2011, 05-05 Permit App: 11001180 Pole Bldg Project Number: 11001180 Inv: 1
Application Date: 5/5/2011 Page 2 of 2
THIS IS NOT A PERMIT
Penalties will be assessed for commencing work without a permit
Building Permit
Contractor: STIMSON CONTRACTING Firm: STIMSON CONTRACTING
Address: PO BOX 1687 Phone:
(509)244-2636
MEDICAL LAKE,WA 99022
This Application: Total Project:
Description Grp Type Notes Su Ft Valuation Su Ft Valuation
POLE BDLG U-1 VB PLAN 720 $13,680.00 720 $13,680.00
REVIEW
FEE
Totals: 720 $13,680.00 720 $13,680.00
Item Description Units Unit Desc
RESIDENTIAL PERMIT FEE Fee Amount
1 SELECT $237.25
ACCESSORY PLANS REVIEW 1 SELECT $59.31
WSBCC SURCHARGE 1 SELECT
$4.50
Permit Total Fees: $301.06
Notes 4
ADDRESS UPDATE FROM 406 N MOORE RD POSTED TODAY-MT
Payment Summary:
Permit Type Fee Amount Invoice Amount Amount Paid Amount Owing
Building Permit $301.06 $301.06 $59.31
$241.75
$301.06 $301.06 $59.31 $241.75
Disclaimer:
Submittal of this application certifies the owner(or person(s)authorized by the owner)has both examined and finds the information
contained within to be true and correct,and agrees that all provisions of laws and/or regulations governing this type of work will be
complied with. Subsequent issuance of a permit shall not be construed to be a permit for,or an approval of,any violation of any of
the provisions of the code or of any other state or local laws or ordinances.
Signature:
Operator: jmm Printed By: jmm Print Date: 5/5/2011
• Project Number: 11001180 Inv: 1
Application Date: 5/5/2011 Page 1 of 2
THIS IS NOT A PERMIT
Penalties will be assessed for commencing work without a permit
Project Information:
� ���'� •,.ate —�� � -h P:
Permit Use: 24 X 30 POLE BLDG FOR GARAGE
Contact: STIMSON CONTRACTING
Address: PO BOX 1687
C- S-Z: MEDICAL LAKE,WA 99022
Setbacks:Front Left: Right: Rear:
Phone: (509)244-2636
Group Name:
Site Information: Project Name:
Plat Key: Name: Range
District: East
Parcel Number: 45133.0743 Block: Lot:
SiteAddress: 15921 E VALLEYWAY AVE Owner:Name: SCHOLZ,BRIAN A
Address: 15921 E VALLEYWAY AVE
Location::CSV SPOKANE VALLEY,WA 99037
Zoning: R-3 SF Res District
Water District: 010 VERA
Hold: ❑
Area: 9,368 Sq Ft Width: 0 Depth: 0 Right Of Way(ft): 0
Nbr of Bldgs: 0 Nbr of Dwellings: 0
Review Information: ,
Review
Building Plan Review
Released By:
Originally Released: 5/5/2011 By: tmelbourn
Landuse/Zoning/HE Conditions
Released By: I
Originally Released: 5/5/2011 By: mharnois
Permits:
Operator: jmm Printed By: jmm Print Date: 5/5/2011
•
Community De - .... .n5-
••--- :-.. . Y V GD (Staff Use Only)
Permit Cen er �� G
UM11703 East • Prague A$en7, • NTE IT NUMBER:
Spokane Val -y, WtSNOPER
Tel: (509) 6::-003 C c IT FEE:
valley Fax: (509) 6:8-0037 �A 5cAll
.ermitcentercns.okaneval a __.
ProjeCt# - A
Name_
RESIDENTIAL CONST • U . is 4-• —-•---- ' APPLICATION
0 NEW CONSTRUCTION ❑ ADDITION/REMODEL p ACCESSORY BUILDING
0 DECK 0 OTHER
SITE ADDRESS: tS° 9-1 e•va11.e(y/vs,
ASSESSORS PARCEL NO.: LEGAL DESCRIPTION:
BUILDING OWNER NAME:
NAME: -56 G 4: i(10(Z,
ADDRESS: I '1 per•( F. v�,t Ips vv
1 j
CITY: . :30&;1.0e, \A9 It �J STATE: v/0 ZIP: c1g03 7
PHONE: -1 l Cj. 8,00• q D I4 FAX: CELL:
CONTACT NAME: StDTTNta
PHONE: Fax:
CELL:
CONTRACTOR NAME: jyri Con-b a cki ifItc iG
MAILING ADDRESS: "rjpx l LAS-1
►
CITY: Med,1 col( LicAte STATE: Vv' ZIP: O-a:a_
PHONE: • a•L-11-4• 'd-11-31,2 FAX: SOC31 • a.y1i-j• 8S %9 CELL:
CONTRACTOR LICENSE NO.: 'reISci0)3 0 Yn t1 EXPIRES: CITY BUSINESS LICENSE NO.:
DESCRIBE THE SCOPE OF WORK IN;ETAIL AND INDICATE USE & PROPOSED USE:
V C / 7
•
****YOU MUST COMPLETE THE FOLLOWING****
MARK N/A IF NQT APPLICABLE.
Height to Peak: 0% Dimensions: )C6tbc la- No.of Stories:
Total Habitable h(0'1
Main Floor FT: Space:
SQI Upper Floor SQ FT: h�a Unfinished Basement SQ Finished Basement SQ
FT: n 19 FT: n IQ
Garage SQ FT: ' Deck/Covered Patio SQ Impervious Surface 30%Slopes on
FT: In 1 a Area:
V‘(� Property: n la
No. of Bedrooms: n I3 Construction Type: Fr - Heat Source: v�la
„ Sewer or Septic: Y
TOTAL COST OF PROJECT: $ 0 i 0 00
DISCLAIMER
The permitted verifies,acknowledges and agrees by their signature that: 1)if this permit is for construction or on a dwelling,the dwelling is/will
be served by potable water. 2)Ownership of this City of Spokane Valley permit Inure to the property owner. 3) The signatory is the property
owner or has permission to represent the property owner in this transaction. 4) All construction is to be done in full compliance with the City of
Spokane Valley Development code. Referenced codes are available for review at the City of Spokane Valley Permit Center. 5) The City of
Spokane Valley permit is not a permit or approval for any violation of federal, state or local laws, codes or ordinances. 6) Plans or additional
information may be required to be submitted and subsequently approved before this application can be processed.
Effective October 28, 2007
Pae 1 of 2
P:\Community Development\02 Administration\03 Forms-Official Versions\Permit Center\Residential Construction Permit
App 10.28.07.doc
Signature Date:
Method of payment: 0 Cash I)Check 0 Visa
I0 Mastercard
Bankcard #: EXP:
VIN#:
Authorized Signature: ,5 J
ALAja_
Effective October 28, 2007
Page 2 of 2
P:\Community Development\02 Administration\03 Forms - Official Versions\Permit Center\Residential Construction Permit
App 10.28.07.doc
Cult°mei' Scholz
� ,G'
w
i
irovged� 3N i.,3O L►a
E / Vas+ � •
r611 , Z\Ct
E
Nik
iS-h nq I-0u3-C .�
at,. lo'
S /
REC
CSV PERMIT CENTER
MAY 11
Project#
l 0 vs 1 I-e w a1� ,/fin' "` e
`" n ve Submittal#_—./
For City Use Only
CITY rojecumerf ,SpOkane Project Address f' 9„2
a'ly®e 11703 E Sprague Ave Suite B-3 • Spokane Valley WA 99206
50 9.688.0036 • Fax: 509.688.0037 • permitcenter®spokanevalley.org
As part of our on-going commitment to customer service during the review process of your project
application, we are providing you with a TARGET DATE for the initial technical application review. If for
any reason we cannot meet this date, we will contact you with a revised target date.
Your application review TARGET DATE is
The TARGET DATE is the date we estimate your project application will have had its initial technical
review. It is not the date for approval or permit issuance.
Tips for a Smoother Project Application Review
➢ Submit complete, accurate plans and documents.
Extra time may be required for re-submittals as project application reviewers work on multiple applications and it
may be several days before they can look at your new or revised information.
➢ Designate a specific contact person to communicate with the City.
While the person designated as the applicant's contact person with the City can be changed, one individual with the
expertise for dealing with reviewer comments would be the best choice for the entire review process.
➢ Call staff regarding the status of your project only after the target date shown at the top of the page.
Although you should be contacted on or by the target date,please feel free to contact us if you haven't heard from us
by your target date. Staff may contact you before the target date if the initial review is complete. By following this
procedure,you will save time and allow the reviewers to complete the work more expeditiously.
Steps in the Permit Process
1. Counter Complete. Your application has been accepted as counter complete. This means all of the required
documents, as indicated on your Pre-Application Checklist have been submitted or have been approved for deferred
submittal. This does not prevent technical staff from requesting additional information as a result of their technical review.
2. Quality Check. The next step in the process is a quality check to make sure that the application is reviewable and free
from substantive flaws that would prevent technical staff from completing the technical review once it is started. When
this step is complete, your application will be routed to the appropriate staff and remain in their review queue until it
comes up for review.
3. Technical Compliance. Once an application is administratively complete, it is routed to technical staff for compliance
review. Depending on the type of project, technical staff may include multiple reviewers. You should be contacted by
phone, fax, email, or mail by your TARGET DATE once the initial technical compliance review is complete.
4. Permit Issuance. When the technical compliance review of the application is complete, including any subsequent re-
submittals, each reviewer will approve their section of the application and route it to the Permit Center. When all sections
of the application are received, a Permit Specialist will process the application and contact the person specified on your
application for permit pick-up. Information regarding fees and pre-construction meetings (if required) will be provided by
the Permit Specialist at that time.
WHITE—APPLICANT PINK—BUILDING FILE REV 9/07