING PERMIT Permit Issued Date: Application Number: SW-12-001041 Expiration Date: FOR SEWER INSPECTIONS CALL THE UTILITIES DEPT AT(509)477-3604 FROM 8:30-5:00 MONDAY-FRIDAY PRIOR TO COVER. ONE WORKING DAY NOTICE REQUIRED. PERMIT ALLOWS FOR A 30-MINUTE INSPECTION.ADDITIONAL INSPECTION FEES APPLY AFTER 30 MINUTES. _ INSTALLER IS RESPONSIBLE TO INSURE ALL WASTEWATER DRAINS ARE CONNECTED TO THE SEWER AND MAY BE REQUIRED TO PERFORM TESTS FOR VERIFICATION. INSTALLER IS TO FIELD LOCATE AND CONFIRM THE ELEVATION AND POSITION OF SEWER STUB PRIOR TO ANY OTHER EXCAVATION. _ SEWER STUBS AND DRY SIDE SEWERS ARE TO BE CHECKED PRIOR TO CONNECTION TO ENSURE THAT THEY HAVE ACCEPTABLE GRADE AND ARE CLEAR AND UNOBSTRUCTED.SEWER LINES SHOULD BE CONSTRUCTED TO ALLOW FOR GRAVITY FLOW FROM THE LOWEST LEVEL OF THE STRUCTURE. _ THE INSTALLER AND THIS PERMIT MUST BE PRESENT AT THE JOB SITE AT THE SCHEDULED INSPECTION TIME. BOTH STATE LAW RCW 19.122 AND COUNTY CODE REQUIRES THE INSTALLER TO GIVE NOTICE OF EXCAVATION TO OWNERS OF UNDERGROUND FACILITIES. Date Printed:04/02/2012 10:15:33 Printed by:IIS APPPOOL\ASP.NET v4.0