1978, 08-28 Permit App: N0306 ResidenceCounty of Spokane, Washington
BUILDING CODES DEPARTMENT, N. 811 JEFFERSON, SPOKANE, WASHINGTON 99201
APPLICATION FOR LAND USE OR STRUCTURE PERMIT /
GENERAL REQUIREMENTS PERMIT FEE./
PERMIT REQUIRED. A land use or structure permit is required by County Resolution to erect a building or structure of any
kind or alter any building or structure already erected, or to change a land use. Construction must conform with the
Spokane County Building Code and Zoning Ordinance. Construction is subject to inspection.
WATER. Water supply must be approved by the County and State Health Departments. Where work on water connections disturbs
the surface, shoulders or ditches of County Roads, permission must be obtained from the County Engineer's Office.
SEWAGE SYSTEM. Permits are required in all cases by County Resolutions Nos. 45-133 and 47235.
SET -BACK FROM PROPERTY LINES. In. most zones and under most circumstances, a set -back from the front property line, of at
least 25' is required, a 5' side yard, 15' side yard from a flanking street, and a 25' rear yard are required.
STATE HIGHWAYS. Where the structure abuts a State Highway, clearance must be obtained pertaining to set -back and ingress
and egress.
COUNTY ROADS. Work on street right-of-way may not be performed until staked by County Road Department and work must be
performed in accordance with stakes. Points of ingress and egress must be approved by the County Engineer..
MOVING OF BUILDINGS. A permit is required to move an existing building. When a building is moved on a County or State
Highway, clearance must be obtained from the County Engideer and/or State Highway Department.
ACCESSORY BUILDINGS. Accessory building& (garages, sheds, etc.) require a separate permit.
RESTRICTIVE COVENANTS. Builders should check provisions of covenants or dedications and easements running with the land
which are enforceable through civil action. County Officials can not bring action to enforce covenants or dedications.
APPLICANT FILL IN BELOW THIS LINE
Name of Owner .ii, /1t, 5 Pr -o -d -a Address E /+-i 7 / % entaPhone 926-8862)
Architect Address Phone
Engineer Address /�� Phone
Contractor 090/2/10 AJ rine h Address A/ 6/,3 /341047/:/-5Q -2/b Phone 928-7/5-2
Legal Description of Property (Give complete description from deed, tax receipt, etc.) Parcel Number2 5 ¢Z 9'02/
Tl,e itior•sh 11,14. A- c Y-Ae SF %¢ Or Tl.e NW /Ae., Sea' 27
Town sA i p i s, N , Rim/6:s O¢ E' / c.d./Y.7 - _tin 7`4 e cociaY � oz
SP°/C,ws, S1 -4.4e_ La2SA/i,�7con . J
DESCRIPTION OF WORK: New X Addition Remodel Moving Blddg...ZZone / Fire Zone
Size of Lot Z O P C RifS Sewage System Sleet/ C CConst. Fr/4mCc,
���/ (Fr., Conc., Br., etc.)
Stories / Dimensions Z$ X 6R 252-X Z. /D X 2 0 L Total Sq Ft 269! ValuatidFi ]S
Rooms 7 Baths 3 Basement Foundation Const. few cre +e' Chimney t9114s-4n Fireplace
(Full, part. none q (Kind) (Number
Heat. Systemk24:CT /C4 Type of Roofing %iA4Ut, Sr/int Ext Finish Ce1dgr- Int Wall Finish te/t ytrr<iLL-
d No of Units —Bedrooms -
Use of Bldg. IQ45i eMrQ ) 65AR AtGE
PLOT PLAN
Draw sketch with dimensions showing: (1) property lines; (2). street or road locations; (3) location of existing and
proposed buildings; (4) distance to property lines and streets; (5) dimensions of buildings; (6) location of sewage sys-
tem and water supply lines.
NORTH
as s
SOUTH
I he b' certify informs aubmitt:$ is correct and there are no other struc res located on this property except
°.
Oiner or Date
Stater a o.
Ind. Ins. Acct. No.
CESIDENTIA -COMMERCIAL
REQUIRED
Plumbing Permit
no Heating Permit
Sewage Permit
H
Plans Received
Plans Checked
Plans Returned
Plans Picked Up
Plans Mailed
78
A LAND USE OR STRUCTURE PERMIT MUST BE ON THE PREMISES BEFORE CONSTRUCTION COMMENCES.
THIS IS NOT A PERMIT.
DO NOT WRITE BEL•W THIS LINE
Tour street address will be 4P24✓ ��� / A
Sewage Perm1�,, Number Issued Building Perm
Remarks /r�C L2f�QB//?1fie%2%Q//g
U� - gA' 7s{ J -
d
Form 523 Bldg. Code
N
N�
•
At said time and place any interested person may appear for, or against, the granting of
',[his application.
SPOKANE COUNTY PLANNING DEPARTMENT
ZONING ADJUSTOR HEARING
TIME:
PLACE:
VARIANCE
7 VE -98-78, Frontage Requirement
a. Location:
TELEPHONE NO: 456-2274
Wednesday, August 23, 1978, 1:30 P.M.
N 721 Jefferson, Broadway Centre Building
Conference Room Second loor)
b. Applicant:
c. Site Size:
d. Existing Zoning:
e. Variance Requested:
Ordinance, 100 ft of frontage
f. Application of Provision:
Section 29, Township 25, Range 44 E.W.M.
N 1/2 of SE 1/4 of NW 1/4
--- Parcel- No. 2-9542-9021- -
Julius F. & Anne L. Presta
E 13217 8th
Spokane, WA 99216
Approximately 20 acres
Agricultural, established March 20, 1956
According to the Spokane County Zoning
is required on a county maintained and dedicated road
Chapter 4.04, Section 4.04.040
�� : 1000'
1
APPLICA`T'ION FOR CERTIFICATE OF EXEMPTION
PLEASE PRINT OR TYPE
, _
1. Applicant's Name: TO (AL) Lt5 r -
Phone: Res: TZ40,
u Bus: gA, 4474,0
Address: 1,32-r7 E , h city: `brT; State: L01 f. ZIP:
2. Legal Description f property for which this ''CFrtificate of Exemption" is being applied
Township S Range
for: Section
5F •
___X) 1,0 Xi J SC -X5 J * 1S tM-2s- AJ), e G & _
1-'10 i `!i % C'��t r _ � T ' (') F S � K _A -A r:
. Parcel Number (From Tax Statement or Assessor's Office): # 95 Z / 2-I
. Size of said property: Square Feet: Or Acres: C)
•
Intended use of said property: 61 f G (.. M L �, ,, )
6. For which of the following reason(s) do you believe you qualify for a "Certificate of
Exemption"?:
(For each box checked, please submit the listed documentation required to substantiate
your exemption. In addition, please submit an assessor's E.E.T. and an ownership micro /
run of your property, both obtainable from the Tax Assessor's Office, with your ap-
plication).
DA. Division of land ten (10) acres or larger
DOCUMENTS OF PROOF: 1) Assessor's rnap and ownership micro run as requested
�---�
above.
rR. M4nor ~amu nd any .,r I.,t iiuc adjusLntents
DOCUMENTS OF PROOF: 1) Adjusted legal description; 2) Copy of sales/contract
agreement.
ElC. The reconveyance of old lots, tracts, or parcels of land which were separate
and distinct when purchased, although the purchase thereof makes the divisions
contiguous.
DOCUMENTS OF PROOF: 1) Copy of tax statement; 2) Copy of
sales/contract agreement
deed or dated copy of
D. Division of land created prior to March 13, 1978, which is five (5) acres or
larger.
DOCUMENTS OF PROOF: 1) Copy of deed or dated copy of sales/contract agreement.
'Phe purchase of one separate and distinct parcel of land prior to March 13, 1978.
DO'UMENTS OF PROOF: 1) Copy of deed or dated copy of sales/contract agreement.
A division of land to a spouse, son or daughter
DOCUMENTS OF PROOF: 1) Copy of deed/Quit Claim Deed or dated copy of sales/con-
tract agreement. 2) Notarized affidavit attesting to said relationship.
7• Additional comments which may substantiate your qualification for an exemption:
E.
r
F.
1, the undersigned, swear under the penalty of perjury, that the above responses are made
truthfully and to the best of my knowledge. I also agree to furnish any further documen-
tation that may be required by the Short Plat Administrator and I hereby agree to waive
the five (5) day approval period as specified in the Short Plat Ordinance if further infor-
mation is required. I also understnad that, should there be any willful misrepresentation
or willful lack of full disclosure on m •art, Spokane County may withdraw any approval that
Lc might issue in reliance of this app, 'ion.
/ 1" • _'� i
4�u-,., ''...�-�.r:1-ti-i Date:
of/ Uig. _ ki_-
NOTARY SEAL
Signe
Not
Date:
7 /2'7-10
411 ) •
APPLICATION NO. CE. Q%v-ei'- .4
L ..-7` •
•
SPOKANE COUNTY SHORT PLAT SUBDIVISION ORDINANCE
NOTICE OF ACTION ON CERTIFICATE OF EXEMPTION APPLICATION
Whereas, the Board of County Commissioners did, after public hearing on March 9, 1978, adopt
the Spokane County Short Plat Subdivision Ordinance, and
Whereas, the Board of County Commissioners in adopting this Ordinance did provide for certain
activities to be exempt from short platting activities, and
Whereas, the Board of County Commissioners did further provide for these certain activities
to receive a "Certificate of Exemption" from the Short Plat Administrator prior to the re-
lease of a building peg grit, and
Whereas, the Short Plat Administrator has received a request for a "Certificate of Exemption"
for certain property located in the unincorporated territory of the County of Spokane, and
Whereas, the Short Plat Administrator has reviewed the evidence presented by the applicant
and all other information available, the Short Plat Administrator hereby takes the following
action on this "Certificate of Exemption" application, pursuant to the Spokane County Short
Plat Subdivision Ordinance.
- Certific- - • xemption -
The Short Plat Administrator finds that a
"Certificate of Exemption" should be and
hereby is issued for said property, as de-
scribed on the reverse side, pursuant to
Spokane County Short Plat Subdivision Or-
dinance Section2.2.5W/
Approval of said "Certificate ofExemption"
and is„u<..:_cc of bu41ding narmi_{;g shall he
subject to the following conditions:
The applicant shall comply with all re-
quirements and regulations of the Spokane
County Zoning Ordinance.
The applicant shall comply with all re-
quirements of the Spokane County Health
District regarding the placement of on-
site water and/or sewage systems.
si-roe...ru4.,
This "Certificate of Exemption" is and shall
run with the land and shall be applicable to
the applicant, owner, their heirs, succes-
sors or assigns.
APPROVED THIS'.;gr DAY OF , 1
SPOKANE COUNTY
PLANNING
MENT STAB
t Plat Administrator
COUNTY PLANNING DEPARTMENT
NORThi 811 JEFFERSON STREET
SPOKANE, WASHINGTON 99201
DENIAL
- Certificate of Exemption -
The Short Plat Administrator finds that a
"Certificate of Exemption" should not and
hereby is not issued for said property as
described ori the reverse side, pursuant to
Spokane County Short Plat Subdivision Or-
dinance Section , for the follow-
ing reasons:
2.
J•
According to the Spokane County Short Plat
Subdivision Ordinance, the division of
land that you propose to develop is defined
as a Shcrt Plat and you will be required to
comply with the requirements of said Ordin-
ance prior to issuance of building permits.
DENIED THIS DAY OF , 19
Short Plat Administrator
SPOKANE COUNTY
PLANNING DEPART-
MENT STAMP
1
IS CERTIFICATE MUST ACCOMPANY
YOUR BUILDING PERMIT APPLICATION