Loading...
2013, 03-26 Permit: SW-13000298 Sewer SPOKANE COUNTY UTILITIES PERMIT Application Number: SW-13000298 Permit Issued Date: 03/26/2013 Expiration Date: 03/26/2014 Project Description: SEWER CONNECTION Project Name: WHITE BIRCH(ROSEHAVEN OFF) Primary Contact: MOUNTAIN MOVERS CONSTRUCTION Applicant: MOUNTAIN MOVERS CONSTRUCTION Phone: 509-535-0398 Address: 2024 E 10TH AVE SPOKANE,WA 99202 Phone: 509-535-0398 Email: SITE INFORMATION: Site Address: 15922 E VALLEYWAY AVE Owner: OBRIEN,JENNIFER Parcel Number: 45133.1012 Address: 15922 E VALLEYWAY AVE VERADALE,WA 99037-9524 Phone: Assessor's Description: VERA ADD E1/2 OF W1/2 OF TR 26 EXC S3OFT Email: FOR MAIN AVE; TOGW PTN OF E1/2 OF TR 26 DAF: BEG AT NW COR OF E1/2 OF TR 26 TH ALG W LN OF E1/2 OF SD TR 26 S00*30'29"E 270.22FT TH N17"27'40"E 19.45FT TO A Inspection Area: : (509)-477-3675 Water District:Vera Irrigation District#15 Fire District: Spokane Valley Fire Zoning: Land Area: 102192 Square Feet CONTRACTOR INFORMATION: MOUNTMC935DO, Exp.03/29/2013 MOUNTAIN MOVERS CONSTRUCTION 2024 E 10TH AVE SPOKANE,WA 99202 509-535-0398 DETAILS: Class Type Quantity Unit Charge Value SEWER SEWER CONNECTION 1 $125.00 $125.00 $125.00 FEE DETAIL: Processing-Utilities $26.32 Utilities Permit $125.00 Total Fee: $151.32 CONDITIONS: Inside Public Transit Benefit Area Plan review fee is required for all site plan reviews conducted by Spokane Valley Fire. CALL 1-800-424-5555 BEFORE YOU DIG--AT LEAST 2 WORKING DAYS IN ADVANCE. SPOKANE COUNTY CODE REQUIRES THE INSTALLER COMPLY WITH ALL REQUIREMENTS OF THE WA STATE DEPT OF LABOR&INDUSTRIES, INCLUDING THOSE RELATED TO TRENCH SAFETY. _ SEWER PERMITS ARE VALID FOR ONE(1)YEAR FROM THE DATE OF ISSUANCE. FOR SEWER INSPECTIONS CALL THE UTILITIES DEPT AT(509)477-3604 FROM 8:30-5:00 MONDAY-FRIDAY PRIOR TO COVER.ONE WORKING DAY NOTICE REQUIRED. PERMIT ALLOWS FOR A 30-MINUTE INSPECTION.ADDITIONAL INSPECTION FEES APPLY AFTER 30 MINUTES. Date Printed:03/26/2013 13:22:54 Project Coordinator: Dawn Dompier SPOKANE COUNTY UTILITIES PERMIT Application Number: SW-13000298 Permit Issued Date: 03/26/2013 Expiration Date: 03/26/2014 INSTALLER IS RESPONSIBLE TO INSURE ALL WASTEWATER DRAINS ARE CONNECTED TO THE SEWER AND MAY BE REQUIRED TO PERFORM TESTS FOR VERIFICATION. INSTALLER IS TO FIELD LOCATE AND CONFIRM THE ELEVATION AND POSITION OF SEWER STUB PRIOR TO ANY OTHER EXCAVATION. SEWER STUBS AND DRY SIDE SEWERS ARE TO BE CHECKED PRIOR TO CONNECTION TO ENSURE THAT THEY HAVE ACCEPTABLE GRADE AND ARE CLEAR AND UNOBSTRUCTED. SEWER LINES SHOULD BE CONSTRUCTED TO ALLOW FOR GRAVITY FLOW FROM THE LOWEST LEVEL OF THE STRUCTURE. THE INSTALLER AND THIS PERMIT MUST BE PRESENT AT THE JOB SITE AT THE SCHEDULED INSPECTION TIME. BOTH STATE LAW RCW 19.122 AND COUNTY CODE REQUIRES THE INSTALLER TO GIVE NOTICE OF EXCAVATION TO OWNERS OF UNDERGROUND FACILITIES. Date Printed:03/26/2013 13:22:54 Project Coordinator:Dawn Dompier