Loading...
28063 PE-1850 . ~ , , S P O K A N E . C O U N T Y DIVISION OF ENGINEERING AND ROADS A DIVISION OF THE PUBLIC WORKS DEPARTMEM Wflliam A. Johns, P.E., Counry Engineer ' December 29, 1999 I ' Jay Logan, P.E. STI Northwest 3628 E. Ferry Spokane, WA 99202 SUBJECT: P1850 - Purvis Point Record Drawings Submittal Acceptance Gentlemen: We have conducted a general evaluation of your recent submittal for this project, and we find that this submittal appears to meet the minimum standards of the Spokane County Standards for Road and Sewer Construction ("SCRS"). We are, therefore, able to accept your Record Drawings for this project. A set of stamped prints is enclosed for your use. Sincerely, W illiam A. Johns, P.E. Spokane County Engineer - . Edward . P , r., P.E. Plan Review Engineer cc: Project Sponsor Project File. Reviewer 1026 W. Broadway Ave. • Spokane, WA 99260-0170 •(509) 477-3600 FAX: (549) 3243478 TDD: (509) 324-3166 y - ~ ~ NORTHWEST ✓o a~ - FAMEE1~C y SOILS, TESTING & INSPECTIO December 14, 1999 ~GOVNN ENGINEE~S STI W.O. # 98339 ~ O,t+~Spokane County Engineers Office OFFtC1AL PUBUC DOCUMENT 1026 W. Broadway ORIGI(VAL Spokane, WA 99260-0170 "AS• B V 1LYS" Attn: Mr. Randy Stronks CERTIFiED RECORD DRAWINGS PRoJECT#: ~105;0 . Re: Purvis Point, Construction Certification Package DATE ACCEPTED: Zq 0e tf Dear Randy, . Please find the following information which is intended to be used by you in the certification and acceptance . . ~ process for Purvis Point. , 1. A three-ring bound set of inspection and testing reports for the work constructed. lncluded within this binder are the following sections which document the scope and nature of the inspection work provided. A. Correspondence B. Test Reports C. Daily Reports 2. A set of mylars and two bond copies for your files. Please note that these mylars are new mylars ("Record Drawings") and should replace or supplement the mylars that you currently have for this project. It should be understood that this submittal provides certification for the initially constructed items associated with this project. This certification only implies that the items shown were substantially built as designed, and only valid the day the as-built survey and visual certification were performed by this engineer. This certification makes no guarantee that other construction activities associated with overall plat build out such as home builders or new home owners have not in fact dislodged, destroyed, filled in or in any manner affected any of the items certified. It should be noted that this letter does not relieve the contractor or developer from the warranties implied within their bonding documents. Should you have any questions or comments related directly to the certification package submitted please do not hesitate to call. ~ wwL~G Sincerely, STI Northwest • CIO ~ 72~ ~ , ay VV. Logan, P.E. ExPIRES 06/14/0I 3628 E. Ferry • Spokane, WA 99202 4'Phone (509) 534-9711 • Fax (509) 534-9755 -J INLAND PACIFIC ENGINEERING - TRANSMITTAL . 707 W. 7th Avenue, Suite 200 Spokane, WA (509)458-6840 Fax (509)458-6844 ~ ~ :.::...:.::::::.-::::;~:::,~,::;;:,•;<:r:.:w:;r.::: ::::..::::.::~::.~~:-:•.~;:;<:;•::~:~.~:~:;>::>~<:_::;: +:~+.~••x~c;fi:>.:::>.5..+zt:x•:e:'?: •-':::-.'y:iac:x:?o-:2• ::,~:;~:;:>:::2:.y`; <ix:z;.~: ::.:•~`so: '"'?>'t~+:~':•: r:: = r;:i~~•::'.ny,~'`$~.;..:: TO: Tomlinson Black ;;fi;:.: ~r:. et+?:::.:: .:::x xy~:•:rti•.:~:•: r:::: ~ r:::::•.~. .{vt;. r:: s:;-: ~ ti•::•: s::~:: • r<~~ ~ i=: 'r:':'r:==.:`-.:~~~:::::=::<;=: ~ ::ti::C:{:}i;:,:%f:~:;i:ti::'r,•:~r}iT::Y{:''v'+~i:~:{'~:rrk{:}:4:~:•::•,i~'i:i.}}•}r}% :'~Yr:i:y;:{{;.::"r":y;:!;' ~:;•:vv: . N. 8205 Division ::;;:r'>:z-:" ::t':="': ~ ::%:>:;~::=:i~ ~~~,>>>.,,r:..:, r ~.z-.:.;..:~ ~ ..r.: • . :1:~:,::: r....:~ - . ~ : . . . ' . . . r.. r. r.... Spokane, Wa. 99208 f }:•!:~•y~•:.•. ...~{{'y . . ......"""""""....ti.. " . ~?:ti•~:v:::: •}7: }:'ti??:;'•?$:~ii::'::'}• : rr r<~ w:: .....ti . ~ f:r: ii"r'->i:.' ~i 4h ~=:i:- • _v: ~:?•i'r?: i ATTENTION: Mike Hume ~~:i:~2:~~~~:::~~:~-~~::~ :~:P . {3,~~.C~'~:~.:::.M~.:~:R~:~.:: ~ :~;::~:s~;;:.?,{:: ~ : :ti2,•:R{.$:{?v:vi7::~: :2•:: ~:~2?riii:tiiv}: v.,•.•v: v: v. ~ ~ x::.:i""" ;r:~:~:~~::::.::._:::::.: r.ti.: r:::r:;.::•:,<::~:::: ::xt_~:~;~:::..: ~ . • r::;:: v.1,.~...v~•r.~:;.; ~ ~ : r • . ~cti.., . •.t::: ..t}.. ..tt;f.x. : =:2ii_; ~ r;_::i_c::2:::: ~ ;_.=:=:=:c€:=:•i5:: _ P - - - ROJECT . . .r - . . . . t, . ' ~ ti1• Y . : 1 . " . :t.Y::.~JA:•~: . . Description: • Xerox Prints 0 Copy of Letter ■ Construction Cost Estimate • Original Drawing 0 Contract Documents ❑ • Work Authorization 0 Report 0 No. Copies Description 1 each, Construction Cost Estimate with hourly breakdown 1'each, Testing and Inspection letter from Spokane County Purpose ■ Information 0 Review & Comments ■ Per Your Request 0 Written Approval Signature & Return Remarks . ~ Mike - Per your request I have enclosed a copy of my construction inspection cost estimate with the hourly breakdown. I have also enclosed a copy of the testing frequency and standards established from a letter from Spokane County. We are using the letter as a guide for contro( of the inspections. ~ _ If you have any questions, please feel free to give me a call. Si9ned: ~ 8888 88888888 8888 8 888 8 8 88&!8888 N g g g~ $g gg g g~g gg g~m..g6 ^ a N dvdE Q, NNN~ YIYI NNN N NNMN M NNM N ~ NN E E E~ 0 O~Vr NNT-OON'N 00v- 1n 0 tD-tD M §000 L O O C G 0~~~ VUU~~~~ ~ M 19 cJ W.5 ON] ~ u► w t H ~:~0 ~LL ~ ow~ com ~ " 8888888888 888888 888888 888888 888888 " 888888888888 88888888 8 888888888 88 ~ ggoooooogg gg°g °O gggO°g n°°g°g g5gg°g ~ ggggggS°Sgog ~~oooogg 0 vgggggggR g ~ V L v V r ~r b► V 4 ti V► r V V►► 4 b \ v V 6~. ► L ~r M b 6 b b V V V V M4 ti b uuu . m m N ~p v NOOOOOO~N NiAONO~ ON~-OON COq- OUIO~ ONNNON NNmNNUf0NON 40~000~0 ~ fV iDNNV0 0 10N(0 ~ C O G C O O G ~ O ~ O C O O r Ln g m =xx 'E 8 os8 8 ~ v " , ' , ~ o R ww• 0 A g « N ~ .13 C ce ~L` °~p ~ cl ~ W ~ ~ c ~ ~ e f ~ ~ ~ ~ fi ~ c 4c- ~ ~ A F ~a p ~ F ~ ~ o~i ~ ~ ~ r ~ g ~ ~ ~ ~ ~ ~ ~ ~ ~ g ~ ~ I u 1° ° Ng ~ a m ol to 2 j~ ~~W B ~ Q a *{v~ ° yM r~ 10 E b ~ 4j , ~ 8 111 G 11~ N A l~ 11 !q / (yy'1f11 ( ~1 ~ ~ ~ ~l ! (1 ` ' ~ + pri - . . . . , S E P 11 1995 . I.P.C. S P O K A. NE ~ C O U N T Y :~--OFFlCE OF THE COUMY ENCWEER • A DNI.SION OF 77-lE PUBUC WORKS DEPARTMFNT Ronald C. Hormann, P.E., County Engineer Dennis M. Scott, P.E., Director . August 8, 1995 Bruce Howard o~ Inland Pacific Engineering, Inc. - 707 West 7th, Swte 200 Spokane, WA 99204 Subject: Inspection & Certifcation of Road and Drainage Facilities _ - Dear Bruce. A clarification was requested regarding what the County requires for the inspection, certification and preparation of Record Drawirigs plans of the construction of road and drainage facilities. . • Inspection, certification, and Record I?rawings are required in accordance with the current Spokane County Standards for Road and Sewer Construction, Section 9.0. Site construction inspections and monitoring, material testing, and reporting, need to generally follow the WSDO'F ConstructYon Manual (M41-0 1). A brief, overall description of what needs to be addressed by the sponsor's Engineer for inspectioq certification and submitting Record Drawuigs are listed beIow. ' Raad Construction Insnection & MonitorinQ Earthwork -cut "I'he Engineer needs to examine each newly exposed cut as soon as possible after it is opened, an inspection of the cut slopes and ditch cuts to locate any objectionable foundatioa materiaLs or faulty . drainage coaditions which need to be corrected. Objedionable materials are those having characteristics which may cause an unstable subgrade. If objectionable materials are found, the Engineer needs to immediately recommend corrective-measures. and coordinate their efforts withthe County. ' Earthwork- For placement of structural fill under rvadways and facilities, the Engineer needs to monitor the compaction material, lift thiclaness, testing of moisture content aad compacted density for each lift„ and note compaction equipment used The maximum density and optimum moisture content shall be determined prior to placement of fill, and relative density of eacli tift is to be reported by the . Engineer through an inspection report. The Eng'uuieer shall test for in-place deasity at a frequency of approximately one test for 5,000 square feet of structural fill surface area. Subgrade The subgrade sha[i be uaiformly compacted to the density specified. The Engineer shall test for . - in-pIace density at-a frequency of approximately one test for each 200 linear feet of twatane roadway or equivalenL 1026 W. Broadway Ave. • Spokane, WA 99260-0170 •(509) 456-3600 FAX: (509) 324-3478 TDD: (509) 324-3166 ~ ' ~ - - . . • ~ Letter to Bruce Howard page 2. August 8, 1995 . Bases Compaction testing of each layer of material is needed. During constructian, each Iayer of surfacing material shall be checked for comptiance with density, specifications at the latest time practical before the next layer of material piaceci. Field tests for each layer placed is to be done at a frequency of approximately one test for each 200 linear feet of two-Iane roadway or equivalent. Upon comptetion of placing and compacting of each surfacing section, and before construction of the surface treatment or pavement the Engineer sha11 ascertain the depth of the total surfacing and base course section by checking the depth under each traffic lane at intervals not to exceed 200 linear feet, measured along centerline. Pavement The:Engineer shall prepare-a written record of paving operatioas, including adequacy of base materiat, tack coat applicatioq spreading and finishing; and compaction. The Engineer shall submit a report showing how the Contractor conformed to compaction and placement requirements, Concrete Curbs & Sidewalks - The Engineer shall note what methods were used by the Contractor to insure that the foundation for curbs and gutters were thoroughly compacted and watered prior to concrete placement. The Engineer is to record the type and condition of the formwork as it pertains to specification - requirements. The Engineer is to also record conerete placement methods and curing procedures: Recording of the weather conditions during concrete placemeat is also important. Drainage The Engineer is to go over the project, particuiarly during severe storms, closely observing the quantity a.nd action of the storm water runoff to determine suffciency of the storm drainage system. The placement of curbs, grates and culverts need to be placed at the proper elevation to insure adequatedrainage of storm runoff. If underground streams and seepage zones are encountered, which were not anticipated or accounted for in the design, or if any other portion of the drainage system appears to be inadequate in the opinion of the Engineer, the Engineer shall notify the County, the Sponsor and the Contractor immediately. The Engineer shall diligendy coordinate with these various parties ia developing mitigative measures to address the problem. For construction of pipes and drainage strucbres, the Engineer shall check for conformanoe with the plaas and specifications on the coadidon and methods of the pipe foundation, bedding, backfill and pipe . grades. _ Erosion Control If an erosion control plan has been required for this project-ffie Faigineer shall record what erosion and sedimentation control measuces were implemented by the.Contractor, and what sequence in the construction prooess. Note when silt fences, sediment trapstponds are installed, construetion entranee's, and how well they are maintained throughout tbe duration of constructioa If dowastream properties is impacted by siit deposition from site con,struction, the Engineer needs to record when it oocurred and what mitigative measures were initiated to correct the problem. Material Testing General: . The Engineer must see that his inspectors are equipped with the proper tools to test and inspect materials and that arrangements are made.to insure that material samples are representative, accurate and complete. It is imperative that the Engineer keep the Contractor informed of test . results at all tunes. If the material being produced does not-meet the requirements of the specifications, the Contractor must be informed immed.iateIy that is unaeceptable, so that corrections can be made. The Engineer must keep a record of daily test results. The Engineer shatt i~;; , - ' . ~ • . . . . . , , _ , f., . • Letter to Bruce Howard page 3. August 8, 1995 conduct sampling and testing as often as necessary each day of construction. Aggregates Gradation and material testing and reporting of the rock material for conformance with the SpeciGcations is needed for each materiat used. The Engineer is to watch for segregation of materials during all stages of manufacture, hauling, and placement. Pavements The Engineer shall test for, as a minimum, material gradation, Marshall test of the asphalt, and asphalt content. - Concrete Curbs & Sidewatks The Engineer shatl ascectainthat the concrete work meets the'requirements of the specifications, including but noc limited to, testing for compressive strength, ai.r entrainment, and slump. ,Submittals gnd ReDorting to the Countv, . Inspection reports, materia[ testing reports, and Record Drawings are to be submitted to the County upon the completion of each phase of the projecL When the Engineer finds the construction work not in conformance with the plans and specifications, he shall notify the Contractor and the Sponsor immediately of non-conforming work. In the event the Contractor fails to immediately correct the defective work, it is the responsibility of the sponsor to ' rectify the sitvation. In the event the Engineer fmds the need to revise the plans at the time of constructioq helshe - shall immediately notify the County of his/her intention, and shall coordinate their efforts with the County, the sponsor and the Contractor. Uniess there is an immediate danger to life or property, the Spoosor is required to obtain written accepta.nce from the Sponsor's Design Engineer of ptan changes prior to imptementation and shatl forward a copy of the approved plan changes and related calculations, to the County Engincer. Tbe inspection reports, material testing reports, and Sponsor's Design Engineer Record Drawings are to be sufficiently complete so as to ctearly demonstrate that every aspect of the project is in conformance with the plans and specifications. The Engineer is to submit the reports and plans to the County in an organil,ed and complete manaer, with the sponsor's Engineers/Surveyors certification statement The Record I?rawings need to reflect what was actualty instalted and constructed. Any changes in elevatioas and horizontal location of pavements, curbs and drainage structures, which are outside of normal construction tolerances, would need to be identified in the Record Drawings. We hope this information hel'ps ciarify what is expected of the sponsor's Engineec for inspection and ccrtification of the coastruction project. Sincerely, Sincerely, Spokane County Public Wor Spokane Coun-t-v Public Works ~ . . Bill Johns, P.E. Bill Hemmings, P.E. Acting County Engineer Development Services EngineerlManager cc: Tim Frank - Grcenstonc Corp. . . . ~~5/21/98 12:15 '8'509 467 9771 TOMLINSON NORTH (g001 p . Tvttilinsun !3lnc1► Nvrth. Inc, ~ BlOS N Division _ SPokone. ;Yo_ 99208 Justthe # . Phone: (509)-467- i 400 ~ Fax: (509)-467-4771 f~ 44 FAX . ,:..L ~-....-..~,,,,.=,ar~'.•4t~t~~~ .J Dare: To: !7r ~cc ~ Phorre: 9 Pages (incl. coVer) Fi-om: ` . Pw1 iom 00 RenraYks: , CC: Llst tnit~ts _JE71 19 ; . i . ~ - CONFIDEN'TIAL[TY NOTE: The dacuments accompanying this facsimile transmission contain inforntation from the above Real Estate ofl'ice which 'ss confidential and/or privileged. This inforrnation is intended only for the use of the individual or entity named on this transmission sheet. If you are not the intended recipient, you a.re hereby notified that any disclosure, copying, dtstribution, or the taking of any ~ n in reliance to the contents of this facsirnile transmission is strictly prohibited, and Ehat the documents shoutd be returned to ihe sender immediate}y_ In this regard, if you have received this facsimite in error, please notify us by telephone immediately so that we can acrange foc the return of the original documents to us at not cost to you. Va7/L1/v0 1G.1J (jJV.7 YV! .y//1 1V171L1f►7v11V1111] lR VVL • 'r5W `~C'. I HV ~ j ~ • W - ~ 1 . • Z L i ' ? I SL`.rI ~ vq~ SO/LS, TFSTING & INSPECTlOIV WORK AUTHORIZATION AMENDMENY TO ATTAGHMENT "Ap DETAILEO DESCRIPTION OF WORK (3/5198) Meadowland {20 Res. tots with 1,6701.f. ot Public Road tmprovements) Gonstruction Inspection IPE! STI iVorthwest W.O. # 98339 STI Northwest will perfarm Construc#ion Inspection and Materiat Testing services as outlined below and charge for said services on the basis of time and expense. A. ROAD and SEWER CaNSTRUCTION INSPECTtON eF: 1. Earthwork and subgrade preparation. 2. Placement and compaction of all base material, and pavement. 3. Placement and compaction of sewer backfill. 4. Verification of Side Services, ar►d market posts. 5. Curb and sidewalk installation. 6. Drywells, inlets, and general faCiiities. 7. Temporary drainage facilities. 8. Erosion control. 9_ Cootdination with Spokane County. 10. Preparation and submittal of street and drainage "Record DrawingsA, prepare and submit sewer °Record Drawings". 11. Soil and material testing for compaction and backfill for rtems f thru 5. B. Direct Expense 1. Nfileage a# $0.30 per mile. 707 W. 7th Avenue, Suite 200 9 Spokane, WA'99204 a Phone (509) 458-6840 • Fax (509) 458-6844 U5/11/NZf 1'L:lti 'tySUU 467 9771 '!'Ul11LU45UlV NUK'1'li t¢JVU3 Inspection page 2 2. DESCRIPTION OF WORK tnspection by STI Northwest personnel or other agency personnel shall not relieve the contractor of his responsibility to construct the facilities covered by this agreement to the line and grade shown on the approved plans or as staked by the engineer. This contract agreement does not include construction management, scheduling ac#ivities, or preparation of irrigation yRecord DrawingsA as required by Spokane County for final acceptance of the street and drainage plans. 1. The scope of these construction engineering services includes: A) Periodic obsenration and reporting of specific construction activities on this project which include; Sewer, Subgrade, 6ases, Pavement, Concrete Curb and Gutter, Sidewalks, Storm Drainage, and Material Testing; B) Nlaintenance of all constructiQn records related to construction activities outlined in paragraph "Av above, which may include; daity inspection reports, manufacturers' certifications, materiai test tepotts, and correspondence; C} Assurance that the construction of the roads is according to the approved plans accepted by the Spokane County Engineer, Spokane County General Provisions, the Standard Specifications, and applicabie portians of the VNSDOT Construction Manual; D) Development of Post Construction Record Drawings for Sewer, S#reet and Storm Drainage Facilities; it is understood the facilities inspected by firms other than STI Northwest will be certified by those firms in a form acceptable to Spakane County; E) Coordination of the testing of construciion materials for compliance to the plans accepted by the Spakane County Engineer, Spokane County General Provisions, the Standard Specifications, and - applicable portions of the WSDOT ConstruCtion Manual. 2. Prior to accEptance of the roads and drainage facilities by Spokane County, the Engineer shaf I submit all construction records and the Record Drawing ta the Spokane County Engineer. 3. The effort to complete inspection and certifrcations in accordance with Spokane County requirements vaties widely artd is closely related to how well your contractor plans his ac#ivities, communicates with our inspection sta#f, and the quality of his work. A pre- construction meeting with the contractor, project sponsor, and STj stafF is strongly recommended prior to commencement of any construction activity. This meeting wiii be held to determine the schedule, client contact, owners representative, and payment responsibility for re-inspection charges for incomplete or inadequate work. 05/21/9$ 1'l : 17 la5U9 467 9771 7'U141LttvJUtv PiUKl'N igj uuq Inspection . page 3 STI Northwest will provide as much sail and materials testing in house as possible, 'but will nat hesitate to use autside consuitants where their specialty is required. 1lVe feet we can provide better service in quality controi, and streamline the inspection process as required by Spokane County. 1Me have a nuclear densometec for compaction testing that rents ouf an ari houriy basis. The s4il and material testing is billed on a time and expense basis. A monthly invoice will be prepared and sent to you for the inspection and matefials testing. The amount of testing is impossible ta anticipate, and will require your contractor and oonstruction manager to c.eordinate witli our inspection dopartment. As you know, there are some soil and rnatecial testing guidelines required by Spokane County, but the requirements are only the minimum and additional testing may be required. The services described herein wil{ be performed as needed and biiled on the basis of time and expense as outlined in the maximum hourfy billing rates b' b cla-q5ifiratiaajn~dude.d in the Work Authorization. You should budget . or the inspection services ou#fined above on a one time basis, and you should budget $1,600.00 for soil and rnaterial testing. Mike Hume agrees to provide to STI or aRange for appropriate cer#ifications fcom other fcrms and to include provisions in their construction contracts to back charge their contracior for the cost of STI services which rnay be required for re-inspection or re-testing of facilities which faited to rneet the required standards. Biilings for said re-inspections will be carefully identified on STI's billing to Mike Hume. Mike Hume will be responsible to back charge their contractor. It is also understood that no work shal{ commence within any portion of the- proposed Spokane County Right of Way without first obtaining a written permit and approved plans from the County Engineer. 1t is also understood that any project facilities constructed without adequate inspection and documeritation by STI Northwest will be removed and reconstructed in accordance with approved projeci plans and Spokane County Specifications, or ST1 will not be responsible for project certification or subrrissian of record drawings to the Caunty Engineer. Accepted: STt Northwest Accepted: Mike Hume . ~ c by- bY= qate: date: . . AaAow _ ~ • ' a l~ 1 ~ 4Ar . . to/ r . ~.A 1 f * V ~ LL , • ~~~Ww . y ~ • ~ . . • ` ~ ~,1 g„~iGOI'~ sw ~ '°;O . P~~~~' ~ . ~1,`f . ~t'``' ~~to~;,~•. . _ o: ~ . , of . . . - . : , ~ • ' ~o~T ~i r?~►• ~t ~ - , . ~ ' ~ . . Q1•! S r 'r'~ ~ . ~ . _ ~ ~ ~ . ~ . ' • ~ . . , - . . , . . * . : . ~ ~ • , - 1V~~.. _ ~ . - ~ - . . _ ~ ~ ~ • . . ; - - . ' - •.~j,~_~C~~~a'\i,T! ~*T-,.nM~' . , . . • • . ~.~.ri!'~'= . , , . • ' . . ' ' . ' ' . . . - , ~~~r~~~y~ ~ ~ ' • . • . , . . ' . , • - . ' , ~ r, ' . . , ' ' • 7 , or- " ' • • . ~,.••.ED, . . . . • ~ - - ~ . - . - ~ . - ~ - • . ' . ~ ' , • ~ . - ' • • . ' , • . . ' . -fL 75 ~ . • i ~ ~ . , - ~ . ' . . A ~ . • • ~ ' w~ ~ ~ • : , . ~ . ~ r • ~r~ . ' • ' rv, IL . . • rw • r ~ . - • ~ ~ , - ~~R . i • • - ~ ' . , ' . ' "f r , • ~M~ ~ M , . ~ ' • ~ ' 6opw ~ , • . . ~ ~/'r'' • ' ' ~ • . ~ AW ~~a~~aG..s ~ - . , ~ ~'7~~ • • i ~ . J * ~ J• ~ . ~ . _ --M • . ~ ~ . . . , _ . . . ~ - - ~ ~ . ' ~ • ~ ~ • . . ~ - ~ ~ ~ - . . . - ~t~` . . . • spopw , ~ . _ ~ . ~.u ~ . - . ~ - . ~ - . ~„S, . . ~ , : . - . . • - . ' ' ~ ' ' ~t~~~l~~' . . - A" ~ . ' . " ' • ' . ~ . • . a- -Pl . . ~ . _ . _ . _ , ~ . ' - - . • • r / • d,~ . - . . Z . • . , : u:i.~,;~,~;~ ; , . ; , , • • , • " . ~lk.f o ; ~ , . , . . . . . ~ CONTRACTOR ~.2V-r- INSPECTQR _1OI455 ~0~ . , ~ . , : . . ~.~j 'GGMPANY . . , , , . . . ~ NOR~ .DATE INSTAILED `t5 A . ~STUB. QlA TYPE- ~ . , , , ~ . . ~ . , D ~ ~ . . ~ ~ . . . u LEr . ~ ~ . . . ~ ~oiRECTIoN ae aisrAwcE . F'RGM °NEARESfMANHOLE , , ~ . ~ ~ . ~ ~ ~~t ~ ~ ~ ~ ~ . INVERT EL. Z 0 6Q . ~ ~ OEPTH FROM NA1URAl ~ GROUND TID S'N8 c~ . ~ ~ ~ ~ . . . LOCAI. B.M. ELEY. ~ m , m M. DESCR1PT10N -OF lOCA1.' B.M. 0- . m O ;o m s a.,. ~ . ,r ~ . v mo D O . . > g zg . . . . . . . ~ Z Z. NOTE: WHERE POSS181E MAKE T1E5 TO TOPO. SHOYVN ON, PLANS , REMARKS - ~ rr'1 . . ! ~ , , . ~ ` ' moN0 > PROJECT NAME: 2 ~ ~ , . ~ ,m ~ REF.' ORAWING Nb: AV-&ooo . . 00 c ~ FILE - NUf~BER: , q ?a 7~ C Z 0:* PARCEL. . L vT' 1.4 . . ~ , , . . . . ~ 4 STR~EET.- . . ;o N ADDRESS: ~ . . ~ . ' ~ ~ . • • •R/'-~l~\9,N~.i.VAW.'Yl~`+~41Il4i'iSTlE'1RR1~~:~1..., ~AW~IVJLVI.:•~A'1~1Y.f.'S~L1711~iN.~\sY~1DiCF'1~~t1S~l~M1~ . ~ - . . . . . . . ' i . . . . . . ~ ~ . .l...u..i..... ~ lM~. ~ nN i.: f .l. .l'.Ril Y~%':'M . • " . ~ ~ ~CONTRACTOR -INSPEGTOR D ~0 ' , • ~ COMPANY 5?"~ ~ < " NOR1H ~ . OATE 1NSTAl.tED 0 ARRa1N . . . ~ ~ ~ , S1U8: DIA TYPE D . . . . , . . . LEUM 3 2' ~40~( OlREC110N dt OISTANCE ~ . ~ . , • .FROM NEAREST MANHOLE ~ ~ . . ~ ~ Soc~t I I~. Nf_ NVERT E1. ~ 5-8- 5'~ . . ~ aO OEPTH FROM NaTURAI. . . . ' ~ ~ ~e..GROUND TO S'N8 v ~ oe ~ LOCAL B.M. ELEV.,---'z'aA36 , rri QESCRIP7ION OF ~IOCAL S.M. 0 m ~ 0 ;o .v ° . ~ ~ . jo v ~ >O . l*z~ ~ . ~ Z Z N.0'tE:-,WHERE POSSIBEE MAKE T1ES TO TOPO SMOWN ON PLANS N REMARKS .3~ m -0 ~ ~ 7z o ~ PROJECT NAM~E: ~4wQ oz, z ~-7 m REF. ORAWfNG NO.- Ft,Lgo'o' a ~ FiLE NUMBER: 7 6 . ~ ~ m ~ . n Z ~ PARCEL: Go~' /~S" ~ ` . . g o STREET: AOflRESS: ~ ~ , ~ , ~ . . ~ . , , . . . , . , . . , . . , ~ . ..'i., . . ~ • . ::ai:c~V:~;i~.R:.f.~!~c.~~y~;~7T;1~ ~~Vf.1.?~AN.~!}~r.r,~`'~/Y,~'L~',1i~:~'i)i~~~`a'1'yk~(,~j~t~%J'AJb;'i;?:~ti'Y'~~:rs.~.M~`' 'tv <:~4i 1e~ ~ ~sYri~~ ~ ~~1~. ~~•+r~ , :y~_ ~ t•r~~":'~ii• . ..ti~~ ~ . . . , ~ . . ~ ~ ~ ' .,v..... ~ IJ:.~.ze. ,-r :~YSNd'a A r~ v ~a.F~E<Ikrb:d~Mvl?Y.~nYKVri'UYiN.4.~%il . . • . 7 . ~ INLAND PACIFIC ENGINEERING, INC. 707 W. 7th Ave., Suite 200, Spokane, WA 99204 (509) 458-6840 Fax: (509) 458-6844 TO : SPOnfiE C(3ITliTy EgGI1jEERS 10/ 13 / 9 8 I026 W Broadway DATE: Spokane WA 99260 I.P.E. PROJECT 98339 ' ATTENTION: PROJECT NAME: M-atinWlan~ Description Xerox Prints M~ Copy of Letter M~ M~ Original Drawing M~ Contract Documents M~ M~ Work Authorization M ~ Report r ~ No. Copies Description 3 Daily Inpsectcion Beports #I through #Z. For the period of 11/5/98 thraugh 11/9/98. PUrpOSe M xA Information M~ Review & Comments M~ Per Your Request MI Written Approval Signature & Return M~ Remarks Signed: Shannon Barratt , cc: Eller Corporation , D:\TRNSMT.PMS z D ~y ' . CONTRACTOR O c a ~ ~ ~ INSPECTOR > ~ - o~ ~ M ~ rn COMPANY ~ m Coo A " NORTH OATE INSTAlLEO ~ ARROW . „ STUB: DIA.---,'!y TYPE LENCTH z3 7 x I,1r OIRECTION & OISTANCE FROM NEAREST MANHOLE b1 o' -,l 2.3, 7'6 1 4 iNVERr EL Q< PP DEPTH FROM NATURAL , . GROUND TO STUB Z U, LOCAL B.M. EIEV, mV) v ,~S DESCRIPTION OF LOCAL B.M. ~ O ~ ~ sru3 ~ . ~ mD ' , . ~.O n0 -mo D O~ " A?~6~~ • . D ~ Z v ` ~;o z Z NOTE: WNERE POSSIBLE MAKE T1ES TO TOPO SHOWN ON PLANS REMARKS . ~m~~n ~ZO ~ l . ~ PROJECT NAME: ~ ~ Z 0 ~ ~ M REF. DRAWING N0. , -o n ~ ~ FILE NUMBER: , - . --j PARCEL: 13 go STREET: a ;o x I ~ Q ° ADDRESS; 1D 0') , • ~--r z D~ D CONTRACTOR ~ ~sT o c oti N~ . E,c 1sr INSPECTOR ~ m A< ~ ~ COMPANY~~ ~ C~ ~ o m . NORTH DA1E INSTALLEO~" ~ ARROW STUB; DIA. y TYPE D LFNGTH ~ r . ~ ft uva0 yb H . OIRECTION dc DISTANCE FROM NEAREST -MANHOLE . FEMLE 53r . Y, ~ 2 (y'~'~ Fn~ 3 ~5',S~.~'ss INVERT EL ' 20~ y,S DEPTN FROM NATURAL ~ GROUND TO STUB 7.5 U(n ° p m LOCAL B.M. ELEV. ' ~ mU) DESCRIPTION OF LOCAL B.M. ~ nm O;:a < onN , mD m ;;u n° . a D O~ ~ Z~ NOTE: WHERE POSSIBLE MAKE 11ES TO TOPO SNOWN ON PLANS REMARKS Yc> 7- m ~ m -p c/) n F 1.L r . , ~ZO ~ ~ D 0 PROJECT NAME: ~D Z z . ;g o m REF. DRAWING N0. n , m ~ FILE NUMBER: , rz PARCEL: , gp STREET; ~ ti (n ADORESS: Zz0ay_,~Zz0t4A __0 rn , , ~ ~ • ! , ' . Z o ~ D - coNTRACtaR ° > , . . o Fx15r INSPECTOR 00 . m~ m DU COMPANY co, 8 0 NORTH L DATE INSTALLEQ~S~ ARROW o a w,l , STUB: OIA ~ TYPE ` D tc LFNGTH ~ - V ~ r ~p ► DIRECTtON & DISTANCE . sn,s FROM NEAREST MANHOLE 1 s' ~ Awt- , INVERT EL DEP1N FROM NATURAL GROUND TO STUB ~ o p LOCAI B.M. ELEV. m . M OESCRIPTION OF LOCAL B.M. . ~ ~ ' • . n m 070 ;u < on~ . m D . o ~o , o n D o> . . ; D ~ Z v ~ z Z NOTE; WHERE POSSIBLE MAKE T1ES TO TOPO SHOWN ON PLANS REMARKS 1-2 (nC) m ' r►m-oC/) n AZO D 0 PROJECT NAME: &Gc / ~ ~ Z Z m REF. DRAWING N0. , -v n c: 0 c: FILE NUMBER: , rz ~ ~ PARCEL: go C N ~ STREET: A~rX ~ ~Q u x --I ~ ; AODRESS: 107-121za~ /A:~lg• AlAd- . - L ~ o D ~ y ' CONTRACTOR ` o ~ m INSPECTOR > o ~'j~! s T ~ ~ r ~ Q COMPANY p" NORTH DATE INSTALLEO..[~' ARROW . . o w,<< S1UB:, DIA y TYPE L.ENGTH _s2i.~ o fc ~r~0 DIRECTION & DISTANCE . FROM NEAREST MANHOLE ~~k$ " , /.ZS' 3S 5 ~S~ l. ~ , . . . , ; , INVERT EL . - DEPTH FROM NAIURAL GROUND T4 STU9 Z~7 o p LOCAL B.M. ELEV, ' z m . . m U) DESCRIPTION OF LOCAL B.M. ~ , n m O X ~ mD • ' . ~ • v ~ no D OD D ~ ~ • Zv ~ Z Z NOTE: WHERE POSSIBLE MAKE T1ES TO TOPO SHOWN ON PLANS REMARKS m 4~E In n s~ r~o~=~ , Z 0 PROJECT NAME: . m REF. DRAWING N0. ~ 9-00 V° ~ ~ ~ FILE NUMBER: r z ..9 ~ 3~ q PARCEL: . C g a w 8 STREET: ,-1' C ~ u 0 ~ I ~ .012o/ Za.2Zz /S'~~. . ~ U) ~ ; ADORESS. F . . ~ - INLAND PACIFIC ENGINEERING, INC. 707 W. 7th Ave., Suite 200, Spokane, WA 99204 (509) 458-6840 Fax: (509) 458-6844 TO: SppgANE COUNTY ENGINEERS 1026 W BROADWAY DATE: NOZMIBER 20 p 1998 SPORANE WA 99260 I.P.E. PROJECT 98339 ATTENTION: PROJECT NAME: MEanowz,ArD DeSCrlptlOri ~X~ Xerox Prints M~ Copy of Letter M~ M~ Original Drawing M~ Contract Documents M~ M~ M~ Work Authorization M~ Report No. Copies Description 1 DAILY INSPECTI0N REPORTS #3 THROMH #7 _ FOR THE PERI4B OF 1I/I1/98 THROUGH 11/1R/98. PU1pOSe - bWInformation M~ Review & Comments M~ Per Your Request M~ Written Approval M~ Signature & Return M~ Remarks Signed: SHANNON BA,RRATT CC: ELLER C4RPORATION D:\TRNSMT.PMS INIC.AND PACIFIC ENGINEERING 707 West 7th Avenue, Suite 200 . Spokane,_WA 99204 Telephone: (509) 458-6840 FAX: (509) 458-6844 FAX TRANSMITTAL DATE: NO.OF PAGES. ~ Uncludrng cover page) TO: gr2A FAX COMPANY: 0CLj- PHONE#: v FROM: JOB ~ - PROJECT NAME: ORIGINAL IlV MAIL: ❑ YES ❑ NO NOTES: ~ • , . yQ~,d G /j-i .;le91100" - - ~ . REV_ 5/97 O:\FORMSIFAXSHEE'I'.WPD ~ INLAND PACIFIC ENGINEERNG 707 West 7th Avenue, Suite 200 Spokane, WA 99204 Telephone: (509) 458-6840 FAX: (509) 458-6844 Fi4X TRANSMI TTAL , DATE: ~ March 22, 1999 NO.OF PAGES: Including Cover Sheet ; < < . . TO: Mike Hume } FAX NO.: ~ 467.9771 ~ COMPANY: ` Tomlinson Black ` PHONE NO.: ~ 467.7400 ..................rr................................................................................. FROM: Bruce Howard JOB NO.: 9$339 ~..9. ~.3 . PROJECT NAME: { Meadowiand Construction Inspection ORIGINAL IN MAIL: O YES yt NO NOTES: ~ Mike - Per your conversation with Todd last week, I have pulled the billing for the above mentioned project. My records indicate we have billed to date a total of $2,207.95 for inspection to date. ir contract has basic services amount of $7,400.00. Our record show we are well below the c:ontract amount. If you have other documentation indicating an error on our part, please let me know as soon as possible. We are currently observing the curb pour this morning. If you have any further questions, please give me a call. Bruce A. Howard - . ~ . 7 ~ INLAND PACIFIC ENGINEERING, INC. 707 W. 7th Ave., Suite 200, Spokane, WA 99204 (509) 458-6840 Fax: (509) 458-6844 ~ - - ~ ~ TO: S~t~~ Ca~ Eq ~~:t~ER..= F~ 1026 eEqy d • qp.~~ROAD~ ~AY ' t~ ~ ~e~/y~~y~ ~+E ~f.L~ S•=p~ d9L. ~gSAl.G L(~ ►7S i~L~.l9it7 ~ I ~{i.~.l . ~•"~L`O`✓ L V ci't,,~l~ ~i+~ "Y"~" r'~!3~ 4.! ~ rr~ r~ W. Y S~O~ ~PR ~ ATTENTION : ~c~ ' ~ ~4ii'~ 8' ~~'.y ~~`SE e~~i{i i~~n N ~ i'~.}~•~;'~~Y~ ~ '~`~'~~7~~~}~ '~f ~aK ~ ~ ; i . ~ ' P~ • F ~i;il~ Ti r ~ x~~> °~'I ~ !nN a'n G - eP4w;`~~~ "a,Nk1T'r a~~. _`"e s~' Description M~ Xerox Prints M ~ Copy of Letter M~ r~ Original Drawing M ~ Contract Documents M~ M~ Work Authorization Mxil Report M ~ No. Copies Description ~ DAiLY INSPECTiQN REPORT 19 ~ ~ ~ERIOD OF 3/16/99. PurpOSe Information M~ Review & Comments M~ Per Your Request M~ Written Approval M~ Signature & Return M~ Remarks ~ ~ Signed: ~HANNON B-A"AT7 ~ cc: ~OMI:~~~N MACK , D:\7RNSM't.PM5 INLAND PACIFIC ENGINEERING, INC. 707 W. 7th Ave., Suite 200, Spokane, WA 99204 (509) 458-6840 Fax: (509) 458-6844 '~+R-L~G'Q'3.3ebie~o TO• SPL.: ,(~O~ rr g4~~~~Lf~.I~EW ~ -~a -t'~ 1r 26 Bd B~.~AD?~:f~u $ s ,t _ Y ~ ~ - ' ^:"''.a~;;~i,l'~~i~'~'~:~~ ~:~'`~'-'~'3 'i~ ~ • ~,~~~'f"r' "N - ~~~A-ME WA. 99260 i'u.., ~ ,11T_# ~PR0~1 ~rTT'~' r. ; I ~i ~~i .y ~ ~ „Z~ '~@, , ly.l"~ •i ~ f r.. ;q . s i'r ' ~~~1►' 1 ' -0:s~ ~I.R' ATTENTION: ~ ~ _ STROAKS • ~`a%t ; . "'y ~ ~ Ks~~ia~~ ~ g ~ ~ ga *~~;t;ep~~ ` ~ ~ k »~u~i.i~ ~iM~ k <y ~ 1' j~~ Description M~ Xerox Prints M~ Copy of Letter M~ M~ Original Drawing M~ Contract Documents Work Authorization MXXI Report M~ ~ No. Copies Desc "ription D~ILY IN5PECL'I~~ ~POR7`iS 'grI€k T"s~.ROUGH #13-j ~ERIOD OF 3/291g~ ~RROU"C'MM126199s , PLirpOSe M 74 Information M~ Review & Comments M~ Per Your Request MI Written Approval M~ Signature & Return M~ Remarks Signed: ~~~~~N B"RATR ~ cc: TOM~~~~~~~ B1A,1-'M , D:1'IRNSMT.PM5 . q~G~~coy9 ~a y - a ~ NORTHWEST ~OFA - MER SOILS, TESTING & INSPECTIOIV May 20, 1999 . STI W.O. #98339 Spokane County Utilities Department 1026 W. Broadway Spokane, WA 99260-0170 Attn: Bilty Urhausen Re: Meadowland: Bond Reduction Request Dear Billy, All work associated with the air and mandrel testing has been completed in substantial conformance with the plan set and specifications. At the request of our client, M'ike Hume, we request a reduction of all associated sewer construction bonds for any related work associated with this project. If you have any questions concerning this issue, please feel free to.contact me. Sincerely, STI Northwest Bruce A. Howard Principal cc: Mike Hume 3628 E. Ferry • Spokane, WA 99202 * Phone (509) 534-9711 • Fax (509) 534-9755 . , CONTAACTOA t~ Abll~dN - ~ INSpECTOR'~;~-c~c,~k..~.► ~ ~r4 . c~ Z NORTH COMPANY SPQKANe C O uN T y ARROW DATE INSTALLEa -7 I 6 c D tlG ~ ` % TYTEE ~ M STUB: DIA, PE ~ o m LENGTN m C 0 CENTEALINE STATI4N -L!±( Z PM Jos# ~ LINE N0. ~ CC: Lisl Inilials STA, OF AND DIAECTION TO V NEAAEST MANHOLE i ~ +q`T ► $ 166u-~1 o Z ~ a INVERT EL, Xd Sb. 40 mcn n + ~J DEPTH FAOM NaTURAI nm o I ~ o ~ c ~ ~ . GAOUNO ro srua 9~ SI on ~ S 4~ . LOCAl. B.M. ELEV.~:SZ6 4--) Z. ,Pj c: x ~ Z r= QESCflIPTION OF LOCAL B.M. 'f sZ H ~"i ~ (or) O } z~ ~~E~{ C E R 1~ , ~aa ~►T Q~ S.~ 3~~s~ ~ ~ N4TE: WHERE POSSIBLE MAKE TiES TO TQPO SHOWN ON ORAWING 4~;; PIPE GRADE; cn m 1"w ' ~ 'i~', FT. BELOW THRESHOLD E 'i PAOJECI' NAME: A f f L E VA ~ L~ Y HOUSETYPE: !ra.. REF, DRAWING N0, o AEMAAKS co FILE NUMBEA: 4 cn N CZa PARCEL, 4 51 13 / 9D N z2~C,5 ~~o t , -9 ~m ' ~ E C E ~i Z STREET. ~1 ~ ADDRESS: V ACA 1V°f . ~ ' CONTAACTOA Jnp%4t~So" INSPECT4R12,7-c=-c..Y~% r -p - N~ m Z~ COMPANY :5l--:'0kp0E COUk7"✓ a NORTN ARROW DATE INSTALLEQ -7 ~ ~ 11 TEE ~ ~ STUB: DIA. ~r TYPE V ~ o ~ LENGTH o w CENTEALINE STATION ~2. +4~ RT~ x • ~ ~ ~ LINE N0, (..•~y STA. OF AND DIRECYION TO V NEAAEST MANNOLE 12+ 4'I% 8 SaV'rH O cnf NYERT El. Mm m DEPTN FROM NATUAAL n m O GROUND TO STU9 z v 0 -4 LOCAL B.M. EIEV. a m C DESCAIPTION OF LOCAL B.M._ J~ 0110 Z m Fn H (n ~ --A d ~/f/✓/~ \ ~ ~rc ~f Z m P! 4. wc NOTE: WNERE POSSIBLE MAKE TIES TO PO SHOWN ON D u :,J• PIPE GRADE; 4►$°~a o ~ ~b • ~ m p • }~~~.,i,~l~;1~(~ ~r~'~~~` 4` ~ ~TIlA FT. BELOW THRESHOLD ~ -Zi PROJECT NAME: APJ~L vAL Le' Y HOUSE TYPE:~A. m ~ AEF, DAAWING N0, AEMARKS m co FILE NUMBER: T64 0) I z = pARCEI: 4 S 2 / 3 ct0 > ~ o ~ w ~ 4'.g- o sTREEY: P/,c ADDAESS: YACAhI T' r _ . ~ ~.o-tm h ~ ~ ¢ -"i NORTHWEST f•~f Sa~'~ - AME~ SOILS, TESTING & INSPECT/ON June 10, 1999 STI W.O. # 98339 Spokane County Engineers Office 1026 W. Broadway Spokane, Wa. 99260-0170 Attn: Mr. Randy Stronks Re: Meadowland, Construction Summary May 31 - June 4,1999 Mt. Crest: Contractor Mike Hume: Developer Dear Randy, . This letter transmits the general construction activity that occurred on site during the time listed above. This letter is not intended to replace the construction daily report produced by STI Northwest or its staff, but it does transmit the general information concerning the construction activity. Any item that may be listed below may or may not be in compliance with the plans and specifications. This letter is not intended to be a submittal for acceptance. It is for informational use only. • No activity this week. If you have any questions or comments concerning any of the items listed above, please feel free to give me a call. Sincerely, STI Northwest er Bruce A. Howard Principal 3628 E. Ferry 9 Spokane, WA 99202 • Phone (509) 534-9711 • Fax (509) 534-9755 0 a ~ - ~ NORTHWEST AMER SO/LS, TESTING & INSPECT/ON lune 15, 1999 STI W.O. # 98339 Spokane County Engineers Office 1026 W. Broadway Spokane, Wa. 99260-0170 Attn: Mr. Randy Stronks _ Re: Meadowland, Construction Summary June 7 - June 11,1999 Mt. Crest: Contractor Mike Hume: Developer Dear Randy, This letter transmits the general construction activity that occurred on site during the time listed above. This letter is not intended to replace the construction daily report produced by STI Northwest or its staff, but it does transmit the general information concerning the construction activity. Any item that may be listed below may or may not be in compliance with the plans and specifications. This letter is not intended to be a submittal for acceptance. It is for informational use only. • No activity thi s week. If you have any questions or comments concerning any of the items listed above, please feel free to give me a call. Sincerely, STI Northwest V'4 f. ~ ~ Bruce A. Howard Principal 3628 E. Ferry • Spokane, WA 99202 9 Phone (509) 534-9711 • Fax (509) 534-9755 0 h ~ . ~ _~-1 NORTHWEST- SOILS, TESTING & INSPECT/ON July 1, 1999 STI W.O. # 98339 Spokane County Engineers Office 1026 W. Broadway Spokane, Wa. 99260-0170 Attn: Mr. Randy Stronks Re: Meadowland, Construction Summary June 14 - June 25,1999 Mt. Crest: Contractor Mike Hume: Developer Dear Randy, This letter transmits the general construction activity that occurred on site during the time listed above. This letter is not intended to replace the construction daily report produced by STI Northwest or its staff, but it does transmit the general information concerning the construction activity. Any item that may be listed below may or may not be in compliance with the plans and specifications. This letter is not intended to be a submittal for acceptance. It is for informational use only. • No activity this week. • Construction Punchlist is being created by STI NOrthwest. If you have any questions or comments concerning any of the items listed above, please feel free to give me a call. Sincerely, STI Northwest • ' ~ Bruce A. Howard Principal 3628 E. Ferry • Spokane, WA 99202 o Phone (509) 534-9711 • Fax (509) 534-9755 o~~pGENE~~,oy~ - ~ - NORTHWEST - AMER SO/LS, TESTING & 1NSPECTION July 6, 1999 STI W.O. # 98339 Spokane County Engineers Office 1026 W. Broadway Spokane, Wa. 99260-0170 Attn: Mr. Randy Stronks Re: Meadowland, Construction Summary June 28 - July 2,1999 Mt. Crest: Contractor Mike Hume: Developer Dear Randy, This letter transmits the general construction activity that occurred on site during the time listed above. This letter is not intended to replace the construction daily report produced by STI Northwest or its staff, but it does transmit the general information concerning the construction activity. Any item that may be listed below may or may not be in compliance with the plans and specifications. This letter is not intended to be a submittal for acceptance. It is for informational use only. • Construction punchlist items being addressed. No deficiencies to report at this time. If you have any questions or comments concerning any of the items listed above, please feel free to give me a call. Sincerely, STI Northwest Bruce A. Howard Principal cc: File 3628 E. Ferry • Spokane, WA 99202 • Phone (509) 534-9711 • Fax (509) 534-9755 O os~oG~E~cy9 lw h ~ 9 - NORTHWEST . ~fAMER~~~' • SO/LS, TESTING & INSPECTION July 12, 1999 ' STI W.O. # 98339 Spokane County Engineers Office 1026 W. Broadway Spokane, Wa. 99260-0170 Attn: Mr. Randy Stronks Re: Meadowland, Construction Summary July 6 - Juiy 9,1999 Mt. Crest: Contractor Mike Hume: Developer Dear Randy, This letter transmits the general construction activity that occurred on site during the time listed above. This letter is not intended to replace the construction daily report produced by STI Northwest or its staff, but it does transmit the general information concerning the construction activity. Any item that may be listed below may or may not be in compliance with the plans and specifications. This letter is not intended to be a submittal for acceptance. It is for informational use only. • Lester Johnson Co. performed sanitary sewer flushing to take care of punclist items • Flushed lines are: Existing MH in 12thto MH #1, MH #1 to MH #2, MH #2 To MH#3, Mh#3 to MH #4 No deficiencies to report at this time. If you have any questions or comments concerning any of the items listed above, please feel free to give me a call. Sincerely, STI Northwest Bruce A. Howard Principal cc: File 3628 E. Ferry s Spokane, WA 99202 9 Phone (509) 534-9711 • Fax (509) 534-9755 . osEp6EHERq~cy9 0 NORTHWEST • ~FAMER~'~'• . ~ S41LS, TESTING & lNSPECT/ON July 19, 1999 " STI W.O. # 98339 Spokane County Engineers Office 1026 W. Broadway , Spokane, Wa. 99260-0170 Attn: Mr. Randy Stronks Re: Meadowland, Construction Summary July 12 - July 17,1999 . Mt. Crest: Contractor Mike Hume: Developer Dear Randy, This letter transmits the general construction activity that occurred on site during the time listed above. This letter is not intended to replace the construction daily report produced by STI Northwest or its staff, but it does transmit the general information concerning the construction activity. Any item that may be listed below may or may not be in compliance with the plans and specifications. This letter is not intended to be a submittal for acceptance. It is for informational use only. • No activity this week. No deficiencies to report at this time. If you have any questions or comments concerning any of the items listed above, please feel free to give me a call. Sincerely, STI Northwest l Bruce A. Howard Principal cc: File 3628 E. Ferry o Spokane, WA 99202 • Phone (509) 534-9711 • Fax (509) 534-9755 INLAND PACIFIC ENGINEERING - TRANSMII`TAL 707 W. 7th Avenue, Suite 200 Spokane, WA (509)458-6840 Fax: (509)458-6844 Op. TO: Spokane County Engineers DAT : J y 2-~~ 999 1026 W. Broadway - Spokane, WA 99260 .P.E,C. PROJ ~ 83K39 ATTENTION: Biily Urhausen PROJ C AM : Meadowiand Description: ■ Xerox Prints 0 Copy of Letter D Final Plat 0 Original Drawing 0 Contract Documents ■ Sepia Mylars O Wor1c Authorization ❑ Report ❑ No. Copies Descripfion 3 copies Sewer As-builts for Meadowland - 1 mylar copy, 2 bond copies Pu rpose ■ Information D Review & Comments ❑ Per Your Request ■ Written Approval O Signature & Return Remarks Billy - Please accept these record drawings for the sewer system at Meadowland. Please note that the information was placed on these drawings prior to our discussions regarding the format for recording the as-built information, therefore the information is recorded from the downstream manhole instead of from the nearest manhote. A significant amount of work would be required to change the information on each lot. I apologize for any inconvenience this may cause, however this should be the last set of as-builts that we turn in this way. Signed: ~John McKenrey ti y NORTHWEST - FAMERic SDILS, TESTING & INSPECTION August 2, 1999 STI W.O. # 98339 Spokane County Engineers Office 1026 W. Broadway - Spokane, Wa. 99260-0170 Attn: Mr. Randy Stronks Re: Meadowland, Construction Summary July 26 - July 30,1999 Mt. Crest: Contractor Mike Hume: Developer Dear Randy, This letter transmits the generai construction activity that occurred on site during the time listed above. Th.is letter is not intended to replace the construction daily report produced by STI Northwest or its staff, but it does transmit the general information concerning the construction activity. Any item that may be listed below may or may not be in compliance with the plans and specifications. This letter is not intended to be a submittal for acceptance. It is for informational use only. • Street and drainage punchlist items currently being completed. No deficiencies to report at this time. If you have any questions or comments concerning any of the items listed above, please feel free to give me a call. Sincerely, STI Northwest , - Bruce A. Howard _ Principal cc: File 3628 E. Ferry 9 Spokane, WA 99202 • Phone (509) 534-9711 • Fax (509) 534-9755 • Y~~ e NORTHWEST - ~A►lES~ September 2, 1999 SOILS, TESTING & INSPECTION STI W.O. # 98339 'Tomlinson Black Realty N. 8205 Division Spokane Wa. 99208 Attn: Mr. Mike Hume Re: Meadowland Lots 15, and 16, Block 2 Dear Mike, - As per your request, I am writing this letter in reference to the above mentioned lots. As you know these two lots fronting Pierce Road were used during the Apple Valley Sewer project for a staging area and storage for miscellaneous consiruction materials for this project. At the conclusion of the work last fall, the construction debris and a number of manhole sections, adjustment rings, and garbage.was left on site. These items should have been cleaned up during the demobilization for the Apple Valley Sewer project. It has come to my attention the construction debris has been cleaned up and hauled away at your expense. It is my opinion the fees associated with this clean up work should be reimbursed to you. Should you have any questions concerning this issue, please feel free to give me a call. Sincerely, STI Northwest . i~f?Lltt ~ l~'a Bruce A. Howard Vice President file no AfMiau or ci.c nssodaces L= 3628 E. Ferry • Spokane, WA 99202 • Phone (509) 534-9711 0 Fax (509) 534-9755 - ~ ~ NORTHINEST September 23, 1999 SO/LS, TESTING & 1NSPECTION STI W.O. # 98339 Spokane County Engineers Office . 1026 W. Broadway Spokane, Wa. 99260-0170 Attn: Mr. Randy Stronks . Re: Meadowland, Construction Summary September 13 - September 17,1999 Mt. Crest: Contractor Mike Hume: Developer Dear Randy, This letter transmits the generai construction activity that occurred on site during the time listed above. This letter is not intended to replace the construction daily report produced by STI Northwest or its staff, but it does transmit the general information concerning the construction activity. Any item that may be Iisted beiovv may or may not be in compliance with the plans and specifications. `This letter is not intended to be a submittal for acceptance. It is for informational use only. • Side sanitary sewer into lots 15 and 16 were installed. • The trenches for .the side sewers were backfilled and tested for compaction requirements. No deficiencies to-report at this time. If you have any questions. or comments concerning any of - the items,listed above, please feel free to give me a call. . Sincerely, . STI Northwest _ . R ~ • Bruce A. Howa.r*d . Principal cc: File M ASiliate of CLC Assodates Ina 3628 E. Ferry o Spokane, WA 99202 • Phone (509) 534-9711 • Fax (509)'534-9755 .r;.. • Ar,,. A ~ ~ _ a + . a ' - t l l ~L_ L-- 9~ l a--.. ~ ~ _ - i - CLC Associates Inc. 707 West 7th Suite 200 (509) 458-6840 ' Spokane, WA 99204 (509) 458-6844 Fax Rowtg r~ Spokane, WA • Denver, CO Pt~mifag •Dgimcrinb •ArcWteeturc •i.andscnpe Atrhicectnn. LmdSurvqft T ra n s m i tta Date: November 4, 1999 - Phone No. 477.3604 W.O. No.: 98339 Fax No. 477.4715 To: Spokane County Utilities Department 1026 W. Broadway Spokane Wa. 99260 Attn: Billy Urhausen - Re: Meadowland Sewer Record Drawings and Certification Letter Transmittal of the Followinq: Notes: Billy, Please find enclosed the following information for final acceptance for the above mentioned project; Utility Construction Completion Letter Spokane County Punchlist Dated 7/1/99 2- Side Service Connection U-16 Sheets for lots 15 and 16, Block 2 Sewer Record Drawings Sheets 1-3 (Mylar) ; Sewer Record Drawings Sheets 1-3 (Bond) If you have any questions concerning this submittal, or need any additionat information, please feel free to give me a call. Sincerely, CLC Associates, Inc. e--z ZU." A 4'vw~ Bruce A. Howard Vice President . - ~ ~ ~ a ~ MQRTHWEST SO/LS, TFST/NG & INSPECT/ON November 3, 1999 _ STI W.O. # 98339 Spokane County Utilities Department West 1026 Broadway Ave. Spokane, WA 99260 Attn: Billy Urhausen RE: Meadowland Utility Construction Completion Dear Billy: , The general contractor for the above menrioned project has corrected 4 of the 5 construction deficiencies based on your attached punchlist for the project dated July l, 1999. At the time the sewer manholes were installed the construction standazds for manhole installation did not included steps. Per our phone conversation yesterday, this is acceptable to you. The remaining punchlist items have been completed. It has also come to my attention that the air and mandrel testing was performed on November 12I' and 13", 1998 by Mt. Crest. At the time of these activities, a Spokane County inspector (Eric) was on site observing the tests. He had given Mt. Crest verbal information that the tests had passed all County requirements. Therefore, based on our field observations STI Northwest has reviewed the construction and to my , knowledge find it to be in substantial conformance with the certified plans and Standard Specifications except as noted on the "Record Drawings" for this project. It should be understood that this submittal provides certification for the initially constructed items associated with this project. This certification only implies that the items shown were substantially built as designed, and only valid the day the as-built survey and visual certification were performed by this firm. This certification makes no guarantee that other construction activities associated with overall plat build out such as home builders or new home owners have not in fact dislodged, destroyed, filled in or in any manner affected any of the items certified. It should be noted that this letter does not relieve the contractor or developer from the warranties implied within their bonding documents. Sincerely, STI Northwest ~ - Bruce A. Howard Vice President 3628 E. Ferry • Spokane, WA 99202 • Phone (509) 534-9711 • Fax (509) 534-9755 • . . • :i ~ . s ~ 0,113820 E. Broadway Spokane, Washington 99202 ~ budinger &associates,r geotechnical,& material engin inc.- Y, eers , TRANSMTTTAL r TO: V DATE: JOB NtJIviBER: ~ g ~I Q&S JOB NAI%E: ZLQQG(DwI G htl . JOB LOCATION: . (,cA • ' - Enclosed herewith please find copies of the following items: Samples Laboratory Results Plans Resume Letter Preliminary Data - Reports Other , DescriPtion: These are transmiued as checked below:. For Appmoval As Requested For Yovr Use Please Rctum Reriuned as Agreed Other R,emarks: cx: • Signed: PN{ JOB# . -;j1_" ~ qr~A - CC: List Initials . -PL I F.C.Budinger PE ~ Stephen D. Burchett PE . (509) 535-8841 John E. Finnegan PE 4t051q9 . ~ yancrete Reao; t PaQe I . Rra; ec t: Me;.dewl and Joa Num:er : 4QO65 1 location: Spr,kane, WA . y :ts`'~ Date . Otp. Mix SIMr- ai.* Sper cet Cy1. Da'ce Laad 5'trangth (i() i=t Reteived Sample Location itep. No. (in.) X (psi) No. No. iesteA Age (kips) t^::1. Spgc :.123/99 3129199 Curb, filenn Road 95 2112 3f4 4.8 3040 iCAA ' . . st3'tion il + 25 te#t 99-0196 3l30/44 1 113 4400 1331 ~ ~ 49-0141 4120!99 28 - - 99-4178 4/20!99 29 . .99-0194 H . . . . . _ , . _ . . . . . . . - - . - .s.a. • ~ - - ~ c ~ d 1 ~ n r e: + 2 ~c.-n. . ~i e 'l C c a : ' a~ = g fi . n i L - ~e ~ ~v L .i _ . ~a~C v ~ . ~ a. . • ~fi6C r MAX MUM' DENS TY MO STURE CURVE*s ~ ~ . . . PRty.IECT Nd•: PROJECT NAME: k•,~ . . . . . . . El.EVATION: r - ~r . . . . . . . . . . : $/1MPl..E NQ.: ~ - . . . 14S ~ . ~ i ~ • ~ ~ { . . , ~ - . i • • . " : 1r TEST DATA - 3 - ' . ~ i ' C q~ MPACTION TEST SIZE I1 . . STANDAR~► MoI.D ~'I. : { • 1140TEST N0. ~ 1 2 3 4 5 ~ . , . ~ . . . MOISTIIRE CONbInON WEIGHT OF SOIL & MOl..O ' - - ~ Ms V . i IMEIGHT - M'OLD y~ a s NET WET WEIGHT SOIL LL 5,,`/6 41-56 ~ . 1 : ( ~ • ~ ~ ; ~ . NET DRY WEIGHT SOIL 3 ~4>00 ,3 96 yv,~ 4/03 11 ' ! : ; : _ ► I ~ VOL. OF MOLD ~ p333 i , ~as DRY. DENSITY pcf t 1 b ~ 1 I ~ ~j /o?ol ~ f •2/, 4 e = i $ ; ; ~ i ! ~ ' ~ • - PAN # ~ : ; _ ► a 3 y WET VIrT. OF SOIL & TARE 1120"'~"t _ DRX WT. OF SOIL & .i'ARE y~396,~ . ~ ~ I ,,_~,l' ~ a--.~ ' ~ _ WEfGHT` T~4RE l`~~f~/, 00.2.. /00,4( . ~ ' • s , i ' , ` ' - L 115 WEiGHT . WATER s ~p.6 3 . y~ 17.3 ~ .yl I ~ ' • l.~ " i ; _ • : : ; . ' • ~ . WEiGHT - DRY SOIL 3a i, l A4&C -V--,dj ~~o.~ . . ~ „o ? MOiSTURE ~ OF DRY WT. 5;3 6, y c,c/ i vi m SOIL CLASS % PASSlNG 3/4 . ~ 105`~' i ~ ~ f ~ ! ~ ~ ~ } ~ • ~ (~~J ~b . . X PASSING #4 MAXIMUM DENSITY tsl`"I -11 . pcf OPT1MUM MOISTURE I i ~....s.__!~--~ ~ ~ j ~ ~ ~ _ ~ _ t i : E t s 3 I i i t~ i i ° 3 1° I i ~.t_` _ t- 90 ~ _ : t • s i ~ i v 1 i E r • " ~ i ♦ i : ~ : ' E + i ;•i i': 85,~ ~ ' i i J E i E i i ~ 6 ~ 3 ~ • ? ~ ~ ~ ` ! } ~ 80 ! [44 NaR°~HWES' 0 5 10 15 20 25 30 35 40 45 MOISTURE OF DRY WEIGHT) MAX MUM DENS TY & MO STURE CURVES mmoor vmm..r . . PRbXCT NO.: 91355' . PROJECT NANE; /A:reaA,.j la''Cg ~ . . . - - - • - ELEVA710N: ~ - ~ - s// 3 .199- . 4- . . . . sn~i.E Nca.: ~~s ! ti ~ ~ . , , , , • . . . ! . = TEST DATA . . ~ . ~ • ~ ~ • s CQMPACTION TEST SIZE 6 . . = STANDARD fyOLD . '{0 j ; A TEST N0. 1 2 3 4 5 ~ = i . . . . . . . . MOISTURE CONbInON t200 Kit WEIGHT OF SOIL & Mnl.~ zg,7~ t6,gZ 2~,tz ZWEIGHT - IN~OLD cS-SB IS,S~ ~~•Sff ~5,~'8 ~s;sg f ~ I NET WET 11VEIGHT SOIL ll•t~ '1•z1{ r1.6y It.g~. ff.yg ~ ~ - ~ I 6-1 F] 130 NET DRY WEIGHT SOIL 1 i VOL. OF MOLO .07 ~ . ~ D S oP70.0?$' d.07f o.c'n ORY DENSITY pcf .oz 125 - 15/~,4( ►YS. ep rq3• / ~ ~ ~ I ~ i ► PAN # . . ~ ~ = I ~ f i ~ • . WET WT. OF SOIL & TARE 120 ~ E = i ~ i : ~ i i • - DRl( 1KT. OF S01 L. & TARE t18 $99 z.2 $ gS..9 fos-z, 31o59,o, - ~ WEtGHT - TARE 2v9, d z99,0 799•0 299,0 z99, o ~ WEIGHT - WATER 29,7 f-- f 6z.z 67.0 L` _ ~ ' --j-- ~ i-- WEIGHT - DRY SOIL S/9 •~S 693, Z S86 ,9 753.3 76a,v U : ~110 MOISTURE 7 LOF DRY WT. s', ? 7. Z '7~S 8~ z5~ 8'. g v i m SOlL CLASS t--- % PASSING 3/4 ; 2 = : % s • ~ j ~ E i ~ t ~ ~ ; % PASSINO #4 MAXIMUM DENSITY pcf ~ OPTIMUM MdISTURE 9.6 . . 90 0 loo F i ' f , ~ ' ~ ~ • ~ ~ _ ' ' : _ ° : ! e ~ ~ ~ i , i t ~ ~V ~ ' • , ' ~ ' . ! s ' ' i ' ~ ' - t ~ ~ i- Y NQ R THWES" { ~ ~ "i~ ~ { } ~ t t , 4 . ~ 0 5 10 15 20 25 30 35 40 45 MO{STURE OF DRY WEIGHT) r - NORTHINEST ~ GRA N S ZE ANALYS S 200 WASH/S EVE PROJECT Il JOB N0. qjL3 3e+ EXPLORATION N0. SAMPLE N0. DATE 4"- r 3-R 9 PREWASH POSTWASH F , TARE I.D. TARE I.D. WET - TARE aaay. Ei DRY - TARE DRY - TARE a l 6 I.O TARE ~q7 WATER DRY SOIL TARE WASHOUT DRY SOIL MOISTURE CONTENT PREF. BY PREF. BY DATE OATE SIEVE 1NEIGHT RETAINED %RETAINED % PASSING % PASSiNG , 1 1/4" SQUARE 3/4" SQUARE . I00 5/8" SQUARE . $ lop 1/4" SQUARE .7 97 SI 3. S 5~, S~ 51;-- -7,'Sg U.S. N0. 40 1 7 g' 3 ~K~ a 0~l. a► T-a.4 U.S. No. zoo 10.0 rn ay_ PAN J 666.5 905 ~ / . PAN & WASHOUT _ jWfi/ NORTHWEST FIELD REPORT # - MATERIAL SAMPLING- & TEST REPORT NO. yof cr PROJECT ~~w ~a ►•~C PROJECT #q 133 j REPORT DATE ~5-,jj• 9y FIELD DATA . ~ . - BATCH DATA ~ MATERIAL SAMPLED MIX NO. -3a 11 A6 MATERlAL SUPPLIER ('-40 j~ - TRUCK NO. 934 DATE SAMPLE TAKEN TICKET NO. _zb J a y 6 C 7 TIME OF SAMPLING 7%~D Q,h SACKS CEMENT/CU YD rj', ~ WEATHER S TYPE CEMENT ~ AIR TEMPERATURE ~y a BATCH TIME 7W SAMPLE TYPE END PLACEMENT TIME 7; e/S ✓STRUCTURE. TYPE AOMIXTURES SAMPLE LOCATION ~ Lo} `7 MAX AGGREGATE SIZE WATER ADDED (GAL) e-t 4,1 v TOTAL CUBIC YDS PLACED ~ O.4- W/C RATIO t SAMPLE TAKEN FROM YARDS INTO PLACEMENT DESIGN STRENGTH 360!7 roS! ~ FIELD TESTING DATA ~ ' TEST RESULTS SPECIFIED VALUES ~F SLUMP (inches) ~~!r 7 Vl y, CONCRETE TEMPERATURE (F) 3 a . sa • - AIR CONTENT WATER ADDED (gal) • . / c►ej wATEwcEMErvr RATio_ . 99 5 0 h•~~ , LABORATORY TESTiNG DATA . ~ LAB ID FIELD ID DATE DATE AGE SIZE AREA TOTAL LOAD STRENGTHTESTED • NO. NO. REC'D TESTED (DAYS) SQUARE IN (LBS) (PSt) BY ZO2. g ay.~ ~ s-~ q 7 6v/a 2g. 2G Sff,570t7 7130 D E- as- I.ov vkid8 a C41 6-1 r- on a s, ya 30 c _ _ - - - . - . - - . ~ REV. 8/97 • O:\FORMS\GEOTECHIMATERIAL RPT.DOC Sent by: BUDINGER & ASSOC 5095359589 06/01/99 10:47AM Job 136 Page•1%1~ AC P f ! A.i;•P..- i2A 10 F.'f Sl:M hiA lii' P~~~i,! i 1 e ~i„a...ll.~ 1" ~ U E 1r., r !V U . O C AT I Oit! - ~~1~~..~►, . ,~ltl!_A - P AG E N0 . ° . LABoRAI-OR'f . UN i~f 5 I~-~ -Q I ~ I 1 ~ ~ , SAMF l__E 1 A S.AMPLED BY ' , saMPLE -rypE . . 11 - DAi E R~CC : VEQ ~ll-tL~.,~~- s ►~_.}u~~ . I ~ 5~. LI I . . f ~ ~'4 / o . ~9 ~ 1 ~ • 1 M ; _ p (0 5-75 -o l` ~ ~ 5~ ~ ~ 1 I ^ ~_z 71 ~ Lr! T - 26 I . } 1 ~ ~ _~r, ^ 2 a C'y PNI cc: LLsc caitua+s ~ , . L ~ Post-it*'Fax Note 7671 c~a1e ~~f ~ ~ ~_~r~ ~~a~io,.~ ( ~ k ~ . .~~r To ~iJ y ~t Fro~r Co.rnc t. ~ g o--~ p M. , . p C • Rhone # Phc~no'tit~'~~ ' ` ~ Fax 11 /P iFax n ~ i ( _ LAB USE ONLY "'aT" ouF 'N A i i: iQMF!_LTED ' ; - ~ ; . budinger & associates - ;;Qo(8C.'1^:cat :a 'Tlc i2.*iat e!lQ!'Z!?t?( 06/01/99 TTiF 11:4R fTX/RX Nn SiF3i r,.. PM JOBIV cc; List Initiats 3820 E. Broadway Spokane, Washington 99202 -go ~ y+ budinger & associates, inc. . ~ Y geotechnical & material engineers , ~ 4 Bruce Howard June 4, 1999 Inland Pacific Engineering 707 W. 7, Suite 200 Spokane, WA 99201 ' . Froject Number L99065 PROJECT: Meadawland Spokane, WA - SUBJECT: Resuhs of Laboratory Testing , . _ Report #1 - At your request, we have provided laboratory testing services for the subjed project. Our services are lunited to the perfomnance of specific laboratory tests, selecied at your discretian. For this period our involvement has been limited to laboratory testing of one asphalt concrete sample submitted to our laboratory on May 26, 1999. The following tests were canduded in geaeral - ac,cordance with the mdhods listed: . 1. Tbeoretical Maxrimum De,nsity WSDOT 705 2. Oil Cantent . AASHTO TP-53 . . 3. Sieve Analysis AASHTO T-30 . The igaition fiunace caL'bratiou facLor was provided to us by the pavmg cantrador. Resutts are presented an the atiached Laboratory Summary. If yau havoe any questions regardiag . this report, please call. . . Respectfiilly Submitted: - BUDINGER & ASSOCIATES - . - , S Wahers . . . Mgr. Constructian Services - SLW/gc Ad&czee • 2 Attacbmmts ~ LaboratorY Summary F.C. Budinger PE Page 1 of 2 Stephen D. Burchett PE (509) 535•8841 - John E. Finnegan PE FAX (509) 535-9589 Scott L. Walters P'vieadowland Froject Number L99065 y Spokane, WA . . LABORATORYSUMMARY . CLASS "A "ACP LABORATORY # 99-0368 _ SAMPLE # lA SANIPLED BY Client " SAWLE TYPE Bulk DATE REC:EIVED 5/26/99 . UNTTS SPEC THWRETICAL MAXR" DENSTTY pcf 154.2 . ASPHALT CONTENT % 5.5' _ S 3/4" % 100 100 . . I 1/2" 90-100 99 E 3/8" P 75-90 86 V 1/4" A 55 75 70 E #4 S - 59 #10 S 30-42 37 - S #16 I - 26 - I #30 N - 20 Z #40 G 11-24 12 E #100 - 6.0 #200 3.0-7:0 3.7 Fage 2 budinger & associates, inc. geotechnical & material engineers ~ ..frec Len Lab oratorie s ~ N. 1403 Greene St., Spokane, WA 99202 (509) 535-5501 P.O. Box 14642, Spokane, WA 99214 ANALYTICAL REPORT Clietlt: STI Northwest Rqmrt NuTiber: E-5006 3628 E Ferry Spokane, WA 99202 Attn: David L'ehn . , 96 meq/ 1 00grams Sample Identification Organic Matter CEC Meadowland Project # 98339 2•07 8.7 Recefved: 7-28-99 Analyzed on -20 mesh fraction D8te: Aug 6, 1999 Signed: ~ , ' • ~ ctu~~e, ~ ~f ~ C. L ~ ~ NORTHWEST Date Inspector's Daily Report No. j . Arrival Time STI Project No.: / ~<3, 13~ V9eaffier , i-age No. / or Cilent Local Representative/ phone number General Gontrac r ~ qeepre~~Iephone numi~er Subcontractor STI`Proj-ect ManagerI phone number ~ . STI Fie1d Representative e,~ Manpower & Equipment Used ~ Comrnents: ,Work Compieted Apparentiy -)er Specifications Problems .ind -ir Solutions) 6ZIL'421 5 O ~ 'Zolue r_A~ ~ e,2 aff !21:9 -S'-' 4ZA,~ Z2..,- Zia el~r SP~ r.,:=1 4er ~ ~ e 1 le- STI FIELD REPRESENTATIV 140 CONfiRACTOR'S REPRESENTATIVE This document and referenced addenda are to be considered preliminary until reveiwed and signed by the STl construction engineer and/or STI project manager. Date Oate . . ~r d STI CONSTRUCTION ENGINEER STI PROJECT IIAANAGER ow - O:lfo~mslstilfeldrep.pm5 ;Vsponding Defciency Report No: ct~r~ e, ~ ~ NORTHWEST Date ' s.~~~ v9 ~ Inspectot's Daily Report No.: . ~ STI Project No. page 19o. o~ Comments: (Worfc Completed Appare ntl _d~lG I'l-e- per Specifications Problems and their Solutions) ` ~4-~ ~ ~~C .4 Ca zrr, ~ ~T B v► T G-t &Z¢ _ H SP"t- he- -cs ~ f' ~ STI Field Rep STI CE STI PM Contractor's Rep , ~ DC • ~ zm isI~~ I ~ - - ~ - -1 1~ ~ ~ I I . L ~ Ui I I ~ Gl ~3(,~ _ L Ul j~ ~ ~ rt ~ ~ . ~ 0 . . 1, • ~ L---------- j ~U I I ~ q ~ to 00 I ~ ~ N I I l~. ~ i----N-}----014~.ISrR911$--~-_~• I ~ \•I p lr~ I j I I ~ I 1 I W O ~ ~f~nn i/.: i i j+~ I .L.T. I- ~ ~ 1•• ~ ~,r ~ I 46 ► ~ ' , ~u r------i-- I i o - ~ ~ ~ . ' . \ ~ ~ J INLAND 1 ~ 98339 ~ MFADOWLAND . PACIFIC FIELD REPORT ~ ENGINEERING # ~ 707 West 7th • Sulte 200 (509) 458-6840 P A G E r;T Q f 3 DATE: siwa9r ` \ / \ Spokane, WA 99204 FAX: (509) 458-6844/ ~ ccrr~~ `o ~ ♦ ti. NORTHWEST x n ~ ~e, Date Inspector's Daily Report No.: ~ Arrival Ttme STI Project No.: *eatner , page No. Client z Local Representative/ phone number . ~ Genera Con c r a p one number ,&0 *rresentativel I Subcontractor STI Project ManageN pho umber ' STI Field Representative~ Manpower & Equipment Used Cornrnents: / (Work Completed ApparenUy S~ ~ f'~`i u~~/~ r1. S~ ~ ,~`O S~1P j • ~ per Specifications Problems and "lir Solutions) . ~2P~' . j~ i~~ ~ eP~, ~x~l/~ ~ ~.sQ~'~• " ~ , 7LZ f/~/A r-e-V /ZP_G ri z- a J /10007 ~ze ~lZz c% lc "'01-4 A0, ~ . f~r STI FIELD REPRESENTATI ~o CONTRACTOR'S REPRESENTATiVE This docurnent and referenced addenda are to be considered preliminary until reveiwed and signed by the STI construction engineer andlor STI project manager. Date Oate 6r--Loo~ il , 4 LZ STI CONSTRUCTION ENGINEER STI PROJECT IIAANAGER .r o ~orresponding Defciency Report No: :lformslstilfieldrep.pm5 • EL11t4~ NORTHWEST Date Inspector's Daily Report No.: ~ STI Project No. . iiage No. .2- oir ~ v Comments: (Work Completed ApparenUy ~ V7 'ee~lj /::::f per Spec~cations Problems and their Solutions) ~ STI Field Rep STI CE STI PM Contractor's Rep . . ~ ~ p~ ' I4 E u i ~ ~ I~1 N ~ I - ~ _ r; -,71 - - -I L ~ ~ _ I ~I ~I ~ 1N ( i ci~► ( " ( ~ c,, ~~ri i ~ I ~ ~ I 1~- ,1}~ - ~ r.! I ~ ~ ~..r ~ ~ . L---------- I T (D Oo -I v) t1i W N ~ 'LU, i I ~ I O i L ~ Ft-~---41HJr'.rRB --L-_~• o M ~ b ~---~--~------r~--- ~ 11 q V1 '0 W 2~~~ ~ .iTy''---- --1~` g ~~~P ~ i ; t~ ~ cn';~ i ~ /'I = o I ~ I~ \ o.c ~ I•• ~ r--------- I`~ ~ j~ I w a) c~, ~ ~ ~ ~ r~ i r ~M ILJ ~ ~ "77 i / I NLAND P MEADOWLAND 98339 AGIFIC FIELD R ~ ENGINEERING EPORT ~ z 707 West 7th • Sulte 200 (509) 458j 8840 P A G E,5 QF DA~; ` Spakane, WA 99204 FAX: (509 458-68441 , ! / , , " ~ c[K!~ ` e 0 I ~ NORTHWEST Date Inspector's Daily Report NoJ Arrival Time STI Project No.:~~~ ~ ea er , ioage No. / ot7 Z.:0- ~ Client f Local RepresentativeJ' phone number o • _ General Con c r i e presen ve p one number Subcontractor STI Project ManageN pho e number ~ /*a- AM . . STI Field Representative Manpower & Equipruent Used "7- Cornments: ~ ,06 s~~ac%~'~ (Worlc Compieted ApparenUy ti r - p- "oecifiQations Pr^obiems / I eir Solutions) ~ P ~,'1'_n't.) 413cl' TZ7G~ ~ e"'D ~ ,0-m &e e.~ / . ~ I'--Z Z~A 7~41Gr1~! A4 , ~ litm t.[l e~ #7 44~re • ~ :PRESENTATIV STI FIELD ~ CONTRACTOR'S REPRESENTATIVE This document and referenced addenda are to be considered preliminary until reveiwed and signed by the STI construction enginesr and/or STI project manager. Date Date 1! STI CONSTRUCTION ENGINEER STI PROJECT (VIANAGER O:Ifo rm s1s ti 1fi e i d re p. p m 5 Corresponding Oeficiency Report No: 1 je ~ . 1► NORTHWEST •~fM`~`Date . Inspector's Oaily Report No.: aw 9 STI Project No. iiage iVo. oir ~ Comments: (Work Completed ApparenUy ~ ~ • per Specifcations Problems ~~~lT~~ P_ and their Solutions) ~ . • ~ ~ Xu cAe_,~~ _U al &_-p o ~A L~A ~L11 146L,1 sf" zj~ `"iddCk 2_L _ ~ • .4Q C1 ~ ~ • ' -,7~s- ~dIL STI Field Rep STI CE STI PM Contractor's Rep rrnMner~ n~t .~NU~~~-.r. . ~ . ''''.%~:..rw.-'_i_+r.•t:S:~-r.. . ':i'.'•'`:,~'~1~"`_I^}.t~:~.~:.:i4';z'.K`:.t~~ 'a.aKh . • ~:Zic',:k~f`:.,:::c:F:~.::~:c:~::.:.....r,.,:,.. c. . , . , . . ~ . _ . . ' NORTHWEST O SOILS, TESTING & INSPECTIQN ~ ~ . ~ s . ~ . ~ . ~ . NUCLEA,R GAUGE TEST JR-ESULTS ; ~ Job Name: STI Job No. W.O. ~ ~ Field Report No. Date: Tech: '-'1 ~ ~ Page ~ °f DS- Rw-7 _ MS- , . ~g Test Location Ft Below Wet Moisture Dry Max. ~ Percent Pass Retest ~ No. . SG. Density ~(Percent) Density Density Compaction or of DT y . Elevation (PCF) ~ (PCF) Fail No. 6 : 4~2), 3 ..O i3jiJ ~ ~ _ - Uiff iD 14A A) Ca P., 4 -LA~- ~ ~y, 5 ~t~4 P . ~ ~ . . ?7 . ~ ~ . ~o ~19 . . . ~ ~ . . r . . . y . ; . . . ~ i 1 . ~ • 7~ ~ • ' ' • jq i ~ ~ , • ~ ~ - ~ ~ . . y ~ ' I 0 . 1. • • • 0:1FormslTf uclearGuaBcTestwpL ~ ~ `110/12 rr) um o''~ r1r) ~ a ~ i~ 00 l~ ~ E---------- i o ~ A,o. ii . j ( ~ I ( zo 2 r, i I G~J`I , FUTURE r^ PLATTiNG ~ r-J 1<910/12i) ~ ( . L _ ~ - =------L- ----J ~ f.. ~ ~ P P t d PC GKs ~ , 4 O ~ C09.3/13 I ro~c t~►vn b ackFil1 ~ ~ ~ 5 oasnNC a' sAwrT~Y sEr~ ( 1 1 PER TNE /1PPlE VALLEY SEWER Pi20JECT /1S I ( DESiCNW BY THOIAAS, DEAN dc FiOSiCl11S I i i 6 I ~ i i I y..JJ ' I V ' T- t, f 7 L1f PLAT BOlittoJ►R LL 1 ~ ~ I Q O O &WHI z~ g ~ ~~C t~- G. r c~. ~ ~ ~ W ~ A Q ~ 9 Pu►T eou,+DARY I W W Q ~ 2 , _ J , fi - J r-- ~ r . - ~ 10 `"L= ` 15 3 w 13 14 co~ i ~ 12 rr~ o V W 16 W v :w •~`~~~7=/ ' / ~ ~ ~!1` ~ ~ < Z ~ .,.LA. W ' . ~ JUz --Na ~ W N . Y / 109.1/15 I ( MH 3 1 nuviTivi:' ( , i ~ I 110.0/1~ aESEt~aut"I~` N~ U+a ► I ; I 46 ra • ~ I I ~ ~ / ~ ~ ~ ~ I ! ~ i~'---- r o ~--------J--------J---------J----------~ rvai \ ~ ` ~ ~uttv ~ ~ • M ~ ~ ♦ ~ !2 w NORTHWEST , e.'A' IffeP w Oate ' Inspector's Oaity Report No.: Arrival Time ~30 STf Project No.: W-e-alher , i-age No. oY Client Locar Represen tivel" phOne number . ~ General Con cr- . ie epresen ve p one number ~'Ll~~~~l~~ fi► ~i~~% Subcontractor SYI Project Mana er/ phone number _ STI Field Representative io Man ower & Equipment Used oel 26 1 /Q,A ~a . ZI-0 l/r MC, G-,-rke Comrnents: (Work Compteted Apparendy _ . t pe► °necifications Problems a :irSolutions) _L6.7L ~+J ; 66V.AP .~C.&, J . : • ~ A aw ,o . . eA ' ~ • ~ ~ ~ s~ zjr ' . . ~ . r, 0 0 0 r-~,9~9 STI FIELO REPRESENT VE a0CONTRACTOR'S REPRESENTATiVE This document and referenced addenda are to be consider+ed preliminary until reveiwed and signed by the STI construction engineer andlor STI project manager. Date Oate , STI CONSTRUCTION ENGINEER STI PROJECT INANAGER ~ 0:lformslstilfi eldrep.pm5 Corresponding Deficiency Report No: ' ~tfti~r~ r, A ` 4a . 4 ♦ ~ ►,~+CJ'R _ _ TH'W R~P~~ No %nspector's : ~ - of g g ~o• ~ 000000 e Of r j project N°. s tnen~' lete~ ApPa '~m ` - p~biem ' . . g° S $ pecif c,°onsl I ttl~d e~r Sol ~ ~ a / . ' ~ ' • zg~ ~ - ~ ~ J2 , - - ' ~ . , . ~ , ~ , ~ ' ~ ~ ► ~ . - ~ , . ~ ' • , ~ ,r ' • r c~~'g Rep Gon~ STj pN1 . . ~ - ~ ST% CE ST~ Field Rep NORTHWEST ttllU~`e . SOILS, TESTING & INSPECTIQN , ~ . : . ~ . NUCLEA.R GAUGE TEST A-ESULTS , Job Name: STI Job No. W.O. . Field Report No. ~ . Date: &-,a _fy Tech:.j'et.., Page -7 of Y . DS= ,3 C MS= , T Test Location Ft. Below Wet Moisture Dry Max. ~ Percent Pass Retest No. SG. Density (Percent) Density Density Compaction or of DT ~ Elevation (PCF) (PCF) Fail I1o. J94r, 14 ffq C~MP 3 f ~ . S -Z2ff -41-4. 7 ~r/ , y 14' , . ' OAFortnsUtuclearGuageTaLwpd ~ ~ 3 j n( ! jSlp W N ~ D-~C ~ ~ j Zm . 0 ~ ~ ~ - -J ,1L ? L _ i i c ~ I ~ L ~ I G~ ~~r~, ~ ' ~ ~I ~ - - L ~ ~L.1~ L_ ~ ~ .J AJl ~ a ~ _ ~ - ~ ~ i---------- I cn oo 4 a~ tn ~ W I ( ' ' I I ~ i O ~ r~ • I I N . I I r------------------- ~ = L ~ ; ( i w C) i i \A j Cn ~ cr,1 Ty------ , Z• o~ M k~ 0„~ I I I i ~ i ~ r ~ ~ ~ i ------i---~ I ~ P-3 ~ ~ i ~ ~`a~ ~ ~ ~ Q ~ ~ ~ • I I ~ rr_ p ~ C ~ ~o -7-7 , INLAND MEADOWLAND 98339 ~ PaciFtc FIELD REPORT ENGINEERING 707 west 7th • Suite 2oo (509) 458-8840 , P A G E1~' 0 F ~ oA~;~?~ f~ ~ Spakane, WA 99204 FAX: (509) 458-6844~ ~ ~ / NORTHWEST Ak SOILS, TESTING & INSPECTION . . . . , DA,ILY FIELD REPORT , Date inspectoes Daily Report No.: ' ~ov- Arrival Time S'TI Project No.: ~33~ V~e~her 9 . iage ivo. or 'I Ciient . ' . Locat Representative/ phone number 'UQrv1 c_i 14urne . . . General Contractor . , Site epresen Mve/-phone number Subcontractor STI Project Manager/ phone number r l3 QJUC-e STI Field Representative . nt eLso"l Oc-=¢~1 . . Manpo.wer & Equipment Used ' 0 FP-otyT Ewl u LUA-O E'P~S uJl oPeea4-T?= . . O 11 St r c ~ Pxrv~ CORlt11@htS: ' . (WoricCompletedApparently CeeST Ae-poA.d - Po.-wi . per -c-QCfficattons Pmblems an( -Solutlons) ~5 J n! T~fi~-T 1~ ~~c..~-YL L' G~A-~ l~ IJ . S ~-rc ~ ~ M.~t-.ab~ ~r►-pLL~ ~4~1~-~r c..cr i n( 4 ! H~ ~ < <J ~ Ttf~i : ~orvt PAe-'r'7 0A.l u E ~ ~a-e'n__~-~ ✓to #1 S ~ TE; ~'T ~ • :l_ i-rti nt.,i Sr-rL= F:~, ! b S f4t I:> Ttt-A-T ~ c~c.. ff&p -89f~-4 C'~ rvi P ~ • - ~i ~•i tS ttE7~ ~rl~~~ ~T T~E SOVTi+ E^l 0 oF o!5=c. e7-l.til ~o~o t S A-PPao,< i ni ri-eL.Y 29z RE1 Bet.CL~ 1)09-4t~k . STI FIELD rP~ESENTATIVE RCONTRACTOR'S REPRESENTATIVE This document and referenced addenda are to be considered prelim'inary untii,reveiwed and signed by the IPE construction engineec andlor'STI proJect manager. Date . Date • L~' 1 u ~ STI CONSTRUCTION ENGINEER STI PROJECT IUTANAGER ~ :orresponding Oeficiency Report No: ~ • b NORTHWEST iM . ate nspectors Da ly Report o: . c~V l 3~. I~~~ ~ ~ . ~l ProJect No. Page No, of ~ . 9 g,3s9 2.. 3 ~ comn,ents twftk cm~ •vparw* TH6 S i-r~ V, S~~. -F14 c CL~w w~ Lcosic~-c-~, • ver specrCatlons, probtems ~ wa aw*wwft►s) .(n) TF+E S ELJG-10-- "?~P-Obj,,-ff To ( ST'1 A[ ~ C'arv► Pa,.1. I e_sTT Ai ~ (:Sf= 71) ,P w-, ~-c-c-~ k c.~►~ . ~ . Tes-1 7 IJ.b SL) acR e-~-DE w i c. c-- V07e4r-y T!-i c ~ __0vn4PR-e.T1 on1 6r--F-p(LT- C4-- `FtE~ Tb P ~ i . . ' ~t rv,, S.e~ic> `t]Ft'pq,-j-- k~ ~ ~J i c~c. 5 i °r0--r o r1 Ttt~ - x AD 1R-i 2'~~ L1 r.l 'Cr~ I/►L STIqLA. ft-M0►•1 FA-e-L-e lls G-C7 LxDC'Z-7L . . ' . ' . STI FIELD REP IPE CE IPE PM CONTRACTOR'S REP DAfIY FIELD REPORT.xis ~ f/' I ~ I g1 N . ~ ' DC II (A /A I ~ • f ~ ~ r ~ a ~ ~ ~ G Z rn ~ w~ ~ I I ~ f w ~ Ip~ i - - - I' li. L ---------,L~ -r ~-1 i ~i i c i I ,P- _ ~ GLENN j c~, jf~i ~ i~ ~ I j~ - -IL~t--- - _ ~ ~)j 0 W ~ ~ ' J v~ I ao C71 I I I ~ , J • r L-----------) ~--~R911~_ W I(lo~ I I ~al ~ ~ I 1 I„ j ~i W ~ ~ I jyl I r~ I cn1\~ ~ l l I + a I 1 ~ ~ ~ I i li ~ s ► 1 j c,, I ~ f1 1 9~ ~ ~ O l 0 ~ n~ I I I I re (A r ~r~ LA • I I I I ~T - ' I I I INLAND ~ /00 98339 ~ MEADOWLAND PACIFIC FIELD REPORT ENGINEERING # . 707 West 7th - Sulte 200 (509) 458-6840 , P A G E 3 Of ~ DATE: ` Spokane, WA 99204 FAX: (509) 458-69441 ~ J ccue~ , NORTHWEST /C!i rir"O 4J 16 Oate Inspector's Daily Report No,: 17AvW.9r ~ Arrival Time STI Project No.: ~ : Qa page No. o~ ea er Client Local Repres ntativeJ pho e number / . ~~a prese ve phone number ~ &Xe/e Generar Con c r Subcontractor S ect Manager/ phone number ~ TIProj ~ STI Field Representative 04 Manpower & Equipnnent Used / ' ltz~redAa Comments: (Wvtk Completed ApparenUy f'l' i l1 e rzu~,,, ~ b s lr -~az~ pe-'"-+ectfications Problams ~ a jir Solutlons) i "foo,- *4 ~f .1„v-P _ S c ~ ~..P ~ > rs ~ . . . ~ a CONTRACTOR'S REPRESENTATiVE STI FIELO REPRESENT IVE (Ap This document and referenced addenda are to be considered preliminary until reveiwed and signed by the STI constcuction engineer and/or STI project tnanager. Oate Date ~ yl STI CONSTRUCTION ENGINEER STI PROJECT IVIANAGER ~ O:%formslstilfi e I d rep.pm5 Comesponding Deficiency Report No: uu~ ~ - ~Cf . ti . ~ NORTHWEST Date Inspector's Daily Report No.: STI Project No. . . p'age no. ot Comments: (Worlc Completed ApparenUy.,& ~ ei XA~g per SpecificaUons Probtems ~ and their Sdutions) ~ ~~0a e__01 4C 6LZ4 , STI Field Rep STI CE STI PM Contractor's Rep N 4 RTHWEST . SOILS, TESTING & INSPECTIQN , . : . ~ . NUCLEAR GAUGE TEST RESULTS Job Name: STI Job No.~ ' W.O.. . . ~ Field Report No. . Date: 17-A16 U7g- Tech: 36M ~ Page ~ of . DS= 36 $50 MS= /?y -S 7 . Test Location Ft Below Wet Moisture Dry Max. ~ Percent Pass Retest No. SG. Density (Percent) Density Density Compaction or of DT Elevation (PCF) (PCF) Fail No. ~ . - 5-~ .4 ffoCkA ~ .7 Du, cix5 -&L7 /yi v (p . ~ a -P R~ P . 0:1fo rtn s Wud carGu ageTaG wpd . . . ~ Zm I u ( ~ ~ ~bl ~ ~ ( - `L rr ..,I ~ ' ! ~ - -i P~\~ I ~ L _ i -------C's ~ I i~ - - = -r } ' G1 -3fz ~ U~- ~ ~I J - - • 1F- - I J I' j I J ! i. I I ~ ~ ~ i ~ L : ~J ~ ~ O r I L---------- ~ ' • 1" I ~ ~ ~ ~v I cD 0D v o~ cn j I , i ~ 0 I ~ P-3 I I r-------------------~ _ ~ .,Z. -cYAJS- MA& i ~ ~ I / ~ ~ ~ O ~S ~ ` ~'m~ ~ ~ I j ~ ~ ( t~1 ~ jk`/l ~ i + N i• 1 ~ ~ i i~A~, i ( i ~ ; ~ ~ ~ ~ i I ~ J ~ ~ a~ ~ ~ ~ t~ • ~ c,, ~ . Mir_ r I` j - I I r~ ~ ' . N = -77 ~ . , ir ^ INLAND MEADOWLAND 98339 ~ PACIFIC FIELD REPORT ~ ENGINEERING # . . ~ 707 West 7th • Sulte 200 (509) 458-e840 P A G E~ 0 F ~ oA,E:~~ ~ Spakane, WA 99204 FAX: (509) 458-6844/ ~ ~t/QyJ ~ ! ~ cuu~~` ' NO HWEST . 1~. Inp G i'J Date Inspector's Oaily Report No.• ~ Ig",006P 1) 9S' Arrival Time STI Project No.: ~ ea er , page l~o. o/~ . ~ !l Client ~ Local RepresentaUve/ phone number General Con c r e epresen v p~one number 27a`~ Subcontractor STI Project Mana er! phone number STI Field Representative L ~jJ ~~iG~c~ _ ~~G. Pf/►~ S~ Manpower & Equipment Used Ns ~vs : 0 ! Comments: (Woric Completed Apparently ~r~ G~l'` !`i (.•~~(L l)~?_ S~~ ~ ~~JP /7_s~_ pe- Qoecifications Problems l a air Solutions) ~'Q1~ ~~G/ f X 1e- 4 e-0 ZZ2Z ` ~ ' • ~ ~ ~ ~ ~ ZZ4, =,a~~-~ . . . c G I ~ • , STI FIELD REPRESEN TIVE ~o CONTRACTOR'S REPRESENTATIVE This document and referenced addenda are to be considened preliminary until reveiwed and signed by the STI construction engineer and/or STI project manager. Date Date . ic , STI CONSTRUCTION ENGINEER STI PR4JECT INANAGER . 0:lformslsti%fiefdrep.pm5 Comesponding Deficiency Report No: cc~r~ - ~ ~1 r► NORTHWEST Date ler A/o r 1 Inspector's Daily Report No.: ~ STI Project No. i'age No. ott oZ Comments: (Worfc Completed ApparentlY-,157ep~ '7G c~ S~ 4t-0--.,o_e ~e~ per Speoifcetions Problems ~ -`a~ and their Solutions) 16 ~~~~6 Z4 S! J~~ A ' r ~zx L.Z5 eUi Cr~ Loo-e ~elf_ILY 4-1 70~ 1 STI Field Rep STI CE STI PM Contractor's Rep NORTHWEST 1 O e► SOILS, TESTING & INSPECTIQN , ~ • - ~ 1ME~~L~• ~ . ; . ~ . NUCLEAR GAUGE TEST RESULTS ,T Job Name: Me C~ ~ o~ /6- ~ Q STI Job No. W.O. Field Report No. 7 . Date: /W6099 Tech: Page ~ of G/ . ' DS= r~6 ~Y ' MS= , Test Location , Ft Below ~ Wet Moisture Dry Maac. . Percent Pass Retest No. SG. Density (Perceat) Density Density Compaction or of DT ~ Elevatioa (PCF) (PCF) Fail No. 1() -L 6.5 1L~, 'CO -zj?//.o 7a f' . ~ . . . , { c3- aa~ ZLLYX Z) ~ - 3- 0:\F0ffns\NudeafGuagcTC3LWpG . , . • ~ ~--~,-Tsr-'---c~ j ~1 ( 1~ j g lP cA N ~ n~ D~ I ~ L - - - L ~ L _ - - - - - - - - L lE ' ~ ~~s ~ r ~ ~ '~t . ( ~ ~ C).- I ~ ~L 11--- ~F L..~ I~jl LI I ~ ~ • ~.JI ) L - - - - - - - - - - ~ iu I I I to Oo V C) N ~ W N ~ L_ ~ I p I . . I I I. ~ ; O I I I N ~ I ~ ~ - r - - - - - - - - - - - - - - - - - - - - ~ ` I yt - -GHi1S-1~914~ - -L-_~ • . ~ I I~I ~ I iF; a I r,n I cr,l~/I .LTy------ g > ~.~j I ~ II v I I I - i~ . ~ ~ ^ • C V ~ ~ ~^y :I ~ Y} (n ~ ~ 'o ~ \J^ I I ' . ~ !L / ~ 0 ~ x J INLAND MEADOWLAND 98339 ~ PACIFIC FIELD REPORT ENGINEERING 707 West 7th • Sulte 200 (509) 458-6840 P A G E O Fy DATE: ~ `Spakane, WA 99204 FAX; (509) 458-6844` ' ~ ~ , /{,~(f ~ / . , . . . ._.._..._.,.~.:...:...u .,,,....W.._:_,......._ - . . . .f A ~ !`0 i[Mtfv o r ~ NORTHWEST Date '0Z ~y~~ Inspector's Daily Report No.: ~ 7 Arrival Time ~ STI Project No.: ' Vlleather . i-age fvo. C/oc-44 Client Local Representative/ phone number ' / A-11 . . General Contrac r i e epresen ve phone num'ber ' Subcontractor STI Project Mana er/ phone umber ~ STI Field Representative Manpower & Equipment sed ~ ~ n ~i~r►~1~~ ~T~ib ~ .roo Cornments: ~ (Work Completed Apparently zze!~.7- ~ R ~ecifications Problems ✓ a, eir Solutions) ~Z,,t/2e ~ . . . ~ ~~s, ' ~ . ~ ~ ~ ov ,2 ~ ~ . STI FIElO REPRESENTATIV f-- CONTRACTOR'S REPRESENTATIVE This document and r+eferenced addenda are to be considered pneliminary until reveiwed and signed by the STI construction engineer and/or STI project manager. Date Date ~ STI CONSTRUCTION ENGINEER STI PROJECT Al1ANAGER r o:lforms\stil Corresponding Defciency Report No: fieldrep.pm5 . ~ \ . ~ w , • x ~ i Z.. ; ~ I - r; ;1 - • L__ ~ - - - - - - - - ~ . -1 ~ cii~ I - } i t,, ~~''1 I 7 J L`..~ -~L,I ' ~ _ - ~ ~ ; I , ~ r• L..J ~..J ~ ;i I I p ~ L---------- I ~ I ~o Oo ~ r~ ~ I '3 O I I I N , 1~. r -GkiJi'.r R914E~ - -L = rn~8 i - ~ ~--i-----,T----~,, ~ N S ~ om) ~ I ~ O m~a II°) I I ~°I~ . ~ L Ty~~---- ~ ~ ~ ~ ~ ~O O I I I I- ~ = o u r------~- ' , R-~ ~ i ~ ~ ~ ~ ~ ~ ~ ~ i i `'►'i I pz ~ ! o yi~ i c,, i i 0 r rr~ ~ I I ' -~r---------- INLAND ~ ~MEADOWLAND ~ 98339 PACIFIC FIELD REPORT ENGINEERING ~ ~ 707 West 7th • Sulte 200 (509) 458-8840 P A G E 2 0 Fa ~ DATE:zy,a U ` Spakane, WA 99204 FAX: (509) 458-6844/ ~ f i i ~ p(MII~ ~ ~ L ~ I a. ~ NORTHWEST r I •eAV`O Date 61qq inspector's Daily Report No.: G) 3/i r Atrival Time STI Project No.: q:~o 1-g7 3q rVeatner ' i-age No. of q 3~1° r c[o~dy Client Local Representative/ phone number U~d~llhSo~, ~~aCK. t e Wvh" e- General Contractor i e epresen 5liveTphone numper . h'1 oIJ K 41.(•M C"s+ `-Subcontractor ' . ' STI Project Manager/ phone number (3 aCD t-• CnHc ire+Z. STI Field Rep resentative D I ~-P~ / c % hf-l 1C t. t aG ic Manpower & Equipment Used Comments: J~v . / (Work Completed Apparendy A{~' l'i ed D N~1 k ~ ~e~` T V►+^ d eits I' I"eS J/h e '99 per Specifications Problems ' their Solutions) -cv U b Co h +ertLfO r " O'C ✓v l tPd e -t c/ J A~t4 v4pa ,-Pat e- 1{ 4e 4t-- t.~~ ~ ~pks-~~~~*+t; ctY.~ m -1 -e s LVL,e 7' tt-t^Q~f ( oi C D t~ D ti S/ tee f'C` ~TGt ' D~ ~i d e hJ/~ y 7'~, s~~ GY(~+-e j~ P!i `fU Yf~ P~U - r 2QS v I~r u v,e res en4ed o hi'G..~ G~ c~. er.~ fJ e"s~~-•. ~e r f- ~eeo ~4- l~ ~4-e s~~cs a 1~. - f h di cr~~~d 4 f ~.o r,t~O ac4 td ti wa s ~c~~ t v~: ~1e. b v~- i'~, e_ vh.o ~s ~f-v►-~. Go~ -k~ ~o~ k~ 177- tj'' l4w ti ~.✓oc S~! ~ L% e H o v c~ c4 vl 49- 10 t4.,-,MS4-0 ~ STI FIELD REPRESENTATIVE tao CONTRACTOR'S REPRESENTATIVE This document and referenced addenda are.to be considered preliminary until reveiwed and signed by the STI construction engineer and/or STI project manager. Date Date ~ STI CONSTRUCTION ENGINEER STI PROJECT MANAGER 0:1formslstilfie1drep.pm5 Corresponding Oeficiency Report No: I ! , - ~ curf~t e ~ IIli1~'~• ~ NORTHWEST Date Inspector's Daily Report No.: C) STI Project No. iiage No. ~ oir ~ 33 Comments: f / - (Work Completed ApparenUy b ~ D(, ` lD w G~/l 4-V ~Lt Ve ( e ~ G ~ t) ~ Of ~Gc l~l 4e • ~~C.!% i ~ ►'~P~ per SpecifcaUons Problems ✓ ✓ and their Solutions) Vs -}-(„A 4'(, ,e CPU H4,y 114 Sf iP_ GAD v' l,v.,t S(&p 7- Gt ~ to w~..t ~ COk CI-4 le 4-in ~s ~••-e ~ v e~v co (d I t~► ~e w+ ~ A-N weu +L► P r, i D~s i~e ! v. 3 S STI Field Rep STI CE STI PM Contractor's Rep , . , . , . ~ . . ~ 7 INLAND PACIFIC NUCLEAR GAUGE TEST RESULTS ENGINEERING ~ • ~ Job Name ~ ~c~~►~ ' IPEJob o 9 W.O. # Field Report No. Date 3 /,tg /%9F Tech. C_ 44 . OS= ~ • ~ ~ ~ MS=- ~ Tes't F~ Below ~ Wet Moisture Ory Max Percent Pass Retest No. Location SG. Elev Density (Percent) Density Denslty Compaction or of ! (PCF) (PCF) Fail DT No. ~ Lof a . /.Av 51 f1,e-, ~ j 36..3 j y.o 1117r ~ a y, o176 3 p L b~ I ISI-V a oZ ,Ovw c-z►-n~✓ ~ 3~•y 1/,3 la 3.7, 3 ~,j Lo~- .3 C~ck ~ ~ ~ ~ /a-7.~ G 4 96. % P q~3 ~ C w stJ--c, _ /a`7.3 9: 5-" //7. y 1 s' l~ P JC* C\ ~ ~ . W s t 3 1~;_3 Y-• aVr ~ -1.✓ s~ , ~~~7. ! ~ ~ - . . . ~ t.: • ac } L , . c:lnudoar_P ~ ~ C ti ' D ~ 4. r Z m c) u ~ ~ ' - ~ ~ ~ ~ - ~ 11: ' ~ L GLENNW U ~ + j (,i ~jf~ i ( ` I j'' -1~1~-- - - ~~F- ! \I ~ L L..J L.:~J o • L---------- j ~~1 I _ tc ao v o) N w I N ~ L t I ~ I , r = L I 0-3- - --GPzlJS- RA1kQ .,v 1---~----i-----r----- i i ~ ~~i ~ ~~g i ; i . •i y' i`'' ~ M j ~ ► s m~ i~o i i i,i I 4. ~ r.11 i v,l`~ i- - ~ I/ = P I , ~ ~ I,~ I ~ o , ` ~ uf r ~~'i. I i ~ ~;0 , ~1 0 ;U C2 pz~ r1 CA J r N. rri -i~--~---- I~ ~ I L- - - - - - - - - - - - - - - - - - - - - - - - I ! ! r/ U • T i . , ~ J INLAND 1/00' MEADOWLAND r Dekf(+XTes4 . C o cA ~~a~s 98339 ~ , ~ PaciFic ENGINEERING FIELD REPORT ` # 1 , 707 West 7th • Sulte 200 -(509) 458-6840 P A G E~ Q f pq~; 3~ 6~~1 y Spokane, WA 99204 FAX: (509) 458-6844 ~ , f ` J ~ • / . ' . ' ~t[IUI~! e ~w ~ ~ a v ~ . . r►. NORTHWEST Date Z~ A In spector's Oaily Report No.: 3 ' 5 Arrival Time STI Project No.: .S - . Vveatner , pa9e no. . o~r ~ Client, , Local Re nesentative! phone number ~_G~~ ~ - Genera Coctor * i e e s n ve phaffe nu ber OG~r~O~i~~ 1~/l S79`/ Subcontractor STI Proje Mana er/ pho :n7 ber 09 ,13 STI Field Representative Manpower & Equipment Used e RA 0. i!!' 4 &G3 Comments: , . • : ~ (Work Completed Apparently %r~.s/'e,/`.d ~ ecifications Problems p / , .neirSoluGons) ~ • v~' ~ ~ /~u~ r'...1~, ~~f~ ~~s'' ) f~P~,~ ~ 12zvw eyzanz I-Z 2+ z~,,A ,,e- ' Y44 e7 ~ oqlz . ~ A A2 . ~ ' a1z, , f . ~ G1kQI~ `r f1 S ~ ~ ~ /fl,ia~ • ~ ~.d7Ct ~i1 iYh/1 J ~ ~ Q!~ . , I STI F1EL0 REPRESENTA E CONTRACTOR'S REPRESENTATiVE This document and referenced addenda are to be considered preliminary until reveiwed and signed by the STI construction engineer and/or STI project manager. Oate Date STI CONSTRUCTION ENGINEER STI PROJECT IIAANAGER a 0:lformskstilfie1drep.pm5 Corresponding Deficiency Report No: : . . ^ 09,T14WEST ` a,rt t~1o.: _ ~nspector"s 03 ily ReP of - ~age No- Z 3 Z hg ~ , f/ ~ ,e.e~~° TI Pr'~'j ect No• /a ~ JO I ai2 ~ • ~y~~i~ ~ 'Lo Comments• . a~n~y1~~ . ~ . ~ , ~o~{C ComP~atsd APP #ionsProblemg per 8P actf"ca Soluuons) - ~ ~ _ . • f•~ • . . ~ ; ~z.~ al; , . ae`~ . .v,..~ Contractor's Rep ^ STt PM ST! CE STI Fiefd Rep t ~ ' ~ • . ~ ~ . NORTHWEST ~ SOILS, TESTING & INSPECTIQN . ~ . NUCLEAR GAUGE TEST 'R-ESULTS Job Name: STI Job No. W.O ~ 3 • /a.~~ ~ W.O. ~ Field Report No. G) Date: Tech: ~ ~ Page ~ of ~ - DS= . w- 36 y9 ~ Test Location Ft. Below Wet Moisture Dry Max. ~ Percent Pass Retest , Na• .~;~,SG. . Density..~ (Percent) Density Density Compaction or of DT Elevation' (PCF) ~ (PCF) Fail ~ No. s . Zs. z 2 ' 3 - ~s 1,22- ~Xo - ~ ~ ~ ~ . , t . , 0:1FornuVNuclearGuageTest wpC / . ' -C19A.,~ W~ ~t E~ c~' I I I ~ - - • L M I ~ ~L9 ~ , _ .J'~~ I ~ C ( F--- ~ = ~ j (,i C)~'~ ~ I ~ - ~ ~F- r ~ . :Jl . L j ' I I I 1 ~ t0 0o V (D N W N i.U ~ I p I . • . r L _ = ~ 0- - -Glki.~'r MA$ - --L • (A 0 ~ Z ~F4 I I / ~ m~N y' • I~:~ I I~ INi i ~ - T, ~ g A 0 ~i< -4 t) ~ ~ ~ I r • ~ ~ ( • , '~1~ ~ ~ ~ i ~ ~ j u, C) ~ ~ ~ ~ l~ ' ~~l ~ ♦ ~ I I I`J L- I I u ~ ~ - ~ ~ ~ , ~ ~ ~ . . ~ {A• ! / ~ ~ I NLAND ~ /10 - MEADOWLAND 98339 PACIFIC ~ ENGINEERING FI E LD R E P 0 R T#,1169 707 we9t 7th • Su,te zoo {509) 458-6840 P A G E 0 F ~ oA,E: ~ Spokane, WA 99204 FAX: (509) 458-6844 ~ ~ ~.Z ~~i . \-.1 • • ~ i[Mf!(f` • ~ ~t o ~ ~ V ~ • o NORTHWEST Date lnspector's Oaily Report No.: 3/z /~r sArrival Time ' STI ProJect No.: ea er 743"0 page iqo. Fxj, 3 ~ . / , ot Client . local Representative/ phone number GeneraM Con c r i eepresen ve/ phone numner Subcontractor TI Proj t Manager/ phone umber . ~ Q• STI Field Representative - . ~ Manpower & Equiprnent Used . ~ r Comments: ~ ♦ ' {W~rk Comp(eted Apparently _~;GLL~• Q1~~S ~ _ ~ 74 R ecifications Problems ai, . ieir Solutions) ~ 7~r ~ ~ / / D ,z~2 &2Z .190 12 /'r ~~~s . ~ 74 • ~ i-&~ . ~ 77z.,o ~ ~ 00, STI FIELD REPRES TATIVE CONTRACTOR'S REPRESENTATIVE lC~ This docurnent and_referenced addenda are to be considered preliminary until reveiwed and signed by the STI construction engineerancUor STI project manager. . Oate Date 3 STI CONSTRUCTION ENGINEER STI PROJECT IVIANAGER a - 0:lformslstilfie1drep.pm5 s. Corresponding Deficiency Report No: o~ j~ Cc ► ~,.5~ 1 Repoct N°•'l ecror's ~aily - . ~ngp , • ok . ~ page-lo li q ' ~ ~ ~te • ! 2~~` O~~ ` ~ • e~t No• j r , ~ fl PrO~ l' ~ 3 . ,.~f"" . lowillillillillilliolIll ~ ntly ~ ' corrimC,omPen~ ~eted APPare • ' .41 ~ons pr°blerns iWark c~,iGa Pgr SPe ttoluttohgl and sir S 3 , ,Jp P ! ~ • leo"* 01 P ~ . 3 L1 J~ , ~ , ' • ' C4 . - ~ . . ~ . , OL P G~~ . ' - " . " ~ . . . , , , ' r• ' ~ ' • !br ~ . ~ - . CQntr.a,cto~'s RGp PM . ~ , ST1CE S-T1 Fie1d Rep • . iQl[tv NORTHWEST ~ SOILS', TESTING & INSPECTIQN NUCLEAR GAUGE TEST IRESULTS , Job Name: STI Job No. ~~~OT, W.O. Field Report No. Date: Tech: ~ _ ~ . ~ . ~~~~r Page of ~ . DS= ZZY Gs MS- . . Test Location Ft, Below Wet Moishire Dry Max. ~ Percent _ Pass . Retest No. SG. Vensity (Percent),. Density . Density Compaction or :of DT Elevation CF ~ ~ ) (PCF) . Fail No. _ S'c c 1G~..~ 270 7. y8~ / . -2 .~W J:'e~IY .,.Zz- ~ f _jj; ~ ~ ~ ~Ff . 7C,° ~ .5 • , ~ z - . ~ . . . . r. ~ . . . ~ ~ / ' ~ o:\Form:w~de&rcuAgerest..vpL / ; • . ~ . G f ~ ~ ~ ~ • ~ ~ I I W N ~ n C D-~c ~ ~ .4' I a ~ ~ N 4 ~ tf~b,l ~ _ - - - L M ~ . ~jrn i ( ~ I ~ -~L 1 - ~ ~ ~I ~ ` . . ~ IL L--J ~ d► . ~ ~ L~~------ I j - I' I I' Zt- ~ I Z I cD OD v 0 W N .~`U I "Q p r~ ( ' I ~ • F `1 i ~ N i - - - - - - --0*LIS- RAA$ - -L=~• ~ ~ I----~-- ~ •w i i° ~ iL" ~ v,l`~ I I ~ I § ° I ~ ~ • ~ ~ .1 r I I~'p I I 4 11 +N I . ` ~ I ~ I I _ I U r ---r o A~ ; ig~~ / . z~~ Q 1~ ,~~^1 ~j ~~1 0~ ~N • ~ G' ~ ~ ~,Y ~ I ~ CYI fr~ ~1., L_ I I r~ ~ - - - - - - - - - - - - - - ~ ~ ~ r [L / . - INLAND MEADOWLAND 98339 PACIFIC ~ ENGINEERING FIELD REPORT # 707 West 7th • Suite 200 •(309) 458-6840 P A G EZ71 0 F(~S ~ oATE: ~ Spokane, WA 99204 FAX: (509) 458-6844~ ~ , ~Q~ J ~ NORTHWEST FIELD REPOR.T # `1 . MATERIAL SAMPLING & TEST REPORT NO. PROJECT PROJECT # REPORT DATE G~j ,~~C1 FIELD DATA . ~ ' BATCH DATA ~ MATERIAL SAMPLED _ onc 4~ MCX NO. MATERIAL SUPPLIER ~L-~d~ ~ ~ • TRUCK NO. . DATE SAMPLE TAKEN ZV4 TiCKET NO. ~v TIME OF SAMPLING SACKS CEMENT/CU YD J. ~ WEATHER TYPE CEMENT AlR TEMPERATURE BATCH T1ME SAMPLE TYPE END PLACEMENT TIME- ~ r STRUCTURE.TYPE (op ADMIXTURES SAMPLE LOCATION G ' MAX AGGREGATE SIZE s ~-~4- / 71e- zS ,Gj , WATER ADDED (GAL) G TOTAI CUBIC YDS PLACED ,o W/C RATtO D, y,3 SAMPLE TAKEN FROM / S YARDS INTO PLACEMENT DESIGN STRENGTH ~ FIELD TESTING DATA ~ ' TEST RESULTS SPECIFIED VALUES SLUMP (inches) . ~ • . / 4..~( CONCRETE TEMPERATURE (F) t'eo;', 7a / O C • . AIR CONTENT • .~j/, g~ el. S^ 70 . WATER ADDED (gal) • . , Q • - ~ n _ WATER/CEMENT RATIO 0 ~ . LABORATORY TESTING DATA . ~ LAB ID FIELD ID DATE DATE AGE ~ SIZE AREA TOTAL LOAD STRENGTH TESTED . • NO. NO. REC'D TESTED (DAYS) SQUARE IN (LBS) (PSI) BY , -~=e-lhj 2e, ~LZU r REV. 8/97 0:1FORMS\GEOTECHIMATERIAL RPT.DOC ~ , . ~;---;---------_r.+_ _ . . ,N.•--. . . CENTRAL PRE-11111X ~ • CONCRETE CO. CUS R q P P.O Box 3366 Spokane, Wa. 99220-3366 ; WOM , Business Office(509) 534-6221 Dispatch Direct (509) 533-0208 SPo-131 ei97 ~ . QITEDWARRANTY Waniing •Injurious to WATERADDEDATCUSTOMER'S @yes.Causes skin imtatlon.Contains Porttand Cement. OWNRIS , e only liability o/ Centraf'Pre- Read te foUowing.vvarning beford' using; nix Goncrete Co for product d~-, Contact fi with wef; unhardeped concrete, tnort~i; cement or cement mbAures wcanith eyes ADDITIONAL WATER ADDED t0 THIS cause K fedt.is the refum of the purchase' sktn irritatiori, severe chefnical bums or serious eye damage. Avoid cartact price. fn no event shaf! Central and skin. Wearvwaterproo(9loves, a fully-buttcned, long-sl~ye $hirt, futl-!en h trouse~ B ~ e1'soa Ce ~LL ~OUCE ITS STRENGTH Pre-~utix Concrete Co, be liable tor and tight~tting eye protection when w~oricing y„ith these materials. lf ~ r~ nt agrees to accept resFanslbility for any direct, indirect, incidental or in wet concrete, use waterproof boois ihat are tight at the top and high enough to keep cortseQuential damages resulting concrete from flowing into them, (f finlshln8 concrete y°u have to stand rength due to water added above design. from the use of the products or After contaM with arry of lhese materials, '~r ~ds to ptotec! knees, A~ j~ ~pp . arising out cf breach of any yvat- lndirect contact through clothPng is es dang ~S S~r ~mdiatety wilh fresh. clean water. ~ ranfy. All daims for damages or clothing. Seek immediate medical attention UYo+ have persisisnt or severe discomfort.ln ~q~. shoriages must be made wit}~in 24 case oi eye contact, tlush with p P~ ~nse these materials /rom • hOU~s of de~Nery.We do not as• immediately KEEP O(n pp RncH ~ter f~ at least 15 minutes. ConsuH physiclan a~ . s~nne ~esponslbility fo~ any dam- THIS Wq~jHp TO ALL pERSON3 WHO M~AY U E OF uC~tE N AGR OEE4SOKTACT --YTM a9e beya~d the curb line. , WET (UHHARDENED) CONCRETE, lylpftTqti, CEMENT OR CEMENT MIXTURES. R~~~ ~ Test cyGnders taken --LFAVE PU1NT ='-AItRIyE Jpa'SJ' E STAR.T DISCHARGE F1MSH DISC B Y . HARGE LEAVE JOB SITE ARRIVE PUIN7 X J2.~,` ~ 1 • •~Y ■ tie~ . w ■ ' . • Bu er's Age receipt ot concrete Order No. C st, No.' CPM project No. - Custorper PO/Job No. TIC ~ y anZ,aQp~oval of any added~ items. . KET NO. Oriver ~ 29 105t2 Customer 10 1249 1~7 I_qRRY H BACON , H l: L. ~ Delivery Address . Detivery Instructlons j 2"H/~'+jF'~'{~~F Date _=~-MAk-~~+y ' Map 2one ,.j`. . . ~ iLoaci' Qty Delivered Qtp order qty Product Cade ~ 90.00 ~ i VOM Product Description I C . t ~ r~~ . :;~.2 t I 1 ~ ` , MA Unit Price Amount 1~'~, cit_i • 7`;r~}< r::l KEi t;:t~ J ~.~99999 RE-Ot_il.ATORY SLIRCH' U Load Size Mix No. ~ Mix Description . t0, ~~4 1 I. 7~SK f_:1_i~tB MA( ;H lump t TyPe 0 ~C Use Truck Plant Sales Tax , 0.00 C1_tRii TOTALDUE ~ E{ATCH 1t. 93'f rGKET , WAT'F.k ` • WA7 . Ai:1:R~~apTE TA~C~~~~' A~:'~i Iq~. STFcJM~. k/Y~"~~'~c; ;~C~Q c_~ ~'~kt~~'Fc: . 1"ATI!"~ Mi i Y~: T p1~IM I X Tk ° GSqNri rAKE 7F'RCr TAFtIBFl` Ar:Ti.iAI _ ~ L F~ANI'i i. ~~ec1-~ 0 j~'~ I~V r+~+. . 4~% t: AI _t: IAE.~JA MU 1~ % iA~(F 1~~'i'I- L k= kC~ 3/4 .~C~ 3~ iv . C Cy . C i~~ 1 _ A I` . M eH ~8 i~ 11 ~ c` i 4~ U 1_~ 324 ~ I N Tr i . r, " ° ~ 7 T N T~. ~ a_ C~. 7% I ht Yi I % . . . . .z;L 1 ARt=. 7FFtO ~ X . , . . , . . . . 1~ fi TAk~ t~:'~ TARE ~ Z ER~~'i 5410 I. B ~-~4 5 N . 7'~~L, C. WATf-:R *1 1'AI~F Z ~ R ~i H.wAT~k #t ].11] L Et i].i~~ IN Tii I..AFcF 7E:RO 17tU 1_8 1706 !N "TO WA i'FFc AI.i _1:1WED A 1' `ir~BSI 7E: :r4 r.aql _ 7ARE 7 ERO FNO f XMF 12: U9: 11 0 • . . , • • • i,~;~ i :r.::~~. ;.~Ay^: .,F..r•r~ .~r~ ~..~n: ic,'"t-x ':~.9.~5 M; • "'?.~v . ..':e:. : ~'y~~~ r•..~..: - ~t'~ii:is'~.` •v . , e. ' : . •~:5: .~r, . :.f.. i i ' r ~ • ,.i~4ra„re •ii 3 y ~i.~' ~f~•I~tt~~• •1= .l.^f :rSr. ~,-:c~:`.'' ~?'s:,~:~: e'~`;`•~~T~[ ' .L.' ~ 1'L t C':~ .3 . J'._ ' II•••.•, . f C~ii~~ _ ; y;, 2'~ i • ~ ~ . _ ' T~' r • ' `~''~t: •rf , {i~'i,., i; '~.;.~~{.x~r~ u3~ . . . - . . . ~ _ . . . . ^ .r . :ia:' ~~s% • v.;~•~` ..z,.3'iK•~.= ' _ • . ' _ ' ^~s. f•n :r.+.'' •:e:i:4- Jf: ~ : '.ti - . • _ . . . ~i:~.r. t i;:'t. ;p ~ %:v 'r.~~.tc:~ _ :~t; -r.:•:' ' - . t:.~ :.:1'~• .i iI•t.'i ..'J'. t~ 1. " . Yi li~ . G ~'M^.tft ••117 .1~'. . • J' • 'A L . . r;' e i~: '~:j: ~ r t.~~: ~~it "•S!'4S-•' ~:tn t -1.~:' ' ` L ~ .1t: . 4....~.. , i. .rS~~ . =t: • ; 's .ti.: ~ .t 'i " '-rr . 'i'' ~~S• _1 . .~y~; :~rr~' L^_ 3~.:; ;.1' u~•;. .y,^FL.r~ )'T t••1:' - :~tr` ' , -L . , . . 'c r -i` • L T.in i 2. „~.5~~!r:~~. : i ..a~ .~t^: - , , . ' ' . . . :r . ".-•i i~t'~ ~ - . ~ r<.;, i?•.:•Y. .ih.... ~.ric:~' •F, ) . ~15~ . tf:(:t..~. ,li ~ ~ ^.rt . t"'r :l . .'Y. .lt~~~ ~ ' . ~ . ' , t - , IL~' 'rl ~ ~tS' .Y`l.~~l~..',•~ti _ ~ . J~ C" 'Tf~ 'I 1°~~.• ~•Y.` . i:°:. i.5•i. ~.C_i?F :r:;S: is:•iy:: ~tSt•:surtct::~.~'~`~''' ;d~"} r • . • . - • ~ :r~. ' n:r. ~C y •'r - } ~ •ti_~ :c;~ ~ -R.. iLriir • 3~: . ~ . , . . . l yt • ' :i.'• 'P~,~' : i P '1• '"'i ~ t r ~ • :~i" ~:.t' ~i~.i '~c`~..•Pr.t. •c':_'. ..iZ. '~-.c~.4`'.rr .r!'i•.' s . . . :•it: , l4.'S~~%r-i':°'.r~,. . .•i•4 .%.r~i•~:~. a~! ~~z,.: r f::~ v~~•_s~.e. .rtfjl~ , . . . .scu.~ yi. ~r. :S, ~r. ..S ' •~~'.'ti` r~ " ~:ii:.':~ Y.~ . . . - . . . . - ..s•' - . •S.? ~ P:^ ' S~'"t~••.i•~ .tr.~s1~...r!S°'Yri - t~ :v"~~l~r: ~•~.,.r y~ . . ' : . . . - ~ - `'ti~ _ _ ' ~ r,i.r- ~ ~ , ti.. ~1~ ~e;:.~ y~~' 'y:•~et~~~°•~~:L ~r~" :~l1•J.d:".~ • •`fY~ f•. . . • - ~ • ' ~ :te.~: :i , -~~~?l~.;'"- . ~.ci.... .~ii~.,~.~"~7,~'~.t't.'~'~:t~'f~'~•. i._ . ~1.. - . , • - . _ - ~ .M•:' ~ z.. ° _ - :i?s" ' .^V".°."'.'p ' . svr,~, ~ ~r 'a. . . _ . . . K'rii> 'idS~i-e%..^:i ~t?~S'` :~~:a'~~-:'s.~~. • ~ . . i ~ ~ • . ' • • a, ~ , r ; : ri:ar.y:;'.2:. : i.t. . -~,:i¢.• , ' . • . . ~ •v'ri..:.•r : ^i~.a -•i ~ t~f-. i.: ~~F,'': ~ "!t~',', , "ij~'a • "i. . - r'" , - ' . . rt':z.:"~ ..t : :~.i ..n•t~. ' • ' :ilr~' ys?~'. ;K. • ; . . _ ~d..•_' u.:i~•' , ~ ,:;~'i'~^'i ":•^*~.,.~i' da^ :;•:;:;y:.:! ' - ' ' . ,<_S•. ::•4 ~ ri4-: ,'L~'`- : ~.';~'-s ~.trl° • • . ,,t~~.s`-.~:~_ :Y.:t~ _ . . . . ~ . .r.~v , ..2'.:, t2 _ ~ .~~~[Y,r• ,j.ri A:,L~t ; . . ~ ~ ~~b;.'• ~ t . . ':r~ ~ ' w:."1' .f.J~t~,• : _ iJ (~qC, ".i:~. '-y~ f\.' • . ( . y1 ~~l: ~cI 1 . . _ " ..~'f ! ' ~ " ~.4. ~ • . _ Lii_..' .~r.._•..'-'~ - ' ~ ' _ • • , . , _ • • ~ . . ~~4 . f. .t..~ , . • ~ . . ' . y k, . " ' ~ . , . ~ •i.••_ ' - • • , ~ . . ~ ~ • ~ " . . ~ ~ ' . . ' r ,r •~4 . ' ' . • ' o ~urr~ . ~ - NORTHWEST Y Date Z Inspector's Daily Report No. Z .~/y/9 Arrival Time ` STI Project No:: ea er ~ i-age fvo. ot ~ Client , Local Representative/ phone number General n c r• ~ e epresen ive~hone num~er 100, Subcontractor n STI P ect Manager! p-hone ' mber STI Field Representative ~ Manpower & Equipment Use or, . Comrnents: (Work Completed ApparenUy per Specifications Pro51ems s eir Solutions) ~'i / STI FIELD REPRESENT ATM CONTRACTOR'S REPRESENTATIVE' This document and referenced addenda are to be considered preliminary until reveiwed and signed by the STI construction engineer andlor STI project manager. Date Date STI CONSTRUCTION ENGINEER STI PROJECT MANAGER ~ - . 0:lfortnslstilfieldrep.pm5 Corresponding Deficiency Report No: A ~s J ~ . ♦ NORTHWEST h~ o, do l.a k 01 . Date -3 j 2~ e a~ Inspector's Oaily Report No.: ~ • / f ( Arrival Time STI Project No.: R1,00 ,4 M q S 3~Gi ea er iage ivo. ~ ot . Client Local Representative/ phone number l~w. ~ so~• l~l.~c,~ - General Contractor . ~i eRepresen af~ve~hone numaer . Mo,-).#JTAi..J (g_QdssE- G~~ t3ucvr, S contractor ProJect Manager/ phone number ~ Field sentative Manpower & Equipment Used Comments: ~ (WorkCompletedApparently - Specificativns Problems theirSolutions) ..~~ON ~TpR gptA T-n Q Ek 0 n Li c .a E~ QYc+ ~ ~,~,,,..e. C M ~C~.~.n ~t.,► ~ G ~ '1-0 ~I- t I.~l~ ~ c ~d w, 1.t~ ~SS.~EZ~ ~~w) •~t,~~~~~R~?~ f3 Ui.~t~Yll~►/ 1 N'~ l,C ~~2~ 1~~ 1~~15.~.2~~ . , F-t u,~ ujA c . l.Wt'~~ U~.~ts L~~~ 1J~► t C3 2•t~.'C1~C,, ~ l.~►'°tF_ C~v~'D e~.RO rT . ~ STI FIELD REPRESENTATIVE p CONTRACTOR'S REPRESENTATIVE This document and referenced addenda are.to be considered preliminary until reveiwed and signed by the STI constructlon engineer and/or STI project manager. Date Date STI CONSTRUCTION ENGINEER STI PROJECT IVIANAGER 0:1formslstilfieldrep.pm5 Corresponding Deficiency Report No: , . ' ctrc~~~~ o ~C~ . ~ s r ~ ► NO'THWEST 44 -ea d.o w ItA~~I ~ Date lqcl inspector's Daily ReportNo.: STI Project No. ~'age No. or Comments: (Work Completed ApparenUy dD (3 3&-VVAr,.h -7 per SpecificaUons Problems . and their Sotutions) (Q AL-)r t`~ ~ OIL133' U= bMily. 4jemA's W~ k1 .d.. -m-IM ~,..~s~ ~ ~ ~ t.&~ ipL,&ejFt t )06C~3~12~a r~ ~ tut r--TS i )GDF ~2 •l~~'L ~ ~ -S`LaL~,4` OP- ~ A d.: ~ ,~.~.C~` F~C~+Q'_~L,_~iP~ w~ _ J ~F tF- TttE~ ~ Loc. K-! Ca UUTYeD CIU A•"Tt'A C.bL-j; NjLII r , . - . ~ - . . ~ . . _ . _ . ~ - . ~ S'~i` ieid Rep STI CE STI PM Contractor's Rep • o / ~ • ♦ ' ~ - "zalkiu(J w _ Q Z ITl • , u r . .1 R J' ~ ~ ~ ~ ~ ~ L _ ~ _1 i ~ ~ = -r I ' r j (,I C)~'~ i ~I ~ I ~ -IL11--- - LrJLL ~ . • ~ ~ I .C't~ L..~ • I~ jl ! j~ ► L...1 . L L - - - - - - I I 0,. l. ~ I t~i~~ I~ I t0 Oo J~~' GI N :t1~ ~ V J ~ N - r-------------------~ ~ , . ~ m ~ ~ 1-- ~ --h----- i -----y~i ~ W N M E3 rn cZi lo ,~i I I ~o} I I ~ I m2t ~l I I I,~,I < ro" 1 ~!~/I 4- I rn I tn1'~~ i' ~ F; ~ y------ .a i i ~ § o ~ ~ ~ ~ I ~ f 1 N I ` ~ I ~ I opa v~i C) ~ 1 N ~~i I I I I ~l ~~ul I ` I I ( • i ~ r -0 - . INLAND 1 ~MEADOWLAND 98339 ~ PACiFic ~ FIELD REPORT ENGINEERING # 701 West 7th - Sulte 200 -(509) 458-6840 P A G E 3 O F3 DATE: S`Z6 ~ ` Spokane, WA 99204 FAX: (509) 458-6844/ \ J I ti~ . NO HWEST • • M JE&A.N-b Date 34 1CM I nspector's Daily Report No.: Arrival Time S STI Project No.: ' Vve r rage fvo. ~ oir ~ .e~ Client Local Representativel phone number . I`0►,.1 I 5 (p L, -T3 ~a c K W1`i lce vkK e . General Contractor STFRepresenvel-Phone numder lM-o vjA }A 1.90% Ct-t. i fi D~H h v ~V- 4a L," ~ - Subcontractor S ject Manager/ phone number ~tA t.J L STI Re resentab 've ~ `~~AXJ-k-t,& Manpower & Equipment Used ComrYOents: (Work Completed ApparenUy -t'c~, p, -tecifications Problems a eir Solutions) 0F /.1i N t lv L.~~ ~ ~F--h t,P ~ -f IJ- ~.l..a~~ ; ~~gra`_ t 1 ~ t..►- ~ t-~.. . l~ F3~.~ 45'vj-• l5~1~ ~~.V► 4 l . ~-1..` ,~~-l ~ ~ 1.~ ~M~ ~ STI FIELD REPRESENTATIVE ~p . CONTRACTOR'S REPRESENTATIVE This document and referenced addenda are.to be considered prelirninary until reveiwed and signed by the STI construction engineer and/or STI project manager. Oate Date ~ ~Ls~L.71 ~ STI CONSTRUCTION ENGINEER STI PROJECT IIAANAGER . • 0:Ifornnslstilfieldrep.pm5 Con-esponding Deficiency Report No: , 4w N ORTH-Vl/ EST r. . . . . ~ ~ .•r'~~,: 1 Y DAILY FIELD Pro]ect Name Date: Project No. . Report No.: q833q e~ra er Arnvai i ime so's ~lY clovdy . . z ; 30 CCertt , Local Represetativel phone number Tot-" Ifhsor, -glactc . m) F NVvs,t c- deneral tontiractor site n~t nrel~phone number • C (i`eS-f" Aeh nv ~vrfor. Su6con~raator~ - ' ' " STi Project rVlanaged phone number Flrtv~• Cotic~-e ~C . C~rvc~ wowalrd Page No. of q Manpawer & Equipmenrt Used CAJ CSS63 C Sl fL Drvi.,. v i6 . CO►+.~o~cf-ov a v*{(Qrf Sf erJo hy e~ Corttrr'er1ts: 1 t a~ (workcom~APparecuY /4 ryr v~ DG, wl vc°! #~T r-~p vw.- ~Ifti S(4 "kI71 Per rrobkma and Sokdiom) -4!a r- Cv v b s o h 12 fk Aw- wri f o-F G-leti.. Rootd qhd o" lS~'- weJ f a~ .~*-.YNh Roud 1 as wej ( as 44Ac. (,-leh,, gp.*p( vnNdw*q~y. 71 e~p" fiv . .,..Q f4-~ e- rmad.wa~A hs 1 z~t, &Veh 6.e- c uv b+v e~vkti d4-4 L e ra.t1 wl„ c t, e. r hCSeti Oa vt +4 e a 1t*c4j ~cJ~ be,eL+ ~pGC v1 ~v+~r uf10 ti ,~rPJ v j~-t AhL ~ De4i 1; 4Y, TCS4 kPfooV4- ~ T 4 e. f~u ~-~-oi- ~ s~o~d ~c f~r~ t,o►r~u~~~o ~ ov1 (rle ti h f2oko4 o~vviti~ vvv Sf"k viS;;ffro4. 12tH Avetive, miLgrfy ~v 15-4'k. ISi"tiwas Sfi11 b-eilnj . ~ • 1 . 1 l ~:,e Le S.1• ~ '~'~S 4f 0 H h v, Roa At I-H c.C / 'K d SA 11 4!~ C TO ~CO 4w GL fi~ 1 O, a S S~+ v w ti . ' Lo . ~ ST1 FiELD REPRESENTATIVE CONTRACTOR'S REPRESENTATNE This document and referenced addenda ar+e to be considered preliminary until reveiwed and signed bythe STI . constpction engineer and/or STI pro)ect manager. . g_ yy U. zz~b EAWED BY: DATE STI PROJECT MANAGER: DATE 0:1fonnsbNfle1drep.pm5 Co ponding Defic:iency Repprt No: . ~ . , ~ ; , NORTHWEST - ~`AMEC~~'• ' SOILS, TFSTING & 1NSPECTIDN . M DAILY FI~LD REPORT . h'leaddw~uHd~ - ate . nspecLots ty port o : . . lPE Projec! N,o. Page No. of . 9833ct. 2 conwnents r*+~~~•~r a K-~'~► ~ DP~ S~ T~es+(~ v-4,~Qw sv eG%~ o f~„ prabim = leoad akcl IStIl' A-veovve Wes~- o-f- G-1ehP, I?oc. d i kdr'ea -kd t, ' b~'h~- 'T'~S~" I~GS~JITS '~'ka'~' -~'L~ StlbqY~~ s✓6tat j ~phS/S"t~ Olr l~k`fe V a f v~ filxm~~el~ m r-~'~o%'~' f' ~t CD Njra L~t o&.. t~va S~~ i~...~ D~l t s j~ o~ 4d,= 0 6s'e ~~t . . ~ +v f-c co ~.d c v s 1 4 :,3 a4,44 tv ~r~~ ~e b ~A + r~e vn i K~ v so-v 4, l , e tifA . of- Cr te ti K 12oa d as we R S! s+ h A-~e . we r4- o-f- G- I-e k H rzJ , T1 -e- 4-es 4- ae s-u I~s l kL~ `KQ~ vP M~/ C~! A hl s~. f~ ~ v r4t t,~ f Z 1 r• C~t S D~ S!/ b~ Yl~c OvC. , ✓ 'o t 1, '44 ~ p1-d b rK i r~ qvu~ reS ✓ 1 +co~ t vA ~D ~y, ~ ra o r ~ V 6 LA K n b r i~1 k p t- s o-~ arcaf w~ ~ v 6.s P,V wr 61 4 e•~.c~ ~'4.e ~ wa s~. o ~ . SC ~ ~'t'lCt~ 1''~bDvt.~ -~Dk, 4'k Q CD 1+A pGCG~-O!~ ~►'V~ r ~pS~ 04• Q l~ ~e~YV~i - ~ . _&4 c le- -ks ~-cN . wt fl, toLtc-~tve StSA N ta ~-f--~ . . . So 1Is tf 4'S Ovv ♦ Ihtoh +Le. Co w4 ac4Io,,% 1'vi+a.L le ~ovCS"rL ~ Non-conforming items: - . • - _ (ftject or+tandar'd spe~iaUon , " itW aD=erved aonsbueiion Is not • in wmowm vA" . . ► ( J ~ 6'~i'~ v ~ ■ ■ ' w~~ i ' IPE FIELO REP iPE CE IPE PM r.nNTpnrTnp~c p~o NORTHWEST . . ~ ~ ~ . . SOILS, TESTING & INSPEC'TIQN ~ . : . ~ NUCLEAR GAUGE TEST R:ESULTS Job Name: STI Jo6 No. q g 3 3 q W.O. Field Report No. 15- Date: Vlzhl . Jech: Page 3 of q , DS= y 3 S y MS= 3 6V 4q . ~ T - t- Test Locatioa Ft Below Wet ~ Moisture Dry Max. ~ Percent Pass ~Retest No. SG.: Density (Percent) Density Density Compaction or of DT Elevation ~ (PCF) . (PCF) Fail No. 1 IZ{ t^ Rv~ SG I Z S 9'e.2 ~ 11 y',5 i Z j. D q 5- p . Z. ,ZAh ~ve, s~ Iz 3 s. 6~ ~ 1~,~ • ~z~ .o q 6 P ~ 3 lsf" If S,s 121 -o ~ $7 ~c . ~ y . I 2O 913.110; 0. l Zt. o 1 23 q $ . ~ ~ 2~ ►Z~ . ~a . 13 ~ . ~ ~ 121 q~ 0 tL(,, 0 re - Ikd re~ sW ~ -7 I 2 3 112 o 8 l I~ 9', I s+~r g, Rd 3~1 IZ3, S 19,3 I i~3 I Zf. o L ~ ~ BL 2 13 0 7, of 12015' ~ 12 1.v Cl Cl I~ . . . 10 lo 4- I gL ll, 1 1) 7,5 IZ-.l.,o 47 ~ . ~ i lo~ 6~L Z Iz 19 6, Cl 1 1g,8 Iz 1 ,o- ..,q °I . P . r: 1 Z f-oa L. 129,s 7,5- 1 HI,s 11i,0 i' . (3 I%.+-op V- 133 9,9 12.110 ~z1,0 100 P - ~E ve ro I,eA a p-a re4cs4c t•Jt+o cL.a1,,2 S , . 0:1FornasWuctearGuuBeTatwpa ~ rn , , . ; • 1 ~ ` t i~~ ~ y ~ ' ~ • . ~ r->iC u I I ~ Ir~1 u i i ~ ~~1N~ I ~ • \ I . _I I - - L L - - - - - - - - - - . I ~ Cl ( ~ ~ ~ I E3 I A - I 4L ~ t I . ' ~ jl ~I ~ ~ I I p ~ --GPcLtS- L---------- OD Of N W - - - - - - - - - -~----------r - - ~ ~ ~ ~ 1r:7- raeA& I w ( tn I cn1\~ ~ T~'- 'I / I F~ o i ~1 i► ~ i I,n I ~ ; i ~ ' ~ ~~1~--~------ i t, ~ ~ r (r1 ~ ~L ~ / r~ ~ I I ~ t~ . ' - - • r ~ \ J INLAND 1 ~ MEADOWLAND p"'~"DehS~~y +'eS+ Lo(ktloti ~ ~ . PA~IFI~ . 9 8 3 3 9 ENGINEERING FIELD REPORT # 1 ~ . .01 707 West 7th • Sulte 200 -(509) 458-6840 P A E q O F u pqTE: . \ Spokane, WA 99204 FAX (509) 458-6844/ / . /6E~tERq~co . " w ~ . ` NORT'HWEST . ' ' - ~AMFR~' . DAILY FIELD REPORT Project. Name ea Date: / ~ow ~ti~ I 3 hi °1 . Project No. . Report No.: ' ' ~1~ 33 ~ 16' e~a er Arnvai i ime sos ovrcQs+ . 9:30 client - L.ocal Representative/ phone number TO w+ ~Ir~ So H- {3 lGe C IC ►'h I IC 6 [-}-v 1~ ~ benera~ontra~tor , SiURepresentFibvep one number h'1 C VC C+ . D~eh h U 13v v4-=&-, ~`~.5uficontra~to~ . STI ProJect M'anager/ phorie numtieir - Ls vvc e- Page No. ~ of t ~ Manpawer & Equipment Used G~-*dCr, 1'vveA- 1/1k~. co r,,ln a c.4-o v. Comments: r_ ~ / (VYa'k Contple~ed APParentlY Ai''V t V~[ ~ O h t f!~ G~'t (h "c+O ~'I y~ er~ ~~r-W►- H-. D~(.~~ . per Pr~obiems , brc/' a~sd~) -k-s-~t k~ ~ o~• h u-E-i ~-e. so i I-~o ~roa~~,..a r vlo c, va d,e a~d ~-v . . ~ ~jP a- at S Cr ~o ooeCQ v&-S e-fv 3- rH. b m rck4nVy Gt ~tevw~`«co~~-cv~-~ o'F . rr" cz Qmv fcu}. vtsy~es4e4-ol'ux fio r (ovlre t,.,r~ s be is~j. )0lticelr,4 oti ";e_tion C~ . ~ AeiL s ~4 4t1 4-S u4,,thG Gb kl•c vG" oi•+ fIz,k_ C~4'e{~ +ivgf 4, ed2k S~~y wct S V a v 1,4 ~~e- VS 1 vL ~ G. m v.C (eav, deh s `r~G. s ✓ L Pu 46e, 1.0 ~ 10 1-0 LLO J v- vN t 4 vv+, I k o+t. jso o 4evi-tat STi FIELD REPRESENTATIVE CONTRACT+OR'S REPRESENTATNE This document and referenced addenda are to be consklered preliminary until reweiwed and signed bythe STI constryAction engineer and/or STI project manager. ' ?fVli~El) BY: DATE 5T1 PROJECT MANAGER: DATE .~r O:tforensbGltleldrep.VmS . Corresponding Defiiciency Report No; u . • ' I ~ ~ - ~ NORTHWEST Date ~ Inspect,or's Daity'Report No.: STI Pro]ect No. tiage No. . oY - R93 3 cl Comments: (Waic Cotnpleted Appamntly CO wt toa G'~'[ o ~1 v-o t el s per 8peoifioaUona Ptablema and thetr sotutions) c v~~ed ~/,~s-}e ~-r uv ~ . , . ~ VG/ V(. !1 410 S I N I h Cy IN t+t, Ol -e~ e-.ru±~,e- Y►n - ObS"c IiV Pd "'PVv W+ 4- L Q ~ti so w,e -k -es 4-s i s cvPtsl s ~t" f w i H, Yts PwaC u y r 4-cJ 4-1 ~ %I P.z -l-~ e- a w-o~ , ~ wt C 4- o + ~ ~4e- cv Ues aG u k(,t ot +~4.e-so v ~ ~ ek~ v-f 64eti bl% Rd~ . k a s s~ ' MC(%iah f r~a c ` • ~ ~ Su61v e C.vk~c ~coh C4uKqet evth +~ovq l, Stwlv aHdl LkC(~-~t'j/ J v~ . wa s Co t" a,~ 4ej &,e e, he po P-.} V* LL.-, 12 Avov q S~1 ~ w a s o bse eved Iin +(nG ScASuv4-4ce soi l olvv;J Kh Stw~Gv Gnq~r. ~ P"K~'~✓u 1*•►L+ w~ c c L. crtrn R f Co. v " 4- . +4,.e.. 112 w-tv' wa~crw.~~..... d{tis'lv ~ f>raS-ed ot., 1°i. .evtovs wL u 4evta 1 c u 1~.&., ~ le- s - a:. • , _ ( . : . ~ ~ STI Field Rep STI CE STI PM Contractoes Rep . ; t: q • . . NORTHWEST SOILS TESTING & INSPECTIQN. - . . . . ~ ~ . . ~ NUCLEAR GAUGE TEST A.-ESULTS Job Name: STI Job No. g g 3 3~ W.O. Field Report No. Date: r /13/q q . Tech: p,Lck&% Page ~ of -9 . DS= y 3 S y M5=- 3 6_ 4el Test Location Ft, Below Wet Moisture Dry Max. ~ Pencent Pass Retest No. ~ SG. Density (Percent) Density I?ensity Compaction or of DT Elevaooa (PCF) (PCF) Fail No. is i'd ~ 131. 0 -6,57 lZ3,0 IZl, o i~'a ~ P . ~ c~ ~sac_ S G- ~ 40 lZr~, o br~ 1i7,5 q 3 i~~ , 3 iiqi o 71 2 tti,d CiZ + gs- . , . si~ .~bsd i l ~ah~►~s -A-sn, . ~ ~e ~0 p~ Q~ d P V~ v w+a h C e - ~ akol c tis's d.eti ~ . ~ ~ • ~ p;\FpnusWuclurGusgeTat.wy,. / 1"' a -p ~-n ( (A N + ~ n}~ ~ ~ I I iL m 1$i C) ~ u ~ -`L~ rr.l i , - • ~ _ I I L ~ ~ ~ . ~ - - ~ ~ s V= ~ 1-o-- - ~ • ~a ; GA .l- ~ Y ~ L ~ I L~ ` 1 ~ + 0 1' : I L ~ ~ ~v ~ ~ ' tn .06 ~ . I i r = - - - - - - - - - - , ~ ~ ~ {---~--~-------r----~y~ ~ '"C' ~ • , / ~ ~ W N ~ 0% < I k~~ .i~.y------ or l j ~ ~ I , ~ ~ ~ ~n ~ j j j ~ i 4 1 ~ S • ~ r " i I i ~ 'r _ , t t i -...r-._...---.,....--------~- -7'7 • ~ / LL / \ 'lo/ /oo fNLAND MEADOWLAND 98339 PacIFIc FIELD REPORT # 6 ENGINEERING 707 West 7th • Sulto 200 •(509) 458-8844 P~A G ELi QF'Lr DATE: Spak J r • ane, WA 99204 FAX: (809) 458-8844 / \ J d~ ~6ENEI~ . C O o y~ . NORTHWEST , ' . DAILY FIELD REPORT . ---Project Name Date: Project No. - Report No.: 17 Arnvaii irne c- - ' /A/~~/ •y _.3 ~ 'w~ Client _T- Local Representative!' phone number ~ ~enerat tontractor i e epresem~e! phone number Subcontractor S Project Managed. phone nurnber Page No. ~of ~ - 1 Manpawer & Equipment Used Commertts: , (WorkCanPiebed ApParentiY J,6~ d 1,r qXn-*-7 $g" `UIE~`.~.~ `f~~~~~/LS .S~` •~-V perS~ecific~ons Problems ar_..',eirsolutiores) 11Ol~-~^~ 1.A , ~ STI FIELD REPRESENTATIVE - CONTRACT'OR'S REPRESENTATNE Thisdocument and referenced addenda are to be considered preliminary until revervved and signed bythe STI construction engineer andlor STI project manager. la, &7 f--~--~ REVIEWED BY: DATE STI PROJECT MANAGER: DATE . O:lformslstilfieldrep.pm 5 Corresponding Deficiency Report No: . _ • . . . NORTHWEST - . `o A• SOILS, TESTING & INSPECTIQN ~ o , ~ . NUCLEAR GAUGE TEST RESULTS Job Name: STI Job No. gW.O. 3~ Field Report No. 17 Date: S1~ tj I Tech: ~ Page 2 of .3 : DS= 4-3 3 s' 1VIS= ~~t g Test Location Ft Below Wet Moisture Dry Max. Percent Pass Retest No. SG. Density (Percent) Density Density Compaction or of DT Elevation (PCF) (PCF) Fail No. ~ i i foC4 2 125~ . 1<2 t L `o t 56 I-z7.a 7. b s-r 1 t el, . a ~ 2? •A '1 .3 l t ~ ~ `I 8 oAFa(mswu<<e&rcuegcrut. wpv ~ . • Z m ~is1$ . ~ W M IJ f i' 4. I I ~ I `11 (r•~ _ L r~ 1 ( . 1 t u ~ • - ' L.~~ li I ~ " ~ ~ ~I I' ji ~L ~ IU I C),~ J • . ~ ~ •F' J~ I f•') ~ ~ N ' tp CD v ~ L_- ~ I a ~ r ' _ - { ' ' ~ 1 ~ oro ~ / ~ ~ r< 2 ~z I ~ ,1~ ~ ~ g°~ I I Z I ~ I tn 1 c n~`j ~w I- i ~ ~ ~ i ~ ~ ~ ~ • ~ r ~ , ► ~ l ~ --1 .LT~ ~ --r' r-- ~ ! I v 1 1 ~ ~ I i l ~ 'oooo 1 \ ` ` ~ ~ • .r r ~ 1 ~ , ~~~i..~~.+~~"'~aw~!~ `~'l~r~~ , ~ ' / ~ . 98339 MEADaWLAND ~ I NLAND P 0 R T 1, 7 PACIFfC FIELD RE ~ oAM: ~ t7 ja°► ENGINEERING P AGE 3 QF 3 Su1te 200 •(509) 458-15840 8844~ 707 West 7th • ~Ax: (509) 458- . ~ Spakone, WA 99204 . . „ c: Oc~,~ Coyih ~ . . - ~ ~ NORTHWEST . •ofA ~ . DAILY FIELD REPORT - Project Name Date: : Project No. Report No.: . gEa-Ekier Arnvai i ime client Local Representativel phone number ' dieneral Contractor ~i e eprese ivApfione number tAr C„¢x*,x- ~ Subcontractor ST roject Managerf phone number Page No. t of ~ Manpawer & Equipment Used ' 0-~ aS S63 S~ ~,I~.~ ~l•c .2~°~~~., ~o-u~ 14 tA~v , Commerrts: , (W°ricComPlebed APParentiY tjQ IfEA &1. : SttE ar 'l'~~. perSpeciScations Problems arr' - "-eir5olutions) &P P&A?_E_ tff 1-J 5A" 1.A.&,~s T~ s~► kc ~r ~ d t C~ ~,~~-~1~ ~ 'l~ n~ VoQ sit w-e: t~, vg q3d=0, T' 4Z~~~ At- , . STt FIELD REPRESENTATIVE CONTRACTOR'S REPRESENTATNE This document and referenced addenda are to be considered preliminary until r+evenived and signed bythe STI construction engineer andlor STI project manager. ~ REVIEWED BY:' DAT.E STI P • ROJECT MANQGER. DATE 0:lforms1stitfieldrep.pm 5 Corresponding Deficiency Report No: . 1 ~ 'NORTHWtS* T . S TESTING & INSPECTIQN . . NUCLEAR 'GAUGE TEST AESULTS 3-3~ W.O. Job Name: STI Job No. I g- Field Report No. Date: 5--1 t 8 P q~ . Tech: 53 Page 2 of LA . DS= L-t 33 S~- ~a~ 8 Test Location Ft. Below Wet Moisture Dry Max. Percent Pass Retest No. SG. . Density (Percent) Density Density Compaction or of DT Elevation (PCF) (PCF) Fail No. L.t..Ira-f-J*f ~ ~'r--~ ~ i-r2J 13~• S ~ E3~,.~ L3S.~ . z-- cg r 3 ~ ? f S1~ ~ ~t~ s' ` i q- s cS""ysv 4.(q ~ 13 -fSu i 3 i..~ ~ t 3 l ,..q% ~ c ~Sq to `'Lfo• , t{ ` f WeS-A F. t-^ i 37 , S 4. -s- t 3 tA . L 3 lS"~' ~ate Nr Z~1 c.sa ~ r l , l.3 1•~ . Gl ~i S-M4 u ,~o t E oa ^ S~ . -t` ~i1.~~►~ l 3~e l ~ . t 3 0, ~ 5 e) P . 141 - v ~ IS tS~ ' ~ • r~ ~ • j,8 •3 4.') t 3 2~ ~ _ ~ ~ ` vQ e.~ ~~c. l 3~~ y•~ r 29. ~3 I~ 1 ~,~.n„ ~ s ac. 'l 34~ ~ •Z t `3 2 . . . p;\FcrmsW uclcarGungeTatwpt • • . . NORTHWEST , e _ SOILS TESTING & INSPECTIQN . - . . NUCLEAR GAUGE TEST RESULTS Job Name: STI Job No. W.O. Field Report No. i -i Date: s-I 1,@ Tech: ys Page 3 of C4 . DS= 443 3.2;' MS= 55-f s . Test Location Ft. Below ~ Wet Moisture Dry Max. _ Percent Pass Retest No. SG. Density (Percent) Density Density Compaction or of DT Elevation (PCF) (PCF) Fail No. .zc.> t ~ S-4 r r3 4, f' q..~1 71 `-F•A 2 'L y' (Xz. t L ~ 2t . CA ~ . ~ O:\FormsWuclarGuagcTaLwpd r n . . 7n\ -~r. ~•-ss(J- -t+~i,, j , ~ ~ N • --4~ Z f*1 ~tf' p ~ I { . II I~- T - --41: L M I C7S IL.JJ I ~ ~ I ~ • ~ . • ~ ~ I ~1 I L 4b, 00 v ~ ta ~ , z1^ r-------: = lh L . . ~c i~; t , ~~f-- ~ ' , ~ ~ ~;~i ~ c~~ ~ u,,\~i ; . , ~ ~ I• 1 I I~,- I ~ ~ u , ` ~---~`,~1-- I I I ~ I t~ ~ I I ~ I ra ~ ~ 'C) ' ~ro 1000 _..r---------------- , ~ INLAND r MEADOWLAND 98339 PACIFIC FIELD REPORT # ~'7 ENGINEERING / 707 West 7th • Sulte 200 ~(509) 458-8840 P A G E µ OF y , DATE' ~ < < ~ Spa kane, W A 9 9 2 0 4 F A X; (509) 4 5 8- 6844 E ` Og d n ~ NOR1 HWESf - DAILY FIELD REPOR'Y' Date: Project NT~J, ~ Project No. Report No.: ~ eher g~ 33 Arnvaf'Time y~►~ Client Local Represe~ atfvelphone number ~ L, ~~c/ 4L ~~~.t General on~act~ ffie ep"resen~-ivel-phone number Subcorif"rii br ± STI Project Manag phone number Page No. ~ of ~ - ManpcPwer & Equipment Used - Comments: (WorkComplebed Apparmtly A-ria-ts .n perSpec~fications Probleins ar "ieir soludons) ~ Q ST S C ¢j ~2 s t z s~~ ~y t~ CYON'%- gjpr-l 'oa L.c-4 L6441(7 (9l ~ ~,T ~1 D~ ~ ./y~ ~ r. T S~s..~ ~ ~ ~ ~p h►~ ~ oln f~e,4 Ut l~~c. j1t_ wt, J ~,TC v► a I w u -c. ~ c, tv {b.T (ajc ~ ~ 2 h t~. G. -S • • z~l _ Pe r+ rk.ILan,~z.`4' y Ar 14 c, ~ ~ ~ t~-- J t,.~u c ~y~Y.~ JC 7~~ vr, ~ r~ ~ n.v w., o~x. , L S► ~Yr, ~ u. vl~._ J W.-I J-,c-oLk _ STI FIELD REPRESENTATIVE CONTRACTOR'S REPRESENTATIVE This document and referenced addenda are to be considered preliminary until reveiwed and signed bythe STI construc,tion engineer and/or STI project manager. A 5 ~ REVIEWED : DATE STI PROJECT MANaGER: DATE ■ o:Vormslstl Corresponding Deficiency Report No: ltletdrep.pm5 ' NO HWEST SOILS, TESTfNG & INS'PECT14N . 1M[th,. . . . NUCLEAR GAUGE TEST AESULTS Job Name: STI Job No. 'o, ?33 y W.O. Field Report No. t c~ Date: Tech: G~ Page a of 3 . DS= 36 MS= / 7 yJP3 - Test Location Ft Below Wet Moisture Dry Max. Percent Pass Retest No. SG.... Density (Percent) Density Density Compaction or of DT Elevation (PCF) (PCF) Fail No. ~ No& aL-*4 6 s~ t 1 7.-~- a pj odc a LO+ 1 ~ t 1.I.o s• 3 I ~y• ~t ~ 9~' ~ ~d~ 7•s~ c ~ ~ o.~ q a . _ ~ . 0.\F0rm5Wucle3rGuage7esLwpo 1 [ r ~ . Iti ~ ~ ~is+ $ C)r^ 1l. , ~ ~ ` I ~ ~ ~ ~ ~ v ~ 'r!1"'.~ { L______ - I I -47 NJ '1, ~ I I t j~ ~ • Ijrj I L_..I ~ G~ (~1 ~ 1-j ~ N ' 4 1' p CD (J~ 00 ~ O ~ t-3 u,+~~', ~ . cl) I ~ a ~ m rA r__.. .LT7---' ~ ; ~ ~ p}~h~.~ ~roo ~ t ' I 1 fri ( a i u I -r' ~ (,l. t I~{,J . ~t ~lil~UJa'~s ~ . 98339 ~ . ,No ~ r ApOWI.ANp , . , . ~ ~ ~ . . ~.qy -,0e~ lN~.a► REp pRT # tf aAM. PACIFIc F I ELD , ~ ~,N~G1~1EER1NG p~-p,GE ll 4F J , . . 458-6844 \ 707 West 7th • Sulte 200 ~(549) 4~" FAX (549) ~ Spokane, WA 99204 \ v ~GfN E . " • . , os, c°y~ NORTHWEST . " - • ~FAME~~ . DAILY FIELD REPORT - Project Name • Date: Project No. Report No.: q? ~3 ~ . .2 0 Arnvai i ime Gliertt ' Local Repr+esentative/ phone number o n. m u r sit eReprosentativ phone number "S'ubcontractcr ' STI Project Manager,41 one number vc.v Page No. ~ of ~ Manpawer & Equipment Used GOmr11Et1ts: Mfork Complebed APPamntlY -A1~Y vt , X p~ ~ C x rvv Y. ad P" Ppr~ Probleim ~ a. " `hei~r Solutions) ~ ~ t~.G.tL ~w me aLi /G Cj-,,PifJ~ ~4a,4-r,2 -424=Q t &1,64k d. 1.'of .S' A,-.;Q . OU16,-0-L" L1'S61 n^.11 #&c..- .C elA 3~D C- .11u~ - cf ,A/Z4 ~d PglUeif4 Al Lol `L/ d{-•tD P"I"i l''f~ 4Ai L574l K1L $t-f^ CLV"jumj ClzYn 0-, 6It~O,, 12x. Co..4VaJar -gt~ ~ 4 la/d, a Ld r ~ ~ I o 2 _ 4 r c~,, v~ ~ ~ t.• ~ ~/~L !1 I~ / GGC . ( Ar1C~1~T7L ~C,I ►~.eo~ T~l r~.. r',..~ C~1 nr ~u~, y_'7._ STi FIELD REPRESENTATIVE CONTRACTOR'S REPRESENTATNE This document and referenced addenda are to be considered preliminary until r+eveiwed and signed bythe STI construction engineer andlor STI project manager. .-LJ1 Qj- 7 REVIEWED B D TE STI PROJECT MANaGER: DATE 0:1to rtnslstlltieldre p.p m5 Corresponding Deficiency Report No: ~ . ' oo pi . . ~ - a . ~ NORg HWEST . _ ~ . . . SOILS, TEST/NG & INSPECTION DAILY FIELD REPORT . Date • - Inspectors Dalty Report No.: • lPE Project No. Page No. of ~ . Comments , (VY~ appwmN < D v ~iprooverTts Pet ~d' end their sokrtioRS) _ t. i c..l I c_t i~. ~P ✓ ~ _ ~o G ~ ,e ~ S„~ tA_ t-s6k -L t".,, ~ ~ . ~ ~-e cs Non-confonming ttems: ~ (Projeu «stardad spearcation th2t observed OOnstrucfion fs not " rn oomprarxo wah) IPE FIELD REP ~ IPE CE IPE PM CONTRACTOR'S REP ~ / . . i J ~ > ::I;o w Z m ~i:1~~ ~ ► ~ n ~ u ~~~NI ~ -aL Y~l I' I • ! " V~ ~ ' ~ L_..__- r wo~ I pt,9 I ~ ( ~ ~ ~ R.....r . ~ ~ji ~ VU 'I ow ~ -0► W N i . ' L____------ ~ t0 0D O . ` N 1 I w_- ^ w I w w w.r wn n+ ~ ~r-' ~ + yj, --(3U1S' Bgh9 I ( r D,F.. cr, r______~-- 1 I I ' `I ~ ;I j p~ ~ I ~ ~ f..a i~ ~ ~ ♦ ~ . - 5 ~ r. ~ . ~ ~ 98339 ~ NLAND ~MEADOWLAND PACIF►c FIELD REPORT # ENGINEERING oatE: 5•dl ~ 9 ~ ~509) 45e-ee40 7p7 West 7th ~ Suita 200 ~aX: (509) 458-6844J ~ Spokone, WA 99204 P A G E~ F~ NORTHWEST FIELD REPORT # . MATERIAL SAMPLING, & TEST REPORT NO, yo~ cr PROJECT rne(jbw)k J PROJECT #qf 33 ~ REPORT DATE FIELD DATA . ~ ' BATCH DATA ~ MATERIAL SAMPLED MIX NO. MATERIAL SUPPLIER C140 ry% TRUCK NO. 934 DATE SAMPLE TAKEN gc~ TICKET NO. ~ 1 a y 6` 7 TIME OF SAMPLING SACKS CEMENT/CU YD 5', 7 ~ WEATHER s . TYPE CEMENT -44-t v h AIR TEMPERATURE vj/ a BATCH TIME `7!00. SAMPLE TYPE END PLACEMENT TIME 95" J~o~.r STRUCTURE.TYPE St ~Q~ i,,,a IL ADMIXTURES -k- A SAMPLE LOCATiON Lp'} ~ MAX AGGREGATE SIZE ~ WATERADDEO(GAL) v TOTAL CUBIC YDS PLACED 'Z O..~- W/C RATIO ~f SAMPLE TAKEN FROM d YARDS INTO PLACEMENT DESIGN STRENGTH 3 D0D po S) . ~ FIELD TESTING DATA ~ TEST RESULTS SPECIFIED VALUES SLUMP (inches) _ , sf) ~ ww ) 4 • v1 ~ CONCRETE TEMPERATURE (F) b sd -0too • AIR CONTENT • q• 1 7b • WATER ADDED (gal) • . ~ v ~lej • ~ A-1 A,,iJ V WATER/CEMENT RATIO „ w .91 • 5 0 (r•,o~~ . ^ LABORATORY TESTING DATA . ~ - LAB ID FIELD ID DATE DATE AGE SIZE AREA ,TOTAL LOAD STRENGTH' TESTED. NO. NO. REC'D TESTED (OAYS) SQUARE IN (LBS) (PSI) BY 7 6v/a . . , . - . . . REV. 8/97 ' O:IFORMS\GEOTECH\MATERIAL RPT.DOC ' - - ~ • ~ ~ ' :w..... t'_ . . • ~ . , . , . ' _ . , , _ . f-•. . . T_'~-• _ t .j~.,{ ~ _ ~ - . . . . ~ ° . _ • i~~' . • _ ~ . , • i~ -MIX ~COId.~~~F: AUD17-~`-,, a . . , _ . . I r~~~~~ T _ ~ - . 4, +d'+)~s 's ~ ~w✓ , _ . . ~ . . , . . . . ~ - _ - . ~ - ' 1 ~ . ~ . _ . T~ . . . _ PO Box~ 3~66 Spokane;Wa.. 99220 PO Box 9575 _YaIC11Y1a~Wa.sasos~ ~ - DisPatch_ Direct (509) 533-0208 Dispatch Direct (509) 248-2046 - , j,~ • ~ ~ ~ ~ ~ . - - • ° ' : w - . . - - ' . 8us. Office'(509) 53a-6221r Sus.:Offce (509) 248-2041. . - • ` . ~ ~f~•n . ~t'~.kr> F ~ ; - ~ ' . ' _ _ . ; • _ ' . r~ ~ '2N' • ~t`.F~ ' . r. ' . 11919'Harris,Rd. Pas~+o,`Wa.99301 =.rt~`500 Seltice Wa~;-,Coeur.cCl-'Alene,ld.63814 ( ! ~ 4 t • `~f j ' 1 a~ft 5.~.~ P • ^ . • . y ^ "'a L, . ~ . . , spatch~Direct('09) fi69-2333 Y' F ic _ . _ 1 - fs~'^ ~ • ' ~7:~ ~ i .t~rr'j^' r. ' ~ • .B,us. Offic~e:~569) 545-8405 :,-Bus..,F~ffice (208)~664-2111* ~ ~ ' . , - • - . . . . , , ~ F3, ~ .f-.~ ; , ~ . • . . - - , . ~WATER~ADDED AT ~ ~ - _ = L. ~ • ~ • - . ~ - ~ _ . ~s - r` ~i - ~ ~ . , . , ~ ~ ~ _ ~CU91,MEItiSt OnN IS • ~ • _ . . ~ Y • Wamirig~IriJur~o s*io e~,y ~C`'a`uses~` skin'iRitation.Contains lPoi~l ~ et~nt. ; ; ~s`-~. ~ ~ , ; , . _ • AppiT~ '~~yVAT,ER. _MGED ,o TH~s, Rgath ~fdlloing`~warng;ti'e'fo~~~sing: Coactvi'rith~`~W`,~e~t.'~r~d'elied, - • -'w~ t~'~,¢-, _ •t ;colicRETEIvViu. RE~u" TRENQTH . . M, r . ~ncete~'~no"`rtar acc eB ~cement~,o cem xt~~es,~can cause'skin :Cfl@~~,',O(~S~,~1i01t~ COI1t~Ct. s , ~ Cnbil~"WC:et►lralPte=M a imf. ~/v bf 4loves'`"~`a,qn~sleeve sFiirtt~o ,~Q 9 ~and~ti ht~ate ~ .atecti~nRwtien with'ttiese~i~tena ~ . f u~h : ~ -•~K~:. ~ bai Pre -;to;,staridjtn~'vwe c~ ~m erpr °~~s;~that are~tigtit~ 't tti~#op~,and~,fi~f~~ Een~e~"~'an' y~`d at ~_b~ inch slump= ~ h~o~.~C crtie~e r flrnewng..ir~ito'them?~If'firin ooncrete ~w~~,,~ea~r• 11 .e->. ~m. a~. ~--9 ~ ..T~,°~,~~ - WN-F,l~ dto~?l~,,.+anf•these,~,matens hol~h'clear~ ~ n~rec,t co~1ttuo ~g~~~a;n~ ,~Qu~c'~a.'.~`1Adde~ii~A~'G d c7an cilofiii " 5~ek'ie. ~ ,~~,,.ri: :.-r•~.<.. ~ <a.. ty~ • ~ ica1~"att an f u~! „~persistent o_r'~sevefe dsc~,~nat'In~,ca.~,se'z~f~;, e ~geso aho~~eg~~~aaemaae{ r:4'- :>>Oftier'~' aY... a e~`~o_- . w r-:;~* - . , ~t ~ -2:or~t~ac ~flus t~r of wateat'l~asY~~S minufes.;Cvnsuft~p~a ~ .2o~~0iNe1y.wf, ~ r""'tor3~ ti' µ ~w---- ~ • 's~ , .ti-~..~.. f.d.d~.. ~ . ~7: ~r noZ: assume, t ns~bif ar. a ,t~ • r Q~ IfTiRI REACH CIi1LbREN! USER -A(iREES~TO;,~O~N THIS;~ ~,f _ :g!e-"rp~,t ~y--3, 'tl m sthe curb IEne. ~ ,.=~c~~k : 'v~~'' :g'~y; " t~., •°~'a~~ ~'~t~-;~ ~ ` wi~t~t~~C WHOMAYUSEO~tCOME1NTOCflN'TACTIIITHW~T(UN a nd HARDEME~, ~ sa~beXo . , CONCR sv9e irn~~ ~ ~ t .F' 'r. y = . . r~~~~' 'r:"Y~ S ~ y 3~.E' . ~E,sr, ' ~~MENT OFt CEMEHY?IV~IXTURES. . • ~ . . ~ . ~~-i?0_A~ ~ 1. L~11YE~?L•ANT,;~s ~68',:~1'fE START;DI$C'NARGE ,FlNISH~DI,SfC - HARGE ;~EAVE~JOB.SiTE~ ,F' -'~~~~•~r_~ - _ ~ . ~ - , : , r . ~ . ~~S k w~ ~~er'~`s*-,,gent receipt oi oitetete ~ i ~y ~ j~~ ~ a:.~ ~ ~ r -I'~ ar x) .F ~•~~;:.~~tc~~#,~f f - ~ • ` ~ai :1t .~xw ~~„^R. .fM~r_§• - ~ tYJ` .~~y . ' . . _ ' ` ? • ' ; • . . . • . ~ ~ i w MN~~ - r~a ~ .`V ~ , - . COMM -ENTS _ ~ . • . . , . • ' . , . ~ ` ' - ~ ~ , . • . . _ . ' • ~ , . . , . OfCIET NO: ..i V~',Cust. ~.No.. , CPM *or Custa~mer Job' . ~ Ctistamer OO / Phase.CQde' TICKET NO... _ Dri~~l . ~ C~PJiAa tojer:t'Nq: _ . . ' •4 { . , - . ' , ~ . , . ~ , . , " _ aA,, df~~'!~}/• .~;i,''1~~d~~F .W • • . r 'F-' :•``y_,. - _ . . , . . . ; _ . , - . , , . . . _ - 4~, . , . , . , . .~t?zil i•: r : 'F ~f~4t'K _ _ yZY~ E .b - Customer . . , " , • ~ - ' . _ ~ . Detivery °Add~ess ~ • • - _ : , . . . ra.-. ,7 f~- - ~ate, ~A~i~IV7-. ~I{:.~.. ~ , ~ . . • qf P - 'f;l.~'.,I~iitil. ; ~ . ~ p,: ~.r (I . . . _ S i R, . ; ~ dc. • ~ ' r,~.~.~?, _ ; • r1~` ; ~ Deliv~ry;'Instructions ~ Z .y g i . _ . , ~ ~i _ . - ' _ ' es~.. ~ ~ i _ _ ~.~r~~ 4 r Y...y s .f;:~ ~r-t ~ y6•7~=A`, .1r.e ' _ _ ' -'F~~~ t • _ y~~:"ti: •r• i rX'`-'L ' _ . " ' f.~ -~`a.. ..a.,:.~ NNM"^'. ...~ii~r... y~ ' ~•S"' l~ ~ R ~ a- ~ ~j~, ~ ~i ~t,~ ' c,~F=- r V~q~. ' ~"a~r..~'j~~°`•~..`.. f- ' , 3`. •..a='?'•~q , . . , r ~ ,A.'.~ ~j ~~''i:f'~+' ' .f.'~*'.rR'~~-~"y , , • _`t . . , . • ' "i~'J'~'`, ` ~ ~ i r _ • t,~~E~~~ '~.2'p •4or~tlAxn+-!'<'~''1.'•Iz.,:: . , , _ _ -~J _ ~ i f• ti~~.' =~r . s~• ~ ^ , } ~ . - - ,i.~F•.4i~.. tis,~'a`~:y~s~:: .-.:r • ' ~ ' a.i ' t 3.e.!G~ . .n[c , . . _ . . . _ •.s3 :j't:ead':QtY ~ 'DeliVefed`Qtv Otder'QEV Product Code •.`IJQM " Ptoduc~•Desc~iAtlorti3~'''" ~ • - - • • . Unit'PYice ~ ;:~~.:i~rtt0unt • f 0 e^0~.~ • ~y~;1 p (T,1(~~ ~ ,`~f•(„~ ~ 1 t~ 3 ~~.t ~ ;,1, .5 o 7.`~i.-~~+~~.s, R=j i~:;~;~h•~ ; _ _ . • • • . - , ~ . ~ t~; L,Q . . . . . ~ :.{9'~9`~+~~ ~ k~~ tt1.1t ~1~'C~~fY ~k- F~ - ~ : . r . ~ . , . ~ . ~ . ~ ~ , t_ , . ' . y . • ; .y . . ' . . t.~ . ' • ' , :gc.. - ' . ~ , ' ~ . . : . . ' ~'~-~~t~: . . - . , =,~:~i.' . ~Y'..~.~i~'r ` ''ei-~~~r, _ „kh~~ • 'f. ~~'.i . . ~ ` 4. • . ' ' . ' ~ • . ' . . , • . I • . ~ ~'j,'1 ~ . .f 1, . . . ~ ; • : 'a• . - % - ' ~ 9e• - . . • . . . ; ' Ij _ ' • . . ~ . At., . v~N~'y. _ , . f~ ~ . . r • , '.~r_ . ' / ~ . • . - . • , , J• _ . . ~ . ~ r . ° a f , ~ . ~ • ' \ . ~ • • ' • ' i• `•'-t~~,J ,~E'~~ ~ - • , - , ~ ~ . . ' .1 . - - . ? ' , • < ` " ' - _ " ' . ' ' r'~: • -y'r= , a~•~~ sn • ~ ' . . - ' I~ r4ye-'t:d~i'y ts~~~:-.~] ~ " ' . _ ' . _ ' - . _ • • ~ . ' ' 1'►a; Y ~ 6~''~.Cr ~d _ ~j ' • ~ . . . ' , ' ~ " . ' . r e , ' - • ' ~ - ' ~'_i~.~r~~~.`'r'_ { ~ • . , • ~ - . . . ' - . i i r` • . • ~ " ' •-~f~;,~ `~~7 J ~ f ` . . ' ' . . - . . . ' . . 4 ` ~ , . . ~Sg . ` • , ! , ~ . . ~ . ' . k!*-Ar . . . f , . . - - • - ~i ' ~'r, ~Y'• . . . _ . : . , ~ - , _.r . v. . - • ~ - - - - • t;,:: - . : • - _ ~ ti..~~:-: - - _ . . , ~ . : . : _ ~.K ,.~r~`r`:`:•: ::r:r>;.__ . { ,t. ~ : }:'q:.: i:.::.. ; . . , . ~ SI~'' Trudc ~CC .:~s~:~:..: x ~i ~ Sales ~T M ,~E. , E , - .•.-,-_-,.:.>{.r:~.......: ~ ~y, , C. . , - --:>-:::-_:-::~,.y' - ~~:~;=~~r;~~'' ' • •r.Y•t vc.-.:...:_ . i- L.._._ . . . . :.:._::X's:n:}}l i}ii" ~r r ~ j _ _ _ 'r.$'. ll....._...~:5:.".':---':i.-:':..ti.,{-... "i:??:•.~:••:-.::r.:::_ { . "<"':..r{{.?.{. . f :I _-!v:• • "T 1•: ' - • :r~. ,C~~.• ...:.r-. . : {ti::. i . ' r~~i:~ ...:~v~rn-. < . . . : l~Ji} " -~.J}~~ '"s.:':.:::=:`-:r': i ,f.' ~si ~~-:1- n , - . .ti . r: . 1 ~ ~ ~ . . ~ Fv,.... ......~.~5. . . ~ 'n_ - . ~ ,'L;~.i _'::.~;.-,-?i- - ::'ri:•}Y•;...."' ~r ~ , . 4.. r~L~~ r - ,,s 7""'•~ ~ ''rl'3'-~.: - sl _f.^' _ ~ ' ~ • :>~i:::':: "F .:-'ti .•»;.~%~.r+~.. ~ }~}{r~_::.''.":'~ C5: ' ~ y ' " , - _ .,f - ~ ~ /1~<u.:. r - - $~l~~ n. .t:;~ TOTAL=DUE ;~r- _ ) - ~.~i~l~ ~ a~ ~ .t:~•. - a> : t:~,. _ = - . - .4 G ~~t~,C ~:~;.~;~~~t~~ ~f:,=:~~~ tt :~=?~...~e~~. ~~~~~C :~~~c:~,~•~''::a~=~i~~~~:....~~»~:::!~'~~= . , .a••:s_ O- ;~r;`r•' .',i ~ _ C~r:.t. tr.r~;:: - i~M~;. . ::r,?. - 'J .i:r• i _ _ I _ C ..}~,'vj>~. ;?t!~~~J~i: rF ; .r, r i . f `E_ .YS`ii.• . ,t ~ < , •~'lai~~ _ i4;~: ri•~,.'„ ' - .X' '''-w`~t•T'..t'i~ .J:''.:-_:_:'.> .}~.r~; ,!~'~y _ '.~~.•:i'.;'t:-•'Y.::%"'3 Y - - ~•F~ ~ ~ r ' -~~T~: rt.p~• . - . . _ _ ~;.1,! `y "s'J"t :~~i;~':w;Y 'Y1 : f 7 . _ ~ 7 . ' . . ~ ~ Zj ..~e. ,M .~r*,~E!^~, ~ ~A"~:L~N'~ r~ ~ , . . ~.:k~ x" I . i~tS a~L~A',1 .~;~=f •l~:~= ~1 ~ l~Ht:rE"T ~1Q~"Ir~Al. :~TA~TI_~t Mj:jRs. I~ - - ~ -TAR~.~'T : l~ 1 ' • . 1 Jn. ~~p~A ~ Kp~p»~ ~ MO. A1~F1V•' 'J,•:'TC) lIV ~1 ,-,=,_.~,y Vp~ ~.0 0 • T.}~,~ -~~,,y~. 1 , ~ , /~~I~ y ^~-r - s~! j i ~ ~ R'i r"1 (y ~ •_.''J` ~ X .'-•~"IiL~~w:_.• - ~•.,'~iv~~.~_ , ~.~~.~'tit„~`,/ . .lIV Jt+..11, " ti. A~:;t./i ~1_~d~t ~ 6 . ~ > J ~$N.~T F=!~~.' ~ , . : . ' ' - ; ~ ' - : : 1 ~y;•"'~,! .~Nj. N T~~. ~ ~ p~~~~a , .2 i- ~ i y ) .~1f '`'1'~~f'l A. JG~ I R~~ ~~~~t:., ,.Z~~. i~Ar~F _ 7ERc~ `fAl~}~~ ~l--.Ft~:~~ _ TAf~t° _ . , c~ i • S4 t~. 1. .l~ ~~4i:~c:~ ' ~ =T`~~~I. WATt~ R ' * I , i ~-~07 P ~ ~ . ~ . ~ ~ • • ~ ~ ~ - H R WA'i'wR - 1 - 1 198.4 I:.A. ',Eu TARE -f -ARF ~ 1 EKC1 F 1~AT~ R 1 -t ➢ 4 t=dt~ -A f' `:.1~::i 1:~'~; r 'CF I raAt . ~ - ~:.i~i~'i I i~1F ' h~c a~ r~~ ~ ' ~ft,~,:- .d ~ENE , ° o`►_,~c~,~ ~lCOy~ sT NoR-rHwEST DAILY FIELD REPORT - - Project Name , Date: . Project No. Report No.: 9VEa-umr Arnvai i ime C~ "eo Cl~~ • , ` Local Representativ~phone number % , ~eneral ontractor i e eprese one number ~ ~p Subcontractor STI Projiiif Manager/ pho e number ~ n _1... i`'Ar-.K Page No. of Manpawer & Equipment Used . v I . .i ~ i-O ~I~ s< TY/~ C✓~ ! t ~ G!-~,Atrs • . J COmmertts: (WorkCanPlebedAPParentlY -i v,r~~ ~~i_~ c, TcJ. c.:_f' r.•, Gc.~ c: 1h I~ perSpecificatioru Problems ' atv'•heirSottrtions) <JJL • oi2 /A N f /1 t t Z /D c•~ t .v /1 ~ ✓L < ,f/. ~ /1 sf l ~ i f 4C' %.O/C!! 1 rj sf l<`'x ~ / z1~ .A q 4 1Z' S4 ~ ~ STI FIELD REPRESENTATIVE CONTRACTOR'S REPRESENTATIVE This document and referenced addenda are to be considered preliminary untl reveiwed and signed bythe STt construction engineer andlor STI project manager. ~ .~c~ • ~ 7, 7 - ~ - REVIEWED B: DATE STI PROJECT MANAGER: DATE w Corresponding DeficiencyReport No: 0:lformslstilfie1drep.pm5 oy ~ 0 . N~RTHWEsT _ 1wirs . SOILS, TEST/NG & 1NSPECTION DAILY FIELD REPORT Date nspecto s Datly Report o.: 5-a4 -gy a/ IPE Project No. - Page No. a of _ ~lrr ~ S' . comments ~~loWd apparer* i -~e Lt> r = w SpKrcatims.~ eM a,eir soMim,a, 2~~- 4..~s ! ~ ya . t_s ~.,cr c_ ~c..1c ar~ ~ Ztl St , t at~~c C~ ~C ~ c 2 . . . M Non-confonning [tems: • ("eet cr atand3rd spedfication . M observed oonsUudion is nOt in oanpfianoe wlth) • . . - _ ~ ~ ■ • Tr' IPE FIELD REP IPE CE IPE PM CONTRACTOR'S REP ` ' . . NORTHWEST «,v~o . ~ SOILS, TESTING & INSPECTIQN . . NUCLEAR GAUGE TEST RESULTS Job Name: 5TI Job No. W.O. . . • ~.n ~'r . rv A n Field Report No. Date: Tech: Page 3 of S~ . DS= 36`i,j d Test Location Ft. Below Wet Moisture Dry Max. Percent Pass Retest No. . SG..: Density (Percent) Density Density Compaction or of DT Elevation (PCF) (PCF) Fail No. I j,2~s`r l~r~ns Pt ~csph~ rr . sTA 7+ i o a.r Yc 1~;-y a q3 I~ . d ST,q 9-4 a 9c2 1 i P.r~ S7 y ST.A q 4 6a - 17 y Gle-hh Rcf 3 ~yA 19410 . .r1 2 <,TA 1-7 ♦9-o 7 srA 16 +"7o ,s . 45 5 Trd 1~~ 7 ~ 3 9 sTA /yf~a 9 y i. 10 S7,,4 / 3 *6a - - . a - sr.4 ia4s~ b qa . t, ~ Z Sr.~ f !o . g3 n 13 s iA 1a43o / c~l~~~~~ sr3 y La~r sra t ct 41n 901 . h /f 9a J s $rA tF+a-o SrA 17 „ 1 7 6.TQ j 4 +ed I 93 , „ i ~c/ 4-7 D q3 ' S s-rA /346 d ~ . w 9 a 0:V0c~WudcarGusgeTat.wpo 7' ! "r C 1 ~1 j1Q~ FCTiQ~T p . n ~ . S L5, T~`ST~~ . saI , . - . ~r.E~' . , ~r►- . 13 GE . ~EA~ ~A ~ ~ w~4• ~ . WO' jOb Np r q(i 3 3 J . ,-r ech • pl~ . ~ • t ' . ~ • - 1"'~ 41 / . q • , . - ~ pate. z~ = 'd r h • ~ Rete.st ,U of DT . gep art ComPaO~On Fail No. ~`e~d r Ivl.oisture ~rY DensitY ~ . - - of Wet ntl DenSity 1 , e~ow (perc.e t ~CF~, ~ ` . ►ae ~ Densl . Lacafl°n gG', a T~ Elev~_'~~O~~ , (pGF~ 1~4• - s ,l+c.' r 5 . ~ s ar, ~ ~ to ~ r `l- sA c L1 ~t+ ~ ~ q3 a~ ~ ; ~ ~ . . i ~ ~ a~- yi ~ . 1 a L 1' ~ + o T~4_,~ ~ ~ ~ . ~ • ~ 5 vc ~ 'p~i / , A t ` r'3~ r• ~ ~ ~ - , _ - ~ - ~ - ► _ ~ • ~ ~ ~ . ~ . ► ''r ~ • . ~ ~ Z rn (A L ~ ~ ~ ~ \ 1' ~ I ~r • ~ ~ 4A 1 CP 1 L ~►~17 rra~~~r~.r~ I j i.~ lu j ~ir,; ~ • . (A N ' I L__-_------ ` i ~,~..~..~.w~ ! ~..ry~' • ~ " I ` N ~ ~.r..+ +1." •~•~~--^'r"~-~-~'"'..r~..~ I ~ { { I o w i 1; I I t,n I cn,`/ i 4 W ~ ~ • I4, i- ' I • W I ~ I ~ ~ i'~ ~ ` ~ ♦ i 1~ ~ ~ x.,_ ~ .;.T~ i , '4,,i u ~ l 1 t ~ ~r' ~r ~ i f i i^ i I ~ $ r...~ "!r7, . ' u- ~ 4~s~.~ ~ . 98339 ~ . ~ / p pWLAN D INLANp M E A ~ pA.cIfLC FIELD REPORT #oATE: 5;~6 Gy . ENGINEERiNG P AGE 5-" OF ~ . . 6840 707 west 7tn • suite 200 FAX:, (509) 458-6844J \ Spokana, WA 99204 h . . y ~ . . NoR-r HWE s-r M~,~ : . DAILY FIELD REPORT - - Project Name Date: . ~.~A►~~ ~-~'N,D 572 4 Project No. Report No.: . ' WVeather Arnvai i ime - ~LEn►2 - S A client Local Representativel' phone number ' A p w-~_.l~ s R 6eneral tontractor e epresent7a--fivel~p one number t\ttw O'k-r- s ,.,v .-J Subcontractor •ST roject Managed phone number ~ Page No. of Manpawer & Equipment Used ' Commerrts: , (WfaiccanoeteaAnmentiY IF 1h. &j2-1 vAn-0~~.., S~ ~~-~►'k~' A. perspecificatiwss Prowems ~ atx, *heirSo[utiotts) ~r~Q i'~~-~►~~C'. ~ ~ 11v ~TYL,1 ~ , ~ ~ - ,~L.~-~a ''1'D . STI FIELD REPRESENTATIVE CONTRACTOR'S REPRESENTATNE This document and referenced addenda are to be considered preliminary unt~~ reveiwed and signed bythe STI construction engineer and/or STI project manager. REVIEWED IfY-. DATE STI PROJECT MANQGER: DATE ~ Corresponding Deficiency Report No: o:lformslstilfieldrep.pms . ~ • - r a - , . NORTHWEST • ofA,,,,~~ : ~ DAILY FIELD REPORT - - Pro)ect Name Date: ' " . Mv-9 7 7..7-99 Project No. Report No.: Arnvai i ime r n _ ar~ ~l Jv F. t)0 a Cr~ent Local Representativel phone number ~ eneta`I Co ~trtract r QL . ~ e eprese nr p tone number b- Subcontractor ` • ~~L STI Pr~i ect M dna f~. phon number Page No. ~ of ~ 3 Manpawer & Equipment Used ~ r CVmmen« f (WorkComPlebed APParentlY rl _ ~ G~.~ ~UC~ a,,~.~ ~J ~~l~ S~ re~~ /~1.•~ perSpeciC~catiass Problems arw"hdrSotutions) ~ L, ~s LLW ,~'F ~c a cJCO w ~Q ~ t,Y A-i a~.r,~ ,~,,f ~ ~r•: -v, cc~ j2nLy ~ eg, V t." ~ . . ~_,111? LLLf G~~ ~ STI FIELD REPRESEM'ATIVE CONTRACTOR'S REPRESENTATtVE This document and referenced addenda are to be considered preliminary until revekwed and signed bythe STI cons),truction engineer and/or STI project manager. R VIEWE4B.- DATE STI PROJECT MAN~IGER: DATE 0:1formslstilfie1drep.pm S Corresponding Deficiency Report Na. lw pe~nT~`r `y ~ o . • • ' ~ ~ . ` ■ f WEST ~ • 4.a , ~1~` .^a . - • : ~ SO1LS, TESTING & INSPFCTION ~ DAII.Y FIELD REPORT . te inspeaors oairy I;WPort ao.: - ~ ~ *7-'7.- r4 4 ;Z-~k . . IPE Project No. Page No. ~ of 3 - ~ ~r 3 39 commeMs ~ cwO* ewpkfta appamfy► G icXP. G . l I ~ .S Ata<- 0 Av I Iz . 4 erld Iheir soAtti0flS) • .t U11S i k~5 40rpC-r11<, . Y t>L t ~X ~y ~C.. : I~"/ U~ ~ t,vG.~",~.r ~Y C. S c~ P_ 1,cn ~~J ci ti-.~. ~ I►. Non-contoRntng items: ' (Proiecx or staneard apeaficeaion • , t►a1 abserved oonstnxtjon ls not " in oompGawe vrith) . , ~ ■■d~:11 ' , ~ IPE FIELD REP IPE CE IPE PM rn~+TA^~Tnp'e Q~o _ 1 i~ ~ . . , ~ ~ ~ ~ ~ ~ ~.~,~-ur-'--~~1 ~ ~ ~ ~ ~ - ~c l ~ ' _J O ~1.~~ I ~ i~ ~ n ~ ~ z m ~ I ~ - fi ~i i 8~ ~ N Q r,.~ ~ ~~~f ~ ~ I ~ ~ I~~~P , W) 4 ~ ro~ ~ f , ' a. ~ ~ ! i~ ~ ~ r`,~ " i • I _ ~ i ~ u ~ ~ ~ ~ _ - - -r = - i I u I ~~~r ~ ~ ~ . ' ~ ~ t ~ . ~ L------_-~,~.~ 'i _ ~ c7x -~L ,F- J~ I ~ . .1 ~ v), ~ ~ '1. ~ I ~ t,► C ~ L~~ ~ Lz.~ ~`1J 1 N I ~ , ~ t~ ~ , o . ~ w ~ , ~ ~ ~ , 1 ; J o L_.» - ~ ' ~ . 4 N r ? t ;,q , ~ - i " i , i ~ + ~ ~ + ...rrr~ r►~~-- _ ~ 3,. .,..C~k~.~5' / i • ~ ~ N ~"_-~~-1-~ 'i ! . ~ i I ~ ~ "~g i i ~ i I i__-_______~ i~ p~ i i i~_ ► ' ~ O ~~°i j 1 N 1 C» ~ cr, ~ i w I ~ I W ~ ~ ~ 1`+~ ~ j ~ ' 1 i ~ , ~ m ~ j I ~ ~ ~ ~~'r~ ' ~ ~ II~~~~ _ ~ ~ / i T • ~ 1 T"' .L.r~ ~ ~ ~ i ~c.4~,~ I ~ ~ j ~ o \ ' se I ~ '~~~,I ~ + N I 1 = o ~ j ~ , 1 r~ I ~ I 4 I ~ ~ ~ ` I ~ ~ a~x ~ G~ i ~ I ~ I t'-" ~ , I I `j ~ ~i ~ ~ ~ ~ ~ ~ ~ ' ~ ~ ti ~ f ►r ~ ~ N ~ I ~ a ( /~N ~ fr ~ t'- I~ 1 ~ ~ Ir~ ^ - , , ~ I y I. a..,.,~y---."'~""" ' I GL / , t ~ ~ ~(vs~ ihj o~ s5 1 ~ ~ g \ . 9833 ~ ~ OWLAND ~ NLAN~ MEAD ~ ~ REPORT # . PACIFiC FIELD oA~: ~ EN~iNEERING P.AGE ~ ~F 3 . . 707 West 7th • S Q~ 200 •~~0~) 509 4 8 68441 . . WA 992 ~A~' ( } ~ $pokone, _ ~ ' . ~ - . ' . - ~ y • W-5-10• ' • - , . , • ' ~ . ~ , ~ . . ~ . . . ~I~L~1~ ~ - oate; . ~ . , . , . H°" e . oFFs; T~ - ;t ~~'~'e ~,aE,~ L~~ ~ ,~---~'1 rm Z • . ~ , ;Gt 140. ~t • , ~y~'~ o~en~ . p , ' p ~ s_Y., Su. rJ 80 , 00 'a "~ge~ sc~p~~ . . 0" • ' Of ~ • g~`► ' I° , w p. ~ ~ ~ • C ~~-~--j~ ! - , r . ~ ' • . , ► ~1p10IW'e''~ Z ~p. K r.-..~ . r ' ~ !s~' ~ ' ' • ,s,-~„t ~c~ . G ~ . .d ~de t ~ rco~, ) , 00 . C'+~'~'-T pt~ob~ ~ • r ~ ' ~ , a`"~„~ ` ~ . . 'd~ ~ . ~ ~e~ • ~ ' , ~S P 'r""~ ) OLY01 , ~ ~ . 'e ' ,Gop- f.~,, - r c+.~' c„ vv a ~ ~ . . . r . ~ ~ 9► Z;;~~, ,..aL~ - ~se"O~''~ ~ , . „ . ~ tiles , . _ ~ ~ . . ~ ~~r,,r,~ted'~► . . : '"~O~ . ~S~'A~ Pr~tn~►~Y . ered , S%F.~ ~ ta be '°°j%s; d . ~ ~ . . ` xrced addeadr~ I polert m~nA~t .t-r~„~~' p~►"~"'E doc~,erta~n tneer aOor 5 Ntp►~AGER: ~ structton'~n~ ~ ~~1~ / ' ST~►'R ~'EG'~ con 9 1 S . Omo,cn+ ~ . ~ R~~ Y+ ~ . ' yReportt. . Ga~~ , ' • , , ~r . • . ~ ~ • . [AORT . G~ & !NSpEC TBST . . ~ ~ . T~;~T 1 . . - . ,GA,.TJG~ . ~ . I • . Nu- q8~3 ~ hIO, ~aTj job 140. . . . DleT3 Tec ~ ~ . . , . ~ -7e. L~ ~ ~Aat • 9 1. ~ ~ pAest . . . ort 1io• °z" ~ ~ p~ 3 5$ d , p~t Pass of DT. ~.ld ~p - . . ~ . or . ~ ~ Dy ~ C;~~°~ g~ l~ta• _ ~ of M O~- ~ . . ~ D►~ns~ty, . . . ~ F~~ p~as~Y ~ ~ CPm ZQ • cl I ~ • ~ z4A q~f G..; • Ss~- / ~ ~ ~ ~ , Z ~ ~ ~ ' . . 1~ ~ . . ' , • ~ ~ ♦ J . ~ - ~ . ~ . ~ ' i . , • i . ~ . . . . • , . ~ . • 1 ' ~ j ~ _ ' . • ~ . + ' ~ ' ' ~ , ' • ' ' • ~ , • ~ + y ~ • ' . . i ~ . . ' ~ . . • ~ • ~ • • ~ • • ~ . ~ ~ • J . • ~ ~ • • + t • ~ ' . ~ ~ , • • • J ' ~ • • ~ ` 1 • , . • - . . • ' ~ ` ~ . 1 ~ . ~ y r 1. ~ . . ~ ~ . . i . ' • ' • ~ • ~ . ~ . . . " . , _ ' ~~~,geta+ on • . . ~ ~ - . . ~ ~ r . i r~' . go Stp0E t I . SEE , ~ j. . ~i . / `1~ ; / .1 ~ ! 1 t~ ~ ` ° t►~~' ~r ~ ,E ♦ • ' ~ ~ ~ I , _ ~J ~ r'~' ~ `•.1 !(1 1 ~ 4 lo ~ ~ r ..r ~ ; ~ ~ ~ ~ .~'''C Z W " o , I rYK D0~ v Y m . XtS~NGp - \JE E gE gEMO Sb ,~ERS ei i r B jF60D OP SEE ET ~ . E ~~nt4G *E f - cMMUNI~ . ~ ; ; ' ' ; , : ~ I PRa'TEC¶QN *tEA J ~ o ~ 1 51DEwAL~ ; S►, ~ ` ~.1 EpS~ t3fiun . _ _ ~ ` t 1 ♦ -'r 'A ' ' ~ ~ ~ . ~ i' ~>T . , . r;;,~„r ~ ;i A ` tQ1/E ~ a,,,,, L d . ~ , ✓ ~ ~r I , ' ~ ~ ~ , ~,h~ + „r~'.. , _ r./~' .q$'339 _ _ . ~ _ _ ~r rJ~ A r Af ~ ~ _ s ~ /1 I . ' / ~y 'RD , /r ~ N ~ND . p. ~ _ r TAE~O, . p~R; . r-if-ID sl al 1) A. T , q/, . . . 3 . ~~~Gf- o'F 3 STAF "°p; 534-9#711 . , . .1 . ' ~Y~• Z ~ • ' CONIRACTOR 1NSPEC~'OR s0 • ' fa) r ~ 0 COMPANI~ i • NOR1H DATE INSTALLED " 0 ARROW ~ a x S1U9: OIA TYPE D . LENGTH3 . 1JU,4*' ~ OIREC?lON dc OISTANCE . • F'tOM NEAREST MANHOLE . Sa~. . ~ . ~K \1° NVERT EL. ZP-O S8, 3~i ~DEPTH FROM NATURAL ~ 4° • . 2 CROUND TO STUB °tIq ~ LOCAL B.M. ELEV., Z O~ 9. 36 rri N DESCRfPT10N OF -LOCAL B.M. nm \ . O ;u - - - - - - - - - - - - • _~CG~ '~rr r',~~+Tf~~'' p n N (~`~BM ! 1 , om-f °m ju nc D D ~ Zo ~ Z Z NOTE; WHERE POSSIBLE MAKE 11ES TO TOPO SHOWN ON PLANS REMARKS ~Z O -4 ~ -4 X y ~ PROJECT NAME: ~Oz rn REF. DRAWING N0. c c F1LE NUMBER: 70 76 ~ r i ~ c PARCEL: g o C . ~ STREET: ADDRESS: N ~ c . L . , t. , i . . ' • z p . . • .t~`, CONTRACTOR.,. 't T Qf..~ o . ~ ~ INSPECTOR 1--5sA55 op • COMPANY 57,T NOR OATE INSTALt.ED 1 S-9 9 , . 0 AP 000, ~ ,r v S1U8: DIA TYPE . >lc- LENcTI-i - u . ~ _ U-4* , DIRECTION & OISTANCE . ~ . . FROM NEAREST MANHOLE ' INVERT EL .Z066, 7q . ! DEPTH FROM NATURAL GROUND TO S?UB Zt q !o b o p~~ LOCAI B.M. ELEV. zo~ Y ~ mLo OESCRiPT10N OF LOCAL B.M. O ;a ~5; ~ • Ma Q Z m 'v D Op. D ~ Z~o° . ;o Z Z NOTE: WHERE POSStBLE MAKE TIES TO TOPO SHOWN ON PLANS REMARKS 0C-)n m . . , ~Z~ ~ . . -4 D 5 PROJECT NAME: ~ ~ ~z rn REF. DRAWING N0. c c FILE NUMBER: 4 7076 o z PARCEL 80 C~ STREET: ;o ~ Q N ADORESS: rn , . . . „ . ~~pGENEqq~cyi1 . y p~ NORTHWEST . f• OFAMEF~,~', a• . lwr,t ~ DAILY FIELD REPORT Project Name Date: . Mf- av 7..7 - y y Project No. Report No.: . ~ ~ 3 J~rnvai i ime ~ 1 /a'r~ Client Local Represerrtative/ phone number tieneral ontract S'ife-Representativef M•ne numiber ,-4n -x, Subcorrtractor = STI Pro ect Mi na er/ phon number ~ ~ Page No. f of Manpawer & Equipment Used G1"-rw~YIOI , Comments: , (wortc compleeed Apparentiy • e- 4v perSpeciifications Problems - and their Sotutiotts) n~ J a p- 1=1 v ~ L4 c ~F.► T~'. r ~ . t~►.~ ~ v. . ~ ~1 ~ ~ ~ G' ~ xCO, Y tn,.as eav e, l'h ~ L ~ R u 1 STl FiELD REPRESENTATIVE - CONTRACTOR'S REPRESENTATiVE This document and referenced addenda are to be considered preliminary until reveiwed and signed bythe STI conVruction engineer and/or STI project manager. qg R VIEWED B: DATE STI PROJECT MQNQGER: DATE sponding Deficienry Report No: 0:1fo rmskstilfieldrep.pm S Co e . . . l~v - ~i► • ~ NORTHWEST • ~ , • . • • ~ - ~ SO/LS, TFST/NG & INSPECTiON DAILY FIELD REPORT . Dats - nspecLors Daily Report No.: --7-"7_- ~ q ~ a y ~ . . _ 1PE Project No. ~ Page No. ~ af 3 . Fr Comments cw«k cmaeted %Varerdti sa,LS sa,. s C-a.-t_ z2, J <~~r 44,11 s s LIS . . ~ qmdficdiarA pvbiomS = ww ,l* sokdioos> . ~ -G ~ S i ~ QYi~LL.~ S r~ - ✓l3L 00 RLJ 4/J'ril PY lCS,5vr P_ UnA. ~,g~~ v 1-k •t r.--~ ~ - - Non-conforming ttems: " (Proled or a:aneard ape«"Frcation ~ . Ihat oDsetwd ootrUrtxlion is twt ' in compfwnce wiifi) . ~ c ~ . ~ ~ ry iPE FIELD REP 1PE CE IPE PM ~nNTpn~Tnp~C R~FP \ \ N 7 w ° ~ . ~ s ] ~ ~ ~ $ ~ ~ 1~t 1'~I ~ ~r^1 ..~1 f ~ 'L_ I u _ ,4~~~..._ L .4JI „ I ..C' t O ~ N to MA$ / N N j, I ' • / t I / ~ J.-~--`' ' ' i ' ~ ` ~ w • ~ ~i ~ ~ o ~ • ~ x~,~°d ~ ~ I ` :lr I 14 N i~ \ r , ~ I (CJ \ . 98339 ~ /NA'EApOWLAND 1NLANp EPORT # a~ PACiFIc, F l ELD R . ENGINEERING p p,GE 3 OF 3 ~ Sulta 200 (5139) 458-8840 707 West 7th 99204 FA%; (509) 458-684 ~ ~ Spokones WA . • ~ " ' . /cY" 6~~c~'yr NORTHWEST' ~ . . ~ . DAILY FIELD REPORT - Project Name Date: . . `1 - Project No. Report No.. . ' 9833 . ■ ~ Arrnrai iime ioFFS►TE~' - -5~.~.►a 80° lO:oS Z = 1~ . Client Loca! Representativel phone number teneraitonha to site RepreseHlihvefphone number . %'~?l" C rcST ~ 17o h 1'Y► a,so -k . Subcoiftactor STl Pijoject Managetl ptione number L~~'uce ~ow.~r?~ . Page No. ~ of . . 3- . , . - Manpower & Equipment Used ' KQ 7;,14 saTS u C01'111'1'1e1'tts: ' (**kconv1e4edAPParoft `L' ,~Ls~C~Ti Z ~io~~e ~e..~~~ /oUSTs9~lQ~'~'ew►t ~i'~o~;~+b+1s Te . per -OnsProblC''111i A1fd tf1*:iOkMO1tS) x j,ST./K r~ ,'c -~f- ~T' r I, t K~',~' t.t-c ,~,'f-. ,?'~T ~►~e'ST l/'JST/4~/ ~Toe V _ 3 Z • . . - c~ ; -H., cr 1 c ~ I T cx,4r ..w fc- ca ✓'a►k--4 aOeJ L 6fi / Altl. e f e v,,+# o►~ ~d ,r Zrcor~ , ~ . Kw~~►c .c~.0 7r,0±L S-,rvives cr ~Oea'f'lcKS. 77'~T crc.rT /S • ~4c►cF.- . • ~ /hl Z ! ~ ~S • „~J ~,Io~ ~ s • ~ c.~.~ rV dT ~o~ c~.~? a't 7'~i.r Ti r~ F • ~os•~ 4c6c ~ r 9z~js 1Zr~; rrd, TL s wo v i,c-- !s 4v hd 2 s~ vv lces at, Ni evee 1M4-o 7~4e vli I t ea.seo, et-t f. . . . ®r,~C~ Z c~ 1 •STI FIELD REPRESENT'ATiVE CONTRACTOR'S REPRESENTATIVE . . . This document. and referenced addenda ar+e to be considered preliminary untl reveiwed and signed bythe STI construction engineer and/or STI project manager. / . l r • ~ l ~~\r ' ~v ~ • ♦ 1 ~ , -r~ , REVIEWE . Y: DATE STI PR JECT MANAGER: DATE C~._ _ rsponding Deficiency Report No: ~ o:ltornnsXstilfieldrep.pmS ~ • - ' ~ - . ■ VAW ~ . I`10R pECTj'~ ~ . ING & INs . . T~~ST . . . . 5OILS, - . - . : irl r . 1~►- - G~ - ,Q. . _ , . CLE~ 9A- ~ - . . • , - 30i 83-~~--- ~ Zm . . ' ~ u- T1► 1 -7-7-14 ' TasS 0r ofvT- • y !UO• V ~ . . ~ F~~oD ' id gev°r~t . Dry ~ G0"mpa`r.t~ F~l " ; of 3 r r vJet ~g~e ~ . F~, Beta ~y Cp CP ~ q 3 Loc',atiofl SG.. r Zg • . ~e~ . . om ~ ~ Elevat~on . 140 -7 . . . - - . . _ . . . ~ : . . ~ ~ ~ . _ . - . . i r . r_~ . ~ . " ` j . • . ~ . r • • . ~ ' • ~ • ^ ~ ~ ~ . ' ' . . ~t 1~ - . SEE SH EET 3 ~ ~ ~ \ I KO SCAI.E 13 , i b , e` ~ ~ ► ~ t ~nnr-I i"~ I A '~`ink I fc'~•~ ~`i ~ ~ 4 wo IVIVULL. I~~I\7f11 IVIVI ';~~1~ • , ..)T/ v ' I W ~ ~ ~ ~ ~ ~ ~ . : ~ ► ~ ~ ~ .M A~0 WLA N D ~t ~ ; ~ ; r , z oW , v m ' ~ ~ ; ~~,;~t ' ' , ~ o W ° - - - - EXISTING a , ~ COMMUNITY WELL EXISTING,,sHED r TO BE REMOVED WELL PRO?ECTION ' E;' ~ 16 q sy BY .a1'NERS AREA I ~ POND A 1 ~ ,,J SEE DETAIL 6 ~0~ ilJ , ~ ; / ~,1 i ~ ~s. sioEwALk qNo ; 4 ~ utILirr EASERtr ~ / z1 < ~ J I --()r • ; 2 _46: . ~ . ; ~ 83 - ~ ~ ~ r •r , 471. o- , ~ . . . _ _ ~ 14 . . 15 12 13 16 Noo*zz'ss0E ' PIERCE~ROAD _ ~ ~ . , , MEADOWLAND - PIERCE RD. 98339 FIELD REpORT # ZS . NORTHWEST DATE: ~III Sl9' 534=9711 PAGE 3 +QF 3 z . CONTRACTOR o INSP ECTOR Ai °p -1 rTl r ~ ~ COMPANY NORTN OATE INSTALLED ARROW o M1~ , STUB: DIA 1YPE LENGTH'- 3 Z ~99o~rc~ . ~ OIRECTION dc DISTANCE . ~ FROM NEAREST MANHOLE . • , . NVERT El. )DEPTH FROM NATURAL GROUND TO STUB ~ o~Q ~ LOCAL B.M. ELEV. rn ~ \ DESCRIP110N OF IOCAL B.M. O .ZmJ p ny (~,BM E2C~ lA /,~Te' O D v D no , I8 D ::E Zv~ 1;0 N~ m, NOTE; WHERE POSSIBLE MAKE TiES TO TOPO SHOWN ON PLANS REMARKS ; = Z O -i ~-+D ~ PROJECT NAME: z R~ m REF. DRAWING N0. el 116 , c c FILE NUMBER: ~'7a ~6 , . m z ~0~ i PARCEL. . , g o C , 8 STREET: , I N ~ r ADORESS; • , > CONTRaCTOR .2?r r-cs.~? G . • . . D ~ N , INSPECTOR ~ 'oO r' m ~ CQMPANY oxt C;8~ NOR DA1E INgTALLED ~ qF~3p . . v w~<< ~~G . STUB; DIR TYPE D > LENG'~ DIREC110N dt DISTANCE FROM NEAREST MANHOLE INVERr EL ..,Z o (p'o , 79 l OEP1H FROM NATURAI~ GROUND TO STUB o p Q~~ ~ ~~~„~blc LOCAI. B.M. ELEV, zoG 9.,.~ m~ ~ DESCRIP110N OF LOCAL B.M. 070 3~ rulr~r o r ~ ~ < - - ^ mV v ~ m ~ n°D i9 D :E Zv ' X Z Z, N4TE: WHERE POSSIBLE MAKE 11ES TO TOPO SMOWN ON PLANS REMARKS m m~Nn . .gZ O D ~ PROJECT NAME: m REF. ORAWING N0. -qA; . . ~ c o . q 70 7G~ m ~ FILE NUMBER. ~T" 16 Z ,C n ~ PARCEL: . g o C y~ STREET; , N p aopRESS: , ~ . OFFICE OF THE COUNTY ENGINEElt SPOKANE COUNTY, WASHINGTON TO: Jeff Forry, Department of Buildings FROM: Bill Hemmings DATE: Thursday, April 22, 1999 SUBJECT: B.C.C resolution #91-0882 Implementation (July 2, 1991) Attached are the individual lot plans for each lot containing a swale in PURVIS PT, plat # PE-1850-97. Please give the appropriate lot plan to the individual applying for a building permit on the lot, so they can draw their house and approach to scale on the lot. We will need this plan, and the corresponding $1,000.00 cash surety, in the form of cash, letter of credit, or savings assignment, before we can issue the approach permit. Also attached are the letter of credit and savings assigmment forms. ' "SAMPLE LETTER OF CREDIT" . "(USE BANK LETTERHEAD)" (BANK NAME ADDRESS ZIl' CODE PHONE # AND OTHER 1NFORMATION IRREVOCABLE LETTER OF CREDIT ANrOLJNT: $1,000.00 v0. BENEFICIARY: SPOKANE COUNTY ENGINEERS 1026 W BROADWAY SPOKANE, WA 99260-0170 SUBJECT: LOT BLOCK PURVIS PT (Plat) PLAT# PE-1850-97. (Development) Gentlemen: We hereby authorize our irrevocable Letter of Credit in your favor, and authorize you to draw on the (bank), a draft up to one thousand (Dollars) ($1,000.00) , for the account of (developer). The draft, drawn under this Letter of Credit, covers the assurance of completion of installation of storm drainage, drainage swales, sod and other work as is incidental and related thereto in accordance with the drawings and specifications as submitted to and approved by the Spokane County Engineer's Office on (date), and is to be accompanied by the following documents: written request by Spokane County Engineer's Office to (bank), at the above address indicating non-completion of all or any of the above improvements and that amount of money required to complete such improvements. We hereby agree with the drawer, endorser and bona fide holder of this drak negotiated under and in compliance with the terms of this credit, that said draft shall be duly honored upon presentation at the (bank), at any time before completion of the above-described improvements or performance, in which event written notice shall be given by Spokane County to the bank. (developer) shall be responsible for any cost incurred by the county in excess of the amount of security. Drafts, drawn under this Letter of Credit, shall bear on their face the words Drawn under (bank) (bank address) Credit No. Dated Bank Name: By: (authorized signor) ' "AGREEMENT" In considerarion of the issuance of a building permit for Lot , Block , PURVIS PT (plat) plat # PE-1850-97 (Developer) has deposited $1,000.00 with Spokane County as security for full and faithful performance by Developer respecting certain drainage facilities and sod in accordance with the drawings and specifications as submitted to and approved by the Spokane County Engineers Office on (date) 199 . Developer hereby agrees that should such drainage facilities and sod not be constructed in accordance with the approved drawing within six months of occupancy, Spokane County may then use the security to bring these facilities and sod into conformance therewith. Developer shall be responsible for any costs incurred by the county in excess of the amount of security. Spokane County agrees to return to Developer any unused funds upon satisfactory complerion of these facilities and sod. NAME & ADDRESS TO BE RETURNED TO: (Developer Signature) DATE ' ASSIGNMENT For security purposes only, (developer) hereby assigns to SPOKANE COUNTY, a political subdivision of the State of Washington, the following: Savings Certificate Number - in the face amount of $1,000.00 and held in and by Bank of Branch (bank address) This assignment is made as security for full and faithful performance by (developer) of certain drainage facilities and sod for LOT BLOCK , PURVIS PT (1'lat) Plat # PE-1850-97 in accordance with the drawings: and specifications as submitted to and approved by the Spokane County Engineers office on (date) . )199 Any interest benefits accruing under said savings certificate shall remain the property of (developer). Said savings certificate to be released to (developer) any other party only with the prior written consent and agreement of Spokane County. PROVIDED, FURTHER, the undersigned does hereby authorize (bank) to pay over to Spokane County all or a sufficient portion of the monies in the savings certificate referenced hereinabove upon written documentation being received from the Spokane County Engineer indicating that the purposes for which the savings certificate was assigned have not been fully and faithfully performed as required and a statement of that amount of money which the County Engineer as required and a statement of that amount of money which the County Engineer deems necessary to complete such obligation. Upon receipt of such written documentation, (developer) hereby authorizes (bank) to release to Spokane County that amount of money requested up to the maximum amount in the savings certificate. (developer) shall be responsible for any costs incurred by the county excess of the amount of security. DATED this day of , 199 . BANK OF President Secretary DATED this day of , 199 . DEVELOPER STATE OF WASHINGTON ) :ss County of Spokane ) On this day personally appeared before me , to me known to be the individual described in and who executed the within and foregoing instrument, and acknowledged that signed the same as free and voluntary act and deed, for the uses and puYposes therein mentioned. . GIVEN UNDER MY HAND AND OFFICIAL SEAL this day of 1199 Notary Public in and for the State of Washington, residing at Spokane , ~ ~ _ _ - _ . n a , TYPE 1 CURB INI.ET PER . \ r_~~_ 12TH AVENU . E , , SPOKANE COUNTY STANDARD _ , ~ TC=2Q~3,,,~„¢ _ ~ ~ . 147.9fi ~ i . -EXISTING BOUNDARY 0 ORAINAGE DITCH F FLAT, ' ~ LEVEL POND BOTTOM AREA OF FLAT, ( AREA flTH TYPE ~ . , ' .1.._.._.. , ~ ; ~ ~s~ unun ~~T . _=2a.ss I ` ~ ' ~ ~ ~ M p 3 R np \ TYPE B DRYWELL 1MTH TYPE POLYDRAIN ( ) p n - 4 FRAME ANO GRATE PER ~p ~ a , ss, SPOKANE COUNTY STANDARD TE PER 'ANDARD 32.50 BUILDING BACKSET ~ . PLAN B-1~ AN B-15 ~ ; TYpE : i i~- DIM ELEV=2052.50 2 CURB INLET PER DRAINAGE EASEMENT ~ 1 ~ , ~ SPOKANE COUNTY STANDARD z / , STA 19+62.39, 23.61 LT I I ' LT 9-9. B W=2054.0 I . / 8 . ~ ~ ~ . I PLAT BOUNDARY - Y: ~ U: ' I Q: , i ~ ~ m, ~ EXISTING TYPE 1 CURB INLET ~ ~ JRB INLET . ~ : ` ~ ~ 1 Z, ~ ~ . _ ~ ; ~I 9~ c ~~I . ~ I . - W ~W `f Q N / , • U o~W m: ~t i~' 7.6 - U . I , -z I ~ _ Z ~ LL . ~x t~.t l~ - u. l~ o ~ : ~ - u. ~ao~d a ' ~ ~ / ~ C7 w ~ Q _orzc~o _ ~ . 0 ~ w z w ch 28.80 M ~ ~¢w~- N . - ~ ~ ~ f- -TYPE R CURB . ~ Z W 3 R(TYP) ~ ~ a W Z ~ . w , . ~o=a io I ~ b w 0~ W_~..~- z • wo ¢ ~ ~ 1; ~RIGH1' OF WAY Z ~ ZW V~ m o ~ ~ I _ - ~wQo ~m~ ~ ~ . J Q a~. t~ cv oC ! . Q ~ ~2a , WI ] ~ m - , cn ~n ¢ ~ , C~ Z ~~ONww_wN wU~ ~~o~ Wz ~ Q . ~aaQ~ JoZo . 0 _z ~ ~ O ~ ~tAl~~~ -w-~ ~ ~W Z QUQC7 F u~ mw -z . ~ ZU' Q -+w 'U~~w~ - ~ ~ .n.--~~ w0~ac ~ a~ ~ • ~d - ~ ~ . 0 m O c~ w~ c . W WW N aQ¢cr • I Z V ~ I""' V, dz . w a~/~ wzz ZW ►-Wa , Z ~ Z_U -a ~ V / . ~ ~Ll z ~ WU o3~ ~ F- z - Q o ~ ~ , QZ ~ ~ 1 - UQt-H ~ o ~ I U ~ W . C~ U U f.- o~ z o t~ LLl V U~ z Q°- Z . ~ _ . a ~ -~Qaww~o~ ~ Ww~~~~o~n ~ . . ~ O No o . I O ~-UOOZ~UQ ~QUo~o~oWoo . 1 aOQaa~a~~a~ ~ ~ ~ ~ 1 , 1 s ; ~ aF k . 1 0 c ~ - ~ mf . . r ~ , ~ y x ~ ! . I . 1 ~ I 1 z~z . 1 s ► I I~NAL 158,61 ~ • / ' „ ~ ~ SCALE: 1 = n-ICALE: 1 "=20' EXPIRES 9/24/ ~ i ~ ~ ~ ~ NLAND ~ . ACIFIC ~ ~ NQINEERING ~o~ we~t ~tn • s~ne 200 (509) 458-6840 Spokane, WA 99204 FAX: S09 458-6844 \ ~ ) ~ DATE: 03/04, fE: 03/04/99 ~ _ ~ ~ ~ , . . ` . ~~-~E ~ T`~ ~NGINErR ~~NAL ! ~~E cpUN 1 QR` _ , ~N ~~~J ~ sr 1 0~~~ ~~,~1~N ^ m ~ 5~4GIAI.p~gi.IC~~~~M p N ~QN,TR ~ ~ . ~ o~ ~ j, ~ ~E~T#._ o~ o . . ~ z ~ ~ pi~0 ACCEp~E~' ~S:. ~ ~ . 03 v~ N pATE EXpIR P~gL►G;. pC~EpTAN~NE M~LES -ts'- ~a TI~ Z~ _ ~ pRO,E~j ~IIILCS QR~N AND CER11F1E~R10A D - ~ NE z~ r ~ PR~ ~~~~Y14N pQCUM~~TAT14 8 C ,~.gUIITS° AR~ R,S~ M~ ~ OF ~ E ~ WINGS, ~p~N O C ~ Z RE~ORD 0~' CE ANd ~SYA TEN~ Z ~ - GLI'flES fp SO CQU~~ A~CEPT~ i~509~ Z m n v ' pRA1NA~QUIR~~ ~ - m ROA1~S A~~~MIT ~ F~A 2 gUSi NSS ~A~' y ~ T4F'f P~~M~j ~N Ci pN5 i RUG1 ~ i z Np ~~,iOR T~ ~ i ~ ' . . ! . M ' _ i ~ - / ~ _ ~ • ,.n , 8~.~~ ~ ~ ~ ~ ~ ~ ~ _ ~ ~ I (,f) " ~ - . 1 , . . - „ , ~ - - . ' ~ rnC ~ ~ r° ~ ~ ~ ~j N ~ O~ O ~ ~1 i . _ _ f~~ ~ ~yr • r ' ~ . ~ 3&' BUILOINGi18ACKSEt .t~......~ ...........................1....... . , , , I~ ~ r! , I ~ - " ~ ~ ~ : : ~ _ ~ ~ 1 . I ~ ` ~~j 1 ! ~ I 4 '`J , ~,~a. ~ I ~ , ; ~ - ~ . ~ . _ 10 U11LtTl F.~.S~ME1+tT ' 1 1 ~ ..r - ; ~ " t~`- ~ I $,03' ~ i - ' _ L~7217' • ~ . " ~ ~ ~ , _ ~ ti , t►; . 1 1 R~A~ ~ G~ENN w _ " I ~ i _ v ~ ~ '~.~.~ZO"~ ~ ~ ~ q,~'zy z ~ N ~ w J p ~ ~G t ~t ~ 4 ~ o~ m ~ ~ Nmb~~ rn ~m ~c ~ o o ~ ~ _ ~r~~ Z . ~ ~n~ O ' ZC p N D n m ~ ~ ''r . ~ t j  l W y O ~ 'N \ - ~ cD ► / ; f~ , ~ . . . . . . , _ , \ i I,~ J~/~ w Q 4II ¢ U p~ui - z m - ~ ~-Z LL ~ oap2o} ~ t7 ~ Q a NO W TE. _o►-Z~o o- 0 ~ r~ i.`L-_ ~ w►u'- M~ ORGANIC CAR ON TES11N I v ~ N 6 G S R E Q U I R E D F O R T H E T O P S O I L 0 ~ ~-~z~ ~ L L W~ - W I F T H E G U TT E R I Q Z z F L O W L I N E I S G R E A T E R T H A N 0. 5 A B O V E S O D . ~ o ~ O ~1 . U ~ W Z w~ n o, E A S E M E N T WO~J 1- w U~-z ° C o' c~ O R R. O. W. C ~ - w o m ~ QQ ~ ~ U+ 6 J fC lL N a ao ?z a v, cn ~ DRAINAGE EASEMENT AS SPECIFIED ON PLAN Z N o : W ~UTTER ~ U ~ , ~CC_N W ~wcn _ w . _ w z ~ p • a aQ ~ o~ o z _ FLOWLINE C~ ~ u~ z ~ W_ o TOP OF BERM ELEV. o w~~Z ~ a ~ TOP OF CURB ELEV. CURB INLET 2 U ~W~~wmwQ -zo . . ~ _ ~ ~ + .2 FT. „ - ~ - - ~ ~ ~ t ~ 1.5 SOD ON TOPSOIL S ~ . . a I ~ OD J QZW - ~ ~ ~ . a ~ ~ ROLLED _ ~ m o a c~ w~ o INSTALLED CONCURRENT WITH R U w N Q I C U B& i. WWO a Q~r~ 1 a W Z Z~ ~ w? w~ O C C U P A N C Y O F A D J A C E N T H O U S E . G U T T E R w ~a z~ ~4 ~ ~ z- z ~ U , ~ E- w o 3 ~ ~ ~ Q z - ao~~ , ~ Z - U V Q~- ~ o,~ 3. 1 T Y P N O R M A L G U T T E R L I N E i ~ ) ~ ~ w , r.. 0 W ~UU~oZZO.o ~ ~ a. Q a. w w~ o a z I 3; 1 T Y P , ~ ~ ~ •r~ (J~ ) . . cr~ w W ~ ~►I-/~ ~ o%{ . ,5~ O V/ O lJ .1i' ~Y~~~IC. ~ f-U~~Z U ~.•,,:,.t}.. y ~ Q U~~ ~ l11 ~ ~ '.:~''t p it•"' n.oQaa~ac° i ` ' CONCRETE APRON 4" THICK P.C.C. 1 "-3~~ TOPSOIL ON GRADED PONp 60TTOM SECTIONAL GRADED POND BOTTOM VIEW .71'-.88' BELOW EDGE OF ASPHALT > > ~ NoT ro scA~ o~ k , 0 . ~ ~ y ~ x . f ! ~.7Y~2 r~NAL EXPIRES 9/24/ / ~ ~ ~ NLAND > > ~ ACIFIC NGINEERING 701 We9t 7th • Suite 200 (509) 458-6840 Spokane, WA 99204 FAX: {509) 458-6844 ~ J oAr~: a3/o4/9~ 03/04/99 ~ / ~ ~ ~'o ~ X ~ ' -o ~ D ~ ~ ~ \ ~ ~.1.. m 0 N~ a sr SPGKANE COUNTY ENGINEcRS OFFICE ~m N o~ OFFiCIAL PUBI.IC DOCUMENT ~RIGINAL $ m-oZ ~ ~ ~ ~ y~ CONSTRUCTIONPLANS Z D r ~ Pi~GJECT A/~~ ~ ~ Z ~ DAT~ ACCEPTED; ~ • Z~ • m~ 0 ACCEPTANCE EXP{RES: ~i- D m PROJECT IANE MILES PUBLIC:~~ 3 PROJECt IANE Mll _S PRIVATE. m Z CONSTRUCTION DOCUMENTATION AND CERTIFIED C ~ cp ~ RECORO DRAWINGS, "AS-BUILTS` ARE REQUIREO PRtOR ~ b , TO COUNTY ACCEPTANCE ANO ESTABLISHMENT OF THE p ~ ROP.DS AND DRAINAGE FACIUTIES FOR MAINTENANCE. ~ $ ~ ~ PERM17 REQUIRED! (5Q9) 456-3600 NOTir"Y PERMIT ENC~INEF~ 2 6USlNESS OAYS ~ Pi~')R TL' Cr':aa'~'~-1CTION ~ a~;' . ~ `.~~``>rh~,J.J -o r ~ C4 ~ . , ~ . ao.oo' Or Z~ n ~ ~ ~o ~c J, r' ~ D z~ ~ N D ~ • ~ m p~ m ob ~ m ~ ~ D m ~o z m D ~ e . 36; BUIl.01NG SE~BACK. . J 4'. . ~ • r-- • , a d, . i a~ s ~r~.) _ ~ ~ ~ ~ ~ ~ ~ i I ~ I ~ ~I ~N i ~I 'v ~ ~ ~ ~o' UT{UTY EASEbIENT ~ ~ ° ~ -----r,-------------- l ~ ._~....~.,~w ~ I , : 7 ' ~ I s.o~~ r ~ 61.21~ ~ ~ , ~ ~ ~ I . / - ~ W ' ~ , ; GLENN ROAD , _ ~ ~ ~ ~ ~ ~ n~~Z~ c~ m m ~Z ~ _ . rp ~ , . ~ ~v~~+ ~ c II -~.uNi v ~ ~ (~Jt D 7~C N ~ ~rZ~, . ~oomm ~ O J D ~ Z ~ r , N ~ ~ ~ ` ~ . . 1 ~ 1 ` .~J 1~~ ~ ` I .Li. I Q ~ ~ O t~~ N  \ ~ ~ ' cD ' / ` ~ \ r \ ~ ~ 1 ~ o ~ D x ~ ~ ~ ~ D ~ m J~ m. fn S~' OV C . N ~n ~ ~ Z „ N ~ o 0 N ~ z ~ o rn-o- . ~ ~ ~ - ~ - ~ zD~ ~ AnD ~ m~0 ~ ~ ~ m ~ _ v~ ~ ~ ~ ' ~ - ~ , so.oo' ~ ~ ~ ~ i ~ -D ~-1 C4 ~ - I A V V ~ ~ ~ ~ Or 0 z~ ~ J ~ ~ ~ ~ rZ v ~ + T J ~ ry Z ~ , ~ 0~ ~ _ Z ~ ~ , O m ~D D ~ ~ ~ p~ z D ,f . . ~ ~ ~ , , i ; ~ ` ` 36' BUILDING SETBAq( ~ ............................l;:.................. ~ 2.50' ; : ~,i v~ ~'f ( . f f~~ f/'~ ! i ; ` ~ a ~ ~ ~ 5.50' ~ j ~ ~ ~W r~ ~ N. ~ ._l. _ ~ L + 10' UTILITY EAS'EhIENT , -j. ~ I I ~ ~.t'. ~ , i eo,oo• I ' tl I'ti ~ . i i i i~ ~ i ~ ' , , . i~~ W ~ ~ ~ r GLENN ROAD - r - n-~NiZQ-~~I ~ DmZ~ ~ 2 r~1 Z N m ~~m~~ ~ O + vc~n-~iN c D W ~ ~ bo~zm . aoalom-; ~ ~OC ~ ZA m ~ ~ SPOKANE COUNTY ENGINEERS OFFICE - OFFICIAL PUBUC D~CUMENT ORIGINAL . CONSTRUCTIDN PLANS Pf~OJECT ~ - DATE ACCEPTED: ~ Z~ • ~9 ACCEPTANCE D(PIRES: ~ ~ Z/ ~ ° Z . PROJECT LANE MILES PUBLIC: o- 0 3 v PROJECT LANE MII~S PRIVATE: D CONSTRUCTION DOCUMENTATION AND CERTIFIED m n RECORD DRAWINGS,'AS-BUILTS' ARE REOUIRED PRIOR " y TO COUNTY ACCEPTANCE AND ESTABLISHMENT OF THE o m ROADS AND DRAINAGE FACIUTIES FOR MAINTENANCE. ~ ' ' PERMIT REQUIRED! (509) 456-3600 ~ NOTIFY PERMIT ENGINEER 2 BUSINESS DAYS ~ ~~y PR10R ?0 CONSTRlJCTION ~  c"'D ~ ~ \ J ? ~ t 1 ' / V / ~ '0 O ~V ~ 0 ~ ~ X ~ ~ ~ sr~~,♦j S~GKANE COUNTY ENGINECRS OFFICE . N ~ o aFFICIAL PUBUC DOCUMENT ORIGINAL , z . TI NPLANS o _ ~ CONSTRUC 0 ~ m ~ z ~ ~ N • y ~ Pf~30JECT ~ Z ~ r DATE ACCEPTEO: ~ ~ ~ ~ ~ P4 D Z -~-n Z ~ ACCEPTANCE EXPIRES: ~ - • ° Z D ~ rn~ p PROJECT LANE MILES PUBLIC; ~ ~ ~ PROJECT IANE MII~S PRIVATE: ~ ~ CONSTRUCTION DOCUMENTATION AND CERTIFIED Z RECOflD DRAWINGS,'AS•BUILTS" ARE REOUIRED PRIOR Z TO COUNTY ACCEPTANCE ANO ESTABIJSHMENT OF THE ~ ROAa.S AND DRAINAGE FACILITIES FOR MAINTENANCE. ~ ~ PERMIT REOUIRED! (509) 45~3600 ~ J NOTIFY PERMIT ENGINEER 2 BUSINESS DAYS ' PR10R TO CQhSTRUCTiON r-1 co . . < ~ ~ ~ 80.00~ v • ~ W Or ~ O zn I I ~ ~ , ~ . . ~ ~ v ~ ~ ao . Z ~Z . ~ ~ ~ ~ o I~ o~ m z ~ D vo m m~ Z o~ ~ Y ~ ~ ~ D N ~ m I ~ D ~ ~ ~ ~ 36' BUILOING SETBACK ' ' ."~2_50~~.~ . ~ ~ f,'' ~ ~ , ~ 5.50' I ~ ~ ~ . ~ ~1~~ W I : . ~ W ~ I N i I~ti ~o' u~un ~as~~r ~ . -----------I -~--_._.._i..._ ~ 0 ~ . ~ I I so.o2' I - - _ } ~ f .~t :.!_:.f ~.._.r _ ~ ~ w ~ . ` ~ ~ - GLENN ROAD ~ _ _ ~ _ } ~ ~ ~ 1 na~°z~ } c~ ~ z tn' ~ m ~ ~ ~ ~~~d ~ c Nrn~ . ~ ~ o~o rn D 7~c m. . j~g OD INA~ . . ~CC 0 ~ Zm . n ~ ~ m m s } ~ f ~ . . W s p II ~ N  co ~ , . c~ / \ ~ ~ ~ C ~ ~ ' . \ Y • NOTE: ORGANIC CARBON TESTING IS REQUIRED FOR THE TOPSOIL / J W , . ! w IF THE DRYWELL GRATE IS GREATER THAN 0.5 ABOVE SOD ' EASEMENT Q.~ /U - Z Z M o~ OR R.O.W. ~ ~a0~ Q . , 0 w _o zc~o ~ --GUTTER 0- w~Z w c~ DRAINAGE EASEMENT AS SPECIFIED ON PLAN ~ ~ ~ W ~ n ' FLOWLINE ~ ~ cn ~ - ~b o~ z ~ , ~ w 0. = a z TOP OF BERM ELEV. ~ ~ W Z = ~ . CURB INLET l1J I-- . U w N~~ N~ ~ w w o ~ T O P O F C U R B E L E V. N , zZ d ~rn> > Z W , U~-z W o o m~~ I+~ .20 FT. 1,5 SOD ON TOPSOIL, SOD -ROLLED r_ Q ~ ~ ~ ~ Q INSTALLED CONCURRENT WITH O CURB & r C7 > z ~d m_ u~ ~n c~ ~ ~ z~~' ~~o y w w~ w~. OCCUPANCY OF ADJACENT HOUSE GUTTER N wz ~ wU~ ..aa►=~o►=o , . Q~ - zo~ ~ 0 c~ c~ -z~w g N~~~a- ~~v 3:1 TYP. ~ / p ~.w u~zm ~~z . ~ w W, w Q o I NORMAL GUTTER LINE /ZU' ~J~ Vu.~W~ - a - ~ z , , ~ J ~ , w C~ ~ cr .4 . 3;1 TYP) ~ ~ ~ . Q c~ w o / GRATE ELEVATION , ~ 0 m O cn a~_ .,;•.E~::,;, V W W WO d~ ~r c~ ~ ~ ~ O~wz wa . W ~-WZZ z~-~a .5 ::,r;~,-~~' ~a z- V) U ~ ► z ~ 0 3 ~ ~ RAINAGE 3: ~ HwZ Qo~~ MqX . Q Z U STRU TURE ~ 1 - F-1- ~ o w ~ U c c, ~ U V~- U U~ o z a o CONCRETE APRON i~- WQawwo~a~a z a~+- ~ W~-,~ c~ ~ v, 4 THICK P,C.C. U?u' OW ~nooo Q 1-U~~ZVUQ NOTE. n n ~ Q U o~ oco w o 0 1-3 TOPSOIL ON a o¢ a au o~ ~ a~ PROVIDE FILTER FABRIC AMOCO 4545 OR EQUAL BETWEEN ) M ~ N OTTO GRADED PO D B THE NATIVE SOIL AND THE WASHED DRAIN ROCK AND BETWEEN THE WASHED .DRAIN ROCK AND THE DRYWELL BARREL. GRADED POND BOTTOM ~ , 1,11 -1,28 BELOW EDGE OF ASPHALT ~ ~ CTIONAL VIEW SE ~ ~ . o~ Sk , 0 ~ NOT TO SCALE ` ~ ° : ~ ~ ~ x . 1 25462 St0 NAL EXPIRES 9/24/ I / \ ~ - ~ ~ ~ NLAND \ ~ ACIFIC . NGINEERING ~o~ w~t ~tn • s~ita zoo (sas) asa-saao Spokane, WA 99204 -6 44 DATE: 03~0~ FAX; (509) 458 8 kTE: 03/04/99 ~ ~ / ~ + , ~ - - ~iclN~.,~y PE-1850-9, ~ . INC1p,A ~ "`PARK I 4 ~ AXWEIS- ~ M aX tNTO ~ (t BOON 2 7 . T ' ~ T T otp 8 ~ _ ~ 0 x cAN ►,lAllON o ~ gR0ADWAY D S~A 11 VAlLpYWAY Bc N K W MA1N ~ z v EWAY ~ t t- ~AA1~ RAGUF ~ 7 ~1 A1N j Z i` &A a 3RD 3FW c dSN ' ~ ~ S a c A N . ' orsNr~IpN ~ i NItlS . O ~ 7~ ~ . ~ . ~ Ca1~tP • 9TM . ~ ~ ~ ~ KARO . wm ~ vl- 2 T}{ ~4- '°t►+ o a Q ti4 . a CC Co 17 . 17 . • • 'a v • • ~ 9 TM+ - ~ ~ 2 8 4 rN 4*N ~ ~ , ~ . ~ 2. ~ ~ liA . < ~ X` ~iot to sczle ~ ~ s; ""EfUED . ~_.%~►1ANIEGQUN11' PR,UttC,:.RY , PL'S OF P;,RV :Et-RE ~~U i.3 ~~91 . ,mh A►v" a . ~ i4 ~ v. i ii ,~4 C" ~Ut.~,~ tAD ?1ANNiP G Q&APw SCAU . • ~ 1 C~„ 1 i i~ I ' f-_-________--_ - 9e xe,_,,-e \rone i aw l 71I4t}lT YAP 1 1 7 M -..\,y~\~9r ^ ~ i s 1 M~'OL fR£.1:.^_-~ _ 2 v~ '~--"_"__-J 1 • I P11T DAl1 3 i 1 mtK iur uu► Ln Ae (D ~ i mTx wmo~ a Lorc v wrs .cr ut ar ~ ~ I • 1tMwu IAT 92[ t40a6 fI K v~ a w n v~• 3 ~6 i nuw Lnr niar~a w' ~.~4r w~ . ttWAvURa stssvsnmia ~~auraemuoaOna m an' ia n i ~ . ~ i • ,..usc OV%Cl9MitrillTFC.-.FL `1, 1 ~I M ~ 1 ►MCC M. 4S7t11061 1 s.O, ~ ~ ~ ~ ~ ~a •`a~`'^~_~}-~. aw p IINQR= iPP1ICUR pp ~ MA10 NpIC O12ImluA f1L/Y MM7 AT a 191 Ar[ 9,11[ !00 17d10 E. 11lQ+SF NOAAT (uE~ooia `~jiac~ ooox-orn -6640 5 • ~ , ~ ~r.,~ ~ . ~lT'• \i~_ .i4~, flG11 nzscRniION r - - - - - - - - - - --I tTAAi in tii. L.~ar.~w ~ I4N, I~~~WRbNMMN114 1~YrN wMMW ~ \ \ 1 \ ~~,~r r' ( / Mi~i yN I M Orb ✓ N M~ 6~ d frlb ~w~ ~.w b .'t:6. M_ O~ d Mr IM~rt Crv M Y~ GrV M t~w tl, Iqe M Iwt 0 M r►wM ~w~ MMS YiM rl w ~M WN ~ ~ / ti Y w~tM M rl Mrl Orb 11 A Iw~wM OrN~ I N/rM~l wH ~GOO ~n ~ r0/V..i ~ a►Abw O.vrw'.IMiN~1r..n ~{W r or ON \ 'r•__ r R r..l.l.~ b r+~ ~ M~s wn 1MTr.a i1 ti O~V d N 1 L~v A Nlw~wl O~b ~ t` i ~ r~ /~Ir ir'rmw tt t7! a. 'L« L~r.... , . r.. ~.~~~.¢.w`T , ` r.•~~ e/ '.f 4~NM~~I~N,NrMW Irv~w+MMIY~:s.r G.~ ~.r.- - - - - - - - . f~rI~11 OrNMMMAw11O~VMM~IM~wlOrbwn ~ 1 1U1761Y~L ~~IYr r MCY ww~ ~l~lld'L~ • ti IIr M1 I~M . MMMnOD ~ ~ \ 1 / ~ w~/~ ~ . v . 9T.UVY,r.y~MwAdM MrL M~ ~A~w ~ ~ \ i ,M ~ iMY r.1w~ Il1~W'YYI ~w~ ~b ~I ~Y Iw i4 ~ rN wN M dku- ::o"w.w..~.., ~..0.~y..~.~ rww I IKr M a~ MM r M u.w , 'I J` . / ~ M M ~/1 ~`M~1 O~Y! ~M M~RAL w'1 W w1 M~ MM M ~►m bl b PRELIMINARY PLAT ; • OF BuRvrroi.e CZR,W=Irz PURVIS POINT ~ nn vauaCwXr rut Mu rAs rarMm er u[ a wmoi (~p~q'~ pj ~ IK~~ YY WSCf A".. N OOMfQIYNK[ U M M[ Pfa1~pITS d PACno nc v«wrc aawn wmxs+a aaNAMa A POR770N 0F YHE 34 1/4 OT ~ EMamulo 9EClTON El, T.26N., R.41L., W.Y. 3POKANE COUNT1t, WL4ENG'DDH • • cm.'~ OCJ'OBLR 1987 t SITE PLAN Qf RECORD ' ..,,50.97 ViCINIrTy MAP ~ . - ~ ~ RA JNQRA MtSS10N ~ PARK J t ~ V N 1AAXWELl AX LL INTO ~ Cr~ N M 27 ~ T j sr~~o a' v W BOO AMP NE T ~ - a 80 ~ ~ z DEAN IA Al.1.ON = W►T ~ o 0 m BROA(?WAY 6 ~ ~ _....r3r 1 c Z VA11' -EYwAY Z v EY„rAY CA $ N.MAIN ~ ~ W E fty - a RAGUE ~ N 1 ~ p 3Rp Z ~ RD . 4TN ~ tA N ~ 7 ~ J)tSNMA1LLS AMP • ~ ~ ~ ~ KARO s~ ce a 2TM x , o CD ~ . '1 1 17 Z 7 0 . • • • ' ' . 1$ 0 18~ - ~19~ ~ . i9 TM ~ . ~ 2 . N ; 28 ~ ~ 29 27~ . ~ ~ T~ . „ . ~ r rlot to scale i; ~E6U~D ~ ;PPRv-.'r,o asEuui;;;,aY. ~j f PL:' 0F P;,R: :ENTtE I C~Q~ ~fa ~v- ua Awwe A 1 ' f J If `'\I~ i'i ✓I j ~LL ~ ~ i i ~ ~:.J~l~~i f„\V ~:~~i~~~` ~7 me•__ ~aa~o ~~ti ~ ~ ~ ~ 6 ~ ~ ~ j~~ $ 7 ~ij owaHC arxt ro ao ~ - 1R(mIII'f YlP /'3 J..., p n oC= I 1, t• ~ I N 1QI ~ iiw•ao~ti \ a\ f 2 i ~ s i auo ro~i f I ' I '-----------~'i` =y==='=-------- ~ \ ' r----- 3 PLAT bm . 4 ~ e IOUI out MlA iIl AC mrx wwa a uM 7 uors . iauw uar sa iaooo c ~ Mn.w Lor narrAa a 'K°,`/ n i6 n1N. 3 m WAM .c un ~ mooa u ~naoena oo~ ~ ie \14f x~ sesm ~ Vaua ooum ^ s ~at ruar ►moom+L y ~ v"i uOUPM a~oa v H 4 a ~ I` ~.+c3 a ~~a 1-j-.~ w I ev v S~ 1PPlICA1R wro rAaic aamac ww nWws :i i ~ a a s j a ( s~oocuE M i~ ~ vw ria ~iu oKOM arm ~ a 0 (5a) 4x-~ea (~a) natasr g 5 ~ ~ . i I nr_ JI I IEPJL DESCROOM i ~ arown I• I\•-~- I@ I I ~ nut nRt ~ r on. ~ a. wr r 0. swa.i w~. r $~w. ~ i-----_~' 2% la06 aw4u.r~r.r.s ~ I e~ A~ Ml 16~ M Iw~ w,100.I1 M wM A N w r~..r ~~r\ L ~ wr r ~.~+a wv ~ r owr r~.o. n, r...e r w.~i.«c~«.~« \ \ ~ I~ ~ f / I ( ~ OwN ~w~ IYrw ~ w~ r M M~1 b~~,1 t1.W YM IrF d IYM~1 . I' I \ 1 I I ~ b W Gb M M MM~+1 ~~I M IM.d 6~b M Lllr ll\\ ~ ~ I iC ~w 1~1 ~ r O~ ~ M~~C r M O.~ I N M0.+1 O/V KII1A1l~AV~~ ~ • ~ \ 1 ~ ~ ~ Mia~LTiI~LMLV4~w ; . •Yn~ ~~y~~ ."r.9..~ ~ rw o.vrwrawrro.r Cwlrlra~MO~~MYfM~IO-bMFIM~lO-bMw .Y rw.....O.wma .rr r M.r w. wr ~ a~ab r 1..~ +w~ _ _ _ _ Lot I I ~ p a-r'`✓~ - - - - - - - - - - i ' + ft 1 ~ „C l a....ww ` rr~~~•~~y.w~~~i~~~+v wr~ ~ nM ~rt ~w ~ ~~e~ I 7xl~ Y~ r~ Mt r rs «n~r~M.~ w~v~ w. ~ AM tll ~ N~ Mrr~ d ~1001M b ~ ; ~ I ~ 1y+r I U.,P:A77. E-. '/?f -1v~~~ ' ~ ' PRELIMINARY PLAT / ` . OF oulcvalor,,Euvr-m PURVIS POINT MS PRaAoum' Mi YW wA5 MIIMM IY K CI UCQ LJOICATIMI IN 7 INLNp r macr sw:,. a aaroar+a MTM nc aoLfitoan a P~RTION 0! 1ffi 311 1/4 0? PACFIO nc saou+a aunn aroa~~a amww~a. l 5aCliCN E3, T.E62i.. R.l4E.. 1fY. fmq BPORANS COUNTI(. IASF@iG1'OH ~ar ~w w.~w s O~ 1~ 1+~+ A~ rm (101) , ~ IID1 1 St1E PlAN 4F RECORD , Busko, Doug From: Busico, Doug Sent: Friday, November 20, 1998 8:50 AM To: Jones, Tammy Subject: PE 1850-97 Purvis Point Development Services has no additional comments on the final plat that has been submitted. Doug Busko, P.E. Page 1 ~ ~ECEIV ED 9 1998 - - _ S P gPbKANE COLIM-ENGINEER O K A N E ~ ~ j' C O U N T Y BUILDING AND PLANNING • A DMSION OF THE PUB[,IC WORKS DEPARTMENT JAMFS L. MANSON, C.B.O., DIRfiCTOR DEvtvrs M. ScOTT, P.E., DIRECTOR MEMORA.NDUM TO: Spokane County Division of Engineering, Transportation Engineering, Pat Harper, c/o Sandy Kimball , ~ o ane ounty ~vis~on o t> >ties, im K-eu Spokane County Division of Stormwater Utility, Brenda Sims Spokane County Health District, Steve Holderby Spokane County Division of Long Range Planning, John Mercer Spokane County Fire District No. 1 Central Valley School District No. 356 Model Irrigation District No. 18 / FROM: Tammy Jones, Associate Planner DATE: November 19, 1998 ~ SUBJECT: Final Plat of PE-1850-97, Purvis Point Enclosed find copies of the above referenced final plat. Please review and forward any comments by December 4, 1998. If you have any questions you may contact me at 477-3675. Thank you. If you have any questions regarding this file, you may contact me at 456-3675. Attachments Copy without enclosures to: William Purvis Patrick J. Moore 1026 WE5T BkOAD6Vt1Y AVENUF •$PU1<r1NE, WASHINGTON 99260 PHONF: (509) 456-3675 • FAx: (509) 456-4703 TDD: (509) 324-3166 S P O K A N E " C O U N T Y DMSION OF ENGINEERING AND ROADS A DNISION OF THE PUBLIC WORKS DEPARTMENT William A. Johns, P.E., County Engineer April 7, 1999 Susan Murphy, E.I.T. Inland Pacific Engineering 707 W. 7th Avenue, Suite 200 Spokane, WA 99204 Re: Review Comments 1 for Purvis Point, P-1850 . Susan, The following items must be addressed prior to acceptance of the road plans: l. Please provide a manufacturer's sheet on the slotted polydrain. The County will review the information for ease of maintenance and durability. 2. On the 12`h Avenue cross-section the 18' utility and sidewalk easement is actually shown as 19' wide (3'+6'+10'). Please correct. 3. Mr. Hume needs to submit a letter to the County authorizing that the inspection and construction bonds posted for Meadowland will also apply toward Purvis Point. Please call if you have questions. Sincerely, ~ IC4 ~Vr c Doug Busko, P.E. Spokane County Engineers c: P-1850 Project File 1026 W. Broadway Ave. • Spokane, WA 99260-0170 •(509) 477-3600 FAX: (509) 324-3478 TDD: (509) 324-3166