2010, 06-30 Permit App: 10001910 Pole Bldg Project Number: 10001910 Inv: 1 Application Date: 6/30/2010 Page 1 of 2
THIS IS NOT A PERMIT
Penalties will be assessed for commencing work without a permit
Project Information:
Permit Use: 24 X 36 X 14 BOAT STORAGE BLDG Contact: SPOKANE POST FRAME
Address: 7001 E 2ND
C-S-Z: SPOKANE,WA 99212
Setbacks:Front Left: Right: Rear: Phone: (509)926-0865
Group Name:
Site Information: Project Name:
Plat Key: 002756 Name: VERA District: East
Parcel Number: 45134.0624 Block: Lot:
SiteAddress: 16523 E VALLEYWAY AVE Owner:Name: BERRENS,MARTIN&SANDRA
Address: 16523 E VALLEYWAY AVE
Location::CSV SPOKANE VALLEY,WA 99037-957
Zoning: R-3 SF Res District
Water District: 010 VERA Hold: ❑
Area: .00 Acres Width: 0 Depth: 0 Right Of Way(ft): 40
Nbr of Bldgs: 2 Nbr of Dwellings: 1
Review Information:
Review
Building Plan Review Released By:
Originally Released: 6/30/2010 By: tmelbourn
Landuse/Zoning/HE Conditions Released By:
This permit is granted based on the structure not being used for storage of on-street vehicles. Should the
use of the structure be used for that purpose,the driveway will need to be paved and approved by the City
of Spokane Valley.
Originally Released: 6/29/2010 By: tschmidt
Permits:
Operator: jmm Printed By: jmm Print Date: 6/30/2010
•
Project Number: 10001910 Inv: 1 Application Date: 6/30/2010 Page 2 of 2
THIS IS NOT A PERMIT
Penalties will be assessed for commencing work without a permit
Building Permit
Contractor: SPOKANE POST FRAME Firm: SPOKANE POST FRAME
Address: 7001 E 2ND AVE Phone: (509)926-0865
SPOKANE,WA 99212
This Application: Total Project:
Description Grp Type Notes Sq Ft Valuation Su Ft Valuation
POLE BDLG U-1 VB 24X36 864 $16,416.00 864 $16,416.00
POLE BLDG
Totals: 864 $16,416.00 864 $16,416.00
Item Description Units Unit Desc Fee Amount
RESIDENTIAL PERMIT FEE 1 SELECT $279.25
ACCESSORY PLANS REVIEW 1 SELECT $69.81
WSBCC SURCHARGE 1 SELECT $4.50
Permit Total Fees: $353.56
This permit is granted based on the structure not being used for storage of on-street vehicles. Should
the use of the structure be used for that purpose,the driveway will need to be paved and approved by
the City of Spokane Valley.
Payment Summary
Permit Type Fee Amount Invoice Amount Amount Paid Amount Owing
Building Permit $353.56 $353.56 $69.81 $283.75
$353.56 $353.56 $69.81 $283.75
Disclaimer:
Submittal of this application certifies the owner(or person(s)authorized by the owner)has both examined and finds the information
contained within to be true and correct,and agrees that all provisions of laws and/or regulations governing this type of work will be
complied with. Subsequent issuance of a permit shall not be construed to be a permit for,or an approval of,any violation of any of
the provisions of the code or of any other state or local laws or ordinances.
Signature:
Operator: jmm Printed By: jmm Print Date: 6/30/2010
"°° Permit Center -----_._r
` M1" '----L-------°3-E117
- rragnE�e Suite
B}3 PERMIT NUMBER: /Q_ /rfi OS cmokane `� 03 R117 - Za 99206
PERMIT FEE:
�Va (66° ..:=6 Ei.`. M p9)68k-0037
'-'J " a t� s ilk4rieva ey.org
Community Development r ak
Residential Construct[���y_f%:�{�.�� �__'! -�� ' New Construction Accessory Bldg
Permit App1icationi - - — + n Addition/Remodel n Deck
_-- — Other:
SITE ADDRESS: I 652-3 I \Jpt\M-1r }1 AAA-, ` o Q s r1 Lt1 l V3-1-
ASSESSORS PARCEL NO: /fr?ICI e 2-1 LEGAL DESCRIPTION:
Building Owner: Contractor:
Name:
fit, n N i_.5„),,,,,t„
SQnt -R1 e Sf,,s Name: `� �CL PO S t' _61,,,,:z.
I�-v I'�►J C,
Address: /4.6-23 i, vikkvul i,AI A) Address:
CityspoJi4 EState1 Zip:11034,•, City:c. ,f c State: _ Zip: 1z,
Phone: a 2$4.4 Fax: Phone: 9 Z f _ OA
Fax:7 it--) Ci'
Corgotsk.,i0 eft t irik `Exp Date:
Contact Person C6-Business Lic.No:
Name:
Phone:
Describe the scope of work in detail: Cost of Project: $ 13 o
SI‘A• :3Z x ig' 34-1- $!asR'it ktritt!uu
1
Proposed Use:
**************The following MUST be complete: (write N/A if not applicable)**********************
HEIGHT TO PEAK: e,- ! DIME $IO�N�S�C #OF STORIES: r^�-� TOTAL HABITABLE SPACE:Tit
MAIN FLOOR TO SQ. 2Nu FLOOR SQ. FTG: UNFIN BASEMENT SQ. FTG: IMPERVIOUS SURFACE
FTG: AREA:
FINISHED BASEMENT ARAG -:0. r7� DECK/COV. PATIOS FTG: 30% SLOPES ON
SQ. FTG: i 6A 1 PROP RTY:
#OF BEDROOMS: ONS :UCTIO 'E: HEAT SOURCE: SEWER R SEPTIC?
Kota $(t. , i obc
The permitee verifies, acknowledges and agrees by their signature that: 1) If this permit is for construction of or on a dwelling,the
dwelling is/will be served by potable water. 2) Ownership of this City of Spokane Valley Permit inure to the property owner. 3) The
signatory is the property owner or has permission to represent the property owner in this transaction. 4) All construction is to be done
in full compliance with the City of Spokane Valley Development Code. Referenced codes are available for review at the City of
Spokane Valley Permit Center. 5) This City of Spokane Valley Permit is not a permit or approval for any violation of federal,state or
local laws,codes or ordinances.6) Plans or additional information may be required to be submitted, and subsequently approved before
this application can be processed.
4
SIGNATURE: (,j,,11.1t DATE: 6125 1 tp
Method of Payment:
0 Cash Check 0 Mastercard 0 VISA
Bankcard#: Expires: VIN#:
Authorized Signature:
REVISED 2/15/07
Si
P okan
liosT
FRAd
7001 E. 2nd Ave. Spokane. WA 99212
June 18, 2010
City of Spokane Valley
Building Department
11703 E. Sprague Ave.
Suite B-3
Spokane Valley, WA 99206
Building Department,
I am requesting a wavier regarding a concrete or asphalt driveway
to my proposed 24' x 36' x 14' Storage building. This building
will be used to store my"new" boat and is located over 250'
away from the front property line access. This building will be
used for storage only and have limited access.
Thank you for your attention to thi4matter.
Sincerely, 0/&0 �(%
Martin Berrens
16523 E. Valleyway Ave.
Spokane Valley, WA 99037
Office: 509-926-0865 or Toll Free: 1-866-926-0865
Fax: 509-924-5161
www.spokanepostframe.com
For City Use Only
•
PLUS Project Number ( tom 1` )
Siiôkane
Project Address /���> � __,' ,% 1/(-Ef� �/�
4000
alleVy)
11703 E Sprague Ave Suite B-3 • Spokane Valley WA 99206
509.688.0036 ♦ Fax: 509.688.0037 ♦ permitcenter@spokanevalley.org
As part of our on-going commitment to customer service during the review process of your project
application, we are providing you with a TARGET DATE for the initial technical application review. If for
any reason we cannot meet this date, we will contact you with a revised target date.
Your application review TARGET DATE is 1 ) l ) U
The TARGET DATE is the date we estimate your project application will have had its initial technical
review. It is not the date for approval or permit issuance.
Tips for a Smoother Project Application Review
Submit complete, accurate plans and documents.
Extra time may be required for re-submittals as project application reviewers work on multiple applications and it
may be several days before they can look at your new or revised information.
Designate a specific contact person to communicate with the City.
While the person designated as the applicant's contact person with the City can be changed, one individual with the
expertise for dealing with reviewer comments would be the best choice for the entire review process.
Call staff regarding the status of your project only after the target date shown at the top of the page.
Although you should be contacted on or by the target date, please feel free to contact us if you haven't heard from us
by your target date. Staff may contact you before the target date if the initial review is complete. By following this
procedure,you will save time and allow the reviewers to complete the work more expeditiously.
Steps in the Permit Process
1. Counter Complete. Your application has been accepted as counter complete. This means all of the required
documents, as indicated on your Pre-Application Checklist have been submitted or have been approved for deferred
submittal. This does not prevent technical staff from requesting additional information as a result of their technical review.
2. Quality Check. The next step in the process is a quality check to make sure that the application is reviewable and free
from substantive flaws that would prevent technical staff from completing the technical review once it is started. When
this step is complete, your application will be routed to the appropriate staff and remain in their review queue until it
comes up for review.
3. Technical Compliance. Once an application is administratively complete, it is routed to technical staff for compliance
review. Depending on the type of project, technical staff may include multiple reviewers. You should be contacted by
phone, fax, email, or mail by your TARGET DATE once the initial technical compliance review is complete.
4. Permit Issuance. When the technical compliance review of the application is complete, including any subsequent re-
submittals, each reviewer will approve their section of the application and route it to the Permit Center. When all sections
of the application are received, a Permit Specialist will process the application and contact the person specified on your
application for permit pick-up. Information regarding fees and pre-construction meetings (if required) will be provided by
the Permit Specialist at that time.
WHITE-APPLICANT PINK-BUILDING FILE REV 9/07
SPOKANE POSTFRAME, INC. t � j -, L4 El.1 J$
Engineered Pole Buildings - * eL5- �e1fp _
strops ROLFE WILL A �S 14.6-2.3._Jf:k 114.(1 .,
garages Sales Manager Owner k Ais. `V 7
storage buildings t
cabins . 509-926.0865 • Fax 509-924-5161DESCRIPTIONt
•kits-cost plus or 1-866.926-0865
7001 E.2nd Ave '
Visit
� �
Sane.WA 99211 www.spokanepostframe.com
pok
1 •
ItAlltaitieliDEPT. APPROVED •
BY: / . , •
S
6/a-ql
DATEr�_
'_,hew .
North / b
. . `2 X3b1c 4�-(
.1—DS3
a
Show streets/alley
Show septic/sewer/drainf leld
Show existing buildings
Show proposed bttflding _ • -
Show setbacks front;rear,sides:
Show lot size
ZONING CRITERIA SPO1 ANC t
4.-,
" ---
n�}
1 closer than 5'to property line -need ilrewalt aDarapet., ,4R-If `.
rut of rear 30'and cipser than S ;:need+waiver•from-neighbor
,'an't cover more than 50�of rear 25 ?
orner lot-building must be 20'from.Property line -
0'minimum setback from front property tine -
ess than 8 from residence need firewall \I_' .y'•' ,——
laximum square footage- 101 of lot area it lust bepless than 3.000 so.I t.) i r ,,r,1
lay not subdivide lot so that building is More than 10%of residual.lot area Y �':-.7-. .1.,-.:',-.--.4.a - \ . 1
r ounty
f closer than 5`to property line need flreWall ` • JUN 2 '2Ie f
0'from septic/drainfield
I ess than 6'from residence-need f firewall !Project t � _1_ _±C
I ENERAL SETBACKS ARE SHOWN BELOW. WILL NEED TO CHECK CODE$OOK ',•f ;.:,e,_
,110 KNOW WHAT ZONING YOU'RE iN TO BE SURE. triAXiflUtl.6UILDI�NGSIZZ. ' • -- f
. �L50EHANGI S WITH OtfEERENT ZONING. —�-- ;
minimum side yard setback
`.'minlmtim rear yard setback.
1 rinimurn front and side street setback.-25'..frriqiirciperty line or 55'from