2015, 04-16 Permit: SW-15000333 Sewer SPOKANE COUNTY UTILITIES
PERMIT
Application Number: SW-15000333 Permit Issued Date: 04/16/2015
Expiration Date: 04/16/2016
Project Description: SEWER
Project Name: CORBIN
Primary Contact: NORM'S EXCAVATING INC Applicant: NORM'S EXCAVATING INC
Phone: 509-928-0580 Address: PO BOX 30873
SPOKANE,WA 99223
Phone: 509-928-0580
Email: tina@normsexcavating.com
SITE INFORMATION:
Site Address: 19204 E VALLEYWAY AVE Owner: JOHNSON, BURR F&DAWN
Parcel Number: 55173.1310 Address: 19204 E VALLEYWAY AVE
GREENACRES,WA 99016-9699
Phone:
Assessor's Description: GUTHRIES VLY VW 5TH L10 B3 Email:
Inspection Area: : (509)-477-3675
Water District: Consolidated Irrigation Fire District:Spokane Valley Fire
District#19
Zoning: Land Area: 11986.4 Square Feet
CONTRACTOR INFORMATION:
NORMSEI972BM, Exp.02/06/2017
NORM'S EXCAVATING INC
PO BOX 30873 SPOKANE,WA 99223
509-928-0580
tina@normsexcavating.com
DETAILS:
Class Type Quantity Unit Charge Value
SEWER SEWER CONNECTION 1 $125.00 $125.00
$125.00
FEE DETAIL:
Processing-Utilities $27.12
Utilities Permit $125.00
Total Fee: $152.12
CONDITIONS:
Public Transit Benefit Area
Inside Public Transit Benefit Area
Plan review fee is required for all site plan reviews conducted by Spokane Valley Fire.
Plan review fee is required for all site plan reviews conducted by Spokane Valley Fire
SVRP Aquifer Boundary:Water Purveyor ability to serve statement required. If unable to serve, ?mitigation certificate?(use of private well)
from DOE prior to permit issuance.
CALL 1-800-424-5555 BEFORE YOU DIG--AT LEAST 2 WORKING DAYS IN ADVANCE.SPOKANE COUNTY CODE REQUIRES THE
INSTALLER COMPLY WITH ALL REQUIREMENTS OF THE WA STATE DEPT OF LABOR&INDUSTRIES, INCLUDING THOSE
RELATED TO TRENCH SAFETY.
Date Printed:04/16/2015 07:54:42 Project Coordinator:Susan Clark
SPOKANE COUNTY UTILITIES
PERMIT
Application Number: SW-15000333 Permit Issued Date: 04/16/2015
Expiration Date: 04/16/2016
SEWER PERMITS ARE VALID FOR ONE(1)YEAR FROM THE DATE OF ISSUANCE. FOR SEWER INSPECTIONS CALL THE UTILITIES
DEPT AT(509)477-3604 FROM 8:30-5:00 MONDAY-FRIDAY PRIOR TO COVER. ONE WORKING DAY NOTICE REQUIRED. PERMIT
ALLOWS FOR A 30-MINUTE INSPECTION.ADDITIONAL INSPECTION FEES APPLY AFTER 30 MINUTES. _
INSTALLER IS RESPONSIBLE TO INSURE ALL WASTEWATER DRAINS ARE CONNECTED TO THE SEWER AND MAY BE REQUIRED
TO PERFORM TESTS FOR VERIFICATION. INSTALLER IS TO FIELD LOCATE AND CONFIRM THE ELEVATION AND POSITION OF
SEWER STUB PRIOR TO ANY OTHER EXCAVATION.
SEWER STUBS AND DRY SIDE SEWERS ARE TO BE CHECKED PRIOR TO CONNECTION TO ENSURE THAT THEY HAVE
ACCEPTABLE GRADE AND ARE CLEAR AND UNOBSTRUCTED.SEWER LINES SHOULD BE CONSTRUCTED TO ALLOW FOR
GRAVITY FLOW FROM THE LOWEST LEVEL OF THE STRUCTURE.
THE INSTALLER AND THIS PERMIT MUST BE PRESENT AT THE JOB SITE AT THE SCHEDULED INSPECTION TIME. BOTH STATE
LAW RCW 19.122 AND COUNTY CODE REQUIRES THE INSTALLER TO GIVE NOTICE OF EXCAVATION TO OWNERS OF
UNDERGROUND FACILITIES.
Date Printed:04/16/2015 07:54:42 Project Coordinator:Susan Clark