2009, 06-11 Permit App: 00091689 Basement Escape Door •
TY (Staff Use Only)
Sio1 \hhhhhhhhhh1PERMIT NUMBER:
Valley Y PERMIT FEE:
CITY OF SPOKANE VALLEY � ,� �
Community Development Department\ :
Permit Center GT4
11703 East Sprague Avenue, Suite B-3
Spokane Valley, WA 99206
Tel: (509) 688-0036 • `
Fax: (509) 688-0037
permitcenter@spokanevalley.org .r`
RESIDENTIAL CON RU -TION PERMIT APPLICATION
0 NEW CONSTRUCTION ► ADDITION/REMODEL 0 ACCESSORY BUILDING
0 DECK 0 OTHER
SITE ADDRESS:15715 EAST VALLEY WAY AVE, SPOKANE VALLEY, WA 99037
ASSESSORS PARCEL NO.:45133.0627 LEGAL DESCRIPTION:VERA E112 OF w1/2 OF
BLK 22 EXC E40 & EXC N518.6& E10 OF
BUILDING OWNER NAME:
NAME:PENNY LYNNE MARSELL
ADDRESS:15715 EAST VALLEYWAY AVE
CITY:SPOKANE VALLEY STATE:WA Zip:99037
PHONE:509-926-4201 Fax:501-640-0682 CELL:951-850-7764
CONTACT NAME:PENNY MARSELL
PHONE:509-926-4201 FAX:501-640-0682 CELL:951-850-7764
CONTRACTOR NAME:owNER
MAILING ADDRESS:15715 EAST VALLEY AVE
CITY:SPOKANE VALLEY STATE:WA ZIP:99037
PHONE:509-926-4201 FAx:501.640-0682 CELL:951-850-
7764
CONTRACTOR LICENSE No.: EXPIRES: CITY BUSINESS LICENSE NO.:
DESCRIBE THE SCOPE OF WORK IN DETAIL AND INDICATE USE:
ESCAPE DOOR IN BASEMENT
PROPOSED USE:
EXIT DOOR
Effective October 28, 2007 Page 1 of 1
http://www.spokanevalley.org/uploads/Community_Development/Documents/Forms/Building/Residential Construction Permit
App.l.doc
•
****YOU MUST COMPLETE THE FOLLOWING****
MARK N/A IF NOT APPLICABLE
Height to Peak: Dimensions: No. of Stories: Total Habitable
Space:
Main Floor SQ Upper Floor SQ Unfinished Basement Finished Basement
FT: FT: SQ FT: SQ FT:
Garage SQ FT: Deck/Covered Patio Impervious Surface 30% Slopes on
SQ FT: Area: Property:
No. of Construction Heat Source: Sewer or
Bedrooms: Type: Septic:
TOTAL COST OF PROJECT: $650.00
DISCLAIMER
The permitted verifies, acknowledges and agrees by their signature that: 1) if this permit is for construction or on a dwelling,the dwelling is/will
be served by potable water. 2) Ownership of this City of Spokane Valley permit inure to the property owner. 3) The signatory is the property
owner or has permission to represent the property owner in this transaction. 4) All construction is to be done in full compliance with the City of
Spokane Valley Development code. Referenced codes are available for review at the City of Spokane Valley Permit Center. 5) The City of
Spokane Valley permit is not a permit or approval for any violation of federal, state or local laws, codes or ordinances. 6) Plans or additional
information may be require to be submitted and subse uently approved before this application can be processed.
Lie/
/1
Signature / .1, 1��G%�L�ld7 Date: /e-
Method
of payment: 0 Cash ® Check 0 Visa 0 Mastercard
Bankcard #: EXP: VIN#:
Authorized Signature:
Effective October 28, 2007 Page 2 of 2
http://www.spokanevalley.org/uploads/Community_Development/Documents/Forms/Building/Residential Construction Permit
App.l.doc
Back Back bedroom window
Back Back bedroom Window Bedroom
Bathroom Entry
window Door
Header
New
basement
Entry door
82W x 82 1/2 H
Stair case
starts
Size of opening 5 1/2 foot wide by
7 feet deep to the bottom
of footing of house
15715 East Valleyway Ave
Spokane Valley, WA 99037
For City Use Ont
Spokane
CITY OFPLUS Project Number �' 1 vProject Address / is— Pti 40000.
a T
°
11703 E Sprague Ave Suite B-3 ♦ Spokane Valley WA 99206
509.688.0036 • Fax: 509.688.0037 • pernitcenter®spokanevalley.org
As part of our on-going commitment to customer service during the review process of your project
application, we are providing you with a TARGET DATE for the initial technical application review. If for
any reason we cannot meet this date, we will contact you with a revised target date.
i r,_, /-g
Your application review TARGET DATE is
The TARGET DATE is the date we estimate your project application will have had its initial technical
review. It is not the date for approval or permit issuance.
Tips for a Smoother Project Application Review
➢ Submit complete, accurate plans and documents.
Extra time may be required for re-submittals as project application reviewers work on multiple applications and it
may be several days before they can look at your new or revised information.
➢ Designate a specific contact person to communicate with the City.
While the person designated as the applicant's contact person with the City can be changed, one individual with the
expertise for dealing with reviewer comments would be the best choice for the entire review process.
➢ Call staff regarding the status of your project only after the target date shown at the top of the page.
Although you should be contacted on or by the target date,please feel free to contact us if you haven't heard from us
by your target date. Staff may contact you before the target date if the initial review is complete. By following this
procedure,you will save time and allow the reviewers to complete the work more expeditiously.
Steps in the Permit Process
1. Counter Complete. Your application has been accepted as counter complete. This means all of the required
documents, as indicated on your Pre-Application Checklist have been submitted or have been approved for deferred
submittal.This does not prevent technical staff from requesting additional information as a result of their technical review.
2. Quality Check. The next step in the process is a quality check to make sure that the application is reviewable and free
from substantive flaws that would prevent technical staff from completing the technical review once it is started. When
this step is complete, your application will be routed to the appropriate staff and remain in their review queue until it
comes up for review.
3. Technical Compliance. Once an application is administratively complete, it is routed to technical staff for compliance
review. Depending on the type of project, technical staff may include multiple reviewers. You should be contacted by
phone, fax, email,or mail by your TARGET DATE once the initial technical compliance review is complete.
4. Permit Issuance. When the technical compliance review of the application is complete, including any subsequent re-
submittals, each reviewer will approve their section of the application and route it to the Permit Center. When all sections
of the application are received, a Permit Specialist will process the application and contact the person specified on your
application for permit pick-up. Information regarding fees and pre-construction meetings (if required) will be provided by
the Permit Specialist at that time.
WHITE-APPLICANT PINK-BUILDING FILE REV 9/07