28067 PE-1850 ENGINEERS REVIEW
came,ed Fi,~ ENGINEE R' S REVIEVV SHEET
pate Filed
bate, As Built Plans RecEived
Date Road Plans Appcaved TR pLA'T FffiE# PE-1g50
New xtQad Standards 5-15-95 Mylar ff:
Campan'tona File
Hear~~g Datea H Time: H Number: Related Fi-le
Teebnical ReYa-w Date: 12/041 1997 TR Time: 02:15' Buildi.ng Dept
Review I)aCe: RTime: It Number: 1'ECH RE VEEW #
Date Re~eived: 11l20/1997 Review Type: Large Lot ❑ Btdg. Squara Feet:
No. Lbt 7 No. Acre 2. 19'
1~XQJ~Ct: ~a~E: P~i.VIS P'~ - Ra~~=TownshjpSectio-w 44- 23 - 24
Site AddxeSs: S 12T-H/E IJNIVEASITY/W FMRGE/N 15TH PA.R,GEL($). (fi~rst 20)
ApplicamNa-me: PURVIS, WI.,L-LkM Phone (509) 924-2087 45123.9064
Apptica~~ Address: 12810 E PAI.OUSE HWY Phone 2#
VALLEYFORIS, W.A 99035 '
c_~ ~2~il~d:
FIQad 2ore Water Sewer ,5 School ~ Fire Phone US WESm 1~ateCOnditi~
B:illing PURVIS, WII.,LTAM J Owner: PURVIS, wILLIAM Engin-eer PATRICK 7' IvIOORE Asddiress- 12$10, E PALOII~E HWY Address 12810 B PALOUSE HWY Company I1vLAND PACT~C E~GM, IMNG
VALLEYF0RD, WA 99036 VALLEYPORlS, WA 99035 AddCeSs: 707 VV 7TH A_VE STE 200,
SPOI{A;NT WA 99204
PhQne: (509) 924-2487 Phone: (509) 924-2487 Phone: (549) 458-6840
Fax: (509) 45$-6$44
Siglied Na-me WLL:LIAM J PU12VIS
~uilding # 456=3675 / Pxawainiz # 456-22205 Contacc: TAMNlYroNES
Tl="Aw - - - -
DA~~ ~~IP41CAx,LY' C0MPLETE
DATE NpT T ECHNICAIrLY COTvIPLETE
11l114997 DATE pAY PEES RECEMD
DATE FRIO ITY FEES RECEZVEI) COPX TO A,CCO'C1'NTING '
FTNAL PLAT FEES GOMPY,ETED A-ND GOPY TO ACCOUNTLNG ~
1 ~ N0TIGE TO PUBLIC I I~~TICE Tp PU$LIC # 1 3 46 COMPLETED - QR NEED5 TO BE 5IGNED
In-but, Ny ln=Out #2 In-Out #3
DESIGN DEVIATIQN DATES IN-OUT
I_n-4ut #4 ln-Out /{S In-O►xt If6
BOND QLTANTZTIES F0R DRAINAGE ITEiVE CALGULI,ATEA ~I
DATE $QND RECEYVED BOND AMOUNT REGEWED
DAfiE $OND REI.EASE - DATE BOND REDUGED BQND BALANCE
Hearing DaCe Decision Approved Denied _ Contiraued Appealgd BGC A_pgr,QVed Denied ~
A~~ealerl to Gaurf Approved Denied Coratinued Final Pr4ject Stafus
s~~~~D M-YLARS TO PEx~T TEcHNIcr.aN (sYL)
STAiVaPED 20$ ~~T PLANS TO SECRETARY (SANDY)
r
t
. • - ~ ' .
• ' ' . ~ , R _ . ~
• i , ' ' . . - .
'0) X< I~! _ ' - . ~ - ~ ' ,S~ . • ' ~
.
. . , - • _ , . _ ~ . _ . , - ~ ~ . . .
~~FFiCs oFT u1c COU(yTY ENGINF.ER • A D[V1SION Op'Ct[F P[JBLIC-WOtUCS DfiPART1vILN~7'~
'R w ' . . .
__onald, C. ~~ofma°nn,, [~.E:, County Engineez Deri~nis M. 5cott, ' P.E., Di~'ecror
' ~ .r . • , ':2+~~= • ~ ` r ' ti ~ t'• • , . ' ? ' -
AGRE EMENT, TO= PAY FEES
PE-1$50:-97 ~ _ _ - . . .
. ENGINE~~t''~ G1ItEk~VINT NT.~MBER
_ ,
~'u~rvi s
This agrcement' `between Spokane County al~d, i am,
- . - • ~vname w fpc.rson) - -
' whose; ii-I'terest: in (lie project is Owner
- (i.e. owner, agenc, ttc:)
. ' ,n` _ ~ , , ^ ^ •
is~ entered ir~C~ tl~is . 1~ day of ~OV ;.-1~9 ; ' $ . '~`llis. agreet~~iealt is applicable Co tlie~ projecC,
known as: Purvi s-Poi nt addi ti on v - . .
kpraject aauress or mename ac nie numaer)
, .
~':I`hat., the, indivic3uals ,and parkies na=d tierein as liaving' a~ii intere-st in the above described property qr projecl,
. agre-e to °the, 'fotlowing: - - . - •
~ • Rein~~urse Spokane Gouiity for p~-ojecC review, ';and:in5pectiQn fees,as speciFied in Chapter -
~ ~ t ~ie.,~b- ~ -
:~:!:14 o~the 5pol~arie Caunty Code. The fees-~vi~~ased~en.actual salary.costs incurred
okane C'ourity foz project reviews and-~~ ! ~o~r 'i~spe~tions Rlus a teii Rezcent
.a~!minisi~ati~ve~ c~iarge, and wil!',be billed riionthl'y-a'~ accrued. ~1'ny billing aynount~~ s c~ue,~ . ~ : . ,
~ . • ~ i . . . , ~ i v 1
~
Iicludiiig,~~ any 'expenses incu~rrediil tlie'.ei~lle~tion -of 'an o~v~rdue account, must be paYCI-
~,rior~ tQlthie Cou:ia~ty's acceptance of tlie~,.prbj~6t,' for, filin,g.;--If,a project,as approved, and_i~r
If&tl with-a, balance 'sti[i owing; the.unpaid, balance sliafl be pai_d within 30'cl'Ays of t~ie
- ~ • 11I.Voice
~ °.4- , ~ - . , . . ~ ~ j , ~ w'~ . - _ _ ~ ~
' ' _ { ' ~,~f{'''l~ F • . , _ : , , ~ - . T ' ~ , ~y , ,
Tli, uncl'ersigned agrees-tkiat these fees are c~ue and'-paya~i'le upon receipt ~F the billi~~ig as.
ecified a[aove.
.Any- invoices noC paid within 30 ci'ays of ttie, iaivoic~,date vvilV be co«sadered deliiiquent.,
. . -
r-
. ~ . lf',any ou,rsCandirig Ualance on the account for_ Chi`s praject.-is not paid w,'tthiia,,30 days Qf
_ ifio'invoice &ke, uo turther -revie~ws Qf the,p.roject 'docu~~~~ents will, be coiiducted unCil'~ the a~count balance is paid. Any balance an Che account .foc this prpject not, paia, - ; - -
witln 65 d'ays, ~of tlie invoice d'ate al°iay resu~.t, in 1'e-gal actioil or the initiati9n, of other
CollectiQn procedures, .i»cluding referralY ib a ebllection agency. 1'l,ie SpansQr, w.ill,be, . . ~ . .
~lia61e fo'r any and all expenses incurred b~r' the County fAr the cQll'ection af overdue
_ accounts.
. , , . _ . .
~ 4.- TlYe monthly billii)g should be sent*to the attentiQn of:
. . , ,
NAM'E: Wi11iam Pur.vis
~ ADDRESS: 12$10 ;E . Pal ouse Hi ghway_: ~ . . .
~ CITY, STA13: Ual 1 eyford, WA,
ZZP CODE: 99036 ~ ~ : - . - ~ ~ ` . •
.Pki0NE'#: . 924-2087 ~ .
. Z und'erstand t11at failure to pay t_hese Fees may resuli in delay in completi.an or approval of-the project o,r other
possib]'e saileiions.
0 lf this -fee agreeinent is coiii~.~ieted by someone other.than tlie Sponsor (i.e:, the project ~
~ QWner or a~ orincipal in the firm sponsaring itie preject), suc~i as ~the 'Engineet designing
the project;, tlien written autnorization from the - Spori$or. - specifically authorizing the
'Agent W.ei~'ecute this Fee Agreeiiient, as attaclled to t'his Fee Agreeinent.
~ ~ t F _ • ; ' • . ' - ,
~ SIGNA'TURE By:
- J
~ lN 4 tk~Al "I W. V l •T-. a , r•. _ . ~ . , -'ti
, . ~ . (PRI N'T N AME)
- ';~tE~'U~'N YE~•L0M COPY TO SPOKANE CQUNTY ENGINEERS,
k,lplflagreemen:fee«'2!!'/9S.
Y ~ ' y ~ ~ .
1(1~26,~N: '~a,oadtivay A~ve. • ~pc~k~ne,~ WA'~92G(~-0`170 . (509) 4.56-3G0U, ~'AX: (5U9~ ~2,!~-347~3 `]'l~D:, (5()9) . ~ - , . . • _ - - -
' . •N~jk^~QR~.~,~i~f'.~'1t_t . ~ ' , ~ r • e • - _ _I:-.~IY~~~}la;:.•""..e~ . t ~
Receipt No. 107406
u Received From:
Ptj-L~U~ oate:
L"
U Address: t
~
~ ~ ~Q ~/q" ~ ~ l~) ~A - ` 03 ~ Amount Paid: J C /
~ ~
~
Zq1 > Acct. No.: ' C Cash: Sales Tax: .
~
0 >
Amt. of Acct: Money Order: ❑ . Total Paid -,Zj~,-T I ~
V U.: 3~ C
~ ~J
~ ~ ~
Z Amt. Paid . ; Check: heck # S j CC Balance Due: , Credit Card:_ Exp.. D'ate:
r-
U) Purpose: - c~~~-c /~f~' ~ ~ ~ ~J
i r / • - ° _ _ - - - - •A'
t> Received by: _
. • - -
,s-,o „s 883.
WILLIAM PURVIS D/B/A WILLCO 1250 - . E. 12810 PALOUSE HWY. (509) 9242087 . - ' 1167430576 . - . : _ '
- VALLEYFORD, WA 99036
' " . DATE I Z ~ IFE
. ~ • - _ - _ . - .
_ . . _ : . . .o
_ • ~ PAY TO THE ~ O ~ K..~ - - . ~,~kJC.t~S - _ ' ~ $a
a ORDER OF ~ 1 - - ~
/
. u►.rLLARS
~ .
- "U.S. BAN K 1-840-US BANKS
i~ - -
~ U.S. SANR OP WASEINGTON. NATIONAL ASSOCIATION j
.
MEMO P
{
-1: L 2 5000 LO 51: L L 6? 430S760 088 3
mp
Usm vAnra
A
t
. RECE VED
SPOKANE COUNTX HEARING EXAIVTINER APR 2 ~
- 0 1996
SPOKANE COUMY ENGINEER
RE: Preliminary Plat of Purvis Point, ) FINDINGS OF FACT,
within the Existing Urban Residential-3.5 ) CONCLUSIONS AND
(UR-3.5) Zone ) DECISION
Applicant: William Purvis )
File No. PE-1850-97 )
1. SUlVIlVIARY OF PROPOSAL AND DECISION
Proposal: Preliminary plat to subdivide approximately 2.19 acres into six (6) lots for the
development of single-family residences and one lot for a duplex in the existing Urban
Residential-3.5 (LJR-3.5) zone.
Decision: Approved, subject to conditions.
U. FINDINGS OF FACT AND CONCLUSI0NS
The Hearing Examiner has reviewed the preliminary plat application and the evidence of
record, and hereby adopts the following findings of fact and conclusions:
A. GENERAL INFORt1~IATION:
Applicants: William Purvis, 12810 East Palouse Highway, Valleyford, WA 99036
Address: 10908 East 12'hAvenue
Location: Generally located south of and adjacent to 12`hAvenue and approximately 600
feet east of University Road, in the SW '/4 of Section 21, Township 25 North, Range 44 EWM,
Spokane County, Washington.
Legal Description: As described on the preliminary plat map of record.
Zoning: Urban Residential-3.5 (LJR-3.5). The site is located within the Public Transit
Benefit Area designated by the Spokane County Zoning Code.
Comprehensive Plan Category: The property is designated in the Urban category of the
Spokane County Generalized Comprehensive Plan. The site is also within the Aquifer Sensitive
Area, Priority Sewer Service Area and Urban Impact Area. Environmental Review: A Determination of Nonsignificance was issued by the Division
of Building and Planning on January 30, 1998.
Site Description: The site is approximately 2.19 acres in size and is relatively flat and
covered with native vegetation. There is an existing duplex on the property which is located
HE Findings, Conclusions and Decision PE-1850-97 Page 1
directly adj acent to 12`'' Avenue, and a detached garage. The proposal is also within the Interim
Urban Growth Area designated by Spokane County pursuant to the Growth Management Act.
Surrounding Conditions: The site is located along the south side of 12`h Avenue, which is
designated as a Local Access Street by the County Arterial Road Plan. University Road to the
west is designated as a Principal Arterial. The neighborhood surrounding the site includes a mix
of residential development including medium density single-family residences, duplexes and
vacant land. The majority of roads in the neighborhood do not have curbs or sidewalks, except
for the presence of curbs along 15'hAvenue. An irrigation district well and storage tank are
located immediately south of the site. University High School is located approximately one-
quarter mile west of the subject property, and Opportunity Elementary School is located
approximately three-fourths of a mile east of the site. The recently approved preliminary plat of
Meadowland (PE-1808-96) , which consists of 21 single-family homes on 6.18 acres, is located
directly east of the site. The recently approved preliminary plat of Parc Centre, which consists of
22 single-family homes on 6.3 acres, is located directly north of the site across 12" Avenue.
Project Description: The preliminary plat map illustrates division of 2.19 acres of land into
six lots for single-family residences and one lot for an existing duplex. Lot sizes range from
10,000 to 20,000 square feet in size, and the net density of the proposal is approximately 3.2
units per acre. Lot 1 will access 12`h Avenue, and all other lots will access the proposed Glenn
Road, which is within the preliminary plat of Meadowland (PE-1808-96). County Engineering
has included a condition of approval requiring that the plat which is finalized first among the
proposal and the Meadowland project be responsible for the development of Glenn Road. The
proposal would be served by public sewer and water, and modern utilities.
B. PROCEDURAL INFORMATION:
Applicable Zoning Regulations: Zoning Code Chapter 14.402 arid 14.616.
Hearing Date and Location: February 25, 1998, Spokane County Public Works Building,
Lower Level, Commissioners Assembly Room, 1026 West Broadway, Spokane, WA.
Notices: Mailed: February 9, 1998 by applicant
Posted: February 9, 1998 by applicant
Published: February 6, 1998
Site Visit: February 23, 1998
Hearing Procedure: Pursuant to Resolution No. 96-0171 (Hearing Examiner Ordinance)
and Resolution No. 96-0294 (Hearing Examiner Rules of Procedure).
Testimony:
Tammy Jones B. J. Sparling
Division of Building and Planning Inland Pacific Engineering
1026 West Broadway 707 West 7" Avenue, Suite 200
Spokane, WA 99260 Spokane, WA 99204
HE Findings, Conclusions and Decision PE-1850-97 Page 2
Items Noticed: Spokane County Comprehensive Plan, Spokane County Zoning Code,
Spokane County Code, and County Resolution Nos. 96-0171 and 96-0294.
C. PRELIMINARY PLAT ANALYSIS:
To be approved, the preliminary plat application must comply with the conditions and
requirements set forth in the Spokane County Subdivision Ordinance, chapter 58.17 RCW, the
Spokane County Zoning Code and other applicable land use regulations. The proposal must also
comply with the requirements of the State Environmental Policy Act and Spokane County's
Local Environmental Ordinance.
The following findings of fact and conclusions are made:
1. The nronosed nreliminarv nlat eenerallv complies with the policies of the Spokane Countv
Generalized Cornprehensive Plan.
The proposal is designated in the Urban category of the Comprehensive Plan. The Urban
category is intended to provide the opportunity for a"citylike" environment, which includes
various land uses, residential development and a high level o€ public facilities and urban
services. It is primarily a residential category of single-family, two-family, multi-family, and
condominium buildings along with neighborhood commercial, light industrial, and public and
recreational facilities. The more intensive uses such as light industrial and neighborhood
commercial will be located near the heavily traveled streets, the least intensive single-family
. residential uses will be isolated from the noise and heavy traffic, and multifamily structures
will usually be a transitional use located between single-family residential and the more
intensive areas. See Comprehensive Plan, Section 1, "Purpose" and "Detailed Definition".
The Urban category includes the following relevant objectives and decision guidelines:
Objective l.l.a Promote fill-in within established development areas and
e.Yisting outlying communities where utilities, arterials, schools and
community facilities have already been established.
Decision Guideline 1.1.1 Urban development will be approved in areas
having adequate power sacpplies, water, sanitary und storm sewers,
streets, and school andfire services, provided that such development
meets the intent of other Objectives and Decision Guidelines of this
section.
Decision Guideline 1.1.4 A variety of densities and residential uses
should be available to provide a freedom of choice to live in Urban areas
with varying densities, combinations, or mix of icses (see detailed Urbari
definitions).
Decision GLCideline 1.2.2 The need for recreation and open space created
by residential developments should be met and be in conformance with
ordinances, plans, and policies prior to resitlential development approval.
Decision Guideline 1.3.3 All Urban development proposals shoulcl
require public sanitary and storm sewer systems or interim sewer systems
to protect water quality.
HE Findings, Conclusions and Decision PE-1850-97 Pa~e 3
7Decision Gzcideline 1.4.2 Areas with steep slopes, susceptibility to
landslides, or other hazards should not have Urban land uses unless it is
shown by the developer that such hazard areas can be developed at Urban
densities.
Objective I.S.a New residential or multiple family should be buffered
from existing adjacent land uses where adverse effects may develop.
Decision Guideline 1.5.1 Buffering and/or landscaping will be used to
mitigate the differences between proposed developments and existing uses.
Objective I.S.c Encourage paved streets and sidewalks in existing and
future developments where they are appropriate to the nature of the
development.
Objective 1. S. e When a neighborhood experiences pressure for change in
character, such change shall be permitted upon appropriate review.
Objective 1.5.8 When determining whether a proposal will change the
existing land use character of an area, factors to consider may include:
a) the structure height of the proposal in relation to str-accture
height of nearby structures, ancl
b) whether new structures will have a positive or negative impact
upon the neighborhood's architectural character.
Decision Guideline 1.6.1 Before land use proposals are approved they
r ShOlIId.
a) conform to plans, policies and regulations of County water, sewer, storm sewer,
utility and special service districts;
b) conform to County transportation plans and policies; and
c) identify and take steps to resolve significant adverse impacts upon existing
utilities, (i.e. water, sanitary and storm sewers, utility, available and future
energy resources), and traffic systems. '
The property is also within the Urban Impact A.rea (UTA) designated in the Comprehensive
Plan. This is an area where growth, development and higher intensities of land use are
encouraged. Comprehensive Plan, Objective 14.1.a. The UTA section of the Comprehensive
Plan indicates that traditional urban problems such as incompatible land uses, environmental
pollution and traffic congestion will be managed with greater attention to the general public's
well-being inside the UTA. Comprehensive Plan, Objective 14.1.e. The site is also designated
within the County's interim urban growth area established under the State Growth Management
Act, an area where urban densities are encouraged.
The proposal is located within the Urban Residential-3.5 (LTR-3.5) zone. The purpose and
intent of the UR-3.5 zone is set forth in Zoning Code 14.616 as follows:
The purnose of the UR-3.5 zone is to implemefzt the lower density range of
the Urban category of the Compreltensive PlafT. The intent of the zone is
to promote areas of primarily single family residential use in un urbanized
neighborhood setting, having a high level of public services. Lots shall be
served by a public water system afid shall require connection to a public
central sewer system when available. Roadtivays shall be puved and
HE Findings, Conclusions and Decision PE-1850-97 Page 4
~
curbed and may have sidewalks.
The net density of the proposal of 3.2 dwelling units per acre is within the recommended
density range of the Urban category. As contemplated by the Urban category, the proposal
will be served by a high level of public services, including public sewer and water, modern
utilities, fully improved roadways and public transit. The proposed subdivision is within an
existing developed area, and constitutes "fill-in development" within the meaning of the
Comprehensive Plan. The density of the proposal will enhance the cost-effectiveness of
extending public sewer and other public infrastructure. Similar projects have recently been
approved by the Hearing Examiner directly east of the site and directly across 12"' Avenue to
the north.
2. The nronosed nreliminarv nlat, as conditioned, complies with the Spokane Countv Zonine
Code and all anz~licable land use reeulations.
„
No deficiencies with regard to the Zoning Code and other land use regulations were made
apparent during the public hearing process. The proposal has been conditioned for compliance
with the UR-3.5 zone and County Zoning Code.
3. Pursuant to RCW 58.17.110, the proposed preliminarY plat makes appropnate nrovision for
the nublic health, safetv and eeneral welfare, and for open spaces and critical areas. vublic roads
and streets. water. sanitarv waste disposal, surface water drainne and drainaRewavs, narks and
recreation, schools and schoolerounds, plawrounds, ~ransit stops and other relevant facts.
includinLy sidewalks and other nlannina features that assure safe walkinR conditions for students
who onlv walk to and from school. The proposed preliminarv plat will serve the public use and
interest.
The Building and Planriing staff report indicates that appropriate provision has been made in
the design of the proposal and through the recommended conditions of approval for roads,
sanitary waste disposal, water supply, schools and the other services and factors referenced in
RCW 58.17.110. The proposal conforms with the Comprehensive Plan, and will provide
housing to serve the growing population in the area. No comments were received from County
Parks. The proposal is within the Public Transit Benefit Area, with the nearest transit stop
located at University Road. There was no objection to the project by area residents or public
agencies. The proposal will rely on public sewer and water.
The applicant has requested deletion of Division of Building and Planning Condition #14,
relating to coordination with the U. S. Postal Service regarding addressing. The Division agreed
that this condition could be deleted.
The project calls for relocation of Glenn Road in the Meadowland preliminary plat to the
current proposal. This may require a change of conditions to such preliminary plat.
4. The t)ronosal will not have a si~,rnificant probable adverse impact on the environment.
No public agencies or area residents expressed opposition to the project, as conditioned. The
proposal will not have more than a moderate effect on the quality of the environment, and the
Hearing Examiner concurs with the Determination of Nonsignificance issued by the County
HE Findings, Conclusions and Decision PE-1850-97 Page 5
1
Division of Building and Planning. The procedural requirements of the State Environmental
Policy Act and the County's Local Environmental Ordinance have been met.
III. DECISION
Based on the Findings and Conclusion above, the above preliminary plat application is
approved, subj ect to the conditions of approval of the various public agencies listed below.
Conditions added or significantly revised by the Hearing Examiner are italicized.
Failure to comply with the conditions of this approval may result in revocation of this
approval by the Hearing Examiner. This approval does not waive the applicant's obligation to
comply with all other requirements of other public agencies with jurisdiction over land
development.
SPOKANE COUNTY DIVISION OF BUILDING AND PLANNING
1. All conditions imposed by the Hearing Examiner shall be binding on the "Applicant" which
term shall include the owner or owners of the property, heirs, assigns and successors.
2. The proposal shall comply with the Urban Residential-3.5 (UR-3:5) zone, as arnended.
3. The final plat shall be designed substantially in conformance with the preliminary plat of
record. No increase of density or number of lots shall occur without a ctrange of condition
application submittal and approval.
4. The Director of the Division of Building and Planning/designee shall review any proposed
final plat to ensure compliance with these Findings and Conditions of Approval.
5. A final plat name/number shall be indicated before the final plat is filed, such name/number
to be approved by the Director of the Division of Building and Planning/designee.
6. Appropriate road name(s) shall be indicated.
7. kipreliminary plat is given conditional approval for fve S~y~ears, specifically to March
0--1lYe'applicant may request an extension of time by submitting a written request thirty
30) days prior to the above expiration date, according to County ordinance.
8. Appropriate utility easements shall be indicated on copies of the proposed final plat.
Approval of utility easements by appropriate utility companies shall be received with the
submittal of the final plat.
9. The final plat map shall indicate by a clear, dashed line the required yard setbacks from all
private or public roads. The dedication shall contain the following statement:
''de yard and rear yard setbacks shall be determined at the time building permits are requested
ess these setbacks are specifically drafted on this final plat. The setbacks indicated on this
l~t may be varied from if proper zoning approvals are obtained."
HE Findings, Conclusions and Decision PE-1850-97 Page 6
.
10. Three (3) current certificates of title shall be furnished to the Division of Building and
Planning prior to filing the final plat.
11. Prior to filing of all or a portion of the final plat the applicant's surveyor shall submit one or
more maps outlined in red of the area being finalized. The scale shall match the appropriate
assessor's map scale.
12. At the time of final plat submittal, the applicant shall demonstrate either on the face of the
final plat or on an acceptable attachment that all lots located on a cul de sac or curvilinear street
meet or exceed the minimum required frontage.
13. A survey is required prior to the filing of a final plat.
14. The applicant shall contact the Division of Building and Planning at the earliest possible
stage in order to be informed of code requirements administeredlenforced as authorized by the
state Building Code Act. Designldevelopment concerns include: addressing, fire apparatus
access roads, fire hydrant flow, approved water systems, building accessibility, construction type,
occupancy classification, existing exterior wall protection, and energy code regulations. (Note:
The Division reserves the right to confirm the actual address at the item of building permit.)
SPOKANE COUNTY DIVISION OF ENGINEERING
Prior to release of a building permit or use of property as proposed:
1. That conditional approval of the plat by the County Engineer is given subject to dedication
of right-of-way and approval of the road system as indicated in the preliminary plat of record.
2. Road plans, profiles and cross sections as designed to County standards showing proposed
street centerline and curb grades be submitted to the County Engineer for acceptance prior to
construction and/or the filing of a final plat; road plans to be prepared under the direction of a
licensed Professional Civil Engineer.
3. Drainage plans and design calculations showing the alignment of drainage facilities be
submitted to the County Engineer for acceptance prior to construction andlor the filing of the
final plat. Drainage plans to be prepared under the direction of a licensed Professional Civil
Engineer.
4. Construction within the proposed public streets and easements shall be performed under the
direct supervision of a licensed engineer/surveyor, who shall furnish the County Engineer with
"As Built" plans and a certificate in writing that all improvements were installed to the lines and
grades shown on the approved construction plans and that all disturbed monuments have been
replaced.
5. No construction work is to be performed within the existing or proposed Public right-of-
way until a permit has been issued by the County Engineer. All work is subject to inspection and
approval by the County Engineer.
HE Findings, Conclusions and Decision PE-1850-97 Page 7
1
6. All construction within the existing or proposed public right-of-way is to be completed
prior to filing the final plat or a bond in the amount estimated by the County Engineer to cover
the cost of construction of improvements. construction certification, "As Built" plans and
monumenting the street centerlines shall be filed with the County Engineer.
7. The applicant should be advised that individual driveway access permits are required prior
to issuance of a building permit for driveway approaches to the County road system.
Dedication of 2.5 feet of additional right-of-way along 12" Avenue.
The County Engineer has designated a Collector Arterial Roadway Section for the
; fr
improvement of 12`h Avenue which is adjacent to the proposed development. This will require
the addition of approximately 8.5-10.5 feet of asphalt along the frontage of the development.
The construction of curbing and sidewalk is also required.
~ The CountY Engineer has desipated a Local Access RoadwaY Section for the imProvement
of Glenn Road which is adjacent to the proposed development. This will require the addition of
varying amounts of asphalt along the frontage of the development. The construction of curbing
and sidewalk is also required.
11. In discussions with County Engineering the applicant has stated the intention to construct
Glenn Road in conjunction with PE-1808, Meadowland. In order to record a final plat for this
proposal, the applicant shall demonstrate that road and drainage plans have been accepted for
Glenn Road in conjunction with PE-1808 Meadowland; or shall prepare plans for acceptance
with this proposal. Off-site dedication of right of way for Glenn Road may be required and a
temporary cul de sac would be required at the south boundary of the proposal if Meadowland
has not filed a final plat prior to this proposal. .
fFhe proposed plat shall be improved to the standards set forth in Spokane County Board of
IL'commissioners Resolution No. 95-0498, as amended, which establishes regulations for roads,
approaches, drainage and fees in new construction.
13. The County Engineer has examined this development proposal and has determined that the
impact of this proposal upon the existing County Road System warrants the dedication of
additional Right of Way and the roadway improvements herein specified.
14. The applicant should be advised that there may exist utilities either underground or
overhead affecting the applicants property, including property to be dedicated or set aside future
acquisition. Spokane County will assume no financial obligation for adjustments or relocation
regarding these utilities. The applicant should check with the applicable utilities and Spokane
County Engineer to determine whether the applicant or utility is responsible for adjustment or
relocation costs and to make arrangements for any necessary work.
15. The applicant shall grant applicable border easements adjacent to Spokane County Right of
Way per Spokane County Standards.
HE Findings, Conclusions and Decision PE-1850-97 Page 8
SPOKANE REGIONAL HEALTH DISTRICT
1. The final plat shall be designed as indicated on the preliminary plat of record andlor any
attached sheets as noted.
2. Appropriate utility easements shall be indicated on copies of the preliminary plat of record
for distribution by the Planning Department to the utility companies, Spokane County Engineer,
and the Spokane County Health District. Written approval of the easements by the utility
companies shall be received prior to the submittal of the final plat.
3. Sewage disposal method shall be as authorized by the Director of Utilities, Spokane
County.
4. Water service shall be coordinated through the Director of Utilities, Spokane County.
5. Water service shall be by an existing public water supply when approved by the Regional
Engineer (Spokane), State Department of Health.
6. Prior to filing the final plat, the sponsor shall demonstrate to the satisfaction of the Spokane
County Health District that an adequate and potable water supply is available to each lot of the
plat.
7. Prior to filing the final plat, the sponsor shall present evidence that the plat lies within the
recorded service area of the water system proposed to serve the plat.
8. A plan for water facilities adequate for domestic use, domestic irrigation use, and fire
protection use shall be approved by the water purveyor. Said water plan must have been
approved by the fire protection district and the appropriate health authorities. The health
authorities, water supplier (purveyor) and the fire protection district will certify, prior to the
filing of the final plat, on the face of said water plan that the plan is in conformance with their
requirements and will adequately satisfy their respective needs. Said water plan and certification
will be drafted on a transparency suitable for reproduction.
9. The purveyor will also certify prior to filing the final plat on a copy of said water plan that
appropriate contractual arrangements have been made with the plat sponsor for construction of
the water system, in accordance with the approved plan and time schedule. The time schedule
will provide, in any case, for completion of the water system and inspection by the appropriate
health authorities prior to application for building permits within the plat. The contractual
arrangements will include a provision holding Spokane County, Spokane Regional Health
District, and the purveyor harmless from claims by any lot purchaser refused a building permit
due to failure of the plat sponsor to satisfactorily complete the approved water system.
10. A public sewer system will be made available for the plat and individual service will be
provided to each lot prior to sale. Use of individual on-site sewage disposal systems shall not be
authorized.
HE Findings, Conclusions and Decision PE-1850-97 Page 9
,
11. ,A statement shall be placed in the dedication to the effect that: "A public sewer system will
be `''~ade available for the plat and individual service will be provided to each lot prior to sale.
Us - of individual on-site sewage disposal systems shall not be authorized.
G-
12. The dedicatory language on the plat shall state: "Use of private ~vells and water systems is
pyo.ibited."
The fnal plat dedication shall contain the following statement: "The public water system,
p rsuant to the Water Plan approved by county and state health authorities, the local fire
~tection district, County Building and Planning and water purveyor, shall be installed within
is bdivision and the applicant shall provide for individual domestic water service as well as
protection to each lot prior to sale of each lot and prior to issuance of a building permit for
ch lot."
SPOKANE COUNTY DIVISION OF UTILITIES
1. A wet (live) sewer connection to the area-wide Public Sewer System shall be constructed.
A sewer connection permit is required.
~ 2. The applicant shall submit for the express review and approval of the County Division of
Utilities, "under separate cover", only those plan sheets showing sewer plans and specifications
~ for public sewer connections and facilities for review and approval.
3. The plans shall be submitted prior to the finalization of the project.
4. Security shall be deposited with the Utilities Department for construction of: Public Sewer
Connections and Facilities. 5. Any water service for this project shall be provided in accordance with the Coordinated
Water System Plan for Spokane County, as amended.
HE Findings, Conclusions and Decision PE-1850-97 Page 10
r
.
DATED this 17th day of April, 1998.
SPOKANE COUNTY HEARING Ex:AMINER
Michael C. Dempsey, WSBA #8235 ~
NOTICE OF FINAL DECISION AND NOTICE OF RIGHT TO APPEAL
Pursuant to Spokane County Resolution No. 96-0171, the decision of the Hearing Examiner
on an application for a preliminary plat is final and conclusive unless within twenty-one (21)
calendar days from the issuance of the Examiner's decision, a party with standing files a land use
petition in superior court pursuant to chapter 36.70C RCW. Pursuant to RCW 36.70C.040, the date
of issuance of the Hearing Examiner's decision is three days after it is mailed.
This Decision was mailed by Certified Mail to the Applicant on April 17, 1998. The date of
issuance of the Hearing Examiner's decision is therefore April 20, 1998. THE LAST DAY FOR
APPEAL OF THIS DECISION TO SUPERIOR COURT BY LAND USE PETITION IS
MAY 11, 1998.
The complete record in this matter, including this decision, is on file during the appeal period
with the Office of the Hearing Examiner, Third Floor, Public Works Building, 1026 West
Broadway Avenue, Spokane, Washington, 99260-0245, (509) 324-3490. The file may be inspected
during normal working hours, listed as Monday - Friday of each week, except holidays, between the
hours of 8:00 a.m. and 4:30 p.m. Copies of the documents in the record will be made available at
the cost set by Spokane County Ordinance.
HE Findings, Conclusions and Decision PE-1550-97 Page 11
~ - -
STAFF REP aR-T TO THE HEARING EXAMINER
~ FILE PE-1850-97
DIVISION OF BUILDING AND PLANNING ~
SPOKAISM COUNn _ -
HEARING DATE: February 25, 1998 @ 9:00 a.m. FILE PE-1850-97
PROJECT PLANNER: Tammy Jones, Associate Planner
PROJECT DESCRIPTION: Preliminary plat to divide approximately 2.19 acres into six (6) lots
for single family residences and one (1) lot for a duplex in the
existing Urban Residential-3.5 (UR-3.5) zone.
STAFF RECOMMENDATION: Staff recommends approval of the proposed preliminary plat, as
conditioned.
Project Data
_.Pr-oject Location: 10908 E. 12`" Avenue. The site is generally located
- south of and adjacent to 12t' Avenue and
: :
approximately 600 feet east of University Road in the
SW'/4 of Section 21, Township 25 N., Range 44
EWM.
. ParCel Number(s) 45213.9064
Applicant:
William Purvis
12810 E. Palouse Hwy.
Valleyford, WA. 99036-9726
(509) 924-2087 ~
Comprehensive Plan Oesignation:'-' Urban
Zoning: Urban Residential-3.5 (UR-3.5)
Existing Lanid- Use: Residential
Surrounding Zoning and land Uses:
~ . ~ • North: : ~ ~ Urban Residential-3.5 (UR-3.5); vacant and
undeveloped.
. • South: Urban Residential-3.5 (UR-3.5); vacant and
. . _ , , undeveloped. .
. ~ ~ • ~ East: Urban Residential-3.5 (UR-3.5);
Single family residential.
~ - ~ West: ' Urban Residential-3.5 (UR-3.5);
Vacant and undeveloped. .
Known Land Use Propasals anai Recent project approvals in the area include;
Recent Project-Approvals in the' Meadowland (PE-1808-96) and Parc Centre (PE-
Area of~this Project- 1809-96).
Land Division Status: = Parcel created through an Assessor's Segregation
. ,
prior to 1978. There is no Certificate of Exemption
on file recognizing creation of this parcel.
PE-1850-97
Staff Report - February 25,1998 Hearing
1 of 4
. ,
Shoreline;Designation:i= Not appiicable
WaterN Purveyor--_ Model Irrigation District #18
i. = niN;'~;~~_. ~~M~-' ` i _ .
;Sewageq,,,~pm=D~~,isposal~ t-'
A~ ~ ~ - N= Public Sewer
~~ia 71°~_ ~f~~2 iU 14~-
= I~ii.ll 11 Y ~.Wru 4 ~ • - _
kL , n S i~y~,
, Fire District~#•~~~~'~`~y~~ ` °Mn ° Spokane County Fire District #1
- Exr ~i. ~ ti ~'i~q~•, ~~s- - - - - - 'r~_
_ . _ _ i,n,iq._._ x _ r~a~~3~-aft ~ ~J~..• - _ ,
. School_Di'strict~~~~~ =-A,,~l Central Valley School District #356
Nearest Arteri~al"and~.~istance~ 12'~' Avenue is designated as a Local Access Street
-
_ _ r ',~.L~ rn.n• T 1'
~ ~~T by the Spokane County Arterial Road Plan.
University Road is located approximately 600 feet
, ~ _ _F•' ilWy, ' '
west of the subject property and,is designated as a
r 1,
_ .c:L~_ Principal Arterial by the Spokane County Arterial
Road Plan.
' Balfour Park is located approximately %mile
; Neare"st.Parks'and Distance:~~a. I'-- I♦J IML~E~2a~14:Sk3a_ - ''lit 'si"' " .
northwest of the proposal.
gHborhood~Assoy~con:: L. None known.
• This proposal is located inside the Interim Urban Growth Area (IUGA).
• This proposal is located inside the Public Transit Benefit Area (PTBA).
• This proposal is located outside the 1000' notification boundary of designated Natural
Resource Lands.
GMA/Critical Areas ~
Aquifer~Rechar'ge;,'A,rea: :~ev~`~° Subject property is located within the Prioritg Sewer
h Y~l~'~ _ r_'_ ~ ne• ~ a r. -
Service Area (PSSA) and the Aquifer Sensitive Area
IFi- ia-h ' ~ IN'G~nmd:'"'{iid ' xx•
n, Overlay Zone (ASA).
'=Fish"~`&~?.W~~.ildlife~Hatiitat~,Coriserva"tion'~; None illustrated on the Spokane County Critical
~rR~ 1'4K° »Y ~ 4WInT _ ttY~R , ' : e=" y ^ c' ~''_-Aceays Areas Maps.
!ruG!~~n'~ xr. rut-y. ^rr,:,rq•~: ~,j..t
Located outside of the 100-year flood plain.
_Geologically;,Haiardou"siA'reas:~;~= T='~ None illustrated on the Spokane County Critical
Areas Maps.
We " None illustrated on the Spokane County Critical
tlands:
Areas Maps orWetland Inventory Maps.
SEPA
DNS issued on January 30, 1998
Comment period ends on February 23, 1998
Noticinq
Published: The proposal was published in the Legal Notice section of the Spokesman Review on
February 6, 1998.
Mailing Deadline: The deadline for notifying property owners/taxpayers on land within 400 feet of the
proposal was February 10, 1998.
Site Posting Deadline: February 10, 1998; sign posted adjacent to 12`h Avenue.
1724 Comoliance Dates
Application Accepted: November 13, 1997
Technically Complete / Determination of Completeness issued: December 31, 1997
Date Notice of Decision is Due: April 30, 1998
PE-1850-97
Staff Report - February 25,1998 Hearing
2 of 4
~ Reviewinq Aqencies
14 Agencies were notified on November 20, 1997 and January 30, 1998. Comments were due on
December 4, 1997 and February 11, 1998.
Agencies'Notified*= -Date~=_=..;.~' Agencies Notified'-; Response,:A -;,Date_., ' .
4V2 -Received ~ - _ _
= ,Received. , ,°Receiv.ed
Spokane County Division Yes 2/12/98 Spokane County Division No
of Engineering and of Utilities, Water
Roads, Transportation Resources
Spokane County Division Yes 2/6/98 Washington State No
of Engineering and Department of
Roads, Drainage Transportation '
Spokane County Division Yes 2/2/98 Spokane Regional No
of Long Range Planning Transportation Council
Spokane Regional Health Yes 12/4/97 Spokane Transit No
District Authority
Spokane County Division Yes 12/1/97 Model Irrigation District No
of Utilities No. 18
Spokane County Division No Central Valley School No
of Parks, Recreation & District No. 356
Fair
Spokane County Air No Spokane County Fire No
Pollution Control Authority District No. 1
Resaonses from the Public: No responses have been received from the public.
Description of the Site: ~
The site is generally flat and covered with native vegetation. The site is approximately 2.19 acres in size
and is accessed by 12'" Avenue. There is an existing duplex on the property which is located directly
adjacent to 121hAvenue, and a detached garage. The application states that the detached garage will be
removed prior to development of the site. The surrounding neighborhood consists of single family and two-
family (duplex) developments at various densities along with vacant and undeveloped land. University High
School is located approximately %4 mile west of the subject property and Opportunity Elementary is located
approximately miles to the east.
Descriation of the Proposal:
The proposal is a preliminary plat to divide approximately 2.19 acres into six (6) lots for single family
residences and one (1) lot for an existing duplex. The net density of the proposal is 3.2 units per acre. Lot 1
will access 121' Avenue. All other lots will access the proposed Glenn Road which is within the approved
preliminary plat of Meadowland (PE-1808-96), located east of and adjacent to the site. The Spokane County
Division of Engineering has included a condition of approval requiring that the plat which is finalized first be
responsible for the development of Glenn Road. The Spokane County Division of Engineering has also
requested the dedication of 2.5 feet of additional right-of-way along 12'hAvenue along with the construction
of curbing and sidewalk. The preliminary plat map illustrates typical lots with frontages ranging from 80 to
145 feet, and lot sizes ranging from 10,000 to 20,000 square feet in size. Prior to final plat approval the
applicant must demonstrate that the location of the existing duplex will meet the required building setback of
55' from the centerline of Glenn Road. The proposal is to be served by public water and sewer. The
applicant has not proposed a phasing plan. The site is located within the Public Transit Benefit Area (PTBA)
with transit available to the north of the site along University Road. A Spokane Transit Authority Park and
Ride facility is located at the intersection of University Road and 4`h Avenue.
PE-1850-97
Staff Report - February 25,1998 Hearing
3of4
.
. ~
Backqround:
The site is subject to an approved preliminary short plat, SP-1018-95, consisting of four (4) single family lots.
If the proposed preliminary plat is approved by the Hearing Examiner, SP-1018-95 shall become null and
void.
The existing Urban Residential-3.5 (UR-3.5) zone was established in 1991, with the implementation of the
Spokane County Zoning Code. Prior to 1991, the subject property was zoned Agricultural (A) (ZE-181-50).
: Staff Analysis:
The site is located within the Urban category of the Comprehensive Plan. The Urban category is intended to
provide for the development of a"city-like° environment with intensive residential development.
Recommended densities will range from 1 to 17 units per acre. The proposed net density of 3.2 units per
acre is consistent with the recommended density range.
Goal 1.1 of the Urban category is to "Encourage a variety of housing types and densities". Objective 1.1 a is
to "Promote fill-in within established development areas and existing outlying communities where utilities,
arterials, schools and community facilities have already been established". Decision Guideline 1.1.1 states
that "Urban development will be approved in areas having adequate power supplies, water, sanitary and
storm sewers, streets, and school and fire services provided that such development meets the intent of
other Objectives and Decision Guidelines of this section." The site is within an established neighborhood
and is served by a full line of public services including public water and sewer. Both a high school and an
elementary school are located within one mile of the site. Objective 1.5a says that "New residential or
multiple-family developments should be buffered from existing adjacent land uses where adverse effects
may develop". The proposed net density of 3.2 units per acre is consistent with existing development and
recently approved preliminary plats in the area whose densities average 3.0 to 3.5 units per acre. As
proposed, the preliminary plat is generally supported by the Goals, Objectives and Decision Guidelines of
the Urban category of the Comprehensive Plan.
The existing zoning of the site is Urban Residential-3.5 (UR-3.5), and the adjoining areas are also zoned
Urban Residential-3.5 (UR-3.5). The purpose of the Urban Residential-3.5 (UR-3.5) zone is to implement
the lower density range of the Urban category. The intent is to promote areas of primarity single family
residential use in an urbanized setting, having a high level of public services. As designed, the preliminary
plat meets or exceeds the minimum development standards, including minimum lot size and frontage, of the
Urban Residential-3.5 (UR-3.5) zone.
Surrounding land uses include single and two-family (duplex) residences, and vacant and undeveloped land.
Recent land use approvals in the area include Meadowland (PE-1808-96) and Parc Centre (PE-1809-96).
Meadowland is located directly east of and adjacent to the subject property and consists of 21 single family
lots on 6.18 acres with a net density of 3.39 units per acre. Parc Centre is located directly north of the site
and consists of 22 single family lots on 6.3 acres with a net density of 3.8 lots per acre. The proposed net
density of the preliminary plat is consistent with recent land use approvals in the area.
, Staff Recommendation:
The Division of Building and Planning recommends approval of the proposed preliminary plat, as
conditioned.
Attachments:
A. Maps
o Vicinity Map
m Site Plan
• Comprehensive Plan Map
~gency Zoning Map
B. and Public Comments
C. Conditions of Approval
PE-1850-97
Staff Report - February 25,1998 Hearing
4 of 4
• Wlap
n
.
I~lAAX~u- ~NS ~
: _ ` ~
r- `,X tNT4 27
M p _ ~ 800N~ F T
a
N ~ ~ _ A 0
~
BpGR`,~ ? ~p.N 'l~A1L~~ ~ ~ cl ~~A~WAY 1
c p '
, F +
.v~ ~ V o p
cr_
• ~ ~ ~ ' ►
1,4 ~
~°~v
0t5N
NtLLs
~ 1► ~
i ~
t eA'MP
. xARO
V1
btA
s-
~ 19 ~ ~Nn 4
. • •
• . ~ 2 ~ ~RQ Z4
A~`
~
, ~ ~ . . C2 B~
~ ~
1 . 20 ' ~
CC6,
~ , - •
~ VICtN~TY ~Ap
N'
p2125198
Not ta gcale
Z
0
r« •
0
cn
n
I;;CEIVED
COUNTY
;Pv;Z.-.t.' vann+nuar ~ ~ 1991 N
PIA~ Of PJ,N. :EIt~RC
.
I~vnU i .
i7m awu[ 0. '
' L._ .
C~;: c>Ui'.t,Nu PLANNil rotL
""'--'-""-i--°----""" ~i Y y l~!- ~a - tlc;Nitt vip
_ t ii ~ j!f _ f. 1,~+ ~w ~m ~ •
1 Y A
N --.t^~. ~semti~i
UNi _ ' i~~.l'~ 1 ` .
t CD ~
?w o,T< < rn
~ \ ~~I ~y1 1 AI~~UIW 1~11L
~ ~ 7 ~ i toia ~w~a v Wn i %en ~
r~~ • V~ n M` r\ 3\ v aW+M /W11+q V ~
yMG~~y~TON C11 h 11
^M111r111V VPW C0.Yh ~
411L4 MJ{ /M41 • ~
♦
1~w~ I ; If
. --....J ~
~onm~a ►veu~r O
Y M ~uN1WCOPtlNd NLWIUN~ ~
Z VOiW,uI~11{NR~~ t11114 M~1~Ip0.VMON•It11 ~
' 1 f ' l~wl ~~►~~a Iw~ il~-1at
~ ti` . ~ T ; ✓1~ i ~ tDO1L D'CJqCtTMN ~
~ ' ri r r......w~w~..rw•rrrrr..~~.. ~ ~
- ;
i ~',~i . ' :~:~;w..~~.~~~~-.~``
0%1
Lu~,Mr.wrw.r...
r4L
O ~~y~ - . M 1 M~ /.~r I w~ tiiY1~Y1 N ~ w wy r W 1
I - - - - - - - .7- - Vi wJ Y~rrr•u~I rrM~r...1~WilrJ~lrr~
~~~N ~ .iiw' :Tv'~.i ~ ~-'y ...•...:'w.. ~
< . ) • `'ti. , - ~ .
~ PRELI1~iINARY PLAT r
\
O i OF ~
~ ~Xe ~n PURVIS POINT
rn ~ ~111~QM~N1 IU1 YY rrrMre ~r a waA ~A= ~ ~
IFWO ~.xu a.u~~w m~a.rK~ wawyun d 1 PORTICH 01 Tlit ST 1/4 0r
Z i$ vu~+w4 tw~ir wn~rf~ ao++~a
PAa+o accnox e1, r,eo~~„ a.ut., T.U.
I 1~ Eta.e-ora etiwxA:n eoMm, xASILwcsox
ocroncn 1097
~
r ~
Z
9 SItE PIAN '
D OF RECORD ~
~
~~~n.r:~ ~ ~ . .
s~
a
~
.s n
~1 a
1
E P
P e
U~
d
,,an rebensive
_ _ ,
comp
_ Z .
anal -
.
MISSIOA
~ -
,
~
.
, .
, ~ i
m r ~ o ~ ell - ~6
ell o
.
8 ~
,
` . t„_.. ~ -
w . -
~
. . . . ~
~ ~ -
~ ti 1
~j~r
~ . g g l ~ cr
. ul
~
0 11 ` . '
31 , '01 hesteY
- -
,
~ ' ~ ~ _ H~t•1SivE QI.AN MAP
COMPRE
~~25~g8
Not tQ gcale
.~7
~o
.~s
~
~ zoning
~ .
t~r►~ _
~ ~ .
' ~ • 7
.
, , o -r-9o.:s`~ 1 Dc , pE ~ _ - -
l Z ~
D F► DL
- - - - - ~ .
a~i 1 ~ ; • C
~R .
k Ce
. r ~ ° " ~
h.~.z ~ `r~ ~ . ~ • ~ SE ~ ; r__.-.
{ . 1 . . ~ .
v
SD
~ ' ~ . ~ • ~
.
sG
70 ~ ~ ~
_
' 00
,
• y4 , i
~
( D.
- •-y, ~ ~ •
~~~t~' ~ ' . . , •
~
771
~ ~ . ~a•- jn^ ~
- ._-~,o• „~\r1
rN 57 . ~ . ` ~
~ j ►r ~ -
10
<< 1 1 3 ru ~ 4 ' ~ L-'~-'
e N~ E, _ , gs bC _ ~ .ot ~ "1 - -
B ~ ~ a .yr tl~ ~ N u ~ g ~
y.s~ CO) .
C~
C -C,01-11" i G .n 1,
• _ ZQ~it4G MAP
N'
p2125►98
Not to Scale
OFFICE OF THE SPOKANE COUNTY ENGINEER
1026 W Broadway Ave, Spokane, WA 99260-0170 (509)456-3600 Fax 324-3478
"ENGINEER'S CONDITIONS OF APPROVAL" PLATS
T0: Spokane County Planning Department
FROM: Division of Engineering & Roads
DATE: February 12, 1998
PROJECT: PURVIS PT
FILE PE-1850-97 /
Hearing: 02/25/1998 @9:00 #3
Review Date:
Sponsor/Applicant: WILLIAM PURVIS
Section Township Range: 21-25-44
Planner: TAMMY JONES
Technical Review Date: (12/04/1997 @ 215)
The Spokane County Engineering Department has reviewed the above referenced
application. The following "Conditions of Approval" are submitted to the
Spokane County Planning Department for inclusion in the "Findings of Fact,
Conclusions and Order/Decision" should the request be approved.
Prior to release of a building permit or use of property as proposed:
1. That conditional approval of the plat by the County Engineer is given
subject to dedication of right-of-way and approval of the road system
as indicated in the preliminary plat of record.
2. Road plans, profiles and cross sections as designed to County standards
showing proposed street centerline and curb grades be submitted to the
County Engineer for acceptance prior to construction and/or the filing
of a final plat; road plans to be prepared under the direction of a
licensed Professional Civil Engineer.
3. Drainage plans and design calculations showing the alignment of
drainage facilities be submitted to the County Engineer for acceptance
prior to construction and/or the filing of the final plat. Drainage
plans to be prepared under the direction of a licensed Professional
Civil Engineer.
4. Construction within the proposed public streets and easements shall be
performed under the direct supervision of a licensed engineer/surveyor,
who shall furnish the County Engineer with "As Built" plans and a
certificate in writing that all improvements were installed to the
lines and grades shown on the approved construction plans and that all
disturbed monuments have been replaced.
5. No construction work is to be performed within the existing or proposed
Public right-of-way until a permit has been issued by the County
Engineer. Al1 work is subject to inspection and approval by the County
Engineer.
CC: Applicant WILLIAM PURVIS
Engineer/Surveyor PATRICK MOORE
Planner TANINIY - JONES
Page 2 of 2
02/25/1998 12/09/1997
PE-1850-97
6. All construction within the existing or proposed Public right-of-way is
to be completed prior to filing the final plat or a bond in the amount
estimated by the County Engineer to cover the cost of construction of
improvements. construction certification, "As Built" plans and
monumenting the street centerlines shall be filed with the County
Engineer.
7. The applicant should be advised that individual driveway access permits
are required prior to issuance of a building permit for driveway
approaches to the County road system.
8. Dedication of 2.5 feet of additional right-of-way along 12`h Avenue.
9. The County Engineer has designated a Collector Arterial Roadway Section
for the improvement of 12t'' Avenue which is adjacent to the proposed
development. This will require the addition of approximately 8.5-10.5
feet of asphalt along the frontage of the development. The
construction of curbing and sidewalk is also required.
10. The County Engineer has designated a Local Access Roadway Section for
the improvement of Glenn Road which is adjacent to the proposed
development. This will require the addition of varying amounts of
asphalt along the frontage of the development. The construction of
curbing and sidewalk is also required.
In discussions with County Engineering the applicant has stated the
intention to construct Glenn Road in conjunction with PE-1808,
Meadowland Addition. In order to record a final plat for this proposal,
the applicant shall demonstrate that road and drainage plans have been
accepted for Glenn Road in conjunction with PE-1808 Meadowland
Addition; or shall prepare plans for acceptance with this proposal.
Off-site dedication of right of way for Glenn Road may be required and
a temporary cul de sac would be required at the south boundary of the
proposal if Meadowland Addition has not filed a final plat prior to
this proposal.
11. The proposed plat shall be improved to the standards set forth in
Spokane County Board of Commissioners Resolution No. 95-0498, as
amended, which establishes regulations for roads, approaches, drainage
and fees in new construction.
12. The County Engineer has examined this development proposal and has
determined that the impact of this proposal upon the existing County
Road System warrants the dedication of additional Right of Way and the
roadway improvements herein specified.
. Page 3 of 3
02/25/1998 12/04/1997
PE'-1850-97
13. The applicant should be advised that there may exist utilities either
underground or overhead affecting the applicants property, including
property to be dedicated or set aside future acquisition. Spokane
County will assume no financial obligation for adjustments or
relocation regarding these utilities. The applicant should check with
the applicable utilities and Spokane County Engineer to determine
whether the applicant or utility is responsible for adjustment or
relocation costs and to make arrangements for any necessary work.
14. The applicant shall grant applicable border easements adjacent to
Spokane County Right of Way per Spokane County Standards.
JKANE REGIONAL HEALTH DISTt\-Lc T
SPOKANFE COUN~ENVIRONMENTAL HEALTH DIVISI4N
FEB 12 1998 Inter-office Communication
DIViS10N0~ U1~,~VG~11D PLA~~;Al1~IG DATE: February 4, 1998
'iY:
TO: Tammy Jones, Associate Planner, Spokane County Building and Planning Division
FROM: Donald T. L nch EHS II - EHD, SRHD Q Y '
SUBJECT: Proposed Preliminary Plat: PE-1850-97 Purvis Point
l. References:
a) Map of subject, scale 1" = 50', by applicant, dated October 1997, received by this office Janauary 30,
1998.
b) Reconnaissance Geoloeic Man of the West Half of the Spokane Quadranale. Washington and Idaho,
Allan B. Griggs, 1966.
c) Soil Survev. Sookane Countv. Washineton, Soil Conservation Service, U.S.D.A., March, 1968.
d) Spokane Countv. Washiniaton, En2ineering Interpretations, Soil Conservation Service, U.S.D.A.,
August, 1974.
e) St)okane Countv Rules and Regulations for SewaLye Disposal Svstems, January 19, 1995.
fl Spokane Regional Health District procedural implementation of Section 52 of Substitute House Bill
2929 (RCW 58.17.110, as amended).
g) Logs of water wells in Range 44E, Township 25N, Sections 16, 20, 21, 22, and 28.
h) Map: Spokane N. E. Quadrangle, U.S.G.S., 1973, and Spokane N.E., U.S.G.S., 1973.
2. Findings:
a) This project lies over the Spokane-Rathdrum Aquifer.
b) The project is within Critical Water Supply Service Area #3 and within the service area of Model
Inigation District #18. Water supply will be a public system.
c) The project is inside the Spokane County Comprehensive Wastewater Management Area, inside the
General Sewer Service Area, and inside the Priority Sewer Service Area recommended in the '201'
Study. The method of sewage disposal is subject to approval of the Director of Utilities, Spokane
County, pursuant to County Resolution 80.0418 adopted March 24, 1980. The topography and soils in
the area are generally suitable for use of individual on-site sewage disposal systems. The lots are not
of the proper dimensions to permit the use of both individual wells and sewage systems.
d) The project lies in a relatively flat area west of Glenn Road and soufih of 12`h Avenue. Local
. f
drainageways are insik,..~ficant.
e) Surface soils are classed by the U.S. Soil Conservation Service as marble sandy loam with 0% to 8%
slopes. They have a septic tank filter field limitation of slight. There is also possible contamination of
groundwater. This soil would be classified as a Type IV.
fl Geologically, the soils are glaciofluvial deposits. These geological structures generally yield moderate
to very large amounts of water. Data from wells in the area referenced in section 1 g shows they are
from 80' to 250' deep and have static water levels varying from 50' to 172' below the surface. The
Model Irrigation District #18 has indicated that it can supply domestic use water for the project upon
complefiion of agreements with the proponent. .
3. Required (mandatory) Conditions If Approved:
a) The final plat shall be designed as indicated on the preliminary plat of record and/or any attached
sheets as nofied.
b) Appropriate utility easements shall be indicated on copies of the preliminary plat of record for
distribution by the Planning Department to the utility companies, Spokane County Engineer, and the
Spokane Regional Health District. Written approval of the easements by the utility companies shall be
received prior to the submittal of the final plat.
c) Sewage disposal method shall be as authorized by the Director of Utilities, Spokane.
d) Water service shall be coordinated through the Director of Utilities, Spokane County.
e) Water service shall be by an existing public water supply when approved by the Regional Engineer
(Spokane), State Department of Health. fl Prior to filing the final plat, the sponsor shall demonstrate to the satisfaction of the Spokane Regional
Health District that an adequate and potable water supply is available to each lot of the plat.
g) Prior to filing the final plat, the sponsor shall present evidence that the plat lies within the recorded
service area of the water system proposed to serve the plat.
h) A plan for water facilities adequate for domestic use, domestic irrigation use, and fire protection use
shall be approved by the water purveyor. Said water plan must have been approved by the fire
protection district and the appropriate health authorities. The health authorities, water supplier
(purveyor), and the fire protection district will certify, prior to the filing of the final plat, on the face of
said water plan that the plan is in conformance with their requirements and will adequately satisfy their
respective needs. Said water plan and certification will be drafted on a transparency suitable for
reproduction.
i) The purveyor will also certify prior to filing the final plat on a copy of said water plan that appropriate
contractual arrangements have been made with the plat sponsor for construction of the water system, in
accordance with the approved plan and time schedule. The time schedule will provide, in any case, for
completion of the water system and inspection by the appropriate health authorities prior to application
for building permits within the plat. The contractual arrangements will include a provision holding
Spokane County, Spokane Regional Health District, and the purveyor harmless from claims by any lot
purchaser refused a building permit due to failure of the plat sponsor to satisfactorily complete the
approved water system.
i j) A public sewer system will be made available for the plat and individual service will be provided to
each lot prior to sale. Use of individual on-site sewage disposal systems shall not be authorized.
4. Recommended Conditions of Approval:
a) A statement shall be placed in the dedication to the effect that: "A public sewer system will be made
available for the plat and individual service will be provided to each lot prior to sale. Use of individual
on-site sewage disposal systems shall not be authorized."
b) The dedicatory language on the plat shall state: "Use of private wells and water systems is prohibited."
c) The final plat dedication shall contain the following statement: "The public water system, pursuant to
the Water Plan approved by county and state health authorities, the local fire protection district, County
Building and Safety Department and water purveyor, shall be installed within this subdivision and the
applicant shall provide for individual domestic water service as well as fire protection to each lot prior
to sale of each lot and prior to issuance of a building permit for each lot."
c: Director of Utilities, Spokane County
c: Sponsor: WILLIAM PURVIS
. 12810 E PALOUSE HWY
VALLEYFORD WA 99036
I anduse.ltrlpe- I 850-971pa
rptComments
To: TAPvIMY JONES (Building & Planning)
CC: KEVIN COOKE (Utiliti2s)
From: JIM RED (Utilities)
Date: 2/13/98
Subject: PE-1850-97 Stage: Hearing Examin
er °hase:
Purvis Point A wet (liv2) sewer connection to the area-wide Public S2wer Sy
stem is to be constructed. Sewer connection
permit is required. Applicant shall submit expressly to Spokane County Utilities D
epartment "under separate cover", only those
plan sheets showing sewer plans and specifications for the pun
lic sewer connections and facilities for review
and approval.
The plans shall be submitted prior to the finaliza-Lion of the
project.
Security shall be deposited with the ULilities Department forL
construction of the public sewer connections
and facilities
Any water service for this project shall be provided i^ accorc
ance with the Coordinated YJater System Plan for
Spokane__ County, as am2nded.
D
Lage 1
I
`S Y.~@~~ Y R'~yy`~ ~Ky« _ f~~°li.'.. +j 9 R~ =i 4.i.j- ;'~lt
.b-,. u~ • ~ _ ` - '6' ~..w.1~.
~ , ^"i ~ ~`Xx I r _ u''Fwi
4~~~~R~E.COMMENDED CONDITIONS,
A~PRov~►~ FoR PE-1~850--9T7 I
.
.z
~ I~~~ I►I~ ~ DIVISION OF BUILDING AND PLANNING a ~
~
SPOJL;►Al `LL/ COUI'M ~w ~Tw---,Adf 1~
_ ~
1. All conditions imposed by the Hearing Examiner shall be binding on the "Applicant", which
term shall include the owner or owners of the property, heirs, assigns and successors.
2. The proposal shall comply with the proposed Urban Residential-3.5 (UR-3.5) zone and the
Aquifer Sensitive Area (ASA) Overlay zone, as amended.
3. The final plat shall be designed substantially in conformance with the preliminary plat of
' record. No increase in density or numbers of lots shall occur without a change of
condition application submittal and approval. .
.
4. The Division of Building and Planning Director/designee shall review any proposed final
plat to ensure compliance with these Findings and Conditions of Approval.
5. A final plat/name/number shall be indicated before the final plat is filed, such
name/number to be approved by the Division Director/designee.
6. Appropriate road name(s) shall be indicated.
7. The preliminary plat is given conditional approval for five (5) years, specifically to March 1,
2003. The applicant may request an extension of time by submitting a written request
thirty (30) days prior to the above expiration date.
8. Appropriate utility easements shall be indicated on copies of the proposed final plat.
Approval of utility easements by appropriate utility companies shall be received with the
submittal of the final plat.
9. The final plat map shall indicate by as clear, dashed line the required yard setbacks from
all private, or public roads. The dedication shall contain the following statement:
"Side yard and rear yard setbacks are specifically drafted on this final plat. The setbacks
indicated on this plat may be varied from if proper zoning approvals are obtained."
10. Three (3) current certificates of title shall be furnished to the Spokane County Division of
Building and Planning prior to filing the final plat.
PE-1850-97 February 25, 1998 Public Hearing
Division of Building and Planning Recommended Conditions of Approval
e 4
11. Prior to filing of all or a portion of the final plat, the applicant's surveyor shall submit one or
more maps outlined in red of the area being finalized. The scale shall match the
appropriated assessor's map scale.
12. At the time of final plat submittal, the applicant shall demonstrate either on the face of the
final plat or on an acceptable attachment that all lots located on a cul-de-sac or curvilinear
street meet or exceed the minimum required frontage.
` 13. A survey is required prior to the filing of the final plat.
14. Prior to approval of road and drainage plans, you are required to coordinate with the
United States Postal Service to determine type and location of central mail delivery
facilities which may include applicable easements for developments of three or more
homes.
15. The applicant shall contact the Division of Building and Planning at the earliest possible
stage in order to be informed of code requirements administered/enforced as authorized
by the State Building Code Act. Design/development concerns include: Addressing, fire
apparatus access roads, fire hydrant flow, approved water systems, building accessibility,
construction type, occupancy classification, existing exterior wall protection, and energy
code regulations. (Note: The Division of Building and Planning reserves the right to
confirm the actual address at the time of building permit.)
PE-1850-97 February 25, 1998 Public Hearing
• Division of Building and Planning Recommended Conditions of Approval
OFFICE OF THE SPOKANE COUNTY ENGINEER
1026 W Broadway Ave, Spokane, WA 99260-0170 (509)456-3600 Fax 324-3478
"ENGINEER'S CONDITIONS OF A~PPROVAL"
~
TO: Spokane County Planning Departmen~
FROM: Division of Engineering & Roads ~
DATE: February 12, 1998 ~
PROJECT: PURVIS PT
FILE PE-1850-97 /
Hearing: 02/25/1998 Q9:00 #3
Review Date:
Sponsor/Applicant: WILLIAM PURVIS
Section Township Range: 21-25-44
Planner: TAMMY JONES
Technical Review Date: (12/04/1997 @ 215)
The Spokane County Engineering Department has reviewed the above referenced
application. The following "Conditions of Approval" are submitted to the
Spokane County Planning Department for inclusion in the "Findings of Fact,
Conclusions and Order/Decision" should the request be approved.
Prior to release of a building permit or use of property as proposed:
1. That conditional approval of the plat by the County Engineer is given
subject to dedication of right-of-way and approval of the road system
as indicated in the preliminary plat of record.
2. Road plans, profiles and cross sections as designed to County standards
showing proposed street centerline and curb grades be submitted to the
County Engineer for acceptance prior to construction and/or the filing
of a final plat; road plans to be prepared under the direction of a
licensed Professional Civil Engineer.
3. Drainage plans and design calculations showing the alignment of
drainage facilities be submitted to the County Engineer for acceptance
prior to construction and/or the filing of the final plat. Drainage
plans to be prepared under the direction of a licensed Professional
Civil Engineer.
CC: Applicant WILLIAM PURVIS
Engineer/Surveyor PATRICK MOORE
Plariner TAMMY JONES
Pag~ 2 of 2
02/25/1998 12/04/1997
PE-1850-97
4. Construction within the proposed public streets and easements shall be
performed under the direct supervision of a licensed engineer/surveyor,
who shall furnish the County Engineer with "As Built" plans and a
certificate in writing that all improvements were installed to the
lines and grades shown on the approved construction plans and that all
disturbed monuments have been replaced.
5. No construction work is to be performed within the existing or proposed
Public right-of-way until a permit has been issued by the County
Engineer. All work is subject to inspection and approval by the County
Engineer.
6. All construction within the existing or proposed Public right-of-way is
to be completed prior to filing the final plat or a bond in the amount
estimated by the County Engineer to cover the cost of construction of
improvements. construction certification, "As Built" plans and
monumenting the street centerlines shall be filed with the County
Engineer.
7.- The applicant should be advised that individual driveway access permits
are required prior to issuance of a building permit for driveway
approaches to the County road system.
8. Dedication of 2.5 feet of additional right-of-way along 12t'' Avenue.
9. The County Engineer has designated a Collector Arterial Roadway Section
for the improvement of 12th Avenue which is adjacent to the proposed
development. This will require the addition of approximately 8.5-10.5
feet of asphalt along the frontage of the development. The
construction of curbing and sidewalk is also required.
10. The County Engineer has designated a Local Access Roadway Section for
the improvement of Glenn Road which is adjacent to the proposed
development. This will require the addition of varying amounts of
asphalt along the frontage of the development. The construction of
curbing and sidewalk is also required.
, Page 3 of 3
~ 02/25/1998 12/04/1997
PE-1850-97
In discussions with County Engineering the applicant has stated the
intention to construct Glenn Road in conjunction with PE-1808,
Meadowland Addition. In order to record a final plat for this proposal,
the applicant shall demonstrate that road and drainage plans have been
accepted for Glenn Road in conjunction with PE-1808 Meadowland
Addition; or shall prepare plans for acceptance with this proposal.
Off-site dedication of right of way for Glenn Road may be required and
a temporary cul de sac would be required at the south boundary of the
proposal if Meadowland Addition has not filed a final plat prior to
this proposal.
11. The proposed plat shall be improved to the standards set forth in
Spokane County Board of Commissioners Resolution No. 95-0498, as
amended, which establishes regulations for roads, approaches, drainage
and fees in new construction.
12. The County Engineer has examined this development proposal and has
determined that the impact of this proposal upon the existing County
Road System warrants the dedication of additional Right of Way and the
roadway improvements herein specified.
13. The applicant should be advised that there may exist utilities either
underground or overhead affecting the applicants property, including
property to be dedicated or set aside future acquisition. Spokane
County will assume no financial obligation for adjustments or
relocation regarding these utilities. The applicant should check with
the applicable utilities and Spokane County Engineer to determine
whether the applicant or utility is responsible for adjustment or
relocation costs and to make arrangements for any necessary work.
14. The applicant shall grant applicable border easements adjacent to
Spokane County Right of Way per Spokane County Standards.
Kimball, Sandy
From: Hemmings, Bill
Sent: Friday, February 06, 1998 12:22 PM
To: Jones, Tammy
Cc: Harper, Pat; Franz, Dean; Kimball, Sandy; Engelhard, Scott; Pederson, John
Subject: RE: P-1850-97 - William Purvis
Importance: High
I received a"DNS" for the above referenced project on Jan. 30, 1998. I have no new comments on this project.
From: Hemmings, Bill
Sent: Monday, December 01, 1997 9:39 AM
To: Jones, Tammy
Cc: Harper, Pat; Franz, Dean; Kimball, Sandy; Engelhard, Scott; Pederson, John
Subject: P-1850-97 - William Purvis
Importance: High
12-01-97
I received the above referenced project application on Nov. 20, 1997.
The SCS Soils Map identifies this area as being Garrison Gravely Loam soils. The soil survey in this area is
known to be accurate. Therefore, since this is an approved soil for stormwater disposal, no concept drainage
plan is required. We have no information that says there are any critical areas on this site.
I consider this proposal to be technically complete.
I recommend using the standard drainage condition.
OW qeoswsu~rqa
Page 1
• ~ .
NOTICE OF PUBLIC HEARING
SPOKANE COUNTY HEARING EXAMINER
TO: All interested persons, and owners/taxpayers within 400 feet
YOU ARE HEREBY NOTIFIED THAT A PUBLIC HEARING WILL BE HELD ON THE
.LAND USE APPLICATION LISTED BELOW, AS FOLLOWS:
Aprlication: File No. PE-1850-97, Preliminary Plat of Purvis Point to divide approximately 2.19 acres
in 'six (6) lots for single family residences and one (1) lot for an existing duplex in the existing Urban
Residential-3.5 (UR-3.5) zone.
Hcaring Datc and Timc: February 25, 1998 9:00 a.m.
Place: Commissioners Assembly Room, Lower Level, Spokane County Public Works Building, 1026
West Broadway, Spokane, Washington.
Anplicant/Owner: William Purvis, 12810 E. Palouse Highway, Valleyford, WA. 99036, (509) 924-
2087.
Address anci Location: Generally located south of and adjacent to 12`" Avenue and approximately 600
feet east of University Road in the SW `/4 of S. 21, T. 25 N., R. 44 EWM, Spokane County, Washington.
Comprehensive Plan: Urban
Zoning Designation: Urban Residential-3.5 (IJR-3.5)
Environmental Determination: A Determination of Nonsignificance was issued by the County Division
of Building and Planning, as the lead agency. The official comment period ends 2-23-98.
Deadline for submitting SEPA Appeal: [note: only applies to administrative appeals to the Hearing
Examiner, not to initial applications such as rezones or preliminary plats]
Related Permits: None
Division of T3uilding & Planning Staff: Tammy Jones, (509) 456-3675
HEARING EXAMINER PROCEDURES
Hearing Process and Apneals: The hearing will be conducted under the rules of procedure adopted in
Spokane County Resolution No. 96-0294. All interested persons may testify at the public hearing, and
may submit written comments and documents before or at the hearing. The Hearing Examiner may limit
the time given to speakers. A speaker representing each side of the issue is encouraged. Any appeal of
the Hearing Examiner's decision will be based on the record established before the Hearing Examiner,
pursuant to County Resolution Nos. 96-0171. Environmental appeals will follow the same procedural
route as the underlying action. All hearings will be conducted in facilities which are accessible to
persons with physical disabilities. , '
Inspection of File, Copies of Documents: A Staff Report will generally be available for inspection
seven days before the hearing. The Staff Report and application file may be inspected at the Spokane
County Division of Building and Planning, ls` Floor Permit Center West, Public Works Building, 1026
West Broadway, Spokane, WA, 99260, between 8 a.m. and 4 p.m., weekdays, M-F, except holidays.
Copies of documents will be made available for the cost of reproduction. If you have any questions or
speciai needs, please call the Division at (509) 456-3675. Send written comments to the Spokane County
Division of Building and Planning, 1026 W. Broadway, Spokane, WA, 99260, Attn: (insert name of staff
person, and/or list file number for application). Motions must be made in writing and submitted to the
Spokane County Hearing Examiner, 3' Floor, Public Works Building, 1026 W. Broadway, Spokane,
WA, 99260-0245.
A
f
1
f
OFFICE OF THE SPOKANE COUNTY ENGINEER
1026 W Broadway Ave, Spokane, WA 99260-0170 (509)456-3600 Fax 324-3478
"ENGINEER'S CONDITIONS OF APPROVAL" TR-PLATS
TU: Spokane County Buflding and PlanniY Department
FROM: Division of Engineering & Roads ~
DATE: December 4, 1997
PROJECT: PURVIS PT
FILE PE-1850-97 / )
Hearing Date: @ #
Review Date
Sponsor/Applicant: WILLIAM PURVIS
Section Township Range: 21-25-44
Planner: TAMMY JONES
TechnicaUReview Date: (12/04/1997 @ 215)
The Spokane County Engineering Department has reviewed the above referenced application. The following
"Conditions of Approval" are submitted to the Spokane County Planning Department for inclusion in the
Technical Review Meeting.
Prior to release of a building permit or use of property as proposed:
1. That conditional approval of the plat by the County Engineer is given
subject to dedication of right-of-way and approval of the road system
as indicated in the preliminary plat of record.
2. Road plans, profiles and cross sections as designed to County standards
showing proposed street centerline and curb grades be submitted to the
County Engineer for acceptance prior to construction and/or the filing
of a final plat; road plans to be prepared under the direction of a
licensed Professional Civil Engineer.
3. Drainage plans and design calculations showing the alignment of
drainage facilities be submitted to the County Engineer for acceptance
prior to construction and/or the filing of the final plat. Drainage
plans to be prepared under the direction of a licensed Professional
Civil Engineer.
4. Construction within the proposed public streets and easements shall be
performed under the direct supervision of a licensed engineer/surveyor,
who shall furnish the County Engineer with "As Built" plans and a
certif icate in writing that all improvements were installed to the
lines and grades shown on the approved construction plans and that all
disturbed monuments have been replaced.
CC: Applicant WILLIAM PQRVIS
Engineer/Surveyor WILLIAM PURVIS
Planner TAMMY JONES
, Page 2 of 2
12/04/1997
~ PE-1850-97
~ 5. No construction work is to be performed within the existing or proposed
Public right-of-way until a permit has been issued by the County
Engineer. All work is subject to inspection and approval by the County
Engineer.
6. All construction within the existing or proposed Public right-of-way is
to be completed prior to filing the final plat or a bond in the amount
estimated by the County Engineer to cover the cost of construction of
improvements. construction certification, "As Built" plans and
monumenting the street centerlines shall be filed with the County
Engineer.
7. The applicant should be advised that individual driveway access permits
are required prior to issuance of a building permit for driveway
approaches to the County road system.
8. Dedication of 2.5 feet of additional right-of-way along 12th Avenue.
9. The County Engineer has designated a Collector Arterial Roadway Section
for the improvement of 12th Avenue which is adjacent to the proposed
development. This will require the addition of approximately 8.5-10.5
feet of asphalt along the frontage of the development. The
construction of curbing and sidewalk is also required.
10. The County Engineer has designated a Local Access Roadway Section for
the improvement of Glenn Road which is adjacent to the proposed
development. This will require the addition of varying amounts of
asphalt along the frontage of the development. The construction of
curbing and sidewalk is also required.
11. The proposed plat shall be improved to the standards set forth in
Spokane County Board of Commissioners Resolution No. 95-0498, as
amended, which establishes regulations for roads, approaches, drainage
and fees in new construction.
12. The County Engineer has examined this development proposal and has
determined that the impact of this proposal upon the existing County
Road System warrants the dedication of additional Right of Way and the
roadway improvements herein specified.
13. The applicant should be advised that there may exist utilities either
underground or overhead affecting the applicants property, including
property to be dedicated or set aside future acquisition. Spokane
County will assume no financial obligation for adjustments or
relocation regarding these utilities. The applicant should check with
the applicable utilities and Spokane County Engineer to determine
whether the applicant or utility is responsible for adjustment or
relocation costs and to make arrangements for any necessary work.
14. The applicant shall grant applicable border easements adjacent to
Spokane County Right of Way per Spokane County Standards.
Kimball, Sandy
From: Hemmings, Bill
Sent: Monday, December 01, 1997 9:39 AM
To: Jones, Tammy
Cc: Harper, Pat; Franz, Dean; Kimball, Sandy; Engelhard, Scott; Pederson, John
Subject: P-1850-97 - William Purvis
Importance: High
12-01-97
I received the above referenced project application on Nov. 20, 1997.
The SCS Soils Map identifies this area as being Garrison Gravely Loam soils. The soil survey in this area is
known to be accurate. Therefore, since this is an approved soil for stormwater disposal, no concept drainage plan
is required. We have no information that says there are any critical areas on this site. I consider this proposal to be technically complete.
I recommend using the standard drainage condition.
ew's~e~rwxl.rqa
Page 1
PAGE 1 11:03:26 25 NOV 1997
Road# Road Names.......... MPost. Reference Descriptio Road Log Info..........
05893 12TH AV (START) 00.000 WEST END TO SIESTA D U 19 PAVED 50
12TH AV 00.010 SIESTA DR (END) U 19 PAVED 50
12TH AV (END) 00.030 DISHMAN RD U 19 PAVED 50
05894 12TH AV (START) 00.000 UNIVERSITY RD U 19 PAVED 20
12TH AV 00.250 PIERCE RD U 19 PAVED 20
00.340 SKIPWORTH RD (END) U 19 PAVED 20
00.500 BOWDISH RD U 19 PAVED 20
00.590 WILBUR RD (END) U 19 PAVED 20
00.620 WILBUR RD (START) U 19 PAVED 20
00.660 FOX RD (START) U 19 PAVED 20
00.720 REEVES RD (END) U 19 PAVED 20
00.750 UNION RD (START) U 19 PAVED 20
00.840 ROBIE RD (START) U 19 PAVED 20
00.910 WHIPPLE RD (START) U 19 PAVED 20
01.000 SR 27 (PINES) U 19 PAVED 20
01.130 HOUK RD U 19 PAVED 20
01.270 VERCLER RD (START) U 19 PAVED 20
01.320 VIRGINIA ST (END) U 19 PAVED 20
01.380 WOODLAWN RD (START) U 19 PAVED 20
01.510 MCDONALD RD U 19 PAVED 20
01.640 CLINTON RD (START) U 19 PAVED 20
01.760 BLAKE RD (END) U 19 PAVED 20
01.820 BLAKE RD (START) U 19 PAVED 20
02.030 EVERGREEN RD U 19 PAVED 20
12TH AVE 02.170 BANNEN RD (END) U 19 PAVED 20
12TH AV 02.250 BEST RD (END) U 19 PAVED 20
02.410 CALVIN RD (START) U 19 PAVED 20
02.470 WARREN RD (START) U 19 PAVED 20
02.520 ADAMS RD U 19 PAVED 22
02.590 MARIGOLD ST (END) U 19 PAVED 22
02.680 BURNS RD (START) U 19 PAVED 22
02.790 PROGRESS RD U 19 PAVED 22
02.870 ST CHARLES (END) U 19 PAVED 22
02.940 NEWER RD ( END ) U 19. PAVED 22
03.000 CENTURY RD U 19 PAVED 22
12TH AV (END) 03.040 SULLIVAN RD
06079 12TH AV (START) 00.000 COLEMAN RD (START) U 19 UNIMPROVED 08
12TH AV 00.120 GIR.ARD RD (START) U 19 UNIMPROVED 08
12TH AV (END) 00.250 PARK RD U 19 GR.AVEL 18
05892 12TH AV (START) 00.000 WEST END TO DICKEY R U 19 GR.AVEL 32
12TH AVE 00.040 BETTMAN RD (END) & D U 19 PAVED 36
12TH AV (END) 00.160 EASTERN RD (START) U 19 PAVED 36
06228 12TH AV (START) 00.000 FAIRCHILD ST (START) R 09 GR.AVEL 30
12 TH AV ( END ) . 00.170 BARTHOLOMEW ST ( STAR. R 09 GR.AVEL 30
06185 12TH AVE (START) 00.000 CHRISTENSEN RD R 09 GR.AVEL 30
12TH AVE 00.250 WHEATLAND (START) R 09 GRAVEL 30
12TH AVE (END) 00.370 EAST END OF ROAD R 09 GRAVEL 30
06037 12TH AVE (START) 00.000 SHAMROCK ST (END) U 19 PAVED 30
12TH AVE (END) 00.060 EAST END OF ROAD U 19 PAVED 30
7 Records Processed
PAGE 1 11:04:37 25 NOV 1997
Road# Road Names.......... MPost. Reference Descriptio Road Log Info..........
01602 GLENN CT & ST (START 00.000 35TH AV U 19 PAVED 36
GLENN CT & ST 00.080 34TH AV (START) U 19 PAVED 36
00.140 33RD AV U 19 PAVED 36
GLENN CT & ST (END) 00.180 NORTH END OF ROAD U 19 PAVED 36
01530 GLENN RD (START) 00.000 32ND AV - U 19 PAVED 40
GLENN RD 00.060 31ST AV U 19 PAVED 40
00.120 30TH AV U 19 PAVED 40
00.190 29TH AV U 19 PAVED 40
00.250 28TH AV U 19 PAVED 40
00.310 27TH AV U 19 PAVED 32
00.370 26TH AV U 19 PAVED 32
00.440 25TH AV U 19 PAVED 40
00.500 24TH AV U 19 PAVED 40
00.560 23RD AV U 19 PAVED 40
00.620 22ND AV U 19 PAVED 40
00.690 21ST AV U 19 PAVED 40
00.750 20TH AV U 19 PAVED 40
00.810 19TH AV U 19 PAVED 40
00.880 18TH AV U 19 PAVED 40
00.940 17TH AV (START) U 19 PAVED 40
01.000 16TH AV U 19 GR.AVEL 28
01.060 15TH AV (START) U 19 GRAVEL 28
GLENN RD ( END ) 01.070 15 TH AV ( END ) U 19 GR.AVEL 28
01533 GLENN RD (START) 00.000 ALKI AV (START) U 19 LIGHT BITUM. 32
GLENN RD 00.090 SPRINGFIELD AV (END) U 19 LIGHT BITUM. 40
GLENN RD (END) 00.120 BROADWAY AV U 19 LIGHT BITUM. 40
01635 GLENN RD & CT (START 00.000 NORA AV (END) U 19 PAVED 36
GLENN RD & CT (END) 00.070 AUGUSTA AV & CT U 19 PAVED 36
01531 GLENN RD (START) 00.000 8TH AV U 19 LIGHT BITUM. 20
GLENN RD (END) 00.070 7TH AV U 19 LIGHT BITUM. 20
01532 GLENN RD (START) 00.000 OLIVE AV U 19 PAVED 40
GLENN RD (END) 00.050 ALKI AV U 19 PAVED 40
01534 GLENN RD (START) 00.000 MAXWELL AV U 19 PAVED 40
GLENN RD (END) 00.090 MISSION AV U 19 PAVED 40
01584 GLENN RD (START) 00.000 SOUTH END OF ROAD U 19 PAVED 30
GLENN RD (END) 00.070 ROCKWELL AV U 19 PAVED 30
01535 GLENNAIRE DR (START) 00.000 GLENROSE RD U 19 PAVED 40
GLENNAIRE DR 00.010 GLENROSE TERRACE (EN U 19 PAVED 40
00.130 DEARBORN DR (START) U 19 PAVED 40
00.160 DEARBORN ST (END) U 19 PAVED 40
00.220 LLOYD ST (END) U 19 PAVED 40
00.280 CUSTER ST (END) U 19 PAVED 40
00.360 WILLAMETTE ST (END) R 09 PAVED 40
00.440 GLENDOR.A DR (END) R 09 PAVED 40
00.460 GLENDORA DR (START) R 09 PAVED 40
00.600 56TH CT (START) R 09 PAVED 40
9 Records Processed
DETERMINATION OF
NONSIGNIFICANCE - "DNS"
SPOKANE COUNTY DIVISION OF BUILDING AND PLANNING
IZESPONSIBLE OFFICIAL, JAMES L. MANSON, DIRECTOR .
WAC 197-11-970 and Section 11.10.230(3)
SPOKANE ENVIRONMENTAL ORDINANCE
FILE NUMBER(S): PE-1850-97
DESCRIPTION OF PROPOSAL: Preliminary Plat of Purvis Point to divide approximately
2.19 acres in six (6) lots for single family residences and one (1) lot for an existing duplex in the
existing Urban Residential-3.5 (UR-3.5) zone.
APPLICANT/OWNEiR: William Purvis -
12810 E. Palouse Highway
Valleyford, WA. 99036
(509) 924-2087.
LOCATION OF PROPOSAL: Generally located south of and adjacent to 12" Avenue and
approximately 600 feet east of University Road in the SW 1/4 of Section 21, Township 25 N.,
Range 44 EWM, Spokane County, Washington.
LEAD AGENCY: SPOKANE COUNTY DIVISION OF BUILDING AND PLANNING
DETERMINATION: The lead agency for this proposal has determined that it does not have a
probable significant adverse impact on the environment. An Environmental Impact Statement
(EIS) is not required under RCW 43.21 C.030(2)(c). This decision was made after review of a
completed environmental checklist and other information on file with the lead agency. This
information is available to the public on request.
This DNS is issued under WAC 197-11-340(2); the lead agency will not act on this proposal for
at least 15 days from the date issued (below). Comments regarding this DNS must be
submitted no later than 4:00 p.m:, February 23, 1998, if they are intended to alter the DNS.
All comments should be sent to the contact person listed below.
By: Tammy Jones Title: Associate Planner
Phone: (509) 456-3675 Address: Spokane County Division of Building and Planning (MS-P)
West 1026 Broadway
Spokane, WA 99260
DATE ISSUED: ~LW41±q , 1998 SIGNATURE: COMMENI'S REGARDING IINVIROTIMENI'AL CONCEItNS ARE WELCOME AT n-IE HEARING.
APPEAL OF THIS DETERMINATION, after it becomes final, may be made to the
SPOKANE COUNTY DIVISION OF BUILDING AND PLANNING, (MS-P), 1 st Floor, West
1026 Broadway, Spokane, WA 99260. The appeal deadline is ten (10) calendar days after the
signing of the decision to approve or disapprove the project. This appeal must be written and the
appellant should be prepared to make specific factual objections. Contact the Division of -
Building and Planning to assist you with the specifics for a SEPA appeal.
°
This DNS was mailed to:
1. WA State Department of Ecology (Olympia)
2. Spokane County Division of Engineering; Pat Harper
3. Spokane County Division of Utilities; Jim Red
4. Spokane Regional Health District; Steve Holderby
5. Spokane County Air Pollution Control Authority 6. Spokane County Division of Parks, Recreation and Fair; Steve Horobiowski
7. Spokane County Stormwater Utility; Steve Worley
8. Spokane County Boundary Review Board; Susan Winchell
9. Spokane Regional Transportation Council; Glenn Miles
10. Spokane Transit Authority; Christine Fueston
11. WA State Department of Transportation; Mark Rowher
12. Long Range Planning Division; John Mercer
13. Fire Protection District No. 1
14. Central Valley School District No. 356
15. Model Irrigation District No. 18
SPOKANE ENVIRONMENTAL ORDINANCE
(WAC 197-11-960) Section 11.10.230(1)
Environmental Checklist
F i 1 e No.~~~~~~"_o~ !
Purpose of Checklist:
The State Environmental Policy Act (SEPA) chapter 43.21C RCW, requires all governmental
agencies to consider the environmental impacts of a proposal before making decisions. An
Environmental Impact Statement (EIS) must be prepared for all proposals with probable
significant adverse impacts on the quality of the environment. The purpose of this
checklist is to provide information to help you and the agency identify impacts from your
proposal (and to reduce or avoid impacts from the proposal, if it can be done) and to help
the agency decide whether an EIS is required.
Instructions for Applicants: This environmental checklist asks you to describe some basic information about your
proposal. Governmental agencies use this checklist to determine whether the environmental
impacts of your proposal are significant, requiring preparation of an EIS. Answer the
questions briefly, with the most precise information known, or give the best description
you can.
You must answer each question accurately and carefully, to the best of your knowledge. In
most cases, you should be able to answer the questions from your own observations or
project plans without the need to hire experts. If you really do not know the answer, or
if a question does not apply to your proposal, write "do not know" or "does not apply."
Complete answers to the questions now may avoid unnecessary delays later.
Some questions ask about governmental regulations, such as zoning, shoreline, and landmark
designations. Answer these questions if you can. If you have problems, the governmental
agencies can assist you. .
The checklist questions apply to all parts of your proposal, even if you plan to do them
over a period of time or on different parcels of land. Rttach any additional information
that will describe your proposal or its environmental effects. The agency to which you
submit this checklist may ask you to explain your answers or provide additional
information reasonably related to determining if there may be significant adverse impact.
Use of checklist for nonproject proposals: .
Complete this checklist for nonproject proposals, •even though questions may be answered
"does not apply."
IN ADDITION, complete the SUPPLEMENTAL SHEET FOR NONPROJECT ACTIONS (Part D).
For nonproject actions, the references in the checklist to the words
"project," "applicant," and "property or site" should be read as "proposal," "proposer,"
and "affected geographic area," respectively.
A. BACKGROUND
1. Name of proposed proj ect, if applicable : RECEI1JED
PURVIS POINT v~OKANE cOUNrY
~J~V 1 :11997
. 1
U;riG EiND PL-ANNfNr
~^i~:
SPOKANE ENVIRONMENTAL ORDINANCE
(WAC 197-11-960) Section 11.10.230(1)
2. Natne of Applicant :
William Purvis
3. Address and phone number of Applicant or contact person:
B. J. Sparling
Inland Pacific Engineering Co., Inc.
707 West 7th, Sui te 200
Spokane, WA 99204
Phone (509) 458-6840
4. Date checklist prepared:
October 27th, 1997
5. Agency requesting checklist:
Spokane County Planning Department
6. Proposed timing or schedule (including phasing, if applicable):
Five years to completely build out project
.
7. a. Do you have any plans for future additions, expansion, or
further activity to or connected with this proposal? If
yes, explain.
No
b. Do you own or have options on land nearby or adjacent to
this proposal? If yes, explain.
No
8. List any environmental information you know about that has been
prepared, or will be prepared, directly related to this proposal.
None that this office is aware ofa
9. Do you know whether applications are pending for governmental
approvals of other proposals directly affecting the property
covered by your proposal? If yes, explain.
2
SPOKANE ENVIRONMENTAL ORDINANCE
(WAC 197-11-960) Section 11.10.230(1)
Preliminary P1at of Meadowland is adjacent to this project and
access wi11 be a shared road also there is an approved
Preliminary Plat of ParCCenter north of this proposal.
10. List any governmental approvals or permits that will be needed
for your proposal, if known.
Pre1 imi nary pl a t approval ; fi nal pl a t approval wi th fi na1 desi gns
for Water, Sewer Storm Drainage, and Streets; building permits.
11. Give brief, complete description of your proposal, including the
proposed uses and the size of the project and site. There are
several questions later in this checklist that ask you to
describe certain aspects of your proposal. You do not need to
repeat those answers on this page.
This proposal is to subdivide a 2.19 Acre parcel into 7 lots, 6
single family residential units and 1 duplex lot. The proposal
is "fill-in" development in an existing urban area.
12. Location of the proposal. Give sufficient information to a
person to understand the precise location of your proposed
project, including a street address, if any, and section,
township and range, if known. If a proposal would occur over a
range of area, provide the range ox boundaries of the site(s).
Provide a leqal description, site plan, vicinity map, and
topographic map, if reasonably 3vailable. While you should
submit any plans required by the agency, you are not required to
duplicate maps or detailed plans submitted with any permit
application related to this checklist.
The site is on the south side 12`h Avenue and will have access
from the proposed pvblic road (Glenn Road) within the approved
Preliminary P1at of Meadowland. The project has 161 feet of
frontage on 12t'' Avenue. Said project is in the Sovthwest 114 of
Sec ti on 21, T. 25 N., R..4 4 E. , W. M.
13. Does the proposed action lie within the Aquifer Sensitive Area
(ASA)? The General Sewer Service Area? The Priority Sewer
Service Area? The City of Spokane? (See: Spokane County's ASA
Overlay Zone Atlas for boundaries).
This proposal is within the ASA, GSSA, PSSA and also within the
Interim Urban Growth Area
3
SPOKANE ENVIRONMENTAL ORDINANCE
(WAC 197-11-960) Section 11.10.230(1)
TO BE COMPLETED BY APPLICANT
B. ENVIRONMENTAL ELEMENTS
1. EARTH
a. General description of the site (circle one):
Flat, rolling hilly, steep slopes, mountainous,
other:
F1at
b. What is the steepest slope on the site
(approximate percent slope)?
The steepest slope on the site is 2g.
c. What general types of soils are found on the site
(for example, clay, sand, gravel, peat, muck) ? If
you know the classification of agricultural soils,
specify them and note any prime•farmland.
Soi 1 s on si t e are i den ti fi ed a s marbl e sandy 1 oam,
moderately coarse textured, somewhat excessively
drained soil formed from sandy glacioflvvial
material.
d. Are there surface indications or history of
unstable soils in the immediate vicinity? If so,
describe.
No surface indications of unstable soils.
e. Describe the purpose, type, and approximate
quantities of any filling or grading proposed.
Indicate source of fill.
Minor excavation and fi11 will be reqvired for
storm drainage, utility, sewer and water and
building construction. Imported fi11 is not
anticipated. r
f
f. Could erosion occur as a result of clearing,
construction, or use? If so, generally describe.
4
V
SPOKANE ENVIRONMENTAL ORDINANCE
(WAC 197-11-960) Section 11.10.230(1)
Minor erosion could occur during construction of proposal. Erosion will be contained within
project site and no erosion is expected when
proposal i s compl e t ed wi th l andscaped yards.
g. About what percent of the site will be covered
with impervious surfaces after project
construction (for example, asphalt or buildings)?
Approximately 26* of the site will be impervious
surfaces.
h. Proposed measures to reduce or control erosion, or
other impacts to the earth if any:
Earth surfaces exposed by construction wi1l be
ei th er covered by bui 1 di ngs or pa vi ng; or wi 11 be
restored with landscaping. A11 construction will
have to be in accordance of the proposed Erosion
and Sediment Control Ordinance when approved.
2. AIR
a. What type of emissions to the air would result
from the proposal ( i. e., dust, Automobile, odors,
industrial, wood smoke) during construction and
when the project is completed? If any, generally
describe and give approximate quantities if known. r►~
~
.
During construction phase. . dust and emission from ~
construction eqvipment. Completion: smoke and ~~I(,~~~~~
emissions from residential uses and from ~
a v t omobi 1 es .
b. Are there anY off site sources of emissions or /
-
odor that may affect your proposal? If so,
generally describe.
No.
c. Proposed measures to reduce or control emissions
or.other impacts to air, if any:
Comp1 i ance wi th exi s ti ng 1 ocal codes and
5
~
SPOKANE ENVIRONMENTAL ORDINANCE
- - Section 11.10.230(1
(WAC 197 11 960) )
regul a ti ons .
3. WATER
a. Surface:
(1) Is there any surface water body on or in the
immediate vicinity of the site (including
year-round and seasonal streams, saltwater,
. lakes, ponds, wetlands I f yes, describe
type and provide names. If appropriate,
state what stream or river it flows into.
No.
(2) Will the project require any work over, in,
or adjacent to (within 200 feet) the
described waters? If yes, please describe
and attach available plans.
.
No. '
(3) Estimate the amount of fill and dredge
material that would be placed in or removed
from the surface water or wetlands and
indicate the area of the site that would be
affected. Indicate the source of fill
material. N/A
(4) Will the proposal require surface water
withdrawals or diversions? Give general
description, purpose, and approximate
quantities if known.
N/A
(5) Does the proposal-lie within a 100-year
floodplain? If so, note location on the site
plan.
No.
(6) Does the proposal involve any discharges of
waste materials to surface waters? If so,
• 6
~
SPOKANE ENVIRONMENTAL ORDINANCE
(WAC 197-11-960) Section 11.10.230(1)
describe the type of waste and anticipated
volume to discharge.
No.
b. Ground
(1) Will ground water be withdrawn, or will water
be discharged to ground water? Give general
description, purpose, and approximate
quantities if known.
Increased groundwater withdrawals wi11 be
reqvi red by exi s ti ng wa t er purveyor from a
remote location. 200 to 1,000 gallons per
day per 1ot wi11 be required. Some
stormwater runoff may be discharged to ground
water which may underlie the site.
(2) Describe waste material that will be
discharged into the ground from septic tanks
or other sanitary waste treatment facility.
Describe the general size of the system, the
number of houses to be served (if applicable)
or the number of persons the system(s) are
expected to serve. ,
None.
(3) Describe any systems, other than those
designed for the disposal of sanitary waste,
installed for the purpose of discharging
fluids below the ground surface (includes
systems such as those for the disposal of
storm water or drainage from floor drains).
Describe the type of system, the amount of
. material to be disposed of through the system
and the types of materials likely to be
disposed of (including materials which may
enter the system inadvertently through spills "
or as a result of fire fighting activities). C
Constrvction of the access road for this site
will not be part of this development. Around
new buildings some stormwater run off in Js,
. 7
SPOKANE ENVIRONMENTAL ORDINANCE
(WAC 197-11-960) Section 11.10.230(1)
excess of the first h inch of rainfall could
• enter the ground. Bvilding construction wi11
have meet the local 11208" stormwater
regvl a ti ons .
(4) Will any chemicals (especially organic
solvents or petroleum fuels) be stored in
above ground or underground storage tanks?
If so, what types and quantities of materials
will be stored?
Some chemicals could be stored in residential
garages but on.Zy those associated with urban
si ng1 e fami 1 y resi dences . No vnderground
storage wi11 be allowed.
. (5) What protective measures will be taken to
insure that leaks or spills of any chemicals
stored or used on site will not be allowed to
percolate to ground water (this includes
measures to keep chemicals out of disposal
systems described in 3b(2) and 3b ( 3)?
Compliance with existing codes and
regul a ti ons . .
c. Water Runoff (including storm water):
(1) Describe the source of runoff (including
storm water) and method of collection and
disposal if any (include quantities, if
known). Where will this water flow? Will
this water flow into other waters? If so,
describe.
Stormwater rvnoff wi11 be collected from
roofs, and driveways. Disposal will be in
accordance with adopted 11208" stormwater
di sposal regul a ti ons .
(2) Will any chemicals be stored, handled or used
on the site in a location where a spill or
leak will drain to surface or ground water or
to a storm water disposal system discharging
to surface or ground water?
8 V
SPOKANE ENVIRONMENTAL ORDINANCE
(WAC 197-11-960) Section 11.10.230(1)
No.
(3) Could waste materials enter ground or surface
waters? If so, generally describe.
Irresponsibl e and ill egal di sposed was te
materials could enter grovnd water through
proposed stormwater disposal facilities.
d. Proposed measures to reduce or control surface,
ground, and runoff water impacts, if any (if the
proposed action lies within the Aquifer Sensitive
Area. Be especially clear on explanations
relating to facilities concerning Section 3b(4),
3b(5), and 3c (2) of this check-list) .
Compliance with adopted 11208" regulations and
stormwater regvlations. A11 sanitary sewage
disposal will be via public sewage collection and
disposal systems.
4. PLANTS
a. Check or circle type of vegetation found on the
site:
deci duous trees: a1 der, maple, aspen, other.
evergreen trees: fir, cedar, pine, other.
x shrvbs.
x grass.
pasture.
crop or grain.
wet soil plants, cattail, buttercup, bullrush,
skvnk cabbage, other.
water plants: water li1y, eelgrass, milfoil,
other.
x other types of vegetation.
b. What kind and amount of vegetation will be removed
or altered?
Most or all existing vegetation wi11 be removed.
c. List threatened or endangered sPecies known to be
4~' on o r ne a r the s i t e. ~Q/j, .
~
9 C~~
~
SPOKANE ENVIRONMENTAL ORDINANCE
~d
(WAC 197-11-960) Section 11.10.230(1) -
None.
d. Proposed landscaping, use of native plants or
other measures to preserve or enhance vegetation
on the site, if any:
Existing site has very little native veqetation.
All yards and developed sites wi11 be landscaped
using mostly non-native landscape materials.
5. ANIMALS
a. Circle any birds and animals which have been
observed on or near the site or are known to be on
or near the site: '
.
birds: hawk, heron, eagle, songbirds, other:
Common bird species.
mammals: deer, bear, elk, beaver, other:
rodents
fish: bass, salmon, trout, herring, shellfish,
other: .
N/A
other:
There may be some wild cats in this area.
b. List any threatened or endangered species known to
be on or near the site.
Non e . .
~1✓r
c. Is the site part of a migration route? If so,
explain. ~
No.
d. Proposed measures to preserve or enhance wildlife, ~ .
if any: ~
• 10 /
~
SPOKANE ENVIRONMENTAL ORDINANCE
L
(WAC 197-11-960) Section 11.10.230(1)
None.
6. ENERGY AND NATURAL RESOURCES
a. What kinds of energy (electric, natural gas, wood
stove, solar) will be used to meet the.completed
project's energy needs? Describe whether it will
be used for heating, manufacturing, etc.
Heating: electric, and natural gas, with some
small vse of wood stoves
Lighting: electric
b. Would your project affect the potential use of
solar energy by adjacent properties?. If so,
generally describe. .
No.
c. What kinds of energy conservation features are
included in the plans of this proposal? List
other proposed measures to reduce or control
energy impacts, if any:
Compliance with Iocally adopted energy code.
7. ENVIRONMENTAL HEALTH
a. Are there any environmental health hazards,
including exposure to toxic chemicals, risk of
fire and explosion, spill, or hazardous waste,
that could occur as a result of this proposal? If
so, describe.
No.
(1) Describe special emergency services that
might be required.
On.1y those fire, police and medical emergency
services associated with residential
devel opmen t .
(2) Proposed measures to reduce or control
• environmental health hazards, if any:
11
SPOKANE ENVIRONMENTAL ORDINANCE VT
(WAC 197-11-960) Section 11.10.230(1)
Compliance with locally adopted codes and
regulations.
b. Noise
(1) What types of noise exist in the area which
may affect your project (for example:
traffic, equipment, operation, other) ?
. .
Minor traffi c noi se and noi se generall y
related to urban residential neighborhoods.
(2) What types an levels of noise would be
created by or associated with the project on
a short-term or a long-term basis (for
example: traffic, construction, operation,
other)? Indicate what hours noise would come
from the site.
Short term: Construction equipment and
building activities.
Long term: Traffic and activities
associated with residential
devel opmen t .
(3) Proposed measures to reduce or control noise
impacts, if any:
. Non e .
8. LAND AND SHORELINE USE
a. What is the current use of the site and
adjacent properties?
Mostly vacant. There is an existing duplex
and qarage frontin.g 1211 avenve. The rest of
the site is vacant.
b. Has the site been used for agriculture? If
so, describe.
No
c. Describe any structures on the site.
V
12
SPOKANE ENVIRONMENTAL ORDINANCE
Y
(WAC 197-11-960) Section 11.10.230(1) One duplex building and garage.
d. Will any structures be demolished? If so,
which?
Yes, the garage will be removed.
e. What is the current zoning classification of
the site? •
UR 3. 5
f. What is the current comprehensive plan
designation of the site?
Urba n .
g. If applicable, what is the current shoreline
master program designation of the site?
N/A . . A a
. ~
h. Has any part of the site been classified as
an "environmentally sensitive" area? If so,
specify, . • ~~`Y"~
~
No.
I. Approximately how many people would reside or
work in the completed project?
Approxima t e.1 y 21 t o 23 peopl e wi 11 1 i ve i n
the completed project.
j. Approximately how many people would the
completed project displace? .
~ -
None. ,QQ,
k. Proposed measures to avoid or reduce
displacement impacts, if any: ~
N/A
13
SPOKANE ENVIRONMENTAL ORDINANCE
(WAC 197-11-960) Section 11.10.230(1)
l. Proposed measures to ensure the proposal is
compatible with existing and projected land
uses and plans, if any:
Proposal will compl y wi th 1 ocal zoning code
requirements and the condi tions of approval
established by Spokane County.
9. HOUSING
a. Approximately how many units would be
provided, if any? Indicate whether high,
middle, or low-income housing.
Up to 6 single family middle income units and
2 units (duplex) will be provided.
b. Approximately how many units, if any, would
be eliminated? Indicate whether high,
middle, or low-income housing.
None.
c. Proposed measures to reduce or control
housing impacts, if any: .
N/A
10. AESTHETICS .
a. What is the tallest height of any proposed
structure(s), not including antennas; what is
the principal exterior building material(s)
proposed?
The tal.iest building will 35' of less with
principal exterior building materials of Wood 35
or wood-like materials; metal; masonry or
~
vinyl siding.
b. What views in the immediate vicinity would be
.
altered or obstructed?
.
3J ,
Si te wovld be al tered. No views would be
blocked.
14
V
SPOKANE ENVIRONMENTAL ORDINANCE
(WAC 197-11-960) Section 11.10.230(1)
c. Proposed measures to reduce or control
aesthetic impacts, if any:
.
Ru1es and regulations by covenants wovld be
enforced to control housing desi gn,
landscaping and fencing.
11. LIGHT AND GLARE
a.. What type of light or glare will the proposal
produce? What type of day would it mainly
occur?
Those commonly associated with residential
uses.
b. Could light of glare from the finished
project be a safety hazard or interfere with
views?
No.
c. What existing off site sources of light or
glare may affect your proposal?
There may be some existing porch lights
affecting this site.
d. Proposed measures to reduce or control light
and glare impacts, if any:
Compliance with local regulations.
12. RECREATION
a. What designated and informal recreational
opportunities are in the immediate vicinity?
r ~ r
University High School play fields are a few
b1 ocks wes t of th e proposal.
b. Would the proposed project displace any
existing recreational uses? If so, describe.
'
No.
• 15
V
~
SPOKANE ENVIRONMENTAL ORDINANCE
(WAC 197-11-960) Section 11.10.230(1)
c. Proposed measures to reduce.or control
impacts on recreation, including recreation
opportunities to be provided by the project
or applicant, if any:
None
13. HISTORIC AND CULTURAL PRESERVATION
a. Are there any places or objects listed on, or
proposed for national, state, or local
preservation registers known to be on or next
to the site? If so, generally describe.
No.
b. Generally describe any landmarks or evidence
of historic archaeological, scientific, or
cultural importance known to be on or next to
the site.
None.
c. Proposed measures to reduce or control
impacts, if any:
None.
14. TRANSPORTATION
a. Identify public streets and highways serving
the site, and describe proposed access to the
existing street system. Show on site plans,
i f any.
Glenn Road (which is being built as part of
Meadowland) wi11 be the primarily access for
the proposed lots. 12th Avenue wi11 be the
ma.in access for the duplex lot and where
G1enn Road connects.
b.• Is site currently served by public transit?
If not, what is the approximate distance to
the nearest transit stop?
112 to 314 block, Transit service exists on
16
SPOKANE ENVIRONMENTAL ORDINANCE
(WAC 197-11-960) Section 11.10.230(1) ' University road •
.
c. How many parking spaces would the completed
project have? How many would the project eliminate?
Approximately 32 spaces will be created. 8
spaces are already existing around the duplex
location. No parking spaces would be
eliminated.
d. Will the proposal require any new roads or
streets, or improvements to existing roads or
streets not including driveways? If so,
generally describe (indicate whether public
or private).
G1enn Road will provide direct access for
most lots proposed. The duplex 1ot wi11
access onto 12th with minor improvements
. requi red .
e. Will the project use (or occur in the
immediate vicinity of ) water, rail, or air
transportation? If so, generally describe.
No.
f. How many vehicular trips per day would be
generated by the completed project? If know,
indicate when peak would occur.
80 trips more or less. Peak hovrs from
8-10 AM and 4-6 PM.
g. Proposed measures to reduce or control
transportation impacts, if any:
Minor improvements on 12th Avenue on1y.
15. PUBLIC SERVICES
a.. Would the project result in an increased need
for public services (for example: fire
protection, police protection, health care,
17
. . ~
SPOKANE ENVIRONMENTAL ORDINANCE
~
(WAC 197-11-960) Section 11.10.230(1)
schools, other)? If so, generally describe.
The new lots will resul t in increased need
for a11 public services. Utilities are
available in adjoininq streets,
b. Proposed measures to reduce or control direct
impacts on public services, if any:
Non e .
16. UTILITIES
a. Circle utilities currently available at the
site: electricity, natural gas, water,
refuse service, telephone, sanitary sewers,
septic system, other.
b. Describe the utilities that are proposed for
the project, the utility providing the
service, and the general construction
activities on the site or in the immediate
vicinity which might be needed.
Electrici ty (WWP), telephone (US West), v
Sewer (Spokane Covnty) Water (Mode1
Irrigation District).
C. SIGNATURE
I, the undersigned, swear under the penalty of perjury that the above responses are made
truthfully and to the best of my knowledge. I also understand that, should there be any willful
misrepresentation or willful lack of full disclosure on my part, the aqency may withdraw any
determination of nonsignificance that it might issue in reliance upon this checklist.
Date: 1► tt ~l1 Proponent: L01%am .3 - PV'C'VlS
' (Please Print or Type)
,
Proponent ~ .'P~vw►r~ Addre s s: I 2$1 a G. Pa ~ D uSC. ~ 1►.~
Si ture ~
Phone : 9a44- 20p-7
Person completing form: Date: II 11 Phone : q58 18
. .
. , SPOKANE ENVIRONMENTAL ORDINANCE
(WAC 197-11-960) Section 11.10.230(1)
FOR STAFF USE ONLY
Staf f Member (s) Reviewing Checklist : OM"
u U
Based on this staff review of the environmental checklist and other
pertinent information, the staff:
A. Concludes that there are no probable significant adverse impacts
and recommends a determination of nonsignificance.
B. Concludes that probable significant adverse environmental impacts
do exist for the current proposal and recommends a mitigated
determination of nonsignificance with conditions.
C. Concludes that there are probable significant adverse
environmental impacts and recommends a determination of
significance.
• FILING FEE - $75.00
19
SPOKANE COUNTY DIVISION OF
BUILDING AND PLANNING PItELIMINARY SUBDIVISION APPLIC'T~%%
SPO' AN:~ COURITY
PART I
NOU 1 31991
A. GrNCRAL INFORMATION:
111VI410;! WGU;!1.;~1Q",{;ND P1.ANNiNG
NAME OF APPLICANT/REPRCSENTATIVC: William Purvis ,
MAILiNG ADDRESS: 12810 East Palouse Highway
CITY: Valleyford STATE: WA ZIP: 99036-9726
1'WONE: 924-2087 (work) (home) rAX:
1T' APPLTCANT 1S NOT OW1VER, iNCLUDE WRITTCN OWIVCR AUTHORTZATION
rOR Al'PL.ICANT TO SERVC AS RCPRCSCNTATIVC.
LEGAL OWNER'S NAME: Same as above PHONE: MAILING ADDRESS:
C1TY: STATE: ZIP:
PROJECT/PROPOSAL SITE AREA (acres or sq. ft) 2.19 Ac.
.
ADJACENT AREA OWNED OR CONTROLLCD (acres or sq. ft.) None
ASSESSOR PARCEL t!'S OF PROJECT/PROPOSAL 45213.9064
ASSrSSOR PARCEI, #'S OF ADJACCNT AREA OWNED OR CONTROLLED N/A
STRECT ADDRESS OT' PROPOSAL 10908 East 12th Avenue
CXISTING ZONE CLASSIFICATION(S) (DATr ESTAI3LISHED) UR-3.5
rXISTING USE OF PROPCRTY Duplex existing on site
COMPREWCNSIVC PLAN CATEGORY IIrban
SCf-IOOL DISTRICT Central Vallev School District
FIRE DiSTRiCT Ffre District No. 1 WATCR PURVEYOR Model Irrigation
PROPOSED USE Of PROPERTY: District No. 18
Single family dwellings (X) Duplexes (X) Mtiitifamily dwellings O
Manufactured homes ( ) Busmess ( ) Industrial ( ) Mixed Use ( )
Other ( ) - Describe:
LIST 1'REVfOUS PLANNING ACTIONS 1NVOLVING Ti-IlS P20PERTY: Pending Short
Plat SP 1018-95 '
B. LEGAL INFORMATION:
LOCATION OF PROPOSAL: South and adjacent to 12th Avenue in SW $ of
SECT(ON 21 TOWNSI-[1P 25 RANGE 44
NAMC OF PUBLIC ROAD(S) PROVIDING ACCESS: 12th Avenue, East of Pierce
Road and Glenn Road (to be bu3.lt with finalizationof Meadowland).
WIDTH OF PRO1'CRTY F'RONTCNG ON PUQLIC ROAD: 161' on 12th Avenue and 650±
on proposed-Glenn f~oaa
DOCS T1-1E PROPOSAL HAVE ACCCSS TO AN ARTERIAL OR PLANNED ARTCRIAL O YES (X) NO
NAME(S) OF ARTCRIAL ROADS
LrGAI. DESCRIPTION OF PROPERTY (Attacll legal description with source of legal clearly inclicated)
INCLUDE LCGAL DESCRIPTTON FOR ENTIRL' ARCA TO I3E SU13DiVIDED ON I'RELIMINARY
SUBDiVISION MAP.
i
~
SUBDIVISION APPLICATION Page 2 of 4
IF YOU DO NOT HOLD TITLE TO PROPCRTY, WIiAT TS YOUR INTCREST IN IT?
WHAT ARE THC CHANGED CONDITIONS OF THE AREA WHiCH YOU FEEL MAKE T141S
PROI'OSAL WARRANTED? The IUGA boundaries encourages inf ill development. -
This area has had other approved projects some with smaller densitp.
WHAT IMPACT WILL THE PROPOSED SUBDIVISION 1-IAVC ON Tf-IE ADJACENT f'ROPERT[ES?
It is possible that hiRh taxes could occur and that increased traffic could
be exp erienced.
WI-IAT FACTORS SUPPORT TI-IE SUBDIV[S10N? Site is served bv egistiniz urban
facilities and meets egistine zonine reauirements as well as the intent of the GMA
legislation and is comp atible with the surrounding develo ment of the area.
Wf-IAT MEASURES DO YOU PROPOSE TO MITIGATC YOUR PROPOSAL'S [ACT ON
SURROUNDING I,AND USE? Comvliance with Findines of Fact imnosed bv
Spokane County.
C. PRrLIM1NARY SUBDIVISION GENERAL INFORMATION:
NUMIiER OF LOTS: 7 Lots GROSS AREA: 2.19 Acres
TYPICAL LOT S[ZE: 11,360 S.F. PROPOSCD NET DENSITY*: 3.20 units/1 Ac.
SMALLEST LOT SIZC: 11,360 S.F. MINIMUM FRONTAGE: 80'
PROPOSED SOURCE OF WATER:
lnciividual welis Public system (x) Private Commtinity System
Otlier ( ) - Describe:
PROPOSED MEANS OF SEWAGE DISPOSAL:
Public sewer Community system Sentic tlnk and drainfield
Double Plumbing O Dry Sewer O Other O
Describe:
UTILITY COMPANICS AND/OR DISTRICTS TO PROVIDC SCRVICE TO TFIIS PROPOSAL:
Clectricity: Washington Water Power Sewer: Spokane Countp
Gas: WashinQton Water Pawer Water:Model Irrigatinn pist. Phone: U.S. West
DO YOU, OR THE OWNER IN THE EVENT YOU DO NOT OWN TI-11S PROPCRTY, HAVE ANY
PLANS FOR FUTURE ADDITIONS, EXPANSIONS OR FURTI-IER ACTIVITY RELATED TO THIS
PROPOSAL? Yes No (g) IF YES, EXPLAIN:
D. PRI;LTMINARY SUI3niVISTON 1MPROVrMENT iNFORMATTON:
LEVEL OP STRECT 1MPROVCMENTS I'ROPOSED: Private roads O
Public roads (30 Arterial roads O ' Tract X roads O
DESCRIBE ANY COMBINATION OI' AI30VE:
EST[MATED TIME PERIOD EXl'f CTED FOR COMPLETE DCVELOPMENT OF THE SUBDIVISTON:
3-5 years depending on the housinR market.
1S Pi-IASING OF TI-IC F'INALIZATION OP THT' SUBDIVISION PROPOSED? Yes O No (g)
IF YES, SHOW PHASING ON TI-IE PRELIMINARY SUBDIVISION MAP OR I'ROVIDE SEPARATE
PHASING PLAN. ,
IS DEDICATION OF LAND-FOR PUBLIC USE CONTEMPLATED (Parks, schools, etc.)? Yes No 00
IF YES, DESCRII3E: ,
* NCT DENSITY IS UNITS OR LOTS PER ACRE MINUS`PRIVATE AND/OR PUI3L[C ROAD AREA.
. /
~I
SUBDIVISION APPLICATION Page 3 of 4
PART II -
TFiiS SECTION OF THE API'LICAT[ON W[LL PROV[DG ThIC 13UILDING AND PLANNING STA1=F W[TI-1
WIZITTCN VERIFICAT[ON THAT TI-lE APPLiCANT HAS HAD PRELIMINARY CONSULTATION WITH TNE
AGENCIES 1DENTIFIED. RESULTS OF THE PRELIMINARY CONSULTATION SHALL BE [NCORPORATED
1N TF[E PROPOSAL I3EFORE FINAL SUBMITTAL TO THE PLANNING DEPARTMENT.
FIIZE MARSHALL/FlIZE
A. TI-i[S PROPOSAL IS WITI-11N T'IRE PROTCCTI T NO. f
B. ADEQUATE ARRANGCMENTS (HAVE) ( AVC NOT) BEEN MADE TO MEET OUR NCEDS
1N PROVIDiNG FOR AN ADEQUATE WATER D FACILITIES FOR FIRE
PROTECTION I'URPOSES.
C. RECOMMCNDED FIRE rI.OW: D ; OR,UNABLE TO CALCULATE NOW
IiECAUSE USC IS NOT DEf'INITIVC; AND WILL QE DETGRMINED AT BUILDING PERMfT
APPLICATION TIME. `
D. REQUIREMENTS INCLUDE: TO`j> >r3[r ,►,~~Y,mov„S
.S- Cl ~ ~ ~~~5!~~~
FIRE D1STRICT / kATURE/TITLE DATE
WAI'Ell PURVE YOR
A. SATISFACTORY ARRANGEMEN TIC WATER AND FIRE FLOW
REQUIREMENTS (HAVC) ,HAV~LNOT BEEN MADC.
• .
B. REQUIREMENTS/COMMENTS:
/
WATER DISTRIC S[GNA R/TITLE G` UDATE
,
~
• A PRELIMINARY DISCUSSION I-IAS TAKEN PLACE AND GCNERAL REQUIREMCNTS f'OR ROADS AND
DRAINAGE HAVE BEEN D[SCUSSED WlTH Tf-lE APPLICANT.
A. COMMCNTS: / n /
d1l), 0 114V
' - S,~
_ x~ ~
~ SIGNATURE E DATG
COUNTY MI.
A PRELIMINARY DISCUSSION HAS TAKEN PLACE AND GENERAL REQUIREMENTS FOR SUBMITTAL
Or TNIS PROPOSAL (HAVC) ~AV~ N~T) BEEN SATISFIED. THE DESIGNATED WATGR
PURVCYOR FOR THIS SITG IS o
A. COMMENTS: l.n hr A~ P_ -\..1AA-e•f
c,
SIGNATURE/TITLE DATE
Le
A PRELIMINARY DISCUSS[ON {-IAS TAKEN PLACE AND GENERAL REQUIRCMENTS FOR SUQMITTAL
OF Tf-IIS I'ROPOSAL (HAVC) (WAVC NOT) BEEN SATISFIED.
A. COMMENTS:
. SIGNA RE/TITLC DA~f'C
LeWEIZ IIUIZVEVOIZ
A PRELIMINARY DISCUSSION 1-1AS TAKEN PLACE AND GENERAL REQUIREMCNTS FOR THE
, PROVISION OF PUQLIC SCWER ARE UNDERSTOOD t3Y THE APPLICANT.
A. COMMENTS: (h►iv.~ t L~ e r.
~ _ Jr, ~ ~ /s S.~
~_SI A R/T TLE~ I~ATE
PLICATION Page 4 of 4
J. A,.
v r
waskZ,:~~ PART III
~ c, SURVEYOR VCRIF'ICATION
. •
; I, TI ERiiG D, A LTCENSED LAND SURVEYOR, HAVE COMPLETED TWE INFORMATION
R D. ; CLiMINARY PL,AT HAS BEEN PREPARED BY ME OR UNDER MY SUPERVISION iN
%
I T[-II? REQUIREMCNTS OF TI-iC SPOICANC COUNTY ZONING/SUE3DIVISION
N TM WS OF THE STATE OF WASFI(NGTON.
~ IGNC DATE: 10131177
~s i! os 9 `S: 707 PHONE: yS~ yo
Z I P: F~F~ y
PART IV ,
(SIGNATURE OF PROPCRTY OWNERS OR LCTTER OF AUTHORiZATION)
I, ThIC UNDCRSIGNED, SWEAR OR AFFIRM UNDER PENALTY OF PERJURY THAT THE ABOVE
RESPONSES ARE MADE TRUTHFULLY AND TO THE BEST OF MY KNOWLEDGE.
I FUItTHCR SWEAR OR AFI=IRM THAT I AM THE OWNER OF RECORD Or THE AREA ['ROPOSCD rOR
THE PREVIOUSLY IDENT[FIED LAND USE ACTION, OR, IF NOT THC OWNER, ATTACNCD HEREWITM
IS WRI"I'TEN PERMISSiON FROM THE OWNER AUTHORIZING MY ACTIONS ON I-iIS/HER BEWALF.
.
SIGNED: DATE:
ADQRESS: I PWONC:
ZIP:
SIGNATURC OF PLICANT OR RCPI2ESENTATIVC DATE
STATC OF WASWINGTON )
) ss:
COUNTY OF SPOKANE )
e
SIGNCD AND SWORN OR AFFIRMED BEC'ORE ME ON TH1S DAY OF
, 1997, BY
NOTARY SEAL -
Notary Public in and for the State of Washington
Residing at:
My appointment expires:
PART V
(TO BC COMPLETED BY THE DiVISION OF I3UILDING AND PLANNING)
DATE SUBMiTTED: FILE T-47-I PY`~0'" °I-~
r DATE ACCEPTED: b` BY: \ \ ,c ~
TOTAL f EES: l. (0O RCCEIPT I I P~("')q
rncL 4V0u0v wrryi uo •
PLICATION Page 4 of 4
~Av,,~04 wasN~~c..0~ PART III .
: h SURVEYOR VERIFICATION
. .
; I, Tt ERS[G D, A LICENSED LAND SURVEYOR, I-IAVE COMPLETED THC INi'ORMATION
~p R D.; ELIMINARY PLAT HAS BEEN PREPARED BY ME OR UNDER MY SUPERVISION 1N
• 1 TI-IC REQUfREMENTS Or THE SPOKANE COUNTY ZONINGlSUBDIVlSION
N THF WS OF THE STATE OF WASE41NGTON.
L~ iGNE ~X; ~ Ioaz DATC:
's ce ;9 / / - ~ r
S: 7677 w• ;7~ -5c4l-e-$• Zoo PHONE:
~~Vo-- Z1P:
rART Iv
(SrGNATURE OF PROPERTY OWNERS OR LETTER OF AUTHORIZATION)
TWC UNDERSIGNED, SWEAR OR AFFIRM UNDER PENALTY OF PER.JURY THAT THE ABOVE
RESPONSES ARE MADE TRUTHFULLY AND TO THE BEST OF MY KNOWLEDGE.
I FURTHER SWEAR OR AFFIRM THAT I AM THE OWNER OF RECORD OF THE AREA PROPOSED FOR
THC PREVIOUSLY 1DENTIFIED LAND USE ACTION, OR, IF NOT Ti-JE OWNER, ATTACHED HEREWITH
IS WTZITTEN PERM1SS10N FROM THE OWNER AUTHORIZING MY ACTIONS ON HIS/HER BEHALF.
SIGNED: i~.~.• ~w> DATE:
ADDRESS: ( . PHONE:
Zi P:
SIGNATURC OF Pi,TCANT OR REPRESENTATIVE DATE ,
STATE OF WASHINGTON )
. ) ss: CQUNTY Or SPOKANE )
SIGNCD AND SWORN OR AFFIRME BEFORE ME ON TWIS DAY OF
. ~0 L/ , 1997, [iY'
~ ,......~0
4;•''i~t ~'9F~~ ,
.
.
N
' •rr • ;
Notary Public in and for the State of Washington
.
~►ti•.r ~ Residing at:
. '
My apnointment expires: 3~Z 'T/ Fq
PART V
(TO [3C COMPLETED I3Y Ti-tE DIVISION OF BUILDING AND PLANNING)
DATE SUBMTTTCD: FILE
DATE ACCEPTED: BY:
TOTAL FCCS: RECEIPT
.n[a JuuNv wrrl -ri Ni
, .
; 6,-A"EIVED ":7103~ANE coUN-rY 1 .3 1997 October 29, 1997
C:= ;:Lii:5:N.'G F;tiD Pi.A1.1N1NG LEGAL DESCRIPTION
. FOR
PURVIS FOINT
THAT PART of the Northeast Quarter of The Southwest quarter of
the Southwest Quarter of Section 21, T.25 N., R.44 E., W.M.,
described as follows:
Beginning at a point 20.00 feet South and 502.14 feet West of the
Northeast corner of the said Northeast Quarter of the Southwest
Quarter of the Southwest Quarter of Section 21; thence south to a
point on the South line of said Northeast Quarter of the
Southwest Quarter of the Southwest Quarter of Section 21, 160.85
feet East of the southwest corner thereof; thence West on said
south line to the southwest corner of said Northeast Quarter of
the Southwest Quarter of the Southwest Quarter; thence North
along the west line thereof to a point 20,.00 feet South of the
Northwest corner of the said Northeast Quarter of the Southwest .
Quarter•of the Southwest Quarter of Section 21; thence East to
the point of beginning;
EXCEPTING THAT portion of the Northeast Quarter of the Southwest
Quarter of the Southwest Quarter of Section 21, T.25 N., R.44 E.,
W.M., more particularly described as follows;
Beginning at a point on the south line of said Northeast
Quarter from which point the southwest Corner of said
Northeast Quarter of the Southwest Quarter of the Southwest
Quarter bears N.89°55112"W., a distance of 160.85; thence
N.00°24'08"E, along a line that runs through a point 20.00
feet south and 502.14 feet west of the northeast corner of
said Northeast Quarter, a distance of 501.63 feet to a non-
tangent curve concave to the west having a radius of 256.00
feet (from which point a radial line bears N.76002153"W.);
thence southerly along said curve through a central angle of
4°10'S0" an arc distance of 18.68 feet to the beginning of a
reverse curve concave to the east having a radius of 294.00
feet; thence southerly along said curve through a central
angle of 17°43'S0" an arc distance of 90.98 feet; thence
4108"W., a distance of 394.21 feet to a point on the
~G~ J• ~~a th ine of said Northeast Quarter; thence S. 89°55' 12 "E .
aid south line a distance of 19.00 feet to the Point
;A4 inning.
' . .
teii he County of Spokane, State of Washington.
.
'0 18091
.
.
Ll►I~
~ 1900
~
A'ovz.
41 57347
~ P e: I cf 2
1iloo1199T W,i$P .
, GD igO 0 10.00 Sp*ane co, wi
After Recordfng Return'£n: Spokane County Engineer
Attn.: Rigbt ofWay Depastment ~
Dntument Title: Right of Way I7ced
Grantor(s): WTLLIAM J. & DEBRA A. PURVIS
Grattitee: Spokare Counky
1,egal descriptiotl: pTN. 5Wi. 5W # , SEC _ 21, TWN. 25N. RG. 44 EP►ST, w . M~
• Additienal Legal [)escripticn: 5ee Page !
flssess4rl'sTax Par,cel r7arnbcr[30. 45213.9054 Refereflcc N Ltrnber:
Pasrpase: P-1$08 MEADDWLANL] ~
40P . .
SPOKANE COLFNTY DIVISION OF ENGINEERTNC~
' Spokane Lounty, Washingtnn
RIGH'i` OF WAY DEED •
i
IN THE MATTF-R OF FIFTxT$ENTH AvErr€E , RFA1O. 2135
4
KA1OW ALL ME]wF BY THESE'PRESENTS, tha# the Grantat(s) IIILLIrM J . PuRiis AND
DEBRx A_ PURVIS, YYUs;ba1lC~ &Ild wife, ,
For and irt consideratiqjk,~~ ~uSutual Ber~eflts, grants and conveys ta Spvkkanne #~v~tr~ty, #he
fol[ow9ng describer~~e~~~ i~ated in Spokane +County, State of V~ashington, #o-wit.
PORTIDl$ OF A~~RCELNO~l~. 452~.3_9064 ~
:
• ~
• , A
'1'liat porfloii .the NE:JI44i %V114 of [Iie 5WPl4 ot' Secticiii21, 'i`,25 N., R.A4 F.,
W.M., niorc paTticularlyt3~er1 as fca9lav~s;
' °tsi:1
I3Cgilllilllgilt a f1oE11C Cfi1 iIle SStiIItII l1nC QFw1[I NE 1{4 f'rc»,3 ►,6°Itiieli iluiril l#tie Sw
Cvrnce nfsaid NF 1#4 nf t1~~ SW114 nf ilse SW1f4 b ears N.89°55'12u1N., a distanc:e
(tf I60.95; t1icnc.e N,00°24'08"F. F-Ioatig a #iike, ihat atisi5 iiiraLigli a pt}iiit 20.00 Ceet
5o «[l) a rici 5 Q2. 14 feek xYcs# of t1tc NE , Coris cr of si id N Flffl, a d i-, tance nf 501. 63
fcr:t tv a rir•i t-iA r3 erif stirs•r. r7w,i +r,at-L I ir; i Iie , v esi }iak, istg 1 rad i; is o f 2 56,(10 feet rroif~
10iich 11ctirti a rnidial liltc j+ewttt T~I.'►~3"{a~'S;''1~J.: kh"11ce sc:lliIle1"Iy aIi]C1g SaId {:LIrvC
- tfimog1I a rcircral fi~1'ale 1"1(.011" an i+i•e cliqtai}cc rsF 18.69 Feet iu t1ae hegiamiiig oEFL
revers e c•i4r ve coi tC FLVC V I I Ii c ciisI lio vicig, n rasli4i e of 294 00 fcee, tlienee sout9terly
rt IctiitiIR ; aii I turve Ifi i•oup) i i ccili r:rl n i igle 0 f 17"4 3'5!I" asi ttrc tli s#a nce af 1)0.98 feet;
lliclice &0[}024'03'"LV., adi~lance csf 394.21 fect #ci a Xxoriil on llre qntotli Eiite of said
N aa EJ•'i; tlIC11ce S.Rq"451 2"F- a1011g s.-lid SOLI lfl lirfc a dasla»cc d►r 19.00 fs:cl lo (}le 1'oitii «C llcgiliiiiiig.
Sittiale itt (1te CnLrnty of SE}nkarte, State of Washiuglcan.
Cv1iRaiiiiitg 9y820 S_F. ai1m'C [ll" l£Ss.
TC1 NAVE AND TO H4LD #he same, unio the said 5pakane Caun#y fvr the purposes ofa gublic
r+oad forever. -
i.l103/i997 MCF! $2_00 970014GLM
~
- - - - - - - - - - - -
~
41 7
1103J198i ~~IXi2.18P
CO EHCIM 0 $0.00 SQokane Co, !A
~ IN WITNESS WHEREOF, wE have hereunto set ocrx hand(s) and seal(s) this
.aY4day of OCTOBER , 1997
.
BY: By:
~
WILLIAM . PURVIS DEBRA A. PURVIS
,
STATE OF WASHINGTON )
COUNTY OF SPOKANE ) ss
I cectiFy that 1 know or have satisfactOry evidence that WILLIAM J. & DEBRA A. PURVIS
OWare) the individual(s) who appeared before me, and said individual(s) acknowledged that
OWsiaieJthey) signed this instrument, and acknowledged it as (fLbftidtheir) free and voluntary
act, for the uses and purpases mentioned in the instrument.
.
k Dated this f~day of ocTOSER 1997
i ~~NI111U/~/
s • C!!
~ ~°"q'r►.,
,
` ~¢o ~pt AR Y
= PtJg1.~ ~~o~ N01'ARY PUBLIC
In and for thc State of Washington,
~'e~r'•q~i9.~.•
v~~~ ~ I,iw residing at Spokane.
My appointment expires: 44
rwforms\right of way deed reg notary ptn parceftbc
r , .
RECE VED
~ NO V 20
)997
SPOiME COUNTY ENGINEER
,
. S P O K A.~T F e'~• • C O U N T Y
I3UlI.DWG AND PLANNING • A DMSION OF THE PUBLIC WORKS DEPARTML`M'
JAMES L. MANS4N, C.B.O., DIRECTOR DENN15 M. SCOTT, P.E., DrREcrott
MrMORANnvM
TO:
Spolcane County Division of Utilities; Jim Re
Spokane Regional Health District; Steve Holderby
Spolcane County Parks, Recreation & rair; Steve lIorobiowski
Stormwater Utitity; Steve Worley
Development Engineering Services; Bill I-lemmings
Department of Transportation, Mark Rowher
Spolcane Regional Transportation Council; Glen Miles
Spokane "1'ransit Authority; Christine rueston
Boundary Review Board; Susan Winchell
Long Range Planning Division; Jolln Mercer
Central Valley School District No. 356
Fire District No. 1
Model Irrigation District No. 18
FROM: Tammy Jones, Associate Planner
,
DATE: Navember 20, 1997
RE: AE-1850-97; Preliminary P1at of Purvis Point with existing Urban
Residential-3.5 (UR-3.5) zoning
TTCHNTCAL RE VTEW MCETING
DECEMBER 4, 199? AT 2:15 P.M.
DIVISION OT IiUILDTNG AND PLANIVYNG 1$` Y+'LOOR LIBRARY
Please review the above application and use the attached TECNNiCAL REVIEW MEETING
1=0RM for your comments. The Division of Building and Planning encourages you to
attend this meeting. The sponsor and representative have also been invited to attend this
nieeting. If you cannot attend, please Forward three (3) copies of your review comments
on the attached form to me for ihe meeting. The attached TECHNICAL REVIEW FORMS
will be given to the sponsor at the meeting and included in the Division of Building and
Planning file. Thanlcs for your cooperatioil. If you have any questions about the
application, please confiact me at 456-3675.
NOTE: The Division of Building & Planning will now be circulating comments for SEPA
Ciiecklist at tiie time of teclinical review. This will be the otily time you will be
able to comment regarding tl» STPA Checklist for this project.
c: William Purvis, 12810 E. Palouse I-iighway, Valleyford, WA. 99036
AtfilChments: Technical Review Foriii, Project Application, Site Plan, SEPA Checklist
1026 WEST BROADWAY AVENUE • SPOKANF, WASHiNGTON 99260
PHONE: (509) 456-3675 • FAx: (509) 4564703
TDD: (509) 324-3166
Spolcane County
Division of Building & Planning
Technical Review Meeting
Meeting Date and Time: December 4, 1997 @ 2:15 p.m.
Project File No.: PE-1850-97
Project Location: Generally located south of 1nd adjacent to 12'h Avenue and
approximately 600 feet east of University Road in the SW '/4 of Section 21,
Township 25 N., Range 44 EWM, Spokane County, Washington.
Comprehensive Plan: Urban
Project Description: Preliminary Plat of Purvis Point to divide approximately
2.19 acres in six (6) lots for single family residences and one (1) lot for an
existing duplex in the existing Urban Residential-3.5 (UR-3.5) zone.
Parcel No(s): 45213.9064
Applicant/Owner: William Purvis, 12810 E. Palouse Highway, Valleyford, WA.
99036, (509) 924-2087.
Project Planiler: Tammy Jones
t .
. SPOKANE ENVIRONMENTAL ORDINANCE
(WAC 197-11-960) Section 11.10.230(i)
Environmental Checklist
Purpose of Checklist: File No.L
The State Environmental Policy Act (SEPA) chapter 43.21C RCW, requires a21 governmental
agencies to consider the environmental impacts of a proposal before making decisions. An
Environmental Impact Statement (EIS) must be prepared for all proposals with probable
significant adverse impacts on the quality of the environment. The purpose of this
checklist is to provide information to help you and the agency identify impacts from your
proposal (and to reduce or avoid impacts from the proposal, if it can be done) and to help
the agency decide whether an EIS is required.
Instructions for Applicants:
This environmental checklist asks you to describe some basic information about your
proposal. Governmental agencics uae this checklist to determine whether the environmental
impacts of your proposal are significant, requiring preparation of an EIS. Answer the
questions briefly, with the most precise information known, or give the best description
you can.
You must answer each question accurately and carefully, to the best of your knowledge. In
most cases, you should be able to answer the questions from your own observations or
project plans without the need to hire experts. If you really do not know the answer, or
if a question does not apply to your proposal, write "do not know" or "does not apply."
Complete answers to the questions now may avoid unnecessary delays later.
Some questions ask about governmental regulations, such as zoning, shoreline, and landmark
designations. Answer these questions if you can. If you have problems, the governmental
agencies can assist you.
The checklist questions apply to all parts of your proposal, even if you plan to do them
over a period of time or on different parcels of land. Attach any additional information
that will describe your proposal or its environmental effects. The agency to which you
submit this checklist may ask you to explain your answers or provide additional
information reasonably related to determining if there may be significant adverse impact.
Use of checklist for nonproject proposals:
Complete this checklist for nonproject proposals, even though questions may be answered
"does not apply."
IN ADDITION, complete the SUPPLEMENTRL SHEET FOR NONPROJECT ACTIONS (Part D).
For nonproject actions, the references in the checklist to the words
"proJect," "applicant," and "property or site" should be read as "proposal," "proposer,"
and "affected geographic area," respectively. •
.
A. BACKGROUND
1. Name of proposed proj ect, i f applicable : FT~CE+vED
PURVIS POINT O'PdKANIE COUNTY
1 .3 1947
1
Ai`D PtANN(NG
,i";
.
SPOKANE ENVIRONMENTAL ORDINANCE
(WAC 197-11-960) Section 11.10.230(1)
2. Natne of Applicant :
William Purvis
3. Address and phone number of Applicant or contact person:
B. J. Sparling
Inland Pacific Engineering Co., Inc.
707 West 7`'', Sui te 200
Spokane,, WA 99204
Phone (509) 458-6840
4. Date checklist prepared:
October 27t`', 1997
5. Agency requesting checklist:
Spokane County Planning Department
6. Proposed timing or schedule (including phasing, if applicable):
Five years to completely bvild out project
7. a. Do you have any plans for future additions, expansion, or
further activity to or connected with this proposal? If
yes, explain.
No
b. Do you own or have options on land nearby or adjacent to
. this proposal? If yes, explain.
No
8. List any environmental information you know about that has been
prepared, or will be prepared, directly related to this proposal.
None that this office is aware of
9. Do you know whether applications are pending for governmental
approvals of other proposals directly affecting the property
covered by your proposal? If yes, explain.
2
, .
SPOKANE ENVIRONMENTAL ORDINANCE
(WAC 197-11-960) Section 11.10.230(1)
PreliminarY .7 Plat of Meadowland is ad 'acent to this
proj ect and
access wi.11 be a shared road a1 so there i s an approved
Preliminary P.Iat of Par Center north of this proposa.I.
10. List any governmental approvals or permits that will be needed
for your proposal, if known.
Preliminary plat approval; final plat approval with final designs
for Water, Sewer Storm Drainage, and Streets; building permits.
11. Give brief, complete description of your proposal, including the
proposed uses and the size of the project and site. There are
several questions later in this checklist that ask you to
describe certain aspects of your proposal. You do not need to
repeat those answers on this page.
This proposal is to subdivide a 2.19 Acre parcel into 7 1ots, 6
single family residential units and 1 duplex lot. The proposal
is "fill-in" development in an existinq urban area.
12. Location of the proposal. Give sufficient information to a
person to understand the precise location of your proposed
project, including a street address, if any, and section,
township and range, if known. If a proposal would occur over a
range of area, provide the range or boundaries of the site(s).
Provide a legal description, site plan, vicinity map, and
topographic map, if reasonably available. While you should
submit any plans required by the agency, you are not required to
duplicate maps or detailed plans submitted with any permit
application related to this checklist.
The site is on the south side 12`h Avenue and wi11 have access
from the proposed public road (G1 enn Road) wi thin the approved
Freliminary P1at of Meadowland. The project has 161 feet of
frontage on I2th Avenue. Said project is in the Sovthwest 114 of
Section 21, T. 25 N. , R. 44 E. , W.M.
13. Does the proposed actian lie within the Aquifer Sensitive Area
(ASA)? The General Sewer Service Area? The Friority Sewer
Service Area? The City of Spokane? (See: Spokane County's ASA
Overlay Zone Atlas for boundaries).
This proposal is within the ASA, GSSA, PSSA and also within the
Interim Urban Growth Area
3
, . .
SPOKANE ENVIRONMENTAL ORDINANCE
(WAC 197-11-960) Section 11.10.230(1)
TO BE COMPLETED BY APPLICANT '
, o
B. ENVIRONMENTAL ELEMENTS
l. EARTH
a. General description of the site (circle one):
Flat, rolling hilly, steep slopes, mountainous,
other:
Flat
b. What is the steepest slope on the site
(approximate percent slope)?
The steepest slope on the site is 2*.
c. What general types of soils are found on the site
(for example, clay, sand, gravel, peat, muck) ? If
you know the classification of agricultural soils,
specify them and note any prime farmland.
Soi1s on site are identified as marble sandy loam,
moaiera te1 y coarse text ured, somewha t excessi vel y
drained soil formed from sandy glacioflvvial
material.
d. Are there surface indications or history of
unstable soils in the immediate vicinity? If so,
describe.
No surface indications of unstable soils.
e. Describe the purpose, type, and approximate
quantities of any filling or grading proposed.
Indicate source of fill.
Minor excavation and fi1l will be reqvired for
storm drainage, utility, sewer and water and
building constrvction. Imported fill is not
anticipated.
f. Could erosion occur as a result of clearing,
construction, or use? If so, generally describe.
4
SFOKANE ENVIRONMENTAL ORDINANCE
(WAC 197-11-960) Section 11.10.230(1)
Minor erosion could occur during construction of •
proposal. Erosion wi11 be contained wi thin
project site and no erosion is expected when
proposal is completed with landscaped yards.
g. About what percent of the site will be covered
with impervious surfaces after project
construction (for example, asphalt or buildings)?
Approximately 26* of the site will be impervious
svrfaces.
h. Proposed measures to reduce or control erosion, or
other impacts to the earth if any:
Earth surfaces exposed by construction wi11 be
ei ther covered by buildings or paving; or wi11 be
restored with landscaping. A1.Z construction will
have to be in accordance of the proposed Erosion
and Sediment Control Ordinance when approved.
2. AIR
a. What type of emissions to the air would result
from the proposal (i.e., dust, automobile, odars,
industrial, wood smoke) during construction and
when the project is completed? If any, generally
describe and give approximate quantities if known.
During construction phase: dust and emission from
constrvction equipment. Completion: smoke and
emissions from residential uses and from
avtomobiles.
b. Are there any off site sources of emissions or
odor that may affect your proposal? If so,
generally describe.
No.
c. Proposed measures to reduce or control emissions
or•other impacts to air, if any;
Compliance with existing 1oca1 codes and
5
SPOKANE ENVIRONMENTAL ORDINANCE
(WAC 197-11-960) Section 11.10.230(1)
regul a ti ons .
3. WATER
a. Surface:
(1) Is there any surface water body on or in the
immediate vicinity of the site (including
year-round and seasonal streams, saltwater,
. lakes, ponds, wetlands) ? If yes, describe
type and provide names. If appropriate,
state what stream or river it flows into.
No.
(2) Will the project require any work over, in,
or adjacent to (within 200 feet) the
described waters? If yes, please describe
and attach available plans.
No.
(3) Estimate the amount of fill and dredge
material that would be placed in or removed
from the surface water or wetlands and
indicate the area of the site that would be ,
affected. Indicate the source of fill
material.
N/A
(4) Will the proposal require surface water withdrawals or diversions? Give general
description, purpose, and approximate
quantities if known.
N/A
(5) Does the proposal lie within a 100-year
floodplain? If so, note location on the site
plan.
No.
(6) Does the proposal involve any discharges of
waste materials to surface waters? If so,
. 6
SPOKANE ENVIRONMENTAL ORDINANCE
(WAC 197-11-960) Section 11.10.230(1) describe the type of waste and anticipated
volume to discharge.
No.
b. Ground
(1) Will ground water be withdrawn, or will water
be discharged to ground water? Give general
description, purpose, and approximate
quantities if known.
Increased groundwater withdrawaZs will be
requi red by exi s ti ng wa t er purveyor from a
remote location. 200 to 1,000 gallons per
day per .1 o t wi 11 be requi red . Some
stormwater runoff may be discharged to ground
water which may underlie the site.
(2) Describe waste material that will be
discharged into the ground from septic tanks
or other sanitary waste treatment facility.
Describe the general size of the system, the
number of houses to be served (if applicable)
or the number of persons the system(s) are
expected to serve.
None.
(3) Describe any systems, other than those
designed for the disposal of sanitary waste,
installed for the purpose of discharging
fluids below the ground surface (includes
systems such as those for the disposal of
storm water or drainage from floor drains).
Describe the type of system, the amount of
. material to be disposed of through the system
and the types of materials likely to be
disposed of (including materials which may
enter the system inadvertently through spills
or as a result of fire fighting activities).
Construction of the access road for this site
wi11 not be part of this development. Around
new buildings some stormwater run off in
7
SPOKANE ENVIRONMENTAL ORDINANCE
(WAC 197-11-960) Section 11.10.230(1)
excess of the first h inch of rainfall could
enter the ground. Building constrvction will
have meet the 1oca1 11208" stormwater
regulations.
(4) Will any chemicals (especially organic
solvents or petroleum fuels) be stored in
above ground or underground storage tanks?
If so, what types and quantities of materials
will be stored?
Some chemicals covld be stored in residential
garages but only those associated with urban
single family residences. No vnderground
storage wi11 be allowed.
(5) What protective measures will be taken to
insure that leaks or spills of any chemicals
stored or used on site will not be allowed to
percolate to ground water (this includes
measures to keep chemicals out of disposal
systems described in 3b(2) and 3b ( 3)?
Compliance with existing codes and
regulations.
c. Water Runoff (including storm water):
(1) Describe the source of runoff (including
storm water) and method of collection and
disposal if any (include quantities, if
known). Where will this water flow? Will
this water flow into other waters? If so,
describe.
Stormwater rvnoff wi11 be collected from
roofs, and driveways. Disposal will be in
accordance with adopted 11208" stormwater
di sposal regul a ti ons .
(2) Will any chemicals be stored, handled or used
on the site in a location where a spill or
leak will drain to surface or ground water or
to a storm water disposal system discharginq
to surface or ground water?
8
SPOKANE ENVIRONMENTAL ORDINANCE
(WAC 197-11-960) Section 11.10.230(1)
No.
(3) Could waste materials enter ground or surface
waters? If so, generally describe.
Irresponsible and illegal disposed waste
materials could enter ground water through
proposed stormwater disposal facilities.
d. Proposed measures to reduce or control surface,
ground, and runoff water impacts, if any (if the
proposed action lies within the Aquifer Sensitive
Area. Be especially clear on explanations
relating to facilities concerning Section 3b(4),
3b(5), and 3c (2) of this check-list).
Compliance with adopted "208" regulations and
stormwater regulations. A11 sanitary sewage
disposal will be via public sewage collection and
disposal systems.
4. PLANTS
a. Check or circle type of vegetation found on the
site:
deci duous trees: al der, maple, aspen, other.
evergreen trees: fir, cedar, pine, other.
x _ shrubs.
x grass.
pasture.
crop or grain.
wet soil plants, cattail, buttercup, bullrush,
skunk cabbage, other.
water plants: water 1ily, eelgrass, milfoil,
other.
x other types of vegetation.
b. What kind and amount of vegetation will be removed
or altered?
Most or a11 existing vegetation wi11 be removed.
c. List threatened or endangered species known to be
on or near the site.
9
SPOKANE ENVIRONMENTAL ORDINANCE
(WAC 197-11-960) Section 11.10.230(1)
None.
d. Proposed landscaping, use of native plants or
other measures to preserve or enhance vegetation
on the site, if any:
Existing site has very 1ittle native vegetation.
All yards and developed sites will be 1andscaped
using mostly non-native landscape materials.
5. ANIMALS
a. Circle any birds and animals which ha=re been
observed on or near the site or &re known to be on
or near the site:
birds : hawk, heron, eagle, songbirds, other :
Common bi rd speci es .
mammals: deer, bear, elk, beaver, other:
rodents
fish: bass, salmon, trout, herring, shellfish,
other:
N/A
other:
, There nray be some wild cats in this area.
b. List any threatened or endangered species known to
be on or near the site.
Non e .
c. Is the site part of a migration route? If so,
explain.
No.
d. Proposed measures to preserve or enhance wildlife,
if any:
10
SPOKANE ENVIRONMENTAL ORDINANCE
(WAC 197-11-960) Section 11.10.230(1)
Non e .
6. ENERGY AND NATUR.AL RESOURCES
a. What kinds of energy (electric, natural gas, wood
stove, solar) will be used to meet the completed
project's energy needs? Describe whether it will
be used for heating, manufacturing, etc.
Heating: electric, and natural gas, with some
sma11 use of wood stoves
Lighting: electric
b. Would your project affect the potential use of
solar energy by adjacent properties? If so,
generally describe.
No.
c. What kinds of energy conservation features are
included in the plans of this proposal? List .
other proposed measures to reduce or control
energy impacts, if any:
.
Compliance with locally adopted energy code.
7. ENVIRONMENTAL HEALTH
a. Are there any environmental health hazards,
including exposure to toxic chemicals, risk of
fire and explosion, spill, or hazardous waste,
that could occur as a result of this proposal? If
so, describe.
No.
(l) Describe special emergency services that
might be required.
.
Only those fire, police and' medical emergency
services assoc.iated with residential
deve.I opmen t.
(2) Proposed measures to reduce or control
• environmental health hazards, if any:
11
SPOKANE ENVIRONMENTAL ORDINANCE
(WAC 197-11-960) Section 11.10.230(1)
Compliance with locally adopted codes and
regul a ti ons .
b. Noise
(1) What types of noise exist in the area which
may affect your project (for example:
traffic, equipment, operation, other)?
Minor traffi c noi se and noi se generall y
related to urban residential neighborhoods.
(2) What types an levels of noise would be
created by or associated with the project on
a short-term or a long-term basis (for
example: traffic, construction, operation,
other)? Indicate what hours noise would come
from the site.
Short term: Construction equipment and
building activities.
Long term: Traffic and activities
associated with residential
devel opmen t.
(3) Proposed measures to reduce or control noise
impacts, if any:
. None.
8. LAND AND SHORELINE USE
a. What is the current use of the site and
adjacent properties?
.
Mostly vacant. There is an existing duplex
and garage fronting 12t`' avenue. The rest of
the site is vacant.
b. Has the site been used for agriculture? If
so, describe.
No
c. Describe any structures on the site.
12
SPOKANE ENVIRONMENTAL ORDINANCE
(WAC 197-11-960) Section 11.10.230(1)
One duplex bvilding and garage.
d. Will any structures be demolished? If so,
which?
Yes, the garaqe will be removed.
e. What is the current zoning classification of
the site?
UR 3. 5
f. What is the current comprehensive plan
designation of the site? Urban.
g. If applicable, what is the current shoreline
master program designation of the site?
N/A
h. Has any part of the site been classified as
an "environmentally sensitive" area? If so,
specify,
No.
I. Approximately how many people would reside or
work in the completed project?
Approxima t el y 21 t o 23 peopl e wi.1 l 1 i ve i n
the completed project.
j. Approximately how many people would the
completed project displace?
Non e .
k. Proposed measures to avoid or reduce
displacement impacts, if any:
IV/A
13
. , .
SPOKANE ENVIRONMENTAL ORDINANCE
(WAC 197-11-960) Section 11.10.230(1)
l. Proposed measures to ensure the proposal is
compatible with existing and projected land
uses and plans, if any:
Proposal will comply with local zoning code
requirements and the condi tions of approval
established by Spokane County.
9. HOUSING
a. Approximately how many units would be
provided, if any? Indicate whether high,
middle, or low-income housing. Up to 6 single family middle income units and
2 uni ts (dupl ex) will be provided.
b. Approximately how many units, if any, would
be eliminated? Indicate whether high,
middle, or low-income housing.
None.
c. Proposed measures to reduce or control
housing impacts, if any:
N/A
10. AESTHETICS
a. What is the tallest height of any proposed
structure(s), not including antennas; what is
the principal exterior building material(s)
proposed?
The tallest building will 35' of less with
' principal exterior building materials of Wood
or wood-like materials; metal; masonry or
vinyl siding.
b. What views in the immediate vicinity would be
altered or obstructed?
Site would be altered. No views would be
blocked.
14
SPOKANE ENVIRONMENTAL ORDINANCE
(WAC 197-11-960) Section 11.10.230(1)
c. Proposed measures to reduce or control
aesthetic impacts, if any:
Rules and regulations by covenants would be
enforced to control housing design,
landscaping and fencing.
11. LIGHT AND GLARE
a.. What type of light or glare will the proposal
produce? What type of day would it mainly
occur?
Those commonly associated with residential
uses.
b. Could light of glare from the finished
project be a safety hazard or interfere with
views? '
No.
c. What existing off site sources of light or
glare may affect your proposal?
There may be some existing porch lights
affecting this site.
d. Proposed measures to reduce or control light
and glare impacts, if any:
. Compliance with local regulations.
12. RECREATION
a. What designated and informal recreational
opportunities are in the immediate vicinity?
University High School play fields are a few
b1 ocks wes t of th e proposal.
b. Would the proposed project displace any
existing recreational uses? If so, describe.
No.
15
SPOKANE ENVIRONMENTAL ORDINANCE
(WAC 197-11-960) Section 11.10.230(1)
c. Proposed measures to reduce or control
impacts on recreation, including recreation
opportunities to be provided by the project
or applicant, if any:
None
13. HISTORIC AND CULTURAL PRESERVATION
a. Are there any places or objects listed on, or
proposed for national, state, or local
preservation registers known to be on or next
to the site? If so, generally describe.
No.
b. Generally describe any landmarks or evidence
of historic archaeological, scientific, or .
cultural importance known to be on or next to
the site. °
None.
c. Proposed measures to reduce or control
impacts, if any:
None.
14. TRANSPORTATION
a. Identify public streets and highways serving
the site, and describe proposed access to the
existing street system. Show on site plans,
if any.
Glenn Road (which is being bvil t as part of
Meadowland) will be the primarily access for
the proposed lots. 12`h Avenue wi11 be the
main access for the duplex lot and where
Glenn Road connects.
b.. Is site currently served by public transit?
If not, what is the approximate distance to
the nearest transit stop?
112 to 314 block, Transit service exists on
16
. ,
SPOKANE ENVIRONMENTAL ORDINANCE
(WAC 197-11-960) Section 11.10.230(1)
' University road
c. How many parking spaces would the completed
project have? How many would the project
eliminate?
Approximately 32 spaces wi11 be created. 8
spaces are already existing around the duplex
location. No parking spaces would be
eliminated.
d. Will the proposal require any new roads or
streets, or improvements to existing roads or
streets not including driveways? If so,
generally describe (indicate whether public
or private ) .
G.Ienn Road will provide direct access for
most lots proposed. The duplex lot wi11
access onto 12='' wi th minor improvements
. requi red.
e. Will the project use (or occur in the
immediate vicinity of) water, rail, or air
transportation? If so, generally describe.
No.
f. How many vehicular trips per day would be
generated by the completed project? If know,
indicate when peak would occur.
80 trips more or less. Peak hours from
8-10 AM and 4-6 PM.
~
g. Proposed measures to reduce or control
transportation impacts, if any:
Mi nor improvemen t s on 12t'' Aven ue onl y.
15. PUBLIC SERVICES
a.. Would the project result in an increased need
for public services (for example: fire
protection, police protection, health care,
17
. ,
SPOKANE ENVIRONMENTAL ORDINANCE
(WAC 197-11-960) Section 11.10.230(1)
schools, other)? If so, generally describe.
The new lots wi11 result in increased need
for a11 public services. Utilities are
available in adjoining streets.
b. Proposed measures to reduce or control direct
impacts on public services, if any:
Non e .
16. UTILITIES
a. Circle utilities currently available at the
site: electricity, natural gas, water,
refuse service, telephone, sanitary sewers,
septic system, other. b. Describe the utilities that are proposed for
the project, the utility providing the
service, and the general construction
activities on the site or in the immediate
vicinity which might be needed.
, Electricity (WWP), telephone (US West),
Sewer (Spokane Covnty) Water (Model
Irrigation District).
C. SIGNATURE
I, the undersigned, swear under the penalty of perjury that the above responses are made
truthfully and to the best of my knowledge. I also understand that, should there be any willful
misrepresentation or willful lack of full disclosure on my part, the aqency may withdraw any
determination of nonsignificance that it might issue in reliance upon this checklist.
Date : 11 q1 Proponent : W%%a rrl rV l 5
z (Please Print or Type)
Proponent :-O Avvvv"'~ Addres s: ( Z$l aF, . P~l I D uSCc. HtQ
Si ture
Phone : Cl a '4 - 20R "1
Person completing form: G Date : I I I I
I ' Phone: q56 -6£4CD
18
SPOKANE ENVIRONMENTAL ORDINANCE
(WAC 197-11-960) Section 11.10.230(1)
FOR STAFF USE ONLY
Staff Member(s) Reviewing Checklist:
Based on this staff review of the environmental checklist and other
pertinent information, the staff:
A. Concludes that there are no probable significant adverse impacts
and recommends a determination of nonsignificance.
B. Concludes that probable significant adverse environmental impacts
do exist for the current proposal and recommends a mitigated
determination of nonsignificance with conditions.
C. Concludes that there are probable significant adverse
environmental impacts and recommends a determination of
significance.
FILING FEE - $75.00
19
.
. •
SP014CANE COUNTY DIVISION OF
BUILDING AND PLANNING
PRE LIMINARY SUBDIVISION APPLICAT~
SPO:~ANE CnlJNITY
PART I
N(lU 13 1991
A. GENrRAL INFORMATION:
NAME OF APPL(CANT/REPRCSCNTATIVf: William Purvis' "
MAILING ADDRCSS: 12810 East Palouse Highway
CITY: Valleyford STATE: WA ZIP: 99036-9726
('I-lONC: 924-2087 (worlc) (home) FAX:
If APPLtCANT IS NOT OWNTR, iNCLUDC WRITTCN OWNCR AUTFIORiZATION
F012 AI'I'LICANT T4 SCRVC AS REPRCSCNTATIVE.
I..EGAL OWNER'S NAME: Same as above f'HONE:
MAILING ADDRESS:
CITY: STATE: Z1P:
PROJCCT/PROPOSAL SiTE ARCA (acres or sq. ft) 2.19 Ac.
ADJACENT AREA OWIJCD OR CONTROLLCD (acres or sq. ft.) None
ASSESSOR PARCCL #'S OF PROJCCT/PROPOSAL 45213.9064
ASSESSOR PARCCL #'S OF ADJACCNT AREA OWNCD OR CONTROLLED N/A
STRCCT ADDRESS O[' ['ROPOSAL 10908 East 12th Avenue
C'XISTING ZONE CLASSIF'ICAT[ON(S) (DATr CSTA13l.rs1-iCn) iTR-3.5
EXISTING USC OF PROi'CRTY Duplex existing on site
COMI'REE-ICNSiVC PLAN CATCGORY IIrban
SCHOOL DISTRICT Central Vallew School District
FIRG DISTRTCT Fire District No. 1 WATER PURVEYOR Model Irrigation
1'ROPOSED USE OF PROPERTY: - t District No. 18
Sinsle family dwellings (X) Duplexes (X) Multifamily d4vellings O
Manufactnred homes ( ) 13usiness ( ) Industrial ( } Mixed Use ( )
Other ( ) - Describe: ,
L[ST PRCVIOUS PLANNING ACTIONS INVOLVING TFIIS PROPERTY: Pending Short
Plat SP 1018-95
13. LrGAL INFORMATION:
LOCAT[ON OF PROPOSAL: South and adjacent to 12th Avenue in SW J of
SCCTION 21 TOWNSH[P 25 RANGE 44
NAMC OF PUBLIC ROAD(S) PROVIDING ACCCSS: 12th Avenue, East of Pierce
Road and Glenn Road (to be built with finalizationof Meadowland).
WIDTFI OF PROPrRTY f RONTiNG ON PUI3L[C ROAD: 161' on 12th Avenue and 650±
on proposedUlenn f~oaa
DOES THC PROT'OSAL f-IAVE ACCCSS TO AN ARTCRIAL OR PLANNED ARTCRIAL O YES NO
NAMC(S) OF ARTCRIAL ROADS
LCGAL DESCRIPT[ON OF PROPCRTY (Attach legal description witll source of legal clearly indicatecl.)
INCLUDE LEGAL DESCRIPTION FOR ENTIRC ARCA TO [3E SURDIVIDED ON I'RCLIMINARY
SU[3DIVISION MAP.
.
SUBDIVISIQN APPLICATION Page 2 of 4
TF YDU ❑O NOT 1-3aLD TITLE 'E"O PROPE, RTY, WI-1AT IS YOU1~ IN'[`E TtCST IN iT?
.
vVHAT ArtE THE Cr-rANGED CONa1`FrDNS OF THE Ar~~A WFIrCtI voU FEEL rirtAKE Tr-rIs
PROI'OSAL WA~RANTED? The IIIGA boundaries encaurages infill develvpiuent.
Tiiis area has had ather appraved proi ec-ts snme with sma,ller density.
WV[A'C' rM PA CT WILL THE PROPDSE❑ SiJB l]1111Sf0N 11 AVE ON TFiE A I]1ACGNT PRDPERT[E S?
It is possible that hiRh taxes covld occur and that increased traffic could
be exp erienced. ~
I~VF[~1T FACTflRS SlJPPOTtT TI-IE SUBDEVlSION? Site is served bv exist3n,e urban
facil,ities and meets existina zonin~ reauirements as w~ell as the intent of the GMA
~1egislatian an,d is camp atihle with the surrnunding develnpment of the area.
WFiAT MEASL]RES DO YOU 3'ROPQSE TO iv11`!'IGATE YOUR 1'R4POSAL'S INl1'ACT UAI
SURROUNDjNG LAND L1SE? CamiDliance with Findings of Fact imnased bv
5pokane County.
C. PRrLrMiNARY suBnIViSioN GENEr~~ ~NFORMATION:
NClMIIER OF L17TS: 7 Lots G1LOSSAltiEft. 2.19 Acre{u`
T1FPjCAL LOT SIZE: 11,360 S. F. PROFDSCD NET ❑F-NS1T1'*: 3.20 units/ Z Ac.
S1vfALLEST L07 SiZE: 1.1,360 S.F. MjNiMUilrt FRONTAGE: SO *
f'FtOP45ED SOLJRCE OI' WA'i'ER:
]ndividual wells ( ) T'ublic systern (x) Private Commuatity Sys#em
Ot1ier ( ) - Describc:
FiiOPOSED 1viEANS OF SEWAGE DTSP45AL.
E'tab[ic sewer (K) Cornmunixy systern Septic tank and drainfield
DotihEe Pltimbing Dry Sewer Otfyer ( }
Describe;
U7`lLCTY COMPANt1GS ANDlQR C]1STR1CTS TO PR,OV1DC SCRVICE TO TI-iiS PROPOSAL:
Electricity: Washington Water Pnwer 5ewer: Spnkane County
Gas: Wa,shininon Water Foae.rt Vllater:M'adel IrriLyatim Dist, Pfivne: U.S. West
D4YOU, OR '1'I-IE C}WNER IN THE E'VCN'I" YDl] DO AIC7't' OWN 'I'H IS PRDPS RT"Y, HA V G A1dY
PLA1ti1S FOR T'UTURE ADDITIONS, EX PANSI0NS OIt FURTII ER AC'I`]V I"r'Y 12E- LATED RC'O TF-YrS
PROPOSAL? Yes ( ) AIo (X) !F YCS, EXF'LAirif:
D. ~~ELXMIN~~~ SUBDTVrsIorv TMPROVrMrNT 1NFORMA-r~ON:
LEVEt.~ OF STREET liVfPitOVEMENTS PROPO5ED: Private roads
I'ublic raads (X) Arterial raads { ] Tract X roads ( )
DESCRI8E ANY CDMB1NA'I'14N OF AI3C1VG:
ES`C`[M.ATCD TlME PEFtIOD EXPGCTGA FOR GOMPLETE DEVELQPMENT OF THE SLJaDTVISTON:
3-5 years depending ❑n the housine market.
YS PI-TAS 1NC C}F TI-iL- F1NAL-1ZATlO1V 0 F"T14 C 5U13DiVI5I QN PROPOSE D? Yes No (g)
IF YES, SHOW PHA51NG ON THE PREL[MINARY SUi3Di111SiDAI MAP DR PROVIDE SEPARA,TE
1'f-IAS1NG 1'L.AN.
15 i]EDICATIOhI OF LAND F4R PUBLIC USE CONT'F-iv[PLATED {Parks, scfiaols, etc.}? Yes Na 00
IF YGSt DE.74R1!?E.
~NrT DENSITY rs uNITS OR i.OTs PcIZ ACRr-, n~INus Pr~IVATe AND/oR PuBL:c RoAa ARrA.
.
.
.
. SUBDIVISION APPLICATION Page 3 of 4
PART 11
TH15 SECTCC)N +DF TE-IE API'L1CATiON VViLL PROV[DE THL BU1LDjNG AND PLA1J1NrNG STAFF WITI-i
WItITTEIWi '4JEREFICATI0N THt1T TH E APPLICANT HAS HAD PREL.II1ri1NARY CONSULTATION WITI-[ TI-~c-
AGENCICS 1DENT1FIED. RESULTS OF THE PRELIZvtINAItY CONSULTATION SHALL !3E IhICORT'ORATT'D
1N T'TIE I'ROPOSAL i3EFflIZE FINAL SUQMIT7'AL TO T14E PLANN!NG [7EPARTMEhIT.
~ FIRE MARSHXLUFIRE DISTRTCT
A. TI-I[S PRQPOStS►L I5 WITHIN FIRE PRQT~CTI T NO. ~
R. ADEQ[~IATE ARRANGEME~lTS (~-IAVr) (I AV~ IwdOT) BE~EN 1vtADE TO 1v1~ET DtJR NEE DS
lN l'R01!lDING rOR AN ADrQi1A'fE V4{A7'ER ,C dFACI1-rTrES FoR FIRE
PRC3TEC'T'!ON P[JRPOSCS.
C. E~CCO~vlMEhlT3EI~ FIRE F1~O~V: ; OR UAlABLE TQ CALCCJLATF NOW
BECAUSE iJSE iS NO'r Dr"r•rNrTrVC; AN13 Wlt-L B' DC-TrRMTNr--D AT BU1LD1NC; T'ER1Vi1T
Af'PLICAT[ON T[MC. 1
D. REQUIREMENTS 1NCL[.fDE: 1 7
5-e
FlitE I]fSTRICT ATUI~tfT[TLE DA~~ WATEII PURVEYOR
~
A. SAT15FACTORY ARRANGC1ViF,N Z-'C`1C WATER AND Fil"tE T'LQVV
REQUIREMENTS (HAVE) HAV'E NOT BEEN MAi]E.
-
B. REQLJiI~EMENTS1COMMENTS:
.
~ .
~JVAT`ER DIST[tIC" lz !~'['T`LE ~ DATE
~
{
ENUTN
A F'ILELIi1{1INARY QISCUSSjON HAS TAKEN PLACE AND GEltilCRAL REQUIREMENTS T'OR TtC]ADS AND
DRAYNAGE HAVE BEEN DISCUSSF-D WY7'FITHE AP1'LiCAN7'.
A. C4ArtME-NTS: ~
1~~ ~
` S]6NA1~"URE~ DATG
~S
A FItGLIM1NARY DiSCUSSION I-IAS TAKGN PL.ACE AND GE-NERAL REQUIREMENTS FOR SUBMI7`TAL
OF TIa[S PROPOSAL (HAVE) -1 AV~ N~'f} BECN SATiSFiED. THE DESIGNATED VVATER
PURVEY'OR FOR Z"II1S SITE IS
A. COMMENTS: F n bs- ~ 3 ~ P_ _ ' N rAA -e 4- ok r t f e- ~ ~rs ~ -r, ~
c, l_.-. L jf- ~l IS
StGNATUREfT1TLE DATE
{ ~
A I'RFL1Ni1NARY QISCU5SION I-IAS TA1CE-N PLACE AN❑ CE-NE-RAl.. REQU1REMEN'C"S FQCt Sil.JBllfiIT`I"AL
Or Tl-IES E'RQPOSA4 (y-TAVE) (T]AVC N+DT) B1CCN SAT1SFlEI].
A. C C] h+f 11+f EN7`S: L4
S1GhiA, ItE! ITLE 3]
L
'
a E PURVEYOR
APRCLiN[INARY DISCUSSZON 14AS TAKEZV PLACE A.ND CENLRAL REQUIREMENTS rOR T~~
~~OV1S1C]N OF PUBL1C SEWFR ARC UNDGRSTOOD 8Y TI-IE AI'PL[CANT.
A. CON[MGNTS: LCVJ vi c-~-~'
. ~ PYLVXIT SA R U 17' G E
_ w
. _ 8
.
.
PL~CATION Pclge 4 0~ 4
rYk J. At }
7 - - - -
a+■
9 P.
PART YY1
SURVEYOR VERIFICATIOAf
. .
. +
1, T ERiIG D, A LICE-NSP-1] LA?r?D Si1R.VEYDR, I-IAVE COiVIFLE"T'E D TFIE INrORNfA"TION
R D.i ELtM1NARY PLA7' HAS BECN PR'CF'ARED BY ME OR UNDER MY SUPET{ViS1ON EN
•~1 # I TI•iE R EQUI R EM ENT5 OF TF] E S PQKANE COUAlTY ZONINCISL1BpIV 1S1ON
N STATE OF WASf-31NGTQN,
~ GNE, DATE: 1'o 1.3 7
s: -70 7 7~ -57- 00 PHONE: 'g; r P D
~1ov ~ • , ~~c~. ZiF':
PAR'C YV
(S[GNA'I`UR,6 OF PROPERTY OWNERS OR LETTER OF AUTHt]RtZATYON)
1, THC [J1*!I]ERSIGNED, SWEAR OR AFFjRM UrilDER F'ENALTY Or- PERJL]RY THAT "T'14E ABO1lE
RrS PONSES A RE M ADE 'T'RUTE-I Fi.1LLY AN❑ TO TI-IC aES''C" OF MV KNOWLEI]GE.
I FUR,THEft SWEAFt OR AFr-1RM 'C`HAT I Aiv!'i'I-IE OWNER OF RECOrtd OF THE AREA PT{aPQSED FQR
T]q E PRE1JIOUS LY ID£NTIFi ED LAND USE ACTION, OR, iF NQT TNE OWN ETt, AT"f`ACH ED HERF-W ['I'FS
IS WR117EN PERMISSTON FROM TH£ OWNEIt ALJTHORIZING MY ACTIONS ON HISJ'HER 8EHALF,
.
sIGNzn: DATE:
ADDRESs. I PHaNE:
ZIP:
sr~~ATURE OF ALICANT Oii REPRESENTA`f'IVE DATE
STATE OF WAS1-fINGTON }
} ss:
COUNTY 4F SPOi{ANE }
5fGNCD AND SWORN OR AFFIRIVIED BCFOrRE ME ON TIJ15 DAv or-
i 1997, BI
I`IO1 ~~Y SGAl.r Notary Public in nnd For the State of Washington
Residing at:
1vEy apposntment expires:
PART V
(TQ aE COMPLETED I3Y TI-iE D1VISIC)N OF HUILDING AND PLANNfNG)
DATE su$MIrrED: F1L£4:
DArc ACCErifiEn: ev: ~ _ _~j
TQTAL FE ES: REcErPT 4:
rn st sua",r.L. .L 4
.n. a!
.
~
. ~
. ,
PLICATION Page 4 of 4
J:.,~-
. .
wa0PART III
. ; ~
; y , ~ . SURVEYOR VERIF[CATION
. •
. •
TI ERSIG D, A LICENSED LAND SURVEYOR, NAVE COMPLETED THE INFORMATiON
R D.; EL1MfNARY PLAT HAS BEEN I'REPARED BY ME OR UNDER MY SUPERVISION IN
1 TI-1C REQUIREMENTS OF Th1C SPOKANC COUNTY ZONING/SUaDIVISION
N THF WS OF TI-1C STATE OF WAStIlNGTON.
LJ11ifl '
1GNE DATC: 10131177
ocPtAEB 120e 9 ~ ~
S: 7~7 -5LL~ Zoa PHONE: ys~ '-ryo
ZIP: l 59 Z05/
rArtT Yv
(SIGNATURE OF PROPERTY OWNERS OR LETTER OF AUTHORIZATION)
I, TML- UNDERSIGNED, SWEAR OR AFFiRM UNDER PENALTY OF PERJURY THAT THE ABOVE
RESPONSES ARE MADE TRUTHFULLY AND TO THE BEST OF MY KNOWLEDGE.
.
1 FURTHER SVVEAR OR AFI=IRM THAT I AM THE OWNER OF RECORD OF THE AREA PROPOSED FOR
THE PREVIOUSLY IDENTIFIED LAND USE ACTION, OR, IF NOT THE OWNER, ATTACHED NEREW[TH
IS WRITTEN PERMISSION FROM THE OWNER AUTHORIZtNG MY ACTIONS ON HIS/HER BEHALF.
SIGNED: DATC:
ADDRCSS: ( u ' PHONC:
ZIP:
SIGNA'C"URE OF ALICANT OR REPRESENTATIVE DATE
STATE OF WASHINGTON )
) ss: COUNTY OF SI'OKANE )
SIGNCD AND SWORN OR AFrIRME BEFORC ME ON Tfi1S --3 R~ DAY OF
1997, I3Y'
4L~~a~~ i
~••''11~NT~~'9 a~~ .
'OIL
.
Notary Public in and for the State of Washington
Residing at:
.
~'~r z ~ w~ My appointment expires: ~PART V
(TO QC COM('LETED C3Y THE DIVISION OIT i3U1LD1NG AND PLANNING)
DATC SUBMIT"fED: FILE
pATE ACCEPTED: gY:
TOTAL fECS: RG'CEIPT I1:
.Mt. ~MIWV A.eL , y, ti~
. ~
,
, EIVEQ . .
COUNTY • .
NOU 1 .3 1991 October 29, 1997
,•;;~::~:;~0 i•,, (:F ~ Ui! b<N'G l,Nn Pi.tlINI NfN G LEI+ DESCRIPTION
FOR
.
PURVIS POINT
THAT PART of the Northeast Quarter of The Southwest quarter of
the Southwest Quarter of Section 21, T.25 N., R.44 E., W.M.,
described as follows:
Beginning at a point 20.00 feet South and 502.14 feet West of the
Northeast corner of the said Northeast Quarter of the Southwest
Quarter of the Southwest Quarter of Section 21; thence south to a
point on the South line of said Northeast Quarter of the
Southwest Quarter of the Southwest Quarter of Section 21, 160.85
feet East of the southwest corner thereof; thence West on said
south line to the southwest corner of said Northeast Quarter of
the Southwest Quarter of the Southwest Quarter; thence North
along the west line thereof to a point 20,.00 feet South of the
Northwest corner of the said Northeast Quarter of the Southwest
Quarter of the Southwest Quarter of Section 21; thence East to
the point of beginning;
EXCEPTING THAT portion of the Northeast Quarter of the Southwest
Quarter of the Southwest Quarter of Section 21, T.25 N., R.44 E.,
W.M., more particularly described as follows;
Beginning at a point on the south line of said Northeast
Quarter from which point the southwest Corner of said
Northeast Quarter of the Southwest Quarter of the Southwest
Quarter bears N.89°55112"W., a distance of 160.85; thence
-N.00°24'08"E. along a line that runs through a point 20.00
feet south and 502.14 feet west of the northeast corner of
said Northeast Quarter, a distance of 501.63 feet to a non-
tangent curve concave to the west having a radius of 256.00
feet (from which point a radial line bears N.76°02'53"W.);
thence southerly along said curve through a central angle of
4°10'S0" an arc distance of 18.68 feet to the beginning of a
reverse curve concave to the east having a radius of 294.00
feet; thence southerly along said curve through a central
angle of 17°43'S0" an arc distance of 90.98 feet; thence
4108"W., a distance of 394.21 feet to a point on the
J• A~a th ine of said Northeast Quarter; thence S. 8 9°55' 12 "E .
~o4'wASX.aid south line a distance of 19.00 feet to the Point
g, . . inning.
. .
~ , .
a~ te:i he County of Spokane, State of Washington.
~ 18091
. 0.
t LJ►O
vcMEs t9os d ,
~
.
h
SPOKANE COUNTY DIVISION OF ~
BUILDING AND PLANNING
PR.ELIMINARY SUBDIVISION APPLICATION
PART I
A. GENERAL INFORMATION:
NAME OF APPLICANT/REC'RESENTATIVE: William Purvis
MAIL{NG ADDRESS: 12810 East Palouse Highway
CITY: ValleYforcl STATE: WA ZIP: 99036-9726
I'HONE: 924-2087 (work) (home) FAX:
Ir APPLiCANT IS NOT OWNER, INCLUDE WRITTEN OWNCR AUTHORtZAT10N
FOR APPLICANT TO SCRVE AS REPRESCNTATIVE.
I..EGAL OWNER'S NAME: Same as above PHONE:
MAILING ADDRESS:
CITY: STATE: ZIP:
I'ROJECT/PROPOSAL SITE AREA (acres or sq. ft) 2.19 Ac.
ADJACENT AREA OWNED OR CONTROLLED (acres or sq. ft.) None
ASSESSOR PARCEL #'S OF PROJECTJPROPOSAL 45213.9064
' ASSESSOR PARCEL #'S OF ADJACENT AREA OWNED OR CONTROLLED N/A
STREET ADDRESS OF PROPOSAL 10908 East 12th Avenue
EXISTING ZONE CLASSIFICATION(S) (pATC rsTAB[.ISHCn) UR-3.5
FXiST1NG USE OF PROPERTY Dupleg existing on site
COMPREHENSIVE PLAN CATEGORY IIrban
SCHOOL DiSTRICT Central Vallev School District
FIRE DISTRICT Fire District No. 1 WATER PURVEYOR Model IrriQation
PROAOSED USE OF PROPERTY: District No. 18
Single family dwellings (X) Duplexes (X) Multifamily dwellings O
Manufactured homes { ) IIusiness ( ) Industrial ( ) Mixed Use ( )
Otlier ( ) - Describe:
LIST PREVIOUS PLANNING ACTIONS tNVOLVING THIS PROPERTY: PendinR Short
Plat SP 1018-95
B. LEGAL INFORMATI4N:
LOCATION OF PROPOSAL: South and adjacent to 12th Avenue in SW f of
SECTION 21 TOWNSI-IIP 25 RANGE 44
NAME OF PUBLfC R4AD(S) PROVIDING ACCCSS: 12th Avenue, East of Pierce
Road and Glenn Road (to be built with finalizationof Meadowland).
WIDTH OF PROPERTY FRONTING ON PUBLIC ROAD: 161' on 12th Avenue and 650±
on proposed vlenn Koad
DOCS THE PROPOSAL HAVE ACCESS TO AN ,~1RTCRIAL t~R PLANNED ARTERIAL YES (K) NO
NAME(S) OF ARTERIAL RQADS
LEGAI. DFSCRIPTION Or PR4PERTY (Attach legal description with source of legal clearly indicated.)
{NCLUDE LEGAL DESCRiPTION FOR ENTIRE AREA TO BE SUI3DIV(DED ON PRELIMINARY
SUBDIVISION MAP.
0
• + .
SUBDIVISION APPLICATION Page 2 of 4
IF YOU DO NOT HOLD T1TLE TO PROAERTY, WHAT IS YOUR INTEREST IN IT?
WHAT ARE THE CHANGED CONDITIONS OF THE AREA WHICH YOU FEEL MAKE THIS
PROPOSAL WARRANTED? The IUGA boundaries encourages infill development.
This area has had other approved proiects some with smaller density.
WHAT IMPACT WILL THE PROPOSED SUBD1VISlON HAVE ON THE ADJACENT PROPERTIES?
It is vossible that hiah tages could occur and that increased traffic could
be exp erienced.
WHAT FACTORS SUPPORT THE SUBDIVISION? Site is served bv existing urban
facilities and meets egistine zoninp, revuirements as well as the intent of the GMA
1egislation and is comp atible with the surrounding develo ment of the area.
WHAT MEASURES DO YOU PROPOSE TO MITIGATE YOUR PROPOSAL'S iACT ON
SURROUNDING LAND USE? Comvliance with FindinQs of Fact imvosed bv
Spokane County.
C. PRELIMINARY SUBDIVISION GENERAL INI{'ORMATION:
NUMi3ER OF LOTS: 7 Lots GROSS AREA: 2.19 Acres
TYP[CAL LOT SIZE: 11,360 S.F. PROPOSED NET DENSITY*: 3.20 units/1 Ac.
SMALLEST LOT SIZE: 11,360 S.F. MINIMUM FRONTAGE: 80'
PROPOSED SOURCE OF WATER:
Individual wells Public system (x) Private Community System
Other ( ) - Describe:
PROPOSED MEANS OF SEWAGE DISI'OSAL:
Public sewer Community system Septic tank and drainfield
Doubte Plumbing Dry Sewer O Other O
Describe:
UTIL(TY COMPANIES ANDlOR DISTRICTS TO PROVIDE SERVICE TO Tf-IIS PROPpSAL:
Electricity: Washington Water Power Sewer: Spokane Countp
Gas: Washington Water Power Water:Model Irrigation Dis~. Phone: U.S. West
DO YOU, OR THE OWNER IN T!-1E EVENT YOU DO NOT OWN THIS PROPERTY, HAVE ANY
PLANS FOR FUTURE ADDITIONS, EXPANSIONS OR FURTHER ACTIVITY RELATED TO TH(S
PROPOSAL? Yes No (g) IF YES, EXPLAIN:
D. PRFLIMiNARY SURDIVISION IMPROVEMENT INFORMATION:
LEVEL OF STREET IMPROVEMENTS PROAOSED: Private roads
Public roads (gj Arterial roads Tract X roads
DESCRIBE ANY COMBINATION OF ABOVE:
ESTIMATED TIME PERIOD EXPECTED FOR COMPLETE DEVELOPMENT OF THE SUBDIVISION:
3-5 years dependine on the housine market.
IS PHASING OF THE FINALIZATION OF THE SUBDIVIS101-1 PROPOSED? Yes No (R) ,
IF YES, SHOW PHASING ON THE AREL[MINARY SUBDIVISION MAP OR i'ROVIDE SEPARATE
PHAS[NG PLAN.
1S DEDICATION OF LAND FOR PUBLIC USE CONTEMPI.ATED (Aarks, schools, etc.)? Yes O No 00
IF YES, DESCRIBE:
* NET DENSITY IS UNITS OR LOTS PER ACRE MINUS PRIVATE ANDl02 PUBL.IC ROAD AREA.
. A '
. `
SUBDIVISION APPLICATION Page 3 of 4
PART II
THIS SECTfON OF THE APPLiCATION W1LL PROVIDE THE BUILDING AND PLANNING STAFF WITH
W2ITTEN VERIFICAT[ON THAT THfi APPLICANT HAS HAD PRELIMINARY CONSULTATION WITH THE
AGENCIES IDENTIFIED. RESULTS OF THE PRELIMINARY CONSULTATION SHALL BE INCORPORATED
1N THE PROPOSAL BEFORE FINAL SUBMITTAL TO THE PLANNING DEPARTMENT.
. FIIZE MARSHALL/FlIZE
A. THIS PROPOSAL [S WITHIN FIRE PROTECTI T NO. !
B. ADEQUATE ARRANGEMENTS (HAVE) ( AVE NOT) BEEN MADE TO MEET OUR NEEDS
IN PROVIDING FOR AN ADEQUATE WATER D FACILITIES FOR F1RE
PROTECTION PURPOSES.
C. RECOMMENDED FIRE FLOW: 17-~D ; OR UNABLE TO CALCULATE NOW
I3ECAUSE USE IS NOT DEFINITNE; AND W1LI.. BE DCTCRMINED AT E3UILDING PERMIT
APPLICATI4N TIME. ' 1f,
D. REQUIREMENTS 1NCLUDE: TO5S Ir3a ~%JY,D~~LfS
S- ~ r. r D.~ 1 { 7
F1RE DISTRICT ATUREJTITLE DATE
WATER PURVEYOT(
A. SATISFACTORY ARRANGEMEr(HMVE ~ TIC WATER AND T'1RE rLOW
REQUIREMENTS (HAVC) NOT I3EEN MADE-.
. B. REQUIREMENTS/COMMENTS:
y
_ -
WATER DISTRIC, S1GNA REITITLE DATE
v COUNTY ~ , ,
A PRELIMINARY DfSCUSSION HAS TAKEN ALACE AND GENERAL REQUIREMENTS FOR ROADS AND
DRAINAGE HAVE BEEN DfSCUSSED W[TH THE APPLICANT.
A. COMMENTS:
J
.
) -
S16NATURE E DATE
C: 5 '
A PRELIMINARY DISCUSSION HAS TAKEN PLACE AND GENERAL REQUIREMEN'T'S FOR SUBMITTAL
OF THIS PROPOSAL (HAVE) (~AV LNQ T) BEEN SAT]SFIED. THE DESTGNATED WATER
PURVEYOR FOR THIS SITE 1S I
A. COMMENTS: ~ ~ c~c~ e'~ ~ P_ ~~J~4-e.!" ~~P _r ~ ~ e_ c~ 1 ~t~ ~ ~ ( °
\ r 1
SIGNATURE/T[TLE DATE
A ARELIMINARY DiSCUSSION HAS TAKCN PLACE AND GENERAL REQUIREMENTS FOR SUBMITTAL
OF THIS PROPOSAL (HAVE) (HAVC NOT) BEEN SATISFIED.
A. COMMENTS: /I/ , , ,
f l,~ 4L~45 Iq 7
SIGNA REi ITLF DtfT'E
SEWEIZ PUIZVEYOR
A PREI,IMINARY DISCUSSION HAS TAKEN PLACE AND GENERAL REQUIREMENTS F'OR THE
PROVISION OF AUBLIC SEWER AttE UNDERSTOOD BY THE APPLICANT.
A. COMMENTS: ( ri ~ P L-t :..i r C •
. k ~
~_S1 A R~lT T/E I3ATE
,
r
PLICATION Page 4 of 4
~ .k J.
wasNtc..~,~ Y PART III
~ y SURVEYOR VERIF[CATION
. •
ERSTG D, A LICENSED LAND SURVEYOR, HAVE COMALETED THE INF4RMATION
R ^D.; EI.IMINARY PLAT HAS BEEN PREPARED BY ME OR UNDER MY SUPERV(S10N iN
• TI-1C REQUIRCMENTS OF THE SPOKANC COUNTY ZONING/SUBDIVISION
N TH WS OF THE STATE OF WASHINGTON.
LAO
1GNE DATE: 7
EXPtRE'S 1ttlOs 9 -
S: 7a7 w'~ 7~ Zoo PHONE: 'yS~ 4'ryo
66o- Z1P: F~F 2-05/
PART IV
(SIGNATURE OF PROPERTY OWNERS OR LETTER OF AUTHORIZATION)
1, THE UNDERS(GNED, SWEAR OR AFFIRM UNDER PENALTY OF PERJURY THAT THE ABOVE
RESPONSES ARE MADE TRUTHFULLY AND TO THE BEST OF MY KNOWLEDGE.
[ FURTHER SWEAR OR AFFIRM THAT 1 AM TE-IE OWNER OF EZECORD OF THE AREA PROPOSED FOR
THC PREVIOUSLY IDENTIFIED LAND USE ACTION, OR, IF NOT THE OWNER, ATTACHED HEREWtTH
iS WRITTEN AERMISSION FROM THE OWNER AUTHORIZ[NG MY ACTIONS ON HIS/HER BEHALF.
.
SIGNED: :i ~ ~ - . DATE:
ADDRESS: I I'I-IONE:
Z1P:
SIGNATURE OF PLICANT OR REPRESENTATIVE DATE
STATE OF WASHINGTON )
) ss:
COUNTY OF SPOKANE )
SIGNED AND SWORN OR AFFIRMED BEFORE ME ON THIS DAY OF
, 1997, BY
NOTARY SEAL
Notary Public in and for the State of Washington
Residing at:
My appointment expires:
PART V
(TO BE COMPLETED BY THE DIVISION OF BUILDING AND PLANNING)
DATE 5UBMITTED: FILE
DATE ACCEPTED: BY:
TOTAL FEES: RECEIPT
rncaav wrrt •rr rt,a
,
.
. 'r
;
~ • ;t
az
~ t ~•':~j iV • , , ; I A'i
.i' r. t'
~ - ~ Y~.:~~~~ E: t
a : I.
0
• RECEIPT SUMMARY
TRANSACTION NUMBER: T9701795 DATE: 11/05/97
APPLICANT: INLAND PACIFIC ENGTN PHONE=
ADDRESS: 707 W 7TH AVE 11200 '
SPOKANE WA 99204
CONTACT NAME: TNLAND PACIFIC ENGTN PHONE= 509 458 6840
TRANSACTION: PRELIMINARY PLAT (ENGS & UTILITES)
DOCUMENT ID: 1) 2) 3)
4) 5) 6)
COMMENTS: PARCEL N0.95213.9064
(2)CHECK(S) - NOS.13141 & 13147
FEE & PAYMENT SUMMARY
ITEM DESCRIPTION QUANTITY FEE AMOUNT
PRELIMINARY PLATS - LONG 1 200.00
LAND USE ACTION REVW 1 100.00
TOTAL DUE = 300.00
TOTAL PAID= 300.00
BALANCE OWING= .00
PAYMENT DATE RECEIPT# CHECK# PAYMENT AMOUNT
11/05/97 00011953 13147 300.00 PROCESSED BY: WENDEL, GLORIA '
PRINTED BY: WENDEL, GLORIA
*******,t*~~*****~****,t******~*,r* THANK YOU *****~***,t**************************
t ti+ ~ r
r ~ r •
- pERMIT CENTER EAST "PASSPOR'1'
Date: Number:
Name Phone
Address
Comments:
CUSTOMER ROUTING •
_Division ofBuiWing & Plannfink ~ " r ' • ~ .,'r . ~Divlston~of~n~ineer.in~;.~
a Addressing Pennit Review Approach Permit
F__j Buiiding Permit Shorelines lnfo. Flood Plain Permit
Q Code lnformation Short Plat Info. PubliclPrivate Roads
ED Commercial Review Subdivision Info. Res. Bldg Permit Rev.
a Conference Temp. Use Permit Site Drainage Info.
F-1 Fire Safety Review Variance Appl. Subdivision Review '
Q Manufactured Home Zone Check Utility Permit
~ Mechanical Permits Zone lnfo. Zone Change R,eview
a Plumbing Permits `Co
Q Private Road Info. NO F E REQUIRED
Reviewer i~ Time Out
i Residential Review
~
F-I Sewer Permits ~ ~ . - _ `.;Divisioti of Utilities " ~ ~ t•,. - . ~ ~
F__j Infotrnation Subdivisian Review
F-1 Admin. Exceprion UL1D/Sewer Info.
Binding Site Plun Info Zone Change Review
F__j Ceri. Of Exemption
Q Comprehensive Plan NO FEE REQUIRED
Reviewer Time Out
~ Cond. Usc Permit ~ I
~
FiCritical Areas Info. Health'Districf ~ • ' - ~
Q Nonconforming Use
NO FEE REQUIRED NO FEE REQUIRED
Reviewcr Time Out Reviewer Time Out Reviewer Time Out
~ ~ ~ ,
. ` _
~~y~ . r '
• . • •
A'
~ ~ I ~ • 1., ` s
I ^ I .
~j~.., , A ' ~ '1' r ♦ pv
ED '
I ~ t< 4J >
.
_ ~.-..•R .
~ . CO~NV
DIVISloN or 1shlc;lt~l1-~'I:RII,I(,;: Ahll) R(tA0S • A 1)IVl:j1014 C'W'I'1II: 1'Ulti.tf; 1IVi:.)ItKS 0Isl'nit'1'MI':tJ'l' - 1VIIIJ;►tti A. Jnlms, 1'.Ci ,Ci►unly liiigineer 11~•niiit N•(. `3co11, sJ 1-997 '
A(:;RT;l±:nf11±;IiV`I' 0 1'AV `I.+l i1LQJ -11V100 OF OUiLMNQ AND PLANN11VG
TNCTNITtt'S
.~._w_...w._..~_,_._.._..._._
I'liis ngreenicn1, hetween .5pokan~ ~omil.y sind . Wi11, i am" J., Pur.v'7 s ,
whose interest in Ilic project is Owner
is er~terec~ intc~ tl~iS I I~= clay f►f Ai~f~'~:~k'~ 19 4~1 .'1'bis agrccrcicnt is appliZable to llie prc>ject
~~~owil ;is; Purvi s Poi nt
~rm"zrr"illei~~m~~zrc'ttl!--tnrwfer)°i_...__
That the incliviclua,ls and parties rminecl liereiii zs havi«g an inlerest in Ilie above ctescribeci properly ar project agree
to the foilowing: ' . -
I. 12eii»hiurse Spokaiie Cotiiity fc~r prc' ject review aud insJtieccion fet:s as s~iecificel iii C'hapter 9. !z1 oF •
ttie Spokane ~omity Cocle. 'i'lie fce;s will I,e bascd orl ncliial s;rlary cosls iiicucrc>ct by Spok;iile
Coiiiity for projecl reviews anci / or 'tnspcclions plus a tell pcrcent aclniiilislrative cliarbe, ;►nd tvill - '
be billt;tl tnc_~iitllly as accrued. llny I►illirig rimmmls clue, Aiicluding a»y expc:nses inctiri•ccl i» I,he.
collection of aii otterclue accoiuil, n►iist l~e paicl pric~r io Iltc ComNy's acccptame of 1he prc~jec! f0r
, filing. 1F a E>roject is approveci andlor filccl wilh alialance still owin!„ the unpaic,1' balance shail be paicl witltiii 30 clays c►f the irivc>ice clale. -
2. The iincic:rsibnecl .►grees tliat tliese Fees are cltie anel payable 11poil receipi of tlic; hilling as spec:ifiecl
above. .
3. Aiiy hivoic:es iiot paici wilhiii 30 cl;iys of ilie itivoic2e tI.ite will br; c:otlsi+,li;ietE dclinrIticill. IT aliy .
cautstanc.lirig b.ilance on, II~e ac:counl for tliis projc;ct is not paki willain, 30 clayti c►f 1lie iiivciicc tlalc,
no fbolie,r i-eviews oF the project docnm~ients, wifl, tae coildiic,ted 111,11il tlle eiilire account halalam is
~
p»icl,. Atty balaiice on the accotinl foi- this prc`►ject not ioiitl M1'liiii 65 clays of Ilie i»vo,ice tlate, niay
result in legal aciiort or tiie iuitialic»> <if «Ilier collcc:liori pi£caml'tires, inclilc.iinb reCetral lc> a .
eol')eclion ngeticy. rClie Sponsor will k.liable foc iny arx1 all expenses iincurr.ed by (he ('ounty for
. tiie collecl.ion af overclue acc:ounls. .j
, 4. `1'lie,nnc>t,illtly billing slioul(i lie 1ei►t In Ilic aIlenlion of:
` N A N1 r.:
• .111)D(tESS: 12810 East Palouse Hiahwav . C[rl"Y,, S'i'A'['F: Ua1Wfo:r,~l,.,_WA.._
ZIP CODE: 99036-9726, - - .
rrc_) N 1.7-1 924-2087__
.
~
. 1 tt;r►i1'~_r'st~ii~~t~l 'll~at fa-il~,i.re tc~ ~~,~y tl~csc ltcs ~~i~iy i•es►iIt in ~I~;I~iy iii c~lrl~~141.i~ii~ ~~r ~~►~rc►v~il ~~►f ~li~ ~~r~~jc~t ~~r ~~Ilier,
- 'piossil~'I'.c,~aii~fi~~~iis`: ; .
~ r •T _ .
; . `;~1~' If~~t~l~%is~~ t~~:a~~`~~tt~~~i~t is c«t»pIeteci by someone c►11ic~r than Ilrc. Spnn:;or (i.e., tlitprojec:t 0Wnef Or 411
' - ~'~i~~tin tlie t"u-»i, sl~~c~risc~riii~; Ili(. ~~rc.~.jcct), s~ic:li :is tlie I~wf1g1(If;f;f' (IeSl~;lill~ib Ilie E~rc~ject, tl~~i~ frorr, Illc Spr,litior spcc:ifically air`thnriziug Iltc Ageiit lo exec«lc this F
ce
~ ~'~a• 8gi~cet1Ierit is atlaclied to this Fee .AgreeiTiiiit. . • , , a .T. .
S 1 Ci Ni1.'I' I .1 R I ; I3y : 13~%'~".~..__--_..___
(1' lt'i N`I' N A M1a)
. . X
- ~~.:t'~x~H_Y~1~I~[ ~.~~'~~~.~.11'Y._~l'~..yl'{:►_~~~11~~~~.5.:'~)~.~M~l'1' I.~tl~~~INI~M1_~:~:~ . .
k1~\Ngteefcc.llo.,'lll~~C- '
1026 '1'~'''lli~ri:►~~iiy Avc rl►ul~~~nc S~'A 9!~Z0(1-Ill'TIl (Stl9) t~Sf-:36illf I~AX: (5(19) :~24~-3~t7N '1'1~>I): (S(1)) 32~4-:i'l~,~if ,
~ • -~iw' :F.:,L:t:. ,'.Y,. x:._. . ' . .i rf: ~..,'r..'i... t}:. . ~ . ,.ep a~:..'~'?-,_.. :x," ! ,tr~ ..~Yt~; - - ' ; ' ~ ` a ~ .
- - • _ . Y ` . . . - .3w. _ - . r ;r1s 't'~ ~'R~' . ~{k:r, :}tr: .'•g: jk. ~
' } r . .
S. P O K A N E • C O U N T Y
OFFICE OF THE COUNTY ENGINEER • A DMSION OF TEIE PUBLI P-EE cot. Ronald C. Hormann, P.E., County Engineer Dennis lN-ry
.
- AGREEMENT T4 PAY FEES
ENGINEER'S AGREEMENT NUMBER P E-185 0- 9 7 DIVISION 4F BUILDINGi AND PLANNiNG .
This agreement between Spokane County and Wi 11 i am Purvi s „ tname or person) '
whose interest in the project is Owner .
.
ti.e. owner, agent, etc.)
is entered into tliis day of , 19 . This agreement is applicable to the project
known as: Purvi s Poi nt Addi ti on
tprojeCt aaoress or rnename ac rue numoer) :
That the individuals and parties named }ierein as having an interest in the above described property or project
agree to the following: 1. Reimburse Spokane County for project review and inspection fees as specified in Chapter 9.14 of the Spokane County Code. The fees will be based on actual salary costs incurred by Spokane County for project reviews and / or inspections plus a ten percent .
adcninistrative charge, and will be billed monthly as accrued. Any billing amounts due,
including any expenses incurred in the collection of an overdue account, must be paid
prior to the County's acceptance of the project for filing. If a project is approved andJor
filed with a balance still owing, the unpaid balance shall be paid within 30 days of the
invoice date. 2. The undersigned agrees that these fees are due and payable upon receipt of the billing as
specified above. .
3. Any invoices not paid witliin 30 days of tlie invoice date will be considered deliiiquent.
IF any outstanding balance on the account for this Project is not paid within 30 days of
the invoice date, no furtlier reviews of the project documents will be conducted until the
entire account balance is paid. Any balance on the account for this project not paid
witliin 65 days of the invoice date iilay result in legal action or the initiation of other
collection procedures, including referral to a collection agency. The Sponsor will be
liable for any and all expenses incurred by the County for the collection of overdue accounts.
. 4. The monthly billing should be sent to the attention of:
NAME: William Pur.vis ADDRESS: 12810 E. Pal ouse Hi ghway .
CITY, STATE: Val l eyford, WA
Z1P CODE: 99036
PHONE 924-2087 -
I understand that failure to pay these fees may result in delay in completion or approval of the project or other
possible sanctions. -
0 If this fee agreement is completed by someone otlier than tlle Sponsor (i.e., the project
owner or a principal in the firm sponsoring the project), sucti as the Engineer designing
the project, then written authorization from the Sponsor specifically authorizing the
Agent to execute tliis Fee Agreemcnt is attached to this Fee Agreement.
SIGNATURE By: ~ r ~ • rc~~ tJ
~ ~u .
(PRINT NAME)
RETUR.N YELLOW COPY TO SPOKANE COUNTY ENGINEERS
k1p1f1agreemen.fee 2/1/95
1026 W. Broadivay Ave. • Spokane, WA 99260-0170 •(509) 456-3600 FAX: (509) 324-3478 '1'DD: (509) 324-3765 .
~ -
i Received From: L L ~ Am Pv IQLU..~s Receipt No. i, 07 4 0 s
Address: Date:
~ W Y ~ v~' UJA T70 ~ ✓ Amount Paid: l C
~ v ' w
t.l.
Z Acct. No.: Cash: ❑ Sales Tax, .
0
V Amt. of Acct: Money Order: F-T• ~ Total Paid
Z Amt. Paid Check: heck # S ~ 3
p , ~ . , - - ~
~ D ~ °C - Balance Due: Credit Card: - - Date
U) Purpose:S
~ ~ = ~ Received by:
. . •.a'°"'~'"°s;~ ~ ~~_.,-~e~._.=_-°~~~•------.~_~~,: - _ -
1s-,o „s _ 8 8 3
WILLIAM PURVIS D/B/A WILLCO 125o ~
E. 12810 PALOUSE HWY. _ (509) 9242087 ,116T430576
VALLEYFORD, WA 99036 -
DATE 4W 11/:
, . . , .
. , . > > . , . .
Q . ~ - . , ~ • - • ' . - _ ~ - -
_ a..
' • PAY T01'EiE
ORDER OF
S -
DIILLARS
o ~
~ '-U.S. BANK 1-800-US BANKS ~
i~
U.S. BANK OP WASHINGTON, NATIONAL ASSQCIATION ~ `
, MEMO ~
~ 1: 12 5000 LO 5I: 1 L 6? 430S76118 088 3
,
~ e
i
7
y .
~
INLAND PACIFICENGINEERING, INC.
SPOKANE • COEUR D'ALENE
March 24, 1999
W.O. 98586 RECENVED
Spokane County Engineers MAR 31 19qq
Engineering Development Services
1026 W. Broadway Ave SPOKANE COUNTY ENGINEER
. .
Spokane, WA 99260-0170
Attn: Doug Busko, P.E.
Re: Purvis Point (PE-1850-97)
Street and Storm Draioage submittal
Dear poug:
The following items have been included in the submittal package presented for your review and
acceptance of the above referenced project:
■ A completed submittal checklist. Please note that though this project is designed
under the 1995 Road Standards; an Inspection Agreement is not included, as the
adj acent proj ect to the east, known as Meadowland, will be built with Purvis
Point, and Meadowland's sponsor, Mike Hume, has agreed to include the
additional inspection for Mr. Purvis's portion of 12`hAvenue in his inspection
costs.
■ Two bond copies of the plan set, signed by the sponsor, and stamped, signed and
dated by the Project Engineer, Todd Whipple, P.E.
■ Pavement design information for 12`hAvenue. We expect to continue the
pavement section for Meadowland's portion of 12`h Avenue.
■ Two bound copies of the Drainage Report and calculations, stamped, signed and
dated by the project Manager, Todd Whipple. A Basin Map, also stamped, signed
and dated is included in each report, with topographic information and Time of
Concentration routes included as required. .
■ A lot plan for the pond in the northeast corner of Mx. Purvis's project, and a cross
section of the `208' pond with a structure. The pond was originally designed as an
off-site pond for Meadowland, and has been enlarged and reshaped to
accommodate Mr. Purvis's 12'hAvenue improvements.
J: 4Docunrents1985861spoco. sub
707 West 7th • Suite 200
Spokane, WA 99204
509-458-6840 • FAX: 509-458-6844
,
Spokane County
March 24, 1999
Page 2
If you have any questions or concerns regarding this submittal, please call our office at 458-
6840. Thank you. Sincerely,
INLAND PACIFIC ENGINEERING COMPANY
Susan Murphy, E.I.T.
sm
enc.
cc: file
J: lDocuments 198586Lspoco.sub
.
+ . .
\ .
~
Submittal CheckIist • .
for Road & Drainage Projects in Spokane County - Piats/Short Piats
. This Submittal Checklist is to be completed and signed by the Sponsor-'s Engineer, and included with each plan
submittal into the Spokane County Engineers 0,,~~`'ice. Ij thrs form is not fully completed and signed, do not '
. submit-plans and calculations to S'pokane Counly for review and acceptance. Incomplete submittals will be
• relurned and will cause unnecessary delays for your client.
'~~u t O ci~." .
. Pro~ect Name: . . .
Spokane County Project No. _P(5_~'1 VEZD _11-1-1 - Date: 3 2.44 el 9
~
~ ~ - Phone: S
Project Engineer: ~
ProJ'ect SPonsor: w~ zm t.-LyV i, ~Phone: q 2.4 -s 2.0$7 •
.
A. 'Preliminary Process
Prior to Submittal of Road and Drainage Plans, the following events are to have already occurred:
. (By checking each item off shown below, you are slating that you have verifred these evertts/items Irave been completed.) '
0, Adoption of a Hearing Examiner's Report for this lonj~ plat, or a Pianning Report for this short plat. '
- 0 ~ At least one Pre-Design Meetin,g has been held with County staffat the Engineers Office.
. ❑ An "Agreement to Pay Fees" has.been signed by the -project spoasor, and submitted to the Coun.ty .
En.gineers Office. - -
17 A Chan.n.elization Plan (e.g. signing and striping plan) of public roadway improvements, has been coordi.nated and discussed with the County Engineers Offce. -
B. Road. and Drainage Plan Submittal . - The items Iisted below are to be provided as a muumum witli a road and dra.i.nage -pla.n submittal. Ad'ditional
information may be required to demonstrate that the pla.ns meet.all applicable standa.cds.
(By checking `yes" for each iterri shown betow; you are verifying that'these items have•.been-completed and are ~included ~•in this submittal. For any box checked "n/aa written justification of any omissiarts at the end of this section is
required) , ' . , . . . , Item Description ~ . - . . . - - - . . " . . .
Q0,yes Road and drainage plans, two print sets. '(Certification-statemenCon cover of plaas)
0 yes B'"in/a 'One set of plans an 24" x 36" mylar media, or CAD electronic file .DWG or DXF forniat
Q,"yes Each Plan Sheet of record is signed and dated by ttie project"sporisor. - - -
. Q~yes ' • 'The road and;drainage design-ineets:tFie requijcem:eats~``o~"Sfai~ :'Iaw;.WAC'I9 6 27°regarding. 's.
- "confornuty with accepted. -staadards";; that is,- theciesign reflectshe . state . of the practice" . . ° .
: for the proposerl concept. - . . " : . , . - • : ' • .
2,yes The plans, Draina.ge Report, basin map(s},. and any =other ca,lculations are stamped,: signed ~
. . :
, . • and dated by anengineer-licensed in;the State of Washi*on: ` . . . . . . . , . . . , -
2"yes. O n/a Drainage Report, two sets: To iiiclude: basin map(s), time of concentration routes in basin
. . map, and Certification statemeat on cover of reQort and basin mao.
0 yes G,-~a Geotechnical Repoct, one set. (Include all soil test pitJboring logs.) O yes 2~Ja Structt.iral Pavement Calculatioas, one set . ,
' 0' yes W`ri/a Cross-slope grade caleulations for road %videning projects.
.
~
` Item Description
. ❑ yes Q"i~a Maintenance Manual and Sinking Fund calcu[ations for drainage facilities.located outside of . ' County road riQht-of-way. ❑ yes O n/a Written explanation of whohvhat entity will be responsible for maintaining drainage facilities •
which are located outside of public road right-of-way, and that the plan is acceptable to the
. County Engineers Of~'ice.
0 yes 0'nIa Chann.elization PIan, or signing and striping information provided in the road plans.. To be
. iacluded in road and drainage plan set.
0'yes 0 n/a I have read the Hearing Examiner's Report (Iong plat), or Planning Dept. Findings and
Conditions (short plat), for this proiect The desiga meets the conditions in the report.
❑ yes O"n/a Copy of Approved Design Deviations. 0 yes 0'n/a Fire District Approval, for private roads: 9""yes-0 nla Lot Pians. Required for any lots with drainage easements a.nd which front a public- road, or for lots which receive and treat runoff from a public right-of-way. 0 yes 0"nla 'Any applicable State'and Federai pernuts have beea obtained. (i.e. HPA,`7.ARP.A,- etc.). For
Pernuts with conditions, a copy of the pernut and conditions are i.ncluded in the plan
submittal. . '
0 yes 0"n/a -Inspection Agreement behveen the sponsor and its eng'ineer. ' yes 0'n/a For off-site easements to be granted to.Spokane County, the following items shall be
i.ncluded: legal description, exhibit, a.ad proof of ownership. .
0 yes 8`1la Erosiori Control Plan, required for "Major Land-Dishirbing Activity." To be i.acluded in the
road a.nd drainage pla.n set.
Explanation for any items listed above which are not included i.a this submittal: . . '
'c9-K. ~'r'~Pf~W1~ • Sc~c ~1'~ `~e.t~iP~f: .
(Note: a.a insufficient justification of why an item was not included in the subnutted, or incomplete documents, may result
in the submittal being returned without review or Nvithout acceptance. . Provide attachments if necessary.)
By signing below, the engineer is stating that the inforntiation provided in the submittal is complete, that the
. infoc7n.ation provided in the Submittal Checklist is accurate, aad the plans and calculations are in accordance with the Spokane County Standards for R d Sewer Construction, and the Guidelines for Stormwater •
Management, except where approv es' De tion allo therwise. '-En 'neer's Signatu • ~ate: 3 ~ ~ ~ . ~
Engineer's Name: - . 49 t) r.)
(please print) ' - . . ' • , , . .
If there : are :any questions about this form, or appropriate pr.ocedures, please call Development Services,
•~-:Spokarie Co.unty Public Works, at (509) 456=3600. . - ' ~ • ' , - . :i~ . . ' . For Spoka.ne County Use Oniy
. Submittal No:- - County Plan Reviewer: . . .
. :~::_tr: . . . . . , : . . . . , . . .
. Cl Accepted in for Review or Coastruction
-O. Returned to the engineer without review and/or acceptance, See attached letter of explanation.
Processing Date: Submittal Cliecklist . ?
Spokane County Public Works; April 29, 1998
•
. ,
Pre-Design Meeting Notes
Spokane County Engineers Office
Project Name: /'~~~✓/S 1'`'oi.c~7-' ProjeCt Number: ~
Project Sponsor:
Sponsor's Engineer:
Design
Firm: .4nEngineer:
Meeting Date: /!!)>t9 Meeting Time: _/O . 31r,>
County Sta.ff Present at Meeting: c~~,,e,
Other Meeting Attendees:
name/representing namelrepresenting
name/representing name/representing
The Following Items need to be Discussed w/ the Design Engineer -
General Items
la. List certain special requirements listed in the Conditions of Approval, EIS, or MDNS. This is
not an all-inclusive list. The Engineer and Sponsor is responsible for adhering to all Conditions and
design criteria. ,
9: 1 ~ ,J ~ E-~ • 48
~
descnption reference
k
~ z • - ,a L~5 , ..4.~ ~
description refcrence
descripdon reference
. . /Z
` .v's
description reference
lb. Does the Engineer have a copy of the Examiner's/Staff Conditions of Approval? ;9~5
2. Include Standard Plan notes in the Road and Drainage Plans.
~
Pre-Design Meeting Notes for Project: Page: 2
Spokane County Public Works
Road Plans "
1. Road Classifications and Design Criteria.
#1 #2 #3 #4
Street Name
,
Classification Av C-C=-
~-t
Roadway Width, W
Minimum right-of-way width ~
see notc (1)
~
iVlin. Horiz. Curve w/ super N~ ~
- Min. Horiz. Curve w/o super
~
l
General Land Slope/Terrain
Design Speed, mph
~
Curb Type & Clear Zone
(see Sec. 3.15)
:
~
Sidewalk required? (yes/no)
Note (1) Additional right-of-way may be given by the Sponsor.
Discussion: 2. According to the Design Engineer, what is the maximum number of units which will have
access from a single roadway? ~ . What is the max. allowed per Sec.1.03?
3. Minimum intersection spacing is 300' for along a Principal or Minor Arterial (per Sec. 3.04),
and 150' for a Collector or Local Access street. What spacing is provided for this project?
~
~
Pre-Design Meeting Notes for Project: Page: 3
Spokane County Public Works
4. Are any off-site slope easements needed, or off-site right-of-way acquisitions needed? If so,
describe.
5. What type of turn-arounds are needed? (i.e. cul-de-sac, hammerhead, etc.)
Street Name Turn-around Type Location
6. Road Surfacing Requirements (Sec. 3.16)
a) What method in determining road surfacing requirements does the Design Engineer propose
to use (i.e. AASHTO Design Method, County thickness table, or other)?
b) Provide the Design Engr. a copy of the Soil Sample Procedures, Design Report Format &
Alternate Pavement Design Table.
7. Does the Engineer plan on applying for any Design Deviations? If so, briefly describe below.
Please note that approval of a11 Design Deviation's must be obtained prior to construction
plan submittal.
Storm Drainage
1. Basin Map
a) Did the Design Engineer bring to the meeting a basin map? If so, does the basin
map show topography and sufficient information to be useful? .
b) Does the basin map depict any contributing off-site runoff flowing onto the property? _Nv
Does it appear to be correct? If not, explain.
c) Is a site visit needed to verify the basin limits? 14 chedule for: .
{Note: Concurrence with County Engineer's on basin limits is required prior to plan submittal. }
2. Is the site located within the Aquifer Sensitive Area (ASA)? ~2) . What type of water
quality treatment is proposed by the Design Engineer?
Pre-Design Meeting Notes for Project: Page: 4
Spokane County Public Works
3. What subsurface investigations, if any, are needed with this project to make sure the
proposed disposal process will function as planned.
z2~~
~
4. Are there downstream conditions which will affect the design of drainage facilities. If so
describe possible mitigative measures.
5. Is maintenance access provided to each GPA swale or drainage pond? If there is something
unusual, what requirements were given to the Design Engr.?
6. What does the DeveloperlEngr, propose for providing for perpetual maintenance of the
drainage facilities? Please briefly describe proposed mechanism, and what is needed to
accomplish this.
//V t ~ GZ"A ~ c_
7a. What Design Storm(s) should be used in the course of analysis (i.e. 10-yr, 50-yr, etc.).
.
7b. Is a Detention or Retention system proposed? Please describe.
8. Are Erosion Control Measures required with this project? If so, briefly describe applicable
requirements.
9. Is a second Pre-Design Meeting needed? ~[Jp .
Pre-Design Meedng Notes for Project: Page: 5
Spokane County Public Works
List of Documents Provided to the Sponsor's Engineer:
a)
b)
c)
d)
e)
Any easements needed outside of the plat boundary, for drainage or other, are to be acquired przor•
ta road and drainage plan submittal. The Sponsor or Sponsor's Engineer shall provide separately
a legal description and Title Commitment (or similar proof of ownership) of the affected parcel(s)
for p,•oposed easements.
7'he Submittal Checklist, completed and signed by the Sponsor's Engineer, shall be provided with .
each plan submittal.
Note: Provide a copy of this completed document to the Design Engineer at the end of the pre-
design meeting.
filename:PreDesign meeting •
APR-12-1999 12 :42 I t4LA14D PAC I F I C Ef4G • P. 01
~
~ jNLANI) P. ACTFTG FNC'~TNFFRTN(:"`~
707 West 7th Avenue, Suite 200
Spokane, WA 99204
Telephone: (309) 458-6840 FAX: (509) 458-6844
F•4X T'RANSMIT7'AL
DATE: NO.OF PAGES: (thcWding covgrpage)
TO: FAX 0: qjZ'~-.eW'S
MMPANY: PHONE 0:
KKGM: JOB iF: . . ......_J~Z~~
PROJECT NAME:
ORICINAL IN MAIL: O YES iT NO
NOTES:
.
.Q~
/ .~~iC/
. •
~
, .
~
• ,
. . . .
rsr~ . r~u ~
KEY 5197 n-1FnRMC1FAXSHEET.WPD
. . . _ , . y ,vc~ J l"Jl,j~ ~r II:i ' ~
APR-12-1999 12:43 INLAND PACIFIC ENG P.02
, . ~
~ •
r
POLYDRi
,SPECIFICATIONS,
;i •
C-
SUGGESTED
SpECIFICA'F10N5
PRODUCT: Trench drains shall be the PolyOrain
CR~secramVEW System as manufactured by A6T, Inc. Troutman,
~r
pmx.«R N.C. (800) 438-8057, in N.C. (e00) 334-6057.
i i a=41 LOOK
BtL1Ct w~i}I astio' IOCR W1At 0lDD~N~3 Car~..
S►fi~D t 6xlr GRlE 000, OOIT 06MMft houaAt tQxlnap .
~TRENCH DRAfN CNANNELS: Shall be made of
V
precast polymer cor~rete with a top width of 6.1 in-
FWnWEN* ches, radiused bottoms and nominal fengths of 1/2
or 1 meter. All channe3s shall interlock with tongue
and gfoove connections with ad~oining channels.
o~ w,~►,~ Each channel shaU have four horizontal anchoring
p- , `ribsto mechanically lack the channel into the floor
slab or pavement,
01- ~ ~~~1~ 4 hannels shall have avaiEable vertical knockouts for
, or 6, discharge and availab(e 4, or 6 honzon-
~ &W-~ tal outlet end caps. Channels shaU have a built-in
80"°'°"LE M' i*' MM°° C&4;%rE-
FWC 18 L12' C187 ic11 RiYd wvpwbottom slope of .6010, o► be non-s(oping, as shown
.B°VE C,,'.""" WW GWE`°'83 '°'~'U "FCL" on pEans.
~2 tit~'ER
CHANNEL GRATES. • Shou{d be PoiyDrain
made of
GraiPS
should be securely locked doum with built in channel
MYORM
. .
lock blocks. Locdng medhanism shall be designed so
as to provide an obstruction•free trench for
mairtenance and c(eaning as well as to prevent con-
' crete from entering channels during installation.
cpm 6MMAL ,W, INSTALLATION: Trench drains shall be installed in
strict accordance with manufacturer's details. A
minimum of 4 inches of concrete shall be placed
beneath each channel.
,
p CATCN BASINS: Shall be precast polymer con•
~ ~~.ut
crete (PolyDrain #900, 901, 610 or 611) with galvaniz-
. 00IT", sUPOMT ed sEeel trash buckets. Any trench drains entering
catch basins shall interlock fuliy with tongue and
groove connections.
~ NOTE TO SPECIFIERS: Where corrosive environ•
ments are anticipated, joints beiween channels should
bese-aled with an adhesive appropri2ie for the channel
~ matErial (polyester or vinyl ester) and environment. See
the PolyOrain Ctlernical Resistance Guide for additional
information.
APR-12-1999 12:43 INLAND PACIFIC ENG P.03
'
r
~
. OLYD.
ACCESSORIES,
~
LOCi([NG DEVICES . MlSCELLANEOUS
Grace loc;king deviceg are rec-
ommended for all appiications
involving vehicular traffic, or
~ ; .
where vandalism may be a
~ ~
' problem. See pages 6 and 7#or
grating / locking device cambi- r j..
nations. No. 816 for use with
PolyWall Sidewall Exiensions.
~:aj;w , ~ . . ; .
Oesigned to conform to the PolyOrain channel sur-
~1~''i - ~ AvaFlabte in stainfess steet. faces, the No, 231 Shovel Head is useful on those rare
occasions when it becomes necessary to clean che
.~R. t channels.
The No. 233 Strainer is designed to intercept leaves
_ and similar trash to prevent its entering the sewer sys-
OUTLETS AND END PLATES tem. Fits a!I 4" vertical channel outiets.
208 258 soa SNALLOW CHANNEL 001
058 108 158 209 259: .309
M .
w'~x
~ ~ . .
_ ~ • : ,.1.~~• E
~ ~3 a. ~
: ~ ~ ~ ';.'t` l• J~-•. ~ ~4S : ~ ~.2 ~ ~ ` ~ ~ ~
4" HoriZOntal Outlet
6" Horizontal Outlei
End Plates End Plates Overal! Width: 6.1.,
~ Overall Oepth: 3.93"
820 821 822 306 206 106 006 Overall Length: 39.19"
t - weight: 28 Lbs
Flow Cross-SecEion: 6.3 Sq. In.
` Specially designed for drainage collection in
multiscory car parks, floors and roofs. A non-
• slope channel which accepts all of the grate
assortrnent. Requires end plate 006, 4" verticaE
VC CONNECTORS Closed End Plates outlets.
POLYVtitALL SlDEwALL EXTENSIONS
patenz No. 4.640,643 ~ : , c:T • ,
6 Part No. 301
.1 . ~ + ~ '~•,w!' ~i..r.ir ~ ~1 ~
4- o,J I ~ Minimurn overall de~~th
~ (N0. 010) 12.5- r 'L rrlf-l-~
MaYimum overall depth
• ~'s {No. 300} 19.6" M xim
a urn cross section flow
area (NO, 300)
sq. in.
. . •
weighr (Cach
) 30 lbs. • • • ~
r''},~T'5;~~+t'~ `''°`"+Y • ~r~~'• .a d.:
1_"•
g .
:l.4q~.'~il~,~ "~'-;ti-:~ ••'l~ . ~ ~o~~C'.
. : . `e~ , .
O :~;:.'Ci~~~; ,``'~~i': ~ '9~J,'L~:~~. ~ *~;s:~;.;.
•i. ''y'v 'l .,,1~.y~~`~,.. r • -t,..,
~ . . . . . . • ~ i'~~.. t'~r~ -ti' • r .
. PolyWailTrSidew.311 Exten:;ior~s wzre devglo0ed to prpvide Cvrn
greater tiexibility in ihe desi-pr) of your Polyprain System. They
aIlow longcr uninterrupted rhanne► runS and vasily inc;rza5Ec1
" ' hpw capacity. AR Si~nQard gra12s are useaDle
-I2-A-De C14V.C.l.LA~1~:~Y Po r KiT
@. (o +-61. 3-7 SfLA-)GUL7r C..OC,4e't aK~) ;
. ~
-[Dp O F ~FxIsTASp(JPrt._T IffL= 2.0IS4. I'l
(,u t TDe iu I 0 C-~ _1-Z2
- o ~ Z~-
20S~5.~ ~ eL-W
elu,Ve pk -~>2DP d,ae)~ - - . i I
20 s 3. 25q gL Qr. L--V
,
20 5 ~x1 "1z_ Et-
pc) f '6'
-TD P c~ V- atS-~t. f~ A 5 P0 A-Ur EL= ZO sg-. d5
12` G- -0, 0Z4Z =-0,2-9 20 d'S
--o,Z9
. Zo (53. Lea -tl
61 uLITTe R-) 2.erp :
1-7o,oe)l
246~3. l05 FL- eL-E/
-r o, ISD
+
-"O p 6r- e?CISmIU67 t45POML~ E-L=
I Z'Gv -o . 041'7 o,~ 2-0 S4. o-T
- ►C o, 0$f ~ I ir,t P
2.o s3, 134o -"'c, el-
I n I a n d 1 / MEMO PROJECT
Pacific
CALC. ❑ JOB N0. SHEET OF
~ En ineerin
g g MEETING ❑ BY DATE
west 707 7cn, suite zoo sPokane, Washington 99204 OTHER ❑ CHK'D BY DATE
~ . ~
` 509 458-6840 Fax No. 509 458-6844 0/
i
. . 7 ,
~ ' ~ ,
INLAND PACIFIC ENGINEERING, INC. November 18, 1997 '
W.O. 97182
Office of the County Engineer ~
Engineenng Development Services I Z ~
1026 W. Broadway Ave. S
pokane, WA 99260-0170 T\JVV.*
~ .
ATTN: Dean Franz, P.E.
~p.~Q~..'CY~ -Co
RE: Results of Soil Classification Testing
Proposed Parc Center Subdivision
Please find enclosed the results of soils classification testing performed by Inland Pacific
Engineering Company, Inc. (IPEC) on six soil ~amples obtained from the above referenced
residential development. Test pits TP-1 through TP-6 were excavated at the approximate locations shown on the attached
Soil Classification Test Pit Location Plan. All samples were obtained from depths of between
1.25 feet (approximate bottom of topsoil) and 5 feet at the sampling locations. The sample
locations were obtained by taping and pacing from existing site features, and should be
considered accurate to the degree implied by the methods used. We certify herein that the
samples tested were obtained by members of our staff from the approximate locations stated
above, and that based on the data enclosed, the USCS soil classification of SP-SM is conect for
the sampre from TP-1, and classifications of SM, SW-SM, SW-SM, SP-SM and SP-SM are
correct for the other five (TP-2 through TP-6) of the samples tested, respectively.
Please do not hesitate to call if you have any questions regarding this letter or other aspects of the
project.
Sincerely,
INLAND PACIFIC ENGINEERI OMPANY
~ wASNZc ~
~
Je . Peterson, P•E ~
• - p~, ?C s ~~a fU~~
Geotechnical Engineer
~tVAL
V"
Enclosures: Sample GradWmamith M.S"assi~'ications
1.1Docum ent197182\S01Lclass.wpd
707 West 7th • Suite 200 2020 Lakewood Orive • Suite 205
Spokane, Wn 99204 Coeur d'Alene, ID 83814
509-458-6840 • FAX: 509-458-6844 208-765-7784 • FAX: 208-769-7277
r~ ~1 `
. • ~ ~ ,
' ~ ' ,3 , ~ 1 , , ~ ~ .
i ' ~ ~ , ~ ' , . \
, 10th AVENUE ~ - -
, ~ t8~.52' 1 '1
~ ' ~ ~ (
~ • . ^ ~ I
~ ' Q ~ ~
' , n ~ " ~ +
i (
~ • 161.53' Q _ . . , . . . Q
~ /38.07' - - ~ 1 205.01' . ` \ ~ ' i~ ~ \ ~
. ~ ~ J I ~ ` ~ . ` I
~ ~ ~ \ ~ . . W . , `r ~.18 ~ . 1 I 19 ~
_ ~Q . /~1 . MV , • ( \1~ '/1 ~ 1i ~ ~ ~
~ , O I . ~ \ GL ~ ~ W ' • ~ ~ ~ ~ \ . ~ I • , ♦ . (
. ~ ~ ~ ~ ~ ~ LL . ~ I \ . . `.~.~o, ~ -~:r:_t•_..;:~ ~
16 ~ ~ ~ ~ ~ ,V 1 f I ~
.w~~\~.r... v a i . ` \ • / Y I i ~ . , ~-._..r , ~
i-.,, ~ ~ ~ . ~ \vr.~. !~`y_ ~
E ~ 161.53 ' 1 " Y05c81'` , `~1-~
! 15 14 - - I I ~ ST PIT 1
. s3 TEST PIT 2 ' I r~ r~ ~ I I ---1•, ~ ` % \ 'c /i I~ \ SCALC: ~ ~~~1
/ ~ L ~ \ ~ . I I \ MI
~ ' n , : . SHOP ~ n
~ r^____ - I I , 1 .
~ f I/ - - ~ .r ~ , ~ ~f ~ \ - . ~I- .
• ,t l'r ~ i '7 I S \ ~ ~ ' : ~8 , g , ; N II O . ~ v e TEST HOLE ~1 1AIf1
n ~ ~ ~ / / \ 710N
. L - - - - - ~ f Z ~ ~~"T 1EST PIT NUMBER AND ~ ~ . . ~ , ~`'s. . . APPROXIMATE LOCATION
----~~--~----•-----r-'~ Ir' . /
/ ~ ~ . ~ ' R ~ i ~ a ( . .
• ~ ' ' . . , , . 6 5 , 4 3 ~
~ ~ It ~ ~ , i ,
~ . . , ~ ,
. ~ ~ . . . . - J
, . ~ 12th AV~NUE ' _ PIT 4 . _.1 - - - - - - -
~ _ ~ -o_ ~r= ~ ~ ~ - ~ f
~ ' ~ - ~ r ~ . . , .
TEST PIT 5 i L~ ~
~ Ic~ - i _I I I
I - I I I
~ I cn i ~ I . ~
0 ~
' ~ D - v ~
, ~ \ . \
; ~
NLAND , ;
+ ACIFIC 4 - OCATED IN THE SW 1 ~ L ,
; NQINEERINQ E. . ECTION 21 T.25N. R.44 W.M OF S , . > > PROJECT NO. 97182 ~
: 747 West 1th ~ Suite 200 509 458-6840 ( ) GTO SPO~ COUNTY ~YASHIN N ~ Spokone, WA 99204 FAX: (509} 458-6844 ~ PROJECT ~
\ /
♦
• •
' ~ •
GRA N S-ZE D STR BUT ON .
; SIZE OF OPENING IN INCHES U.S. STANDARO SIEVE SIZE I HYDROMETER
i5 3 /4! 3~ 4 ql0 16 210 30 lp 5060 80 100 240 ~
100 • -100
gp..,------ •------~~z----- -90
~
\
gp...------ 4..,.~~_ -80~ .
f'- \
0 70--•------ -70
w
m 60-••------ -60
~ .
w 50-•~-----_. -50
Z ' •
LL-
F- 40.,.____-- -40
•
w 1 .
, ~ 30--•-----... ...----r~ 30 ' .
W ~
a 20--------- 20
~
~
~
~o--------- - 10
o ; r o
• 1000 ~ 100 10 1.0 0.1 0.01 0.001
GRAIN SIZE IN MILLIMETERS
COBBLES GRAVEL ~OARSd MEOIUM I FINE FlNES (SILT. CLAY)
- • • SAN D
EXPLORATION SAMPLE DEPTH ~ MOISTURE % PASSING 200
.57-7
~ I I I ~
I I i I
. I I I I
l.~s~s :~p s~t I I I ~ I
PROJECT NO.: t Z, PROJECT NAME.
DATE:
I NLAND
PAC[Fic
~ ENGINEERINQ
i
.
. ,
G RA N S ZE D STR BUTION .
r
SIZE OF OPENING IN INCHES U.S. STANDARD SIEVE SIZE I-• HYDROMETER
~5 314' 3~ 4 q 10 16 20 30 40 5060 80 100 240
100 -100
90-•------- •gp
~
80-•-------- -~80. . . .
F-
2
w 70••'- - ••.f-~-~--~-~ r•.-.-~-~-~~. `70
~
~ y 60"'_______ 'so
w 50..------- -sa
Z
li..
Z
40...------ -40
,
- U 30."- - - - -30
LL `
W . ~
~ 20-•------- ,..y---- -20
~
~o-~------- -10
1000 100 10 ~.o a; 0.0 ~ o.oo1
GRAIN SIZE IN MILLIMETERS ~
~ COBBLES GRAVEL --oARSd MEOwM I FINE FINES (SILT, CLAY) .
• • . SAND
EXPLORATION SAMPLE DEPTH % MOISTURE PASSING 200
--rP - Z, 12-
~
tx5 t-5 ~ .5m _ I ~ I I
PROJECT N : q-71-32, PROJECT NAME.
•
DATE: ~ 22I~7 '
. ~
INLAND ~
. ' =J11IIIIIIIIIIIIiI PACIFIC
~
~
, • ; •
GRA N S ZE D STR BUT-ON .
. SIZE OF OPENING IN INCHES U.S. STANDARD SIEVE SIZE I~ HYDROMETER
1.5' 3/4' 3/8" 4 8~0 16 20 30 40 5060 8p100 200
100 t i i i i i i ~ i i ~
-100
.
~
90•-------~ -90
80••--=----
~ ,
4- r.-- -•80,--..
~ 70•-------- ...-------y-...---~ ...y---- -70 . w
~
~ m 60••------- -so
~
W so--------i -50
Z
Li.
. ao•
F- . ~ . -40
Z ~
U 30•-------- -zo
. ~
Q. ~ .
20--------- -20
~
~o••------- -10
.
0 0
• looo Ioo 10 1.0 0.1 0.01 o.oo1 ~
~ GRAIN SIZE IN MILLIMETERS -
_ COBBLES GRAVEL ~OARSd MEDIUM I FINE ~ FINES (SILT. CIAY)
- SAND • -
~ EXPLORATION SAMPLE DEPTH % MOISTURE % PASSING 200
TP- 3 I~~ I<<2s'- s' I~ 3 I 8
~ ~ I ~I I I
I I- i I
u scs sw~ sM I i I i
.
~
~ PROJECT NO.: PROJECT NAME: ~ -A rlr- C
r
DA1E:
~s INLAND
~ IWO-AIIIIIIIIIIIIIIIII PACIFIC
. F ~ 7 •
~ .
GRA N S ZE D STR BUT-ON
. SIZE OF OPENING IN INCHES U.S. STANDARD SIEVE SIZE • HYDROMETER
~5' 3 /14' 3/9* 4 ~10 16 20 30 i0 5060 80 I00 270
100 -100
90----- -90
gp----- -•60 • .
f'-
_
, w 70....----- ••---i-- .70 ~
~ 60....~----- -60
. m
~
W 50...------ .------i -50
Z
~ .
. F- 40•-------- .40
Z .
W '
Q 30.___------ ------T- 30
w .
CL
20--------- 20
~
10--•------ - 10
0 p
' 1000 100 10 1.0 0.1 0.01 0.001
~ GRAIN SIZE IN MILLIMETERS ~
• . COARSd MEDIUM I FINE '
C08BLES GRAVEL FlNES (SILT. CLAI) .
. . SAND • .
EXPLORATION SAMPLE DEPTH % MOISTURE % PASSING 200
l,~Sc-s ~ Sw - s~ ~ I I I
_ . .
PROJECT ~O.: PROJECT NAME:
onTE:
< <
~ INLAND
' ~m Pe~iFic:
! , j~ ~•.1 '
GRA'N SZE D STR BUT-ON .
.
. SIZE OF OPENING IN INCHES U.S. STANDARD SIEYE SIZE I~ HYDROMEI"ER
q 10 116 0 30 40 5060 80100 2q0
too
-1oo
90...-----_ -90
so•-------- -eo • - •
f-
_
W 7o.._______. .70
~
~ m 6p...__---- -60
~
LLi Z 5p..------- gQ .
LL_ .
, F- ,w.._____~- ~ -40
W
~ ao--------- ao . .
W . I
20---------• - Z0
~
10-•------- - 10
0 0
1000 100 10 1.0 0.1 0.01 0.001
GRAIN SIZE IN MILLIMETERS
_OARSd MEDIUM + FINE
. COBBLES . GRAVEL ND FINES (SILT, CLAY)
~
,
EXPLORATION SAMPLE DEPTH % MOISTURE % PaSSING 200
- --rP-s ll,2sI 4- I ~3
~cs~s : s P- s~i ~ I I
~
PROJECT NO.: q'71 9 Z PROJECT NAME
DATE: GII Z 3I q? ' .
~ ~ .
INLAND
: I =A11111112s PACIFIC
,
► ` .
. ,
. , .
_ ~ .
GRA N S ZE DISTR BUT ON -
J
~
, SIZE OF OPENING IN INCHES U.S. STANOARD SIEYE SlZE I• HYDROMETER
5 3/4 34 8 10 16 210 30 4i0 8060 80 100 270
100 "100
90••-------~ -90
gp.-..~----- _g~•._.. .
~
•
~ 70-------~..~ .70
w
- ~
60--------~. -60
' im
w so--------- 1~-------- so
Z .
LL
.
• ao•-----~-- _40
Z
W
. Uit 30-.._------ • 30
W ,
20--------- -zo
to--•------ ----i - 1o
a - o ~
' tiooo la~ 10 1.0 0.1 0.01 0.601
GRAIN SIZE IN MILLIMETERS
-OARSEl MEDIUM I FINE
COBB~ES GRAVEL FlNES (S1LT, CLAY) • • ~
_ . • • SAND
~
EXPLORATION ~ SAMPLE OEPTH % MOISTURE % PASSING 200
- TP-<v N~o Z- ~ l, 25'- S' N Z N ~
I I I I
- l I I I
- ~ .
PROJECT Ng.: PROJECT NAME:
OATE. . ~49G (Irmc")
q23~~?
t +
INLAND
PACIFIC
FuniNC~Ai~~n
n J~ ~
a ~ .
S +
~ LOCAL ACCESS PAVEMENT STRUCTURES . ~
AVERAGE DAILY TRAFFIC ~
~ SOIL TYPE 'ffl -uQ 200-600 600 +
GW _..211/6" 217611 211/6„
GP 211/61' 211/711 2„/711
GM 211/611 211/711 210/811
GC 2~~/7" 211/811 3176"
SW 211/611 211/711 21774
SP 217611 211/71' 211/811
211/811 3'1/611
SC Pavement Design
ML 311/611 3111811 417611
CL _ Pavement Design
OL 411/7's 511/7" 511/811
. . MH Pavement Design
OH Pavement Design -
PT Pavement Design
. SF'4KA-NE COUNTY ALTERNATE PaVEMENT DES[GN
. ~ . (INTERIM) . . . .
R/W 19' UTILITY &
24' PROPOSED RIGHT OF WAY SIDEWALK EASEMENT
~
20' EXISTING RIGHT OF WAY , ~ - 4' DEDICATED RIGHT OF WAY
20' TOTAL ASPHALT I
I SAWCUT LINE I
12' NEW ASPHALT 2'
5' 6* ' 10' UTILITY
EXI5TING ASPHALT PLANIING SIDEWALK EASEMENT
- STRIP
VARIES
.02 VARIES 29; TO 4.5%. _.02 27, MAX.
2q
~+•w'~ o MAX.
.
2° CLASS "B" ASPHALT CONCRETE CONTAINING TYPE 'B' CURB
5 3/4% TO 6 1/4% ASPHALT ON 7" CRUSHED & GUTTER
ROCK TOP COURSE IN ACCORDANCE
WITH W.S.D.O.T. SPECIFICATIONS.
- ASPHALT TO BE REMOVED
VARIES 3' TO 4'
12TH AVENUE CROSS SEC11ON
- NOT TO SCALE • -
~j/lpfeu+rr....._.. _ ~ . . ~ . . , ...M. . . . ~ , . ~ ,.~..w. . . ~ . . _ , '
f . , , .
~ , , • ~ .
r i • .
' ~ .
~ .
~ • a •
s
i
•I S P O K A N E , ` C O U N T Y
DNTSION OF ENGINEERING AND ROADS A DNISION OF THE PUBLIC WORKS DEPARTMENT
January 16, 2002 Colonial American Casualty and Surety Co.
1200 Westlake Ave. N., Suite 802
' Seattle, WA 98109
-
RE: Bond Number LPM 4041281 for Residential Construction of Purvis Point. (P 5)
Dear Sir or Madam: -
Please be advised that the Bond Number LPM 4041281 dated May 7, 1999 issued by
your company as surety for installations of roads and associated drainage facilities to
William Purvis for the above mentioned plat in the remaining current amount of
$6,910.00 may now be released in full effective immediately. The project Roads are
established and the warranty period has expired. This final release should close out the
above referenced bond.
If you have any questions, please call me at (509) 477-3600. .
Sincerely,
/
John Hohman, PE
Development Services Engineer/Manager
cc: William Purvis
File
1026 W. Broadway Ave. • Spokane, WA 99260-0170 9 (509) 477-3600 FAX: (509) 477-7655 (2nd Floor) 477-7478 (3rd Floor) • TDD: (509) 477-7133
DEVELOPER BOND REVIEW FORM
Pr .
Project Name: vi S' lo p -
Project Number:
Location: C~~ Of L'Z r,..- Original Bond Amount:
Original Bond Date: ell
Bond Balance: REVIEW Last Review Date or Punch List Date: A ~aer~d D CG Z9 ~ tq~°~
Work Remaining to be Completed: "!"s Af~
ar +`6 z~r p/
Reviewed by: "ti, sm~p&E Date: 6, Y2&~, ~ Findings: io za x/ 'b coz 5'x ~dx/~~ ~ .
, _
ACTION TAKEN -
(Circle Acfions)
RECOMMENDED ACTION: Action Taken:
1. Release Bond 1. Release Bond Letter
2. Reduce Bond 2. Reduce Bond Letter 0_ Continue Bond~ 3. Continue Bond
4. None
By: Date :
FOLLOW UP
Follow up Scheduled: .
Comments:
Files Updated Comments: Date: By:
Files Updated Comments: Date: By:
Files Updated Comments: Date: By:
Files Updated Comments: Date: By:
Files Updated Comments: Date: . By:
DEVELOPER BOND REVIEW FORM .
Project Name: o~q~C~ ~Zp
. - ~
Project Number: ~ /SQ,:!5 .4
Location; k7r? 5
Originai Bond Amount:
Original Bond Date: /DAOA? a
~ •
Bond Balance: 10116 I4?0D0
REVIEW
Last Review Date or Punch List Date: 9 ~
Work Remaining to be Completed: ,
Reviewed by: Date:
Findings: . .
- ACTION TAKEN
(Circ[e Actions} .
REC0I~IIIMEND D_ CTIO : Action Taken:
1. Release Bond 1. Release Bond Letter -
2. Reduce Bond 2. Reduce Bond Letter
3. Continue Bond 3. Continue Bond
4. None
gy: Date : .
FOLLOW UP
Follow up Scheduled: Comments:
--Files Updated Comments: Date: By:
Files Updated Comments: Date: By:
Files Updated Comments: , Date: By:
Files Updated Comments: , Date: By:
Files Updated Comments: . Date: By:
0002
05/05l99 WED 11:59 FAX 509 822 0610 DOTY & GILES. INC.
' P.02
MAYr 05-1999 1 B: 55 I 1~l-AND pAC I F I C~h1G
• . .
j' .
' BAAD AY Tll+kit
Bond H„ T,PM 4Q41281 '
. ;
SpoJcsrto Ca FD&eet Fylc o
lGKOW ALLSYTHFS PitESENTB. thei(davrlopec), a+a u'MCipAL."
ini T jJ.,j AM PUR V I S and a,pNpMGCc,MANyCol_c,ni alAmgricau...Casualtv and Surety Company a 00lpCr40n OlpID7td cd C.id84a$1uWet ftjBWS of fk S09m Of M a r c, 1_a nd ,
06 81Ab0'imd w [td188Ci d bVM 0!L[mC3Y 14 &C goC O( WiB~Wgm. A9 "$t1tW.' 8J1C kP.d dnd firmlI► bOypd 13atc SpD)dw
Cptmly. aPoJitiCA aubdivtdm of dC SutC of WSSwOgG. 8a "Qalis¢G. ~im ik QMW 3iim of
Six Thousand Nine Hundred Terio.,, 6, 910,, 00
IawFul monry of tbe Unlrod State of Ametics. 6ar ft pwmm of vhi& thc Prlnc+pal =d Sumy► ta tDemqdm. thei,c hda,
rawom, samiafsusoors. arxxssop .ad easfigoa, jotrtitly and scvcraly, fumf)► dY iheu pccmm-
VPAERBAS, sasd pricr4al is the dcvraoper ni a lract of lana ia Spokaae Counry kacwa ed
PUpVIS POINT ,aa be;n,g ieowa m seaioa . rawAAIP Kattk xRAP e,w.M,. Ia spobw cauefy. .
wasAiagcm. snd eald Coumpr haa roquicnd t'bat ahoW be gaaLgIed Ln an aMmt sufOcicnc tc pay me aonswctlnn mrs of
iasWling m tbe approve+d gradrs, cacbs. ridawalks. ataiW comol and/ar paving ot roadways a4auuc ta aaid dcvrlapmrut,
&o4 s+A othet wa& as in incidcW and occeasasy tllct+em, Oll iu saoxdame witls Spolann Caaaty Raad Deps:tmcat
Spsifr=ioas datrd 119 -
aod [a tht satiafactiv9 af t5c Spolme Cau* F.n&wr, sudh imQtcYcnesrs co hc complcW two (Z) Yean ar Iffi dGOe udw
. said timc pcrW hc azoeodad es the cption of do Spo1aw CouwtY ftgiaoer•
Upon lailuro of P:icGipal to comgty witb cita [eyulruuacs stated httia v+itblc 1hc time juDnri3rd. and upon deGvcry
of wciRCn noclrt tbr.tsaf by Obllgx to Surery, the 5lutty shall mda s.tisfactiotl u+ Obliget w tho esutu oF dxia bovd. .
'ihc obiigaiiaa of d~s Bond shaIl br lo*t ia fu11 foram aad offto vna wdc opiaina n! tDc 00!(W, the reqwrmems
1tci+cin sutad bavt bccp sdgfrcd. ia whicb evml wriaca iclraac cnM 6e giroo by the Ghligac, t8e Obtigac Aavltig iwlt ftt to
grua svth tetew. 3urtry bcttDy uraivc9 all cighc9 0o Kelease fcom tt obtiptm cYec~l as hectin sutcd.
siGrED arm sF.AL&D thts ? t h day d M a X_
BONDIlrG C0MP'ANY: ColQ,jl,i a 1 A m P~ r i c• JZ a c» a 1 t v an O r, C O.
Aa&=& 1200 Westlake Ave. N. Suite Fjla .
CUyI nW.; Seattle Wa 98109 _ , . , •
upCode 98109 .
Phooa h 800-A41-07L2.
-
-
. '
' Inuez- Attornev-a.n-FkC_t-- _ . ' .
. a 1 . • ' , .
YMC,IPAI. (devdOpcr): .
aadccos:
ftic'ek 1.J4,
ciey, starz:
.
g~o Z ~ qa y ~o8 ~
Zip Cade: -
' TOTAL P.02
J . r
.
~
Power of Attorney
COLONIAL AMERICAN CASUALTY AND SURETY COMPANY
HOME OFFICE: P.O. BOX 1227, BALTIMORE, MD 21203-1227
Know ALL MEN BY T'HESE PRESENTS: That the COLONIAL AMERICAN CASUALTY AND SURETY
COMPANY, a corporation of the State of Maryland, by W. B. WALBR, Vice-President, and T. E. SMITH,
Secretary, in pursuance of authority granted by Article Vl, t~ JHE
Assistant of the -Laws of said Company, which
are set forth on the reverse side hereof and are hereby certife V full fo W~~~effect on the date hereof, does
herebY nominate, consritute and aPPoint David R. EDWA ~ mas E. NE and LYnda D. BIGGS, all of
Spokane, Washington, EACH its tive and lawful ag ttomey-' ~to make, execute, seal and deliver, for, and
on its behaif as surety, and as its act and deed: ~ all com r~eh' bonds, each in a Penalh' not to exceed
~
the sum of ONE MILLION DOLLARS , 00) an e cution of such bonds or undertakings in pursuance of
~
these presents, shall be as bindir~g ;Ve id''~Compan ~~y and amply, to all intents and purposes, as if they had been
duly executed and acknowledged gu larly ~y~~officers of the Company at its offce in Baltimore, Md., in their
~
own proper persons. 0\r-
The said Assistant Secretary doe certify that the extract set fortt► on the reverse side hereof is a true copy of
Article VI, Section 2, of the B- ~aid Company, and is now in force.
IN WITNESS WHEREOF,~e said Vice-President and Assistant Secretary have hereunto subscribed their names and affixed the Corporate Seal of the said COLONIAL AMERICAN CASUALTY AND SURETY COMPANY, this 8th day .
of February, A.D. 1999.
ATTEsT: COLONIAL AMERICAN CASUALTY AND SURETY COMPANY
(A CM111!111
B Y
T. E. Smith Assistant Secretary W. B. Walbrecher Vice-President
State of Maryland
ss:
County of Baltimore On this 8th day of February, A.D. 1999, before the subscriber, a Notary Public of the State of Maryland, duly
commissioned and qualified, came W. B. Walbrecher, Vice-President and T. E. Smith, Assistant Secretary of the
COLONIAL AMERICAN CASUALTY AND SURETY COMPANY, to me personally known to be the individuals and
offic~-rz descrbsd i.-: and who execlted ttse pri:ceding instnunent, and iney eacn acknowiedged the execution of the same,
and being by me duly sworn, severally and each for himself deposeth and saith, that they are the said officers of the
Company aforesaid, and that the seal affixed to the preceding instrument is the Corporate Sea1 of said Company, and that
the said Corporate Seal and their signatures as such officers were duly affixed and subscribed to the said instrument by the
authority and direction of the said Corporation.
IN TESTIMONY WHEREOF, I have hereunto set my hand and affixed my Official Seal the day and year first above
written.
PUOUC
Carol J. Fad6r' Notary Publ ic
My Commission Expires: August 1, 2000
L 1428-180-02081
. , . `
~ • -
EXTRACT FROM BY-LAWS OF COLONIAL AMERICAN CASUALTY AND SURETY COMPANY
"Article VI, Section 2. 1"he Chairman of the Board, or the President, or any Executive Vice-President, or any of the
Senior Vice-Presidents or Vice-Presidents specially authorized so to do by the Board of Directors or by the Executive
Committee, shall have power, by and with the concurrence of the Secretary or any one of the Assistant Secretaries, to
appoint Resident Vice-Presidents, Assistant Vice-Presidents and Attorneys-in-Fact as the business of the Company may
require, or to authorize any person or persons to execute on behalf of the Company any bonds, undertaking,
recognizances, stipulations, policies, contracts, agreements, deeds, and releases and assignments of judgements, decrees,
mortgages and instruments in the nature of mortgages,...and to affix the seal of the Company thereto."
CERTIFICATE
I, the undersigned, Assistant Secretary of the COLONIAL AMERICAN CASUALTY AND SURETY COMPANY, do
hereby certify that the original Power of Attorney of which the foregoing is a full, true and correet copy, is in full force
and effect on the date of this certificate; and I do further certify that the Vice-President who executed the said Power of
Attorney was one of the additional Vice-Presidents specially authorized by the Board of Directors to appoint any
Attorney-in-Fact as provided in Article VI, Section 2, of the By-Laws of the COLONIAL AMERICAN CASUALTY
AND SURETY COMPANY.
This Power of Attorney and Certificate may be signed by facsimile under and by authority of the following resolution
of the Board of Directors of the COLONIAL AMERICAN CASUALTY AND SURETY COMPANY at a meeting duly
called and held on the Sth day of May, 1994. .
RESOLVED: "That the facsimile or mechanically reproduced seal of the company and facsimile or mechanically
reproduced signature of any Vice-President, Secretary, or Assistant Secretary of the Company, whether made heretofore
or hereafrer, wherever appearing upon a certified copy of any power of attorney issued by the Company, shall be valid and
binding upon the Company with the same force and effect as though manually affixed."
IN TESTIMONY WHEREOF, I have hereunto subscribed my name and affixed the corporate seal of the said
Company, this
~ day of
~l
Assistant Secretary
OFFICE OF THE COUNTY ENGINEER
SPOKANE COUNTY, WASHINGTON •
TO: BILL HENIlKINGS
FROM: DAVE BERTO
DATE: August 31, 1999
SUBJECT: BOND ITEMS P1850 PURVUS POINT
The bond for the above mentioned project is for the
following items: 1) All the items on the approved road and drainage plans
with the exception of the sod for the "208" Swales.
2) No inspection bond was given but road plans were accepted
by Doug Busko pursuant to Mike Humes letter of April 19,
1999
~ 7 .
~ R E C E D
~
SEP 0 1 tiq4q
INLAND PACIFIC ENGINEERING, INC.
SPO COUNTY ENGINEER
707 W. 7th Ave., Suite 200, Spokane, WA 99204 (509) 458-6840 Fax: (509) 458-6
TO: sPOxmE courrrY .
ENGINEERING DEPT. ~ DATE: `SEPTEMBE~t- - ;Z~;': . ~1 999-:°~
1026 W BROADWAY AVE
~ Z. A If4 ptyz.,
SPOKANE WA 99260
-9=8586
T.~? E. PROJ.ECT,#:
,y~~~' ~ ' ''~~„i,•'~~~~~~,~~~~r'~~" ~,~r~~''~:'~~:i,.•~ " ,
;:E;~ ~ ~ ' ~ r ~I~~, ~ - •
,pURV
ATTENTION: .,,,T„S . , P4I*~T, T
DAV E BERTO P~.~}~ CT'~` N,
, i~, , i ~~i•i~~~• ~
- - I,'~ ~,;~;l~; ' ~ ,
~ , ti. .,t ~ .~I~~ ~ ~ • ~
Description PE-1850
M~ Xerox Prints M X I Copy of Letter M~
M~ Original Drawing M~ Contract Documents M~
M~ Work Authorization M~ Report
M~
No. Copies Description
COPY OF LETTERS .
PL11'pOSe
M XI Information M~ Review & Comments M~ Per Your Request
, MI Written Approval M ~ Signature & Return
Remarks
DAVE:
THIS IS THE INFORMATION THAT WE HAD IN OUR FILES.
~ ~ .
~ Signed: r _
cc:
D:ITRNSMT.PMS
INLAND PACIFIC ENGINEERING
707 West 7th Avenue, Suite 200
Spokane, WA 99204
Telephone: (509) 458-6840 FAX: (509) 458-6844
FAX TRANSMITTAL
DATE: T`~~ ' 9 9 NO. OF PAGES: ~ (including cover page)
.
TO: ~ FAX -f& 7- 9 77 l
.
COMPANY: - PHONE ~ 7'~'~dD
FROM: ' JOB
~
.
PROJECT NAME: ' ~ .
ORIGINAL IN MAIL: ❑ YES ❑ NO
NOTES:
.
.
-
,A
, .
~(v
,
.
REV. 5/97 OAFORMSTAXSI-EET. WPD
4
' HNK. 1e. 1 yJy 9:4$AM SNK G`17 Y BLDG&PLANN I I`tG NO. 561 P. 1/ 1
. i I . .
• '
~
S P aK A~~E G o v Nr -r Y.
DMSIOIS OP ENCIIVbbR1NG wND ~O~m A~, nvMN oF THE pvsuc woM DEPmffMM
w~lli= A. Johns, P E., Caustty Eng~eer , ~ .
? -
( ' r
~ I
R ' • ~
Apcil 1999 ° • .I
1
pM J0B# '
y 1
Susan Murh E.
p y, I.T. Cc: List tnitiats ~
,
Inland Pacific E»gineering- -
707 W. 7th Avenue, Suite 200
Spokane, WA 99204 ' ! .
Re: Review Comments 1 for f'~rvis Point, P-1850 1
Susan,
~
The following items must be a J dressed prior to a+ptance of the road plans:
1. PIease provide a manufacfurer's sheet on the s1 l- {tted golydrain. The Courity will
review the information fo- ease of maintenance'~nd durability 2. On the 12'' A,venue cross~sfction the 18' utilit~ and sideWalk easement is actually
shown as 19' wide (3'+631+10'). Please correctt
- .
3. Mr. Hun1e needs to subitut a Ietter to the CounY I authorizing that the inspectioa and
construction bonds posted ~or Meadowtand v4* also apply toward Purvis Point.
Please c,all if you have question?. ,
Sincerely,
~ .
Doug Busko, P.E.
Spokane County Engineers
.
,
c: P-1850 Pt~cct File ~ I
I 1 ~ i
,i
,
1026 W. Broadway Ave, ~ Spokane, VVA 99260-0170 ~(509) 477i3600 FaX: (509) 324-3476 TDD: (569) 324-3166
~ ~
' 5Y
• . ~ (
RECEIVED
APR 2 0 1999
SPOKANE COUNTY ENu11-41- •
April 19, 1999
Mike Hume
8205 N. Division
Spokane, WA 99208
Doug Busko, P.E.
Spokane County Engineers
1026 W. Broadway
Spokane, WA 99260-0170
RE: Bonds for Purvis Point
Dear poug,
The inspection and bond for Meadowlands will also apply toward Purvis Point.
Sincerely,
V
Mike Hume
lma/MH
. ~
BONL i IMATE 40
PROJECT Purvis Point, P-1850 NAME Doug Busko, P.E. DATE 19-Apr-99
DRAINAGE ITEMS UNITS QUANTITY PRICE COST
1) Drywell - Type A EA 1350.00 0.00 '
2) Drywell - Type B EA 1700.00 0.00
3) Grate - Type 1 EA 320.00 0.00
4) Grate Type 2 EA 345.00 0.00
5) Grate - Type 4 EA 300.00 0.00
6) Backfill For DW CY 17.25 0.00
7) Concrete Inlet EA 800.00 0.00
8) C.M. Pipe 10" Dia. LF 24.00 0.00
9) C.M. Pipe 12" Dia. LF 27.00 0.00
10) C.M. Pipe 15" Dia. LF 29.00 0.00
11) C.M. Pipe 18" Dia. LF 30.00 0.00
12) Precast Manhole EA 1500.00 0.00
13) Solid lid EA 325.00 0.00
14) Ditch Excavation CY 10.00 0.00
15) Sod SF 0.70 0.00
NON STANDARD DRAINAGE ITEMS
1) Wilbert Vault Curb Inlet EA 1.00 250.00 250.00
2) Polydrain LF 15.00 10.00 150.00
3) 0.00
4) 0.00
5) 0.00
6) 0.00
DRAINAGE SUBTOTAL 400.00
16) Monuments EA 185.00 0.00
17) Barricade LF 35.00 0.00
18) Street Signs EA 90.00 0.00
OTHER SUBTOTAL 0.00
GRADING, SURFACING, CURB, AND SIDEWALK
19) Rough Grade CY 67.00 10.00 670.00
20) Top Course CY 52.00 15.50 806.00
21) Base Course CY 15.50 0.00
22) Asphalt Concrete Tons 30.00 46.00 1380.00
23) Curb Type A LF 7.50 0.00
24) Curb Type B LF 150.00 8.50 1275.00
251 Curb Type R LF 8.50 0.00
26) Sidewalk SQ YD 100.00 17.50 1750.00
NON-STANDARD ROAD ITEMS
1) 0.00
2) 0.00
3) 0.00
4) 0.00
GRADING AND SURFACING 5881.00
CONSTRUCTION TOTAL, INCLUDING MULTIPLIER OF 1.10 $ 6,909.10
• , , ~ ~
STREET QUANTITIES
PROJECT N0.- P-1850 DESIGNER- DOUG BUSKO DATE- 4/19/99
PROJECT DESCRIPTION- PURVIS POINT
STREET # 1
NAME- 12TH AVENUE LENGTH- 150.00 FT. WIDTH- 12.00 FT.
BEGINNING STATION = 661.00 ENDING STATION = 811.00
ONE SIDE ONLY PWIDTH= 20.00 EWIDTH= 8.00 QWIDTH= 0.00
TERM # 1: TAPER TAPER LENGTH = 100.00
TERM # 2 : CHOPPED ~
ITEM MEASUREMENT QUANTITY
SURFACE AREA- 2400.00 S.F.
ROADWAY EXCAVATION 0.75 FT. 66.7 C.Y.
CRUSHED SURFACING TOP COURSE 0.58 FT. 51.9 C.Y.
CRUSHED SURFACING BASE COURSE 0.00 FT. 0.0 C.Y.
ASPHALT CONCRETE 0.17 FT. 30.4 TONS
CURB TYPE B EXISTING 0.00 FT. PROPOSED 150.0 FT.
SIDEWALK EXISTING 0.00 S.Y. PROPOSED 100.0 S.Y.
TOTALS
ROADWAY EXCAVATION 66.7 C.Y.
CRUSHED SURFACING TOP COURSE 51.9 C.Y.
CRUSHED SURFACING BASE COURSE 0.0 C.Y.
ASPHALT CONCRETE 30.4 TONS
CURB TYPE B 150.0 FT.
SIDEWALK 100.0 S.Y.
; _ ,
ti TR.ANSNATION TITLE INSt;TRANCE COMPANY
NORTH 7 2 O AFtGONrrE
S POKANE , WASHIIVGTON 99212
Prepared for: Order No. : JM-222713
WILLIAM PURVIS Charge: $125.00
12810 E. PALOIISE HIGHWAY Tax: $10.13
VALLEYFOR.D, WA 99036 Total: $135.13
THIRD REPORT
P L A T C E R T I F I C A T E
Certificate for filing Plat of: PURVIS POINT ADDITION.
In the matter of the subdivision to be submitted to Spokane County for
approval, this company has examined the records of Spokane County Auditor's
and Clerk's offices, and the records of the Clerk of the United States
District Court holding terms in said county. This certificate is made for
the purpose herein specified, and is not to be used as a basis for closing
any transaction. Liability is limited to the amount, if any, paid for this
cert i f icat e. From such examinat ion, the company hereby cert if ies the t i t 1 e
to the following described land, in said Spokane County, to-wit:
See Legal Description
RECEIVED
SPp
. KANE CoVIV
TY
AUG 0 3 lggg
DIVISION pF gUILDIIUG
AND PLANNING
Page 1 of 3
- .
~
s S
Order No. JM-222713
LEGAL DESCRIPTION
A parcel of land in the Northeast quarter of the Southwest quarter
of the Southwest quarter of Szction 21, Township 25 North, Range 44
East, W.M., described as follows:
BEGINNING at a point 20.00 feet South and 502.14 feet West of the
Northeast corner of the said Northeast quarter of the Southwest
quarter of the Southwest quarter; thence North 89059'51" East, a
distance of 7.13 feet to Northeast corner of a parcel of land
described in a Quit Claim Deed recorded under Auditor's Document
No. 4193896; thence along the Easterly boundary of said parcel the
following two courses; (1) South 00024'08" West, a distance of
86.41 feet to the beginning of a curve concave to the Northwest
having a radius of 256.00 feet; (2) thence Southerly along said
curve through a central angle of 13°32'5911, an arc distance of
60.54 feet to the Northerly most corner of the parcel of land
described in the Right of way Deed recorded under Auditor's
Document No. 4157347, said point being the beginning of a non-
tangent curve concave to the West having a radius of 256.00 feet
and from which point a radial line of said curve bears North
76002'53" West, thence Southerly along the Westerly boundary of
said parcel the following three courses: (1) Continuing along said
curve through a central angle of 0411015011, an arc distance of
18.68 feet to the beginning ot a reverse curve concave to the East
having a radius of 294.00 feet; (2) Southerly along said curve
through a central angle of 17143'50", an arc distance of 90.98
feet; (3) South 0002410811 West, a distance of 381.21 feet to the
Northerly line of a parcel of land described in Quit Claim Deed
recorded under Auditor's Document No. 4193897; thence North
89155' 12" West, along said Northerly line a distance of 141.85 feet
to a point on the West line oi said Northeast quarter; thence North
00023'29" East, a distance of 634.73 feet to a line parallel with
and distant Southerly 20.00 feet, measured at right angles, from
the North line of said Northeast quarter of the Southwest quarter
of the Southwest quarter; thence North 89059'51" East, along said
parallel line, a distance of 160.97 feet to the Point of Beginning;
Situate in the County of Spokane, State of Washington.
VESTED IN: WILLIAM J. PURVIS and DEBRA A. PURVIS, husband and wife.
EXCEPTIONS:
1. Taxes and assessments, if any, no search having been made thereof, as
to Parcel Nos. 45213.9063 and 45213.9064.
Parcel Nos. are provided from the latest Assessor's Maps available to
the Company. Said parcel numbers are not a matter of the public record
therefor, the Company makes no assurance as to validity or accuracy
relating thereto.
Page 2 of 3
i " -
t . • . .
Order No. JM-222713
2. Liability to future assessments by Model Irrigation District No. 18.
3. AGREE;MENT AND THE TERMS AND CONDITIONS THER£OF:
BETWEEN: Model Water and Light Co., a corporation
AND: Glenn Pierce
DATED: May 4, 1911
RECORDED: In Book "M" of Misc., page 511
RECORDING NO.: 321718 .
REGARDING: Relating to the furnishing of water and
electricity to said property and other
. properties; providing for lien for unpaid
water or power charges; and creating
easements far pipe lines, ditches, etc.,
over said property
4. EASEMENT AND THE TERMS AND CONDITIONS THEREOF:
GRANTEE: Spokane County, a political subdivision
PURPOSE: Installing, operating and maintaining
drainage facilities
AREA AFFECTED: This and other property
RECORDED: October 14, 1998
RECORDING NO.: 4280604
5. DEED OF TRUST AND THE TERMS AND CONDITIONS THEREOF:
GR.ANTOR: William J. Purvis and Debra A. Purvis,
husband and wife
TRUSTEE: Sperling F'acilitator Services, Inc., a
washington Corporation
BENEFICIARY: Michael D. Hume
ORZGINAL AMOUNT: $78,171,73
DATED: June 9, 1999
RECORDED: June 14, 1999
RECORDING NO.: 4379573
Investigation should be made to determine the present balance owed by
contacting the appropriate lender/agency/individual.
DATED AS July 6, 1999 at 8:00 a.m.
'I'RANSNATYON TITLE INSURAIVCE COMPANY
, ' -
BY
For 'ervice on this order call:
(509) 922-2222 (FAX) 926-1519
Judie Mitchell, Title Of?=icer
sc
Page 3 of 3
w~
. 4379573
~ M M sPeRLtric u+o etu.cn
' INII999 o
1FdNSAIIIOK, IlilE INS fQ 01 lII,fA SD01uu W, Tl A7tOtu+tY4 hT Lnw
7301 1~ORTN DIVISION ST. SU[T[ 309 ~
tAls OeM at iroit.
SPOKIWB, WA 99208
S. To psy Ul tostt, leet aM eipmiu In carawcllon vlth tAI+ OaM el tro+l. InelWlnq the 61pOZ-e0 el IM
irvlter fnturrM In 0nfe0`0119 tnt eE1lpalton seturM nereDr eM Troitu'f anA attarney'i feef utuellr
ineurrd. „ praieb er stetute.
6. tMuld crmter f.it w wy wn«+ eue *my e„ms. snuiamn, Inwrena preolwo, Ilons, rotu.eolmat e, 4919575
otner tnnan qainsc the preanr norein,eew auuleea. eMofieierr war ay tne seu, aM tM want to pala. ~1; ( 0~ ~
. 1thIntoNll IM nl~ 1et Iar1A In the na1e iuurM Mnbr, Mall De b7ed le 4nA Dogeid i plrt al lM O4Dl J\
~uurb 1n ~M~ e.M er t~uu, C6 11f1999 01;1f1
li 11 IWNAILT AOACfD MAI; IIUYSA11101, Ilili INS C0 01 i11,00 San1tM te,1t1
1. In 1M went nq perNen ef the praperty 1t votm or dwaM In an tNneet deuln proeeMlrq, the entlrr
*ro"t of the ~wrA or suth portlon as uy pe netessary to lully satlsfr tM eellpation setwM AaeEy, grull
E~ p~ld te Otnelltlur lo De sppl1M ro laIO aellqetlen. l/A No. 12 ~1'~~~
Deed of Trust ~
t. gr g«ntiro ar•Mt er ony iw suvred hortbr Nter 1t1 dw date, leno1111ary doa ne1 va1vo 11s Hpht io ~hlnpeen oniy)~
rpuiro p►aqt apMl ~M Aue of *U etnn $usi wluvrM er ta doslno aNwlt ler IoIluro to ie pq. (Iof u!e !A CA• lNte o[ N+ 1(OK 3
tterov No, 1110111e ~I
Ae huitto Wll eogawey 41l er my prrt el the preperry eevaed br tAls Ooed af irv+t to the pma TILlle O[dee Ne.
entltlW tAer~le en vrltten reqwsl ef the Oremor aM IM lmeflelory, er upon sa11sfaatlon ol the oDllqslion
~pDUtO
lftY/fd tld VfI11M requut ier rua,wyenu uae ey tm EOntrtalerr or cM pueon mHtlb in•rero. Agfereoee NumDere o! Rel~ted Docnnentil
1. vpen dehuU Ey orenror In the o+rant #1 •-Y ine4Dleeneu saur.e hvoey er In t~o oa.ler.«au et any TNIS DtCO Of SAUlT, m~d~ on Jue• 1, If11 , becvesn
69roloont tatolnd Nit@tn, O11 /w& toturM hereDr sMll IrM1alely Oetae eue 6b p.yeeu .I the eplien ef
ine eenNieiary. In iucA wmt ud u0on vrltun rpuut of loneflHSry, Truu*@ tnall sell the vwl Oraputr, NILLtNI J. PURVI9 AJID OClRA A. PUI1VJS, ~SSMO MD NIrE
In seterdantr r1tl+ tho OeM el Iru1t Aet ef the Stot► ol Ysinlnqten, at puDUe wetlen to the Mqhest EieErr,
Inr perien 4pserpt Iruft#@ Ni bld at Iruotee'e Ul#. Iruitn tM11 sDply the proteedi ot 1M fale ai lella~~ , CRAlITOR,
1tl huu/ 111 c tMl wr,,s~~1~ iruiNe'i ho aM ueorney's 1ee; (tl te tM oetfq•non
.
seeurd E ' 1~101 t. 01SD9 11D. H1CA, MA 1907~
y tAli DeM a plul rq, thdl bo AIstrIbulM te tM personf rnUHM tnntle, uhoe• eddress 1s EPERLINO 1ACILITATOA lGRVICEl, INC., • Mudlegtoa Gorponlloe ,
S. TnntN iMU deUver te tl+t pureMur at the ul* Its deM, wIdwt ruranry, wh1eh dull eanvq ro the TRU9TLE,
qmMser IM 1nterest In the praperty Mleh 6rantor I+ed er Aed the pover te cawry at the tlu of AIg
I .~~utlon ef tMi ooed ef fwu, mA +ucl~ as M ay luve aequlrM tAonNUr, twecn'i eeed in.U reefu eAr Whoee addrese l! 11211 C. dto&dwef hwe., Spokiee, NA 91206
hrt~ sMv1nq tMt the ul* we tenduued 1n taplima vltA oll tl+r rpulresents al Iw md tMs CNd ol HI[AACL D. 611ML
frvsl, vAleA nettel 1haI1 be prlu fulot tvldmu et iucA eoopUene& tM eenalullvo wlema tnvrol In h.or
al bens flee purehSsor nd mcumDrmnea9 far vque. , BtNC1ICIARY,
Tho parer ef nl* eenfa►N br IAIi OoM ef irust m~+e ey the oob oi nun l<r of the tuu ef wsklrqta+ 1s ~ vhOee eEdeese l! ItOS N. DIVIliON ST., SPORANlr llil 19208,
rot an ualuilve nuCy; Amdlelery uy nwr IAIs Deed af fruit ie be IeraleoM so 4 .oreq~p~.
NItNESSLtHi Crantor hereby berqelne, sells end conneye to iruetee n ruet,
In the wmt ef tAt deuh, 1neaNelty, EIsaDIUty, 0r ffsIgMHon OI I/Yltff. em•nalory uy oppolnt In ~ vICA pos,.er Of ee1s, eM lOllovlnq d9leclbed Ce11 pcopetty ln fPOKANt Couety,
vr111nq 6 suaut+er trusut, ab uoen int neorelp or wch appolntunt In 1M artdye ncerds ol the coumr Ma1111nqtonl
1n vA1eA tAlo OtM a1 irusl fi reeeMM, the wetuler lrmur iMll !e vu1M Wtn 4N pam ef iht eo-lplnel
Irwuo. Me trwtee U rot aAl1qaIM le netllr #ny prrtr Mroro of peMlnp uU ueeer any atMr Dud ai tolust
er af anr aqlon er prouMlrq In vAlaA OrOnter, truuee o. eon@r+a~ory sn,tt% ee a arty wtess iucn utlm er SCE LIE1SiT '0.' AffAClltlf ELAd'S'0
oraobirq is erovnc br in• Iro+t*#, Aueisor'i Oropsrtr !a• PiralJlletouo! NuRDec(S)i IS217.9061
1, T1t1e DeM of Trwt opOlla te Iwnl te the Ew~eflt ef, md 1a D1M1iq rot alr a the parHes Mrete. Eut
on tnelr hoIrs, drvtiove, lpolHe, idalnlstntors, ea4evrors nd asilpns. IAe term Aamflelory oNll 4M the
bldu ab anv ef the roa uevrd nueby, vRUl+u er rot nnd as lmellelarr MrNe, vhlCh nal property 1i not used prinelpally foe aqrleulturel or lerminp
• r purpogae, topether wltA all the tenements, heredltnments, and appurtenances new
Detedt June 4, 1999 0r hereatter therounta belonqlnq or ln any uli• AppOrtalnlnq, a nA the ronto,
~ leeues and proflca ther90(.
' .1"~~ ~~X.r-CQl ~..~4~'~/.~E'✓ ~ Thta Oeed of Trust Le for the pucpoee ot ueurlnq pecformanee of eecA eqreemene
' NILLIAN J. P1I9 OEEM A. PUAVIS o( qrontor hKeln cantatned, and poyment of the •um of Sorooty t19A! 2Aau.~nd
One Nundred 6ereetYOn~ And 73r100 Dellan (t7A, U 1,1I) vLtA lnteregt, ln
8ecordence wttA the teno11 of e promlesory nots of even det• hecewlth, peyebl•
to 9eneticldry or otder, and made by oeentor, and ell renevn19, modltleetiona
end extenelone thenol, and aL+o tuch turthor eume ee mey be advaneed or loened
~ by Benellotery to Crjkntor, oc any nf thele wceeesorti or Agglqn$, toqetAer with
Intorest tAereon at sueh ret• as ehell D• aqned upon,
lo proteat the ucurltr el thb OtM el irust, Gnnter, taemnts ud preei;
1. fe Mep the proportr In qood terdltlen srd /epalr; te penll ro wgle tMnof; to ta0lote my Du1lElry.
11rvctvr• or Iqrore. t Doinp bullt Or *Aout to Of bullt IMfecn; to rsnerq otao«r Mr bu11e1na, strvelvr•
or Ioprowlent tM1qreen wAlch rr be dasqea or Gntro~odi oM te ca01y vftA aIl Ins, ardliuncrs. rpul6tia+s,
covemnts, ea+dltlen9 nd nstrletlone sIfOellnp tM1e propqrty.
aleu pay ol ~Il ' otAv~cMrqu1 18VIUt t or „roc~s6mogoolts nnce M~~j~rqA,~MaMecvrlry olp iMtp•0aid 'rolrlfrusi~
1. Ie berp eII Dulldlnq' rw Ord h@re@lter a"cte0 an the prooertT de«rIDed Aertln aont4nuoutlt Iewred
aq~lnit loii Dy Ilrt or other Miaras in &n 200mc rot leII nun !ne f0lal deEt sttured Dy lhil DtrA ol ffuit.
AIl pelltlts iMll M Aeld by Iht E100fltldry', md Ee In wch compsnles n tM leneflc"ry rr apprave aro
neve tou areete Nrst te tAq Aenelltllry. ali Iti tnterat my oppeor, md tnen to the Ormtor. ine snouni
~y tnsuroneg ~tier yr og oaoli~ w°"'"r tbt°"d"eSs ntr.ey seeured In sucA or0er as 1 e
1
ceiieoiea urot► t ftarl
~ proeeedlrqf to,lorrelme'tnlf Oeed elrtrust'~la tAe^ermt^`eft1lor4Neiure,rooU"rlgntsl'e~1tnGranior Mn
. Imunner poUales then 1n rora tn.tt vst re the wrcnos« st the foredown tde.
~ l ia delend ~ny ~etlan er proeeedlnq qrrporNiq to OIftu the feeuNry herrof er IM rlphb ar pa4n of
~J 1.mqllel8ry ot Irwlee, wd te ar NI rost+ a~d e~rpMg n, lnoludlrq cert af tltl~ ~~~ri~ u+d ~~ramey'~' fe~+
In a reuomOle 4~an+t. fn e~ry w<A 4ctlon er proteMip, me In Mr ~ulr Dro~qht br AMellcl~ry ~o torrdo~e
~
s_
/ V 4379579
• h ; )dl .
06 ~i+n91A a,iu
, oINSAIIIA+I. IlflE (K CO 01 111.00 Sooliot (a, q
Stete o( kesAlnyton ~
)ee.
Courtty ot SpoMae•
t hereDy certlfy tAee I know or heve eetlelaetory evLEence that NI6I.Ihq
J. FURVIS i CEBM A. PUAVIS ere ehe pereon(e) vho eppeered be(ote mo, end
4379513 eeld pereonle) seknovladqed tAet they flqned thl• lnstrument and
PIl!: 1 0f ( eekr:o++ledqed lt to Ee their freo end volunuty ect tor the uaes and purpaies
(611411" M:iSP meneloned Ln thls tneecumene.
• 1(UNtN1110N. Illlf INSOO 01 UI.Q~ S1alinlc0. Deceds ~Il.~.. ~~i ~q9~ -••---~t►n.n►»+..+~*►►~+z.,
aI r,u...•.
E X 1-11 II IT "rt" t~urv o, w+se►+
roainn~c.Iw~u+rwwe~a
Noeery iubllc Ln and foc the Stat• o! Neshingeon ~COLONry I~ pp
resldlnp at
Pan of the Nonheast Quaner of the Southwest Quarter of the Southwest Quenu of
Stction 11, Township 15 Nonh, Renge 44 East of the Willamette Meridian, described as Ny appolntment •xplree
follows:
DEGfNMNG at a point 20 feet South and 502,14 Qet west af the Nonheast comer of ihe
said Nonheast Quaner orthe Soulhwest Quaner of ihe Soulhwat Quaner of Seciion 21,
Thence Souih to apoint on the Sawh line of said Nanheast Quarter of ihe SouiMvest
Querter of the Southwtst Quarter of Seciion 21, 160.e5 feet East of the Southwesi corner
thereof; Thence West an said South linc io the Southwest corner of said Nohheast
Quartcr of the Southwest Quarter of ihe Southwest Quarter; Thence Nonh along the Wett line thereaf to a point 20 feet South of ihe Nonhwat corner of the said Nunheast
Quuterof the Souihwest Quener or the Sou►hwest Quaher of Section 21; Thence Eesllo
the Point of Beginning;
Situele in the County of Spokane. State of 1Vashington,
t-A
(
~
.
,
,L
. .
. ,
~ i .
0,
~
~
~ 4157347
11r6991 o43 iBP
, cD ENGIA4EA D $0.00 Spotuu to, s1 Aftcr Itccortlittir. {2clurn'fu: Spulcune Caunly fnginrcr
Atln.: Itibllt ot 1Yuy f)cpartiurnt
1)ocun►cnt '1111c: IZigIU af W7y I)crd
c;ranwr(y): w t t.l.l nH J. t. ul•:If Icn A. PUrcv 1 s
Grontcc: tipok:ine Cuuuly
' l.[gall?C5t'nphuil: 1°P11. SN1,StJI' SI:C. 21, T'WN.:Stl, 12G. AA F:AST, W. H. '
Atlditional I.eEal 1)rw6ptiun: 1ce i'.aj;c I .
/lsscssurs'I'ax 1•arcel N►uiibcc(30: 45213.9064
ttcfcgeilcc Nu►Iihtt: Cufpuse: f'- 1 U0f! HI:At9ri41.At10
I
~ ' .
S{'UKANfi Ct)UN'I'Y t)IVfSiUN OF 1iNGlNi:T:it1NG
tijuuk;tnc Cuunly. Wosliiiiblon
lt1C:11'1' Ui0'`VAY I)E1:J)
IN 'i'lll: h1A'1'I'1:1( 01: U•tl-111TEr.rrr11 nv1.31111: Itr. NO. 2135
KNOW nl.l, Ml:N IlYTI11:S1: I'Itl:Sl:N'I'S. that tlir Gr;►ntnr(s) ++iLLIl+M J. ruitvTS t+nn
Ul:I11N A. t'l1llYl;;, tiuuliut«l tim1 wlfv,
For ,vui in conxidrrcifiy(jtj)S P"tutual ilriirlits, brnitls nnt) c:unvcys lc► tirc►kntic C.'ounty., tlic i
fullowin6 de,rritk"i4i~cal olNojj~rjituntcJ in Spakunc Counly. Slnlc oC Wushirigton, to-wit: '
. ~ t n • i '~''J ~~i
I~c~It~~;lc~t~*cil~ti.~?~xl. 45213.9064
-.a.~. .
r • .r
~ • • r
'll1:1l isciiNI:IMMV1/4 tif11le S1V I/•1 uf' tirctims 2 f,'I'.35 N., RA1
1V.~1 , n~~~~~• (~ailic:til~il~' ~1~~~~rli~il cit lillluws;
• •,~.:t~
IIrE;iilisini, :1I 7(►ilicil tiil tlir •o s«l1t littr. ul~x:~i~l NI :1/•1 licum whu•{s poilil 111c :M
('oa ur< «&said f`!ti l!•1 uf 1hC MY (/•1 iif Ilic tiWIM hrnts N.K'►"S5' 12"W., tt ttislattc:c
~i f tC►ll' K'.; ilitiirr f•I 00"24'08"I:. a{i~~ig a 1int- t1ia1 iuns lluuugh n litiint 20.00 fccl
;03.1 I li•rt vir';l of 1111• hIl: ('utnrr IlI'sail) M:l/•I, c1 clisUincc uf SUI. 61
6`4-1 Itt :1 INI11 1:U111••111 1'111%'1• ~•~~n~':1!'~! lo1 111'• •~•~•~1 11:1"I11l; fl lil-lllls 411*7i(011) rl'l'( fil(111)
whids ~~~~iul i:~~lial lii~~• I~r:~~e I I~i~"It ~",.t"l~f ; tli~•n~•~~ s~~~~fli~tl~~ :~I~i~~~; tni~l cti~vc
:I ~•riili:~) :illicle :In ui(: Ilisl:ilict• II1* IR,(OK (i•c1 tu Ilir Iorgimtii~g of n
IrvrIsr rIto ve rIInr:n•r 1..1 Ilir cas, lmvitu; n iculitia (if 294 01) li•rt; Ilicticc swillicily
almn}; saill cm vq'• Ilu48111:11 :1 Crima) aiit.,le itf nii ttic ilistniice of90.98 (eCl; .
111CIO«-.` u0"~~,t•u;c~%V , iik<anv< <►r 39,i 21 i«t ti, to 1wit►, tit, ttte stma, r►ii< <,r3oid '
NI:IM; Ihrrn•c ;ilc►m,:::iid smullt linr -1 tlistat►rc cC I9.00 li:ct to thc
I'~~ii~l ul~ I li•Z,iunin~~
'iitu;tlc it► tlir ('smi►{V ortipoka►le, Sl;tlc i& Washint;loii.
~isu~c u~ 1~•~s
Conmaiili►►g R,1I211 S.F.
'1'n [1J1V1: AN{)'f'U (101.(3 tlir s:imc, unlu ltu snicl SpaScnnc Caunly fur tlic purnosc9 oCn rublic
ro:ut (iorcvrr.
. ,
r .
4157347
~lgt: 2 of 1
. IIp~1991 Q~:18~
~ CO EKtNEER D $0.00 Spolux to, R
IN WI'INI:tiS 1V111:ltl:UF, Ne linve licrcunto sct (IuR linnd(s) and scul(s) Ihis
. ~ '
-/,O-/4cl.iy nf OrMMrtt .1997
. .
fly: Q • . P,,,.,,....~~ 13y: 0, C1.
.
N11.I.lAM . PURVI:; OE11M A. !'U1iVIS
sTnTr: 01' Wntil IINGTON
CUUN'fY UFSI'UKANI: ) ss
1ccrtify tlrat l ki~u~v cir lj:jvc s;►fisf:«tory cvitlrncc: t{int WI1.LIAM J. c DtuRA A. PuRvTs
linluri) the iiiJividuut(s) w110 111)[xturJ 1►clute tnc, uitd siticl iiiJiviJuoi(s) uckrwwlccJgcd that '
Yltntsha/thcy) sibncil this iiisttuntciit, aiul ncknawicclbcd ic ns (his(hrr/thcir) fi'cc anJ voluntt+ry
ncl, i'ur tlic usrs aiiJ liurpwses i»etitiurieJ in thr insirur»cnt.
I)alrd 111i, I:ry (,f cx'rcinFit , 1997.
`~%0It11111/,1/i
C
~ 2x~`'`'+~ ;fQ~,1~ ~Q . • .
_ 0 ~t ~ Y E ~ ~ ~ a l /~.~-d L~Jl~t _SC 1
~
~4p P~up~VlG NO''AitY I'UliL1C ~
~ . i .4!q„ •~~~•~o`~` bi nnci fiir Ilic Slutc of Wasliington. i
' .•w • sY►`~~resicling at S~kanc.
O 1l11i►~~~ hty nrjwintincnl cxpires:
rwforms\ribhl uf way tlrct) rcb rwlary pln pnrccl\hc:
„ • ' I. ~ 4193896
• •'~J ~ :,,Z ( Pa~e: 1 of 2
00.0311948 03:19P
1 Tcc nrn co rn c&4,~. N B
ILt U
\ l
~
wHF.t,i RP_f'(1RtIF❑ RFTiiRN Tr1 •
SPERLING & BALCH -
LEOAL DEPT.
E. 12211 HROADWAY 1#3
SPORANE, WA 99206
DOCUMENT: QUIT CLAIM DEED
REFERENCE NO.: NONE
GRANTORS : WA21U, I.LC
GRANTEES: PURVIS, WILLIAM J.
PURV I S. OEf3RA A.
LEGAL DESCRIPTION: A portion of Nc 1/4 SW 1/4 of SW 1/4 uf Sec 21,
Z' 25N, R 44E, W.M., County of Spokane
PARCEL NO.: PTN 45213.9063
QUIT CLAIM DEED
THE GR.ANTOR, WAHU, LLC a Washington Limited Liability Company,
conveys and quit claims all their right title and interest in equal
ehares to WILLZAM J. PURVIS and DEBRA A. PURVIS, hueband and wife,
in the followiiig described real estate, siCuaCed in thc County oF
; Spokane, State oF Washington, togeth`r with all after acquii•ed
title of the grantor therein.
That portion of the Northeaet Quarter of tha Southwest Quarter
of the Southw@st Quarter of Section 21, T 25 N., R. 44 E.,
W.M., more particularly deecribed as follows:
Beginning at a point 20.00 feet South and 502.14 feet West of
the Northeast corner of said Northeast Quarter, thence S 00°
04'28" W, along a line that rune through a point on the South
line of eaid Northeaet Quarter, 160.85 feet Eaot of the
o SouChwest corner of said Northeaat Quarter a dietance of
\ 146.34 feat to the beginning of a non-tangent curve concave to
o the Northwest having a radiue of 256.00 feet and from which
point a radial lina beare N. 76°02153" W; thence Northerly
~ along eaid curve through a central angle of 13°32'S9° an arc
~ diatance of 60.54 feet; thence N 00 04'08" E a diatance of
~ 86.41 feet to a point lying 20.00 feet South and 495.01 feet
~ Weet of eaid Northeaet corner; thence S 89°59' S1" W a distance
~ of 7.13 fBet to the Point of Heginning.
c~
Parcel # 45213.9063
SUBJECT T0:
• The above-named Grantora' interest in tha real.property above
deecribed. -
M
N
o Dated February ~1, 1998.
kD WAHU, LLC ~
OD
o - ,
0 gY .
o ~
.
N /•~y"'L~1-. Y .l~'•
4ICNAEL D. HUT~fE' N -
~ DAV I U l•IAC)E
W Member tqernber
,4193896
Page: 2 of 2
MO195d 03: t9P
fac nrn co nl cmyaM N n
STATE OF WASIi I NGTON )
3 ss.
COUNTY OF SPOKANE )
On this day personally 3ppeared before me, the undersigned, a
Notary Public in and for the State of Washington, uly coimnissioried
and sw n, personzilly ppeared ~'~~_f~(-/7. ~F~7L.
and /t_l; n~Q. to ruc ktlOwit to bc the
01c ►•r 'th " < oE WAi{U, I.LC tt3at
executed the foregoing instrument, and acknowlccjyed the said
instrument to be the free and voluntary ac:t and dzzd of said
corporation, for the usea and purposes r.lic:rein mentioned, and on
oath stated that they authorized to exectite the said instrumecit and
that the seai affixed (iE any) is the corporate seal oF said
corporation.
GIVEN under my hand and of f icial seal this day of February
1 9 9 8 . `sNiIIti11//1,
/
A. {yliI~ ,
Z~l
• ~•.t~ ~ /~-~(~l , r 1 i~~l ( "C~t~-1
= V; kR M.,C f 1
Y No~a'ry Publ ic in and for he SSCate of
~PUBItG Washington, residing
`My appoiritment expi res :
%'~Fe o°
N
t. Z N
ACCEPTED AND APPROVED:
W~~ . ~4N•'~~
WILLIAM J. PURVIS
1
S~ • / Lf 1,1. L Lc ~
DEB A. PURVIS
4193897
Pa e: 1 ot 2
0.1103;1998 00:19
lioc nrn co nn c~,,,. I„ ~u
c~0~
~
WHFN A _C]RIIFT1 FZETLTR2d Tt'1 • .
SPERLING & BALCK LEGAL DEPT.
E. 12211 BROADWAY #3
SPORANE, WA 99206
DOCUMENT: QUIT CLAItd DEED
REFERENCE NO.: NONE
GRANTORS: PURVIS, WILLIIIM J.
PURV T S, DEDIZA A.
GRANTEES : WASiU, LLC
LEGAL DESCFtIPTION: A portion of NC 1/9 SW 1/4 of St•J 1/4 of Sec 21,
T 25N, R 44E, W.M., CouriCy oE Spokatie
PARCEL NO.: PTr1 45213.9064
QUIT CLAIM DEED
TIIE CRANTORS, WZLLZAM J. PURVIS and DEBRA A. PURVIS, hu8band
and wife, convey and quit claim all their right title and interest
in equal shares to WAHU, Y.LC, in the following described real
estate, situa[ed in the County of SpoE:ane, State oE wasliington,
together with all aFter acquired title of the grantar(s) therein.
That portion of the Northeast Quarter of the Southweat Quarter
of the Southweet Quarter of Section 21, T 25 24. , R. 44 E.,
W.M., more particularly described as followa:
Beginning at the Southweet corner of said Northeast Quarter;
thence S 89°55'12" E. along the South line of eaid Northeaet
Quarter a dietance of 141.85 feet; thence N 00°24' OS" E. a
dietance of 13.00 feet; thence N 89°55'12W West a distance of
141.85 feet to a point on the Weet line of eaid Northeaet
Quarterj thence 3 00029'08" Wast a distance of 13.00 feet to
o the Point of Beginning.
w
N.
0 Parcel # 45213.9064
w
IN '
I.-
~ SUBJECT TO:
m The abova-named Grantors' interest in tha real property abova
deecribed.
~ •
~
r~1C~ ~ C' 11
Dated &ebruay-y 1998.
, ' • .
~ .J . , L l~-~.✓.) ~ ' ~ : C1• , • ,
WILLIAM J. ~~CJRVIS DEBftA A. PURVIS
N
.
O
O
~
p STATE OF WASHINGTON )
o y ss.
N COUNTY OF SPOKANE )
ET%
,j
A
, .
' 4193897
' P+gt: 2 of 2
Q3;43iN 03:19P
fDc Mn <n m eM►.,,. r. r~
On this day personally appeared before me. the undersigned, a •
Notary Public in and for the State of Wsshington, duly commissioned
and sworn, personally appeared William J. and Debra A. Purvis to me
known to be the individual in and who executed the witliin and
foregoing instrument, and acknowledged that they signed the same as, ~
their free and voluntary act and deed, for the uses and purposes
therein mentioned.
I ON
GIVEN= inCa-et"•nt~,b~4r}nd and of f icial 3ea1 this t1 cisy of ~~e br~ i•y
199 : 'r ~t~;, Cli
;
v : . ~ .
Notary Pub] ic in acid for Ctie Stntz of
o4*0_ S•7ashingtoil, residiiig at (L'( k•~f~.
oF My appointment expi res : - ~ 1-~! ~ •
ACCEPTED AND APPROVED:
WAHU, LLC
I3y :
~
~
✓~?i1~1~-'L1~~
. . ~j ~
Y • y • I •
-A-
srokANr
• * COUNTY 4019750
Pige: t of 2
TITLE SOM CQlA;il' I 1lE CO 1D 0113011950 10:56d
59.00 Spotuu fo, u
~ , Yhis Sparc PtuviJcJ F.tr Kc.vaJco'i Usc
S 7 76' :
Fitcd !ur Rccord at Rcyurst uf:
Spokena Couticy Tltlc Cumpony
ARFR RECORDING AIAIL?O: .
Najuc uillinm J. Purvis
AdJress 10906 !S 10908 Fnst 12ch Avc:nue
City, S121c Zip Sookane. WA 99206 T:scrow Numiicr. 5185
Slatulory Warrucity 1)crcl
`11I[:GIL11Y?'nlt UAVIO LIAYNE BUCKNl:R and JUI.IA Aflti BIfCKNER, husbuncl unJ vife
for and in ecrosiJcratiwnuf I, k. C. SEC1' ION 1031 TAX- UEFEiZRED EXCl1ANCE
ui banJ paiJ. cun%tys anJ w2rriuls tWI I.LIAH J. ('UItV I S uns UEBitA A. YUItV 1 S, 1►usband ai►c1 v[ f e
ilic fulluwing JcxritkJ rcil cswc, siwaicJ in ilic Couuty cof Spukunn
l.ECAI. DFSCKJ CTION AT'fAC11En AS EXIII9I'f " 1" ANn FIAUE A!'r\ItZ' IIE:ItL•'QF .
9f,00U10306
Excisc Tax Paid'~( ~ U
aia,Aini. Pd.
~pok~ u Coun / Tre ~ ~
SUB.)EC1' 'f0: F1ITURE Rf!►L FSTATE TAXl:S AND ASSESSMEN'1'S. / ~
SUBJECT T0: E1ISEHEN'fS, FZESTRICTIONS, [iFSFKVATI0N5, GOVENA~I'fS,S~~~ PK V~SIOi1S UE'
RF:CORU, AS S1l0uN ON t'itEi.1MINAItY TITLE 1SSUE!) BY S1'0l~1NE CUUt~'l'1' T/I1'LE:, EILE NUtitSER
76705.
DATCD dayof k. % %wi
/ •
pY c.~! - «y
pAV10 W. liUCKNF:lt yJULIE A. BUCI:NEK liY UAVIt~ u,
~uC ~ EK i~EK A1'TUtin~FY iN r~nc'f
nY lly ;t t//
l<!~
S"I'A1'1i UF uASlllN(:'1'ON
~ .1.1:
Ctiunlyur Suokatur y .
~ An Ihis 76 Jay ul' Jti lY. 1996 (►cli)tC itiL persui»IIy appcarcJ 11AV (U 11. 11UCKNEFt
.1ti ntc litiuwn tu hi the inJivitlual dcxril,ctl iu inJ wliu
CxreulCJ ilic tiilcduinb uisuuiucue li,r h 1 nne:lf and as Atleitacy in Fact liir .1I11.I E A. itUCKNER
anJ arf;nuwlcd6cJ tliac si6ncJ anJ
acairJ lhc saiuc 2s licc auJ vrduul'rry act anJ dccd for h f m ac:lf andsluo •rs h i s
ffCC atld WlUlllaf)► ]l'1 ]Ild OCCIJ JY ^IIUtuCY UI Fact for saiJ principal fiir ilic uscs auJ pnrpnx:s dicrciu nicutioncJ, rnJ
un oa1tt slatcd Itiat ilic i'uwcr o( Aiiurncy authorizinb tt,c cxrcutinn iif Utis instruntcnt bas uot becn rc-.vlcd aacl tlut tl►c
saiJ psintipal is now livuig, and is nol incurupctcn1.
Gi,,zn auJcc nty hand anJ iifticial scal thc Jay and prar 1»t ahu%r writtcn.
(Scal)
,
• X l~~~~ ~ ~ ~%/~!'~(~~f l/~f~'~~~Y( ,
~ ' . UEBttA K. N1tF:DF:KICKSON
Nutary Public in aud lur tlic Statc uf uashinmton
ltcsidinb at Snoknne
' • kf y appuinlutc»t eipirta: 04 - 0') - UO
, .
, ~ • 1 PH In
. '
.
4019750 . .
er rvo. 7c705 ' Pige: 2 of ? i, .
0113011996 10:56A ° . .
Exhibit 'I' ~U MWI' 1IIlE tb tD 59.04 Spolcanc Co, u
Part of tlic Nortftcast Cluartcr of tltc Soutliwest Quattet of ttie So„t{iwest Quartcr of jCttto!1
21, Township 25 Norih, Ranne 44 Cast of the Witlamettc Meridian, describcd as ioilows:
E3CGINNING at apoiitt ZO fcet South and 502.14 (cct wcst of tttic Northcast corncr of tlic ssicl -
Nohheast Quancr o( Iha Southwest Quarter of thc Sautliwest Ouzrtcr of Section 2 t; .
Tlicncc Soutli to a poiiit on thc Soutli liiio o( salc! Nortlicast Quartcr of thc: Soutltiwest Qllaiter
of the Southwest Ouartcr o! Secliori 21, 160.95 tect East of thc Soutliviest cariicr tticrcot;
Tlicnce Wesl on said South linc to llie Southwest corncr of saic! Nortlicast Quarlcr of Ihe '
Soutliwcst Quartcr of thc SouUiwest Quartcr; :
Tlicnco Nonh nlong the Wesl line tticreof to a point 20 (ccl Soutti of tlic Nanltwcst corticr of tho said Northcast Cluartcr of the Southwcst Ouartcr of tlic 5oulhwcst Qu3rtcr o! Scctioll 21;
Ttienco East to ttie Po(nt of Ocginning; . • Situalo iit tlic Counly o( Spokanc, Slalc of W:isltincJton. . '
~rrti 1(1(1~1 •52
. i .
! J 4280604
Pi t: 1 of 6
t0~1111998 0~:21P
CO EIC fAS 50.40 Sootine Co, TA
Attcr Rccording Rcturn To: .SPoknne County Engincer
Attn.: Riglit of Way DcPurtrticnt
;
Gocumcnt Titlc: flrninasc and Utifity F.ascment
Grantor(s): Wiltiam J. Purvis and Dcbra A. I'unis. husband and wife '
Gmntce(s): Govcrnmcnt, County of Spokanc .
Legal Dcxriplion: Portion of Scction 31, Township ?S Notth, Range 44 Cast, W.At., Spokanc County, WashinStan
AdJitional Lebal tkscription: Scc Actschmcat'A`
Assessors Tax Parcc) Nuinbcr, 453139464
. '
Log In Uate: 08R5/98 Rcquested by: D. Qusko Prcparcd by: A. Skimming
F'urpose: P-I808 RF No(s).: 1293 Road Namc(s): 12' Avcnuc S. Glcnn Road
. .
~ . . .
~ f•' - . , .
•
; SPUKANf: COUNTY DtVtStON Of CNGIN(:I:RfNG
Spokanc County, Washington
nltAiNACE AND UT[1.iTY CASENtI:N"I'
IN T11[: M/1TTT:12 Ol- 12"" AVf:NUr-- AND G1.I:NN 1tOAt), [tnAD I:ll,l: NO. 1292, KNOW
/1I.1. M1:N 1)Y TI!l:SI: I'KCSI:NTS, that thc Grantors, Witliam 1. and Dcbra A. t'un•is, husbancl
anJ wiCc, of lhe Couniy of SPo{;anc. Staic of Washinbton, for :►nJ in consiclrratian of Ntutual
(icncfits, ihc reccipt of which is hcrcby acknowlcclbrJ, 6r,int to Spokanc Cotinty, apolitical
s subclivision of thc Statr of Washin6ton, a nrsinage and Utility Easemrnt aver, under, uron anJ
` ncross thc fullowin6 dcscribcd rcal rcopcrty S1tt13iCd in thc County of Spokanc, 5lutc:^of
Wasliin6ton:
Fi.E. Ex ' o T Exempt
j\rrrcTS nsSrssORS rARr.r:r. NO. 45213_9064A r.. .,s ~(F
c. T~tl• • r
See Attachmrnt "/1" and h1ap
11ic Draina6e Cascmrnts, as descritxd in Auxhmcnt "A" arc for thc Purposrs of installins,
apcrating and maintuining drainasc facilitirs to disposc of nino(1: Thc Pmpcrty ownrr shall
msintnin thc drainngc Arca wiih n pcmiancnt livc covcr of lawn turf, «•ith ortionai sitruhhrry
nncUor trces, which do noi obstruct thc ilow and pcrcalation of stomi Jraina6c walcr in the
drainagc arca as inJicatcJ hy tlic arProvcd plans.
'llic Grnntor(i) will cansinict thr clrainaUr facililics in confcirmunce with ihc arprovrJ plans on .
(~lc in the ofiicc oCthe Spoknnc County Uivision of fnbinecrinb.
The individual lot owtiers or their succrssors in interest shatl maintain the drainage facilitirs in
conCormance with thc approvcd pIans.
'llic Prnpcny owncr or hi' rrnresrntntivc shalt infcirni rnch succcccliii6 purchascr of nll
Cascments an Ihe ProPerty uncl his rcspansibility for msinlainin6 draina6e tacilitics within said
I:iscmrnts.
`llie Droina6e I:ascmcnt dcscribrJ in Altnchment "A" is to nnd shull nin with ttie land. No
mocli(ication of (he bounJaries of said Casrment can be madc wittiout the prior approval of
Spokanc County.
_ Ei. . _zc' -o Tx Fxem t
~ ~ lfl fd
~sy.
~ -
? of 6
1it toi 14I1498 03:13P
ce E& EAs 54.0D Scotine fo, u
Whenevcr tlie individual lot ownccs or thcir succcssors in intrrest fail to maintain the drainagc
facilities in confortnance with the approvcd Dcains6c Plan. u notice will bc givcn to the
individual lol owncrs or tlieir succcssors in intcrcst by the County. If not corrrctcdaRcr tcn (10) '
doys. the County has the risiit io corrcct the maintcnuncc failurc or have it coRCCtcd et the
expcnse of the inJiviJual lot owncrs or thcir succcssors in intcrest.
Spokane County does not accept the responsibility of maintainins the Jrainage caursc nn privatr
lots within Draina6e fascments or (laodplain areas, nor the resronsibility tur any clrainabr
whatsocvcr, including but not limitcd to inverse conJcmnalion to any rropcnics dur to deficirnt
construction uncUor maintcnancc of drainube courscs in Oruinage Cascmrnts on privutt proprny.
This Dcainagc Casemcnt will tcrmina(e at sucti time the clescribed nreas erc rlatted. '
IN WITNCSS WII[:REOF, wc havc hcrcunto sct our hancls and scals this _/9"-day of
- - ,1998. .
B y; ~y; ~ Q • ~.~1.~
Q)'
William J.1 .is cbru A. I'urvis .
STATE Of WASIIINGTON )
couNTY or sPoKANr: ~ SS
I certiCy that I know or havc satisfactory evidence tliat Williarn J. nnct Dcbra A. Purvis are i1►e
individuals wlio aprcarcd hcfarc: mc, nncl saiJ inJivicluals acknowlydbcJ that tlicy signrJ this
instrument, and acknowled6cd it to be tiirir Crrc anJ voluntary nct, Cor tlie usrs anJ Pucixoses
mentioncd in the instrument.
Datrcl this /a' el- duy of ~-~-,~-~~~•1-~- , 1998.
v~n~~u~uu~a~nn,ny,.
. K Mp '
o P <----1 9- 711.7 ` ~°~•~G •.O ~ ~
t. ~at, ~,,.EHr NO'fARY PUAIC
~O?ARr 9v : o In And for thc Stntc of 1~'ushinbton,
z
~ .
' p ' z e resicling nt Spokanc. _
E~ ~.f• UBL►G 0 a
o o~► ~ q o,: ~ o My a p p ointmcnt cx pires
t~ C/! 26 i ~
c~
. q~ pF • W A :5~\` ~O
~'~I//pt011oWUw~~
nv\Allcnl('urvis drnina6c R utility coscmcnt\bk
2
. . . , .
4280604
1011411998 o 03:23P
CO E!G ~ fAS 50.00 Sootuie to. U
ATTACI3MENT "A"
EASEM1IEN7 No.l: .
That poMion of the Northcazt Quanrr oCthe South%vcst Qusrter oCthe Soutliwcst Quartcr of
Scction 21. T.IS N.. R.44 E..1y.M.. morc particulatly describcd as Coltows:
J3cginning at a point 20.00 fcct South and 502.14 fat Wcst of lhc 1YortAcast comcr of said
Northcast Quartrr; thrncc S99°59'5 I`W olang a linc 20 Ccct South of and parellcl with the north
. linc of said Nonhcast Quartcr, a distancc ot22.0J fcct; thcnce S00°00'09"E a dirtance of 22.98
fcrt; thrncc N119•59'5 1"E a distancr oC 10.12 fuxt; thmcc S07°24'29"E : distanoc oC 13.79 fat;
thenee South a distance of 18.21 fect; thrnce S89°3S'S2"E a distance oC 16.87 fect; thence
N00°24'O8'E a distancc of 54.99 fcct to it intcrsatioa with a linc 20.00 fat Souch of uld para11c1 -
with the noiih line of said Northcut Querter, thtnce S89°59'5 1"W along said north line, a distance
of 7.13 fxt to the point of bcginning.
Containing 1222.E squarc kct morc or lus
EASEMENT No.2:
That ponion of the Northeast Quarler ot dic Souchwesl Quarter of the Southwrst Quarter of
Scction 21, T.25 N., R.44 E., W.M mote particularly dcscnbcd as foiloW3:
Hcginning at a point 20.00 fcct South and 501.14 fmt Wcst of the Northcnst comcr of said
Northast Qu3rter: thrncr S.00°24'OR"W. 146.34 fcct along a linc lhat tucu through a point on the
Sauth (irn of said Nonheut Quartct disunt wseecly 160.85 foct trom t!u Southwrsc comtr of said
Northcast Quencr, to the bcqinning of e non-langcnt curvc concave to thc Nort}iwcsc haring •
' radius of 2SG 00 fzct and from which point a n Jial linc bcars N.76°02'53W.; tlxncc southcrly
along said curve through a ccntrsl angle of 4' 10'50' an erc distancc of 18.68 lcrt to the bcginning
of a rcvcrse curve contxvc fo the wst and hsvinQ a radius of 294 00 Ccci; t}icnce southcrly along
uid curvc ttuouQh a ccntral anglc oC I I4 19'29" an arc distance of 58.11 Ccc[ lo thc Tnic Point oC
Dcginning; Utcnec tonlinue southctly along a3id curve through a cmtral anglc of 5°2R'20" an arc
distuicc of 28.08 Crct; thcncc NA9•55'12"W n distancc of 34.79 foct; dxxtcc N00°04'48"E a
disuincc of 2E.00 Ccrt; tlirncc SR9955'12"G 1 distancu of 36.74 fcct to the true point oCbcginning.
Containing 995.1 squan; kct more or Icss •
F.ASF.111FNT No.3:
That portion of ihe Notchcasc Quagtcr at the Southwcst Quartcr of the Southwtst Quancr of
Sation 21. T.25 N., R.44 F. , W.M morc particularly dacribcd u follows:
Beginning aI the Southwcst torncr of said Noriheut Quattcr; thcncc S.89°55' 12"fi. along the
South linc of said Northcast Quahu a dislancc of 141.85 foct; thcncc N_00024'080E. a di3tana of
E0.00 fat to the Truc Point of Tkginning; tlicncc NA905 S'12"W e distancc of 33.00 fat; thrncc
N00•24'Oa"E n distancc of 25.00 fart; tl►cncc SE9'55'12'C a distancc of 37.00 fat; Lhencc
S00'I4'09"W a distance of 23.00 foct lo the truc point of bcginnin6•
Containing 925.0 squarc fcet morc oc (ess
A tcn (10.00) foot %vidc utilily cascmcnc localcd in the Nonhcast Quancr of'chc Southwcst Quahu
of the Soi,Ih%%-cst Quartcr of Scction 21, T.15 N., R.44 C., W.M. Ihe castcrly margin of saiJ
cascmcnt bcing morc panicularly drscrilicd as follo+vs:
Ilcsinning nt apoinl 20.00 fcct Soiilli and 495.01 frcl Wcst of Ilic Nonhwsc comcr of said
Noctlicast Quartcr; tlicncc SO0°04'08"W a dislancc oC86.41 fcct to tfie bcginning of e
curve concavc to tlic wcst and havirig a radius of 256.00 fcet; tlicnce southcrly along said
curve ilirough a central angle oC 17°43'S0" an are distence of 79.22 Ceet to the beginning
of a reverse eurve concave to the east and liaving a radius of 294.00 Ccet: thencc southerly
along seid curve lGrough a centrs►I angle of 17°4]'SO" nn arc distt►nce of 90.98 fcet; thence
S.00°24'08'W., a clistnncc of 3R 1.21 fcct to i!s inlcrscctian witli a linc parallcl with and
13.00 feet nonh oCthe south (inc af said Northeast Quartcr and tcrminus of this line
dcscrir(ioit.
4280604
, . _ _
, . • • , - ~ Pt9c: 1 of 6
16111119'98 43:23P
SO.OD Sooluu to.
fA ElC ~
ATTACHMENT "A"
,
12th AVENUE ~ N~
S89'59'51`W 0e Se9'S9rS W ~ ~
22-03 7'~~ NC9~4'31'E 5021 ~
W
r"ZZ 9 d,
p
t
WAZ • ~ g~
~p_7'2t'29' I (
1.79'
1lf.21
00 00" (
61 T 7.12' ~ ~ .
t I
,o•
o I
z 2
J 2 i I
c~ ~ I
I NLAND . ~
PACIFIC
~ ENGINEERINC3 ~
i w
707 w•st Ttn • suft• 200 (309) 45e-e840
spok,,,., wA 99204 iAx: (509) 458-6e44 97076\EXt11E31 09/23/98
r
' ~ . . 4280604
• Pige: S of 6
1011411998 03:27P
~ OD Ec EAS 50.00 SooEine Co. LI
ATTACHMENT "A"
~ 12th AVENUE 1/4 coRNeR
o
~ N89S9'51'E 502.14' ' cbv '
- -r-- : ' ~
/
L
~i z I
. ~ . . I
19' 19' ~ I
~i Q I
e. 41o•so• O
R - 2se.00• ~ 1 Cr
L- 1a.ee• f ~
. T - 9.31' V) I
C• ta.68'
2 I
G - 1119'2
R - 294.00'
l • 58,11' ~ - -
T+ 29.15'
C • 58.01'
.
W-55.1 Tpap I
36.7 4' ~ (
~
3
.
34.79'
/
a- 05120'20'
R • 29 4.00' / ' .
L- zaoa• /
T - K0T
c - zaor ~
/
,
INLAND ~
PACIFIC
~ ENQINEERINQ .
707 w..t 7tn • s„u. zoo (509) 45a-6e40
.
Spo►on•, wA 99204 fAX: (S09) 4511-6814
. 97076\EX11101 09/23/98
• • ~ . . .„,y~.x,
• . 4280604
• Pi9e: 6 of 6
1011111999 03:23P
C4 E}G fAS 50.00 Soolane Co. LI
ATTACIIMENT "A"
e6/fZ/60 IflINX3\9tOL6 ` 1,1,99_95~ (600 :xrJ ►ozs6 vM ••UOIwas
• 0009-QS► (600 OOI b11ftS • VIL I80M LOL
~
oNia33NinN3
0I~t0dd
aNd~N I r~
,
Z
. ~
_ J
~ - - ~ ~ .S9't f t 3.Z 1,59.695~ )
.S4'091
~ r/t •µs 't/«s 'ti/tIH ~
Jo Mr+aoO •,As
/ ~ -
vodL
/ S oo cr
M.U,ssaaN
~ oo*sz
~ • ~ ~ - ~ oorr
6cs
r 3 Lt's~
m
' Z
Z M.QO,►LOOS
/
. ~ /
0 /
9 D~ o ~ .
~
~
. ~
/
. t) C~ 21
.
.
.
.j -7 b ! L''
WIiEN RECORDED MAIL TO:
~ CLS MORTGAGE, INC.
12904 EAST NORA AVL•'NUE
SPOKANE, WASHINGTON 99216
Loan No. PURVIS109011 4019751
Pige: 1 of 11
011 3011996 10:56A
SPQ►GXE fAUN1Y i111E CO 01 518.00 Spokane Co, TA
l5pacc AI.uvc ?laii I.iiK For Rc.urJiny t).ul
DEED Or TRUST
TII1S UCED Of 1'ItUST ('Sccurity Itutrun►ct►t') is uwdc on JUGY 26, 1996 , .
Tlic grajuur is WILLIAM J. PURVIS AND DE13R.A A. PURVIS, IiUSBAND AND IJIF'C
('[Surrwvcr'). '[1►c trustcr is
.
CLS MORTGACC, INC., 11 W11SliINGTON CORPORATION (~1'nutrc'). T1ie Lrn~ticiary is
wbicii is organizcJ aiiJ cxisting under ttie lsws of Wl151lINGTON and «•liasc adJress is
12904 EAS'1' NORA AVENUE
SPOKANE, WASliINCTON 99216
('lxndcr'). Durruwcr owcs l.rndrr thr principal sum uf
SEVENTY EICIIT TtiOUSAND SEVEN IiUNDRED F'TFTY AND 001100 t*****•*
Dullars (U.S. $ 78, 750 . 00 11tis drbt is cvidcncrJ by fiorruwrr's nutr i1•rlcd thc samr Jatc as ibis
Srcuriry Inswmcnt ('Notc'). wliich 1)ruviJrs for monthly rayinciiis, with thr fult drbt, if iwt paid c:utirt. due anJ
payablc uu AUGUST 1, 2016 . 1l112 SCCU(1(y ({1SIfU(IlC11l srrurrs ro Lrnclc;r: (a) tlic rcpaymciu of
ihc drbt eviJcncrd by the Nutr, with intcrest, ajid alt rcncwsls, cctcusions wnd modifications of thr Nutc; (b) ihe
paymcm ot all oilirr suuu, witli imcrrst, aJvaticcd tntJcr paragralils 7 ta protect 11ic acrurity of this Sccuricy
luitruiticnt; ajiJ (e) Ibc: pcr(urmanct uf l3urruwcr's cuvrnaiils wul abrecutcws w►Jcf ihis Srcurity lnstrunirnt atiJ lhc:
Notc. For this purnosc. Uorrowcr irrrvucably grants aaJ convcys w Trustcc, in tcust, with Fwwer uf :ale, the fotlow•inb
dcscrilxJ prorcrty lucaicil in SPOiCANC County, Wasfiinbtun:
LEGAL DESCRIP'TION 11TTACtiED !lERETO 11ND M11DC A P11R'I' HERCOi' 115 EXHIIIIT
„A".
A.P.N.: 95213.906•1 ~
1-4 FAMI LY RI DER ATTACIIGD IICRETO J1N0 MADE A PART IIEREOH'.
wbich has thr address of 10908 EAST 12TFi AVENUE , SE'OKANE ,
IsncCcI (Curl
Washinbton 9 9 2 0 G Propcrty AclJress');
(Zip Cuxlcl
.i
~ WASIIiNGT(JN sijiblc Family Famic MAcll-naWic Mu UNl1;OW.t lNS'CkUAl1'.N'1' I:,iW 3U1E vm (P,Cc 1 uf K P+fc>>
~.1
n • '
• ~ .
i'
C:
1-4 rAMILY RIDCR Loan rio. PURVIS1090A
(Assignment of Rcnts) .
. TIIIS 14 CAJ►tiLY RIDrR is nudc this 26C71 Jay uf JULY , 1996 , ond is iucorpuratrd
into aitJ tha11 bc dccmcd to amcnJ anJ supl►Icmcnt du htongogc. OccJ uf Ttuit ur Sccurity DrcJ (dir 'Srcurity lnitruuicnt') of thc
samr Jatc givcn by Uie unJcrsigncd (ihr 'liutrowrr') to ucurc liwtuwcr's Nutc w CLS MOlt1'GAGL, INC. , A
WASfiING1'ON CORPOFtATION ~
(thr 'LrnJcr')
of Uic sanic Jatc afxl cuvcritib thc prupcciy JcxsitxJ in dic Sc.uray Inst►umcnt snd tur;ItcJ at:
10904 eAST 12TIi AVENUC, SPOtiANC, WAS}ITNG1'ON 99206
ji'iopcr(r AJJmis{
14 FAAlll.l't:UV1:NAKl:ti. lo adJitiun lu Ihr ruvrnSnti inJ 36rrrmrnts nuwJe in tlir ticcuiity ttuuunvit. ISommcr uitd
l_cnJrt furllicr ruvciuol anJ 2btrc as IiilluH•i:
A. AI)i)!'!'IU~V,11.1'llO1'l:lt'1'1' 1UIUL•:('1"!'U '1'lIl: SI:C:U1l!'I'1' I~\S'I'l~U~II;KI'. lu aJtliliun tu iht Porulwrty .IcacribrJ
in Ihc Serutitr 1iulrurnci►t, ehc fulluMUig iicini arc aJdeJ ai ihc Pruf+crty Jcirrij,tiun, anJ ihall alsu cumtilutr dir Pniprciy cuvcrrJ IiY
tlte Sccuriry Initrumcat: builJing tu3tcrials. applijnces 3r►J LutKls ul' crcry nawic wltalxnvcr mow ur hrtcal'trr locateJ in, uu, ur usrJ.
ut iniruJcJ w lc uxJ in cuuncctiun wuh thc {'rupcrty. inctuJius. hut uut liniitrd w. ihuir liir dir purposci ui aupplring ur Jiauihuiing
hr2ting, clxlling, ctcctncity. gas. wztct, xir anJ liglu. litr li«mt,ion a►td cxun,uiihind 2PPUMus. s«uriry :►nJ accrss ruutrul appiiacus,
plwnbing, baUi tuhs. walet liralcts, w•atcr rtuac~s.~i~its,taates,stuvcs.tcl'r+setuuts. dishw~~h~r~.di~p~»~ls. N'~~hct~.Jtycra.~w~ninb~.seunn
winJuwi,sturm Juurs. xtrrni. l►IiuJi. iIiiJrs, cutuins anJ curtain nxls, attacttcJ mitrun. cAbinct-s, panclling and zttachcd Ilui>t cuvcr inbs
IIt1W Uf IICIC]IICC am,chcJ (u iIic Ptulocrty, 111 uf Nhich. illcluJing rcillarrmruis iitiJ SJJiliuus thcrctu, 1,11411 t►c 11:01.4.1 ta t*r 311J NnUiu
y pilt uf dic 1'1401wrly cuvcrrJ by tlir Srcutiiy Insirun►cnt. AU uf dte lutcguing tugtd►rr wiih iIle I'iuprlly dcactibrJ iii Uic 5ccutuy
1113,11umrm (tir chr IeasrholJ cilitc il ihc Scrtiiity lu.%truunenf isun a lraarh,oIJ) air rrlrrtrJ w iu Uiis I-J 1'vmily ltiJcr anJ thc Sr:urny
; lnauwiirnt as Ilie 'Ptulktly'.
U. U,E OF 1'1UO1'1:11"1'1'; [:t)1t1'1.lAlYC1:1\'ITIi I.111Y. liuciuwrr i!►all not aecl. abrre ito ur mil•r a rhatigc in ihc use
uf tlic Prul►crty ot its zuninb c1a»i1iialiun, uulcsi 1xnJct his abrcrd in writing to lhc rlianbt. Uurn►wrr AuU rutnply with :►II I1W5,
u(Jutancei. rrgulatiuns anJ rcyuiccmc►tits ul' in7 buvernnlenul lMKfr applkable w tlit Nrupeny.
C. SU1lOKI)INA"I'E l.lk:N5. Gxccpt as pennittcd by fcdcrtil 12w, tlurruwer siull tiut aIlow 2ny licn infcriur tt) ilir Srcurity
Inilrwmuut Iu bc pcrfccirJ 2gaiiui ihe Prulkrty witttuut t_cnJcr's pfiot wriltciti pctitiissiun.
U. l~l:Nl' t.OSJ 1NSUIZANC1:. Iturruwrr A»11 injiauin insunckc ag:sinit rrnt luis inadJitn,n tu dic uthcr b2zatJa fur wlii:h
iniurancc il, rcyuicrd by Unifurni Cuvrnant S.
1:. "lfUltHOWt:k'SK1GIi'I'7'n Itl:lh'til'A'I'h"UliL1:1E0. Unif4pntt Ctivrnant l8 isdcktcd. F. RUIt}t0WElt'SUC(:Ul'ANC'ti'. Unlcs% l.cnJer anJ tlurruwcr uthcrwisr adtre iu w•ritinb.dtc 11fi1 SC{1tG(ll'C iu Unifurm
Cuvcnanl 6 conwcrniiig liurruwcr's urrupanry uf thc Propcny ii dckteJ. All rcntaininl ruvrnims anJ agrcrmcuts ict tucUt iu Unitiinit
Cuvciuul 6 3l1211 rcnuin in cffcrt.
G. A1.tili:NMl:W OF I.1:A1E.1. llr„n l.citJcr'a te1111cm, Ituonswrr ihill j%aij:11 tu I.rnJrt :1II Iciscl ul' thr Piul►rrly and
all xruiity Jciw►a111 n►a& in cAiuorclui+l wuli tc;A1c1. ul Uir !'rulicily. t)1Nin I19c ~a~i~;nmr~►t, (.cn&t 111411 liavc die 1ichl 141 inoNlily, rxtrii.l
ur tcrruinatc die caiuing ka%u asul tu carcutr tlcw Icaui., in 1.cnJct's wtc Jixrctwm. As wrJ in Ukii. p2tagraph G, thc vrurJ 'Ir~x'~h~ll
lnrau 'subtrax" il thr SrrutiiY liuliunurilt 1% ui► a lc3sr!►oIJ.
IL A1.11(:NAi1-.Nl' Uh' Itl:f~''1:1; ,~l't'UI(~f17111?N"C OF ltt:(.'!?lYl:lt; {.r:NUI:K IN 1'UStii•:J1ION. l)urcuwcr abmulutrly
ouJ uikuuJitw►ually 2saibI1i21bJ Itanalcts tu I.cuJcr all thc rcnls aiW rerruuea ('itcnts') u{ dtc 1's.+pcrty, fCb2t1lICiS /)f (Q WIIUIII IIIC kCt1i5
uf die I'ru(xny ue payablr. 110ftuH•rt auIltuiitrs l_enJrr ur Lcinler'i 2dcnu wcuUcct (lir ltcnta, anJ agtecs tt►at eacb trl»iit ut du
I'ra(kny aliyll pay Ihc Itcula (i► I.endrt ur I.riulrt's igrntt. Iluwrvrr. Uuriuwrr sb•rll rrrrir•c ilic 1lrnis uatil (i) l.rn.ler his bivc+t
. Ilurcuwer n+uicr ui Jefiuh puriuant tu paragraph 21 uf tJie Srrurily Instrurncnt 2uJ (ii) l.enJcr lus bivrn untiee tu du ienam(a) that
tl►e Rrms are 10) t►c paiJ w LcnJcr ar l.cnJCr'a agent. a»ibnuftlu uf Ren1s euiutitulca an absulutr imNignnieui anJ nw •ro a»ignmenl
ttit aJJitiuiul srrwitr unlr.
!t l.cualrr YtYCl RlilKC Uf btCYI'II fU Itiorruwct: (i) all Hrnts fl'CCIYCiI lty 114IffQKtl lhiII I1t IICW (lY IlUffIIMCf 3S lfWll'C fi►t Utc
hcncfil u( I.cnJrr unlr. tt► l►c applad tu dtc %urm >ccuttd by 11►t Sctutity (iutrumcnt; (ii) Lcndcr iliall 1w rntiUcJ lu rullcct anJ rrcrivc
- aU uf iIic ltcntu uf thc Prulxriy: (iii) Uurruw-rr agrccs d4at caclt trnant uf Qtc Paipciiy altiill p:►y al{ {tcnu Jur aud uupaiJ iu l.cnier or
I.cuJct's ageuls upx►n 1xnJrr's wriurn JeurrnJ tu II►e lcnanl: (iv) unless oppliCahlc !aw SuuviJca 4iQsccwue. a11 {trms cultcrtrJ by.l.cnJcr
ur l.ci►Jcr's agrtiis shall t►e applicJ lirst w dic rusa uf ukiugeanuul ul' anJ nunagiii` ihr 1'rupuriy 31tJ cullccting Uic Kcnts. inr{uJinb.
but twl liuiiicd tu. atwrnry's fcci. rrrcivcr'stres. prcmiums ua rcrcivcr'sMnNJs. rcpw anJ nuintcnincc ruats. insuranrc prcutiunis. taara,
2sussmuuS afiJ uthcr charbcs un thc Ntapcriy, and dicn w chc wn►i ucutcJ hy dic Srcurity liutrurncnt; (v) I_cuJrr, lxuJcr's ubrnts
or any juJiciaHy 2pixiinteJ teteivrr ihall bc liahlr io aetuum fur only tbu>c Rents uIuylly receiveJ; anJ (v1) I.CIItICf Sh:III hC CIIUIICtJ tu
I13YC 3 fl'CCIYC[ 3(1(1151{1tCd ti+ ta►c pussrssiun uf and 1113112dc ihc 1'rt+pcriy anJ cuUcrt thc Itcuti anJ pmliis JcrivcJ 1'rum ct►c Prulicrry
wiiliout any tI►uwing is to dic iiuJcyuscy o{' tltic Ptupctty 31 ururity.
If ilic Kcnts uf dic Prupcny arc uul SulliCicnt w Cuvcr {1u cu-sis u( takiiig Cunuul u( 3nd nWIubin` U►r Ptnjnrty 21ld uf rullrctinb
the itcnts any 1'unJs c:rwu.lcJ by I.cnJrr lior iuch purpuus sfuU lxcenie indcbtcJncss uf Ifutruwrr w LrnJcr kcurrJ by dlr Sccuri(y
Insirument pursuant iu Unifiirui Cuvrnam 7.
4019751
Pnge: 9 ct 11
MuiaIs-rAW 1-4 I7nMU.Y kwi:x - I-NMA/!ti 0713011990 10:56t J 17u 9rxo
°r`°"" s"""•~ tm.• SPQIURE CQll81Y Ilitf 00 11 S18.N Spokeoe Co, 'hA
~
Y
4019751
Pigt: 11 of 11
0113011996 10:5EA
VM WAY 1 1lE CQ OT ,18.00 Spotane Go, Tl
Loact No.: PUfiVIS1090A Date: JULY 26, 1996
I'roperty AdJress: , .
10908 EAST 12'C1I nVGNUE
SPOKANC, W11SlIINCI'ON 99206
1'JCh1bIl */t*
Ix};at llcac:ril,lion
Part ol llie tlottfteast Ounrter of Uto Souliiwesl Ouolter of llie Soulhwesl auarter o( Secttull '
Towtis1jW15lloril~._(3~t!DSL.31.East of Ilto Yllitnriiolto Rlorictlc+ri, da9ctlbea aa (allows:
BEGIfit11iJG M a liolnl 20 (eet Soutli atict 502.1-1 (eet wesl of tlio floitliensl coriier of Itie siicl
Plorllieast Ouocler of llio Soulltwost Uuotler of Ilie Soulliwesl Ouorter of SecUon 21;
'71lQtice SouUi lo a polnl aii Uio Soullt Utio o( eolcl tlotllteesl Quniler of lho Soullirio9t (]umi1er
of Il1a Soulliwcsl atiarter of Seclloit 21, tG0.95 lecl Ea3l of tlio Soulliwost cotiter tllcrrol;
ThQncu West on anlcl Soullt Iliie to tlio Soulliwest corrier of sultl fiOtlhea3l (]ueiler ul tlte
Souttiwesl Quatlcr vt Itte Soulliwest Queticr •
71tQtice tloctti olociq 11io Y1est line lherQOl !o a rolnl 20 Ieet Soutli of tlie tloiltiwe3t coiiic•r o1
Itie sald tioilltienst Ouoiter of Ihe Soulhwest Ouacter of Ilio SoulRweat Cluecter ol Sectloet 21;
Tlsoitice East 10 11te S'ohtt of Deglnnlrig;
Siluale !t% UtQ Cousity o( Spokane, SlatO of Y/as1i1iicJtoti.
11 . P . N. It :4 5 13 .90 G4
L ~ ~ ' + ~ dryli~~.~l~S/iLt:~" • ~s ` aji-~:'i.l`i].'r't:ivlLi.:::i:.
4187434 +
• , ~ ' tiye: 1 9t t ~ .
. r ~~y3,~~~~'s~ s2r08tt99] t2:25P
R • ~~r ~ ';~'a~ IJQiEQ G0P013E1 • - aS9GA - - 1I.00 fpckant to, TA
~
t 1 ';~r~ ~ t~1•.;f ;T.~ • : . . , . . .
~ ~'l.s r ~ ~;1:~T., '.1;..~' ~ t•.
V1` ~ ~ `'fa~,t~4 e~r ~i yt4} ~ t~~~~~ ~ry~:.t~..t~' ~'rY1.'~`; ~ ~ ' •I 1. . . .
~.~1.~ ~•~.9~~.~3 T i~~~~~„~j~~tr~~~ti ~ir'~,~ }i. r . ' : ' ' ' .
,:~n 3 5v.~~~t;••,~~•~~.•'~C~,~.tt~~►,v1;`~;,+;~`,'~,'~'~~.~• . . .
• ~.;;:;•,-~:~r~ : ~.:;i~,, ~~K . , - .
~';.;Fi.:..~,~
~~~~~t`~l~k~•.'~C~~•~,~i~~`~~:~.•t'!'_S}::'~~'A'• ' ~
♦ ~ 'fs;~ ~ J'~:.~•. ~i.::~y , -
Ifi~ 'J .a~11,•t~~<<., \f(,~ .~.j• Lt'.~• '-t • . .I 1 %7, • , . '
r~+'~t:t: '•y.:l,:.•;~:.•~;: . . .
• ~i v ~1 • r r. .
y ~„~t'~.1 ~y ,~,I`,I aN V't?~ `''L~~.~~j ~ . ' . _ . , ~
~ •(^.L~ ~~v .li 4' •
. ~~..l~y%! ti,R~~:'~~~ • ~ 1; . .i , . • . . , .
t ~,Kl~..~ ~i~~~f ~ ' ~~.JI j~ • _ . ' • , : • . _
sT',! ' , ~ ; , ' . . • ' l
.:•M! ~
' ~ ~ , ' . .
J~ ~f;v~V~~..;,,:w:: . . • . .
~ . . .
v~4~I'iiThts hsstncnxnt v►as prqvtcti! by 3c rcrurn lo: .
/1PRIL MELL07T
Unlia! CanMnki Lttkiing Corporatlun • . .
i P.O. Bot 1341
' h~ non Raulte.lJ1 T0321
~ ~ . , • , • . '
wASittNGTON ~ ; ' ; , • ~ .
COUNTY OF SPOlUNE ' : - . .
~ri.~;~„r• 025609000749
~r,~~~ ~►'v %~i~~~~ ` ~ • .,r,.?~~ ~ i• ;r ~ : . : : AtctGrlAiCNT OF 1►iQKTCAGE ~ .
~C ~~~i• . •
. ~ ,
~~e~'v:.?~~l KNOW ALL biEN 8Y ?1{CSE PRESENT'S: That UNITLD CQI►iPANIC.S LGNDINO CORPORA7fQN ttocitrJ at 4W !(•SSI:N
LANB. BJITON ROUGE. 1J1 7080'4. tAt ownct uf a AtuttSisc (inJ of the (rxkMcJirca% -%ccurcJ tAcrcby) madc hy Wll.l.iA?►t
PURVIS AND DCDM A. PURVM to ClS btORTGA(3I: INC, Wt S 76730.00, an )U1.Y 26, 1996. •oK! rccur.lcd in
• y,'!;{ . .r, .
;;;',Yk Officlal Rao(d Owt , al pate 1-11. lnmrvrtxnt numbcr 1019131. of the Publk rc«KJsvf SPOKANE C4wnuy. 1` a0hiugiua, fnr
t,( ;-%.Tcn DcJlan (f10.00) •nd fut aAct gooJ arxd ralwbfc coniWct3doe ►cccivcJ from. QANKI:RS TRUST COh{PANY OF
'G1LlFORNU N.A., TIIR£E PARK PLAZJI, IRYINE, CALIFORNIA 42714. a► cwiJian or irusice unJcr ihc opplicaMc
. ~
cvsioJ1,1 a tru,t agrccmcru aa Dcfurc the enss,linj &nJ Jcllrcryot ihcse prcunus. (nc ra«pc »n«<uf itne«nr .~kfko»icJ,cj.
~':•'~i•.~i~.,. "i txrcby ass{gn ini trirufcr. wltlfcxrt fKUUtie, the umc ttw►rtgaic. IrKluJing sI1 writlcn rtKxlif~cilbins Ihctctu, If inr. nf cccors,
o note irxJ thc InJctxcdncst %ccurcJ thc►cbr. inJ the rsor►trs Juc inJ DcuxntJuc thcra,n, witA aI1 intcrest thcrain frum thc ef(rrti.•c
•~`t:'~:~
~ -n'- ~
~ t~~~~~~`•~~::~r d+ac hcroof is sct funh hclaw, to BANKEftS?RUST COt►1FANY OF C~1LlFORNIA N.A., i~►.! iis succawrtanJ issigni(urcvcr
~':t=t4~~V~on tbfi Ux 6td dar ot UC700ER Eu! c(iectirt ts of 1Ac 70th dar of SEP?UIl3L•FZ 1444. .
t~ : • ' , . . . . . . . , .~ti,~t~~,,•..,
r
~ - 7 ~f t::.; : , ~ ` ' ~ • N.
. . . . . . ~ . . . . .
_ot.~tAT/o~/ .
ej`. •
;!N WiTNESS WIIEREOR. UNRL•D tOMPANICS LCND1~16 CORi'ORATiON Tus cauxJ thcx prescnA ia'1cr~a~w~a+I
•~~~-i ~';~+x ame. inJ iu car+uaie scal to bc &fT1zeJ Acrrto. by lu prt"r uffircrs on the Jaie Kt lurth .twrc but tu bc ptist►ivc d~t~l+es~ic a~
fnN1ab0YS. • . . . , • } ~
:,~yk~~l`~,!~_+~` ' . . . ' ~ ~ ~ ~ r t
?;i~~r~..`'~ : ^ ' : r;' . : ' (t.'~ORi'~R1y~tj•S!}~l.):
,,~~r2Y~~?~~ r•r' Sltmd, ictlcdtnJ.i3cllrctc+lDy: UNI7EDCOAtPANIGS LENDIVG CORPOR11'j10,'Y 0J
•
'yj~r;,:~'-' • , ' , .
A
Q ) V] 1•(%
r
r
~'Y•~ r! Na 11ANTALE WAS OM) . Nrrtx: BL•L1NDA WYNN ~
lf~i(~~~~.~~~:~~:' . • ~ ~ Ti<<<:vkc•P«swcna ~
•ar, .
~v~i y~ w'•~i.'•~: " N~mc: M R,A HUR . . . ~ ' iC3~~~ v-- •
~1•Si::~'~~ ~~.'.t • • . ATTCST
~~~~rs~:~,;!t::'•►:;:ia;• .~t•~. • • . • Name:AY LMl:LLO
r(~,`w:• • , ' . • . • - .
~'•~itt`;~:x~; ~ . ' . , , • , 7itlc: ASSlf{aQI SKfctlfr
;'t'::1'~i _•1~:St~.•. ~ . .
STIITEOF LOUISIANA ~
PARlSII OF EAtT 9ATON ROtlGE ~ '
~ ~,*,L'~': ~ ~ ~3f • . . . • . '
~~'Z~....1• ; . ^
,~`~v;; .r~ •,r t l(EREBY CERrFY that on this ar. Dcfurc me. •e officct Julr sutM►tltcJ {n the State •nJ P+rish afuraafJ tu ake
ae}nowleJjcmcnts.ptisonallr aM+cttc-J BCLIltiDA WYNN anJ 11PR1L MGLI.OTT, wcll tnuwn lu nic to tx the Vkc•prc,iJctn
~lii~~zc~~:'~•;.::'~ tnJAulsurxSarttary tes{+ecyfvelrofUN17L'•DCOAtPANIfSLCNDINGCORPORATIONinihe(urcguing irt3trunbuu.anJt!►u
ttwy aevaallr ictrwwMljcJe;ecwinj the nme in Lhe presenee of Iro subscribing vriuKises anJ vuluntuitr unJcr wQliuitJr JuIY
• c a'~:~ •~;t vs%iW ln lhuq Or uiJ cotpotslim ind tful tt.c ticat &('(licJ lltictctu li the ln+c cutpuruc scal uf i+iJ corIxiratiom.
~ ~~►y(~~.~..)c.Ja:;lr=: • ; ~ •
WiTNET3 MY lund aeJ otTklsl scal in stx Pul►A arn! Sute 1iu ifuresald ihii 6411 d4y el OCTOBCR
~ ; •~;:~ti r -t~~• ; ~ . .
4 1s of ' ~ ' • ' ~ • .
tn.afY .11W b11 L. ~ . . •
COMMI SQgREQIMNSq fi PA'Si1S(tOF FJ1ST BATON ROUGE '
~ ' ~ 51'IITE g~ C) f • t . , , , . .
MY ~ ~la~ • - ; • ~ .
, ~
•v 'r.~;j_ ~ . . • . . ti - , . , . .
. •r'~ • Z . ~ - . ~ , •
i (Naaq ~ ~ t i . . ~ ; . , . • . : . . . -
= 1~•V,jfY~-:~~~:'!\ i ~ ~ ' •~j ~ . . • ' 1,• • .
1 ~+~•1~,•i.v~~..^~ ~.P N 1•40•• 45113.9064 1 ' tnAC[L ~ . t 9m .
'j r~ .1~ ~~}~t~ L~•V', '•~t. • , ' ' : ' • .
L-~• • ,'t y~ , ~ r • .1 . • i • ~ . • ,
t lM~.v~"•T~•' : •l` ~ I~•l~~ • !•I.t•'
~ l •R'~l 1 A • I4 ~ 1 ~I ~~1 1 •l.~ ~ ~ l.' • ' .
. ~ ~~~4,,.~~y~~.:-- , .1; . ; ; , • . _ . , , . , , .
~ ~ ~M!r ~ ~/~hJ~,;:aQ:~~~ C•~.~..` f•'~►~j .':.r~ . : . . .
~ ~l t~
~"1'!~fhll~t~~~~~~ '~~~f ~~~711~:''J~~~t~ r~.,!,~••', ,'j, , . . . .
•
•N ` "1 ; !~1'f • • • ~ ; • ~
4"~ttj~~ • ~{~jp~ ~y~,~~• ~`;~f`~~'~~~~i\I~•~' ~ . .
f ~i}.t~~iii~~L1 ~i~•i:::~ti_~: , •
6 '•!1:•, •~q'r'~►'~•:'.tir,~;%~ ,.r~~s+, , , . _ . . . . . .
..if~.
~
»r. ♦ J~ 1 , , . , v: . ~
9 • ~ ` '
Z ~ou
~ 211 ~ SHAYION TtiIE INSURAN~f
21 s : rwided, without charge, ior , v ~ 1 I MhAw
31 ~ _ • mati . o a m en
OD • re ted to the p ding, but rtot qm ad to, Z~
Ro sian ~ s, erc►oachmert►s, or
~ y
~ ~ cD I fn h jt► Ia 'e, s no part ol..VorA
~ I. ~ 7 ify, r mitment a t' o w is OA ~
pany as 11 Il tor
1 ihis sk rence sbou be ~ ~ y 7 Q N~
roto suner tor turtner tnta s5
?o' ~ e' s ~ • 2 • _
:__LZ t N ~ vE
/L 0.7! ~ , MSt; 1 K ,~J
K~ R ~ g ac
V PA TA
,
FRDD. o Q a
~ SB SA
Ci C;1 J 11a .
SE ~ q . 2 .
i
: S b
, ~1 M -88R ~ ~
J
I7 q
t N l
K ; 34r. 7o C.o rn ~
!o~• 3.oc ' _ o.8s - _ ~ ~ C f
Co H
fp C U
Cl~ll i~~ASITY I~~/GNTS ~ ~ . L L 2 . ADD
f"IA.Sr ~991». Lij t~o ~fz A t
-
M ~CX y ~ ~ Q~&AdO,(
~ • .
'rt° LA
~
I ~ EF
~ . .
z . . ~ V±-"M
7 8'
/sgg.9.019
. .
.
.
~
4403993
,
08~2Q{1999 o 112
:03A
CO ENGINEERS C4V $0.00 Spokane Co, WA
AFTER RECORDING RETURN TO:
Spokane County Public Works
Development Engineering Services, 2"d Floor
1026 W. Broadway Ave
Spokane, WA 99260-0170
Document Title: Drainage Declaration of Covenant
Grantor: William J. Purvis and Debra A. Pur-vis
Grantee: Spokane County and The Public
Abbreviated Legal Description: SW 3, S. 21, T.25 N., R44 E., W.M. Purvis Point
Addition
Assessor' s Tax Parcel Numbers: 45213.9063, 45213.9064
County Reference No. PE-1850-97 .
In consideration of the approval by Spokane County of Purvis Point Addition (hereinafter refened to as the
"plat"), undersigned covenants and agrees that:
Drainage easements, as platted and shown hereon, which are for the purpose of installing, operating, and
maintaining drainage swales and drainage facilities to dispose of runoff, are hereby granted to Spokane
County and the public.
Spokane County and its authorized agents are hereby granted the right to ingress and egress to, over and from
all public drainage easements for the purposes of inspection and emergency maintenance of drainage swales,
ponds, ditches, culverts and other drainage facilities, if not properly maintained by the property owner.
Spokane County does not accept the responsibility to inspect or maintain drainage facilities located outside _
of public rights-of-way, except in cases where Spokane County specifically assumes that responsibility in
writing. Neither does Spokane County accept any liability for any failure by the property owner(s) to
properly maintain such areas.
1'he property owners within this plat shall be held responsible for keeping open and maintaining the surface
path ofnatural or man-made drainage flow over and across their respective properties. If the property owners
fail to maintain the surface path of natural or man-made drainage flow, or drainage facilities on private
properties, a norice of such failure may be given to the property owner. If not corrected within the period
indicated on said notice, Spokane County has the right to correct the maintenance failure, or have it
corrected, at the expense of the property owner.
Spokane County does not accept the responsibility of maintaining the drainage course on private lots, nor
the responsibility for any damage whatsoever, including, but not limited to, inverse condemnation to any
properties due to deficient construction and/or maintenance of drainage courses in drainage easements on
private property.
Any building that is constructed on a lot in this plat shall be set at such an elevation so as to provide positive
drainage away from any drainage entry point to the building (including but not limited to a window well, a
window unprotected by a window well, or a doorway). Said positive drainage shall consist of a minimum
slope of 3% away from the building for a distance of at least 10 feet from the building. The lots shall be
graded so that either a) all runoff is routed away from the building, and conveyed over the lot to a natural
drainage swale or aporoved drainage facility, or b) drainaee intercepted on the lot is disnosed of on the lot
in an approved drainage facility. All drainage facilities for this plat, including any ' 208' swales, shall be
constructed in accordance with the approved plans on file at the Spokane County Engineer's Office. Any
proposed changes to the approved road and drainage plans must be approved by the Spokane County
Engineer's Office prior to construction of said changes.
There may exist properties located uphill and adjacent to this subdivision which periodically discharge
stormwater runoff onto individual lots within this plat. Stormwater runoff from nearby uphill properties
1
r- - - -
4403993
,
06~2011999 ~ 11? 03AA
C0 ENGINEERS COV $0,44 Sookane Co, YIA _
should be expected, and during snow melt periods or wet seasons the lots may be subjected to higher
amounts of stormwater runoff than what is normally observed or anticipated. Because stormwater runoff
from adjacent properties have discharged onto this plat prior to development, stormwater runoff will likely
continue to do so after development.
The property owners within this plat shall maintain all water quality swales 208' swales) and drainage
ditches situated on their respective properties, and any portion of a' 20$' swale situated in a public right-of-
way adjacent to their respective properties, with a permanent ground cover as specified in the currently
approved and accepted plans on file at Spokane County's Engineer's Office. No structures, including fences,
shall be constructed directly over or within a' 208 ' swale without the expressed written consent of the
Spokane County Engineer. Spokane County does not accept the responsibility to inspect and/or mainta.in
the drainage easements or drainage swales, nor does Spokane County accept any liability for any failure by
the lot owner(s) to properly maintain such areas.
This covenant and agreement shall run with the land in perpetuity, and shall be binding upon the owner, their
heirs, successors and assigns, including the obligation to participate in the maintenance of the drainage
facilities as provided herein.
IN WITNESS WHEREOF, the aforesaid owners have caused their corporate names to be hereunto
subscribed and affixed their corporate seals (if any) this Z1 day of V61&64:iZ' , 19
By: W. ~ By:
Wi iam J. urvis Debra A. Purvis
ACKNOWLEDGMENTS
STATE OF WASHINGTON )
COUNTY OF SPOKANE )ss
I certify that I know or that I have satisfactory evidence that William J. Purvis and Debra A. Purvis, are
the individuals who appeared before me, and said individuals acknowledged that they signed this
instrument, and acknowledged it as their &ee and voluntary act, for the uses and purposes stated in this
instrument.
DATED this day of 19 ``~~~I11R~~~ ✓ - -
~~~O~~~i
~sj~•.d`9~i
~
N0T AR I~TAR PUBLIC, in and for the State
of Washington residing at ~Q~
pU811►G : Z•
; ; ~O~ My Commission expires
i~~~►~ ,Q~j. :0
V,Z~ ~ lw
2
AF'TER RECORDING RETURN TO:
Spokane County Public Works '
Development Engineering Services,; 2"d Floor
1026 W. Broadway Ave Spokane, WA 99260-0170
Document Title: Drainage Declaration of Covenant
Grantor: William J. Pacrvis and DebYa A. Purvis
Grantee: Spokane County and The Public
Abbreviated Legal Description: SW 3, S. 21, T.25 N., R44 E., W.M. Purvis Point ,
Acldition
Assessor' s Tax Parcel Numbers: 45213.9063, 45213.9064
County Reference No. PE-1850-97 .
In consideration of the approval by Spokane County of Purvis Point Addition (hereinafter referred to as the
"plat"), undersigned covenants and agrees that:
Drainage easements, as platted and shown hereon, which are for the purpose of installing, operating, and
maintair.ing drainage swales and drainage facilities to dispose of runoff, are hereby granted to Spokane
County and the public. ,
Spokane Caunty and its authorized agents are hereby granted the right to ingress and egress to, over and from
all public drainage easements for the purposes of inspection and emergency maintenance of drainage swales,
ponds, ditches, culverts and other drainage facilities, if not properly maintained by the property owner.
Spokane Cuunty does not accept the responsibility to inspect or maintain drainage facilities located outside
of nublic rishts-of-way, except in cases where Spokane County specifically assumes that responsibilitiy in
writing. Neither does Spokane County accept any liability for any failure by the property owner(s) to
properly maintain such areas.
The property owners within this plat shall be held responsible for keeping open and maintaining the surface
path of natural or man-made drainage flow over and across their respective properties. If the property owners
fail to maintain the surface path of natural or man-made drainage flow, or drainage facilities on private
properties, a notice of such failure may be given to the properiy owner. If not corrected within the period
indicated on said notice, Spokane County has the right to correct the maintenance failure, or have it
corrected, at the expense of the property owner.
Snokane County does not accept the responsibility of maintaining the drainage course on private lots, nor
the responsibility for any damage whatsoever, including, but not limited to, inverse condemnation to any
properties due to deficient construction and/or maintenance of drainage courses in drainage easements on
private properly.
Any building that is constructed on a lot in this plat shall be set at such an elevation so as to provide positive
drainage away from any drainage entry point to the building (including but not limited to a window well, a
window unprotected by a window welI, or a doorway). Said positive drainage shall consist of a minimum
slope of 3% away from the building for a distance of at least 10 feet from the building. The lots shall be
graded so that either a) all runoff is routed away from the building, and conveyed over the lot to a natural
drainage swale or aporoved drainage facility, or b) drainage intercepted on the lot is disposed of on the lot
in an approved drainage facility. All drainage facilities for this plat, including any ' 208' swales, shall be
constructed in accordance with the approved plans on file at the Spokane County Engineer's Office. Any
proposed changes to the approved road and drainage plans must be approved by the Spokane County
Engineer's Office prior to canstruction af said changes.
There may exist properties located upllill and adjacent to this subdivision which periodically discharge
stormavater runoff onto. individual lots wit;hin this plat. Stormwater runoff from nearby uphill properties
1
♦ ~ • ~
should be expected, and during snow melt periods or wet seasons the lots may be subjected to higher
amounts of stormwater runoff than what is normally observed or anticipated. Because stormwater runoff
from adjacent properties have discharged onto this plat prior to development, stormwater runoff will likely
continue to do so after development.
The property owners within this plat shall maintain all water quality swales 208' swales) and drainage
ditches situated on their respective properties, and any portion of a' 208' swale situated in a public right-of-
way adjacent to their respective properties, with a permanent ground cover as specified in the currently
approved and accepted plans on file at Spokane County's Engineer's Office. No structures, including fences,
shall be constructed directly over or within a' 208' swale without the expressed written consent of the
Spokane County Engineer. Spokane County does not accept the responsibility to inspect and/or maintain
the drainage easements or drainage swales, nor does Spokane County accept any liability for any failure by
the lot owner(s) to properly maintain such areas.
This covenant and agreement shall run with the land in perpetuity, and shall be binding upon the owner, their
heirs, successors and assigns, including the obligation to participate in the maintenance of the drainage
facilities as provided herein.
IN WITNESS WHEREOr, the aforesaid owners have caused their corporate names to be hereunto
subscribed and affixed their corporate seals (if any) this day of 19 g~
. '
1 ~ ay: ay: c~c ) ~ ,~t,c1.~
-1W Purvis
.
Wi iamQ~Purvis Debra A.
ACICNOWLEDGMENTS
STATE OF WASHINGTON )
CQUNTY OF SP4K:ANE )ss
I certify that I know or that I have satisfactory evidence that William J. Purvis and Debra A. Purvis, are
the individuals who appeared before me, and said individuals acknowledged that they signed this
instrument, and acknowledged it as their free and voluntary act, for the uses and purposes stated in this
instrument.
DATED this day of 19
X``~~~I11~111//~~~ -
~N• • • • Wl
~slon'
_ ~
<XA07ARj,*
I~CSTAR PUBLIC, ~n and for the State
p~~ ; Z= o f Was hing ton resi di n g
9~.,~ My Commission expires
♦
~ ~►O~~
0~ wAS ;
/11f11
2
DRAINAGE LANGUAGE FOR
Purvis Point, P=1850
Reviewer: Doug Busko, P.E.
Date: Monday, April 19, 1999
Drainage casements, as platted and shown hereon, which are for the purpose of installing,
operating, and mainta.ining drainage swales and drainage facilities to dispose of runoff, are hereby
granted to Spokane County, the public, and the Homeowners Association or
successors in interest.
Spokane County and its authorized agents are hereby granted the right to ingress and egress to,
ovcr and from all public drainage easements for the purposes of inspection and emergency
maintEnance of drainage swales, ponds, ditches, culverts and other drainage facilities, if not
properly maintained by the property owner or the Homeowners Association.
Spokane County does not accept the responsibility to inspect or mainta.in drainage facilities located
outside of public rights-of-way, except in cases where Spokane County specifically assumes that
responsibility in W--iting. Neither does Spokanc County accept any liability for any failurc by thc
propcrty owner(s) to properly maintain such areas.
The property owners within this plat shall be held responsible for keeping open and mainta.ining the
surface path of natural or man-made drainage flow over and across their respective properties. If
the property o,,Amers fail to maintain the surface path of natural or man-made drainage flow, or
drainage facilities on private properties, a notice of such failure may be given to the property
owner. If not corrected within the pEriod indicated on said noticE, Spokane County has thc right to
corrcct the maintenance failure, or have it corrected, at the eYpense of the property owner.
Spokane County does not accept the responsibility of mainta.ining the drainage course on private
lots, nor the responsibility for any damage whatsoever; including, but not limited to, inverse
condemnation to any properties due to deficient construction and/or maintenance of drainage
courses in drainage easements on private property.
Any building that is constructed on a lot in this plat shall be set at such an elevation so as to
provide positive drainage away from any drainage entry point to the building (including but not
limited to a window well; a window unprotected by a windotiv well, or a doorway). Said positive
drainage shall consist of a minunum slope of 3% away from the building for a distance of at least
10 feet from the building. The lots shall be graded so that either a) all runoff is routed away from
the building, and conveyed over the lot to a natural drainage swale or approvcd drainage facility, or
b) drainage intercepted on the lot is disposed of on the lot in an approved drainage facility. All
drainage facilities for this plat, including any `208' swales, shall be constructed in accordance with
the approved plans on file at the Spokane County Engineer's Office. Any proposed changcs to the
approved road and drainage plans must be approved by the Spokane Couni}, Engineer's Office
prior to construction of said changes.
There may exist properties located uphill and adjacent to this subdivision which periodically
discharge stormwater runoff onto individual lots within this plat. Stormwater runoff from nearby
uphill properties should be expected; and during snow melt periods or wet seasons the lots may be
subjected to higher amounts of stormwater runoff that what is normally observed or anticipated.
Because stormwater runoff from adjacent properties have discharged onto this plat prior to
development, stormwater runoff will likely continue to do so after development.
The property owners within this plat shall maintain all water quality swales ("208" swales) and
drainage ditches situated on their respECtive properties, and any portion of a`208' swale situated in
a public right-of-way adjacent to their respective properties, with a permanent ground cover as
specified in tlie cunently approved and accepted plans on file at Spokane County's Engineer's
Office. No structures, including fences, shall be constructed directly over or within a`208'swale
without the expressed written consent of the Spokane County Engineer. Spokane County does not
accept the responsibility to inspect a.nd/or maintain the drainage easements or drainage swales, nor
does Spokane County accept a.ny liability for any failure by thc lot owner(s) to properly maintain
such areas.
' , (A ~ - . 'vQe
srnTtsTIcs »ATi;---~-.
['!ac Clicck Fcc
~ /-~2 7 ~ 1-7 /q
~
Nuuibcr of Lols ~
Road MiIcs (Ncw)
Tolal . . . , . . . , . . .
Arca,
. _ . _ . - ~ ~ - - - - - . . . - - - - - -
- , - - - - . _ _ _ . . - - - . - - - -
MA.I'
_ _ - - -
- _
Nortli Arro►v
$C1lC . •
( l
LC$C!1d
~
- Proccduccs & Equiptnent
Dasis.of 13c1rings • ~ r~.,~n r. f 4oZd ~
Plat Locacion IIy Title
O[Gcial Signaturc IIlocks
Surveyors Ccrtificatc
. 6<1
Itoacl Nanics
j
Road 1liclllis /
~
Acljaccnt Arca 62"CA
Lot Sc IIlock Nuutbcrs ~
_ It/W Dcclicacioti clcsigiiacccl
' 1 Fool Strips /
3 RPS on GLO Cornccs
'1'rnct X "
Lat Arcas
. l3cncli Mark
~ Closurc IArl~✓
. . - . - . ~ ~ -
' uEllICA'.I'ION
...Dcscription ('I'o M
ap)
Dcscriptio» (To Ccrt)
c ~ 60 _ ~ ~ -
,Gw
Owncrs
. - ~~d
Ccctificatc to Plac
1 Foot Scrips
t'
R1D - Ci'R Statenlcnt
Acccss Prollibitccl
It/1V Dcclication
~
Urainagc l..anguagc
Drainagc 'Covcnant • . . . ~ • `b~~2,~/~~ ~yC~~3
1 j I
j'lOOCI 1t1SUC111CC
208 13uiuls -$1,O00.00 ca 208 I'LANS APPItOVCU
' C'rivatc Road Doc. N's
('riv7lc ltaacl Warning
iZond Ptans ~ I h j /1J ~&QIII,,
IZO:1(J I)011(I IlllpfOVCI1lCIli ~Q , 6
ItonJ uniicl Irupcction ~ ~G b N~~
Sigiiccl Dy Cnginccr -TF L f ik-
FD _ C-04 G~
00
j
- - Ik
-r---
1\Ilplatlist.ck9/95
. ,
.
- - ~
FROM AM1IGLt:. DI aT NOR7I-• EAST TO
"
f8 ~JO PURV I S PO I NT ADD ~"YLAT HOUNqRY 1 1--20-98 D. BERTO ~
AUTO r N iJ E RSE I .
5`i"ART 10Q►0. 000O0 1000.00000 1
1 I iVV iV 0 2; 29.0 E 6;4. 7300 1634.71519 1~c~04. 3358::: 2
2 I NV Iti1 89 59 51.0 E 168.1000 1634. 72`53 1172.43582 3
3 I NV 5 0 24 08.0 W 86. 41 00 1548. 31465 1 171. 82922 4
RAD I AL S 69 35 52.0 E
DELTA 17 43 50.0 RT
RAD I U5 256. 0000
TAh! 39.9296
L--F1RC 79.2209
RAD I AL 5 71 5;2 02.0 E
RF' 1550.11179 915.83553 5
4 CHORD s 9 16 03.0 W 78.9052 1470. 4;943 1 159. 12202 E
TANCdPT S 18 07 58.0 W
RAD I AL tV 71 52 02.0 W DEi._TA 17 43 50.0 LT
RAD I US 294.0000
TAN 45.8567
L-ARC 90.9802
RHD I AL hl 89 35 52.0 W
RP 1 378. 94070 1438. 52134 7
6 CHORD S 916 03.0 W 90.6176 1381. 00460 1144.52859 a
TANCdPT S 0 24 08.0 W
8 I NV S 0 24 08.0 W 381.2100 999. 80;99 1141.85248 9
9 I NV N 89 55 12.0 W 141.8500 1000. 01Zi205 1000.00261 10
LAT R UEP --0. 0+Zi20S --+Zi. 00`h 1
10 HCLOSE S 51 53 -53. 9 W 0.0033 1 000. 00000 1000.00000 1
PREC = 1 TQ 476329 Ar,ea = 94480. 77 sq ft 2.16898 ac
FROM ANGLE llIST NORTH EAST "f0
BLOCK 1 S T DE.L I h1ES '
AUTCI INVERSE
S7ART i0Q+0. 00000 1000. 00000 1
1 S iVV h! 0 23 29.0 E 63v-.1. 7300 1630. 71 52f3 1004. 30850 11
11 I NV hl 89 59 51.0 E 147. 9500 1630.72174 1152.25850 12
RAD I AL. N 0 O1Zt 09.0 W
DELTA 90 24 17.0 RT
RAD I US 20.0000
TAIV 20.1418
L-AHC 31.5572
RAD I AL S 89 35 52.0 E
RF' 1610.72174 1152.25937 13
12 C:HCIRD S 44 48 00.5 E 28.3840 1610.58134 1 172. 25888 14
TAN[dF'T S 0 24 Q18. 0 W
14 I NV ~ 0 24 08.0 W 62.2700 1548.31287 1 171. 82174 15
RAD I AL S 89 v~ 52.0 E
DELTA 17 43 50.0 RT
f2AA I US 256. 0w")00 TAIV 39.9296
L.-ARL 79.2209
RAD I AL S 71 52 02.0 E
RF' 1550.11000 915. 82HQ►5 16
15 CHC]RD S 9 16 03.0 W 78.9052 147@. 43765 1159.11454 1'7
TANCdPT S 18 07 58.0 W ,
RAD IAL i4 71 52 02.0 W
DELTA 17 43 50.0 LT
RAD I US 29 4. 0000
TAIV 45.8567
I--fa R(`' 90.9802
RAD I AL N 89 35 52. Q► W
RF' 1378.93892 1438.51386 18
17 CHORD S 9 16 03.0 W 90.6176 1361, ~0282 1144.52111 19
TAN@PT S 0 24 08. 0 W 19 Z NV S 0 24 08.0 W 381.2100 999.80221 1 141. 84500 20
20 I iUV iV 89 55 12.0 W 141. 8500 1000.00027 999. 99513 21
LAT & DEFI -0. iZt00` I 0.00487
21 HCLCIaE S 86 50 31.1 E 0.0049 1000.00000 1 0O0. 00O0tZi 1
PREC = 1 TQ 321303 Area ~ 93716.72 sq ft 2.15144 ae
.
f
~
. ~ _