28099 ENGINEERS REVIEW .
Project Status A<<;ve Engineer's Review Sheet
As Built Plans Received Plats File PE-1 773 -95
Road Plans Approved 7,E-QOQ7-9~
Companion Filcs:
New Road Standards 5-15-95 Mylar
Related Files:
Iiearing: 11/04/1998 illiO t3uilding Dept:
Technical Review: 02/01/1995 TR DRPC-089-95 Largc Lot J Bldg. Square Feet
Preliminary Review: Type: No I_ots: 13 No. Acres; 15.7
Date Received. 01/19/1995 Range-Tuwnship-Section: 44 - 25 - 24
Project Name SHELLEY ACRES
Site Address N. 12TH, F. Sl-[AMROCK,
PARCEL(S): (tirst 18)
Applicant Conditions Mailed: 45244.91 19
Mark &Bcn Simpson Mciiianus Flood "Lone Yes
Vdater Source Public
921 S. Monroe Sewer Source Septic "Cank
Spokane, WA 99204 School Dist 356
Phone Fire Dist
(509) 455-5411 Phone Dist
Survcyor
Wtlliard D Boatwnght
LAND MARD SURVEYORS
13528 E. Broadway
Greenacres, VITA 99016
Phone
(509) 924-3905
. ~
Building Ph: 456-3675/Ylanning Ph: 456-2205 Contact: KEN KUl-IN
Date
Submitted Description Initials
Lng Need Drainage Plans Eng Need Elarvard Rd Nlitigation '
Eng Need Traffic Analysis Eng Necd Other
J Eng Pay Fces R<n /(p /QTJ Lng Final Plat Fees Carnpleted
Eng Priority Fees Received / Copy to Ac:,ounting
Notice to Public / Notice to Nublic # 1 3 4 6 Complcted - or Needs to be signed i
Design Ueviation Dates (Tn-Out)
/24 /4l - 911--5'l9'y
Bona quaniies ior
drainage item calculated
HcAring Date Dzcision Approved ^ App Den ~Cond Appld BCC
Appealed to I3CC Decision App Den Connd Appld Court ~
Appealed to Caurt Decision App Den Cond Appld
Stamped Mylars to Secretary (Sandy)
Stamped 208 Lot Plans to Secrctary (Sandy)
• Nt~ ~ ~ ~ .
To ~ ~i~~~ _ ~ o!~
,
_ _ ~~1 v~ 00 ~C-a~- - - - -
_ ~ ~ ( $ •9 °t ~ ~ ~ u~6r~,~.~s~rc.-~'~ ~r~ - - - - - - C~~1-~
~ ' `i. ct
z5 4t Z
rC5 czA
Z Kov q,~ Ao"
~ ~►~fi ~ - ~ ~ ~ ~ zt~,~~
~611-4) vv~
/~'~i ~,~j j~,/~~-~,1~ ~G~ J~~t, T ~`'`T ~ n
~ QNrr
~ e~--s ~
,
~ ~ . ~
- .
cv
~ ,
~I~~
. ~ ~
. - ~ . ~
,t .
. . . _
. .
, _
. } .r
- y
T_
. 5 '
AfT. , • , . ,
RY±,~ y •
♦i ~ .
. t
'~t~' - • t ~ • ~ ~ ~
tr ~
`
. . j'~
R~ r
t
. - - ~ p -
~
. RECEVED
.
DEC 07 1998
SPOKANE COUNTY H[EARING EXAlV1INER ~~~~UNTY ENGINEER
RE: Time Extension Application for the ) FINUINGS OF FACT,
Preliminary Plat of Shelley Acres; ) CONCLUSIONS,
Appellant: Mark McManus ) AND DECISION
Fi le No. PE-1773-95/ZE-7-95 )
1. SUMMARY OF PROPOSAL .4ND DECISION
Proposal: Appeal of an administrative determination by the LoLirity Division of Building
and Planning, finding that the preliminary plat of Shelley A.cres had expired and was not subject
to a time extension request.
Decision: Approval of the appeal, finding that the preliminary plat does not expire until
March 23, 2000.
II. FINDINGS OF FACT AND CONGI[.,USIONS
The Hearing Examiner has reviewed the appeal and the eviderace of record, and hereby
adopts the following findings of fact and conclusions:
A. GENERA.L INFORMATION:
Appellant/Applicant: Mark McManus, 14522 East Valleyway, Spokane, WA, 99216
Legal Otivner of Site: Mark McManus and Ben Simpson, 921 South Monroe, Spokane, WA
99204 .
Address: None assigned.
Location: Generally located east of the terminus of 12`h Avenue, approximately 350 feet east
of the intersection of 12'h Avenue and Shamrock Street, in the SE '/4 of Section 24, Township 25
North, Range 44 EWM, Spokane County, Washington. Zoning: Urban Residential-3.5 (UR-3.5) and Suburban-1 (SR-1). The site is located inside
the Aquifer Sensitive Area Overlay zone and the Public Transit Benefit Area designated by the
Spokane County Zoning Code.
Comprehensive Plan Category: The property is designated alrriost entirely within the
Suburban Plus cateaory of the Spokane County Generalized Comprehensive Plan, with
approximately 1.8 acres located within the Urban category. "The site is also within the Urban
Impact Area, Priority Sewer Service Area and Aquifer Sensitive Area designated in the Plan.
Environmental Review: A Determination of Nonsignificance was issued for the originai
preliminary plat by the Spokane County Planning Department on March 3, 1995.
HE Findings, Conclusions and Decision PE-1773-95/ZE-7-95 Page 1
,
Critical Areas: Spokane County Critical Areas maps do not show any geologically
hazardous areas, priority wildlife habitats or wetlands on the site.
Interim Urban Growth Area: The site is located inside the Interim Urban Growth Area
boundaries designated by Spokane County pursuanx to the State Growth Management Act.
Site Description: The site is approximately 15.7 acres in size, and is irregular in shape. The
property is mostly flat to gently sloping to the west, with a very steep hillside along the east and
southeast portions of the property. The sfieepest slope on the site is approximately 60 The
applicant indicates that water mains, fire hydrants, gas lines and electrical power lines have been
installed since the preliminary plat was approved in 1995.
Surrounding Conditions: Shamrock Street and 12" Avenue in proximity to the site are
designated as Local Access roads by the County Ai-terial Road Plan. The land southwest of the
site has been developed for single-family homes, with lot sizes similar to or less than the
proposed lots in the subject preliminary plat. The land lying west of the site has been given
preliminary plat approval for a large residential subdivision (File No. PE-1750-94, preliminary
plat of Shelley Lake), at a higher residential density than the cunent property. Central Valley
High School is located about.3 miles northwest of the site. Shelley Lake, a private lake, is
located a few hundred feet northwest of the subject property. The land lying north and west of
the site is undeveloped land. Directly east and south of the site can be found a rock outcropping,
steep and treed hillsides and basalt cliffs which adjoin the vacant land. The land lying south of
the site is zoned for mining.
Preliminary Plat History: On March 23, 1995, the Spokane County Hearing Examiner
Committee entered Findings of Fact, Conclusions and Order in File No. PE-1773-95/ZE-7-95,
approving the preliminary plat of Shelley Acres, to subdivide approximately 15.7 acres into 13
lots for single-family residential lots, at a net density of approximately one (1) unit per acre. The
decision also approved a rezone of a portion of 1.74 acres of the site from the SR-1 zone to the
UR-3.5 zone. Spokane County Planning Department Condition #8 of such approval gave
conditional approval of the preliminary plat for three years, until April 1, 1998, and advised the
applicant that a request for extension of time could be requested by submitting a written request
"approximately 45 days" prior to the April 1, 1998 expiration date.
Pursuant to a letter dated May 4, 1998, the County Division of Building and Planning advised the
applicant that the preliminary plat had expired on April l, 1998. On August 18, 1998, the
applicant's legal counsel submitted a letter to the Division requesting that the Division reconsider
its position and allow the applicant to request a time extension for the project. Pursuant to a
letter dated September l, 1998, the Division responded that the request for extension of time was
untimely, and that the Division's determination could be appealed to the Hearing Examiner
pursuant to Section 12.100.126 of the Spokane County Subdivision Ordinance. On September
14, 1998, the applicant appealed the Division's determination to the Hearing Examiner.
HE Findings, Conclusions and Decision PE-1773-95/ZE-7-95 Page 2
B. PROCEDURAL INFORMATI0N:
Applicable Zoning Regulations: Spokane County Zoning Code Chapter 14.612 and 14.616.
Hearing Date and Location: November 4, 1998, Spokane County Public Works Building,
Lower Level, Commissioners Assembly Room, 1026 West Broadway, Spokane, WA.
Notices: Mailed: October 19, 1998, by applicant.
Posted: October 20, 19981 by applicant
Published: October 16, 1998
The legal requirements for public hearing notice have been met.
Hearing Procedure: Pursuant to Resolution No. 96-0171 (Hearing Examiner Ordinance)
and Resolution No. 96-0294 (Hearing Examiner Rules of Procedure).
Testimony:
John Pederson John Bury
Division of Building and Planning 631 Lincoln Building
1026 West Broadway Spokane, WA 99201
Spokane, WA 99260-0240
Russ Grant Mark McManus
6023 North Atlantic #1 14522 East Valleyway
Spokane,'WA 99205 Spokane, WA 99216
Jim McConnachie Bill Main Jr.
14021 East Boone 12810 East Nora
Spokane, WA 99216 Spokane, WA 99216
Dick Wait Ron Hormarul
1418 South Shamrock 1319 South Shamrock
Veradale, WA 99037 Veradaie, WA 99037
Items Noticed: Spokane County Comprehensive Plan, Spokane County Zoning Code, and
Spokane County Code. County Resolution No. 97-0652 (amending Critical Areas Ordinance),
97-0321 (adopting interim development regulations regarding County ILJGAs), 97-0134
(establishing IUGA boundaries, including map of boundaries), 96-0302 (adopting Critical Areas
Ordinance), and 96-1224 (adopting Subdivision Ordinance). Also Spokane County Critical
Areas Maps.
C. EYTENSION OF TIME ANALYSIS:
1. Pertinent reizulations
When the preliminary plat of Shelley Acres was approved in March, 1995, former RCW
58.17.140 provided an initial three (3)-year period for finalizing a preliminary plat. Such statute
also autliorized a one (1)-year extension of time beyond such three (3)-year period, if a written
request for extension was made within 30 days of the expiration of the three (3)-year period and
HE Findings, Conclusions and Decision PE-1773-95/ZE-7-95 PagP 3
upon a showing that the applicant had attempted in good faith to submit the final plat within the
three (3)-year period. Additional extensions could be granted by counties under the statute,
based on criteria adopted by the individual county.
The th.ree (3)-year time period in former RCW 58.17.140 was based on amendments to
such statute adopted by the State Legislature in 1986, which increased the initial time period for
finalizing a preliminary plat from two (2) years to three (3) years. The 1986 amendments also
provided for retroactive application of the initial three (3)-year time period to any preliminary
plat pending before a...county as of July 24, 1993, where the authority to proceed with the
filing of a final plat has not lapsed under an applicable county ordinance containing a shorter
time period that was in effect when the preliminary plat was approved." See former RCW
58.17.140 (as amended by Chapter 233, Section 2, Laws of 1986 Regular Session).
At the time the preliminary plat was approved by the County in March, 1995, former title
13 of the Spokane County Code (SCC) provided, in pertinent part:
13.12.120
Approval of ct preliminury subclivision shall airtomatieally expire three (3)
years after preliminary anproval is granted unle.ss a time extension is
applied for. In any case that the subdivision does not apply for a time
extension when required under this title, the prelinzinary upprovul expires
and the subdivision zs null and void. Upon application for time extension,
the planning director or designee may administratively approve extetisions
for up to three yeur periods provided at least one of the following
circumstayices is found to apply...
The fee for such application shall be set by resolLCtion of the board of
coainty commissioners. Application forms ajicl sacpporting data
requiremenls for tiine extensions are required aj2d will be provitled upon
the szcbdivider's request, by the plarining director.
See former SCC 13.12.120, and County Resolution No. 86-246.
Former SCC 13.12.120 did not specify the time when a time extension request must be
applied for, other than by implication that it must be submitted before the preliminary plat
expired. Former Title 13 did indicate in places that subdivisions must comply with the state
subdivision law (chapter 58.17 RCW) as last amended in 1974, and with applicable rules and
regulations. See former SCC 13.04.020, 13.12.010 and 13.12.020. Former 13.12.010 provided
as follows:
All subdivisions shall conform to the Spokane Coicjity compreherisive platz,
all zotiing regzclations, and all other applicable local and state
reeulatioris in effect at the tirrie any preliminary subdivision is subrrcitted
for approval or at the time an e,Ctension of time is granted.
[Emphasis added, County Ordinance 80-424, #IV (B)(1)]. The application of the above-quoted
provision must be tempered against the application of former SCC 13.12.040, which defines
HE Findings, Conclusions and Decision PE-1773-95/ZE-7-95 Page 4
.
when a preliminary plat application is complete for the purposes of applying the vesting
requirements of RCW 58.17.033. Under RCW 58.17.033, a preliminary subdivision application
is to be considered under the laws in effect when a fully completed application for such
preliminary subdivision was submitted.
Effective July 23, 1995, RCW 58.17.140 was amended to increase the initial time period
for finalizing a preliminary plat from thxee (3) years to five (5) years, subject to such extensions
of time as counties might provide for by ordinance, which extensions "may or may not contain
additional or altered conditions of approval." (See Chapter 68, Section 1, Laws of 1995 Regular
Session). The amendments did not address any retroactive application of such five (5)-year
period to preliminary plats.
In 1995, former SCC 13.12.120 was amended to specify a five (5)-year initial time period
for finalizing a preliminary plat, as provided in RCW 58.17.140, but its provisions regarding
time extensions were not modified. Former SCC 13.12.120 otherwise remained unchanged
between 1993 and 1996. See County Resolution Nos. 95-1105, Attachment A; County
Resolution No. 86-246. RCW 58.17.140 currently authorizes counties to provide by ordinance
for extensions of time for the final platting of a preliminary plat, beyond the initial five (5)-year
time frame provided for final plat approval.
Effective January 1, 1997, the County adopted a new subdivision ordinance, which
repealed chapters 12 and 13 of the Spokane County Code. See County Resolution No. 96-1224.
Such ordinance has not yet been codified into the County Code, which omission does not affect
its enforceability. Former SCC 13.12.120, which addressed time extensions and preliminary plat
expiration, was replaced with sections 12.100.116, 12.100.118, 12.100.126 and 12.400.120 of the
new ordinance.
Section 12.100.118 of the Subdivision Ordinance somewhat modified the criteria for
granting time extensions, established a deadline for the submittal of time extension requests (i.e.
30 days before plat expiration) and revised the length of time for which time extensions could be
granted. This included an initial five (5)-year time period for finalizing a preliminary plat, which
could be extended for one three (3)-year time extension and successive one (l )-year extensions,
based on the satisfaction of certain criteria, and compliance with new or altered conditions
required by public agencies to protect the public health, safety and welfare. Sections 12.100.116
and 12.400.120 indicate that a preliminary plat will expire within five (S) years from its initial
approval, and be null and void, unless a time extension request is granted under the provisions of
chapter 12.100 of the ordinance.
2. Procedural status of anpeal
In December, 1996, Spokane County adopted a hearing examiner system, which authorized
the County Hearing Examiner to hear and decide appeals from administrative decisions rendered
by the County Division of Building and Planning. See County Resolution No. 96-0171,
Attachment A, Section 7. Spokane County Resolution No. 96-0293 ambiguously provided for
either a 10-day period or 14-day period for appealing County administrative decisions to the
Hearing Examiner. See County Resolution No. 96-0293, Section .070, paragraph (A)(2) and
Section .080 (B). However, effective July 23, 1995, state law required a 14-day appeal period for
administrative land use appeals. RCW 36.70B.110 (9)
HE Findings, Conclusions and Decision PE-1773-95/ZE-7-95 Page 5
~
Section 12.100.118 of the Subdivision Ordinance indicates that appeals of time extensions
shall be filed consistent with the provisions of section 12.100.126 of the Subdivision Ordinance.
Section 12.100.126 authorizes the appeal of administrative decisions or actions rendered by the
County Division of Building and Planning to the Spokane County Hearing Examiner, pursuant to
the provisions of the Hearing Examiner Ordinance. SCC 12.100.126 provides a 14-day appeal
period for appealing such determinations.
The Staff Report takes the position that the expiration of the preliminary plat on April 1,
1998, under the Hearing Examiner Committee's 1995 decision, without timely application for an
extension of time under section 12.100.116 of the Subdivision Ordinance, is not subject to appeal
to the Hearing Examiner under section 12.100.126 of the Subdivision Ordinance. This partly
reverses the position taken by the Division in its September 1, 1998 letter to the appellant's
attorney, John Bury. In such letter, the Division advised that its position on expiration of the
preliminary plat could be appealed to the Hearing Examiner, based on the Hearing Examiner's
1997 decision on the time extension application for the preliminary plat of Cambridge Knoll.
See Hearing Examiner Findings of Fact, Conclusions and Decision dated 11-18-97 in File No.
PN-1696-93 .
The Examiner agrees that the current appeal does not involve an administrative decision either
denying or approving a time extension application under Section 12.100.118 of the Subdivision
Ordinance, since the appellant to this day has not filed a time extension application. However, the
Division's May 4, 1998 and September 1, 1998 do represent an interpretation of the Subdivision
Ordinance. RCW 36.70B.030 (3) and RCW 36.70B.110 (9) require local government to provide
and adopt procedures for obtaining adlninistrative interpretations of its development regulations.
Paragraphs .0 1 0.B.3 and .080 of Couniy Resolution No. 96-0293, which resolution is intended to
implement chapter 36.70B RCW (ESHB 1724), specifically provide for appeal of administrative
interpretations of County development regulations to the Hcaring Examiner. The Hearing Examiner
Ordinance by its terms takes precedence over all conflicting County regulations. See County
Resolution No. 96-0171, Attachment "A", Section 16.
The above resolutions can be read together without conflict to indicate that administrative
interpretations issued by the Division of Building, and Planning are administrative decisions
subject to appeal to the Hearing Examiner, under the appeal provisions of the Hearing Examiner
Ordinance. This should particularly be the case with regard to administrative interpretations that
relate to the final disposal of a land use action, such as a determination that a preliminary plat has
expired and cannot be extended by the filing of a time extension application.
The Examiner could take the position that the appellant did not timely appeal the statement
by the Division of Building and Planning in its May 4, 1998 letter that the preliminary plat had
expired on April 1, 1998. However, as stated in the Division's September 1, 1998 letter, the
Division did not provide any indication that the April 1 letter represented a decision or official
interpretation that could be appealed to the Hearing Examiner within a designated period of time.
The Auaust 18 , 1998 letter from John Bury to the Division can be interpreted as a request for an
administrative interpretation on expiration of the preliminary plat, and the Division's September
l, 1995 response construed as an administrative interpretation subject to appeal to the Hearing
Examiner.
HE Findings, Conclusions and Decision PE-1773-95/ZE-7-95 Page 6
,•r.jr . v • , - • ,
. , • . ' •
:
Based on the above discussion, the Examiner finds that the current appeal is properly
before the Examiner.
3. Merits of anneal
The appellant, Mark McManus, as one grounds for appeal, contends that the appeal should
be granted because he was a party of record at the March 26, 1997 public hearing held on the
request for time extension regarding the Cambridge Knoll preliminary plat (PE-1696-93), and
allegedly left the hearing with the impression that a time extension could be applied for within 30
days after plat expiration. It is not apparent from the record what the appellant may have heard at
the Cambridge Knoll hearing to have formed this impression. Whatever he may have heard,
during such hearing would be superseded by the Hearing Examiner's written decision approving
a time extension in such matter. The Hearing Examiner Ordinance requires the Examiner to
enter a written decision with findings and conclusions for all land use actions coming before the
Examiner for hearing.
The Examiner's decision on the Cambridge Knoll time extension request involved unique
circumstances. This included an erroneous deadline for finalizing the preliminary plat stated in
the Board of County Commissioner's decision approving the preliminary plat of Cambridge
Knoll; the County's approval of a fnal plat for a portion of such preliminary plat beNveen such
erroneous deadline and the correct deadline for finalizing the preliminary plat, without the
County drawing attention to the erroneous time provided in the Board's decision for finalizing
the preliminary plat; evidence of a practice by the County of routinely advising applicants of the
time when their preliminary plat would expire, which practice had only recently been
discontinued by the County when the preliminary plat expired; use of the word "approximately"
in the Board's decision as to the time when a time extension would have to be applied for prior to
the expiration of the preliminary plat; and certain inconsistencies between state law and former
SCC 13.12.120 on when a time extension must be applied for. Under these facts, the Hearing
Examiner found there to be a constructive waiver of the time extension requirerrients applicable
to the preliminary plat. See Findings of Fact, Conclusions and Decision in File No. PN-1696-93.
The only facts which are similar in this case to those in Cambi-idge Knoll are the use of the
word "approximately 45 days" in the Hearing Examiner Committee's decision on the current
preliminary plat, in giving the time when a time extension had to be requested before preliminary
plat expiration to prevent the preliminary plat from expiring. At the time (and currently), state
law required that a time extension be filed at least 30 days prior to expiration of the preliminaxy
plat. See former RCW 58.17.140. In the current circumstances, Section 12.100.118 of the
Subdivision Ordinance was applicable to the extension of time, which is consistent with RCW
58.17.140 regarding when a time extension must be applied for. Further, by attending the public
hearing on the Cambridge Knoll time extension, the appellant would have kllown that the County
had long since discontinued the practice of notifying project sponsors when their preliminary plat
was due to expire.
Under the above analysis, it was unreasonable for the appellant to assume that he had until
30 days after the date of preliminary plat expiration stated in the Hearing Examiner Committee's
decision to apply for a time extension under Section 12.100.11 S of the Subdivision Ordinance.
The most the appellant could claim in terms of detrimental reliance is that he had until the date of
preliminary plat expiration to file a time extension request, on the basis that the Hearing
HE Findings, Conclusions and Decision PE-1773-95/ZE-7-95 Pace 7
Examiner Committee's preliminary plat decision stated that a time extension must be filed
"approximately 45 days" before the stated expiration date, and that the word "approximately" is
an uncertain term. Further, if the appellant understood that he had 30 days after preliminary plat
expiration to file for a time extension, it would have been prudent for him to have filed a time
extension request within such time period, even though he had been advised before the passage
of such time by the Division of Building and Planning that the preliminary plat had expired.
The other grotinds for appeal raised by the appellant is that expansion of the initial time
period for finalizing an approved preliminary plat to five (5) years under sections 12.100.118 and
12.400.120 of the Subdivision Ordinance, adopted by the County in 1997, applies to the current
preliminary plat. Since such sections of the Subdivision Ordinance are based on the current
version of RCW 58.17.140, the appellant's argument on this ground depends on whether the five
(5)-year time period for finalizing a preliminary plat in RCW 58.17.140 can be applied to the
preliminary plat of Shelley Acres approved by the County in March, 1995.
There are no Washinaton cases which interpret whether the initial five (5)-year period for
finalizing a preliminary plat can be applied to preliminary plats approved prior to the July, 1995
effective date of the 1995 amendments to RCW 58.17.140. The Examiner's review of the
legislative history of such amendments discloses no discussion of this issue by the State
Legislature.
It is true that the 1986 amendments to RCW 58.17.140, which expanded the time for
finalizing a preliminary plat from two (2) years to three (3) years, contained language appearing
to give retroactive effect to such 3-year period, while the 1995 amendments do not discuss
retroactive application of the new five (5)-year approval period. However, the retroactivity
language in the 1986 amendments appears to be flawed, in that there appear to be no examples of
preliminary plats that could have received the benefit of retroactive. application of the three (3)-
year period provided by the 1986 amendments, under the peculiar retroactivity language of such
amendments.
RCW 58.17.140 and sections 12.100.118 and 12.400.120 of the County Subdivision
Ordinance can be interpreted in a manner that allows the appellant a period of five (5) years to
obtain final approval of the preliminary plat of Shelley Acres, norivithstanding the conditioning
of the preliminary plat for a three (3)-year period for finalization under the Hearing Examiner
Committee's 1995 decision. Several Washington cases address the retroactive application of
statutory amendments. The following statement summarizes tiVashington case law on such issue:
A statute is prestcmed to apply prospectively unless it is renieclial in natacre
or tcnless the Legislature provitles for retroactive application. A remedial
statLtte is oite which relates to practice, procedicres and remedies and is
upplied retroactively when it does rtot affect a substantive or vested right.
State v. McClendon, 131 Wn.2d 853, 861 (1997). Also see State v. Bennett, Docket No. 41527-
1-I, Division I, Washington Court of Appeals, Slip Opinion dated September 14, 1998. A"right"
has been defined as "a legal consequence derived from certain facts", while a"remedy" is "a
procedure prescribed by law to enforce a right." This doctrine has been applied in the criminal
law area to allow fihe application of a longer statute of limitation to the prosecution of crimes
under amendatory legislation, so long as the crime was not already time barred under the
HE Findincys, Canclusions and Decision PE-1773-95/ZE-7-95 Pacre 8
~
previous statute of limitation at the time the amendatory legislation became effective. See State
v. Hodgson, 108 Wn.2d 662, 668 (1987). The doctrine has further been applied in the civil torts
area, with regard to the amendment of a statute of limitations to provide a longer time for
bringing the civil action. See O'Donoghue v. Stute of Washington, 66 Wn. 2d 787 (1965).
In the current circumstances, the substantive right involved is the appellant's right to
finalize the preliminary plat, while the time period for finalizing the preliminary plat relates to
the procedure used to enforce such right. The extension of the time period from three (3) years to
five (5) years has no negative impact on the appellant's right to finalize the preliminary plat or
any vested or substantive rights recognized under chapter 58.17 RCW. At the time the 1995
amendments to RCW 58.17.140 took effect in July, 1995, the current preliminary plat had not
lapsed under the three (3)-year time period for finalizing plat approval applicable at the time the
preliminary plat was approved in 1995. The Hearing Examiner can find no public policy reason
for not applying the five (5)-year time period to the subject preliminary plat, and such application
brings uniformity to preliminary plats approved by the County which have not been finalized by
project sponsors. Under the circumstances, the Examiner finds that the 1995 amendments to
RCW 58.17.140 are remedial in nature and can be applied retroactively to preliminary plats
which had not expired under a previously applicable period for finalizing a preliminary plat on
July 23, 1995.
This is a case of first impression, and the Division of Building and Planning caruiot be
faulted for its interpretation that the preliminary plat expired within three (3) years after the date
the preliminary plat was approved on March 23, 1995, or that such interpretation was not subject
to appeal to the Hearing Examiner.
III. DECISION .
Based on the above Findings of Fact and Conclusions, the Hearing Examiner hereby
approves the applicant's appeal, and hereby determines that the preliminary plat of Shelley Acres
will not expire until March 23, 2000, which is exactly five (5) years after the date the preliminary
plat was approved by the Spokane County Hearing Examiner Committee.
The time for finalizing the preliminary plat may only be extended by the filing of a time
extension request under section 12.100.118 of the County Subdivision Ordinance at least 30 days
prior to such expiration date, or no later than February 22, 2000 (tlzere is a leap year in the year
2000).
HE Findings, Conclusions and Decision PE-1773-95/ZE-7-95 Page 9
i
DATED this 7' day of December, 1998.
SPOKANE COUNTY HEARING EXAMINER
AZ O-z
Mich6el C. Dempsey, WSBA48:0
NOTICE OF FINAL DECISION AND NOTICE OF RIGHT TO APPEAL
Pursuant to Spokane County Resolution Nos. 96-0171 and Spokane County Code 12.100.126,
the decision of the Hearing Examiner on the appeal of a County administrative decision rendered on
an extension of time request for finalizing a preliminary plat is final and conclusive unless within
twenty-one (21) calendar days from the issuance of the Examiner's decision, a party with standing
files a land use petition in superior court and serves the petition pursuant to chapter 36.70C RCW.
Pursuant to chapter 36.70C RCW, the date of issuance of the Hearing Examiner's decision is three
(3) days after it is mailed.
This Decision was mailed by Certified Mail to the Applicant and by first class mail to other
parties of record on December 7, 1998. The date of issuance of the Hearing Examiner's written
decision is therefore December 10, 1998. THE LAST DAY FOR APPEAL OF THIS
DECISION TO SUPERiOR COURT BY LAND USE PETITION IS DECEMBER 31. 1998.
The complete record in this matter, including this decision, is on file during the appeal period
with the Office of the Hearing Examiner, Third Floor, Public Works Building, 1026 West
Broadway Avenue, Spokane, Washington, 99260-0245, (509) 324-3490. The file may be inspected
during normal working hours, listed as Monday - Friday of each week, except holidays, between the
hours of 5:00 a.m. and 4:30 p.m. Copies of the documents in the record will be made available at
the cost set by Spokane County.
HE Findings, Conclusions and Decision PN-1507-85/ZN-57-85 Page 10
• • • ounty Public Works,
. • • • • ' • Section,
D • • County • •
Memo
To: JOHN PEDERSON
From: Scott Enaelhard c,~
Applicant: MARK MCMANUS
Date: October 19, 1998
Project Name SHELLEY ACRES PE-1773-95 ZE-0007-95
S-T-RQ 24-25-44 .
RE: 11 /04/1998 04/10/1998 The Transportation Engineering Section has no comments to submit concerning the appeal. Should
the Hearing Examiner grant an extension to the plat all previous engineering conditions are still
applicable.
Kimball, Sandy-
From: Hemmings, Bill
Sent: Thursday, October 08, 1998 8:26 AM
To: Pederson, John
Cc: Engelhard, Scott; Harper, Pat; Kimball, Sandy; Busko, Doug; Miller, Katherine; Sims, Brenda
Subject: PE-1773-95/ZE-7-95 - Mark McManus - Appeal of Decision
10-8-98
I received the above referenced application on October 7, 1998.
I have reviewed the project file in detail and i find no evidence that there every has been any engineering
submittal made to Spokane County on this project. There is no evidence that a predesign meeting was
ever held on this project. There are no engineering plans or calculations for this project in the project file.
~G~ ~f' ►
Page 1
~~I ; ' • . .
. . . ~
REQ/1'~~~'j ~~y~/~~p~y~1~~!
~+~lu ~11~~1l~ ~~L ~~i'M~ il 1 • • ~ I - ' ~ .
, • • • - ~ $30m00, • i~ _ -I. . ' ~ • .
DATE- 10 ~14/99 ~ ~ ~ ' • - _
- - . .
~~~D NiE COtrRTN~~ LANE CRP/RID
N.AMEOF PLAT $H~~~~Y AGRES ~ . ~ . ~ . - P1at#'~~~1 7,73 .
ADDRESS O~F BGDG
NAME OF BLDG PROJECT ~ 4 ~r ~ • BLD+~~ B9 ~ ~ ~ V ~
~DERAL1SUM PROJECT # PRO)PC`t" LIIIVIITS.
EMSTING +~ONDiTIONS: ~~OP~SED r~~~~MIBNTS ,
RO.~ ~DTH 1.61 (Private Dr.ive)
ROAa SURFACE ~ _ . . . _ ~ ~phalt,_ .
AVG. DAILaY TkAMC 20~ _ 30 A DT
Catent Tr~'io Count Design Yew Tra~`'cc Cotmt : -
F~OJECT DESCR.tPTION Sh eZ lo;~ 'Ac res a. s a 13.1 6t' .`olatw 'G our~ tne y Lane i s an c'-c'e s s
l ar~ e to:f erve '4 of the l ots, A11 16ta ~rill hisue-f r onta~ e on Steen Cau"r t, .
but t~epe-,-4 homes will be s$rved by Zane*
~1~C~~~►~~ ~~~I~~' ~~~'~►T~~N u ae o a 241 wi c~-e c1i~. ~`e,~r~. dro p ~.n a°~ eac1 Of c~x r~i,' ' - .
. . retu.rns, (;Se~~ at°~~~-heA `ol'an.
♦ ' • ' _ ~ . ~ , ' • ~ • ~ ~ ~
i . ' _ ` . . . ft d
. . w. _ . ' 4 . ~ ~~~~~Y~ I~~~` . Y.• ~ .
. • , ' . J:
' ' . ~ " • VO~R~ Clir+U+~l,~ 4N1iJ'~t!f~l'i~l'M'
~"T ` ~ppy,~T a
J~4~!lS~►( ~~wAT1L!L'J f , ~ ' ~ ' . ..V: ~ • , ~ ~ t - .
. Ile- w~ro to1d at the beginning ` of the_ project 'Doug 13u~~~ ~ ~the:,Couht~~r~~
,
E~.;.n`eers) ~Lhat the en,t~.~~.nce to -~he pri~tatey ~~.~~:~~r`~ ~~~u~~l ~lc~~~ ~3,ik~~ ~
• ~
dri~~~~y an,d ~iicat ha~~ ~~rb rett,t~~~s.. lyi~~tial :1'Y"-we- weroM, told t o r~ot.,~041!0 ~ ~ ~ .
.a ~r i ~rew;s. drc?p~ _ . _ _ . . . , _
' _ ' ' ' ~ i • , . '
~ . - ~ _ . • ~ . . ^ .~~J , • , r • . .
The pr ~1vate drive ,wi11 have liiit~~.'~ t-4a2 f
. - . . . ,
res3.dential drivetTa+'
• , . * . ~ ' r, ` y, y'" - . - - - ~ _ - . . . : . ~
. ''1 _ s n ` ~T i. -I' _ •'Y •t`~~r.i.h~ ' '
' ~ ' . ' ,1. ~J' i ~ - ~ - . ' ^ - _ '
. ! , . . - ~ 1 'I ~r ~ I ~ ~i _ . ~
~~I~ L+,+1UNTY E1'lSAINt~~
~ ~ . , • - i . - :1~ ~~lP 3~~~
BY ~KETRO EI~`119EERING, 3NC " tiT o e ; ; . _ , , _ =t .
S~~4~"~ED y ~ . E.
- i~ .
` ' SS_ ' S,. S1~ertYlan, S~7c~,~1'6,
~C~ ' .
t~~ - ~5C~9) -624~-~'351 ,
'PHO
ADNBNtgZVATM 'VAItIAN+GE FEE OF .~3QJM, PAIQ TO SPOKA,1`+1~ ~OUN'I'Y
. 1026 W BROADWA"Yg SPOi~~E WA~99260170 PH+~~1E (5Q9)A~56•3~► F~ (509)324-347$
~ -~QU~'!`'1~T.:L ~Y(~'~" DfE 1~~V.M'WW WItHOr.f'lC FUM)S..
~ CAST3' H ~ ~4~ ~CME1~ BYff DA'TJ~
. . . . , . . . ,
' . - . , - . , . • , • . . - . . . . ~ - " " . .
. ~ ~
~
.
~~~~~N
ffAU
&4
Approved Approved w/oondicions Nat Approved .
P'raject Ma►nager Dat~
~094mc.- &e.-- ,~'...G ,
~ppra ~d Approved wlconditinns Not Approved
/
, . P'r0~ct MaaagernenC Engineer : Date
. ,f
,
Approved Ap'pcaved wlconditions Not Approved
.
. , , Operations Engineer Date
SFOKA1wf.~ COUNTY ENGI M`S
DET~UNATIONi
.ti ~w ` ~ ~ ~ •
4"~~ T
n . I
Approved wlno conditiom Approved as recommended abave Nat Approved
{ } a 4 ) , ' .
~Spakaz7~ Co Engineer . D►ate
~
ti
1-
o+oo 1+00 Z+oo ~ 3+00
8' ~
RIP-RAP AT PIPE OUTLETS WITH MINIMUM
DIMENSIONS AS SHOWN. 50% OF RIP-RAP _
TO 8E 3" OR LARGER (d50=3°). MIN. 6"
THICK. RIP-RAP SHALL BE IN ACCORDANCE
a oo WITH SECTION 9-13.1 OF THE WSDOT/APWA
~ o 0o Z
STANDARD SPECIFICATIONS.
0
~o
c°
DRAINAGE PIPE
o ~ . . . 3+00 .
o~ $ i~ . . ► , .
. ~ .
Lj.-1044613"~; • ' ~
4,P DETAIL 7
~
TO SCALE
^ N ~ , / ~ 30' PRIVATE
DRIVE EASEMENT
STA. 0+92.00 ~ ~,°j ~ `j~~
W.S.D.O.T. GRATE INLET TYPE 2
(t PIECE BASE) W/NPE "A" GRATE ~rv ~ 6 0 ~
;~kj'u~~~T.O.G. EL.=2045.28
~ I.E. = 2043.08
54 L.F. OF 8" CPEP, ADS N-12
CORRUGATED PIPE (INSTALL PER ~
~ 50' PAVEMENT TAPER TO MANUFACTURER'S RECOMMENDATION)
TYPICAL ROAD SECTION ~ . ~ SLOPE = 0.70%
03A, -3038
STA. 0+39.89, 18' RT. ~ P - 0+'69.63
RIP-RAP OUTLET PER DETAI
.
I.E. = 2042.70 I , • - - . _ ~ .
~ 2046
STREET NAME SIGN, PER M.U.T.C.D. 204~15
, y f _ - .s~oca
24' DRIVEWAY APPROACH PER , ' ~ ~ ' . • • . . ,
1 ~
SPOKANE C0. DETAIL A-7 ' _ ' . j -F • : r' • !~,~`r~' ;w• , o
. • • . • • . ~"Q
. oOT , . ~ , , r• , ~ `S
• . ' • ~ i 7 • .
•v••• • ~ . • ~ M oO+O1.. ~ . •~~Oj S I ~
r._ . v `I. • ' ' ' ' ~ ~
~88'£6= - . .l < . ~ .
' r
LINE TABLE , . ~ . ~
S.~.. ' • ,
BEARING ~ LENGTH 0+00 COURTNEY LANE _ xs ;
~ 10+79.48 STEEN COURT ~
~ 2. ~sZ•
N 75'43'46" E~ 59.63'
l 9Z, ~
4 3
CONSTRUCTION NOTES:
ALL ITEMS OF CONSTRUCTION SHALL 6E COMPLETED IN ACCORDaNCE bVITH THE 5) IF THE COr1TRACTOR DISCOVE►":--
•nn~ rnrnorin~, rin.ic^ Cno D/\ Af1 001(l!'`C Ar.lf1 1 IIIAII!`10 NI I"l1hICTG'1/`TIf'lAI r!'eof11Tl/Zt,I0, rp.irri11N1TC(7r(1 Tt-!:
.r .
• ,
. .
• , . . - -
- - - ,
METRO ENGINEERING INC. ~ 2 2 9 3
3245 SH RMAN 28-8270/3251
SPOKANE, WA 99202 DATE ~
~l•
7
ORDE~R OF t~C~
~ K
e~` 9sturity leetures
~nUua~C. r .
' ~ 1✓ T f~ V ~~.~..A~ e
~ . Dstalq on Osel, ;L
r
Spotaae Tearbeis Gedlt Ualoa
• . ~ ' ~ - . - ' - r . • , Pou Omoe Buz 5261
Si7ffu R - .
. _ - _ _ • _ _ , Spo]me, WA 9=5-0284 ~
- . • • • ),_p~ ~J/' b'L I-/C/V - ~ 11P o
-
FOR Y
~
. i: 3 2 5 L8 2 7001: L00 500 ? L L84911' 2 3 ;
O WWLAND
~ _ , . . ' - - " • . . • a. ~ . . _ + . . . : - .
Received From: a<00wr44 ReceiPt No. 10 7 4 9 5
~
Address: , Date: 4&i*r -24 Cerff
~
~ Acct. No.: P1~113 Amount Paid:
~ JCash: 0. . 4^
0 Sales Tax:
V Amt. of Acct: _ Mone Order:
W ~ Y , Total Paid
Z Amt. Paid
Check: --Check# ~q3
_ 0 Balance Due:
_ -Credit' Gard: ,~Exp. Date:-~
a -
Purpose: ~ 4ri ~If1~h~J" Qj~•(Vfh~.
L
_tj u r,. ~4 m i .5..+, u , •
Received by:
NJ
' • .
Kimbali, Sandy
From: Hemmings, Bill
Sent: Thursday, March 02, 2000 1:06 PM
To: Richardson, James
Cc: Engelhard, Scott; Kimball, Sandy; Sims, Brenda; Miller, Katherine; Darrell, Virginia; Parry, Ed
Subject: P-1773-95 - Marck McManus
3-2-00
I do think that drainage language has been issued for this plat.
ew qeHrm4r.94. ps
Page 1
~
Received From: Rer,eipt No. 122308 Address: Date: Arnount Paid:
z Acct. No.: lCash: ❑
, .
M Sales Tax:
V Amt. of Acct: ~ Q Money Order. ❑ ; Total Paid W
Z Amt. Paid ~ ~ n .4 ' Check: Check #
Y _
0 ance Due: ~Credit Card
Bal : :L-J Exp.,Daie:
c~n Purpose: ~~ti/f~l~ ~~!'JT r~i~~~`~Y~' L{~/ 'r•.~•4/~./"°t~,-~~`. l773
~ ~ r~lt.,y _ f.~~~ _ ~ ,~,.r , _ " Cy JY ~ /
Received by:
,
'
MARK McMANUS 19-7076/3250 2854
OR ZOE McMANUS 5063024899
E. 14522 VALLE`(WAY 924-0968 DATE v;? '~P
SPOKANE, WA 39216
PAY TO TH: $
OROF.R OF e
~OO ir OOLLAR$
_ ` .
Washington Mutuai
WasRington P.6utval 8ank
SoOFane Vattey r~nartciai Center
P.Q. 8ox 16587^ 1•a0a736-8000
syakaae. wA 99214 24 na,. cusumef sav,ce i00!~~~~~~
NOTES • - ~
1: 3 2 50 70 ?601: 506oll 30 2L+89oll 911' 213 5It
. , .f.` • -
1 O 8:~0-'S?01-0
,
• 1399 1 i ~ CnTY gl,DGB„ptpr. , r0. 884
~iZ . .
- I
r
~ ' . - ~
. ,
~ p C` O Lt 14 'r Y ~
orveam Ma in.ns • A Dtrmu Cf 7fR PtJ= Wr,= DQwlTbawr '
4 D.rilJ,%t ioeA, T Dimbw
Wmtiee+ A ~oi~~, ~~.S.,~li~t1►7 f~~ ~
~ M
PRIaPi'TY FEE,AGRFYIWENT
~
AGREDAM . PI- `7
- . ~
mm bomeft ~~~y~ WILLIAM W. MAINi JR. .
ta che pwf oct 3s E R
►
2 3 r d~ d,~, ~ '~l lJ N E , 19 5 9-.~a ~~~~c ,
t . ,
►NEL~Y ACRFS ADDI.TION - ~ . ~ ~ •
- - , - -
. ~
livWuala uW _paitlw Wmed besem as 6iviag n'~oer~e~a~ia tba abo~Ye-desCii'bed pcvpettY or, Pq*t &am ,
Y requcsC tbm-pr&fc~► t~+P 0e Sfvmi~to Wr Qorjsct ~ . .
~D~t~e ~polc4t~e~C' -out~► ~t'pt.:pr~ec,t ~r"tlookfieea, ia ~.-speoi6edF3ta ; ~.a9,: 14 0f me
~~',an,
Y.~C1_ode~~'~c~:fcia '
11 Y
y r ~ j_ _ 1~ti• '~t' 4..F. Ll l ~
li r~ L~ ~ t -`~!'~~1 ~~V~ u~•
t~.,,L..'_'~c
It' due~~ "mc ~~d ;.a~: ~►"o~e:' .~~les ~e±d Ql 'tbe Oo11ecQ4Q O~! "!s w'e~r~C' ~eco~mt, .
r - ot
111. ~ r~~. . ~ ¢ _ , . ,.,j.~1i _ - ~
bc,- 'paid p~c~r~,:~:~;,~_` sc~o~e,~pRa~ce cf tbe pi~ec;t. 'fa T.~: .o a~~o~wd . . . ,
loc~'f11ed eoir*; ftilavaid balme~ &sl1 ba pW".withio'~30 ds" a! 9se iavoice . ~ . ~ =
• ~ '
ft Md pM*IC 1"0 MtO Ot ft bWft is V=ifW •
• fi~ AI f
1~. • • - • ♦ •
OOt~~~F~- ~30~" ,41ql~~~vf ~D d.
'f IQ1!o~00 ~ - - ' -
Y
i~►
y r ~r-s i .•---~e~ i-_ y Y`QF ~ f~~
d
R~Q~.p~Q~t l~.npR pi~d~~•~30~
r ~ yL- ` y(+~3~~s. ~ 4_ ~ ~ t ~ / r~t _ ~i ;g : ;G'~L. 1 y~a ,-'r' ~ ~ - -
bes;rev,s.C>m. p~v~ec~t~lao~ap~=ri~R~*be ooo~~oa~.~~~~s~ia~e,~incot~t~o_~Isace~'i~ patid,
pid ~ii@i6~~6S
tl ta~io~D ~oitz'tb~~i~ioa~af~;vt~ayyt- oo~6ec~loa Ro~ol~t+er~ ~c~iaiQm~~~tefn~alwm~t~ ` ~`~oo~t~l~~~ecboa~ ~y,
ry~i,~'~~ ~ ~r2~4SI ~ ,~si _ ' 7 r.~, , r _ ~-rv~ ~ s-=rtit--: o z.. ~
eocpeata ioa~'ed~ by ~d~e•: Cotimt~l tbi~ 1ba,'COOocti~c+a ai : j.
raue a~o~a.~ . .
,dwft~Y _bilIDg~*WLd be's+wi° m ft amatkm 01►
'
. . .
.
~NAM.: °~iW;'1 L~L.~I A~M W`~-. MA 1 N, JR -
.
, ' • _ _ _ . • . - . ~ T , _
~
AD~R~9s~ 'N 0 R A- , S U I T E"E"
"Y, si'A,~,. S'P~U`.KA N E~- W_A 99216
C~ .
y. -
s,- • ; : -
. 1~09 ) 9~221- 3000 ~
~ - f ~ r.- . . . .
PmY~p:~t~iese _,.i ~tosy cesult ie dd~7 ~ IBUM ~ a F~'olsct or ~et , .
. - , .
kedl ib9 -othe~ - w~' " ,Spop~ot~;(i-~-• .~°.Pro}~t o'+~t a ~
~ , = ~ ~
~pal I~t dfe` xaim~I~ . ~pi;.•~i~~~ ~
~ ` =,~~`'~4~~~ ~ ~ - •~ESa ~1~'~^ ~
A F"
,
• . 1~..~+ ~ / ~ ' , a . ,
~~~~3~~~Tr• - ' , _ _ . ' _ . . ~ ,
L L_I_AM. W, :._:,,M~A~I3~N , J R.
• {t ~ ~E 9 ~ ~ 9 - - -
~"•-s±~T y er'7-'T~Y~n ~ ; Y "t : _ . _ _
ari•q 0►w 81~, ~WA ~Aiaa'1?~ OW 4963M FAX: (M 324%V1f 'DW. OM 324-31ii
. ~ • . • - . - ~ , . ~ •
'.i~ ~~."iS~'k~.~R.~. ..L~`f..tl .~/~:.~A~'•a.•,. a . _ ~ ~ , u _ ' .:r" , . i - 3. . , ~ '<v ~ .,.n. ~ _ . ~ r: ~'i'~3i+t~ei{ x~ ~ Y+~v«. '1y.
! « ~ •
Apr-16-01 08-05P P_02
,IUr. 2a. t999 il :0i0Arf SP+C cnTti ~PIAr~ING
~ . ~ w0. 080 :/Z . .
. r • I
1
(
p O 1G A N~. C O T.T N T Y (
~ ~
D~v~ oi acaAt~c ~ tn.c~ ~ A Dlwmw 0 "a pvrx ~D ~.w~*
wm~. Jo~ ~.i. cea~► i~n. MOSiTY I+'E8 AGREEbIENT
ZNGV~'eAZZEDMT NUMMM ~ I `7
This betwm Quoty and WILLIAM W. MATN, JR. ,
whm wwatInOWNER
23rd &yof JIJNE ,1999 .~1 19 ,PPqC" t,dw proiecc ,
km,nu; SHELLY ACRES AODITION . nOt de bdlAdnals and p4to aMed bess hivin ea ~a ia tba am dde~ OMPM Of PwJ9a &R=
Ao the EouowCtg:
1. luy requcs+t dw prlor* tsvbw Oo g!v'm oo Q& pwh=L
a. Rebmbwee Spohte C=ny for pnppet ar+ie- ud ftometlm feea aa weai6eQ In Cbqm 9.14 of ine
9po~aae Cb'mcep Oade. Ue fm 90 ee boed ad dadA"M oon bkc 1+e4 byY 9po1ne CMA kt
psoJeac revim plm cen pacew clsarp, aad •~iII De billed mondty u &aensed. wzW
6On ammob de, inc aey adet e~cme: }amTed m dm odl4cdoo of m weJdw woa-c~
=at bc paid pdw mds Cwoty's sscaQtreae of tbe pcojat toor H%%g. If s prvject b a*uowd
aad/ar fllcd wifb s balmact sa'31 vwt*, fte ucQairl belt~ce ~hsD ba paid wdo 30 dsys ad oe tavaim
dae.
3. The mm&rspod apma mw toe ieo at ft ma p.yabk upoo raa* a ft bfift aa opedfied
ibave.
t. AN tn~o~oa m paid 30 OM of 6e ievoice dw wffl be om.Auee~d delt+oquea. If mw
ouaamdiaj balmce an tbs amo= fot dds po}ea 4me paid w*lw 30 drys of de ~aloe dsm, eo
ssme= ie+rieos o[ ft pmJect doot=M wM be eoodtlCOed unell !bt aelite Moaa bdme it Pid.
Aey bdmea en ft sacomR 6oc tb pCVjeot aoR paid .ia& 65 4qs of & Wvaks dw may rmA m
lwal acsion dc ar kmoda of adw ooiftfon peooedtQa, hcloft "haal w a oollatim yeocy.
'Ibe Spo~nt vMbe 1Mte !knaWad all ~cpeata fnamed byt5e daaRy fbe dr oo0ocdm o[ ,
aver0ue saooum.
s. TU moomly barmg dade be sm oc mw acomtiaa ai:
. NAMR: WiLLIAM W. MAIN, JR.
. ADDRM: 12810 E. NORA, SUITE "E"
C27Y. SrATE: SPUKANE, WA 99216
ZIP CODE:
~ •
(509) 9 2 2- 3000
iund=mld &at W1om to psy &eae bra mry resuk in deYy ia eooroa at apptvvsl d tbe pe+oject or omw
pelme svcdoar.
O Il d& Eee sp+ameat im camteoW bp raitocoa oier ffiauo *s Spoa~ac (i-s-, te Pwj8Ct o+rnes ot a
pffoc,vl la Q1e am q aiis bc p~vje~Q. mb ss tbe Ba~ Oaipft fbe pwJea, 6ea
avrskGhoelneioo ftom de 9poot4 ~r spdAeaW I lo' tbe Apd to aooa mY Ftie
ApseMW is ~od m dw Fis A~o~ ~
SHWATVRF Dy:.
WTLLIAM W. MAIN, JR. ~ (PM?T NAW
~
~ ~imiwq Aw 9poir WA 9Md'170 O!! 40"M 'AX OW U"M =0 OM XW31ii
, a
, , ~
4b
y • ~ ~ ~ •11 1 • 7 ~ • .
f ~ f,~ • " • ( ~ ~L . ~ ~T 'ki.h 1~~. , -
~
S p O K A N~ ~ ~ ; _.~kr -
~ I
- ~ _ - - . ~
OFFICE,OF TYlE COUNTY ENGINEER • A DIVISIQN, OF 7'4C ~PUI3LIC WORKS DEPARIMENT -
Ronald C. I-formann, P.E., County Engineer Deniiis M. Scott, P.E., Director ~
AGRE~M,ENT ''O ~PAY FEES
ENGINEER'S AGREEMEN'T NUMBER
I'Ilis agreement between Spokane C'otinty ancl A) ~ _ - , -
, . ~ - n 1 _ . rsori), . ,
WlICISC Int,el'eSt 111 tile pCojeCt IS ~~;~p+~ -oA'~'-
(i.a ownCr, ageiir, ctc.) . . . ~ , ~ ,
is enlereil; into tlvis clay Qf `rkq ,.1'~ 9 2 . iis ag . reement is, a.rr'licatil'e ~_r~oJ;ect
. Tl . ~
known as:
l; ~ l ~ ~ •
~ - ` ~ ~ i~.i~ A
_ -WrnjZ_ _ c r-_-s_0r-Mcnant - i. - m er
-
" irties name~l ,hcteit~ as,,~iaviiig.an interest in tt~e.al~ove c~e~scri,t~ecl-j?r-rerty or
, - ''t~at:,t~he ' ~nclivi~lua;~l~, and ~ ~
ro"cct ag , - rcc to the fc~filowing:
J . . . :
~ 1 . Reimt~urse~~~-S okane C~unt for ~ ro'ecrevicw aind -~'ti's ectican fees ~s s ecified'i'n~_.
t?- Y . J,-~- I? n . Y
• C hapter 9., 1 4; o f t lte Sno kane C oun ty. -Co c~er ,Tlr6fees,:wi l l i N, ba se d o n,ac tua l,s a l ary
cosl-s incurr~ed Uy Spokane County ~fo,r. pr0,jec~~ ,reviewan~ ! or- i'nspect~ions pl~us a tcn
~
~ ~►ercent ac~ininistrative cl'iarge, ~~nicintlily as acc~rue~i. Any
. , . .
' l~illirig atno~unts~, tc~ inclucie any late -,Fpes orR~any -,oother expcnscs incurrcd in ' tke
~ cali~eclion of an overcfue account rni,st. be rai'j.prior ~tti~ the C,ounty's accert~ance.~Qlf
the nroject for filing.
.
. ~ .
2. Tiie, unversiSnecl Agrees that these fees a,resAc~e ~ancl~ ~~ayable upon' receipt c~f -tlie
, billing as specified above. _ ,
3:- ~ Any invoices nat paicl within~ 30 days _o,fA he:i n, Wi'ce ii'a~.te wilt.bc, subjecteci to aAare= '
fce char,ge 6f l°1o-per tno.nt:h (12%- per year,on~~trlie:~ui~,naic.i 'l~al'ance- of .1I~e accnunt ' ~ ~ , - ~r~ •
I x~,}_ -
~,~an~i"any~,anccrue~i late fee charges.. I,n=-`AClciition;°~,if' any outsran,din,~; ~tia~lance Qn tlle
' i } ~S ~ _
- acc,o~un~t: fQr ;t~iis rroject is not,~ raid .wi.tliin"~'30 idays~-of;tlie invoice "d_ate,I no further, ,
- revi.ews o~F the pr9ject docun-icnts. wi-tl ~be,.con~ucteci;un'ti~l, tl~,e entice, account ;~tial'a~nce
~ - • _ • ~`r~~v~ ' n4 . >-t. ' ~ " ~ L'•. i • f
~ -,is=raicl. Any~bata~~cc on rtl~ie ~account ,fo~r ~lhis ~~~~~roject .n,~it ai,cl wit;l~~~~~n~ 6~5~ cl~ys, ~Qf~~tl~ie . ~
i
invoice ctate in~y result in legal~actton oW t~he init~a~ti~on-of.,ot:her collection. proced, 108, •
. ~ . .
~ incl,cidi.n'g ~rcferral 'to a collection ageney. ...7,1~e~Spo~nso'r ;wl be I ia~ile~ Fc~r an~y ac~~l a~ll
~ expe:nsc"s incurred by the Coun~ty ifor the coll~e°cl~i4n ~of-,.Werdtie~ accotints. - -
- .
4. 'Ilic manthly billing shoulcl Ue sent lo lhe aCtention ofi
NAME: M141AI- +~o R, 09 0 ~.4 r7a Aj
~
• ADDRESS: 12,9►~~ A~6 1?,vq ~ _ •
CITY, STATE: /."o c ~-o Y\7 ~
~
Z[P CODE:
PFIONE 1~.z -Z
f - - . .
~ ~ .
- Vu~nderstand that- fail!ure to pay thesc fees may~result in dtla,y in comnletiQn or approval of t he project or ~
the"r pos'sitiie -sanciions. _ . ~
~ . "If 01is !1f.ee ,s►Sreemcnt is ccampletecll 'Uyy, sQrneQne Qth-e~_r, tha►n ther,SpQnsor, (i.e.,, ttie-.
. ~f ect, owncr or a, ~princiral in ithe f rm~ srons~ring~ tl'ie rr;oject),, such astlli>e E~ngi~iieer.,- ~~a,
'e'signing ~~tli~ p.r~ject,, then, wri~tten ' .au~tl~~ioriia~t~ion, froin , tli~e S~~~nsorW s~eciticul!ly
.
:,uulhor,t~z~ng tlie .Asen~t to execute tltis Fee Agreeriient '.is- attached to : this Fee-
Agreement.
51GNATURF Qy:
' ` . 6v 16 61 t Olt) '44 -'1 t 0,V . . • ° . ~:s: .._.4 - -
;(PRINT NAM,E),,
, , . .
R~ ~RFTURNW Cni'Y TO 5IV~KANE COU,N'TY LN(:INEERS -
. - -gte- -
-,k~pV\aenicn,f_ce 8%20/Q3~ ~ . ` , • ~
: • . _ 1N.1026 I3raad way Ave. ~ Sj*kane;:;W/1..9926(1-0170 , (5(l9) 956•3G00 ];'AX,.1(50?).~~5G.L4715~ y
,
~
S P O K A N E •,e';,~ C O U N T Y
J UILDING AND PLANNING • A Dtvtsiotv oF rxE Ptfsuc Wofztcs DEPA RT~ ,rD
AMES L. MANSON, C.B.O., DIRECTOR DElvtvIs M. ScoTr,~0ocTQ7SO
SppKANE COUNTY ENGofo
MEMORANDUM
TO: Spokane Count c/o Sandy Kimball
li-liolililiNimi!titi,-t!iwitw ~
po ane Founty Division of Utilities; Jim Red
Spokane County Stormwater Utility; Brenda Sims
Spokane Regional Health District; Steve Holderby
Spokane County Air Pollution Control Authority
Spokane County Division of Long Range Planning; John Mercer
Spokane County Division of Parks, Recreation and Fair; Steve Horobiowski
Fire Protection District No. 1
. Central Valley School District No. 356
Vera Water & Power
WA State Boundary Review Board; Susan Winchell
FROM: John W. Pederson, Senior Planner
DATE: October 7, 1998
SUBJECT: Review and comments for the hearing of November 4, 1998, time 1:30 p.m.
FILE # PE-1773-95/ZE-7-95
Description: Appeal of an administrative determination regarding expiration of
Shelley Acres preliminary plat.
(STR) 24-25-44
Sponsor: Mark McManus, c/o John F. Bury, Esq.
Please review and return any comments to me by October 20, 1998.
hrd
Attachments: Notice of Public Hearing
1026 WEST BROADWAY AVENUE • SPOKANE, WASHIyvGTON 99260
PHONE: (509) 456-3675 • FAx: (509) 4564703
TDD: (509) 324-3166
J
NOTICE OF PUBLIC HEARING
SPOKANE COUNTY HEARING EXAMINER
TO: All interested persons, and owners/taxpayers within 400 feet
YOU ARE HEREBY NOTIFIED THAT A PUBLIC HEARING WILL BE HELD ON THE
LAND USE APPLICATION LISTED BELOW, AS FOLLOWS:
Application: File No. PE-1773-95/ZE-7-95, Appeal of an Administrative Determination dated
September 1, 1998 regarding the eYpiration of Shelley Acres preliminary plat.
Hearing Date and Time: November 4, 1998 at 1:30 p.m.
Place: Commissioners Assembly Room, Lower Level, Spokane County Public Works Building, 1026
West Broadway, Spokane, Washington.
Owner/Appellant: Mark McManus
Appellant Contact: John F. Bury, Esq., Murphy, Bantz & Bury, 818 W. Riverside Ave., Suite 631,
Spokane, WA 99201 (509) 838-4458
Address and Location: Generally located East of 12`h Ave. (extended) approximately 350 feet east of
the intersection of 12`~ Avenue and Shamrock Street in the SE 1/4 of Section 24, Tovmship 25 North,
Range 44 EWM, Spokane County, WA.
Comprehensive Plan: Urban and Suburban Plus
Zoning Designatioo: Urban Residential-3.5 (UR-3.5) to Suburban Residential-1 (SR-1)
Environmental Determination: Determination of Nonsignificance issued March 3, 1995
Related Permits: None Division of Building & Planning Staff: John Pederson, Senior Planner (509) 477-3675
HEARING EXAMINER PROCEDURES
Hearing Process anci Appeals: The hearing will be conducted under the rules of procedure adopted in
Spokane County Resolution No. 96-0294. All interested persons may testify at the public hearing, and
may submit written comments and documents before or at the hearing. The Hearing Examiner may limit
the time given to speakers. A speaker representing each side of the issue is encouraged. Any appeal of
the Hearing Examiner's decision will be based on the record established before the Hearing Examiner,
pursuant to County Resolution Nos. 96-0171. Environmental appeals will follow the same procedural
route as the underlying action. All hearings will be conducted in facilities which are accessible to
persons with physical disabilities.
Inspection of File, Copies of Documents: A Staff Report will generally be avaiiable for inspection
seven days before the hearing. The Staff Report and application file may be inspected at the Spokane
County Division of Building and Planning, ls` Floor Permit Center West, Public Works Building, 1026
West Broadway, Spokane, WA, 99260, between 8 a.m. and 4 p.F~., weekdays, M-F, except holiciays.
Copies of documents will be made available for the cost of repruduction. If yau have am-y.,questions or
special needs, please call the Division at (509) 477-3675. Send written comments to the Spokane County
Division of Building and Planning, 1026 W. Broadway, Spokane, WA, 99260, Attn: John Pederson, PE-
1773-95. Motions must be made in writing and submitted to the Spokane County Hearing Examiner, 3d
Floor, Public Works Building, 1026 W. Broadway, Spokane, WA, 99260-0245.
t
APPEAL OF ADNIINISTRATIVE ACTION,
1. Appellant: Mark McManus
14522 E. Valleyway
Spokane, WA 99216
Agent: John F. Bury
Murphy, Bantz & Bury, P.S.
W. 818 Riverside Ave., Suite 631
Spokane, WA 99201
2. File: PE-1773-95; Shelley Acres
3. Action from which appeal is taken: Spokane Building and Planning
Administrative Action
Dated September 1, 1998
(copy attached)
4. Relief Sought: Reversal of determination denying extension of preliminary plat PE-1773-95
5. No appeal form was attached to the administrative action. Appeal Fee is paid herewith.
6. This is a request for public hearing of appeal.
7. Basis for Appeal:
Findings of Fact, Conclusions and Order were entered by Spokane County Hearing
Examiner Committee on March 23, 1995.
The project sponsor subsequently installed- water main and fire hydrants (energized);
natural gas lines; and electrical power. Preliminary engineering elevations were made, and
approved. Sponsor proceeded to testing for on-site sewage disposal.
Spokane Regional Health District examined perc test holes in August, 1997, and required
additional dedicatory language to the plat.
On June 3, 1997, Sponsor Mark McManus entered into a Real Estate Sale and Purchase
Agreement, for sale of the entire project to Bill Main, Jr. Sa1e was subject -w feasibility study and
financing commitment for certain improvements. Contingencies of sate._ have been satisfied or
waived. Sponsor is prepared to close sale but for prelimsnary plat.
Sponsor Mark McManus was a witness bef'ore th;z Hearing Examiner in ; eview of the
request for extension of the Cambridge Knoll plat (PN- 1696-93 The Spokane Ccunty Hearing
Examiner approved an extension of time for that plat. In that case, the Division of Building and
Planning "informed the applicant that the preliminary plat expired on a specific date" and would
not be reinstated, and that such determination could be appealed to the Hearing Examiner. Mr.
1
not be reinstated, and that such determination could be appealed to the Hearing Examiner. Mr.
McManus clearly understood from that hearing that a plat sponsor could seek extension within 30
days after plat expiration. Based on this understanding, Mr. Russ Grant, on behalf of Mr.
McManus, personally appeared at the Building and Planning offices on April 24, 1998 for the
express purpose of obtaining extension of the Shelley Acres plat. The HEC order approving
preliminary plat at page 3, section 8, states that the preliminary plat is approved "for three years,
specifically to April 1, 1998." Mr. McManus and Nir. Grant believed that the request for
extension on Apri124, 1998 was well within 30 days of April 1.
Section 12.100.116 of the Spokane County Subdivision Ordinance provides that
preliminary plats shall expire "five (5) vears afler preliminary approval unless a time extension is
approved for the project." emphasis added.
Pursuant to Section 12.100.118 of the Spokane County Subdivision Ordinance, the
Director may administratively approve extension provided there are no significant changed
conditions and the sponsor has (2) (a) surveyed the lots; (b) arranged for public services; (c)
obtaining necessary financing. All of these elements have been met by the sponsor.
Contrary to Section 12.100.118, providing for appeal of denial of reyuests for extension,
the County (Stacy Bjordahl) oralI'y advised the Sponsor on Apri128, 1998 that he "had no rights"
and must refile a new application for preliminary plat approval.
STATE OF WASHINGTON )
)ss.
County of Spokane ) .
MARK MCMANUS, being first duly sworn, deposes that:
I am the appellant in the above matter, have read the foregoing notice of appeal, know the
contents thereof and the same are true and correct to the best of my knowledge, information and
belief.
ZMARK MCMAKUS
SUBSCR3OBLD AND SWORN to before me this 04-~A/day of September, 1998.
OFFICIAL SEAI
lANIS E. POTESKY
AtE 7F ~~A~HINGTON
NOTARY PU6t1C - 5T
~
COUNTY OF SPnlCAnE Nota~ Public in and for the
NAy Commission Expires SePtember 11• 2001 State of Washington,
Residing at Spokane
My Commission expires: <DC::)
~
t 1
I
~ ~ . . b. • , • , . • ~
. ~ ~ 01Q+I~N~~~M, ' . , 'k • , ' _ • *
V3,:' p, ' . . , • , , ' , ' ,I ~
.~8. , . . . . ' . . , _ ~
y . . • ~ ' ~ , ~ ,
~ ~ , , • , • . ' . • ' ' , . , . ' ~
_ ':;:t ~ q • . '
1~ • ~ 'j~ , ' ~ ~ • , ~ ~ ' •
•1' ~ . , r '.~:i~ '.t ~ • ' w' ~ . , ~ . . ~ ' ~
~ .jr~t~..n'.~:~i„ '',d,',t':~' ~r~~.i~, , ~ . • , . ' .
~ ;'1.~~' r'~~ ~ i .7. ~ ~ • . . ' , , , • . ' ,
i. A': ~t• 't~f r Y~~ ~ . ~ ~ ~
i. y ; ,{LN Y~.' ° . ~1 ° 1~,'f . . • • ' ' ~ ~ ' .
~ ~ r•,4' v ~'v' ~ h~. ~ :t+~. 4 ~ . i ,.f
i,~~. '~~1 ' ' ; . ` , i ~ • • , . ' t ' '
,I~~,i,'~: i•~l •;~a , r . .t • ~ . . ' , ~ • ' • , •
„i•L~' :p . ~1) • . , , ~ '
, ~ •r,., •,,~,F~ . , _ . . , ; . . . . , • ,
` ~ ~,I+ ~ ~ .
: ' . • ~ ~.r.
)^.'`~l. ~ . + , . . ' , I . , . •
w J ~ ~ • . ~ ' . . . ' . •
Q~ ' w d ' . 'va N + ~ ~ • ; , : ~ . , . . ~ , .
O v/
„ - • ?~`q'i:> ~c,,~,}rE,~,~~';,w;,~~.
~ • ~ ^~a
ct v4
i
rq
k "?'17~w► ` M~ °y ~ . , .
~ , ' • x ~Na~+~n
, Q a
- ~ 7,s - ~°r v', J•,,^ :
J u ~ ~n,
~
1 . dp
'
Ob31S .r > `~r 04,
: ' r'~; • 1 s4J~ ?
, ftftft-...
~
Hemmings, Bill .
From: Hemmings, Bill
Sent: Thursday, October 08, 1998 8:26 AM
To: Pederson, John
Cc: Engelhard, Scott; Harper, Pat; Kimball, Sandy; Busko, Doug; Miller, Katherine; Sims, Brenda
Subject: PE-1773-95/ZE-7-95 - Mark McManus - Appeal of Decision
10-8-98
I received the abov+e referenced application on October 7, 1998.
I have reviewed the project file in detail and i find no evidence that there every has been any engineering
submittal made to Spokane County on this project. There is no evidence that a predesign meeting was
ever held on this project. There are no engineering plans or calculations for this project in the project
file.
ow q 4 .
Page 1
\
~
~ y RECE-VEu
OCT 0 y 1998
~ sPOKANE COUNTY ENGINEER
S P O K A N E ~ C O U N T Y
_ BUILDING AND PLANNI,UG • A DMSION OF THE PUBLIC WORKS DEPARTti1Eti'T
JAMES L. VIANSON, C.B.O., DIRECTOR Dstvtvts M. ScoTr, P.E., DIRECTOR
MEMORANDUM
TO: QWAN M„
evelopment Engineering Services; Bill Hemmings
Spokane County Division of Utilities; Jim Red
Spokane County Stormwater Utility; Brenda Sims
Spokane Regional Health District; Steve Holderby
Spokane County Air Pollution Control Authority
Spokane County Division of Long Range Planning; John Mercer
Spokane County Division of Parks, Recreation and Fair; Steve Horobiowski
Fire Protection District No. 1
. Central Valley School District No. 356
Vera Water & Power
WA State Boundary Review Board; Susan Winchell
FROM: John W. Pederson, Senior Planner
DATE: October 7, 1998
SUBJECT: Review and comments for the h~ rinb o ov~mber 4, 19~98., ime 1:30 p.m.
FILE # PE-1773-95/ZE-7-95 Description: Appeal of an administra:ive determination regarding expiration of
Shelley Acres preliminary plat.
(STR) 24-25-44
Sponsor: Mark McManus, c/o Jo LTLsq.
Please review and return any comments (me by October 20, 1998.
hrd
Attachments: Notice of Public Hearing
~
1026 WEST BROADWAY AVENUE • SP0ICANE, WASHINGTON 99260
PxoNE: (509) 456-3675 • Fax: (509) 4564703
TDD: (509) 324-3166
.
NOTICE OF PUBLIC HEARING
SPOKANE COUNTY HEARING EXAMINER
TO: All interested persons, and owners/taxpayers within 400 feet
YOU ARE HEREBY NOTIFIED THAT A PUBLIC HEARING WILL BE HELD ON THE
LAND USE APPLICATION LISTED BELOW, AS FOLLOWS:
Application: File No. PE-1773-95/ZE-7-95, Appeal of an Administrative Determination dated
September 1, 1998 regarding the expiration of Shelley Acres preliminary plat.
Hearing Date and Time: November 4, 1998 at 1:30 p.m.
Place: Commissioners Assembly Room, Lower Level, Spokane County Public Works Building, 1026
West Broadway, Spokane, Washington.
Owner/Appellant: Mark McManus
Appellant Contact: John F. Bury, Esq., Murphy, Bantz & Bury, 818 W. Riverside Ave., Suite 631,
Spokane, WA 99201 (509) 838-4458
Address and Location: Generally located East of 12`h Ave. (extended) approximately 350 feet east of
the intersection of 12' Avenue and Shamrock Street in the SE '/4 of Section 24, Township 257North,
Range 44 EWM, Spokane County, WA.
Comprebensive Plan: Urban and Suburban Plus _
Zoning Designation: Urban Residential-3.5 (UR-3.5) to Suburban Residential-1 (SR-1)
Environmental Determination: Determination of Nonsignificance issued March 3, 1995
Related Permits: None
Division of Building & Planning Staff: John Pederson, Senior Planner (509) 477-3675
HEARING EXAMINER PROCEDURES
Hearing Process and Appeals: The hearing witl be conducted under the rules of procedure adopted in
Spokane County Resolution No. 96-0294. All interested persons may testify at the public hearing, and
may submit written comments and documents before or at the hearing. The Hearing Examiner may limit the time given to speakers. A speaker representing each side of the issue is encouraged. Any appeal of
the Hearing Examiner's decision will be based on the record established before the Hearing Examiner,
pursuant to County Resolution Nos. 96-0171. Environmental appeals will follow the same procedural
route as the underlying action. All hearings will be conducted in facilities which are accessible to
persons with physical disabilities.
Inspection of File, Copies of Documents: A Staff Report will generally be ava?1a.b1F; for inspection
seven days before the hearing. The Staff Report and application f le may be inspected at the Spokane
County Division of Building and Planning, 1 S` Floor Permit Center West, Public Works Building, 1026
West Broadway, Spokane, WA, 99260, between 8 a.m. and 4p,m., v~reekdays, M-F, except holida-ys.
Copies of documents will be made available for the cost of repro.duction. lf you have.any q- uestiz,ils or
special needs, please call the Division at (509) 477-3675. Send written comments to the Spokane County
Division of Building and Planning, 1026 W. Broadway, Spokane, WA, 99260, Attn: *John Pederson, PE-
1773-95. Motions must be made in writing and submitted to the Spokane County Hearing Examiner, 3`d
Floor, Public Works Building, 1026 W. Broadway, Spokane, WA, 99260-0245.
,
APPEAL OF ADMINISTRATIVE ACTION
1. Appellant: Mark McManus
14522 E. Valleyway
Spokane, WA 99216
Agent: John F. Bury
Murphy, Bantz & Bury, P. S.
W. 818 Riverside Ave., Suite 631
Spokane, WA 99201
2. File: PE-1773-95; Shelley Acres
3. Action from which appeal is taken: Spokane Building and Planning
Administrative Action
Dated September 1, 1998
(copy attached)
4. Relief Sought: Reversal of determinatioe denying extension of preliminary plat PE-1773-95
5. No appeal form was attached to the administrative action. Appeal Fee is paid herewith.
6. This is a request for public hearing of appeal.
7. Basis for Appeal:
Findings of Fact, Conclusions and Order were entered by Spokane County Hearing
Examiner Committee on March 23, 1995.
The project sponsor subsequently installed water main and fire hydrants (energized);
natural gas lines; and electrical power. Preliminary engineering elevations were made, and
approved. Sponsor proceeded to testing for on-site sewage disposal.
Spokane Regional Health District examined perc test holes in August, 1997, and required
additional dedicatory language to the plat.
On 3une 3, 1997, Sponsor Mark McManus entered into a Real Estate Sale and Purchase
Agreement, for sale of the entire project to Bill Main, Jr. Sale was subject to feasibility study and
financing commitment for certain improvements. Contingencies of sale have been satisfied or
waived. Sponsor is prepared to close sale but for pre7iminary plat.
Sponsor Mark McManus was a witness befure-- ilhe,Hearing Examiner i-ft _re.v-+.ew of f.he
request for extension of the Cambridge Knoll plat (PN-I696-93). The Spokarie County Hearing
Examiner approved an extension of time for that plat. In that case, the Division of Building and
Planning "informed the applicant that the preliminary plat expired on a specific date" and would
not be reinstated, and that such determination could be appealed to the Hearing Examiner. Mr.
r .
not be reinstated, and that such determination could be appealed to the Hearing Examiner. Mr.
McManus clearly understood from that hearing that a plat sponsor could seek extension within 30
days after plat expiration. Based on this understanding, Nir. Russ Grant, on behalf of Nir.
McManus, personally appeared at the Building and Planning offices on April 24, 1998 for the
express purpose of obtaining extension of the Shelley Acres plat. The HEC order approving
preliminary plat at page 3, section 8, states that the preliminary plat is approved "for three years,
specifically to April 1, 1998." Mr. McManus and N1r. Grant believed that the request for
extension on April 24, 1998 was well within 30 days of April 1.
Section 12.100.116 of the Spokane County Subdivision Ordinance provides that
preliminary plats shall expire "five (5) vears after preliminary approval unless a time extension is
approved for the project." emphasis added.
Pursuant to Section 12.100.118 of the Spokane County Subdivision Ordinance, the
Director may administratively approve extension provided there are no significant changed
conditions and the sponsor has (2) (a) surveyed the lots; (b) arranged for public services; (c)
obtaining necessary financing. All of these elements have been met by the sponsor.
Contrary to Section 12.100.118, providing for appeal of denial of requests for extension,
- the County (Stacy Bjordahl) orally advised the Sponsor on April 28, 1998 that he "had no rights"
and must refile a new application for preliminary plat approval.
STATE OF WASHINGTON )
)ss.
County of Spokane
MARK MCMANUS, being first duly sworn, deposes that:
I am the appellant in the above matter, have read the foregoing notice of appeal, know the
contents thereof and the same are true and correct to the best of my knowledge, information and
belief.
~MARK MCMAI4US
SUBSCRIF3ED AND SWORN to before me this kq~-qday of September, 1998.
OFFICIAL SEAL
JANtS E. POTESKY f~
BLiC - ST~~TE OF WASHING?ON
NO7ARY PU
1
C4UNTY C3~SP0KANE Notaf~ Public in and for the
My Commission Expi« September 11, 200' State of Washington,
--Residing at Spokane
My Commission expires: a'i -1 l-~ c~U (
r
SPOKANE COUNTY
HEARING EXAMINER COMMITTEE
FINDINGS OF FACT, CONCLUSIONS AND ORDER s~~~E1VED.
MqR 2'71995
INTRODUCTION County fngffineering
This matter has come before the Hearing Examiner Committee on March 23, 1995.
The members of the Committee present are: Brenda Bodenstein, Chair, Jane Myers
and Harry Gibbons.
PROPOSAL
The sponsor, Mark McManus, requests approval of the Preliminary Plat of Shelley
Acres, PE-1773-95, to subd.ivide approximately 15.7 acres into 131ots for single-
family residences and a Zone Reclassification, ZE-7-95, from Urban Residential-3.5
(UR-3.5) to Suburban Residential-1 (SR-1).
FINDINGS OF FACT AND CONCLUSIONS
1. The property is generally located east of 12th Avenue (extended) approxi.mately 350
feet east of the intersection of 12th Avenue and Shamrock Street in the SE 1/4 of
Section 24, Township 25 North, Range 44 EWM, Spokane County, Washington.
2. The Committee adopts the Planning Department Report as a part of this record.
3. The existing land uses in the area include fanmland and single family residences.
4. The proposed use is compatible with existing uses in the azea.
5. The properry is located almost entirely within the Suburban Plus (S+) category of the
Comprehensive Plan while 1.8 acres are within the Urban (U) category. The proposal
is also within the Aquifer Sensitive Area (ASA) and the Priority Sewer Service Area
(PSSA). The Suburban Plus category is intended to provide the opportunity for
development of residential areas with large yards and open spaces. The Goa1s,
Objectives and Decision Guidelines of the Suburban Plus category promote fill-in
development within established Suburban Plus development areas and existing outlying
comrnunities where utilides, arterials, schools and community faciliries have already
been established. Residential net densities in the Suburban Plus category shall range
between 1 acre to 5 acres per dwelling unit.
The Urban (U) category of the Comprehensive Plan is intended to provide the
opportunity for development of a"city-like" environment which includes various land
uses, intensive residential development, and public facilities and services (water,
sanitary and storm sewer lines, police and fire protection, and other features). The
Goals, Objectives and Decision Guidelines of the Urban category promote fill-in within
established development azeas and existing outlying communities where utilities,
arterials, schools and community facilities have already been established. Residential
net densities should have an approximate density of 1 unit to 17 units per acre.
( t •
The proposed density of approximately 1.21 acres per unit is consistent with the
Suburban Plus category and generally consistent with the Urban category of the
Comprehensive Plan.
6. The existing and proposed zoning does implement and conform to the
Comprehensive Plan.
7. The Arterial Road Plan identifies 17th Avenue and Sha.mr+ock Street as Local Access
Streets.
8. The existing zoning of the property described in the application is Suburban
Residential-1 (SR-1) and Urban Residential-3.5 (UR-3.5) previously established as
Agricultural (A) zoning in 1942 (ZE-60-42) and redesignated to Suburban
Residendal-1 (SR-1) and Urban Residential-3.5 (iJR-3.5) on January 1, 1991
pursuant to the Program to Implement the Spokane County Zoning Code. Pursuant
to RCW 58.17.195 the proposal dces conform to the requirements of the existing
and proposed Suburban Residential-1 (SR-1) zone.
9. The provisions of RCW 43.21C (The State Environmental Policy Act) have been
complied with and a Determination of Nonsignificance (DNS) was issued. The
Committee, after independent review, hereby adopts the DNS.
10. The legal requirements for public notice have been fulfilled.
11. The owners of adjacent lands expressed disapproval of the plat name and support
for the proposal.
12. The applicant has demonstrated that conditions have substantially changed since the
original zoning of this area and accordingly, the proposed zone reclassification is
justified. Specifically, changed condidons include adjacent residential
developments.
13. The proposed use will not be detrimental to the public health, safety, morals or
welfare especially in light of the conditions recommended by the reviewing
agencies.
14. The subdivision proposal is generally consistent with RCW 58.17 and the County
subdivision regulations, promoting the public health, safety and general welfare in
accordance with standards established by the state and Spokane County. The
proposal as conditioned dces provide adequate public facilities as cited in RCW
58.17.110 (2). More specifically:
a. drai.nage ways
b. public and/or private rights-of-way
c. potable water
d. sanitary waste disposal
e. parks and recreation facilities
f. schools and schoolgrounds
HEC Order for PE-1773-95 Page 2
' - r- \
The above improvements are either exisring facilities or will be provided by the
applicant upon finalization of this subdivision as conditioned by the Committee and
implemented by the various County agencies.
15. The Committee additionally findsJconcludes:
a. The applicant agrees with and accepts all recommended conditions of
approval.
CONDITIONS OR CONTINGENCIES APPLIED TO THIS APPROVAL
1. All Conditions imposed by the Hearing Examiner Committee shall be binding on
the "Applicant," which term shall include the owner or owners of the property,
heirs, assigns, and successors-in-interest.
2. The conditions of approval apply to the preliminary subdivision of record.
SPOKANE COUNTY PLANNING DEPARTMENT
1. All conditions imposed by the Hearing Examiner Committee shall be binding on the
"Applicant", which term shall include the owner or owners of the property, heirs,
assigns and successors.
2. Upon filing the final plat, or a partion thereof, the zone reclassification of the final
plat area shall be finalized, and the existing zone classification shall be changed to
Suburban Residential-1 (SR-1), consistent with the proposed zoning approved with
the preliminary plat of record.
3. The proposal shall comply with the Suburban Residenrial-1 (SR-1) zone and the
Aquifer Sensitive Area (ASA) Overlay Zone, as amended.
4. The final plat shall be designed substantially in conformance with the preliminary
plat of record. No increase of density or number of lots shall occur without a
change of condition application submittal and approval.
5. The Planning Director/designee shall review any proposed final plat to ensure
compliance with these Findings and Conditions of Approval.
6. A final plat name/number shall be indicated before the final plat is filed, such
name/number to be approved by the Planning Director/designee.
7. Appropriate road name shall be indicated.
8. The preliminary plat is given conditional approval for three (3) years, specifically to
April 1, 1998. The applicant may request an extension of time by submitting a
written request approximately forty-five (45) days prior to the above expiration
date.
HEC Order for PE-1773-95 Page 3
, -
9. Appropriate utility easements shall be indicated on copies of the proposed final plat.
Written approval of urility easements by appropriate utility companies shall be
received with the submittal of the final plat.
10. The final plat shall ind.icate by a clear, dashed line the required yard setbacks from
all private, "Tract X" or public roads. The dedication shall contain the following
statement:
"Si ard and rear yard setbacks shall be deteimined at the ttime building pennits
uested unless these setbacks are specifically drafted on this final plat. The
acks indicated on this plat may be varied from if proper zoning approvals are
o tained."
11. Three (3) cuirent certificates of tide shall be furnished to the Planning Department
prior to filing the final plat
12. Prior to filing of all or a portion of the final plat, the applicant's surveyor shall
submit one or more maps outlined in red of the area being finalized. The scale shall
match the appropriate assessor's map scale.
13. The final plat shall indicate yard setback arc lengths on cul-de-sac lots which meet
or exceed the minimum frontage of the underlying zone of the final plat.
14. A plan for water facilities adequate for domestic service and fire protection shall be
approved by the water purveyor, appropriate fire protection district, County
Building & Safety Department, and County Health District. The agencies will
certify on the Water Plan, prior to the filing of the final plat, that the plan is in
conformance with their respective needs and regulations. The Water Plan and
certification shall be drafted on a transparency suitable for reproduction and be
signed by the plat sponsor.
15. The water purveyor shall certify that appropriate contractual arrangements and
schedule of improvements have been made with the plat sponsor for construction of
the water system in accordance with the approved Water Plan. The rime schedule
shall provide for completion of the water system and inspection by the appropriate
health authorities prior to application for building pemuts within the final plat The
airangements or agreements shall include a provision holding Spokane Counry and
the purveyor harnlless from claims by any lot purchaser refused a building permit
due to the failure of the subdivision sponsor to satisfactorily complete the approved
water system.
16. Tij final plat dedication shall contain the following statement:
" e public water system, pursuant to the Water Plan approved by county and state
th authorities, the local fire protection district, County Building & Safety
4
par
p ' maent and water purveyor, shall be installed within this subd.ivision and the
' t shall provide for individual domestic water service as well as fire
tion to each lot prior to sale of each lot and prior to issuance of a building
't for each lot."
17. No building permit will be issued for any lot within the final plat until certified by a
Washington state-licensed engineer that "the water system has been installed
HEC Order for PE-1773-95 Page 4
,
pursuant to the approved Water Plan for the final plat" including a signed license
stamp. The certification may be in the form of a letter, but is preferred to be certif'ied
on a copy of the Water Plan as a schematic map showing the "as-built" water
system.
18. The Water Plan and the above four (4) condirions of approval regarding the Water
Plan may be waived by the Planning Director/designee upon receipt of letters from
the appropriate water purveyor and fire protection district stating that simple
connections to an existing, approved water system will provide adequate domestic
and fire protection water to ensure the public health, safety and general welfare.
19. A survey is r+equired prior to the filing of a final plat.
20. Vera Power and Water requires provision of utility easements that are not co-
existing with drainage easements.
21. Prior to approval of road and drainage plans, you are required to coordinate with
the United States Postal Service to determine type and location of central mail
delivery facilities which may include applicable easements for developments of
three or more homes.
22. The Owner shall negotiate with the Central Valley School District and submit a
recorded copy of a voluntary agreement making provisions for public schools prior
to finalization and recording of this plat. The agxeement shall provide a written
description of the subject property to which the agreement applies and also state the
dollar amount and any other agreed to mitigating measures.
The Owner shall also notify any potential purchasers who have made an agreement
to purchase property within said plat pursuant to the Revised Code of Washington
(58.17.205), that adequate provisions for school facilities must be made
conditioned on a future agreement between the plattor and school district.
Voluntary agreements between the Owner and School District shall confonn to the
requirements of the Revised Code of Washington Chapter 82.02.
23. To satisfy the requirements of RCW 58.17.110 that a subdivision make appropriate
provisions for public parks, recreation and playgrounds, the owner, at his opdon,
shall either dedicate land within the subdivision or enter into a voluntary agreement
with Spokane County to nutigate the direct impacts that the subdivision has on
public parks, open spaces and recreational facilities within the unincorporated areas
of Spokane County.
If the owner opts to enter into a voluntary agreement, the agreement shall be
executed prior to the finalization and recording of the plat and recorded in
conjunction therewith. The agreement shall be consistent with RCW 82.02.020 and
substantially the same as the standardized agreement prepared by the Spokane
County Parks, Recneation and Fair Department Prior to finalization of the plat, the
owner shall advise any pwrchaser of property, as authorized under RCW
58.17.205, of the obligation within the voluntary agreement
24. The Planning Department shall prepare and record with the Spokane County
Auditor a Tide Notice noting that the property in question is subject to a variety of
HEC Order for PE-1773-95 Page 5
special conditions imposed as a result of approval of land use action. This Title
Notice shall serve as public notice of the cond.itions of approval affecting the
property in question. The Title Notice should be recorded within the same time
frazne as allowed for an appeal and shall only be released, in full or in part, by the
Planning Department. The Title Notice shall generally provide as follows:
The parcel of property legally described as [ ] is the subject of
a land use action by a Spokane County Hearing Body or
Administrative Official on [ imposing a variety of special
development conditions. File No. [ ] is available for inspection
and copying in the Spokane County Planning Department.
SPOKANE COUNTY DIVISION OF ENGINEERING AND ROADS
Prior To Issuance Of A B'~,lding Permit Or u,g,e Of The Prq=KZLA&ProUU
1. The conditional approval of the plat is given by the County Engineer subject to
dedication of right-of-way and approval of the road system as indicated in the
preliminary plat of record.
2. Plans, profiles, and cross-sections as designed to County standards showing
proposed street centerline and curb grades shall be submitted to the County
Engineer for approval prior to construcrion andJor the filing of each final plat; road
plans to be prepared under the direction of a licensed Professional Civil Engineer.
3. Drainage plans and design calculations showing the alignment of drainage facilities
shall be submitted to the County Engineer for approval prior to construction andlor
the filing of the final plat. Drainage plans to be prepared under the direcrion of a
licensed Professional Civil Engineer.
01.
4. ~ tn M.
th pr- ► - • ~ ~ ~ 1.1 A development
pennit shall be obtained from the County Engineer e ore construction or
development begins on any property all or a portion of which is in any area of
special flood hazard (reference Sgokane Counry Ordinance No. 88-0521).
The following statement shall appear within the dedicatory language of the plat:
~
"Devel ent within this subdivision shall conform to the requirements of the
Nario Flood Insurance Program and Chapter 3.20 of the Spokane County Code.
Purc ' rs of the property in this subdivision are warned of possible flood.ing or
po ' g and the potential requirement to purchase flood insurance. This warning
sh cairied in each and every deed drawn to transfer ownership of any and all
p within the plat in the area of special flood hazard.
5. Construction within the proposed public streets and easements shall be performed
under the direct supervision of a licensed engineer/surveyor, who shall furnish the
County Engineer with "as-built" plans and a certificate in writing that all
impmvements were installed to the lines and grades shown on the approved
construction plans and that all disturbed monuments have been replaced.
BEC Order for PE- 1773-95 Page 6
` -
6. No construction work is to be performed within the existing or proposed public
right-of-way until a perinit has been issued by the County Engineer. All work is
subject to inspection and approval by the County Engineer.
7. All construction within the eacisting or proposed public right-of-way is to be
completed prior to filing each final plat, or a bond in the amount estimated by the
County Engineer to cover the cost of construction of improvements, construction
certification, "as-built" plans and monumenting the street centerlines shall be filed
with the County Engineer.
8. No direct access from lots to 1/2 Rights-of-Way until such roads are constructed to
County Standards and established as County Roads.
9. No direct access from lots to Stub Road connections until such roads are
constructed to County Standards and established as County Roads.
10. Road design, construction and drainage control for 1/2 Rights-of-Way and Stub
Road connections are the responsibility of the developer.
11. Individual driveway access pernuts are required prior to issuance of a building
permit for driveway approaches to the county road system.
12. yA Aeop~6 mm, tQ U~~.
13. Existing county roads providing direct access to the plat shall be paved and/or
curbed to Spokane County standards.
14. All public roads within the plat shall be designed and constructed to Spokane
County standards.
15. The word "applicant" shall include the owner or owners of the property, his/her
heirs, assigns and successors.
16. The .~o. ~n ~ . ' ~ ► ~ ' t ~ ~ ,
co' tniand-e pAvA nt
ako
17. The proposed subdivision shall be impr+oved to the standards set forth, 's ,olone
si.oas amended, which
reso ution esta s es regulations for roads, approaches, drainage and fees in new
construction.
18. The County Engineer has examined this development proposal and has deternuned
that the impact of this proposal upon the exisdng county road system warrants the
dedication of additional right-of-way and the roadway improvements herein
specified.
19. The applicant should be advised that there may exist utilities, either underground or
overhead, affecting the subject property, including property to be dedicated or set
aside for future acquisition. Spokane County assumes no financial obligation for
HEC Order for PE-1773-95 Page 7
adjustments or relocation regard.ing these utilities. Applicant(s) should check with
the applicable utility purveyor and the Spokane County Engineer to detennine
whether applicant(s) or the utility is responsible for adjustment or relocation costs
and to make arrangements for any necessary work.
20. Applicant shall request dedication of the 1 foot strip prior to any final plat approval.
SPOKANE COUNTY DIVISION OF UTILITIES
1. Any water service for this project shall be provided in accordance with the
Coordinated Water System Plan for Spokane County, as amended.
2. Pursuant to the Board of County Commissioners Resolution No. 80-0418, the use
of on-site sewer disposal systems is hereby authorized. This authorization is
conditioned in compliance with all rules and regulations of the Spokane County
Heal District and is further conditioned and subject to specific application
a a1 and issuance of permits by the Health District.
3. 0 h new dwelling unit shall be double plumbed for connection to future area-wide
ection systems.
4. A dry sewer connection to the future area-wide Public Sewer System is to be
constructed.
5. If there are any public facilities on or through private property which must be
maintained by Spokane County, then a Public Sanitary Sewer easement shall be shown
on the face of the plat and the dedication shall state:
"T'he perpetual [exclusive] easement granted to Sgokane County, its successors and
assigns is for the sole purpose of constructing, installing, operating, maintaining,
repairing, altering, replacing, removing, and all other uses or purposes which are or
may be related to a sewer system. Spokane County, its successors and assigns at all
times hereinafter, at their own cost and expense, may remove all crops, brush, grass or
trees that may interfere with the constructing, installing, operating, maintaining,
repairing, altering, replacing, removing, and all other uses or purposes which are/may
be related to a sewer system.
The grantor(s) reserves the right to use and enjoy that property which is the subject of
this easement for purposes which will not interfere with the County's fu11 enjoyment of
the rights hereby granted; provided, the Grantor(s) shall not erect or construct any
build.ing or other structure or drill on the easement, or diminish or substantially add to
the ground cover over the easement.
The easement described hereinafter is to and shall run with the land."
6. Applicant shall submit expressly to Spokane County Utilities Department "under
separate cover", only those plan sheets showing sewer plans and specifications for: Dry
sewer connections for review and approval by Utilities Department prior to issuance of
permit to connect.
HEC Order for PE-1773-95 Page 8
7. Security shall be deposited with the Utilities Department for construction of public
facilities/double plumbing/private connection/dryline connection.
SPOKANE COUNTY HEALTH DISTRICT
1. The final plat shall be designed as indicated on the preliminary plat of record andJor
any attached sheets as noted.
2. Appropriate utility easements shall be indicated on copies of the preliminary plat of
record for distribution by the Planning Department to the utiliry companies,
Spokane County Engineer and the Spokane County Health District. Written
approval of the easements by the utility companies must be received prior to the
submittal of the final plat.
3. Sewage disposal method shall be as authorized by the Director of Utilities, Spokane
County.
4. Water service shall be coordinated through the Director of Utilities, Spokane County.
5. Water service shall be by an existing public water supply when approved by the
Regional Engineer (Spokane), State Department of Health.
6. Prior to filing the final plat, the sponsor shall demonstrate to the sarisfaction of the
Spokane Counry Health District that an adequate and potable water supply is
available to each lot of the plat.
7. Prior to filing the final plat, the sponsor shall present evidence that the plat lies
within the recorded service area of the water system proposed to serve the plat.
8. A plan for water facilities adequate for domestic use, domestic irrigation use and
fire protection use shall be approved by the water purveyor. Said water plan must
have been approved by the fire protection district and the appropriate health
authorities. The health authorides, water supplier (purveyor) and the fire protecrion
district will certify, prior to the filing of the final plat, on the face of said water plan
that the plan is in conforrnance with their requirements and will adequately satisfy
their respective needs. Said water plan and certification will be drafted on a
transparency suitable for reproduction.
9. The purveyor will also certify prior to filing the final plat on a copy of said water
plan that appropriate contractual arrangements have been made with the plat sponsor
for construction of the water system, in accordance with the approved plan and time
schedule. The time schedule will provide, in any case, for completion of the water
system and inspection by the appropriate health authorities prior to applicarion for
building permits within the plat. The contractual arrangements will include a
provision holding Spokane County, Spokane County Health District and the
purveyor hanmless from claims by any lotltract purchaser refused a building permit
due to failure of the plat sponsor to satisfactorily complete the approved water
system.
HEC Order for PE-1773-95 Page 9
,
10. Prior to filing the final plat, the sponsor shall demonstrate to the satisfaction of the
Spokane County Health District that suitable sites for on-site sewage disposal
systems are available on all lots.
11. Subject to specific application approval and issuance of permits by the Health
Of r, the use of individual on-site sewage disposal systems may be authorized.
12. dedicatory language of the plat will state: "Subject to specific application
proval and issuance of germits by the Health Officer, the use of individual on-site
sewage disposal systems may be authorized."
13. /tems edicatory language on the plat shall state: "Use of private wells and water
is prohibited."
14. Th ~ al plat dedication shall contain the following statement: "The public water
sy' je ' pursuant to the water plan approved by county and state health authorities,
th' oc~fire protection district, County Building and Safety Departrnent, and water
p eyor, shall be installed within this subdivision and the applicant shall provide
f~ individual domestic water service as well as fire protection to each lot prior to
~ e of each lot and prior to issuance of a building permit for each lot."
SPOKANE COUNTY DIVISION OF BUILDINGS
1. The applicant shall contact the Department of Buildings at the earliest possible stage in
order to be informed of code requirements administered/enforced as authorized by the
State Building Code Act. Design/development concerns include: Addressing, fire
apparatus access roads, fire hydrant/flow, approved water systems, building
accessibility, construction type, occupancy classification, exiting, exterior wall
protection, and energy code regulations. (Note: The Department of Buildings reserves
the right to confirm the actual address at the time of building pernut.)
SPOKANE COUNTY AIR POLLUTION CONTROL AUTHORITY
1. All air pollurion regulations must be met.
2. Air pollution regulations require that dust emissions during demolirion, construction
and excavation projects be controlled. This may require use of water sprays, tarps,
sprinklers or suspension of acrivity during certain weather cond.itions. Haul roads
should be treated, and enussions from the transfer of earthen material must be
controlled, as well as emissions from all other construction-related activities.
3. SCAPCA strongly recommends that all traveled surfaces (i.e., ingress, egress,
parking areas, access roads) be paved and kept clean to minimize dust emissions.
4. Measures must be taken to avoid the deposition of dirt and mud from unpaved
surfaces onto paved surfaces. If tracking or spills occur on paved surfaces,
measures must be taken immediately to clean these surfaces.
5. Debris generated as a result of this project must be disposed of by means other than
burning (i.e., construction waste, etc.).
HEC Qrder for PE-1773-95 Page 10
,
6. All solid fuel burning devices (wood stoves, pellet stoves, etc...) must comply with
local, state, and federal rules and regulations.
SPOKANE COUNTY DEPARTMENT OF PARKS, RECREATION & FAIR
1. See Planning Department Condition No. 23.
CENTRAL VALLEY SCHOOL DISTRICT
1. See Planning Department Cond.ition No. 22.
VERA IRRIGATION DISTRICT
1. Project will require uriliry easements not ccexisting with drainage easements.
HEC Order for PE-1773-95 Page 11
ORDER
The Hearing Examiner Committee, pursuant to the above Findings of Fact and
Conclusion, APPROVES the application of Mark McManus for the Pr+eliminary Plat
to subdivide approximately 15.7 acres into 131ots for single-family residences and a
Zone Reclassif'ication, ZE-7-95, from Urban Residenrial-3.5 (UR-3.5) to Suburban
Residential-1 (SR-1) as described in the application PE-1773-95fLE-7-95 known as
Shelley Acres.
Motion by: Jane Myers Seconded by: Harry Gibbons
Vote: (3-0) UNANIMOUS TO APPROVE T'HE PRELIlVIINARY PLAT AND
ZONE RECLASSIFICATION
FEARING E R COMIVIIITT.'EE
HEREBY ATTEST TQ THE ABOVE FINDING , RDER AND
c .
CHAfR
C
ATTEST:
For WALLIS D. HUBBARD
Planning Director
A le'.w
B J HN W. P ERSON
Senior Planner
DATE
Pursuant to Spokane County regulations, any aggrieved party has the right to appeal this
written decision to the Spokane County Board of County Commissioners within ten (10)
calendar days of the signing of this order. Upon receipt of an appeal, a public hearing will
be scheduled. If you desire to file such an appeal, you must submit a written appeal,
preferably on fornas designed for such purpose, to the Board of County Comnussioners,
West 1116 Broadway, Spokane, WA 99260, along with a$215 processing fee payable to
the Spokane County Treasurer.
If you have any questions, please call the Planning Department at (509) 456-2205.
HEC Order for PE-1773-95 Page 12
.
&YVVM
- - ~
r:(J
~
~e
~
~
~
or
~
I q 1 . O 1~' ~ • ~ V - ~
\
~ C
` i ~ ~ , • 1 ~
tLIt) J
C;)
1?r L~~ _
• r3
~ 5 -
~
.
~ ~
~
1 ~ ~2
~
46
PENR
1773mag
7wn95
~ ~Ri ~Z
~4V u ~ K
, ,U ~ . GO(_, . ,
S PR ,qGUE
--._.4.. . -c
~-L~~Z • ~F.1- :i: .
AF'' R.R: ~ ~:s` o
~ _ r _ ' - . - ea ''C _ ~ • ' . ~
-f
bt ~ ~ ~ r; . " - ' . ~ , - , • .
r ~ , . ~ .3 ,Ro . ' ~ ' ' . ~ _ . . . 2 ,►d a~
~ W N • -I, f .r '
us
BrT'D C ` , ,IQI: ~.YE, ~ . ~ . - , r
t,~~ N, 4 S E v~ ~~...r . I . .
4.04 17. t!'L Lj? r ` O ~ ; V . "~`•~r'r~ Yl . .
. i ~ .
~ ~ ~ • . ' . a . . • .
f• _ , ' • .
~ ~ • ; ~ ' ' . ,
~ • _ - :BTFI~ '~~.~►E. ~ ' .
• i • -
c~ ' . ~ • ~
~ j An ~ _ . ~ . . . .
~y ~ `•i':~~ii; ' • . - • , '
r ~+.i;:.;, ~ ,
~ ~w f :v ~::~5:;~: `t•:~ . " , - .
"`r, ~ f ' e
~ : ;::::,t';;; x:: • .
~ 2 7h q,~~;.~r`:;::~:ti f::;;;;~;.:: . ' • ' .
~F.~;.. .
• . ' ~ .
~~~'~~:;:•;;.;;s,:;'~~'~ ~ .
~ .t;:.
. , . , . .
L~ ~ ~ ' •
~e. f _ . ' . .
~ i - . .
~ . .
k `r ' ~ ' • . ~ • '
~►+a _ ~ ~ 1' _ ' . ~ ~ ~ : - . •
. ' r~ ~.~"L ' " . • • ~ •
~
. oa.~ , , ~ . , • ~ ,
~ QQ~s 10* . .
~ JO }i ~ •
~ p F 1 • . .
• ~ ~ ;J ~ ~ . ~ . , ; . ' . .
. 9P'~ _ c r S~~Q~~ . . . . .
. , J ~ •r • ~
,.E,
3en ; . , • • •
J~ c° Q ; ' , ~ • ~ .
_ . f , • .
_ , . ,
3/95 HEC S ta ff Re ~ .
p°rt for PE-1773_95 ~
Pa 9 81
.
PE,?1773-95/ZEm m95
, o . ~1
l ~ e-2 ~n U u
, 2 M 1 N
8
_._.-Al ~ . . e
uR•22 B-2 B 2
B_ B3 es ~R_ ,U • - ~
~ " ~ ~ L~. ~ • . 204 9. ~
9
3
~ c+ m (~2 ~ B- R R c.;o„ £
- ~ - . - rFt2i UR-? ~ .
B -2 . • ~ , , 3 RD
c UR-7 . I` ~
UR-3.5 z -a-T ~
c
w
A yC. UR-3.5
A,Dr E Qn
- , , ? 8 , ~
ELl_E 0 9
Y~
~L.4KE ' .
f 1 \
8TH
~ _ ~ ~ . . .3 ...,.1
, . :1 •
• :
. t~ . , ~i;,
w ~ . ~;:'=<:%••=.;=.`{.'i::::.i
T ~ . : :s:::;: '
; :
€
' y ~ n ' T ~'i:,'~i;, y , _'1
W ' . ;k:. ,
E Q,~ MT .
, ~r ~ . . .
w
~ .
. ~
• ' ~ ~ ~ .
C
1
~ • C Qs~ ~ ~1
• , i .
- • ~ S ~ ti
•3` } t .
,~Q~• ' " - N L~
sRal
~ ,y G•~ i% ~ ~
s
. ~ ~
~ _ ~ ~ •
i. f- , ~ p • ~
~ ~c.Y, ~ • ~ l
~ Co _ `~3,~~-. _ _ tQ~i:__% ~~f~•~- ;b• - ' ' ~ -
~ ' ~ 'J r " ;a„',p ~ L
\ _ •
\
Page 82
3/95 HEC Staff Report for PE-1773-95
,
0 46
PE=1773w95/ZE=7=95
. . • • L • 'R \
s~' ~ ~ ~ 'c ~ : ~ --~;.`o
~ ~ • k \ o ^ ~Y :yr~.--r. _ ~ • • a e J e ~ . ~~v • .p' . ~i a. •
~ ~ • - • f: o a•»W
30io
, 1 ` ~ ' e ,t• ~RQ
j • ' l - : MlSS`ION _ • , c ~ ~ • yfD
'"8 M
~ -Lr.~l~ • • . • . . . v . •
~ - `~C\ _ ~_'~e pp • . ~c• ~'T~o~.~~~~.~~• J' •
~ ~ , ~.y •
' J v ' w.~ . . ~ ^ ~ ~ ' ~ ~ ~ ~ • i ~
r . . ~ . . _
p.•Greenacres : : z.-~ .
. ' . . . ' • . ~!'i. .
• ~ ~ r~ ~~t. . -
• _ ~ • c ~ 10)1 . °il'•"r="_ •
A ~ , ~ _ ~ ~ ~ ~a ' .
~ " . . . • . . ~ . . . • • 1U30 3} • ~
.
. ~ . ~ 2 ~ - ~ ( • :i 18 . v. ~ - - .
■ .
: .'r'~'T«S ~ T ^'~J ^ O ~ ~~_lf G : C~ -:~~t '1~' ^?S].- ~ 1 • • Y • '
• ..~I • « O • • • 0 . ~ ~ ~~~*h
• ~ 1.i ~ ~ p ` O O A~ O o ~ ~ ~ ~
• : O ~ • • O
• • • ~ ~ ~ •~~r~~~~~• • ~ • • •1
.
• p
1 • , 0 _ •l i~i~ • ~w• • • ~ • o _ .~y : ,'i~i~~iTi~
-1
' ~ W IOJ1 ~ • ~ • ~ o r •
~ ~ . . • - ~ ° ~ ~ ~ .
• ~ , ••'N a ~ ~I~ • ~ i y~ ~ - ]C ' D~` •i
• ~ ~ ~~I • ~ J •
• f, - - O_ .~.?."..t ~tlT.-:,'~. . ~ ~1. ~ • U ~ ~ • ~
• •~~;Y ~ ~ ~"'ii.~~~:• • w.*••• ~WAY • e • • ~
• a o o ' f • • ° ~ • t • ~
h piO
~ ~ , / ' • k i • •(eM ~
• • . • ~«ZO3t
, , , n ~ t .
~ • ' ~y
jV' : •r • . ,,t 0 ~ VsI ~p ~ • . •
A • ~ „ . ~ . J. . • .
~ ~ . , ~ p ~!o , •~'M. Ve~e
~ Y
JVL L ~Id~• • • • ."~l I • AN a• . ~ • • N we.• • • •o
~.~f..•~;.~.. ~--~__._J -
~ • . • • rr~. i '~~~~,'4iii ~ ~ •~~L• • ~Q~'
• ~ . • o~ ~ o i : i ~ ~ ' . • y d ~ • . ' ° ' o 'SPRAA~/~ ;
. ~ O ~ ~ . ~
( ~ f • ~ . . ~ j~~ca
• • ~
• ' `
~ MM • ~VP~oi •1 ~ • ~ 1 i
• ~ P~tx p ~`H'4. ~j ftt •
• i
, j~ .
• ~•~M• • ♦TN ~ •i AYCv:.~+" ~ ! t.•_ ~r • •~.~5:. .a~ .~r `~~:~_rr.::; v-••~•Z• i
. . . . ~ i.; 1 'r Park . t•. . i.'. _
~ o s o a _-:r-~ ~ ° . ~
~ ~ ~ ~ .x ' S i • o • e .
. C~ ~ 6 • ~ ~h _ '
jt)60
• - ► . - ' ~ n.• r4": _ .
2020 i ~ i ' " . ~ r .D I • ~ , " ' ~ ~ .r
~ - . - . 'l ~ 2 9 • . . . . , .
24 r . i- t . ~ . . . . • .
. , ~ .
i ~ " ; Akw • ~ MSnt Oisoes~i - ~
G tow 1 y!. ,
! ~r ~ -_.7,.,n:~, P1(A r ~
. ;I~____1i . ,.j~ .t~:•'• C> ' ~ h
~ • • • r ' ~1I~6 . ~ M r ~ ~
. • . . . , i . . . .
.a~ C ± ,
' . ~ ~ 1•i.•.•.'.•.'.•.'.•.:•.•.•.•.•.'.'.•.'.'.'.'.• y ^~i'l~
~ : y • •f:•: ' • .
ti . Pit eQ~:
~ . ,~►'••'''.'.~.;t:;:~•'•''•:
, ni~'~'•:
fa • AV~~ .Y.`74' .TT'!7'!l.4~.T.'TT~ ~ ~
~ `1 •I . o i .
! ' ~ ' l. ~ '
. .i~'' . t.'.'. ,
: ~ : , ' .l1•.•.•. . . . . ~
~ .J. ~I .i•.'.•.
. ~f:.,.•.•
k Z - - . .
!0 ~r s: ° ~ - _ . ' ~ .'T'~ • . . ♦ • . . . . . . . . ~ ~ ,
. ~ y`.~ , .•o 'f:.~.~.~.~.~:•::l:•:•.•.•:•.•:•.•.~:•:•:•:•:
t• 3 ~ . • ~ '~c: :t~:~:~:~:~:~:~:~:
b .
• ~ ' ~ . ~ ~ ~ . ' ~ . . . . . . . . . .'~:~:~'~'~'~'~'~'~'~'-'~'~'~'~7; ~
; • , . .:~i- N(..... ~ .
• • •/I~~ ~Q • ~•t' ~ .t.'.'.'.'.'.',~:.~,~~. . . ' •~J.'.'.'.~'1.'.'.'.'.' . . ♦ .:a- 1 ~ ♦ .
~ .7C:
7,: `
~4TN " ~ ' %~Ar ~ :i+: •i.•' . . . ' i'
• , . ~ i
; ~ ~ •.y • • S;
~ . •.j `i: ::1 ;f ~ ~ ' ~
( • ' . Y'`- :~i.13a1~'~'~...};...};... . . * • ~
~ ~ ' ~ • ~ . ~ . , r~
~ ~ ' ; : . ; - . 7~ .
: I ..i. . .1~'•••• ~ I 1
• ~ ' ~ •'i;t' ~ .
f
, . .
. . ' ~
. . L•_• , ~ f ~ I. 1 r ~
T• ~i. .~.~.~.~I%;•;•~•~.,.;,;':•;',• ,
~ , . . . . . . . . .
~ • BM - ~'s:•:•:~:•:•:•:•:•:•:•:•:•:•:•:• ;Y ;G•on .
.
• . • . • ° • 2057
~
, ~o - ~ . ~ __-~,e • 2129
: • ~ • . .
~`0
,
• i~ ' P A r . 1Jr~. , • , n ~ ~ ~ . ~ 1 I I ~ /
\ •Y
3/95 HEC Staff Report for PE-1773-95 Page 83
.
%
/=95
i - PE773=95/ZEm`
~ ~ ~ • N~r~ . •'y F~
~ ~ • v
. ~,.li . +_`IILT ?
Greenacres •
~ . , .n. .
~ ' ~ o u . . • . '
~ ~ ~ 10.~1~~ ~ . •t~• '
' ~ ' ~ ~ • ~ .
, . . .
• 2030 ij
~ os~
2oL0~, -"`~w■m+ ' ' ' ~ • i; , l~g ■s la ~"Eft
, . . . . . . s.~ .I~i~.J~ ~ • t . . - -
~ , ~ „y: ~
~ ~ I'r~iKrv•.~ , fT~'1 ! 1 ~ • . , . • • _ . . ~ • ~
.sc h ' 'J*
t ~j'. . i• ' oJ „ • ' . •i • _ ~ , . .
•i:•.
i Y
. • v~~Y~~ : , . ~ ~ ~ l --1
~ . . ' r~ 3:~:'ii ~~++~r ' . .o
VALIfY ~ ~ T. ~ : • ~ . WAY . u ~
jr {lIk+ ' . ' •
. : ~ . . y~'~~/yytt/~~~\~~ ~ • ~ Pp .
.
• , . ~~//,,JJ~~%// f\]j1J~(j~~V~J ~ :20 18
~ ~I .1 • • • V ~ ~ / ~Ti
. ~ ~ • . • 1 ti/ • ~ ,
Veradale _
~ •.ti"6u6. "66W, J •&t ertF . ' 'Ai:
.w~~
. I. ~y . . . . • ~ . . . .~11 ~ . ..y~ ~ . . • . • Sp• • G~ • JO<5 '
. .
' ~ ~ Gravel Pit..
n i~~. c ~ ' i,~~ii~ • / , ~ (V'diler
• ~ . . , . ~ ~ . t Park ~ . . . . ~ ~ . • . .
Q ~ ~ ~ ~t1~ • ~i . ' ~ . 1f>6~
;
~nt / 1 . • -
1'g '
^ ~ ~ ' ' -
t'i• ~
'nlrnl Vell„~ 2`'~ I_' - - •
\ . . , y • lC1Hi • ~
~ IiiKh:trh x I ~~Sewd e DiSp0521,
d s \
Gre~'' /
. . I w
' • ~'~2:::'':~:•. 2 • i C-)
. . . ~oah ::fi;?~::~:: ~ ' . cr
.ti ~a pit~ Q ~i
~
l ' ~ I z C► m eM ~
. ~ ~ W r ~ 208:~
~-~+--~,0~■~1■~
~ ~ . .
~ i
~ . .
~ .
Q
wace. {
• Ta ~
. 110 ~ • ~r~.~ ~ ~ _ . . . . • . .
~ . !:.AVe 2
, , • r,..
i~ • • ;
. ~
~fl ~ ~ 4~ ~ • x236/ 2~Q0 .
: ' • - ' .
; . • , ~ ~ ~
Ak Il' . . . ~ U C . ~ u •J ~ ~ ~ .
rrGrange' 5 ~ N a I I 8M tA • I
a
C
. . 6 ~~6p j'~' • ~ 1 l,oo."
f ~ - . ~3.J/ ,
I~~g~ ` (FREEMAN) ~ R 44 E k 45 E lO'
•w n w r.
3/95 HEC Staff Report for PE•i773-95 Page 84
q61~T KY M I
SHELIEY ACRES ADDI710N
' wrt or r in It ul 8 in rmta 24. tanuoU n.om~
• wat u e+M. n m camm or uaug, mn m wkNneta. ~
i
W ~ r
= 1 ~ L
m ~
n it6::EIVE:l
~ ~ FEB 81995
Itlt -11,7 6VOKANII COUNTY
}tilL IMt AMA 13 r.,IIAC OfPAHTWLNI
~ f wns nwn a ur~ . mcm•
~ o~m. ~
rrue
(D .~m rorns ~
ua it +n n. couu or ng 3e. u4 or m 24.114 m im-
. ~
fIOi I1. fOwAI/IAO I~ 11 ,OfTt, AaYGf 11 nM. TIfIG ~.0•71'71•3
~ f11.11 R1t Ttl YIR UY 0t YW 11.114 12.1 /1 A Rt t19~
O " IOtR Q7 aGIOl10 0f 111! al[tIRIW. ' OF p
rmc~ ..ru~u•~. ~n~.m rtm e~^
0.44 ~u•n•~.~~~.»•rmi ~4*
ne~ S,n•u•01-2. ~n.~rrtni O
T ~~OT
tClics ~.a~n»•r. ~w.ovmti
tuya 0.6rttaiw~ ~tieo nct~
nna ~.n'n'71't. IId1 /IR t0 tun ICa. 4
"~1 • ~ nn w , = rm m uoanaam or
O a ru misR a trowa "o Bt.n a+wnuci.. Spuo .•u~[t.
.tGM. ~
~ .
m i
fsAf ~b1f
~ lflY. 1'•110' "
~ I I t ~ ~ ~ , YYY•~~. •
V - rXtl•IIY. 111111! . ' . . ~.~•u.~Ihj ~1f1.11• ~ ~1 ~ ~
W ~ . ~ • ~ . IlN.ll~ ~ ~ 1171./1' `
tn ~ ~i ' . t!(4N ~f ~R . ;t ` ' pwif ~J tt~61N
4 I ♦
' ^ . •~w.'e~+rrie F p ~ ~ i , S • = i .
~ ~ s , ; 4 'y~ I .e n w iu. ~1 \ • t.rah~~i. ~ ! wr \ ~b.a• I ~'l ( . , .
.IRp •rr~~ ` I
i a• w.u i».tr u~.~~
~1~~\~! ~ ~~'lt _ \`~'~~••w~= ` _ ~1 T - ` 1 ; 171d,• 1 , ,
I \ \ • . \ 1 1 ~ I j ` t qn~
/ ~
` )))11111aaaCCC 4 • /aY11 1
! '
~ .wu.a•
~ / i . ~ ~i : ~ I l\:' M 1 • 1 ~ \I 1 G 41~N~
`
~ ~ ~ + r u~~ •:i. ~ `1 1 ` ~ ~~'l 1 twnrl
, ~ ~ ` "w ~u~m~ 1~* W~ u K~UtN nra a 1 i ~ i~►Nq•y
N.
\ \ , • _ _ ^ • ~ ' 1 I
~ 1 \ ~ ~ ~ 2: y er ~ ut• " `~~i~.. ~ ~~N wi.n.
+ I g G , -STEEN
w nr~au•
~ ~~::-•i.... . r i,~,+' • ~t ~l,'~A ~~i.` .
~ N'.w . ••ui.h•' . A~ ♦ ~ ~n~~~earru...
~ ~ ,I ~ ` • • ..nuu~: ~~~1 `LN. ~r~ . .I~~j.~f~C,,1• ~ I~ ~ui~t~ :
c J \ _ ~ .v, ` ; ,
. . ~l . , il , ~ ~ ~ ` : : .ti ~ ~ ~
1 i. `.~~.il~~ \ \ • ~W~~
~ '4 • ~ + ui.~ ~ S tw i ~ ~ O
\
111i
` \ ~It \ .
11 ~p Y 1~~ ~ 1 I ~ ` ~p 1 L t ur ~ \S
~.a .a. I ~ ;.r.. _ ) . _ ».u•
W .~'~'r= ` ` ~ ~ ' ~ \ -I 1,~ \ I~ ~ ` •li. ' r~ wuan ~.11 11'717.
~ ~ j _ alql'ry~ ^Y.` v 1 1 ~ ~ir n. in.u.+ ~ ~ ~ ~•6 ~L~ ~ wniimu~ u.~~ ~
\ L n~.n• L lr.. .
1c~~~"+ 'wr.r. 11 ! ~ + mu• i A A
/ ' ~ ♦ I`~ ~ ~ 1 1 rur.n.1~✓ I ..rtrw•c: ua.uI_~ f
M . • ~ q I~ ~ ~ j b ~.ru~7~7. ' wa.n~ ur ~ ~ M~ ~ ~e ~ ,I
tJl i • ~ (e, •?~9
~ y I I _ i~ ~Y°O ~ rrwi~ .mu un rmw ( Nr l~ ~ •~;~w
• ,~w ~ , . , ' _ _ ' ~~J . LAND-MARK SURVEYORS
.
..ru•n~~n~.ti~ ~ 414 aw
IGW. I••111•~"'~' I~
I • UIi1 8. ONOLO101 AiLICI. a@ICi1/r WMI-
I t•111-I11•1111 ,
~ ~ . .
PLANNING DEPARTMENT REPORT
TO: SPOKANE COUNTY HEARING EXAMINER COMMITTEE
FROM: CURRENT PLANNING SECTION
DATE: MARCH 23, 1995
SUBJECT: PE-1773-95, PRELIMINARY PLAT OF SHELLEY ACRES
WITH EXISTING SUBURBAN RESIDENTIAL-1 (SR-1)
ZONING WITH A ZONE RECLASSIFICATION, ZE-7-95
FROM URBAN RESIDENTIAL•3.5 (UR-3.5) TO
SUBURBAN RESIDENTIAL-1 (SR-1)
1. GENERAL INFORMATION
Applicant: Mark McManus
Ben Simpson
921 South Monroe
Spokane, WA 99204
(509) 455-5411
Surveyor: Willard D. Boatwright
East 18828 Broadway
Greenacres, WA 99016
(509) 924-3905
Contact Planner: Kenneth Kuhn
Location: Generally located east of 12th Avenue (extended) approximately 350 feet
east of the intersection of 12th Avenue and Shvmrock Stneet in the SE 1/4 of SeCtiOn 24,
Township 25 North, Range 44 EWM, Spokane County, Washington.
Proposal: Preliminary Plat to subdivide approximately 15.7 acres into 131ots for
single-family residences and a Zone Reclassification from Urban Residential-3.5
(UR-3.5) to Suburban Residential-1 (SR-1). .
II. SITE INFORMATION
A. Site Size: Approximately 15.7 acres
Gross Density: Approximately 1.21 acres per unit
,
B. Comprehensive Plan
1. Land Use Plan: The property is located almost entirely within the
Suburban Plus (S+) category of the Comprehensive Plan while 1.8 acres are
within the Urban (U) category. The proposal is also within the Aquifer
Sensitive Area (ASA) and the Priority Sewer Service Area (PSSA). The
3/95 HEC Staff Report for PE-1773-95 Page 86
.
Suburban Plus category is intendeti to provide the opportunity for
development of residenrial azeas with large yards and ogen spaces. The
Goals, Objectives and Decision Guidelines of the Suburban Plus category
pnomote fill-in development within established Suburban Plus development
areas and existing oudying communities where utilities, arterials, schools and
community facilities have already been established.. Residential net densities in
the Suburban Plus category shall range between 1 acre to 5 acres per dwelling
unit.
The Urban (i) category of the Comprehensive Plan is intended to provide the
opportunity for development of a"city-like" environment which includes
various land uses, intensive residential development, and public facilities and
services (water, sanitary and storm sewer lines, police and fire protection, and
other features). The Goals, Objecrives and Decision Guidelines of the Urban
category promote fill-in within established development areas and existing
outlying communities where utilides, arterials, schools and community
faciliries have already been established. Residential net densiries should have
an approximate density of 1 unit to 17 units per acre.
The proposed density of approximately 1.21 acres per unit is consistent with
the Suburban Plus category and generally consistent with the Urban category
of the Comprehensive Plan.
2. Arterial Road Plan: The Spokane County Arterial Road Plan identifies
12th Avenue and Shamrock Street as Local Access Smeets. The County
Engineer has required dedication of 50 feet of addidonal right-of-way along
Steen Court. There is no Future Acquisition Area (FAA) requined for this
proposal.
3. County Parks Plan: The nearest county parks are Terrace View Park and
Sullivan Park. Terrace View Fark is located approximately 2 miles west-
southwest of the proposal, at Blake Road and 24th Avenue. The Park is 9
acres in size and is equipped with picnic facilities, piay equipment, ball field,
rest rooms and swimming pool. Sullivan Park is located approximately 2.2
miles north-northwest of the proposal, immediately west of Sullivan Road on
the north bank of the Spokane River. The park is 10 acres in size with 1400
feet of shoreline an the Spokane River. It is equipped with play equipment,
shelters, water, electricity, and cooking units, drinking fountains, and rest
rooms. The Parks and Recreation Plan identifies a shortage of park facilides
in the East Valley area in which the site is located. (See Item R. below).
C. Site Characteristics: The topography of the site can generally be described as
mostly flat to gently sloping to the west, with very steep hillside along the east and
southeast sides of the pmperty. The steepest slope on the site is approximately
6001o. The site is predominately grass vvith some trees in the steep slopes along the
east and southeast edges of the site.
D. NeighbQrhoad Characteristics: Tlie area to the north and west is open
agriculturalland. Central Valley High School is approximat,ely .3 mile to the
wesL I?irectly to the east and south rise a r+ock outcropping, steep treed hillsides
and basalt cliffs which adjoin vacant land. Southwest of the site are single-family
residences on lots ranging from approximately .8 acres to 1.6 acres in size.
3f95 HEC Staff Report for PE-1773-95 page 87
46 E. Zoning Analysis:
Proposal: Suburban Residential-1 (SR-1) and Urban Residential-3.5 (UR-3.5)
established on January 1, 1991, previously classified as Agricultural
(A) (ZE-60-42)
North: Urban Residendal-3.5 (UR-3.5) established on January 1, 1991,
previously classified as Agricultural (A) (ZE-60-42)
South: Mining (MZ) established on January 1, 1991, previously classified
as Rock Quarry, Sand and Gravel Pit Zone (ZE-199-56)
East; Suburban Residential-1 (SR-1) established on January 1, 1991,
previously classif'ied as Agricultuml (A) (ZE-60-42)
West: Suburban Residential-1 (SR-1) established on January 1, 1991,
previously classified as Agricultural (A) (ZE-60-42)
Since January 1, 1991, when the Spokane County Zoning Code was fully
implemented, the site has been zoned Suburban Residential-1 (SR-1) and Urban
Residential-3.5 (UR-3.5). Prior to 1991 the site was zoned Agricultural (A).
Adjacent property on the east and west is also zoned Suburban Residential-1 (SR-1),
while the property to the north is zoned Urban Residential-3.5 (UR-3.5). The
property directly to the south is zoned Mining (MZ). This proposal includes a zone
change request from Urban Residendal-3.5 (UR-3.5) to Suburban Residential-1
(SR-1), and is compatible with existing and adjacent zoning designations. The zone
reclassification is requested to provide the entire proposal with one zone designarion,
Suburban Residential-1 (SR-1), inste.ad of dividing three of the proposed lots into
two ciifferent zones. The S uburban Residential-1 (SR-1) zone can implement the
Goals, Objectives and Decision Guidelines of the Urban category of the
Comprehensive Plan and is consistent with densities in the adjacent properties.
F . Land Use Analysis:
Proposal: Vacant and undeveloped. ,
North: Undeveloped, with one abandoned single-family residence.
South: Vacant and undeveloped.
East: Vacant and undeveloped.
West: Agricultural land and single-fanuly residences on less than 2-acre
lots.
The are,a generally to the west consists of farmland and single-family residences on
less than 2-acre lots with no sidewalks or curbing. The area generally to the north,
east, and -south consists of agricultural and vacant undeveloped land. Recent
subdivisions in the area include Remington Hill (PE-1763-94), Shelley Lake (PE-
1750-94), and Sullivan Meadows (PE-1747-94). Remington Hill is located.9 mile
directly south of the site and consists of 7 single-family lots on 30 acres with an
overall density of 4.3 acres per unit. T'he proposed Shelley Lake development is
located adjacent to the west of the site and consists of 244 single-family lots on 123
acres with an overall density of 1.98 units per acre. The Sullivan Meadows
3/95 HEC Staff Report for PE-1773-95 Page 88
proposal is located .9 mile southwest of the site and consists of 17 single-family
lots on 5.5 acres with an overall density of 3.09 units per acre. This proposal, with
an overall density of 1.21 acres per unit, is generally compatible with land use
trends in the surrounding area.
G. Circulation: Access to lots within the subdivision will be provided by one public
road, 12th Avenue, extending from Sha.mrock Road to the west property line and
one public road, Steen Coult, extending from 12th Avenue and ending in a cul-de-
sac near the north end of the subdivision.
H. Design: The plat design illustrates residential lots ranging from 1 acre to 1.43
acres. All the proposed lots either meet or exceed the minimum lot size and
frontage requirements of the Suburban Residential-1 (SR-1) zone.
I. Density: The net density is approximately one acre per unit, which meets or
exceeds the density stand.ards of the Suburban Residential-1 (SR-1) zone and the
density range suggested by the Suburban Plus and Urban categories of the
Comprehensive Plan.
J. Drainage: A drainage plan is required. This plan must be reviewed and approved
by the County Engineer's Department prior to development.
K. Power Transmission Lines/Other Known Easements: None illustrated.
Any required or recorded easements will be disclosed during the final plat process.
L. Water Supply: The proposal is within the Vera Water and Power District. The
water district has indicated that they are able to supply the proposal. A water plan
and provisions for water service shall be coord.inated with the water purveyor prior
to finalizarion of the plat.
M. Sewage Disposal: The project will be served by on-site sewage disposal. Plans
and specif'ications are to be reviewed and approved by the Spokane County Utilities
Department prior to finalization of the plat
N. School: The proposal is in the Cenual Valley School District No. 356. The
Central Valley School District has responded to the proposal and has indicated that
existing facilities are inadequate to accommodate additional students. The school
district has r+equested the applicant be required to negotiate a voluntary agreement to
mitigate the impacts of the proposal on the school district and existing facilities.
This request is included as a r+ecommended condition of approval.
0. Fire Protection: The proposal is within Fire District No. 1. The Fire District
and the Division of Buildings Department (Fire Marshall) are required to approve
fire protection provisions prior to finalizing the preliminary plaL
P.. Wetlands/Critical Areas: Spokane County Wetland Inventory Maps do not
indicate the presence of wetlands on the site. However, the proposed plat is
associated with an area of special fload hazard, therefore development within this
subd.ivision shall conform to the requirements of the National Flood Insurance
Program and the Spokane County F1ood Zone Ordinance (Spokane County Code,
Chapter 3.20). Flood zones are critical areas under 36.70 RCW and policies in
Section 13A of the Spokane County Comprehensive Plan (Critical Areas).
Conditions submiued by County Engineering will implement these specific policies.
(See Engineer and Roads Condition No. 4)
3/95 HEC Staff Report for PE-1773-95 Page 89
~ •
Q. Culturai Resources: None have been identified.
R. Department of Parks, Recreation & Fair: The Spokane County Parks and
Recreation Plan indicates that existing park facilities in the East Valley Suburban
Area are inadequate to meet current and projected needs. The Parks Department has
requested that the applicant be required to reach a voluntary agneement to mitigate
the impact of the proposal on park facilities. To satisfy the requuements of RCW
58.17.110 that a subdivision make appropriate provisions for public parks,
recreation and playgrounds, the owner, at his option, shall either dedicate land
within the subdivision or enter into a voluntary agreement with Spokane County to
mitigate the d.irect impacts that the subdivision has on public parks, open spaces and
recreation facilities vvithin the unincorporated areas of Spokane County. This
request is included as a recommended condition of approval. If the owner opts to
enter into a voluntary agreement, the agreement shall be executed prior to the
finalization and recording of the plat and necorded in conj unction therewith. The
agreement shall be consistent with RCW 82.02.020 and be substantially the same
as the standardized agreement prepared by the Spokane County Parks, Recreation
and Fair Department. Prior to finalization of the plat, the owner shall advise any
purchaser of property, as authorized under RCW 58.17.205, of the obligation
within the voluntary agreement.
III. ENVIRONMENTAL REVIEW:
An Environmental Checklist was submitted by the sponsor and was reviewed by the
County Planning Department The review considered the specifics of the proposal,
other available information, County ord.inances, other regulations and laws, possible
standard Conditions of Approval, the Generalized Comprehensive Plan, and other
County policies and guidelines. The Planning Department has determined that No
probable significant adverse impacts" would result from the proposal being developed
and has issued a Determination of Nonsignificance ("DNS").
The "DNS" was circulated to 13 other agencies of jurisdiction and other
agencies/deparanents affected by the future development for review and comment.
The "DNS" comment period ends March 21, 1995 and was advertised 15 calendar
days before said date in the newspaper, by letter to adjacent property owners within
400 feet of the proposal, and by notice on a sign posted on the proposal site. The
Hearing Examiner may consider additional environmental related testimony at the
public hearing.
I V. PLANNING _ DEPARTMENT SUMMARY AND RECOMMENDATION
The proposed preliminary plat conforms to the Spokane County Subdivision and
Zoning Code regulations, and is consistent with and implements the Goals, Objectives
and Decision Guidelines of the Suburban Plus and Urban categories of the
Comprehensive Plan. The proposal is consistent with existing and pending land uses
in the area and also provides "fill-in" development as encouraged by the Suburban Plus
and Urban Comprehensive Plan categories. The zone reclassification from Urban
Residential-3.5 (UR-3.5) to Suburban Residential-1 (SR-1) is consistent with the
Goals, Objectives and Decision Guidelines of the Comprehensive Plan. The Planning
Department recommends approval, as conditioned.
3/95 HEC Staff Report for PE-1773-95 Page 90
, .
V. CONDTTIONS OF APPROVAL
i. All conditions imposed by the Hearing Examiner Committee shall be
binding on t6e "Applicant", which terms shall include the owner or
owners of the property, heirs, assigns and successors.
i i. The conditions of approval apply to the preliminary subdivision of
record.
SPOKANE COUNTY PLANNING DEPARTMENT
1. All conditions imposed by the Hearing Examiner Committee shall be bind.ing on the
"Applicant", which term shall include the owner or owners of the property, heirs,
assigns and successors.
2. Upon filing the final plat, or a pomon thereof, the zone reclassification of the final
plat area shall be finalized, and the existing zone classification shall be changed to
Suburban Residential-1 (SR-1), consistent with the proposed zoning approved with
the preliminary plat of record.
3. The proposal shall comply with the Suburban Residential-1 (SR-1) zone and the
Aquifer Sensitive Area (ASA) Overlay Zone, as amended.
.
4. The final plat shall be designed substandally in conformance with the preliminary
plat of record. No increase of density or number of lots shall occur without a
change of condition application submittal and approval.
5. The Planning Director/designee shall review any proposed final plat to ensure
compliance with these Findings and Conditions of Approval.
6. A final plat name/number shall be indicated before the final plat is filed, such
nameJnumber to be approved by the Planning Director/designee.
7. Appropriate road name shall be indicated.
8. The preliminary plat is given conditional approval for three (3) years, specifically to
April 1, 1998. The applicant may request an extension of rime by subnutting a
written request approximately forty-five (45) days prior to the above expiration
date.
9. Appropriate utility easements shall be indicated on copies of the proposed final plat
Written approval of urility easements by appropriate utility companies shall be
received with the submittal of the final plat.
10. The final plat shall indicate by a clear, dashed line the required yard setbacks from
all private, "Tract X" or public roads. The dedication shall contain the following
statement.
"Side yard and rear yard setbacks shall be determined at the tim building permits
are requested unless these setbacks are specifically drafted on this final plaL The
setbacks indicated on this plat may be varied from if proper zoning approvals are
obtained."
3/95 HEC Staff Report for PE-1773-95 Page 91
11. Three (3) current certificates of title shall be furnished to the Planning Department
prior to filing the final plaL
12. Prior to filing of all or a portion of the final plat, the applicant's surveyor shall
submit one or more maps outlined in red of the area being finalized. The scale shall
match the appropriate assessoes map scale.
13. The final plat shall indicate yard setback arc lengths on cul-de-sac lots which meet
or exceed the minimum frontage of the underlying zone of the final plat.
14. A plan for water facilities adequate for domestic service and fire protection shall be
approved by the water purveyor, appropriate fire protection d.istrict, County
Build.ing & Safety Department, and County Health District, The agencies will
certify on the Water Plan, prior to the filing of the final plat, that the plan is in
conforniance with their respective needs and regulations. The Water Plan and
certification shall be drafted on a transparency suitable for reproduction and be
signed by the plat sponsor.
15. The water purveyor shall certify that appropriate contractual amangements and
schedule of improvements have been made with the plat sponsor for construction of
the water system in accord.ance with the approved Water Plan. The time schedule
shall provide for completion of the water system and inspection by the appropriate
health authorides prior to application for building permits within the final plat, The
arrangements or agreements shall include a provision holding Spokane County and
the purveyor harmless from claims by any lot purchaser refused a building pemut
due to the failure of the subdivision sponsor to satisfactorily complete the approved
water system.
16. The final plat dedication shall contain the following statement:
"The public water system, pursuant to the Water Plan approved by county and state
health authorities, the local fire protection district, County Building & Safety
Department and water purveyor, shall be installed within this subdivision and the
applicant shall provide for individual domestic water service as well as fire
protection to each lot prior to sale of each lot and prior to issuance of a building
pernut for each lot"
17. No building pemut will be issued for any lot within the final plat until certified by a
Washington state-licensed engineer that "the water system has been installed
pursuant to the approved Water Plan for the final plat" including a signed license
sta.mp. The certification may be in the form of a letter, but is preferned to be certified
on a copy of the Water Plan as a schematic map showing the "as-built" water
system.
18. The Water Plan and the above four (4) conditions of approval regarding the Water
Plan may be waived by the Planning Director/designee upon receipt of letters firom
the appropriate water purveyor and fire protection district stating that simple
connections to an existing, approved water system will provide adequate domestic
and fire protection water to ensure the public health, safety and general welfare.
19. A survey is required prior to the filing of a final plat.
20. Vera Power and Water requires provision of utility easements that are not co-
existing with drainage easements.
3/95 HEC Staff Report for PE-1773-95 Page 92
21. Prior to approval of roa.d and drainage plans, you are required to coordinate with
the United States Postal Service to determine type and location of central mail
delivery facilities which may include applicable easements for developments of
three or more homes.
22. The Owner shall negotiate with the Central Valley School I?istrict and submit a
recorded copy of a voluntary agreement making provisions for public schools prior
to finalizadon and recording of this plat. The agreement shall provide a written
description of the subject property to which the agreement applies and also state the
dollar amount and any other agreed to mitigating measures.
The Owner shall also notify any potenrial purchasers who have made an agneement
to purchase property within said plat pursuant to the Revised Code of Washington
(58.17.205), that adequate provisions for school facilities must be made
conditioned on a future agreement between the plattor and school district.
Voluntary agreements between the Owner and School District shall conform to the
requirements of the Revised Code of Washington Chapter 82.02.
23. To satisfy the requirements of RCW 58.17.110 that a subdivision make appropriate
provisions for public parks, recreadon and playgrounds, the owner, at his option,
shall either dedicate land within the subdivision or enter into a voluntary agreement
with Spokane County to mitigate the direct impacts that the subdivision has on
public parks, open spaces and recreational facilities within the unincorporated areas
of Spokane County.
If the owner opts to enter into a voluntary agreement, the agreement shall be
executed prior to the finalization and recording of the plat and recorded in conjunction therewith. The agreement shall be consistent with RCW 82.02.020 and
substantially the same as the standardized agreement prepared by the Spokane
County Parks, Recreation and Fair DepartmenL Prior to finalizaaon of the plat, the
owner shall advise any purchaser of property, as authorized under RCW
58.17.205, of the obligation within the voluntary agreement.
24. The Planning Department shall prepare and record with the Spokane County
Auditor a Tide Notice noting that the property in question is subject to a vanety of
special cond.itions imposed as a result of approval of land use action. This Title
Notice shall serve as public notice of the condirions of approval affecting the
property in question. The Title Notice should be recorded within the same time
frame as allowed for an appeal and shall only be released, in full or in part, by the
Planning Department. The Title Notice shall generally provide as follows:
The parcel of property legally described as [ ] is the subject of
a land use action by a Spokane County Hearing Body or
Administrative Official on [ imposing a variety of special
development conditions. File No. [ ] is available for inspection
and copying in the Spokane County Planning Department.
3/95 HEC Staff Report for PE-1773-95 Page 93
SPOKANE COUNTY DIVISION OF ENGINEERING AND ROADS
Prior To Issuance nf A Building Pernmi.t Ch iJr. nf The Pro~r v As Pronosed:
1. The conditional approval of the plat is given by the County Engineer subject to
dedication of right-of-way and approval of the road system as indicated in the
preliminary plat of record.
2. Plans, profiles, and cross-secdons as designed to County standards showing
proposed street centerline and curb grades shall be submitted to the County
Engineer for approval prior to construction and/or the filing of each final plat; road
plans to be prepared under the direction of a licensed Professional Civil Engineer.
3. Drainage plans and design calcularions showing the alignment of drainage facilities
shall be submitted to the County Engineer for approval prior to construction and/or
the filing of the final plat. Drainage plans to be prepared under the direction of a
licensed Professional Civil Engineer.
4. The regulations of the National Flood Insurance Program shall be observed since
the proposed plat is associated with an area of special flood hazard. A development
peimit shall be obtained from the County Engineer before construction or
development begins on any property all or a portion of which is in any area of
special flood hazard (reference Spokane County Ordinance No. 88-0521).
The following statement shall appear within the dedicatory language of the plat:
"Development within this subdivision shall conform to the requirements of the
National Flood Insurance Program and Chapter 3.20 of the Spokane County Code.
Purchasers of the property in this subdivision are warned of possible flooding or
ponding and the potential requirement to purchase flood insurance. This warning
shall be carried in each and every deed drawn to transfer ownership of any and all
progerty within the plat in the area of special flood hazard.
5. Construction within the proposed public smeets and easements shall be performed
under the direct supervision of a licensed engineer/surveyor, who shall furnish the
County Engineer vvith "as-built" plans and a certificate in writing that all
improvements were installed to the lines and grades shown on the approved
construction plans and that all disturbed monuments have been replaced.
6. No construction work is to be performed within the existing or proposed public
right-of-way until a permit has been issued by the County Eng-ineer. All work is
subject to inspection and approval by the County Engineer.
7. All construction within the existing or proposed public right-of-way is to be
completed prior to filing each final plat, or a bond in the arnount estimated by the
County Engineer to cover the cost of construcdon of improvements, construction
certification, "as-built" plans and monumenting the street centerlines shall be filed
with the County Engineer.
8. No direct access from lots to 1/2 Rights-of-Way until such roads are constructed to
County Standards and established as County Roads.
9. No direct access from lots to Stub Road connections until such roads are
constructed to County Standards and established as County Roads.
3/95 HEC Staff Report for PE-1773-95 Page 94
` • ~
~
10. Road design, construction and drainage control for 1/2 Rights-of-Way and Stub
Road connections are the responsibility of the developer.
11. Individual driveway access pezmits are required prior to issuance of a building
pemut for driveway approaches to the county road system.
12. Dedicarion of 50 feet of additional right-of-way along Steen Court is required.
13. Existing county roads providing direct access to the plat shall be paved and/or
curbed to Spokane County standards.
14. All public roads within the plat shall be designed and constructed to Spokane
County standards.
15. The word "applicant" sha11 include the owner or owners of the property, his/her
heirs, assigns and successors.
16. The County Engineer has designated Typical Roadway Secrion Number Two,
Local Access standard for the improvement of Steen Court, which is to be
constructed within the proposed development and extending to existing pavement
on 12th Avenue. This will require the installation of 36 feet of asphalt. The
construction of curbing is aiso required.
17. The proposed subdivision shall be improved to the standards set forth in Spokane
County Board of Commissioners Resolution No. 80-1592, as amended, which
resolution establishes regulations for roads, approaches, cira,inage and fees in new
construction.
18. The County Engineer has examined this development proposal and has deterrruned
that the impact of this proposal upon the existing county road system warrants the
ded.ication of addirional right-of-way and the roadway improvements herein
specified.
19. T'he applicant should be advised that there may exist utilities, either underground or
overhead, affecting the subject property, including property to be dedicated or set
aside for future acquisition. Spokane County assumes no financial obligadon for
adjustments or relocation regarding these utilities. Applicant(s) should check with
ihe applicable utility purveyor and the Spokane County Engineer to determine
whether applicant(s) or the utility is responsible for adjustment or relocation costs
and to make arrangements for any necessary work.
20. Applicant shall request dedication of the 1 foot strip prior to any final plat approval.
SPOKANE COUNTY DIVISION OF UTILITIES
1. Any water service for this pmject shall be provided in accordance with the
Coordinated Water System Plan for Spokane County, as amended.
2. Pursuant to the Board of County Commissioners Resolution No. 80-0418, the use
of on-site sewer disposal systems is hereby authorized. This authorization is
conditioned in compliance with all rules and regulations of the Spokane County
3/95 HEC Staff Report for PE-1773-95 Page 95
0 ~ • Health I?istrict and is further conditioned and subject to specific application
approval and issuance of permits by the Health DistricL
3. Each new dwelling unit shall be double plumbed for connection to future area-wide
collection systems.
4. A dry sewer connecrion to the future area-wide Public Sewer System is to be
constructed. (See Condition #6)
5. If there are any public facilities on or through private property which must be
maintained by Spokane County, then a Public Sanitary Sewer easement shall be shown
on the face of the plat and the dedication shall state:
"The perpetual [exclusive] easement granted to Spokane County, its successors and
assigns is for the sole purpose of constructing, installing, operating, maintaining,
repairmg, altering, replacing, removing, and all other uses or purposes which are or
may be related to a sewer system. Spokane Counry, its successors and assigns at all
times hereinafter, at their own cost and expense, may remove all crops, brush, grass or
trees that may interfere with the constructing, installing, operating, maintaining,
repairing, altering, replacing, removing, and all other uses or purposes which are/may
be related to a sewer system.
The grantor(s) reserves the right to use and enjoy that property which is the subject of
this easement for purposes which will not interfere with the County's full enjoyment of
the rights hereby granted; provided, the Grantor(s) shall not erect or construct any
building or other structure or drill on the easement, or d'uninish or substanrially add to
the ground cover over the easement.
The easement described hereinafter is to and shall run with the land."
6. Applicant shall submit expressly to Spokane County Utilities Department "under
separate cover", only those plan sheets showing sewer plans and specifications for. Dry
sewer connections for review and approval by Utiliries Department prior to issuance of
pennit to connect.
7. Security shall be deposited with the Utilities Department for construction of public
facilities/double plumbing/private connection/dryline connection.
SPOKANE COUNTY HEALTH DISTRICT
1. The final plat shall be designed as indicated on the preliminary plat of recard andlor
any attached sheets as noted.
2. Appropriate urility easements shall be indicated on copies of the preliminary plat of
record for distribution by the Planning Department to the utility companies,
Spokane County Engineer and the Spokane County Health District. Written
approval of the easements by the utility companies must be received prior to the
subnuttal of the final plat.
3. Sewage disposal method shall be as authorized by the Director of Utilities, Spokane
County.
4. Water service shall be coord.inated through the Director of Utilities, Spokane Counry.
3/95 HEC Staff Report for PE-1773-95 Page 96
. 0 40
5. Water service shall be by an existing public water supply when approved by the
Regional Engineer (Spokane), State Department of Health.
6. Prior to filing the final plat, the sponsor shall demonstrate to the sarisfaction of the
Spokane County Health District that an adequate and potable water supply is
available to each lot of the plat
7. Prior to filing the final plat, the sponsor shall present evidence that the plat lies
within the recorded service area of the water system proposed to serve the plat.
8. A plan for water facilities adequate for domesric use, domestic urigation use and
fire protection use shall be approved by the water purveyor. Said wat,er plan must
have been approved by the fire protection d.istrict and the appropriate health
authorities. The health authorities, water supplier (purveyor) and the fire protection
district will certify, prior to the filing of the final plat, on the face of said water plan
that the plan is in conforniance with their requirements and will adequately satisfy
their respective needs. Said water plan and certification will be drafted on a
transparency suitable for reproduction.
9. The purveyor will also certify prior to filing the final plat on a copy of said water
plan that appropriate contractual anangements have been made with the plat sponsor
for construction of the water system, in accordance with the approved plan and time
schedule. The time schedule will provide, in any case, for completion of the water
system and inspecdon by the appropriate health authorities prior to application for
building permits within the plat, The contra.ctual arrangements will include a
provision hold.ing Spokane Counry, Spokane County Health District and the
purveyor harmless from claims by any lot/tract purchaser refused a building permit
due to failure of the plat sponsor to satisfactorily complete the approved water
system.
10. Prior to filing the final plat, the sponsor shall demonstrate to the satisfaction of the
Spokane County Health District that suitable sites for on-site sewage d.isposal
systems are available on all lots.
11. Subject to specif'ic applicadon approval and issuance of petmits by the Health
Officer, the use of individual on-site sewage disposal systems may be authorized.
12. The dedicatory language of the plat will state: "Subject to spacific application
approval and issuance of permits by the Health Officer, the use of individual on-site
sewage d.isposal systems may be authorized."
13. The dedicatory language on the plat shall state: "Use of private wells and water
systems is prohibited."
14. The final plat dedication shall contain the following statement: '"The public water
system, pursuant to the water plan approved by county and state health authorities,
the local fireprotection district, County Building and Safety Department, and water
purveyor, shall be installed within this subdivision and the applicant shall provide
for individual domestic water service as well as fire protecdon to each lot prior to
sale of each lot and prior to issuance of a building permit for each lot"
3/95 HEC Staff Report for PE-1773-95 Page 97
# -
SPOKANE COUNTY DIVISION OF BUILDINGS
1. The applicant shall contact the Department of Buildings at the earliest possible stage in
order to be informed of code requuements administered/enforced as authorized by the
State Building Code Act. Design/development concerns include: Addressing, fire
apparatus access roads, fire hydrant/flow, approved water systems, building
accessibility, construcrion type, occupancy classification, exiting, exterior wall
protection, and energy code regulations. (Note: The Department of Buildings reserves
the right to confirm the actual address at the time of building permit.)
SPOKANE COUNTY AIR POLLUTION CONTROL AUTHORTTY
1. All air pollution regulations must be met.
2. Air pollution regulations require that dust emissions during demolition, construction
and excavarion projects be controlled. This may require use of water sprays, tarps,
sprinklers or suspension of activity during certain weather conditions. Haul roads
should be treated, and emissions from the transfer of earthen material must be
controlled, as well as emissions from all other construction-related activities.
3. SCAPCA strongly recommends that all traveled surfaces (i.e., ingress, egress,
parking areas, access roads) be paved and kept clean to minimize dust emissions.
4. Measures must be taken to avoid the deposition of dirt and mud from unpaved
surfaces onto paved surfaces. If tracking or spills occur on paved surfaces,
measures must be taken immed.iately to clean these surfaces.
5. Debris generated as a result of this project must be disposed of by means other than
burning (i.e., construction waste, etc.).
6. All solid fuel burning devices (wood stoves, pellet stoves, etc...) must comply with
local, state, and federal rules and regulations.
SPOKANE COUNTY DEPARTMENT OF PARKS, RECREATION & FAIR
1. See Planning Department Condition No. 23.
CENTRAL VALLEY SCHOOL DISTRICT
1. See Planning Department Condirion No. 22.
VERA IRRIGATION DISTRICT
1. Project will require utility easements not ccexisting with drainage easements.
3/95 HEC Staff Report for PE-1773-95 Page 98
i
~
. v.
(JFF I CE OF THE Gt7tJNTY EfVG I NEE R
SPqk:ANE GQIJNTY, WASHTNGTON
Mar ch 13, 1995
T0: SpoE;ane Coijnty Planninp Department (Current Planninq
Administrator )
FRDM: Spok:ane County Enqineers Depari:men{: (3di" tL.
SUBJ: SLtbdivision Conditions, Name She11eY_Acres
Nt.tmber PE~i 773-95
re: Subdivisions
"f'he fo11owinqr"Conditions of Approval" for the above referenced
suladivision are submitted to tfie Spink:ane Gounty Hearinq F:•;aminer
Committee for inclLtsion in the "Planninq Report" and "Findinc7s
and Order" of the publ i c hearinq scheciuled Mar ch 1995.
E 1 The conditional approval of the plat is given by the County
Enqi neer sub.je e t to dedi eat? on of r i qht-of -way and approva 1
ofi the road system aa indiGatecl in the preli.minary plat of
record.
F: That plans, profiles and cros5 ser.tioris as desiqned to
County standards sfiowing proposed street center 1 ine ai-id curb
grades he sLtbmitted to the County Engineer for approval !
prior to constructiori anci/c)r the filinq of a final plat; I
road planr to be prepared unc:lPr the direction of a 1iGensed
Professiona1 Ci v i 1 Enqi neer.
F 3 That draxnaqe plans anrJ desiqn cal culationa sttowa.nq the
aliqnment of drainage facilities be 5ubmii;ted ti-r the County
Engineer for approval prior to construction and/or the
•fi 1 inq of the final nlat. Drainaqe plans to be prepared
under the da.rection of a 1 i censed Profes5ional Civi 1
Enqineer»
E4 That the requlations of the hlational Flood Insurance Proqram ~
b~ i-nbserved Cince the proposed plat is associal:ed with ~.~n I
area of rpec:ial fliDod hazarcl. A clevelopment permit shall be
iDbtained from the County Engineer before constructiiDn or ;
developmEnt beqins on any property all or a portion of which
is in any area of speeial f liDod hazarci (referencP Spok:ane
COLinty Ordinance 88-0521)p
That the folli-lwing statement shall appear withxn ihe
dediGatory 1anquaqe of the plat.
~
paQe r~..
"Development within this siabdivision shall conf---)rm to
the requirements of the N2tiona1 Fl.ood Insurance Program and
Chapter 3.20 of the Spok:ane County Code. Pur chasers of
property in thi.s subdivisi.on ar-e warned of p-Dssible f1oodinci
or piDndinq and the potential requirement tO plArchase Flood
In surarice, This warninq shal l be carried in each and every
deed drawn tiD transfer owinership of any and a11 property
within this plat in the Area of Special Flood Navard. "
E 5 ConStruction within the pr-Dposed public streets and
easements sha:l1 be performed under the direct supervision of
a licensPd enqineer/surveyor, who sI-ia11 furnish the County
Enqineer with "As BLtilt" plans and a cprtifxcate in writinq
that a11 improvements were installed to the lines and qrades
shown on the approved construction plans arid that all
disturbed monumeiits have heen rep1aced.
E6 h!o constructi-Dn wurk: is to be performed within the existxnq
or proposed Pub 1 i c Fdi qht-of -Way unti 1 a permi t has been
irsued by the Gounty Enqineer. Al l work: is sub ject to
iiispection and approvzzl by the County Engineer»
E 7 A+11 construction within the existinq or priDposeci Public
Riqfit-of-Way is to be rompleted prior to fil.inq the final
plat or bonr1 xn the amoLtn-t estimated by the County
Enqineer to cover the cost of construction of i.mprovemei7ts,
coristruction certification, "As Built" plans and monLtmentinq the street cPnterlines shall he filed with the County
Engineer.
E 8 hliD rJ i r e c t access from 1ots to 1/2 R i q ht-of-Ways unti 1 suc h
riDads are constructed tO D.-DUnty Standards and establ i.sheri as
County Road s.
E 9 IVo direct access from 1ots to Stub Ftoad connecti.ons until
sur_h rciads are con structed to County 5tandards and
establ ished as Caunty Roads. .
E 10 Roa d d esi gn, coi7 st ruc t ionan d d rai na qe cont ro1 for 1/2 R i ght-
of -Ways and St uh Road conne c t i.ons are thp re5ponsi bi 1 i ty af
the developer.
I
~
E12 The applicant should be advised that individual driveway !
ac_r_es5 permit s are requireci prior tO isSLtance of a bi_tildinq j
permit for driveway approaches to the COLtnty road system. ~
~ - ,
(JcZQ2 3
E13 Dedicatioii of 50_feet of additiona1 RiUht°of-Way alony Steen
Court.
E16 Existinq County roads providinq direct access to the p1at
shall be paved ~.~nd/or clArbed to Spokane Coi_tnty stand~.~rdse
~
\
E17 That a11 public roads wi-thin the plat be desiUned and
constructed to Spokane Goi_tnty standards.
E'1 9 "rhe worci "applicant" shal l i.ncli_ide the owner or owners of
the propertyq his heirsq assiqns anci successors.
E23 The C~--)Ltnty EriUi.neer r~as desiqriateci Typical Roadway Section
hliamber Two,L_L~M►cal~Access standard for the improvement of
Steen_Court which is towbe constructed within the proposed
dcvelopment Gznd_extending_to_the_existing_pgvement_on_i2th
_
Aven~_iP. Tr~is will req~_~ire tr~e installation of 36 ft« of
asphalt. The construction of curbinq is a1so requirEd.
E^: The proposed plat shall be improved to the standards set
forth in Spokane COLtnty Board of Commissioriers Reso1Lltion
tV o. 80-1592,as a mp nd ed, w I-ii c h estab1 i. r hes r e qu1at i. on s f---)r
1`' oad5 y app 1' oc.~ r f'i P..~a , d rainaq e a1"1 Cj f@e5 1 I"1 nE' W Cor15 tYuC t 1oI'1 d
E33 The County Enqineer h~~ examined this dPVelopment pr~~~posal
and haS determineci that the impact of this proposal upon the
existing County Road System warrants the deciicaticin ~--)f
additiona1 Right of Way and the roadway imprc-vements herein
specifiPd.
E90 The applicant should be advised that there may Exist
util.ities either Ltnderqroi_ind or overhead affecting the
applicarits property, inclLtdinq proper•ty to be dedicated or
set aside for fUtLtre arqLtisi.tion. Spokane Coi_inty will
aSsLtme no finaricial obliqati.on for ad.justments or relocation
reqardinq these util.ities. Yhe applicant should checE:: with
the applicable utilities and Spokane County Enqineer to
determine whether the applicant i--)r utilii:y is responsible ;
fiDr ad,)u5tR12f1t oY t^EloGatlorl Cortr af'1d to fYlak2 ~.~rranclements for any necessary work:. ~
Special Conditioiis: I
~
1
- - -
`
paCq e 4
Applicant shall shall reqLtest dedication ofi tl-ie 1•ft. s{:rip
prior t-D any final plat approval.
~
M
. DETERMINATION OF
NON'SIGNIFICANCE - "DNS"
WAC 197-11-970 and Section 11.10.230(3)
SFOKANE ENVIROrfNIENTAL ORDINANCE
FILE NUMBER(S): PE-1773-95fLE-7-95 SHELLEY ACRES
DESCRIPTION OF PROPOSAL: Preliminary Plat to divide approximately 15.1 acres
into 131ots for single farnily residences and Zone Reclassification from Urban Residential-3.5
- (UR-3.5) to Suburban Re$idential-1 (SR-1) on approximately 1.74 acres.
APPLIC'ANT: Mark McManus
Ben Simpson
921 Squth Monroe
Spokane, WA 99204
(509) 455-5411
LOCATION OF PROfOSAL Generally located east of 12th Avenue (extended)
approximately 350 feet east of the intersection of 12th Avenue and Shamrock Street in the SE
1/4 of Section 24, Towns,hip 25 North, Range 44 EWM, Spokane County, Washington.
LEAD AGENCY: SPOKANE COUNTY PLANNING DEPARTNIENT
DETERMINATION: The lead agency for this proposal has determined that it does not have
a probable significant adverse impact on the environmenL An Environmental Impact Statement
(EIS) is nDi required under RCW 43.21C.030(2)(c). This decision was made after review of
a completed environmental checklist and other information on file with the lead agency. This
information is available t6 the public on requesL
This DNS is issued under WAC 197-11-340(2); the lead agency will not act on this proposal
for at least 15 days from the date issued (below). Comments regarding this DNS must
be submitted no later than 4:00 p.m., March 21, 1995, if they are intended to
alter the DNS.
RESPONSIBLE OFFICIAL: WALLIS D. HUBBARD, PLANNING DIRECTOR
By: Ken Kuhr~, Planner I
Phone: (509) 456=2205
,
Address: Spokane Counry Planning Department
West 1026 Broadway °Spokane, WA 99260
DATE ISSUED:~ 1995 SIGNATURE:
CONBENTS RBGARDING INVlRaN1VtNTAL OCNCFRNS ARE AT TiE G.
APPEAL OF THIS D•TERMINATION, after it becomes final, may be made to the
SPOK:ANE COUNTY PA G DEPARTMENT, West 1026 Broadway, Spokane, WA
99260. The appeal deadline is the same as the above project's appeal deadline, being ten (10)
calendar days after the siq!ung of the decision to approve or disapprove the project. This
appeal must be written an~ the appellant should be prepared to make specific factual objections.
Contact the Planning Department to assist you with the specifics for a SEPA appeal.
This DNS was mailed to:
1. WA State Departme,nt of Ecology (Olympia)
2. WA State Department of Health
3. Spokane County Health District
4. Spokane County Division of Engineering .
5. Spokane County Ai'r Polludon Control Authority
6. Spokane County Pa'rks Department 7. Spokane County BQundary Review Board
8. Spokane Regional Transportation Council
9. WA State Departm6nt of Transportation
10. Spokane Transit Authority
11. Central Valley School I?istrict
12. Vera Water and Power
13. Fire District No. 1'
, r
~
JAi~ 13, 199.5
' SPOKANECOUNTY
PLANN{NG DEPARTM£NT
~
SPOKANE ENVIRONMENTAL ORDINANCE
SECTION 11,0109230 -1=
~
` SPOKIINE ENYIROtMENTIII ORDINANCE
(MAL 197-I1-960) Section 11.10.230(1)
. Enviromaentai Checkllst 75
File No.
Purpose of Checkllst: The State Environaientai volicy Act (SEPA) chapter 43.21C RCW. requires all goverrnwntal agencles to consfder the environrnental impacts of a proposal
Defore aaking Aecisions. An Environaentai IQpact Statement (EIS) must be prepared for all proposals with probable siqnificant aEverse impacts on
the puality of the enviromrcnt. The purpose of this checklist is to proviCe infortnation to he1D you and the agency identify fmpacts fron your
proposal (anG to reduce or avoid irtqatts from the proposal. if it can be done) and to help the agency detide vhether an EIS is required.
Instructions for Aqplicants:
Th9s environsental checklist asks you to descrtbe sooe basic informatlon ebw t your proposal. Governmental agencies use thts checklist to determine
whether the environaentai impacts of your proposal are slgnificant, requiring preDaration of an EIS. Answer the questfons briefly, with the most
precise lnfomation knorn. or gtve the best description you can.
You nust ansrer each question accurately and carefully, to the best of your knowledge. ln most cases, you should be able to ansrer the questions
froe your own observations or projett plans witAout the need to hire ezperts. If you really do not know the answer, or if a Question dces not a0D1y
to your proposal, wrlte 'do not know• or 'does not apply.' Camplete answers to the quQStlons nar may avotd unnecessary delays later.
Sone questions ask aDout 9overnaental regulations, such as zoning, shoreline. and landmark deslgnations. Answer these questtons if you can. If you
have problems, the govermrcntal agenctes can assist you.
The checklist questlons apply ta all parts of your proposal. even 1f you elan to do thesn over a period of time or on different parcels of land.
Attech any additional information that wiil descrlbe your proposal or tts envtronnentai effects. The agency to which you submit this checklist may
ask you to explain your ansMers or provide additlonal info nnation reasonably related to determining if there may be slgnificant adverse impact.
Use of theck 11 st for nonprofett proposal s:
Complete this checklist for rtonD*oject pro0osals, even though questions may be answereC 'das not aDply'.
iN ADOITION, couplete the SUPPLEtIENTAL SHEET FOR NO!IPROJECT AC7IOM5(Part D).
For nonproject actions. Lhe references in the checklist to the words 'project.' 'appllcant.' end 'property or slte' should be renC as 'proposal,"
*proposer.' and 'affected geographic area,' respectivety.
A. BACKGROUND
l. lawe of proposed project. 1f applicable: 5je6 c-v Ac-/S
2. 'lat of Applicant:
3. Address and phone numDer of applicant or tontact person: ___11~,J1 RG~Ql1IL.I,
4. Oate checklist prepared: / Z ^ ,317
5. Agency reQuestfng checkilst: /~L~I✓/~~~Gi
6. Proposed tiAing or schtdule (irtcludinq pheslng. Sf appltcable): P2OY~c~.~~i) l/7-o STA2T
~ /9 qS
7. a. Oo you have any plans for future addttions, enpenslon, or further activity related to or com ected rttn thts proposat? if yes, explain./~
n. •
0 b. Da you own or have optto on land nearb or adjacen to this proposat? If yes. explaln.~ /VdieT15'~
G'L14'~ ~j • ° _fn.,h`• f G~~ l C f' 41529114, ~ y116
/
~ 8. llst any environmental infarniation you know about that has been prepand, or wii) be prepared. directly related to this proposal.
Rev.2/1/88 - 1
9PO1CA71L ERVIRONlENiAL ORDIPANCE
(vAC 197-11-960) seccion 11.10.230(1)
A. 8AL1CC804RD (coatinued)
9. Do you lmov vhether applicatiocu are pendla$ for governmental approval• of o[her propoeala Gireccly uffecting the praperty covereA by your
proposal. If yea, ezplain. ^ f() ,
10. Liat anq gonernaeec approvale or permics that vill be needed for your proposal, if Imovn. ,/C~f'JT-
X :i'e'~si~e,C6,1
S't~frc T ayL,f~ AA,r'c0 VWe--c ~i°osWAu~ ~9 L.'..)-re
11. Give a brief, ccoplete description of ywr proposal, including the proposed uses and the •ise of the proJect and site. "here are several
queotions lecer in chia checkllet chac ask yov to describe certain aspecte of q wr proposal. Y w do not need to rep nc thoae anevers on this
pege.
',~V /9PveOX /lG2Fc-
( s-•~uocatioo of the propoea2. Give sutficient lnforsacioe for a person [o unEerstand the precise location ot your propoeed pro)ecc, includlnE a
treec sddreee, if anq, end •ection, te+nu h1p aod range, if knovn. If s propo" l vould occur over a range of erea, provtde the range or
Doundarlee of the sice(e). Provide a legal descriptlon, •ite plan, vicieity nsp, and topographic mep, if reasora bly evatlaDie. vhile you
ehouid sut,sic any plins required by the agency, yw •Te noc reQuired to duplteate aap• or de[alled plans eu m it[ed vith any perait appllcacton
re Lted co this checklisc.
1~.C7~T Z AJ 7-11 OF I
L. IfJ, ~ Wf', 09:'-X /,~/1~ilJ
aJ&
/{l rL ~s~ • ~ o ,G ~~~f,I~ .1~~F'~C`•~-~/.L o Ai
2 <<ellp y/
/ y
i~
13. Does the proposed action lie vichio the Aquifer Sesultive Area (ASA)' ':he General Saver Service Ares? 'he Prlor![y Sever Service Area' 'he
Ctty ot Spokane? (See: Spokane County's ASA Over L y Zone A[ L e for boundaries).
1
QJor-st c
70 Be COKPI.E'.ZD BY APPLICANT
B. OiVIF0144ER'..AI. CS.EKE22?$
Evaluatlon For
Agency Uoe Only
a. Geaeral descriptlon of the site (eircle one): flat,(rollin` g~ hlllq,( eceep elope~J oountaluous,
otr: `
cu
o
E. 'fiec is the •teepest slope on the •ite (approximate pereent slope)'.--607v r /
~ ~ -.•,'^,~,J
c. 'Jhat geeeral types of soile are found on the site (for e:aaple, clsy, uod, gravel, peat, muek)?
If you knov the claeeiflcacion of agricultural •oils, speclfy chen and note any priae fars Lnd.
~.e~- ON ' T
,L i.,OlJ/Iq2 /i/Alt' /
~'1 ntlv ~r
E~'~% C i'~
7 t/
d. Are chere surfaee indicatione or hlstory of unscable soile in the Lamediate viciaity? If so, C
describe. A,I U
. ~C~c:•~~'~$~;Z~ ~&-V ✓L--i/i~
&rnf,,
. ~
/
2
' SPOKANE ENYIROtIMENTAI ORDINANCE •
(WAC 197-11-960) Section 11.10.230(1)
B. ENVIRONMENTAL ELEMENTS(continued)
Eraluation For
~ Describe the purpose, type, and approximate puantities of any fSlling or grading proposed. Agency Use Only
Indicate source of fill.
a ~ Q
r .-4 1~'~-Sd1~`l~.O~ r ~ /9L't O/~O_i:/1~/~ ~ / •
f. tould erosion o aur as a result ot clearing, construction. or use? If so, generally descriDe.
No
g. ADout what percent of the site will De covered wtth impervtous surfaces after project construc-
tion (for exampl@. asphalt or buildings)?
4yr/__
h. Proposed measures to reduce or tontrol erosSon. or other lmqacts to the earth, 1f any:
"ow<~ i Z_z
Z.
a. What type of enfssions to the air would result frpn the proposal (i.e., duit. eutasroblle. odors
industrial, rooE smoke) durSng constructton anE when the project ts coaqleted? lf any, 22'v>j~~Z~•~
generally describe and give approximate Quantltes if known. r~✓
il; CoA) ~re
6t"' /
b. Are there any off-stte sourtes of emisslons or odor tf+at may affect your proposal? [f so.
generally descriDe.
~J C. Proposed measures to reduce or control eailsslons or other impacts to air. tf any:
% ~4Zc/~~ .S"l~~li1N6 Gov~t lT,~
61 Z_ !1 UTL&-Y 1) v/ll ,-eOL-
3. WATER
a. Surface:
(1) ls there any surface water body on or in the imeeElate vtcinity of tAe site includinq year-
round and seasonal streams. saltwater, takes, ponds. wetlandsl? If yes, descrlbe type and
provlEe names. If appropriate. state what stream or river 1t flows fnto.
~4109 ~ 4ddt-
(2) 11i11 the project raquire any work over. 1n, or adfacent to ithln 200 feet) the described
waters? [f yes, please descrlbe and attach avallable plans. ~o
/P~~1~GTt3 ~CG~l=NI~ ~f~~.t/ 1O 0 f ~
3
~
, •
~ SPOLANL CR9Ifl01Q0DrfAL OBDIHANCE
(uAC 197-11-960) Section 11.10.230(1)
E. CNVIRONFMN?AL ELTKEN':S (contlnued)
Evaluatlon Foc
Agency Use Onlq
(7) Esclmate the anounc of fill end dredge n~teriel ttut ~roald be placed in or removed from the
surface vater or vetlands end ladicate the area of the •ice tlut vould be affected. Indicate
the eource of fill oaterlal.
~J0A9f _
(4) Will the proposal require eurfu e wa[ac vlthd nvsls or divessloos? Cive a general desetip-
[lon, purpoee, and •pproxiaate Qutntl[les, if knwn.
A/ o
(5) Does the proposal Lie vitAin • 100-yqr flood p Liat If so, note lou tion on the •ite plan.
7' Q~~LAT
(5) Does the pTOQSfYl lnvolve any diseharges of v"te oaterial• to suriace vatets? If •o,
descrlbe the type ot vaste and antlcipated voluae of dlsclu rge. .
IV Q
D. Cround:
(1) Y111 groundvater Ee vithdravn, or vill vaceT be disctureed to groundvater.' Cive general
deacriptlon, purpoae. •nd approsinate Quantlties. !f Imovn.
6"l C 70- bleloVA ~,i • 1~
..~Az A
Detcribe vaste saterial thac vill ba dlscharsed lato the `round trom •eptlc [anks or other
saoitary vute creaoeot lacilicy. DescrlDe the general •i:e of the s7stea, the numDer of
houses to be served (i[ •9Dllcabls) or the aisber ot persons the systeo(s) are erpected co
eerve.
S~/s~~~-~-~► ~~~~ar~~
(7) Deseribe any systeas. ocher thaa those designsd tor the dispowl of saalcary vu te.
installed for the purpose of dischargiag fluids balav the ground suriace (loclude• syscm• such
•s chose for the diapoul of scoes vater or draiaae fram floot dralos). Daserlba the cype of
systen, the asount of aaterial to ba disposed of chrougA clr system and the type• of ~cerial• .
likely to be disposed of (lncludiag as[erial• vfileA aay enter the @yeto inadw rtentl7 through
opills or a• a result of firefighting sccivities).
A;0=
'14i
(4) Will any chmieals (especiallq orsanic •olvents or pstroleus fuels) be •tored in above-
grouad or uadergreuad storage tanlu? If no, vhat types and Quantitie• of mtecials vill be
stored?
4
~ SPOICAliE ENVIHORlQ1iM OBDINANL'E
(VAC 197-11-960) Seetion 11.10.230(1)
B. ERVIRONlMAL PLBCtt';S (continued )
Evaluation For
Agency Use Only
(S) Wha[ protective eeaeuTee v111 be cakeo to ineure that leake or e9111• of any chenicela
acored oc used on eice vill not be alloveQ to pereolate to groundvater (chie includee euaeurea
to keep chemicals ouc of disposal eyeteo• described in 3b(2) and 3b(1)?
N1%
c. uater Runoff (Lncluding •coro vater):
(1) DeseTibe the source of runoff (including stocm vater) and oetbd of colleetion and disposal
if any (include Quantities, if knovn). Wlsere vill chis y tet flovi Vill [hls water flow Snto
oCher vatere? If so, deecribe.
(2) :1111 aay chealcala be •tored, hanEled ot wed on the site le a lou tion vhere s*pill or
leal: vill drain to surfaee or groundvater or to astotv water Qispowl @ye[m disclurging to
eurface or grounAvater!
~v V
(3) Could vaete oaterials enter grwnd or •urface waters? If•so, generally describe.
N~ d. Proposed measures to reduee or control surface. ground. and rvno[f water lnpoctt. tt •ny (it
t the proposed action 11es vltAin the Aquifet Sensitive Araa oa especially clear on explaoa[loos
r relating to facllitie• coneecniaa Sectlons 3b(6). 3b(5), and 3c(2) of thl• cAeeklist):
7o
TH,~ d61U,,I,~/..~CZ.c.f- /•l~~~ fS~ .~~"r{~: ~c1 ~j -
_zj~
G . P(.A.vl'S
s. f:heek or circle type of vegecstion found oe the site:
deciduout tree: alder, maple, aspen. other.
~ evecgceen tree: fir, cedar, pine, otAer.
X ohtuDa.
~ grems.
X pascute.
cTOp or 8r,in.
vet wil pLau, csttail. buttareup, bullrush. •kualc caDDa6e, other.
water plsnts: M ter 1111y, eelgcaoa. allfoil, other.
ocher t7Pes of vegetation.
fb. Vhat kind and aiount of vegetatlon vill De rsoved or alteced?
J~~~"
c. List threatened or eadaogeced specie• kaove co be on or near the siteZW7;';
~.~Or, N i
d. Proposed landscaping, we of eative plants. or other seuure• to presern or enhance vegetatioo
on the •ite. 1f anq:
,
• SPOKAltE ENVIRONKENTAL ORDINA1lCE
(WAC 197-11-960) Section 11.10.230(1)
B. ENVIRONMENTAL ELEMENTS (continued)
Evaluatton For
Agency Use Only
5. ANIMALS
a. Circle any birds and animals which have bFen observed on or near the slte or are known to be on
or near the site:
birds: haw heron. eagle. ongbirds) other:
mammais' deer bear. elk. Deaver. other:
fish: bass, salmon, trout, herrinq, shellfish, other:
other:
b. list any threatened or endangered species knarn to be on or near the site.
1Uo~~~'-~~'it~ o v~ a~ ~PfJy~I,n1 ~-~✓~rJi ~i/~-,~~L/~s
t
c. Is the site part of a raigration route, . If so. explaln. Na
a
.
d. ProDOSeG neasures to pr serve or enf~ance wi 1411fe. 1f any: L L~~1 ~~Gd G.Lf"1G-
~~.zs~~ ~i~~lo,~;>
5. ENERGT AND HATURAL RESOURCES
a. 4hat kinds of energy (elettric, natural gas. wood stove. solar) rill be uSeC io meet tAe
the corapleted project's energy neeCs? Descrtbe whether it w111 be used for heating, nbnufac-
turing, ett.
"'50,e • ~~.~i~~ XA1~
4. Would your project affect the potential use of solar energy Dy a Qjacent properttes? If so,
generally Eescribe.
C. uhat kinds of energy conservatlon features are included in the plans of thls proposal? List
other proposed rneazures to reduce or control energy Inqacts. 1f any:
00~0 j257C-/ • ~~~L ~
T 4
1~~r~l~ Cd!/lN4 ZQ1r' ~
7. ENYIRONMENTAL HEALTH
a. Are there any envlronnental health hazards. includinq exposure to toxic cAe+oicals, risk of fire
and explosion, spill, or hazardous waste. that could o aur as e result af this proposal? If so.
describe.
(1) Describe speclai energency servites that mlght be requfred.
/1/Drq,_
6
~ 9PO1CALiL T.R7IS02OMl7M OILDIPAttCE
(uAC 197-11-960) Section 11.10.230(1)
B. E*JVIRONlMIf'LAL EI.EKE27TS (eontinued)
Cvaluatlon For
Agency Use Only
EtNIROtilE:RAL HEAL7R (continued) ~
~
(2) Proposed meesures to reduce or control enviroanencal healch hasards, lf any:
b. Noiee:
(1) Yhat types of aoise e:ist ln the area vhleh "y affnet ywr project (for e=anple: trafflc,
equlpeeet, operation, ottu r?
/&Li"-
(2) Vhst type• and levels of noise vould be c[eatsd by or a uoelated vith t!u projeet on •
short-cerm oc s long-terv basi• (for e:aaple: tratfic, cocutruetioe, opetatlon, other)? Indicate
vhat hour• noise vould cose Eros che •ite.
~a,, ~
(lAL/l~('n (~lJ~(1 '/rLfl~) S ~D Y G ~~yU
Lr- ~ I ~J6 '
(3) Proposed measure to reduee or control noise lepaets, if •ey:
' ~ _•i L~' G~O/CI~.Z~~ /C~ ti ~ ~1~~L~.// Oc~°~~
8. U1'1D AND SHORELINe USE
a. Vhac i• che current we of che •ite and •djacenc propertieo?
D. Ilas the •ite been used for agrlculture'. If •o. describe. (J41 /4,0:;- (r,eQ/,f Z4/~G
c. Deacribe any structures on che •ite.
d. Vill any ecructure• be deaolished? If no, vhich'
e. Vhac 1• the curreac :oning clusitiutioo of ihe sitet (;Q'C'l
3
f. Whac i• the currenc compreheasive pLn desigaatlon of ttu •ite?
g. If applicable, vhat 1s the cunenc slwreline aaeter progro designation of the •lte?
h. Nas aay psrt of the •ite been classified aa an 'enviromeetally wmitive' areai Ii so,
specify.
i. Approziaately hw many people vould raside or vork in the easpleted pcoject!
~
7
. , SPOfGNL LRVIIIDWWRfAI. OxDl[iAPCE
(uAC 197-11-960) Section 11.10.270(1)
B. LNVIROttlE1ZAL B.EKEFT'S (eonciaved)
°valuation For
Agencq Use Only
Approxioately hov maey people vould the c.oopleted projecc dlsplue' 0X./~
k. Proposed meaeures co svold or reduce dispLeeaent lapacts, if any:
1. Proposed aeasures to ensure the proposal is coapatibk vith ezistin6 aed pro3eeted Land use• aad
plans, if anq:
9. HOUSING
Approaimatelq hov eany unic• vould be provided. if anyt Iodicate vd ther high-. aiddle-, or
lorincooe housing.
b. Appro:lnately Aov aanr units, if any. vould be elimloacsdt Iediute vhtthar high-, aiddle-, ot
lowincoae housing. .
J D~
c. Propoeed ueasures to reduce or tonttol housing impacts. lf anq:
10. AES21tETICS
a. Vhac is che callesc height of aay proposed •truccure(e). noc including antennas? Yfuc ts che
priecipal ezterior building mte[lal(s) proposed'.
60 D. Nf►at vlevs in c!u imediate vicinity vould be altered or obs[ruccedt
65444;&45~b 4Co.'P- %~-o
D
oO,E- .
c. Proposed seasures to redute or coatrol mochatie lapae[s. Sf aoy: 75~/~~9G
/~/.~c~.~~0~/fa.~/1.?"~
- J! lemT ° . AC- 10&_s~:a~f/._s~~
J& /00A/c v,7; > T l/•
11. LICH:' AND CI.ARE
A. •lhat type of light or 6Lre v111 the propowl producet tThac tise of day vould it maialy oecur'
N o A veo: .
b. Could liaht or gLre frvs clse fiaished projecc be a "tecy hasard or latertere vitb •leNt ~d
e. IJha[ ezistin6 off-site •ourees of lighc or `Lre aay atfeet your proposal!
~
d. Proposed snsures to reduce or eontrol lighc aod aLr• isputs. if any:
8
~
- SPO[ARB IIfVIRONfEt1'fAL ORDItUNCE „
(iiAC 197-11-960) Section 11.10.230(1)
E. EPVIROlaCeF[AL e1.EMERl5 (eontlnued)
Evaluation Foc
Agency Uee Only
12..RE A2ION
~ s. Vt►ac designaced and inforval recreational,oqportunitles are in the immediete vicinicy? /
e l~~„,:► 6~C ~.1~~-
~ 4l ' ~e/'lL , . ~
✓ i~~c~/ `
b. Would the proposed project disp Lee any ezisting recreatioaal wes' If eo, describe.
/UO,r/ 4i5-
c. Proposed measure• to reduce or control lapiets oo reereatioo. ineluding recrw ciowl opportuai-
tie• to De provided by the project or appliunt. if aaq:
IUoA4~5 iHe
13. HIS'.'ORIC AND CULTURAL YRESERVATION
a. Are tlu re any plaees or objects Llsted on or yroposed for naciocyl. •cace or local preserve-
tion regieters knorn co be on or aezt to the •ite4 If so, geaerally describe.
IUoNtF 25
b. Generallq descrlbe any landaarks or evidence of hlstoric archseological, scientific or cultural
imporcance lmovn to be o0 or nest to the site.
/.60t-;- AUo:vAl 1,7'17'"l.../~S
c. Proposed aaasures to reduce or control lopaus. ii •nr:
_nW_51~dCTZi10/ ;E~Ori'i1Nf
14. : FAt1SPOR"ATION
a. Identify public •treec• aed highvay• serving the site and describe proposed acee u co the
esiscing screet syscm. Shoron oite pLns, lt any.
.
b. Is eite cuzrently •ervsd by puDlic translc' 2f noc, vhat 1• the approsisace distance to the
o n rest tcansit atopt
Vo
c. flov oan7 parkiag spacas vould the coapleced projecc havei 8ov many vouid the project elid oate'
13
~ Yill the propo ul require aoy nev road• or •traece, or is➢ron=ets co e:istiog road• oc acreats
aot includlag drlvevayst If so, generally deacribe (lodlute vtti ther public or prlvate).
e. Will the pro}net use (or oecur in the laediata vicinity of) mater, rail. or air tramportacion?
If eo, generally deseriAe.
Na
9
SPOIUNC PINIYO10(KRfAL OBDIMNCL
(WAC 197-11-960) Sactlon 11.10.230(1)
D. FFVIROKKE1*IAL ELHMENIS (contlnved)
Evaluatlon For
Agency lJse Ooly
f. Rov oany vehicular trip• pet day vould be generated by the canpleted project' If Imom,
indica[e vhen peak vould oecur.
7/~/~~,/ll/J4, o,,,;;~ SUR~Z,//1S:Z0/(f ~i~i!/E~~~
/OD
N~
g. Pro cxansoorcatlnn lepeecs. if an ~G ei
~z1~~"/
~1 or.~~ A~.~o ~v~ ,~i~~• ,
//'15. P1T8LIC SERVICES
a. 'aould the project rasulc in an lnereased naad for publie •enlca• (for e:uyle, tire pro[aetion,
police proteetioo, health eate, sehooli, other)t If •o, genera117 deseribe.
Proposed neasures to reduee or coetrol dlracc Lput• oc+ public •ervlces. 1f aay:
16. p-IL17IES ~
a. Citcle uti2.ic~trentlr •valLDle at the •ice: eleetrlclt~~icural gu vate[, ~efwe
(service, celephone. •anitarr sever. •eptic •ystem. other.
b. Descrlbe the ucllltie• tlut are proponed fot the projset. the u[iliCy providins the ser►ite and
the general construction aetivities on the site or !o the laaadiata vleieitr vhieh dght be
needed.
C. SIC?IATtJRP '
I, the undersigoed, sveir under the peaalty ot parjutr chat the above respowee are made truthtully and to the basc of oy kaovledge. I also
understand ctut, should there be anr vlllful oisrepresentatlon or villtul laek of full dloelosuse oo sp part, the a en sar vithdrav any
deternisucion of noeuignifiuoes that it a16At issue !e reliaoee upoo thl• clseicllK.
Da te : Proponent Xwe- <
~ (Plsue Prihc or Typa)
Proponent: /Wdress: ~ s
SLg'na e
Phone :
Person eoaplecictg fosa: x~_LL~~ ~ Qate:
Pfione :
POR STAlP USY ONLY
Scaff omDer(s) revieving ckecicliac:
~ = v
Baied on hie eceff reviev of the eo ro ntal checklist and other pertine~t intormtLon, the staff:
~
A. Conclude• that there arn no probable •ignifiuat adverse lapacti and rec~nd• a deteraination of aoosignificacen.
B. Conelude• that probabla signlficaot advetse environaental iapaets do ezist for the curraot proposal and neoa~nd• a oitigated deter-
mioation of uoaaignificance v![h conditiocu.
C. Conclude• that there are psoDnble signifiunc adaerse environmantal Saputs and recanseods a detetsloation of signitiunee.
lZLI11G M - =75.00
10
SPOKANE COUNTY PLANNING
PRELIMINARY SUBDIVISION AND 70NE RECLASSIFICATYON
APPLICATION PART I
A. GENERAL INFORMATYON:
NAME OF APPLICANT/REPRESENTATIVE: ~ ~~C~v(~f-UW C
MAII,ING ADDRESS: GI ;L1
CITY: • TA'T'E: ZIP: '
PHONE: (work) (home)
IF APPLICANT IS NOT ()WNER, INCLUDE WRITTEN OWNER AUTHORIZATION FOR APPLXCANT TO SER~4AS~R. E ESENTAT VE.
LEGAL OWNER'S NAME: PHONE:
MAILING ADDRESS: C ~C l'Y1.0 ~L~'
PRO7ECTiPROPOSAL SITE AREA (acres or sq, ft)
ADJACENT AREA OWNED OR COIVTROLLED (acres or sq. ft.) Ap
ASSESSOR PARCEL #S OF PROJECT/PROPOSAL O F
ASSESSOR PARCEL #'S OF ADJACENT AREA OWNED OR CONTROLLED ~
oP (4~^a9 q "R~ ~ ~ ~S ol.4 I • ~j t4. u s-~~~ - 9) L (,p
STREET ADDRESS OF PROPOSAL ~A~SI O- La t'~
EXISTIIVG ZONE CLASSIFICATION(S) (DATE ESTA.BLISHED) ~`'!L LG~'-3• f J~
EXISTING USE OF PROPERTY
, PROPOSED ZONING s /Q ~
COMPREHENSIVE PLAN CATEGORY
SCHOOL DISTRICT
FIRE DIS'I'RICT I WATER PURVEYOR
PROPOSED USE OF PROPERTY:
Single family dwellings ~ Duplexes Multifamily dwellings
Manufactured homes ( ) Business ( ) 'I Industrial ( ) Mixed Use ( )
Other ( ) - Describe:
LIST PREVIOUS PLANIVING DEPARTMENT ACTIONS INVOLVING THIS PROPERTY: CL,
CiE 7.50 9~W /~A C b B. LEGA.L/7.,nNE RECLA;SSxFIC.ATIn Z F RMATIQT~L-
-
LOCATION OF PROPOS AL:
SECTION cZ~ TOWNSHIP RANGE
NAME OF PUBLIC ROAD(S) PROVIDING ACCESS: WIDTH OF PROPERTY FRONTING ON PUBLIC ROAD:
DOES THE PROPOSAL HAVE ACCESS TO AN ARTERIAL OR PLANNED A.RTERIAL YES 0
NAME(S) OF ARTERIAL ROADS
RECE4VE
rEB 9 199;
SPOKANE COUNTY '
PLA1V1J1NG 017-PAR'Ct:4zr!7
~
~ I
SUBDIVISION AND ZUNE RECLASSIFICATION APPLICATION Page 2 of 4
LEGA.L DESCR.IPTION OF PROPERTY (Auach legal description stamped by Land Surveyor). INCLUDE
. LEGAL DESCRIPTION FOR ENTIRE AREA TO BE SUBDIVIDED ON PRELINDNARY SUBDIVISION
MAP AND REQUESTED ZONIlVG FOR EACH LOT AND BLOCK FOR MULTIPLE ZONE REQUESTS.
t
IF YOU DO NOT H4LD TITLE TO PROPERTY, WHAT IS YOUR INTEREST IN TI'?
~
~QV6~
j
WHAT A.RE THE CHANGED CONDITTONS OF THE AREA WHICH YOU FEEL NiAKE THIS PROPOSAL WARRANTED? /71A" &.C, 4.o7',-5 7P4: SsN G,i-.6 /j'10S T
,
WHAT IMPACT WILL THE PROPOSED ZONE RECLASSIFICATION HAVE ON1'HE A.DJACENT
PROPERTIES? 1)9 c2a AsE "I ,/76n1A-fT~ 1 '
WHAT FACTORS SUPPORT THE ZONE RECLASSIFICATION?
_ _ ep NT DO~,G7".Zf~ - -
WHAT MEASURES D(J YOU PROPOSE TO MITIGATE YOUR PROPOSAL'S IMF'ACT 'ON
SURROUNDING LAND USE? C64?~4228t_dr ,WZ~Tiy
PI'U AJ4FX6&&O&jQ!1~G~ GO T ~
~ . ,
C. PRELIMINARY SIIBDIVISION CENERAL INFORMATION:
NUMBER OF LOTS : GROS S AREA: L.
TYPICAL LOT SIZE: PROPOSED NET DENSITY*: 4 I QZ~aG
SMALLEST LOT SIZE: 1• 0/ 1&e4!5- MINIMUM FRONTAGE:
PROPOSED SOURCE OF WATER:
Individual wells Public system ~ Private Community Syscem
Other ( ) - Describe:
PROPOSED MEANS OF SEWAGE DISPOSAL:
Public sewer Community system Septic tank and drainfield ~
Double Plumbing Dry Sewer Other
Describe:
UTII.ITY COMPANIES AND/OR DISTRICTS TO PROVIDE SERVICE TO THIS PROPOSAL:
Elecoricity: Sewer.
Gas: U 1 l.u A Water. ~~`1~4~- Phone: Us (Ai
DO YOU, OR THE OWNER IN THE EVENT YOU DO NOT OWN THIS PROPERTY, HAVE ANY
PLANS FOR FUT'URE A.DDITIONS, EXPANSIONS OR FIVRTHER ACTIVITY RELATED TO THIS
PROPOSAL? , Yes No ( TF YES, EXPLAIN:
D. PRELIMINA,RY SUBDIVIfiIQbLIViPRQY
EViE~VT- I F R TLQJ~L-
I
LEVEL OF STREET IMPROVEMENTS PROPOSED: Private roads
Public roads 64 Arterial roads O Tract X mads
DESCRIBE ANY COMBINATION OF ABOVE: • . i
ESTIMATED TIME PERIOD EXPECTED FOR COLETE DEVELOPMENT OF TH~E SUBDNISION:
.
IS PHASING OF THE FINALIZATION OF THE SUBDIVISION PROPOSED? Yes No ~
IF YES, SHOW PHASING ON THE PRELIMINARY SUBDIVISION MAP.
IS DEDICATION OF LAND FOR PUBLIC USE CONTEMPLATED (Parks, schoolst etc.)? Yes No ~
IF YES, DESCRIBE: RECEIVED
~ ~j
* NET DENSITY IS UNITS OR LOTS PER ACRE MINUS PRIVATE AND/4~2WBLIC M&) AREA.
sPOxaNe couNrY
' PLANNIMG DEPARTMENT
~
' ~
.t SPOKA►.NE COUNTY PLANNING
PRELIMINA,RY SUBDIVISIQN APPLICATIQN .
PART I REcEIVED
JAN I s 1995 A. GENE.RAL _YNFORMA11ONi
,c,rOfiANE COUNT`l
n^r.IT
wrJ`) Ay^ S3=P~-.
NAME OF APPLICANT/REPRESENTATI'VE: ,z9W,d1%1~~/Id'11 1 S
MAILING ADDRESS: -5 AO/lJ~o er,
CITY: STATE: ffj/49 ZIP:
t~ ,
PHONE: (worl:) 0y41, (homc)
IF APPLICANT IS NOT OWNER, YNCLUDE WRIT'TEN OWNER AUTHORIZATION
FOR APPLICANT TO SERVE AS REPRESENTATIVE.
/ylilkrr /yI F/~/w4tS
LEGAL OWNER'S NAME: L.6,n.I 50i0,o~o~✓ PHONE:
MAILING ADDRESS:
,
CITY: S~Difr~I/ll 'a.~ STATE: ~A ZIP:
PROJECT/PROPOSAL SITE AREA (acres or sq. fl)
ADJACENT AREA OWNED OR CONTROLLED (acres or sq. ft.) _Z tl?
ASSESSOR PARCEL #S OF PROJECT/PROPOSAL ZMZ-j---0AJ OL" ySp?
ASSESSOR PARCEI. #'S OF ADJACENT AREA OWNED OR CONTROLLED
O?c
,
' ~ ,~v . '1'"'~~+^~'J~i
STREET ADDRESS OF PROPOSAL Of- 12
kk,
EXISTING ZONE CLASSIFICATION(S) (DATE ESTABLISHED) S ~
EXISTING USE OF PROPERTY OIJ~Al
COMPREHENSIVE PLA~I CATEGORY
5CH04L DISTRICT
FIRE DISTRICT l WATER PURVEYOR
PROPOSED USE OF PROPERTY:
Single family dwellings>< Dup,lexcs Multifamily dwellings
Manufactumd homes ( ) Business ( ) Industrial ( ) Mixed Use ( )
Ocher ( ) - I?e.scribe:
LIST PREVIOUS PLANIVING DEPARTMENT ACTIONS INVOLVTNG THIS PROPERTY: L.~
9- ~3 . B . LEC AL INE(3RM AYTn~L-
I'Z 7, A-
LOCATION OF PROFOS AL: ~A57'7_
SECTION a? T TOWNSHIP RANGE
NAME OF PUBLIC ROAD(S) PROVIDING ACCESS:
~
WIDTH OF PROPERTY FRONTING ON PUBLIC ROAD: 60
DOES THE PROPOSAL HAVE ACCESS TO AN ARTERIAL OR PLANNED ARTERTAL YES NO
NAME(S) OF ARTERIAL ROADS
LEGAL DESCRIPTION OF PROPERTY (Attach legal description stamped by Land Surveyor). INCLUDE
LEGAL DESCRIPTION FOR ENTIRE AREA TO BE SUBDTVIDED ON PRELIMINARY SUBDIVISION
• MAP.
SliBDIVISION APPLICATION Page 2 of 4
IF YOU DO NOT HOLD TITLE TO PROPERTY, WHAT IS YOUR INTEREST IN IT?
. D ~)v1S .~~yj ~tl J'
NI~ITIONS OF THE AREA WHICH YOU FE~iAKE THIS
WHAT ARE THE CHANGED CO
PROPOSAL WARRANTED? WHAT IMPACT WILL THE PROPOSED SUBDIVISION HAVE ON THE ADJACENT PROPERTIES?
WHAT FACTORS SUPPORT THE SUBDIVISION? .
WHAT MEASURES DO YOU PROFOSE TO MITIGATE YOUR PROFOSAL'S IMPACT ON
SURROUNDING LAND USE? C. PREL_IMIN_ARY SI1BDIVISION CLENERAL INFORMATION:
NUMBER OF LOTS : /3 GROS S AREA: --2-5 /.&'e~ <
. TYPICAL L4T SIZE: l 4G2 4e- PROPOSED NET DENSITY*: t~~/~~'.~
SMALLEST LOT SIZE: l~e-. e 4 MINIMUM FRONTAGE:
PRQPOSED SOURCE OF WATER:
Individual wells Public system P11 Private Community System
Othcr ( ) - Dcscribc:
PROPOSED MEANS OF SEWAGE DISPOSAL:
Public sewer Community system Septic tank and drainfield
Double Plumbing Dry Sewer Other
Describe: UTILITY COMPANIES AND/OR DISTRICTS TO PROVYDE SERVICE TO THIS PROPOSAL:
Electricity: v664 Sewer: PIVX4~
Gas: Wa) yo Water. Phone:
DO YOU, OR THE OWNER IN THE EVENT YOU DO NOT OWN THIS PROPERTY, HAVE ANY
PLANS FOR FUTURE ADDITIONS, EXPANSIONS OR FURTKER ACTIVITY RELATED TO THIS
PROPOSAL? Yes No ~ IF YES, EXPLAIN:
D. FR . XMINARY SUBDIVI~SYnN iMPRQVEMENT INFORMA'[ION: LEVfiL OF STREET IMPROVEMENTS PROPOSED: Private roads
Public roads Arterial roads . Tract X roads
DESCRIBE ANY COMBINATION OF ABOVE: ,
ESTIMATED TIME PERIOD EXPECTED FOR COMPLETE DEVELOPMENT OF THE SUBDIVISION:
IS PHA5ING OF THE FINALIZATION OF THE SUBDIVISION PROPOSED? Yes No x
IF YES, SHOW PHASING ON THE PRELIMINARY SUBDIVISION MAP.
IS DEDICATION OF LAND FOR PUBLIC USE CONTEMPLATED (Parks, schools, etc.)? Yes O NoA
IF YES, DESCRIBE:
* NET DENSITY IS UiVITS OR LOTS PER ACRE MINUS PRIVATE AND/OR PUBLIC ROAD AREA.
SliBDNISION APPL'ICATION . Page 3 of 4
PART II
THIS SECTION OF THE APPLICATION WII.L PROVIDE. THE PLANNING DEPARTMENT STAFF WITH
WRTTTEN VERTFICATION THAT THE APPLICANT HAS HAD PRELIMINARY CONSULTATTON WITH THE
AGENCIES IDENTIFIED. RESULTS OF THE PRELIMINARY CONSULTATTON SHALL BE INCORPORATED .
IN THE PROPOSAL BEFORE FINAL SUBMITTAL TO THE PLANNING DEPARTMENT.
FIRE MARSHALL/FIRE DISTRICT A. THIS PROPOSAL IS WITHIN FIRE PROTECTION DISTRICT NO. ~
B. ADEQUATE ARRANGEMENTS (H*A0Cj (HAVE NOT) BEEN MADE TO MEET OUR NEEDS
IN PROVIDING FOR AN ADEQUATE VVATER SYSTEM AND FACILITIES FOR FTRE
PROTECTION PURPOSES. ,r6!~
C. RECOMMENDED F1RE FLOVV: ~ ; OR UNABLE TO CALCULATE NOW
BECAUSE USE IS NOT DEFINITIVE; AND WILL BE DE'1F-RMINED AT BUILDING PERMIT
APPLTCATION TTME. G - , i FJ
D. REQUIREMENTS INCLUDE: fine, G''+ ~f~'' ~~~/~.f~Ni ~~C'► A/ A lt'~~
.~~rPdlef
FIRE DISTRICT SIGNATURE ITLE DATE
,
WATER PURVEYOR
A. SATISFACTORY ARRANGEMENTS FOR T):QMF-STIC WATER ANll FIRE FLOW
REQUIREMENTS (HAVE) (VAVE NOT) BEEN MADE. ,
B. REQUIREMENTS/COMMENTS: c fe,
,
~"'lt 1 /7 f-t~,-c~~.. .
~r(//
1 .~,J~. ' •,I-~, ;.yt a ! 11 L~~ ! ( 5.
WATER DISTRICT SIGNATURE/TITLE r DATE _
COUNTY ENGINEER
A PRELII'v1INARY DISCUSSION HAS TAKEN PLACE AND GENERAL REQtTIREMENTS FOR ROADS
AND DRAINAGE HAVE BEEN DISCUSSED WITH THE APPLICANT.
A. C OMMENTS :
S IGNATURETLE DATE
COUNTY UIILITIES
A PRELIMIINARY DISCUSSIQN HAS TAKEN PLACE AND GENERAL REQUIREMENTS FOR
E NOT) BEEN SATISFIED. THE DESIGNATED
SUBMITTAL OF THIS PROPOSAL (HAVE) (H)a
WATER PURVEYOR FOR THIS SITE IS A. COMMENTS: (~CPR.~ A-T_..F OiT~o WATF-0 `t'i-%A-VEYok
~
~ Z
SIGNATURE A ,
HEALTH DISTRICT
A PRELIMINARY DISCUSSION HAS TAKEN PLACE AN17 G.E3yVERAL REQUIREMENTS FOR
SUBMITTAL OF THIS PROPOSAL (HAVE) ;0AV.E BEEN SATISFIED. .
A. COMMENTS: ~t,~~„~ f C%/i 5.,~r= S~l~~l~c :c' .5~~-/~ T~ ~ti•-S
r j r ~ ✓
3" y
, ~__-MGNATURE/I'ITLE DA
SEWER PURVEYOR
A PRELIMrIVARY DISCUSSION HAS TAKEN PLACE AND GENERAL REQUTIZEIVIENTS FOR THE
PROVTSION OF PUBLIC SEWER ARE UNDERSTOOD BY THE APPLICANT.
A. COMMENTS: Uk L\0A1V-F L 00 SITE
r
E Ci
SIGNATUREfI'ITL A
SUBDIVISIrJN APPLICATTON Page 4 of 4
PART III
SURVEYOR VERIFICATION '
I, THE UNDERSIGNED, A LICEI~ AVE COMPLETED TI-E INFORMATION
REQUESTED. THE LEGAL DE ~J~~~3 • M Y PLAT HAVE BEEN PREPARED BY ME OR .
UNDER MY SUPERVISION IN C A~~~ QUTREMENTS OF THE SPOKANE COUNTY
ZONING/SUBDIVISION REGUL : T : = N Nsr OF TEE S TATE OF WAS HINGTON.
, , . .
SIGNED:
D ATE:
^•c • r 7j ~q -i ,
ADDRESS: -
l ~ PHOIVE: z
~c~ - r ~ ' : . . ~ >
zrP: ~ c, r
~
~:~~=`;Gt: 1!'ii•1 ~
1'Z .":?f12',;57;,7'1~';,:.;~'r.~t!'•...~.•a, u• , .,.'r
PART IV
(SIGNATURE OF PROPERTY OWNERS OR LETTER OF AUTHORIZATION)
I, THE UNDERSIGNED, SWEAR OR AFFiRM UNDER PENALTY OF PERJURY THAT THE ABOVE
RESPONSES ARE MADE TRUTHFULLY AND TO THE BEST OF MY KNOWLEBGE.
I FURTHER SWEAR OR AF"FTRM THAT I AM THE OWNER OF RECORD OF THE AREA PROPOSED
FOR THE PREVIOUSLY IDENTIFIED LAND USE ACTION, OR, IF NOT THE OWNER, ATTACHED
HEREWITH IS WRITTEN PERMISSION FROM THE O'WNER AUTHORIZING MY ACTIONS ON HIS/HER
BEHALF. ' ! 1 -
/ ~L~' . /~~~z•~_
SIGNED: ~ - - -
DATE: I -3
, .
ADDRESS: hrZ 2- !l4Gce yGv,4 y PHONE:
.~OA'wGv e' : ZIP:
SIGNATURE OF APPLICANTP< REPRESENTATIVE DATE
~9irlD
STATE OF WASHINGTON ) ) ss:
COUNTY OF SPOKANE )
SIGNED AND SWORN OR AFFIl2MED BEFORE ME ON THIS DAY OF
. .
1994', BY
- , ,
;
IVQ .
` . \551 O N ~,A ` , i' • ; .
~ Y S E
i v N N C Notary"Public in or,, c S lc of Washingt~)
2
Rcsiding at: ~ • ~x c~
. . o,.
My appointmcnt txpires:
WA
PART V
(TO BE COMPLETED BY THE PLANNING DEPARTMENT)
DATE SUBIvIIT!`ED: ( FILE L273 9S (ze - 7- 9 5)
~
DATE ACCEP'I'ED: BY: V.
41TOTAL FEES : ~l ~ . ~ RECEIPT ~OD ~
Y • r ,
~
i
S P O K A N E C O U N T Y
~
OFFICE oF THE CouNrY EtvGUVEEtt • A DMSION OF THE PUBLIC WORKS DEPARTMENT
Ronald C. Hormann, P.E., County Engineer Dennis M. Scott, P.E., Director
MEMORANDUM
TO: JOHN W. KEN KUH , ANNING
FROM: BREND~AND KATHERINE R, STORMWATER
DATE: FEBRUARY 1 1995
SUBJECT: n, 11
During the SEPA review process the applicant wiil need to address the following
issues:
The applicant shall address mitigation of any possible impacts to public drainage
facilities from the project. An erosion control plan may be required to safeguard drainage facilities during
construction activities.
How are the drainage facilities to serve the private roads going to be maintained?
Ditches or other areas receiving stormwater shall be grass-lined to filter pollutants
before water seeps into the ground.
A maintenance plan and maintenance schedule will need to be prepared to guide the
responsible individual or group in the maintenance of the private drainage facilities.
Identify the parties responsible and make sure that every facility is identified as to who
is responsible for it and what the maintenance will include.
The applicant shall address means of disposing of the drainage associated with the
private roads and/or lots without impacting public road facilities or other properties.
The design of the approach (driveway) shall be completed in such a way the does not
direct street drainage into the proposed house or garage.
D/SHELLEY ACRES
1026 W. Broadway Ave. • Spokane, WA 99260-0170 •(509) 456-3600 FAX: (509) 324-3478 TDD: (509) 324-3166
r
OFF I CE QF TME CCIUNTY ENG I NEER
SPQKANE C(]UIVTY, WASH I NGTOIV
February 1, 1995
T0: Sp-Dkane Cour-ity Plani-iii-iq DQpartmerit (Current Planninq
Administrator)
_ a -
FROM: SPoE:ane CountY _ Enqineers DePartmentQd+
SUBJ: Subdivision Conditioris, Name 5heX ley_AcreS
NLtmber Unassigned
re: S+abdivisions
1"he fiollowinq~"Conditxons of Approval" for tf-ie above referenc:ed
sLtbdi v isi-Dn are submi t ted to t he Spcik:ane Coianty N 1 anni ng
Department for inclusion in the llesiqn Review Meetinq scheduled
February 1, 1995,
E 1 The coriditional approval of the plat is ctiven by the County
Engineer Suha.ject to dedieation of riql-it-of-way and approval
of the road system as iridicated in the prPliminary pl~t of
record.
E2 "rnat plans, profiles and cross sections as desi.qned to
Couni:y standards showinq proposed street centerl.ine and curb
qrades be submitted to the County Enqineer for approval
prior tiD constructi-Dn and/or the fil.inq of a fiiial plat;
road plans to be prepared under the direction of a 1 i censed
Professional Civil. Eiiqineer.
E3 That drainaqe plans and desiqn cal cu1a•tions showinq the
aliqnment of drainaqe farilities he submitted t-D the County
Engineer f~.wr approvaX prior to constrLtcti.cin and/or the
fi 1 inq of the firial plat. Drainaqe plans to be prepareci
under the clirection of a licensed Professionci1 Civil
Enc7ineer.
E 4 "fr~at the regulations of the Nationa1 F7.ood tnsurance Proqram
be c)bserved since the propcised plat is associated with an
are2 of special flood ha: ard. A development permit sha1l be
obtaiiied from the Coijnty Enqineer before constri.iction or
deve].opmEnt beqins on any property a11 or a portion of which
is in any arP~.~ of special flood I-iazard (referei-ice Spok:ane
Coun t y 0 rd i na n c E 88--0521
That the fiol liDwinq -statement Shal 1appear within the
ciedi.catory lanquaqe of the plat:
, -
'
PagE' r~
a~.
"Development witliin thi~ subdivision shall conf-Drm to
the requi.rements of the hlational Flood Insurance Proqram and
Ghapter 3.20 of the Spok:ane County Code. Purcha5ers of
property in thi~ SLibdivision ~.~re warned ofi possible floodinq
or p-Dndinq anci the potential requirpment to purchase Flood
Insuranceo This warni.nq shall be carried .i.n each and every
deed drawn to transfer ownership of any and a11 property
withi.n this plat in the Area of 5pecial Flood Hazarda "
E 5 Constructir-)n within the propi-nsed public streets and
easements shall be performed under the direct supervision of
a licensed enqineer/surveyor, who shai l furnish the Coi_inty
Engirieer with "As Bui:lt" plans and a certifYCate in writi.nq
that all improvements were ii-istalled to the lines and qrades
shown on the approved constrLtction plans and that 211
disturbed monuments have been replaced.
E6 No eonstruction worb:: is to be performed withiin the existinq
or pr-Dposed PLtb1 a. c Ri gh t-of -Way unt i 1 apermi t ha<.s been
issued by the County Eriqineer. All work: is sub.ject to
inspection and approval by the County Enqineer.
E 7 A11 construction wi.tfiin the existinq or pr~~po5ed F'kAblic
Right--of-Way is to be completed pric-ir to filinq the -fxnal
p 1 at or a bond i n t he amount esti.mated by t he County
Enqzneer toD C!?V21'' the CoSt of Cor15tYi.ACtlol'l of impreDvements,
construction certification, "As Built" p.lans and monumentinq
the 5treet center ines shal be fi led with the County
EnQi neer .
E8 IVo clirect access from 1ot~ to 1/2 Riqht-of-Ways unti1 such
roads are consi:ructed to Courity Standards and established as
COLtnty Roads.
E9 IVo direct access from 1ots to Stub Road cortinections i_tntil
such roads are constructed i:o County Standards and
establ ished as County Roads.
E10 Road design, constructiiDn and drainaqe contr~iDl for 1/2 Riqht-
of °Ways and StLtb Road connections are the responsibi 1 ity of
the developer.
E12 The.applicant should bp advised tha-t individua1 driveway
access permits are required prior i;o issuance of a bi_tildinq
permit for drxveway approaches to the County roaci systemo
!
R~ ,r
paqe 3
E13 Dedication cif 50_feet ofi adriitional Riqht-ofi-Way along Steen
CU~.~rt.
F16 Existinq County roads provi.clinq direct access to the plat
sha11 be paved and/or curbed to Spokane County stanciarcis.
E17 Th~at a11 pLiblic roads within the plat be desiqneci ancl
constructed to SpoE;ane C~Dunty standardsn
E19 1"he word "appl i cant" sha1 1 inc 1Ltde the owner or owners of
t he proper ty, his hei rs, assi qns and suc cessars.
E23 The COLtnty Er7qineer has desiqnated Typical Roadway Section
IVumber Two,__Lr_,cal_Access si:andarci fiDr the improvPrnent iDf
Steen_COLtrt wtiich is to he Construc•teci within the proposed
development anci er;teridi.nq to e•r.istinq pavement on 12th
Aveni_ie. This will requi.re the installation of 36 ft. of
asphaltp The constructiiDn of curbinq is also required.
E32 The proposed plat shall be i.mpriDveci to the standards sPt
forth in Spokane County Board of Commissioners R@so1ution
hlo. 80-1592, as amended, which establishes requlations for
ri-rads, approaches, drainaqe and fees in new constr+.iction.
E33 The County Enqineer has examined this devel.opment proposal
and has dPtermined that the impaet of this proposa1 upon the
existinq County Road System warrants the dedication of
additi-,nal Riqiit of Way and the roadway improvements herein
speci.fiied.
E90 The applxcant should be advised that there may exist
utilities either i_tnderqr~DLind ~Y-r overhe~.~d affecting the
applicants property, inclLtdinq property to be dedicated or
set aside for future acquisitiiDn. Spok:ane County will
as5Ltme no financi.a1 cibliqati.on for ad.justments or relocation
reqardinq these utilities. The applicant should check: with
tr~e appl i cabl.e uti 1 ities ancl Spok:ane COLtnty Enqi.neer to
deterrnine whether the appl i cant or uti 1 ity is responsible
for ad justment or re1ocation costs and to mak:e arrangementr
-for any necessary wiDrk:.
Speca.al Conditions:
f
~
(]aQ@ 4
Appl.icant shall demonstrate i:o the sati5faction of the COLtnty
Enqineer that the pubXic ro~.~d as de]. i.neated on the preliminary
plat meets public road standards for horizontal curve
requirements prior to any public hearinq on this item.
. .
PAGE 1 13:57:20 20 JAN 1995
Road# Road Names.......... MPost. Reference Descriptio Road Log Info..........
05893~12TH AV .(START) 00.000 WEST END TO SIESTA D U 19 PAVED 50
;12TH AV 00.010 SIESTA DR (END) U 19 PAVED 50
! 12TH AV (END) 00.040 DISHMAN RD
05894•12TH AV (START) 00.000 UNIVERSITY RD U 19 PAVED 20
12TH AV 00.250 PIERCE RD U 19 PAVED 20
00.340 SKIPWORTH RD (END) U 19 PAVED 20
00.500 BOWDISH RD U 19 PAVED 20
00.590 WILBUR RD (END) U 19 PAVED 20
00.620 WILBUR RD (START) U 19 PAVED 20
. 00.660 FOX RD ( START ) U 19 PAVED 20
; 00.720 REEVES RD (END) U 19 PAVED 20
00.750 UNION RD (START) U 19 PAVED 20
' 00.840 ROBIE RD (START) U 19 PAVED 20
00.910 WHIPPLE RD (START) U 19 PAVED 20
01.000 SR 27 (PINES) U 19 PAVED 20
01.130 HOUK RD U 19 PAVED 20
01.250 VERCLER RD (START) U 19 PAVED 20
01.320 VIRGINIA ST (END) U 19 PAVED 20
01.380 WOODLAWN RD (START) U 19 PAVED 20
~ - 01.510 MCDONALD RD U 19 PAVED 20
01.640 CLINTON RD (START) U 19 PAVED 20
i
" 01.760 BLAKE RD (END) U 19 PAVED 20
01.800 BLAKE RD (START) U 19 PAVED 20
, 02.010 EVERGREEN RD U 19 PAVED 20
12TH AVE 02.170 BANNEN RD (END) U 19 PAVED 20
12TH AV 02.230 BEST RD (END) U 19 PAVED 20
t . 02.390 CALVIN RD (START) U 19 PAVED 20
' 02.450 WARREN RD (START) U 19 PAVED 20
% 02.520 ADAMS RD U 19 PAVED 22
, 02.570 MARIGOLD ST (END) U 19 PAVED 22
~ 0 2.'6 8 0 BURNS RD ( START ) U 19 PAVED 22
02.770 PROGRESS RD U 19 PAVED 22
- 02.870 ST CHARLES (END) U 19 PAVED 22
02.920 NEWER RD (END) U 19 PAVED 22
02.980 CENTURY RD U 19 PAVED 22
; 12 TH AV ( END ) 03.020 SULL I VAN RD
0 6 0 7 9•, 12 TH AV START ) 00.000 COLEMAN RD ( START ) U 19 UNIMPROVED 08
1112TH AV 00.120 GIR.ARD RD (START) U 19 UNIMPROVED 08
12 TH AV,( END ) 0 0. 2 5 0 PARK RD U 19 GR.AVEL 18
05892 12TH AV (START) 00.000 WEST END TO DICKEY R U 19 GR.AVEL 32
12TH AVE 00.120 BETTMAN RD (END) & D U 19 PAVED 36
12 TH AV ( END ) 00.250 EASTERN RD ( START )
06228 12TH AV (START) 00.000 FAIRCHILD ST (START) R 09 GRAVEL 30
12TH AV (END) 00.300 BARTHOLOMEW ST (STAR
06185:12TH AVE (START) 00.000 CHRISTENSEN RD R 09 GR.AVEL 30
; 12 TH AVE 00.250 WHEATLAND ( START ) R 09 GR.AVEL 30
,12TH AVE (END) 00.370 EAST END OF ROAD R 09 GR.AVEL 30
06037, 12TH AVE (START) 00..000 SHAMROCK ST (END) U 19 PAVED 30
. 12TH AVE (END) 00.050 EAST END OF ROAD U 19 PAVED 30
7 Records Processed
.i .
i . .
:
; Tra f f i c Count s
Road Name Location.................... Leg Count...
. 16TH AE (START)* at DISHMAN-MICA RD E 04834
16TH AE (START) at DISHMAN-MICA RD W 00589
16TH AV at UNIVERSITY RD E 7694
16TH AV at UNIVERSITY RD W 6964
16TH AV at BOWDISH RD E 07295
16TH.AV , at BOWDISH RD W 06269
16TH AV (START) at CARNAHAN RD E 00866
16TH AVE at PINES RD (END) W 06610
16TH AVE at WOODLAWN RD (END) E 02789
16TH AVE at WOODLAWN RD (END) W 02473
16TH AVE at EVERGREEN RD E 03764
16TH AVE at E`IERGREEN RD W 03828
16TH AVE at ADAMS RD E 3173
16TH AVE at ADAMS RD W 02773
16TH AVE at SULLIVAN RD W 02073
16TH ~VE (START) at SALTESE AV (START) E 03945
.
,
~ . .
;
:
.i .
,
,
February 1, 1995; 1:15 p.m.:
PRELIMINARY PLAT OF SHELLEY ACRES
Generally located east of 12th Avenue (extended) approximately 350 feet east of the
intersection of 12th Avenue and Shamrock Street in the SE1/4 of Secrion 24, Township
25, Range 44, EWM, Spokane County, Washington.
COMPREHENSIVE PLAN: Suburban-plus and Urban both outside and within the
Priority Sewer Service Area (PSSA)
EXISTING/PROPOSED ZONING: Urban Residentia13.5 (UR-3.5) and Suburban-
Residential l (S R-1)
PROJECT DESCRIPTION: Preliminary plat to divide approximately 15.1 acres into
131ots for single-family residences and those uses allowed in the existing Urban
Residenda13.5 (UR-3.5) and Suburban Residential 1(SR-1) zones.
PARGEL NUNIBER: 45244.9119 (PTN)
SITE SIZE: Approximately 15.1 acres
APPLICANT: Mark McManus
Ben Simpson
921 South Monroe
Spokane, WA 99204
(509) 455-5411
ASSIGNED PLANNER: Ken Kuhn
j
I
S P O K A N E C O U N T Y
PLANNING DEPARTMENT MEMORANDUM WALLIS D. HUE3BARD, DIRECTOR
RECEIvIED
TO: ' at er, So•ane Cou~nty Di~risio =0131811111'~g ,1 A N 1995
Brenda Sims, torm Water Uty C
Jun Red, Spokane County Utihties Department M* EQglaeattAp;
Steve Holderby, Spokane County Health District
Wyn Birkenthal, Spokane County Parks & Recreation Department
Greg Figg Department of Transportation
Christine Fueston, Spokane Transit Authority
Susan Winchell, Boundary Review Board
Glen Miles, Spokane Regional Transportation Council
Fire Protection District #1
Vera Water & Power
Central Valley School
FROM: John W. Pederson, Senior Planner q-
DATE: January 17, 1995
~
RE: Preliminary Plat of Shelley Acres
APPLICATION ACCEPTANCE AND DESIGN RF,VIEW MF~TI~LQ
FEBRU."Y L 1995,AT "5 PJM,t
CQUNTY PLANNINC CONFERENCE RnM ZND FLQOR
Please review the above application and use the attached APPLICATTON ACCEPTANCE AND DESIGN
REVIEw MEETIlVG FORM for your comments. The Planning Department encourages your presence
at this meeting. The sponsor and representative have been invited to also attend. If you can not
attend, please forward your review comments on the attached form to Ken Kuhn for the meeting.
The attaChed APPLICATION ACCEPTANCE AND DESIGN REVEEW FORMS will be given to the
sponsor at the meeting and included in the Planning Department file (so bring thrqg copies to the
meeting). Thanks for your cooperation. If you have any questions about the application, please
contact Ken Kuhn of the Planning Department at 456-2205.
c: Mark McManus
Attachments: Application Acceptance and Design Review Form, Project Design, Site Plan
1026 WEST BROADWAY AVENUE • SPOKANE, WASHINGTON 99260-0240 •(509) 456-2205 • FAX: (509) 456-2243 • TDD: (Sa9) 324-316b
• . ' .
` SPOKANE COUNTY PLANNING
PRELIMINARY SUBDIVISION APPLICATION
PART I . RECEIVED
JAN 131995 A. GENERAL INFORMATION:
sPCJlhANE C.C)UNTY •
NAME OF APPLICANT/REPRESENTATIVE: ~~G~l~ J SK.. fa cr ne -IT
A/&~-
MAULING ADDRESS: --5 WO/1IZ0 ~
CITY: STATE: ~/fl ZIP: i?~G~ v
PHONE: (work)
F
~ (homc)
,
YF APPLICANT IS NOT OWNER, INCLUDE WRITTEN OWNER AUTHORIZATION
FOR APPLICANT TO SERVE AS REPRESENTATIVE.
NiJk/r 1#-(*/I'lAN41S
LEGAL OWNER'S NAME: 5~~ oi✓ PHONE:
MAII.ING ADDRESS: 19 &1
CITY: STATE: GVi9 ZIP:
PROJECT/PROPOSAL SITE AREA (acres or sq. ft) ADJACENT AREA OWNED OR CONTROLLED (acres or sq. ft.)
ASSESSOR PARCEL #S OF PROJECT/PROPOSAL rr 'cJ aF y~ 4o
ASSESSOR PARCEL #'S OF ADJACENT AREA OWNED OR CONTROLLED
_ ,
STREET ADDRESS OF PROPOSAL 7'
EXISTTNG ZONE CLASSIFICATION(S) (DATE ESTABLISHED) (1/~...3 ~
EXISTING USE OF PROPERTY D~eN
COMPREHENSIVE PLAN CATEGORY v
SCHOOL DISTRICT
FIRE DISTRICT ~ WATER PURVEYOR
PROPOSED USE OF PROPERTY:
Single family dwellings>< Duplexes Multifamily dwellings
Manufactured homcs ( ) Business ( ) Industrial ( ) Mixed Use ( )
Other ( ) - Describe:
LIST PREVIOUS PLANNING DEPARTMENT ACTIONS INVOLVING THIS PROPERTY: L.~
9- ~P3 . .
B. LEGAL INFORMATIn~L-
LOCATION OF PROPOSAL: 6A57- e~~ 12 7' 4.
SECTION v? T TOWNSHIP 2_5 RANGB t7l
NAME OF PUBLIC ROAD(S) PROVIDING ACCESS: lG 7-~ %
~
WIDTH OF PROPERTY FRONTING ON PUBLIC ROAD: ~ o
DOES THE PROPOSAL HAVE. ACCESS TO AN ARTERIAL OR PLANNED ARTERIAL YES ONO
NAME(S) OF ARTERIAL ROADS
LEGAL DESCRIPTION OF PROPERTY (Attach legal description stamped by Land Surveyor). INCLUDE
LEGAL DESCRIPTION FOR ENTIRE AREA TO BE SUBDIVIDED ON PREL,IMINARY SUBDIVISION
MAP.
. " .
SUBDIVISION APPLICATION Page 2 of 4
IF YOU D4 NOT HOLD TITLE TO PROPERTY, WHAT IS YOUR INTEREST IN IT?
~
WHAT ARE THE CHANGED CONDITIONS OF THE AREA WHICH YOU FE~AKE THIS
PROPOSAL WARRANTED? WHAT IMPACT WILL THE PROPOSED SUBDIVISION HAVE ON THE ADJACENT PROPERTIES?
WHAT FACTORS SUPPORT THE SUBDIVISION?
WHAT MEASURES DO YOU PROPOSE TO MITIGATE YOUR PROPOSAL'S IMPACT ON
SURROUNDING LAND USE?
C . PRELIMINARY SUBDIVISION CENERAL INFORMATION:
NUMBER OF LOTS : /3 GROS S AREA: S/9~'.~.~ <
TYPICAL LOT SIZE: PRQPOSED NET DENSITY*: 1 ~~~1/',~
SMALLEST LOT SIZE: ~~G•e ~ MINIMUM FRONTAGE:
PROPOSED SOURCE OF WATER:
Individual wells Public system Private Community System
Othcr ( ) - Dcscribc:
PROPOSED MEANS OF SEWAGE DISPOSAL:
Public sewer Community system Septic tank and drainfield
Double Plumbing Dry Sewer Other
Describe:
UTILITY COMPANIES AND/OR DISTRICTS TO PROVIDE SERVICE TO THIS PROPOSAL:
Electricity: 11E64 Sewer. 11"415
Gas: it/W 7O Water. Phone:
DO YOU, OR THE OWNER IN THE EVENT YOU DO NOT OWN THIS PROPERTY, HAVE ANY
PLANS FOR FUTURE ADDITIONS, EXPANSIONS OR FURTHER ACTIVITY RELATED TO THIS
PROPOSAL? Yes No K IF YES, EXPLAIN:
D . PRELIMINARY SUBDIVISION IMPRovKME~,1T TALnRMATIQN: LEVEL OF STREET IMPROVEMENTS PROPOSED: Private roads
Public roads K Arterial roads , Tract X roads
DESCRIBE ANY COMBINATION OF ABOVE:
ESTIMATED TIME PERIOD EXPECTED FOR COMPLETE DEVELOPMENT OF THE SUBDIVISION:
IS PHASING OF THE FINALIZATION OF THE SUBDIVISION PROPOSED? Yes No K
IF YES, SHOW PHASING ON THE PRELIMINARY SUBDIVISION MAP.
IS DEDICATION OF LAND FOR PUBLIC USE CONTEMPLATED (Parks, schools, etc.)? Yes O NoA
IF YES, DESCRIBE:
* NET DENSITY• IS UMTS OR LOTS PER ACRE MINUS PRIVATE AND/OR PUBLIC ROAD AREA.
-
. -
SUBDTVISION APPLICATION . Page 3 of 4
PART II
THIS SECTION OF THE APPLICATION WII.L PROVIDE THE PLANNING DEPARTMENT STAFF WITH
WRITTEN YERIFICATION THAT THE APPLICANT HAS HAD PRELIIv1TNARY CONSULTATTON WITH THE
AGENCIES IDENTIFIED. RESULTS OF THE PRELIMINARY CONSULTATTON SHALL BE INCORPORATED
IN TFE PROPOSAL BEFORE FINAL SUBMITTAL TO THE PLANNING DEPARTMENT. FIRE MARSHALL/FIRE DISTRICT . r
A. THIS PROPOSAL IS WITHIN FIRE PROTECTION DISTRICT NO. ~
B. ADEQUATE ARRANGEMENTS (H*~ (HAVE NOT) BEEN MADE TO MEET OUR NEEDS
IN PROVIDING FOR AN ADEQUATE WATER SYSTEM AND FACILI'TIES FOR FIRE
PROTECTION PURPOSES. n
C. RECOMMENDED FIRE FLOW: r/ r~ ; OR UNABLE TO CALCULATE NOW
BECAUSE USE IS NOT DEFINITIVE; AND WILL BE DETERMINED AT BUILDING PERMIT
APPLICATION TIME. A"A ~iq f~ 44)
D . REQUIIZEMENTS INCLUDE:
r
-~;CFPd 75E( . > - r~- ~j
FIRE DISTRICT SIGNATURE TLE DATE
WATER PURVEYOR A. $ATISFACTORY ARRANGENiENTS FR STIC WATER AND FIRE FLOW
REQUIREMENTS (HAVE) BEEN MADE. ;
B. REQUIREMENTS/COMMENTS: fe' r
~f . ,/7 e. f-4
1 ~ /Z n%•~
~r.l ~i. ! ~ C~r ~V ~ l'~--G~L. / •~.C•fi'>y, ; = v r 11 CC!" / f / ~ ~ ~
WATER DISTRICT SIGNATUREfI'ITLE ~ DATE
COUNTY ENGINEER '
A PRELIMINARY DISCUSSION HAS TAKEN PLACE AND GENERAL, REQUIREMENTS FOR ROADS
AND DRAINAGE HAVE BEEN DISCUSSED WITH THE APPLICANT.
A. COMMENTS:
SIGNATURE/TfT'LE DATE
COUNTY UTILITIES
A PRELIMINARY DISCUSSION HAS TAKEN PLACE AND GENERAL REQUIREMENTS FOR
SUBMITTAL OF THIS PROPOSAL (HAVE) (H VE NOT) BEEN SATISFIED. THE DESIGNATED
WATER PURVEYOR FOR THIS SITE IS A
A. COMMENTS: (~MR! nL&T F 1OITj~ VJ 14 TE_p p►x R1_Eyu12
, ' 'Z
; 13nlcl q
SIGNATURE A
HEALTH DISTRICT '
A PRELIMINARY DISCUSSION HAS TAKEN PLACE G RAL REQUIREMENTS FOR
SUBMITTAL QF THIS PROPOSAL (HAVE),- AVE,NC~~~ BEEN SATISFIED. .
A. COMMENTS: ~J / r~'~'~ S~fG~GLC" ..~~•1' e7~..5'
y -
, F~rv ~2 3a 9
. ~ GNAT"tJRElI'ITLE DA
SEWER PURVEYOR '
A PRELIMINARY DISCUSSION HAS TAKEN PLACE AND GENERAL REQUIREMENTS FOR THE
PROVISION OF PUBLIC SEWER ARE UNDERSTOOD BY THE APPLICANT.
A. COMMENTS: --qLI t~~ rTf_
i
~L
EIXSI'G ATCUREA
. r
, : .
C UBDIVIS ION A,PPLICATION Page 4 of 4
PART III
SURVEYOR VERIFTCATTON '
I, THE UNDERSIGNED, A LICE AVE COMPLETED 1HE INFORMATION
REQUESTED. THE LEGAL DE M= Y PLAT HAVE BEEN PREPARED BY ME OR .
LJNDER MY SUPERV IS ION IN C ~IEE . QUIREMENTS OF THE SPOKANE COUNTY
ZONING/SUBDIVISION REGUL THE STATE OF WASHINGTON.
SIGNED: C DATE: I ZZ-~► ~
~ - ' ~ : ;•z .
ADDRES S: PHONE:
C'~.~.R s• • . .
CI~/ •':I r a ZIP: ~ ci I ~
/
FX~IF2CQ 1?I•;l ~f ~ ~
PART IV
(SIGNATURE OF PROPERTY OWNERS OR LETI'ER OF AUTHORIZATTON)
I, THE UNDERSIGNED, SWEAR OR AFFIRM UNDER PENALTY OF PERJURY THAT THE ABOVE
RESPONSES ARE MADE TRUTHFULLY AND TO THE BEST OF MY KNOWLEDGE.
I FURTHER SWEAR OR AFFIRM THAT I AM THE OWNER OF RECORD OF THE AREA PROPOSED
FOR THE PREVIOUSLY IDENTIFIED LAND USE ACTION, OR, IF NOT THE OVVNER, ATTACHED
HEREWITH IS WRITTEN PERMISSION FROM THE OWNER AUTHORIZING MY ACTIONS ON HIS/HER
BEHALF. ~
I .
SIGNED: r7t DATE: I 3 " ~
.
ADDRES S:~ 1!~52 Z V/9Gcey
'W'0~ty PHONE:
ZLP:
~
SIGNATURE OF APPLICANT0 REPRESENTATIVE DATE
/9irlD
STATE OF WASHINGTON )
) ss:
COUNTY OF SPOKANE )
SIGNED AND SWORN OR AFFIRMED BEFORE ME ON THIS DAY OF
~
199*, B Y
Nd .
510N / • .
SE - , ~ - , ~
0 N No ublic in or. c Siatc of Washingt~)
C p
~y AZ Residing at:
.01.
,
MY aPPointment ~xpires:
~ wAS~
PART V
(TO BE COMPLETED BY 1'HE PLANNING DEPARTMEN'I)
DATE SUBMITI'ED: q ~FILE
-0 DATE ACCEPTED: BY:
TOTAL FEES: RECEIPT
~
~ •
SPOKANE COUNTY PLANNING .
PRELIIdIINARY SUBDIVISI4N APPLICATION
~
PART I .
A. GENERAL INFORMATION:
NAME OF APPLICANT/REPRESENTATIVE: -~~~~l4l S -
MAILING ADDRESS: ~I -.5 1,;1O/1/.eO er, .
CITY: ~,~0//~l~'U~ • STATE: ZTP: 14~7Zd `f'
,
PHONE: (work) (homc) '
IF APPLICANT IS NOT OWNER, INCLUDE WRITTEN OWNER AUTHORIZATION
FOR APPLICANT TO SERVE AS REPRESENTATIVE. .
LEGAL OWNER'S NAME: Bkri ~
SO~~N 0/t/ PHONE:
MAII.ING ADDRESS:
CITY: 51peh2AM~ STATE: Xe ZIP:
_ - . . ~
PROJECT/PROFOSAL SITE AREA (acres or sq. ft)
, ADJACENT AREA OWNED OR CONTROLLED (acres or sq.
ASSESSOR PARCEL #S OF PROJECT/PROPOSAL 14ZZ-j--0A) l/ oc-
ASSESSOR PARCEL #'S OF ADJACENT AREA OWNED OR CONTROLLED &~2 V z/, 9~/ 9
~ STREET ADDRESS OF PROPOSAL CW.'Sr OC ~Z ~
EXISTING ZONE CLASSIFICATION(S) (DATE ESTABLISHED) S~ie-l
EXISTING USE OF PROPERTY &4e- N
COMPREHENSIVE PLAN CATEGORY
SCHOOL DISTRICT
FIRE DISTRICT I WATER PURVEYOR
PROPOSED USE OF PR4PERTY:
Single family dwellings)K- Duplexes Multifamily dwellings
Manufactured homes ( ) Busincss ( ) Industrial ( ) Mixed Use ( )
Other ( ) - Describe:
LIST PREVIOUS PLANNING DEPARTMENT ACTIONS INVOLVING THIS PROPERTY:
B. LEGAL INFORMATInN;
~
LOCATION OF PROPOS AL:, J6As7- i~`
SECTION o? T TOWNSHIP RANGE
NAME OF PUBLIC ROAD(S) PROVIDING ACCESS: l Z f-~
i
WIDTH OF PROPERTY FRONTING ON PUBLIC ROAD: G D.
DOES THE PROPOSAL HAVE, ACCESS TO AN ARTERIAL OR PLANNED ARTERIAL YES (>~NO
NAME(S) OF ARTERIAL ROADS
LEGAL DESCRIPTION OF PROPERTY (Attach legal description stamped by Land Surveyor). INCLUDE
LEGAL DESCRIPTION FOR ENTIRE AREA TO BE SUBDIVIDED ON PRELIMINARY SUBDIVISION
MAP.
- . •.J` ~
~ ' • i
l .
' jBDMSION APPLICATION . Page 3 of 4
PART II
' THIS SECTION OF THE APPLICATION WILL PROVIDE THE PLANNING DEPARTMENT STAFF WITH
WRITTEN VERIFICATION THAT THE APPLICANT HAS HAD PRELIMINARY CONSULTATION WITH THE
AGENCIES IDENTIFIED. RESULTS OF THE PRELIMINA.RY CONSULTATION SHALL BE INCORPORATED
IN THE PROPOSAL BEFORE FINAL SUBMITTAL TO THE PLANNING DEPAR11viENT. FIRE MARSHALL/FIRE DISTRICT A. THIS PROPOSAL IS WITHIN FIRE PROTECTION DISTRICT NO.
B. ADEQUATE ARRANGEMENTS (HAVE) (HAVE NOT) BEEN MADE TO MEET OUR NEEDS •
IN PROVIDING FOR AN ADEQUATE WATER SYSTEM AND FACILITIES FOR FIRE
PROTECTION PURPOSES.
C. RECOMMENDED FIlZE FLOW: ; OR UNABLE TO CALCULATE NOW
BECAUSE USE IS NOT DEFIlVITIVE; AND WILL BE DETERMINED AT BUILDING PERMIT
APPLICATION TIME. . D . REQUIREMENTS INCLUDE:
FIRE DISTRICT SIGNATURE/TITLE DATE
WATER PURVEYOR
A. SATISFACTORY AR.RANGEMENTS FOR DOMESTIC WATER AND FIRE FLOW
. REQUIREMENTS (HAVE) (HAVE NOT) BEEN MADE.
B. REQUIREMENTS/COMMENTS:
WATER DISTRICT SIGNATURE/I'ITLE DATE COUNTY ENGINEER
~ A PRELIMINARY DISCUSSION HAS TAKEN PLACE AND GENERAL REQUIRENLENTS FOR ROADS
AND DRAINAGE HAVE BEEN DISCUSSED WITH THE APPLICANT.
A. COMMENTS:
. ~ .
. . r.. .
<< < d ~z~~-Yo .
~
- SIGNATURE E DATE .
COUNTY UTILITIES
A PRELIMINARY DISCUSSION HAS TAKEN PLACE AND GENERAL REQUIREMENTS FOR
SUBMITTAL OF THIS PROPOSAL (HAVE) (HAVE NOT) BEEN SATISFIED. THE DESIGNATED
WATER PURVEYOR FOR THIS SITE IS
A. COMMENTS:
SIGNATURE/TITLE DATE
. HEALTH DISTRICT
A PRELIMINARY DISCUSSION HAS TAKEN PLACE iD=GE RAL REQUIREMENTS FOR
SUBMITTAL OF THIS PROPOSAL (HAVE) AVE N; BEEN SATISFIED. .
A. COMMENTS
j ~
- CVGNATURE/TITLE DA
.
SEWER PURVEYOR
A PRELIMINARY DISCUSSION HAS TAKEN PLACE AND GENERAL REQUIREMENTS FOR THE PROVISION OF PUBLIC SEWER ARE UNDERSTOOD BY THE APPLICANT.
A. COMMENTS:
SIGNATURE/I'ITLE DATE
~ - _ •
1
~ PERMIT CENTER PASSPORT
Date: Number:
Name Phone
Address
Comments:
CUSTOMER ROUTING
,
. ' :':~':ii:.}::.: i:' ':,'v' • ' : . . . .
- _ - .r.
. .....~:.v..:._:. .
}
BUIL r'.r'r . •:..tiii::.:':: •:~:r:::?•:
~ : . . . . . ~
. . ..ti t ...n-..' . •v:7':r ;}}:r.. f::?i:?:n•:
S. v. . . '.~.,r.•."
` .DING . De artme~t ~r;.::>N ::;<:r;::;:_<::~:: • l•. : . . : ' ~ ' •:t:{;:} ~,f~ntiti ~::v'•" : }i •r: r: - . . _ _ Department ...r.ti• : '??$?i:: "
f . - P . .y..ry . ~.PLXNNING_ NGINEER S~:De. .,par#m
Addressing . i Admin. Exception . = Approach Permit
Building Permit Arterial Rd Plan Info , Flood Plain Permit ~
Code Inforruation Binding Site Plan Info i Public/Private Roads
~ Commercial Review Cert. of Exemption i Res. Bldg Permit Rev.
Conference Comprehensive Plan ~ Site Drainage Info
_ - ~ S gC L-L-1 /A- CK.-t~S
_ Energy Code Info ~ Cond. Use Permit Subdivision Review
Fire Safeh► Review = Nonconforming Use : Utility Permit
~ Manufactured Home i Permit Review i Zone Change Review
f Mech:nical Permits Shorelines Info '~~s2''i"'t'• ~ C~~
~ Othcr Permits ! Short Plat Info NO ~~E ItEQiIIKKED
- s Revicwer Time out
~
Plumbing Perniits i Subdivision Info
~ . . .:.r:....
! . .
Private Road Info Ternp. Use Permit ~UTi LITIES" D .e ..p tti'ttlent::•:•.:;,':':;`'~'-~'"~;;:<;~:
! Residcntial Review Variance Appl. s APA Payment
Sewer Permits ~ Zone Check _ Cert. of Exemption
! Zone Info Subdivision Review
ULID/Sewer Info
7.onc Changc Review
! NO ~ s1? tZ1:QUIRTI7 NO IFF.Is XE QUIIZLD
Revicwer 'I'irnc out Rcvicwcr "1'imc out ltevicw~cr Time out
A1JLS'11:RTASSPOR1.CfR 1II1193 ~
~
` REQLJEST FOR DESIGN DEVIATION
$30.00
DATE 10/14/99
ROAD NAME C 0 UR TV EY LANE CRP/RID # NAME OF PLAT SHELLEY ACRES Plat#' Pl 773
ADDRESS OF BLDG
NAME OF BLDG PROJECT BLDG# B9 S T R
FEDERAL/STATE PROJECT # PROJECT LIMITS
EXISTIlNG CONDITIONS: . PROPOSED IMPROVEMENTS:
ROAD WIDTH - 16' (Private Drive )
ROAD SURFACE A sphal t
AVG. DAII.Y TRAFFIC 2 0- 3 0 A D T Current Traffic Count Design Year Traffic Count
PROJECT DESCRIPTION Shel 1 e y A c r e s i s a 13 1 o t p1 at. C o u r tn e,y L an e i s an a c c e s s
lane to serve 4 of the lots. All lots will nave frontage on Steen Court,
but tnese 4 homes will be served 'oy Courtney Lane.
PROPOSED DESIGN DEVIATION Use of a 241 wide driveway drop instead of curb
returns. (See attached plan. )
HLULIVED
SPOKANE COUNTY ENGINEER NSTIFICATION: We were told at the beginning of the proj ect (b,y Doug Busko of the Count,y
Engineers) that the entrance to the nrivate drive should look like a
,
driveway and not have curb returns. Initially we were told to not have
a drivec,ray drop,
- P~
The private drive will have limited use and will fu
residential driveway.
HECEIVED
n 90
51'UKANE COUNTY ENGINEER O~+ 30891 q ~
.a clsTSR~
1
SUBMTTTED BY MLTRO ENGIVEERING, INC. , Joel G. Lee, P. E. sslo~ ~/14/99
A.DDRESS S. 324 Sherman, Spoltane, WP G 99202
(509) 624-9351 ~
PHONE # f 1
ADNIIVLST][tATIVE VA►RIANCE FEE OF $30•00 PAID TO SPOKANE COiJNTY
' 1026 W BROADWAY, SPOKANE WA 99260-0170 PHONE (509)456-3600 FAX (509)324-3478 ~
-REQUF,S"I' WII.L NOT BE REVIEWHD WTTHOUT FUNDS-
CASHJ HE ~ # 20P RECEIVED BY lbD AVIM DATE 0:2%r 2 f cC?o'
k\tidaign.dev 2I96 • r 14
I
•1 I 1 1
L+! I I ~ 1
✓
(
I
o+oo 1+00 ~ 2~00 ~ 3+00
8. -
RIP-RAP AT PIPE OUTLETS WITH MINIMUM
DIMENSIONS AS SHOWN. 50% OF RIP-RAP
TO 8E 3" OR IARGER (d50=3"). M(N. 6"
THICK. RIP-RAP SHALL BE IN ACCORDANCE
~o 0o WITH SECTION 9-13.1 OF THE WSOOT/APWA ,~~•9ZZ
STANDARD SPECIFICATIONS.
0
~a
G ~
DRAINAGE PIPE ~ ~ - - - ~
o ~
S ~ ~ ~ r ~ .3±00 .7~~
° , ~ • 0446'13"
3 ~ k~~ i ~ ~
aP DETAIL 7 ~ ~ - ' ~
o I
t0 SCALE ~
^ / ~ 30' PRIVATE
N / • * / ~ DRIVE EASEMENT
STA. 0+9 2.00 ~ 1~
W.S.D.O.T. GRATE INLET TYPE 2 / 6 ~
(1 PIECE BASE) w/TYPE "A" GRATE
T.O.G. EL.=2045.28 o
I.E. = 2043.08
~
. / 54 L.F. 0F 8„ CPEP, ADS N-12 CO
Ppoy ljo CORRUGATED PIPE (INSTALL PER ~i
50' PAVEMENT TAPER TO MANUFACTURER'S RECOMMENDATION)
TYPICAL ROAD SECTION SLOPE - 0.70~
~Alz~038 , , .
STA. 0+39.89, 18' RT. ;F F 0+69.63 1
RIP-RAP OUTLET PER DEfAf
I.E. = 2042.70
, 2046 \
5
STREET NAME SIGN, PER M.U.T.C.D. 04 .Z0421
,pl'SL= ~ . t d'.a
24' DRIVEWaY APPROACH PER ~ ~ ~ ~ ~ . ~ ' ~-•ti~~ ~
' I : ' •
SPOKANE C0. DETAIL A--7 • • ~ ' ~ o ~ . . . ' • .
, . . . ~ . - ..~-r . ~ . ~a
oo+o~i~ ~ ~ •t. s°z~
LI N E TAB LE ,8s'C s-;
_ s.i.:
~ BEARING ~ LENGTH 0+00 COURTNEY LANE
+ N 75'43'46" E ~ 59.63' 10+79.48 STEEN COURT ~ 6:~• ~
~ 9,~~ 1\;
4
3 -
CONSTRUCTION NOTES:
A_L ITEmS CF CONSTRUCT(ON SHALI. 8E COMPLETEG !N ACCORGANC£ `flITH THE 5) IF THE COt1TRACTnR DIS.O!E-~"
- - nr.►ic~7r. inTin.K. /'r'ni~ATI^rIC r"~Ir`('Itt~TCf:C, Tt1:
~
• ~ -
~ -
_ . • - - ---~~-...:._.~s.~- ~ - - -
~ - - .
2293
` METRO ENGINEERING INC.
a PH 509-6249351
324 S SHERMAN 28-8270/3251
SPOKANE, W A 9 9 2 0 2 pATF I i J
, I 3
PAY'['O Tt[E 00
oRDER oF
~ ~y, ~i un~r f~•iw•~ ~
QOLI.ARS E]S•e
' T ~y' . D•~~n~ ew e~ca. ~ .
- . ' Spokaae Toche:s Credit Onloa
. _ • _ ' SM Pou Omcs B~ 5264 ~
$Qpkaoe. WA 947054281
. ~ , - . • - ~ ~ D&V.
~ FoR AC'Ye; AP
~1: 3 2 5 LB 2 7004 100 500 7 L L8 4 9u• 2 3 .
, _ - -
oH^Mmo
~ . - .
Received From: MOO ri~ . Receipt No. 107495
Address: Date: 4rv--~!24 cCj'w
z Acct. No.: p1~13 Amount Paid:
~
~ Cash: ❑ Sales Tax:
Amt. of Acct: '
U ` Money Order: ❑ Total Paid ~
w ~ : .
z Amt. Paid Check: - Crieck # ZZq3
~ ~ ~ ~ ...+-w r ~ , `a
Balance Due: ~Credit Card:r ~=Exp:~ Date: ~
0
Purpose: X54t4 VA'E •4~~
: t~ii
~ ' .r ~ t - t : : " --*,~'`5~r--^ - ;
• ^ '^'ra.''~'`.5,~'~'~C~i.`:,::+~ ~ ~:-r~--
Received by:
~
j~j
~ 1 O ~
X'1'1sTIcs
~i~ clicck I~~cc d1L Nuinbcr of l..ois
,toacl lvtilcs (Nc,v) 3 Z
royl nrc~1~ ~ ~ , . . . .
. . _ _ _ . - - - . . /5 - 7S
Norcli Arrow - - - - - . . . . . _ . . . . . . . . ~ 0~..- -
' Sc.1lc . ~
J J_cgcnd ~ .
• I'roccclures Sc Equipi»cnt
~
Wsis,orucnc;ngs . ( e!Vc~-P
1'ht Loucion Dy 'I'iile
Official Signiturc Dlocks
~ ~5 l ~~t.✓N~ ~ C°'f
5urvcyors Ccrtif icnic
ltoncl N,►mcs
. r
IZoncI 1`licllhs
Acljnccm Acc;%
l..ot Sc 131ock Numbcrs i li/1V Ucclicalion clcsignmcd _p
~7.
1 Fool Slrips
3 1tI'S oii GLO Coriiccs
'1'uicc X ~ r
Lv l/\ rc ns
q&fc,
- llcncli Nt;irk
• Clostirc ~
. ~
. _ ul.ll~CA 1 ION I
Dcscril)(ioii (7'o ht:,p)
Dcscrip(ion (To Ccrt)
Owncrs I
~
ccrtiftcatc co ['hc
1 Fooc Strips "
1tlU - Cl'lt Slatcnicnt
AYJA-
Acccss ['rohibitccl
lZ/1Y Dcclication ,
urainagc L:ii,guagc
- ~ .
uc~i~i~~c Covcn, i,t Ir
rlooJ liistirai►,cc
20u uu►►(i5 - $1,Ooo.00 en 208 1'LnNS AP1'ltOVCU 1-11a~I-V' 02`
l'riwitc itolcl Doc, ll's
1'rivalc ltond 1V-nrning
~p
Rvad I'laiis / lo s
Itoacl Uoiicl lmprovcinc:nt Itosicl Uo<<cl 111spcclioil
Sipccl Uy Giigiiiccr
~
~r
- -
i\I\10 -aIlisl.ck9/)S__.... . . - - - _ . . e
WTICd•dt~~W. ~r.~ ~f.J ~ . .i . ~ .I~i. ♦ .Ol '~1~ ~J•
. ~ . . (
~
,
F
k
S P O K A N E C O U N T Y
PLANMNG A DNISION OF THE PUBLIC WORKS DEPARTMENT
Gary Oberg, Director
MEMORANDUM
TO: Dave Berto, L.S.
~
FROM: James Richardson, Associate Planner ~
DATE: March 22, 2000
RE: Final Plat Mylars for Shelley Acres; PE-1773-95/ZE-7-95
Please review the attached final plat mylars for Shelley Acres Addition. I have also
attached a plat certificate and the Drainage Declaration of Covenants referenced in the
plat dedication. If you have any questions you may contact me at ext. 7168, or stop by in
person.
Yours in anticipation,
Attachments
1026 W. BROADWAY • SPOKANE, WASHINGTON 99260-0220
PHONE: (509) 477•7200 • FAX: (509) 477-2243 9 TDD: (509) 477-7133
~
p -7
~ ,
• ~
-
4462634
,
03~10J2004 ~41;59P
TRdNSNbTiQN. ?1TLF 1NS (xl (;OV 310.00 Sookane Ca. WA
Spol:anc County Lnginccrs
] O2C W Broaclway -
Spol:anc WA 99260-0170
509)477-3600 COUZ?E5" f,FCu^p,%N;
Documcnt l'itle DECLARATION OF COVEN'ANT
Refcrcncc Numbcrs P/~ 7.~ 9~ 3
Lrbal nescription .S-o-E C,F 1✓ T~ jAh S~ ~I LI oZ ~I ' a 5' y(4
P.ircel Numbcr
Crantc>i•s ancl Cra►itccs 'Tar~/r
In consideratian ot' the approval by Spokan; County ot/~C7,~~ o0VQb-V
(hereunafter referrecl to as the "Development"), the undersigned covenwits and agrees that:
1. T11c subdividerlsponsor will construct tlie private roads nnd associated di•ainabe facilities in conformance with
the approved plans on f lE in the Couiity Engineer's Oi'tlce.
2. A loc is scrved vy a private road Nvhen: a. (he only road frontage for the lot in the Developrnent is on the private
road, or; l). a lot having frontage on more than one road (public or private) constructs an approach to the privale
road.
3. 'n1e Uw[1CC(S) Of 111y lot created by the Development or alternation thereor and served by a pivate roaci shall be
responsible lOI' I111117Iellance of said privatc road, inclucling associated drainage facilities in conformancc with
approvecl plans on file witll the Counly Engineers office.
-l. Maiiitcnlnce; II[1111C1I1g OI' the private roads :tnd associated cirainagc Cacilities shall be in il 111111I1t1' CICCCPIIIIIIeti by
the owner
` a. die majority of lots servecl by sucli private roacl;,
~ ►
. rootage of`t~ts-ser-~c~-1~-s~a~r~~t-i•rt~-r-e~c-l;-e~
d. • .
5. In thc event such private road, including associated drainage facilities is improvecl to Spokane County standards
for public streets, and the County is willing to accept thc dedication of such road and facilities, each lot owner
shall execute aily documents necessary to accomplish such dedi~cation.
6. Owners of lots within die Development who are served by such road, may sue and recover clamages and
attorney's iees from aity owner of any 1ot witliin thc Devtlopmc:nl wllicli is similarly served who rel'usccl to
participate in clle road and dr<<inase facilitics, constrtiction, financing, ancl maintcnanee.
VVAMN1NC: Spokane Cocrriry llas rlo responsibility to Uuild, iiilprove, or mairltain ot- othenvise service the
private roads, inclr.rding associarcri d,aincge jr.:cil'l.l-.S, contnined ►villiiii nr pro>>icling serviee to t/re propei7y
(lescrihed in t/tis Developntenl. B), accenting this Developitient or srrnseyicently by altoti>>irtg a l;ltliding pern~it rn
be issrr.ed for propeity on a private road, Spokanr• Corcnty ussrunes iro obligation for saicl privace 1-oad and the
. owireis hereh>> ackno►vledge thnt 11re Cotuiry ftas no ohligtitioic of uny, kirid of natrrre whnts•oever to estafilislc,
eCa»liire, strrvey, caistrrrct, aller, reparr improve, maiiltain, provide (lr(iinage or snow removal on a private
rond, or associated cliainase facilities.
1
r
~ ° - - - -
4462634
• ' Pae; 2of3
~ ` 03~14J2000 01;59P
+ . TRANSNATiQN. TiTI F 1N9 CQ COV S10.00 Sookane N. WA_
8. This covenant and agreement shall run with dle land anci shall be binding upon he owncr, theic heirs, successors
ar assigns, including the obligation to participate in dle maintenancc oi= the private road, and drainage facilities as
provided herein. ~
,
OWNrER
"OWNER
DATED diis day of 20 O O
S'I'ATE OF WASHINGTON )
Coruiq, of Spokauie )
Ori tliis (lay pcrsaially appeared Uefore nie 6{/:rG4.,77.9~
.
kno►vii to nie to be tlte indivitlual(s) described in atid wlro e,recuted the ivitliin and foregoing iiYStrirment utul
ackizowledged t/iat he/slie/tJiey signed the same as /lis/Icer/tlieir free aiid volluitury act aird deed for rhe uses and
piriposes tlrerein stcctett.
GlVE, N UNDER MY HAND AND OFFICIAL SEf1L tliis jn' dayof 2000.
-
MEACy*1
_ i •
`f40 ,.N „ty''++
~
~A i
~ ; Nntrriy\ptrblic in ar lfoi• tlie State
. Ot ,p ae of Wasliit2gtori, res~ling at Spokatze
,
or-
Mi«iapr ir_ooo
2
r-~
~ - -
~ R
.
' 4462fi34
I Q3~10J2000 o41359P • TRANSNAT10N. TITLE INS CO C4V _110.00 _ Sookane Co. WA
COMMENCING at the Southwest corner of the Southeaet quarter of
the Southeast quarter'of Section 24, Township 25 North, Range 44
East W.M.; thence North 0 26'34"East, 911.95 feet along the West
line of eaid Southeast quarter of the Southeast quarter to the
True Point of Beginning of this description; thence North 0
26'34•'East, 1067.97 feet; thence North 64 14102"East, 368.57
feet; thence South 89 15'08"Eaet, 337.11 feet; thence South 0
29159"Weat, 890.05 feet; thence South 62 26'36"West, 721.90 feet;
thence North 89 33126"West, 29*.50 feet to the Point of Beginning;
Situated in the County of Spokane, State of Washington.
~
~
i
i
- , - i
~
0 3 aov~
~ . . - . . . ,
,
- . . : -
. .
.
ti
~ Cr
~ 7 ~ ~
. p
~
t1G~1,':r,~~y~ ;•it r~l
'';j'
MAR 1 0 2000
VvN
(0-3y
~
ti~~~~k,iiic (.;i►iiiily I;n~;in~~ri:S
1 U2li W liro:►dw;ty
,tip(l::mc \1'A 9)260-(I171)
509)477-361)(1
Oucaimclil 'I'illc I)I:(::I.AItA'I'IUN OF-CUV1?NAN7'
Itcfcrcncc Nunilbcrs P1:-7 11'
c~ •
i.ega1 ()cscriptioll SF
P.irccl N~imber L/,
(:i~:►~~tui~~ cl Glc cs 5/Z/FL
lii consiclcr:iliun c►f Ilic .ipproval by Spuok;~lu Coilnty c►I_.~i~GG~f~/~~~
(licrciiialicr rcli:rrctl 1o :is (lie "I)cvrlopnicnl"), ilic iin(lci-sibiicc( covcii:inls mid .igrccs (lial:
I. ThL• sululiVidCr/sl)Oilaor will construd tlic privalc i'oacls 1111d sissoc;isilc(l clr.tinabc facililic:s in coiil'urniance with
thc appiovccl pIans on lilc ii► ilic Cuunly L113inecr's 0I*11ct.
2. A Iol is.w.rvrel by a priv;ile i'o;id wIlc:n: a. ilic Only road fironlagc 1i01- ilic IoI in (lic laeve;lopincnt is on ilic priv:tte
n►.ul, ur; I). a Iu1 having I'roiitubc uil iiuorc llian c>nc: io.lcl (piiblic oi- priv.ite) c:onstnicts an appro:ich lca tlie piivale
ro;ul.
1. Tlie c►wncr(s) ol'tiny Io( crealed l►y ilic I)cvClol)iitcilt Or aIlcrnalion Ilicreof and sei-ved hy ;i piv;ilc roae) sh.ill hc
rcspi>nsiblc liOr mainlcncince cil' saicl priv;ilc rcrut, iiiclucling .issocialccl clr;iinagc I';tciiitics iii coi11,01-11mnce Wiili
.ippravccl pI;ins on lilc wi11i ilic Couiily l:ngiiiccrs ol'lice.
•J. NIaiiilci►ancc I'iii,inciiig of ilic privalc ro:idti ciiul atisoci;~~cd drciin.igefincililicS sli:ill be in :i ii1.uiiui dCiCIniinL•(I b),
ilic
~~~vii~rS~~=----•-
a. ilic m;ijority oI' lots sc;rvccl by sticli priv;itc ro.lcl;~
-Elie-111~4t~-ef-I4eI Ila-11 e-rji=-Fc,rs-servrd-hy--st ie~~40valG-reaclt-
lrt1C"l()tagc -oTMt,.s-servc:cl by such privatc roaca; oi=
d. . .
5. In Ilic cvcnt sucli private ro;tcl, Inclutliug ,issocialccl dr7iuagc Cacililies is iniprovecl tc> Spuokane Cc~uniy slancl,iicls
lilr pi►blic siiccts, 4111cl lhc Counly 'ts williiig lo acccpt Ih~, dccliraltun ol' sucli rnacl tiiul fiu:ilitics, c:acli lot owner
,Irill cxcculc iiiiy clncuIIIcntti ucccssary 10 acconiplish sucli clcclicalion.
C,. nwne:rs ol' IoIs within iIie Devclopincnt wlio are ti:rvccl hy sticli road, may sue aucl recovcr clsinrascs ancl
s111oriiev's li:~~s I'r~~i>> :ii~y c»~~iic:r c~f tiil_y Int williiii tlic I)evc:lc►piticnl wliicli is simil,irly u:rvccl wlio rc:l'usLA lo
s 7
~
'I'Iiis rovcnaiu .ind abrccnicnl sliall i-uii with Ilic I,iiicl and slmll hc hincliiib ulloii bc uwncr, Ilicir lieirs, succcssurs
or <issiuns, iiicluelinb Ilic obligalion to parlicipale in tlie i»:iinlensince of llie; private rcrul, ancl clrainabc Cacililirs as
pruvitled lici'eiii. • .
0 NvncIt
Ol-VN C:It
DnTED Iliis clay 0 I' Aw e, 2O U 0
.S 1 A"I'!s Ul% IV,I,SIIING%'ON )
C'nniily o/',Spnkultc )
Oli rl~i.~ ~lri~~ ~~c~~~.c~►~icr!!1' n~~~~c~c~rc~~l l~c~%ur~~ ~►ic (i{~.Z~GC.1'~9i1'L.__~~/f'.~ ~ ~2 L~~~~.~
~ ~ .
~~N-k-J ~
krtintvi Io iiie lo be ilie inrlirithitrl(s) dcsc'iibed iit n►t(l ►i-lio c.rer.iNr;d llic 1141hilt and forcrgoing iirsil rrnic'lii ni)(l
ne'knoivlecl~r,d ilrn1 lie%she/they sigitet! 11ie sanre ris hi.c/her/Ihcir f'ree nncl voluu►ary ac< <riicl decr! fnr ilie uses crnr(
pui pnse.c Iherrin slnted.
G/ 1'l'N UN1)/s'R llt I' 11i1 ND i1 ND OFr'/C'li1 .S/sil l, rlris &r>> o/' 20 - MEAey ~ . .
H
. (J
Nntniy 'iihlir, innl ( t for tlre 5tnlc.- ,
. OC ;p ae pj I~thislringlat, r•esl~ling ni Spokane
Au ' P Y o Lv
~ 7•16.4
OG
~
COMM@NCING at the Southwesl corner of the Southeaet quarter of
the Souttieast quarter 'of Section 24, Township 25 North, Range 44
East W.M.; thence North 0 26'34"East, 911.95 feet along the West
line of eaid Soutiieaet quarter oE the Southeast quarter to the
True Point of Beginning of l-hie deacripti.on; tlience North 0
26'34"East, 1067.97 feet; thence Nortli 64 14'02"East, 368.57
feet; tlience Soutli 89 15'08"East, 337.11 feet; ttience South 0
29' S9"West, 890.05 feet; ttietice Soutti 62 26' 36"Weel, 72 1. 90 feet;
ttience North 89 33'26"West, 29'.50 feet to the Point of Heginning;
Situated in the County of Spokane, State of Washi.ngton.
i-- ~
l 723
4465539
,
43~22/2000 ~ 10 05A
t`~1 FNf; fAU g0.00 Sonkane fn. WA
AFTER RECORDING RETURN TO:
Spol:arte County Public Works
Development Engineering Services, 2"d Floor
1026 W. Broadway Ave
Spokane, WA 99260-0170
Document Title: Drainage Declaration of Covenaat
Grantor: Harley Manz and Geraldine Manz, W. Main Corporation, Shelley Acres Subdivision Joint Venture, Mark McManus
Grantee: Spokane County, Lots 4, 5, and 6 of Block 1 of the Plat of Shelley Acres
Abbreviaied Legal Description: Portion of SE of Section 24, T. 25 N., R44 E.
Assessor's Tax Parcel Numbers: 45244.9119
County Reference No. P 1773
SPOKANE COUNTY ENGINEER' S OFFICE
Spokane County, Washington .
DRAINAGE DECLARATION OF COVENANTS
In consideration of the approval by Spokane County of The Plat of Shelley Acres Addition, Spokane
County Project No. PE-1773, (hereinafter referred to as the "Plat"), undersigned covenants and agrees that:
Spokane County and its authorized agents are hereby ganted the right to ingess and egress to, over and
from all drainage easements for the purposes of inspection and emergency maintenance of drainage swales,
ponds, ditches, culverts and other drainage facilities, if not properly maintained by the property owner or
the responsible parties. Spokane County does not accept the responsibiiity to inspect or maintain drainage
facilities located outside of public rights-of-way, except in cases where Spokane County specifically
assumes that responsibility in writing. Neither does Spokane County accept any liability for any failure by
the property owner(s) to properly maintain such areas.
The property owners within this plat shall be held responsible for keeping open and maintaining the surface
path of natural or man-made drainage flow over and across their respective properties. If the property
owners fail to maintain the surface path of natural or man-made drainage flow, or drainage facilities on
private properties, a notice of such failure may be given to the property owner. If not corrected within the
period indicated on said notice, Spokane County has the right to correct the maintenance failure, or have it
conected, at the expense of the property owner.
Spokane County does not accept the responsibility of maintaining the drainage course on private lots or
floodplain areas within private lots, nor the responsibility for any damage whatsoever, including, but not
limited to, inverse condemnation to any properties due to deficient construction and/or maintenance of
drainage courses in drainage easements on private property.
Any building that is constructed on a lot in this plat shall be set at such an elevation so as to provide
positive drainage away from any drainage entry point to the building (including but not limited to a window
well, a window unprotected by a window well, or a doorway). Said positive drainage shall consist of a
minimum slope of 3% away from the building for a distance of at least 10 feet from the building. The lots
, shall be gradad so that either a) all runoff is routed away from the building, and conveyed over the lot to a
natural drainage swate or approved drainage facility, or b) drainage intercepted on the lot is disposed of on
the lot in an approved drainage facility. All drainage facilities for this plat, including any `208' swales,
shall be constructed in accordance with the approved plans on file at the Spokane County Engineer's
Office. Any proposed changes to the approved road and drainage plans must be approved by the Spokane
County Engineer's Office prior to construction of said changes.
E. ~ • Tax Exempt .
Date ~ 1i 20
p~~ uBy
~
4 4465539
,
03~2212000 ~10;05A
rn F~ mV 40.flf1 SnnkanP Cn. Wb
There may exist properties located uphill and adjacent to this subdivision which periodically discharge
stormwater runoff onto individual lots within this plat. Stormwater runoff from nearby uphill properties
should be expected, and during snow melt periods or wet seasons the lots may be subjected to higher
amounts of stormwater runoff that what is normally observed or anticipated. Because stormwater runoff
' from adjacent properties have discharged onto this plat prior to development, stormwater runoff will likely
continue to do so after development.
The property owners within this plat shall maintain all water quality swales ("208" swales) and drainage
ditches situated on their respective properties, and any partion of a`208' swale situated in a public right-
of-way adjacent to their respective properties, with a permanent ground cover as specified in the currently
approved and accepted plans on file at Spokane County's Engineer's Office. No structures, including
fences, shall be constructed directly over or within a`208' swale without the expressed written consent of
the Spokane County Engineer. Spokane County does not accept the responsibility to inspect and/or
maintain the drainage easements or drainage swales, nor does Spokane County acr,ept any liability for any
failure by the lot owner(s) to properly maintain such areas.
Spokane County hereby accepts responsibility for maintaining the drywells located in Swates "A", "B",
and "C".
The owners of Lots 4, 5, and 6 of Block 1, and their successors in interest shall maintain the drainage
facilities, located in easement "D" in conformance with the approved plans on file at the Spokane County's
Engineer's Office. Maintenance of drainage facilities includes, but is not limited to, keeping open and
cleaning storm pipes, ditches, drywells, drainage ponds, swales, etc., replacement of drainage facilities as
needed, and maintaining live native-type dryland grasses or lawn turf in the `208' swales located in
common areas or tracts, with optional shrubbery and/or trees, which do not obstruct the flow and
percolation of storm drainage water in the drainage swale as indicated by the approved plans. 6wners of
Lots 4, 5, and 6 of Block l, and their successors in interest shall be equalty responsible for payment of all
claims and other liabilities which may bacome due for said maintenance responsibilities.
4
The owner of Lot,0 of Block 1, and their successors in interest shall maintain the drainage facilities, located
in easement "E" in conformance with the approved plans on file at the Spokane County's Engineer's
Office. Maintenance of drainage facilities includes, but is not limited to, keeping open and cleaning storm
pipes, ditches, drywells, drainage ponds, swales, etc., replacement of drainage facilities as needed, and
maintaining live native-type dryland grasses or lawn turf in the `208' swales located in common areas or
tracts, with optional shrubbery and/or trees, which do not obstruct the flow and percolatio of storm
drainage water in the drainage swale as indicated by the approved plans. The owner of Lot ~f Block 1,
and their successors in interest shall be responsible for payment of all claims and other liabilities which
may become due for said maintenance responsibilities.
If the responsible parties, or their successors in interest, fail to maintain the drainage facilities in
conformance with the accepted drainage plan on file at the Spokane County Engineer's Office, a notice of
such failure may be given to the re:sponsible parties, or their successors in interest, by the County Engineer.
If not corrected within the period indicated on said notice, Spokane County has the right to correct the
maintenance failure, or have it corrected, at the expense of the responsible parties, or their successors in
interest. This covenant and agreement shall run with the land in perpetuity, and sha11 be binding upon the owner,
theu heirs, successors and assigns, including the obligation to participate in the maintenance of the drainage
facilities as provided herein.
IN WITNESS WHEREOF, the undersigned has caused this instrument to be executed on this
2_/ S T day of 2000.
ERALDINE MANZ
J
State of Washington )
~
- 4465539
,
a3~22120Q0 o 10,05A
)ss
County of Spokane ) CO ENG CUV $4.04 SpOkdne C0. WA
I certify that I know or have satisfactory evidence that Harley Manz and Geraldine Manz, husband and wife are the
persons who app8ared before me, and said persons acknowledged that they signed this instrument and
acknowledged it to be their free and voluntary act for the uses and purposes mentioned in the instrument.
Dated a I ' 0c) ' S. ~ la&zw
o yr
~ublic in and for the State of Washingion.
My Appointment Expires:
SHELLEY ACRES SUBDIVISION JOINT VENTURE ~45'0J O~q
O
Z
W.MAIN CORPORATION T11
h•
By:
lts: ~oFwP
State of Washington ) )ss
County of Spokane
I certify that I know or have satisfactory evidence that j,A Aa4ti At, ri.~ is the person who appeared before
me, and said person acknowledged that they signed this instrument, on oath s~ted that they were authorized to
execute the instrument and acknowledged it as the l/t c--c ?~r4s ~~ja of W. Main Corporation as
g~}~..o•~ra~~ 4.9e~.~f the Shelley Acres Subdivision Joint Venture to be the free and voluntary act of such party
for the uses and purposes mentioned in the instrument.
Dated U` 0?04?60e)
4~6tfary Public in and
for the State of Washington.
My Appointment Expires: 8-15' -D /
ROBERT D. WALDO
,
MARK McMANUS STATE OF WASHINGTON
NOTARY PUBLIC ~
State of Washington ) UY COidItISS10N EXPtRES 8-15-01
)ss .
County of Spokane )
I certify that I know or have satisfactory evidence that Mark McManus is the person who appeared before me, and
said person acknowledged that they signed this instrument, o oath stated that they were authorized to execute the
instrument and acknowledged it as the !t u D~-~con1~•c~QyP,c~f the Shelley Acres Subdivision Joint Venture to be
the free and voluntary act of such party for the uses and purposes mentioned in the i strument.
Dated D-HD ' Gi%%5~
-r~
fl-o-t-ary Public in and
for the State of Washington.
My Appointment Expires:
ROBERT D. wALDO
STA1E pF WASHINGTOH
NOTARY••`M pUgi.1C
~
~Y tpltltlSS10N EXP1REg 9-1"
H/' / v
C OPY
~AMMy P'LE0 OR RECORDEp
MAR 2 2 2000
e0Ji~7
`I Y A1iD170fi
o ~
SPOKANE C013NTV WN.
~v V~~~-3'~:
, '_-y "=^n, ' • .
• ~ ..E~ N ' • • _
2.Ii My}- _ _ •
-j'.•;
y` * ~ T J ' ~ a _ •
!p ♦ / i ~ .
'•'c ' r ' i~`i
AFTER RECORDINC RETURN TO:
SPokane CountY Public Works
Developmeni Engineering Services, 2od Floor
1026 W. Broadway Ave
Spol:ane, WA 99260-0170 Document Title: Drainage Declaration of C • .3~ ~
Grantor: Harley Manz and Geraldine Manz, W. Main Co~ t4 V.. _ _ _AcManus
Grantee: Spokane Counry, l..ots 4, 5, and 6 of Block I of the Plat of Shelley Acres
Abbreviated Legal Description: Fortion of SE of Section 24, T. 25 N., R.44 E. Assessor's Tax Parcel Numbers: 45244.9119
County Reference No. P1773
SPOKANE COUNTY ENGINEER'S OFFICE
Spokane County, Washington
~ DRAINAGE DECLARATION OF COVENANTS
In consideration of the approval by Spokane County of The Plat of Shelley Acres Addition, Spokane
County Project No. PE-1773, (hereinafter referred to as the "Plat"), undersigned covenants and agees that:
Spokane County and its authorizetl agents are hereby ganted the right to ingress and egress to, over and
from all drainage easements for the purposes of inspection and emergency maintenance of drainage swales,
ponds, ditches, cuiverts and other drainage facilities, if not properly maintained by the property owner or
the responsible parties. Spokane County does not accept the responsibility to inspect or maintain drainage
facilities located outside of public rights-of-way, except in cases where Spokane County specifically
assumes that responsibility in writing. Neither does Spokane County accept any liability for any failure by
the property owner(s) to properly maintain such areas.
The property owners within this plat shall be held responsible for keeping open and maintaining the surface
path of natural or man-made drainage flow over and across their respective properties. If the property
owners fail to maintain the surface path of natural or man-made drainage flow, or drainage facilities on
private properties, a notice of such failure may be given to the property owner. If not corrected within the
period indicated on said notice, Spokane County has the right to correct the maintenance failure, or have it
COITCCtPd, at the expense of the property owner.
Spokane County does not accept the responsibility of maintaining the drainage course on private lots or
floodplain areas within private lots, nor the responsibility for any damage whatsoever, including, but not
timited to, inverse condemnation to any properties due to deficient construction and/or maintenance of
drainage courses in drainage easements on private property.
Any building ihat is constructed on a lot in this plat shall be set at such an elevation so as to provide
positive drainage away from any drainage entry point to the building (including but not limited to a window
well, a window unprotected by a window well, or a doorway). Said positive drainage shall consist of a
minimum slope of 3% away from the•building for a distance of at least IO feet from the building. The lots
shall be graded so that either a) all runoff is routed away from the building, and conveyed over the lot to a
natural drainage swale or approved drainage facility, or b) drainage intercepted on the lot is disposed of on
the lot in an approved drainage facility. All drainage facilities for this plat, including any `208' swales,
shall be constructed in accordance with the approved plans on file at the Spokane County Engineer's
Office. Any proposed changes to the approved road and drainage plans must be approved by the Spokane
County Engineer's Office prior to construction of said changes.
R E'yn "xempt '
20 }w .
BY
~
There may exist properties located uphitl and adjacent to this subdivision which periodically discharge
stormwater runoff onto individual lots within this plat. Stormwater runoff from nearby uphill properties
should be expected, and during snow melt periads or wet seasons the lots may be subjected to higher
amounts of stormwater runoff that what is normally observed or anticipated. Because stormwater runoff
from adjacent properties have discharged onto this plat prior to development, stormwater runoff will likely
continue to do so after development.
The property owners within this plat shall maintain all water quality swales ("208" swales) and drainage
ditches situated on their respective properties, and any portion of a`208' swale situated in a public right-
of-way adjacent to their respective properties, with a permanent ground cover as specified in the currently
approved and accepted plans on file at Spokane County's Engineer's Office. No structures, including
fences, shall be constructed directly over or within a`208' swale without the expressed written consent of
the Spokane County Engineer. Spokane County does not accept the responsibility to inspect andlor
maintain the drainage easements or drainage swales, nor does Spokane County accept any liability for any
failure by the lot ovmer(s) to properly maintain such areas.
Spokane County hereby accepts responsibility for maintaining the drywells located in Swales "A", "B",
and "C".
The owners of Lots 4, 5, and 6 of Block 1, and their successors in interest shall maintain the drainage
facilities, located in easement "D" in conformance with the approved plans on file at the Spokane County's
Engineer's Office. Maintenance of drainage facilities includes, but is not limited to, keeping open and
cleaning storm pipes, ditches, drywells, drainage ponds, swales, etc., replacement of drainage facilities as
needed, and maintaining tive native-type dryland grasses or lawn turf in the `208' swales located in
common areas or tracts, with optional shrubbery and/or trees, which do not obstruct the flow and
percolation of storm drainage water in the drainage swale as indicated by the approved plans. 8wners of
Lots 4, 5, and 6 of Block 1, and their successors in interest shall be equally responsible for payment of all
claims and other liabilities which may become due for said maintenance responsibilities.
4
The ovviier of LotO of Block l, and their successors in interest shall maintain the drainage facilities, located
in easement "E" in conformance with the approved plans on file at the Spokane County's Engineer's
Office. Maintenance of drainage facilities includes, but is not iimited to, keeping open and cleaning storm
pipes, ditches, drywells, drainage ponds, swales, etc., replacement of drainage facilities as needed, and
maintaining live native-type dryland grasses or lawn turf in the `208' swales located in common areas or
tracts, with optional shrubbery and/or trees, which do not obstruct the flow and percolatio of storm
drainage water in the drainage swale as indicated by the approved plans. The owner of Lot ~f Block 1,
and their successors in interest shall be responsible for payment of all claims and other liabilities which
may become due for said maintenance responsibilities.
If the responsible parties, or their successors in interest, fail to maintain the drainage facilities in
conformance with the accepted drainage plan on file at the Spokane County Engineer's Office, a notice of
such failure may be given to the responsibte parties, or their successors in interest, by the County Engineer.
lf not corrected within the period indicated on said notice, Spokane County has the right to correct the
maintenance failure, or have it corrected, at the expense of the responsibie parties, or their successors in
interest.
This covenant and agreement shali run with the land in perpetuity, and shall be binding upon the owner,
their heirs, successars and assigns, including the obligation to participate in the maintenance of the drainage
facilities as provided herein.
1N WITNESS WHEREOF, the undersigned has caused this instrument to be executed on this
S T day of 2000.
ERALDINE MANZ
~
State of Washington )
~
~ - ' i r
)SS
County of Spnkane )
I certafy that I know or have satisfactvey evidence that Harley Manz and Geraldine Manz, husband arid wife are the
persons who appeared before rne, and said persans acknowledged that they signed this instrument and
acknowledged it xo be their free and voluntaay act for the uses and purposes mentinned in the ins#rument.
❑ated e. '
o Oublic in and
f€ar the State of Vtilashingkon.
My Apguinhnent Expires: 10
SHELLEY ACRES Si.TBI]iV1SION JDiNT VENTURG
~
0
, Z U
W.MA1N CORPORATIC~N 'F'us~ ~
By:
Its: 0 F
~ ~ .
State ofWashington
)ss
County of Spnkane }
1 certify that i know or have satisfactory evidence that 1~1194-.q M6 is the person who appeared before
me, and said person acknowledged that they signed thrts instrument, on aath qated that they were authorized to
execute the instrument and acknowledged it as the i/ i c-t '~v,4s J}p f-- of W. Main Gorporatian as
i ka~krz ed Q9 -eiA~f the Shelley Acres Subdivis`ron Joint V'enture to be the free and votuntary act o-f such par#y
for the uses and purpases mentioned in the instrurrnent.
Dated ~ ~'z'z
446fia'ry Pub lic in and
far the S#ate of Washington.
My Appointment Expires: 9-15 --6 ~ .
~ ROBERT D. VVALDO
STATE DF WAS1~INGT4N .
MAtK mcMANUs i~{ `~'y
,f7.RTf11 fY l~*~r P~7~+LIC
State nf Washington ~ UY COM1llSS10N MIE$ 8-15-01
)SS
Cou-nty of 5pakane ~
I c-ertify tha# x knaw or have satisfac#ory evidence that Mark McN1anus is the person who appeared before me, and
said person acknowledged that they signed this instrument, c~ oath stated tha# they were authorized to e~cecute the
instrument and acknowledged it as the ~ r~ }~r.~ ~l~f the Sheiiey Acres Subdivision Joint ~Ienture to be
the free and voluntary act of such party fof #he uses and purposes mentioned in tl~e istrument.
Dated o ~-~c~
lotary Puhlic in and
for the State of ~Vashington.
]V[y Appointment E~cpires: 7- l ~ -0 ~
_
iAlE or wAs"1~~~~~
~ PU~LI~i
5~1~-41
COIA1MS14ti EORES
Office of the County Engineer
Spokane County, Washington
17 March 2000
To: Landmark Surveyors
Willard Boatwright, P.L.S.
From: Development Eagineering Services
Ed Parry, P.E.
RE: P1773 - Shelty Acres
Plat Dedication
Please note: The Drainage Declaration of Covenant is to be signed by the Title Owner's. Please
submit the signed Declaration of Covenant to the County Engineer's Offce. The County will
record the document. Please note that the County Assessor's Office has strict requirements on
document size and margins. The Declaration of Covenant will need to adhere to these
requirements. This includes, but is not limited to: a 3" margin at the top of the first page, a 1"
margin at the top of all other pages, and 1" margins on the remaining three sides.
An electronic copy of the Covenant is available upon request.
Plat Dedication
Drainage easements "A", "B", and "C", as platted and shown hereon, which are for the purposes
of installing, operating and maintaining drainage ponds and drainage facilities to dispose of runoff
from public rights-of-way, are hereby granted to Spokane County.
Drainage easement "D", as platted and shown hereon, which is for the purposes of installing,
operating and maintaining drainage ponds and drainage facilities to dispose of runoff from
Courtney Lane, are hereby granted to the owners of Lots 4, 5, and 6 of Block 1.
All drainage easements, lots and tracts are subject to the separate Drainage Declaration of
Covenant as recorded under Auditor's Document No. which
by reference is made a part hereof.
.
AFTER RECORDING RETURN TO:
Spokane County Public Works
Development Engineering Services, 2od Floor
1026 W. Broadway Ave
Spokane, WA 99260-0170
Document Title: Drainage Declaration of Covenant
Grantor: Harley Manz and Geraldine Manz, W. Main Corporation, Shelley Acres Subdivision Joirrt Venture, Mark McManus
Grantee: Spokane County, Lots 4, 5, and 6 of Block 1 of the Plat of Shelley Acres
Abbreviated Legal Description: Portion of SE '/4 of Section 24, T. 25 N., R.44 E.
Assessor's Taac Parcel Numbers: 45244.9119
County Reference No. P 1773
SPOK:ANE COUNTY ENGINEER' S OFFICE
Spokane County, Washington
DRAINAGE DECLARATION OF COVENANTS
In consideration of the approval by Spokane County of The Plat of Shelley Acres Addition, Spokane
County Project No. PE-1773, (hereinafter referred to as the "Plat"), undersigned covenants and agrees that:
Spokane County and its authorized agents are hereby granted the right to ingress and egress to, over and
from all drainage easements for the purposes of inspection and emergency maintenance of drainage swales,
ponds, ditches, culverts and other drainage facilities, if not properly maintained by the property owner or
the responsible parties. Spokane County does not accept the responsibility to inspect or maintain drainage
facilities locateri outside of public rights-of-way, except in cases where Spokane County specifically
assumes that responsibility in writing. Neither does Spokane County accept any liability for any failure by
the property owner(s) to properly maintain such areas.
The property owners within this plat shall be held responsible for keeping open and maintaining the surface
path of natural or man-made drainage flow over and across their respective properties. If the property
owners fail to maintain the surface path of natural or man-made drainage flow, or drainage facilities on
private properties, a notice of such failure may be given to the property owner. If not conected within the
periad indicated on said notice, Spokane County has the right to correct the maintenance failure, or have it
corrected, at the expense of the property owner.
Spokane County does not accept the responsibility of maintaining the drainage course on private lots or
floodplain areas within private lots, nor the responsibility for any damage whatsoever, including, but not
limited to, inverse condemnation to any properties due to deficient construction and/or maintenance of
drainage courses in drainage easements on private property.
Any building that is constructed on a lot in this plat shall be set at such an elevation so as to provide
positive drainage away from any drainage entry point to the building (including but not limited to a window
well, a window unprotected by a window well, or a doorway). Said positive drainage sball consist of a
minimum slope of 3% away from the building for a distance of at least 10 feet from the building. The lots
shall be graded so that either a) all runoff is routed away from the building, and conveyed over the lot to a
natural drainage swale or approved drainage facility, or b) drainage mtercepted on the lot is disposed of on
the lot in an approved drainage facility. All drainage facilities for this plat, including any `208' swales,
sball be constructed in accordance with the approved plans on file at the Spokane County Engineer's
Office. Any proposed changes to the approved road and drainage plans must be approved by the Spokane
County Engirieer's Off'ice prior to construction of said changes.
There may exist properties located uphill and adjacent to this subdivision which periodically discharge
stormwater runoff onto individual lots within this plat. Stormwater runoff from nearby uphill properties
should be expected, and during snow melt periods or wet seasons the lots may be subjected to higher
amounts of stormwater runoff that what is normally observed or anticipated. Because stormwater runoff
from adjacent properties have discharged onto this plat prior to development, stormwater runoff will likely
continue to do so after development.
The property owners within this plat shall maintain all water quality swales ("208" swales) and drainage
ditches situated on their respective properties, and any portion of a`208' swale situated in a public right-
of-way adjacent to their respective properties, with a permanent ground cover as specified in the currently
approved aad accepted plans on file at Spokane County's Engineer's Office. No structures, including
fences, shall be constructed directly over or within a`208' swale without the expressed written consent of
the Spokane County Engineer. Spokane County does not accept the responsibility to inspect andlor
maintain the drainage easements or drainage swales, nor does Spokane County accept any liability for any
failure by the lot owner(s) to properly maiotain such areas.
Spokane County hereby accepts responsibility for maintaining the drywells located in Swales "A", "B",
and "C".
The owners of Lots 4, 5, and 6 of Block l, and their successors in interest shall maintain the drainage
facilities, located in easement "D" in conformance with the approved plans on file at the Spokane County's
Engineer's Office. Maintenance of drainage facilities includes, but is not limited to, keeping open and
cleaning storm pipes, ditches, drywells, drainage ponds, swales, etc., replacement of drainage facilities as
needed, and maintaining live native-type dryland grasses or lawn turf in the `208' swales located in
common areas or tracts, with optional shrubbery andlor trees, which do not obstruct the flow and
percolation of storm drainage water in the drainage swale as indicated by the approved plans. @wners of
Lots 4, 5, and 6 of Block 1, and their successors in interest shall be equally responsible for payment of all
claims and other liabilities which may become due for said maintenance responsibilities.
The owner of Lot 6 of Block 1, and their successors in interest shall maintain the drainage facilities, located
in easement "E" in conformance with the approved plans on file at the Spokane County's Engineer's
Office. Maintenance of drainage facilities includes, but is not limited to, keeping open and cleaning storm
pipes, ditches, drywells, drainage ponds, swales, etc., replacement of drainage facilities as needed, and
maintaining live native-type dryland grasses or lawn turf in the `208' swales located in common areas or
tracts, with optional shrubbery and/or trces, which do not obstruct the flow and percolation of storm
drainage water in the drainage swale as indicated by the approved plans. The owner of Lot 6 of Block 1,
and their successors in interest shall be responsible for payment of all claims and other liabilities which
may become due for said maintenance responsibilities.
If the responsible parties, or their successors in interest, fail to maintain the drainage facilities in
conformance with the accepted drainage plan on file at the Spokane County Engineer's Office, a notice of
such failure may be given to the responsible partie.s, or their successors in interest, by the County Engineer.
If not corrected within the period indicated on said notice, Spokane County has the rigUt to correct the
maintenance failure, or have it corrected, at the expense of the responsible parties, or their successors in
interest.
This covenant and agreement shall run with the land in perpetuity, and shall be binding upon the owner,
their heirs, successors and assigns, including the obligation to participate in the maintenance of the drainage
facilities as provided herein.
IN WITNESS WHEREOF, the undersigned has caused this instrument to be executed on this
day of 2000.
HARLEY MANZ
GERALDINE MANZ
State of Washington )
)ss
County of Spokane )
I certify that 1 know or have satisfactory evidence that Harley Manz and Geraldine Manz, husband and wife are the
persons who appeared before me, and said persons acknowledged that they signed this instrument and
acknowledged it to be their free and voluntaty act for the uses and purposes mentioned in the instrument.
Dated
Notary Public in and
for the State of Washington.
My Appointment Exp'ves:
SHELLEY ACRES SUBDIVISION JOINT VENTURE
W.MA1N CORPORATION
sy:
lts:
State of Washington )
)ss
County of Spokane )
1 certify that I know or have satisfactory evidence that is the person who appeared before
me, and said person aclalowledged that they signed this instrument, on oath stated that they were authorized to
execute the instrument and acknowledged it as the of W. Main Corporation as
of the Shelley Acres Subdivision Joiat Venture to be the free and voluntary act of such party
for the uses and purposes mentioned in the instrument.
Dated
Notary Public in and
for the State of Washington.
My Appointment Expires:
MARK McMANUS
State of Washington )
)ss
County of Spokane )
1 certify that I know or have satisfactory evidence that Mark McManus is the person who appeared before me, and
said person acknowledged that they signed this instrument, on oath stated that they were authorized to execute the
instrument and acknowledged it as the of the Shelley Acres Subdivision Joint Venture to be
the free and voluntary act of such party for the uses and purposes mentioned in the instrument.
Dated
Notary Public in and
for the State of Washington.
My Appointment Expires:
Office of the County Engineer
Spokane County, Washington
17 March 2000
To: Landmark Surveyors
Willard Boatwright, P.L.S.
From: Development Engineering Services
Ed Parry, P.E.
RE: P1773 - Shelly Acres
Plat Dedication
Please note: The Drainage Declaration of Covenant is to be signed by the Title Owner's. Please
submit the signed Declaration of Covenant to the County Engineer's Office. The County will
record the document. Please note that the County Assessor's Office has strict requirements on
document size and margins. The Declaration of Covenant will need to adhere to these
requirements. This includes, but is not limited to: a 3" margin at the top of the first page, a 1"
margin at the top of all other pages, and 1" margins on the remaining three sides.
An electronic copy of the Covenant is available upon request.
Plat Dedication
Drainage easements "A", "B", and "C", as platted and shown hereon, which are for the purposes
of installing, operating and maintaining drainage ponds and drainage facilities to dispose of runoff
from public rights-of-way, are hereby granted to Spokane County.
Drainage easement "D", as platted and shown hereon, which is for the purposes of installing,
operating and maintaining drainage ponds and drainage facilities to dispose of runoff from a
portion of Courtney Lane, is hereby granted to the owners of Lots 4, 5, and 6 of Block 1.
Drainage easement "E", as platted and shown hereon, which is for the purposes of installing,
operating and rnaintaining drainage ponds and drainage facilities to dispose of runoff from a
portion of Courtney Lane, is hereby granted to the owners of Lots 4, 5, and 6 of Block 1.
All drainage easements, lots and tracts aze subject to the separate Drainage Declaration of
Covenant as recorded under Auditor's Document No. which
by reference is made a part hereof.
• ' it • .
' . . . • 1 .
~ . . . . . _ ' . . " ' . . . . . . . _ . . . . _ . ~ . . L - . . . . " _ ~1
, . .
~ . ~ .
. ~ . . ~ .
. . .
COUNTY AUDITOR
AUDITOR'S CERTIFICATE . ••:i ; •
Filed for record this day of
2000 at M. in Book i•
~ of Plats at Page at the ~
requeat of . ~ _
, •
'
• ~ .
' • ; .
. ,
• l
. • ~ . . ~
.
. ~ .
, q.
. .
• IN WITNESS WHEREOF, the undersigned has caused their namee to be
affixed this day of 2000. • ~
.~•f.
HARLEY MANZ GERALDINE MANZ . ' ~ ~ ~ ~ •
.
• SHELLY ACRES SUBDIVISION JOINT VENTURE
. =L%.~.~.r
. , : ~ K
. ~•~t~~~~'~~~
~ W.MAIN CORPORATION MARK McMANUS
1~ . ~ j 1 ~
bY
Its
~ ~;+=e;fy-~4;
~ ~r,;t ;{':t • ~,r ~ "'L
1• R~~
• ~ • _I ~1~.~/
. • ~ • ~t
- - ' •
• ACKNOWLEDGEMENT
STATE OF COUNTY OF j SS , ' .i •
On this day personally appesred before me, NARLEY MANZ and GERAL-
.•':.J DTNE MANZ, hueband and wife to me known to be individuals who executed the within and foregoing instrument, and acknowledqe '
`',r:.•° that they signed the seme as their free and voluntary act and
. deed, for the uses and purposes therein mentioned. Gfven under
-my hand and seal this day of , 2000. , '
Notary public in and for the State of
, residing at
. • , My Commission Expfres. . . F
•-~i` .
- ACKNOWLEDGMENT ' ~ •
STATE OF
• ',d.' :SS th
_ COUNTY OF
On this day 2000, pereonally appeared before me
to me known to be the f of SHELLY ACRES SUBDIVI-
- SION JOINT VENTURE that executed the within and forgoinq instru- •
ment, and acknowledged the said inatrument to be the free and
voluntary act and deed, for the uaes end purposea therein men- -'~'r -
tioned, and on oath states that he/she is authorized to execute
the said instrument.
~1 - Witness my hand and official seal affixed the day and year first •a "
above written. . . ~
. . "j
Notary public in and for the State
. Of
• ; Residing at . . '
. ~ -
• ° . , . ~ -
~ My Commission Expires . . • t ~ .
• i i' , . .
- RECEIVED SPOKANE COUNTY
MAR O 1 20 'hECEIVEa .
. CURRENT PLANNIN* G DroWt 12000 .
PE-1773-95 ~ ,
•t ! SPOKANE COUNTY ENGM I
. .
,i
~ .
LANDMARK SURVEYORS ~ . . .
' RECEIVED z•z~'-2o00
FEA 2 9 2000 .
. ~
BOX 354, SPRAGUt. WASHINGTON 00032
~ 8POME wim EN4INFcFA . . . . ,
~ ' . . ; SBBBT 2 OF 2 ;
, 1-800-024-3003 . ,
~ . ; i ; .
' ' ~ . . . • -f .
~ - - . . . . . _ : _ . _w_. _ . . .._,~_.~.w:.~,
, - !
, . .
_ „ .
` ' s • • . .
~
0
_ E-MO
To: William W. Main, Jr.
From: David A. Berto, L.S.
Subject: Plan Review P1773 Shelley Acres .
Date: March 2, 2000
Our office has received your Plat for review prior to accepting a final Plat. For this deparhnent to
continue we need a$100.00 final submittal fees payable to the County Engineer. If this has been
done I need a copy of a receipt or canceled check If you have any questions call me at 456-3600.
Thank you for responding to this matter.
cc john todd
~
,
TRANSNATION TITLE INSUR.ANCE COMPANY
NORTH 7 2 O ARGONNE
SPOKIINE, W7ISHINGTON 99212
Prepared for :
SPOKAN v E
No.: SH-230638
LANDMARK SURVEYORS Z,? 200U Charge : $12 5. 0 0
ATTN: WILLARD BOATRIGHT Tax: $10.13
BOX 354 Total: $135.13
S P RAGUE , WA 9 9 0 3 2 _CURRENT PLANNlNG DMSION
T H I R D
P L A T C E R T I F I C A T E
Certificate for filing Plat of :
SHELLEY ACRES ADDITION -
In tl-ie matter of the subdivision to be submitted to Spokane County for
approval, this company has examined the records of Spokane County Auditor's
and Clerk's offices, and the records of the Clerk of the United States
District Court holding terms in said county. This certificate is made for the purpose herein specified, and is not to be used as a basis for closing
any transaction. Liability is limited to the amount, if any, paid for this
certificate. From such examination, the company hereby certifies the title
to the following described land, in said Spokane County, to-wit:
COMMENCING at the Southwest corner of the Southeast quarter of the
Southeast quarter of Section 24, Township 25 North, Range 44 East,
W.M.; thence North 0026134" East, 911.95 feet along the West line
of said Southeast quarter of the Southeast quarter to the True
Point of Beginning of this description; thence North 0026134" East,
1067.97 feet; thence North 64014102" East, 368.57 feet; thence
South 89015108" East, 337.11 feet; thence South 0029'59" West,
890.05 feet; thence South 6202613611 West, 721 . 90 feet; thence North
89033'26" West, 29.50 feet to the Point of Beginning;
Situate in the County of Spokane, State of Washington.
VESTED IN:
GERALDINE MANZ, as her separate property, as to a portion and
SHELLY ACRES SUBDIVISION JOINT VENTURE.
EXCEPTIONS:
1. Taxes and assessments, if any, no search having been made thereof, as
to Parcel Nos. 45244.9133 and 45244.9141.
Parcel Nos. are provided from the latest Assessor's Maps available to
the Company. Said parcel numbers are not a matter of the public record
therefor, the Company makes no assurance as to validity or accuracy
relating thereto.
~
Pa~m I 8f 3
\
. -
Order No. SH-230638
2. EASEMENT AND THE TERMS AND CONDITIONS THEREOF:
GR.ANTEE: The Washington Water Power Company, a
corporation
PURPOSE: Electrical distribution line and
associated fixtures; with right to inspect
line and to remove brush and trees
AREA AFFECTED: East half of the Southeast Quarter
DATED: June 25, 1945
RECORDED: July 3, 1945
RECORDING NO.: 658470A
3. EASEMENT AND THE TERMS AND CONDITIONS THEREOF:
GRANTEE: T.D.C., Inc., a Corporation
PURPOSE: Ingress and egress and utilities 60 feet
in width
AREA AFFECTED: This and other property
RECORDED: November 7, 1977
RECORDING NO.: 7711070326
NOTE: This Easement is a correction of the Easement recorded April 16,
1976 under Recording No. 7604160332.
4. AGREEMENT AND THE TERMS AND CONDITIONS THEREOF:
RECORDED: March 20, 1987
RECORDING NO.: 8703200315
REGARDING: Sewerage System
5. EASEMENT AND THE TERMS AND CONDITIONS THEREOF:
GRANTEE: Weston Ogzewalla and Rosemary Ogzewalla
and their successors and assigns
PURPOSE: Ingress and egress and for utilities over
and across said property
AREA AFFECTED: This and other property
RECORDED: November 17, 1987
RECORDING NO.: 8711170213
6. EASEMENT AND THE TERMS AND CONDITIONS THEREOF:
GRANTEE: Vera Irrigation District No. 15 and
Washington Water Power Company
PURPOSE: Operate and repair water and natural gas
lines
AREA AFFECTED: Exact location not disclosed
RECORDED: Octobr 21, 1996
RECORDING NO.: 4047130
Page 2 of 3
. ,
-1
i. 1..1
` .
Order No. SH-230638
7. EASEMENT AND THE TERMS AND CONDITIONS THEREOF:
GRANTEE: Vera Irrigation District No. 15
PURPOSE: Construct, erect, operate and maintain
electric distribution facilities; Cut trim
and chemically treat trees and shrubbery
AREA laFFECTED: This and other property
RECORDED: October 22, 1998
RECORDING NO.: 4283827
8. REAL ESTATE CONTRACT AND THE TERMS AND CONDITIONS THEREOF:
SELLER: Harley Manz and Geraldine Manz, husband
and wife
PURCHASER: Ben H. Simpson, a single person
RECORDED: January 3, 1994
RECORDING NO.: 9401030633
EXCISE TAX RECEIPT NO.: 0094000190
PURCHASER'S INTEREST IS NOW HELD BX:
SHELLY ACRES SUBDIVISION JOINT VENTURE
RECORDED: January 31, 2000
RECORDING NO.: 4452007
SELLER'S INTEREST IS NOW HELD BY:
ASSIGNEE: Geraldine A. Manz
PURSUANT TO SPOKANE COUNTY ,
CAUSE NO.: 00400242-6
TYPE OF PROCEEDINGS: Petition for Order Adjudicating Testacy
and Heirship
9. Declaration of Covenant imposed by instrument recorded on March 10,
2000, under Recording No. 4462634.
END OF EXCEPTIONS
sc
DATED AS OF February 11, 2000 at 8:00 a.m.
TRANSNATION TITLE INSURANCE COMPANY
, t
BY
For service on this order call:
(509) 922-2222 (FAX) 926-1519
Sean Heath, Title Officer
9C
Page 3 of 3
~
F
• ~ fi
Afl.er Recording Retum io : Spatcane CiDunty Enginecr
Attn: Engineering Administr2ttion
l~
RESOLUr~ON NO. 2 0613
BEFOR.E THE BOARD OF COLTNTY COM1VIISSIONER5 DF SFOKANE COUNTY, WASHINGTON
iIV THE NTAT`FER DF ESTABL~SHMENT ) -OF 12'n AVEIVLTE AND ST'EEN C0LIRT ) RES OLUT ION -
COUNTY ENGINEER' S ROAD FILE NO. 2496 ) ~ STAS LIS H MENT
Na Assessor's Tax Farcel Nwnber Assi~ed - Fublac Raadways
'I`his being the day set for the hearing on Spokane Cvunty Engineer's Report on che proposed
establishment of 12' Avenue and Steen Court, proceedings far which were iniciated by Preliminary
Resalution Na, 2-0511, and it appearing to the Soard on proof duly made that Noxice af Hearing was
puhlished and posted in the muner and for the time required by law, and the Board after examining the
regort and maps af the Spokane County Engi.neer and all claims and papers on file and after hearxng aIl
other evidence adduced at the hearing; and .
IT FURTHER APPEARING that the rights of way have heen dedicated as public roads, 60 and 50 feet wide, and that sard raads are apublic necessity and the same should be apened and established
as County road.s.
xHEREFORE BE IT RESOLVED by the. Board of County Camrnissioners of. Spokane Cotrnty>
Washington, that the hereixiafter described roads as repurted by the Spokane County Engineer on the
18th day af June, 2002,being; more partieularl}r described as follows:
12~ AVEIVUE - 60 foot wide right of way, frvm the west -right of way line of
Sharnrack S#reet ea.st to the east line of L,ot 9, Block 6(one foot strip) of Rotchford Acre
Tracts. .
STEEN ~OU"RT - 54 faot wtde right of way, frQm the west line of Shelly Acres
Addition easterly and north to and including cul-de-sac.
I.ocated in the Southeast Quarter (SE a) of Section 24, Townshfp 25 North, Range 44
East, W.M.
and as shown by the records and maps on ~'~le in the Off'ice of the 5pokane Caunty Engineer be and the
same her~by are established as County toads and the same shall be lcnawn as 12' Avenue a.nd S#een
Court, Road File Na. 2496. The road supervisor af the road distriet in which the said roads are located
s . . •
SHELLEY ACRES ADDITION
CONSTRUCTION COST ESTIMATE Date: 21-1un-99
Prepared by Metro Engineering, Inc.
By: JKO
Project No. 97-035 Checked: JGL
UNIT ESTIMATED
ITEM NO. DESCRIPTION QUANTI UNITS COST
.
SANITARY SEWER
1 8" PVC SDR 35 irtd. trench exc. 914 LF $20.00 $18,280.00
2 Manhole Type III-48 1 EA $1,500.00 $1,500.00
3 Manhole Type 1-48 3 EA $2,000.00 $6,000.00
4 Side Sewer pipe 4" d'ra. 612 LF $20.00 $12,240.00
5 4" Side Sewer C.O. 3 EA $100.00 $300.00
Sub-Tatal $38,320.00
WATER LINE
6 Backfill & ComRact Ex Watierline (approx 3' aepth) 1 LS $2,000.00 $2,000.00
7 Water Service 2 EA $200.00 $400.00
8 Valve Box on EAssting Watsrtine Vahres 4 EA a125.00 $500.00
9 8" C900 Class 150 PVC incl. trench exc. 233 LF $18.00 $4,194.00
10 8" FL x MJ AdapOef 2 EA $100.00 $200.00
11 8" FL x FL x FL Tee 1 EA $350.00 $360.00
12 S" FL x MJ Gabe Valve 1 EA $700.00 $700.00
13 8"MJ x 8"MJ x 6"FL Tee 1 EA $350.00 $360.00
14 8" MJ Plug 1 EA $100.00 $100.00
15 5' FL Vera Sfandard Fire Hydrant Assembly 1 EA $2,000.00 $2,000.00 16 Thnist Block 4 EA a100.00 $400.00
Sub-Total $11,194.00
STREET AND DRAINAGE
17 Clearing 8 Grubbing 1 LS $1,000.00 $1,000•00
18 Erosion 8 Sedimettt CorYtr+ol 1 LS $1,000.00 $1,000.00
19 Excavation, Irx;luding Haui (See Nabe 1) 1,561 CY $5.00 $7,755.00
20 Embankrrwtt (See Nate 1) 1,460 CY $2.00 $2,920.00
21 Subgrade Preparation 6,576 SY $1.00 $6,576.00
22 Type "R" Concnebe Curb & Gutter 2,018 LF 37.00 $14,126.00 23 Concebe Curb InWts (See Nobe 2) 7 EA $75.00 a525.00 '
24 Asphatt Paving - 2" A.C. on 8" rock (12th Ave.) 1,175 SY $10.00 $11,750.00 '
25 AspFtalt Paving - 2" A.C. on 8" rock (Sbaen CL) 3,915 SY $10.00 $39,150.00
26 Asphatt Paving - 7' A.C. on 6" rock (Courbisy) 1,486 SY $9.00 $13,374.00
27 Type "A" D ryvNell 2 EA $1, 750.00 $3,500.00
28 Type "WDryw+eU 3 EA $2,000.00 $6,000.00
29 W.S.D.O.T. Grabe Inlet Type 2 1 EA $1,500.00 $1,500.00
30 8" CPEP, ADS N-12 Corrugated Pipe 58 LF $18.00 $1,044-00
31 Rip-Rap Pad 1 EA $300.00 $300.00
32 "208" Svvale Construction (5 swales) 236 CY $10.00 $2,360.00
33 Off-Site Interception Ditch 1,555 LF $2.00 $3,110.00
!34 Turf Reinforcement Matting 347 SY $5.00 $1,735.00 ;
35 Hydroseeding 38,500 SF $0.07 $2,502.50
'
36 Street Name Sign 2 EA $200.00 $400.00
Sub-Total $120,627.50 ~
~
GRAND TOTAL (ESTIMATE) s170,141.50
Notes: 1) Courtney Lane only, Steen Court assumed bo be rough graded. Quantities do not include kot grading.
2) The quantities and estimate are not guaranteed to be accuratie and are fumished without any liability
,
on the part of the ERgiReer.
I
~
METRO ENGIIVEE.RING, INC.
S. 324 Sherman LETTER OF TRANSMITTAL
Spokane, WA 99202
(509) 624-9351 Fax: (509) 624-8153
TO: Date: 11/04/99 Job No: 97-035
Spokane County Engineers Attention: Ed Parry, P.E.
Re: Shelley Acres Addition
1026 W. Broadway
Spokane, WA 99260
WE ARE SENDING YOU:
x Attached Under separate cover via the follo '
~tftD
Shop Drawings Prints Plans Samples
Copy of Letter Change Order Specifications Mylar N o v o~~~q9
r SPOKANE COUN7Y ENGINEER
,
Copies Date ~ No. ~ Description
1 1 Street and 1'~rainage Plans (Original Vellums)
1 1 Street and Drainage Plans (Mylar)
THESE ARE TRANSMITTED AS CHECKED BELOW:
X For approval Approved as submitted Resubmit copies for approval
For your use Approved as noted Submit copies for distribution
X As requested Retumed for correction Retum corrected prints
For review and comment For bids due Prints returned after loan to us
COMMENTS: Ed- Your acceptance of the attached plans is requested. Please let me know when you have
stamped the vellums so we can pick them up for our records.
F. S. - Co&4td we atso 9e-k o,e
Please call me if you have any questions. Thank you! I-Ae
: 4 "'~"~►-o h ~ S' /
COPY TO: Bill Main, Jr.; Main Corporation SIGNED: ,
L
Joel e, P.E~
7
~ - • ' ' • . METR4 ENGIIVEERIN-G, INC. . . Civil Engineering and Project Management Services June 2211999 . .
. . , RECE1VED ,
Spokane Lounty Engineering Department : JUN,2 21999
102E W. Broadway " ' .
Spokane, WA 99260 5~~~ t~oUPd'e r,~rWER
- ATTEN'I'[ON: Bill Hemmiags, P.E. - , . ItE: S6elley Acres Addition .
, . . . -
Dear Bill: - , - Attached, plea.se find our estimate for the above referenced project. We are subnutting '
this per your request. It is nty understanding that by doing so, it will speed the acceptance
, process. + _ Please call me if you have any questions or comments.,. -Sincerely, Metro En neering, InG
oel G.1.ee, . E. ' Principal Engineer . , cc: 6i11 Main, Jr.; l'viain Corporation .
- . ,
. I
. ,
- . ~
. . ~
. + .
S. 324 S.herrnan St. Spokane, Washivsgton 99202 Ph.: 509-¢24-9351 Fax: 509-624-8I53
. . ~
Page 1 of 2
i
Wayne McGavran
From: John Hohman
Sent: Tuesday, April 04, 2006 11:53 AM
To: Wayne McGavran; Alysa Wiyrick
Cc: Henry Allen Subject: RE: Recommendations for PE-1750-C and PE-1773
Ok to both. Thanks.
-----Original Message-----
From: Wayne McGavran
Sent: Monday, April 03, 2006 11:02 AM
To: Alysa Wiyrick
Cc: John Hohman; Henry Allen
Subject: Recommendations for PE-1750-C and PE-1773
Alysa, •
Listed below are updated reports for two projects shown on the surety inspection spreadsheet.
PE-1570-C Autumn Crest 4th Addition
I visited this site on 3/29/06 and found no areas of concern. This project was constructed in
1994.
A Letter of Credit was in the files in the amount of $15,700.00 with Washington Mutual Bank.
No release was found. Placed call to bank and was told that file was too old and would have
been purged from system. Therefore, it would be safe to assume LOC was released. If not, l'm
sure someone would have heard from Landreth Construction.
Recommenda.tion: Consider this project closed with no further action required.
~
I visited this site on 3/29/06 and found no areas of concern. This project was constructed in
2000.
A Warranty Bond was in the files in the amount of $32,820.00 with Bank of Fairfield. No
release was found in the file, but two letters were in the file dealing with reducing the original
bond amount to $21,880.00 and then releasing the $21,880.00 in full. This letter sta.tes that a
replacement warranty security replaced the need for a performance surety. However, nothing
was found in the files concerning this latest warranty surety. There was a post-it stating
4/5/2006
Page 2 of 2
"warranty bond already taken out. Disregard this letter". It was initialed RS. Called bank and tlze savings certificate for this bond was released. 1 requested bank fax copy of release letter for
our files.
Recommendation: Consider this project closed with no further action required.
Please let me know if you need more information.
Wayne McGavran
4/5/2006
~ 04-04-06;10;22AM; ;15093267277 # 1/ 3
■
i i ■ ' .
■ ■
■ ■ ■
201 W North River Dr, Ste 305
Spokane WA 99201
Phone: (509) 328-6000 ext 226 % • ~ - ^ ~
Fax: (509) 326^7277
tloney@bankof fairfield.com
rax
f'r_)CC_jU j')Zj r,, Frvm: Tammy Loney
F~= Pages: ZS .
a ~s
Phone: Dato: 4 - '~t -0 (p
Re; CC:
~
O Vrgent O For Review ❑ Please Comment ❑ Please Reply ❑ Please Recycle
Comments: -
c~J
.
OL
. ~ . ~
rnlls~
. . ~
.
* CONFIDENTIlaL - Thls fax contains confidentfal, priviieged Information intended only forthe addressee. Do not
read, copy, or dlsseminate it unless you are the addressee. If you have received thls communlcatlon ln error, please call us
(corled) at the number above, and mali the oRginal message via U.S. Postal Service to us at the above address.
04-04-06;10;22AM; • ;15093267277 # 2/ 3
VV/ CJV/ LUUO 1V. iL 1:.1V~.GGlJ~GUt r~~ v1 r~~♦~~.✓ .-.v- ar~
~
ii
S p O K A I~ ~ , C O LT N T Y,
DMSiON OE ENCM66KINC iwD ROA05 /1 T1tv1SION oF THE PV.ALIC WORtCS DEPARTMEM '
Febniary l9, 2002
Aan-k of Fairfield
PO Box 189
Spangle, WA 99031 . '
RE: Sa,vings Certificate # 28779 fox XZesidemial Constxuction of Shelley l1.c,r,es. (P1773)
, . ,
Dcar Sir ox Madam
~
Plcase be advised that tbe Savingv Cer6ficate # 28779 dated May 4, 2000 issued by yvur
cv.rr~ any for 5helley Acre9 S
roads and associated drauAgubdivasion Jox~t Ventur~ as.~LY-~o .z-~a~latioz~s o~
p ' e facil~plat m the re , cuccEnt acnount of ~21,SS0►00 ~nna ities-foxAq.A-bovr6-.mentioned-
ow })e~releas d in ~11 ef~ecCive i,cntzaediatcly. 1~
~
replacement waxxanry secuority is secu ty'
'~his final releasE should close out the above referenced Surety
tf you have any questi~ons, Paease call me at (509) 477-3600.
Sincexely,
' Joho Hohwan, P)E
' 1~
Development Scrnces Eng~r,eer/~e
cc: Sbelley Actcs Subdivision Joint Ventuto
~
File
1026 W. IIroildwny Aive. • Spokane, WA 992Wa170 ~(509) 4T/4'600 FNC; (509) 477-7655 (?s+d Floor) 477-7479 (3rc1 Floor) ~ TDD: (509) 477-7133
04-04-06;10:22AM; ;15093267277 # 3/ 3
v-i v-i s.vvv v. A. ~..1 v.0 A uv~i~.& vt "y~~l &►..i..u r►.VG vJ
I
I
I
S ~ O K. A N E ~ O V N T X
•
V1'ILT'TIF9 glvtsyoN A DMSION OF THE PLJDLTG WOX!LS OnPAItTMENT
N. Bxuce itlwln, P,Fi., UtgiNee DaTecoc+x
I
January 15, 2003
Saaelley A,cros .Yolnt Ve.nture
Atm: Mark McMantis
921 S Monroe, #5 •
Spokane, WA. 99204 '
Re: SheUcy ,A.c,r.es Dry Sewex Sysfem
Dear Mr. McManus: .
Tha9 is io uotify you that the Shelley Acres Dry 5ewer Systeru has satisfactoxily completcd the
construction wan'mty period. Xour secuziry (Baak of Fairfield Savings Assignment #28780, dated May 4, 2000, in tlie anaount
o:f $8,000.00) is be,reby authorized to be released in its entirety.
I:f you havc any qucstions concerning this matter, please contact Crene Repp at 477-3604.
Sinccrcly,
~
~ . .
Kevin R. Cooke, P.E. .
Setiver Planning arad Design, Mana.ger 3
~1,o
cc: F3a1a]c of Faufield
Altn: Bob Joxgenaen
Ve,r,za ,Tarvis . /
1026 w. »madway • Spokane, wA 99760-0430, •(509) 477-3604 PnX: (509) 477-4715 'i'DD: (509) 977-7131
Page 1 of 2
~ y
Wayne McGavran
From: Wayne McGavran
Sent: Monday, April 03, 2006 11:02 AM
To: Alysa Wiyrick
Cc: John Hohman; Henry Allen
Subject: Recommendations for PE-1750-C and PE-1773
Alysa,
Listed below are updated reports for two projects shown on the surety inspection spreadsheet.
PE-1570-C Autuma Crest 4th Addition
I visited this site on 3/29/06 and found no areas of concern. This project was constructed in 1994.
A Letter of Credit was in the files in the amount of $15,700.00 with Washington Mutual Bank. No
release was fou.nd. Placed call to bank and was told that file was too old and would have been purged
from system. Therefore, it would be safe to assume LOC was released. If not, I'm sure someone would
have heard from Landreth Construction.
Recommendation: Consider this project closed with no fiu-ther action required.
I visited this site on 3/29/06 and found no areas of concern. This project was constructed in 2000.
A Warranty Bond was in the files in the amount of $32,820.00 with Bank of Fairfield. No release was
found in the file, but two letters were in the file dealing with reducing the original bond amount to
$21,880.00 and then releasing the $21,880.00 in full. This letter states that a replacement warranty
security replaced the need for a performance surety. However, nothing was found in the files
concerning this latest warranty swety. There was a post-it stating "warranty bond already taken out.
Disregard this letter". It was initialed RS. Called bank and the savings certificate for this bond was
released. I requested bank fax copy of release letter for our files.
Recommendation: Consider this project closed with no further action required.
Please let me know if you need more information.
4/3/2006
Page 2 of 2
~ - '
Wayne McGavran
4/3/2006
. . ~
- ( '
S P O K A N E C O U N T Y
DIVISION OF ENGINEERIING AND ROADS A DMSION OF THE PUBLIC WORKS DEPARTMENT
February 19, 2002 Bank of Fairfield
PO Box 189
Spangle, WA 99031
RE: Savi.ngs Certificate # 28779 for Residential Construction of Shelley Acres. (P1773)
Dear Sir or Madam: Please be advised that the Savings Certificate # 28779 dated May 4, 2000 issued by your
company for Shelley Acres Subdivision Joint Venture as surety for installations of
roads and associated drainage facilities for the above mentioned plat in the remaining
current amount of $21,880.00 may now be released in full effective immediately. A
replacement warranty security is sectued replacing the need for a performance surety.
This final release should close out the above referenced Surety.
If you have any questions, please call me at (509) 477-3600.
Sincerely,
John Hohman, PE
Development Services Engineer/Manager
cc: Shelley Acres Subdivision Joint Venture
File
i 1
~
~
1026 W. Broadway Ave. • Spokane, WA 99260-0170 ~(509) 477-3600 FAX: (509) 33
~
~
S P O K A N E C O U N T Y
DMSION OF ENGINEERING AND ROADS A DIVTSION OF THE PUBLIC WORKS DEPARTMENT
William A. Johns, P.E., County Engineer
December 21, 2000
Mr. Bob Jorgensen
Bank of Fairfield
P.O. Box 189
Spangle, WA 99031 .
Re: Reduction of Construction Performance Surety
Savings Certificate No. 28779
Spokane County Project #P 1773 - Shelley Acres ~
Dear Mr. Jorgensen:
The County is starting the process to establish the roads constructed in this project. This
Savings Certificate may now be reduced from the original amount of $218,800.00 to
$21,880.00 (Twenty Thousand Eight Hundred Eighty and NO/100 USDollars.
If you liave any questions, feel free to call our offce at 477-3600.
Sincerely,
William A. Johns, P.E.
Spokane County Engineer
~ -
William H. Hemmings, P.E. Development Services Engineer/Manager
1026 W. Broadway Ave. • Spokane, WA 99260-0170 •(509) 477-3600 rAX: (509) 477-7655 (2nd Floor) 477-7478 ('ird Floor) • TDD: (5(19) 477-713.1
7
ASSIGNMENT FOR CONSTRUCTION WARRANTY BOND
For security purposes only, SHELLY ACRES SUBDIVISION JOINT VENTURE , hereby assigns to SPOKANE COUNTY, a
political subdivision of the State of Washington, the following:
Savings Certificate Number 28779 .
in the face amount of $32,820.00 (Thirty two tliausund eigfit I:undred twenty dollars and N01100 US Dollars)
and held in and by
Bnnk Nome
BANK OF FAIRFIELD , SPANCLE Branch .
For improvements related to:
COUNTY PROJECT # P1773
PROJECT NAME: Sliellev Acres ("Project")
Sald ASSIGNMENT FOR WARRANTY 130ND PURI'OSES is made as security for the full and faithful performance by the Developer of a
guarantee against all defects in workmanship and materials which may become apparent during a period of one (1) year after the
County's establishment of the improvements constructed under this project as public facilities.
The County Engineer may request payment from the Bank for the purposes of remedy of such defects in materials and workmanship
become apparent during the warranty period, by providing documentation to the Bank. The County Engineer's documentation shall
indicate that the work done contains defects in materials or workmanship in the construcrion of the improvements for the Project and
therefore the purposes of said savings assignment have not been fully and faithfully performed as required. The County Engineer's
documentation shall also include a statement of the amount of money that the County deems necessary to complete such obligation.
Upon the Bank's receipt of such written documentation, the Developer hereby authorizes the Bank to release to Spokane County that
amount of money requested, up to the maximum amount in the savings certificate.
The County Engineer shall provide a copy of all such documentation and correspondence with the Bank to the Developer at the
address noted below.
BANK: BANK OF FAIRFIELD .
ADDRESS: P.O. BOX 189 .
CITY, STATE, ZIP : SPANGLE, WA 99031 .
PHONE: (509) 245-3226 .
AUTHORIZED REPRESENTATIVE: BOB JORGENSEN . .
TITLE: assistant vice president .
PRINCIPAL: SHELL Y A CRES SUBDIVISION JOINT VENTURE .
WILLIAM W. MAIIV 1 V .
MARX O. McMANUS .
ADDRESS: E. 12810 NORA SPOKANE, WA 99216 .
' AHONE: . (509) 922-3000 .
DATED this 27 day of DECEMBER , 200 0. '
PRINCIPAL:
She!!y Acres Subdivision Joint Venture
Developer:
A Washington Partnership
s
~
*
By: (typed name)Mark d! NFeManus, General Partner
Wr1[iarrr W. Main #'V, General Partner
State of Washingtan }
~ss
County af Spokane ~
Icertify that I know ar have satisfactory evidence t'hat MARKO, McMA1VUS and WILLI}111rI W. MAI1V lV are said persons
u+ho appeared befvre me, and said persons acknowledged that they signed this instrutrlent, on oath stated that they v►+ere authorized to
execute the instrurnent and acknowledged it as the General Partners of S#telfu Acres Subdivision Jornt Vertture
to be the free and voluntary act of such party for the uses aPurposes mentiorred in the instrument. ~
Dated 1 2f27104
i „
N~ot~y Aaablic in and
Ij
ro • ff]C the Stc`lte 0f W3Sh1T1 011
• - -4 f r
My APl3o1TltiTleC1t E7ip1TES: ~NDHA K. WALLER
IV~~~~Y PUBLlC
SfiATE OF WASHINCTON
COMMfSS1#M'■ 4 ~~PI■ ■ES
LAL.Ks O'RF 1O~EFt 19, 2-002 ,
Eank af Fairf e[d, Sparrg#e Brarach (Bank Name)
X(typed Cc~rpc~ration
e) Bob ,forgensen
Tts: (Title) Assistanf Vtce Prestdent
State of Washingtnn ) -
)ss
County of Spakane )
Z certify that 1 knvw vr have satisfactor~ evidence that BOB JORCElVSEN is the persan who appeared before rne, and said
persan acknawledged that he signed this instrument, an aath stated khat he was authnrizeci to execate the instrurnent and
acknowledged it as the crssisirrnt vice president of BANK DF FAIRFIELD to be the free and voluntary act of
such party far the uses and purposes rrtentioned in the instrument.
Dated 12127100
$s".~i~Ta Public in and
for the Staze 4f Washington.
A?~
~ '%-~OT~~j- 01 ~ My Appointtnent Expires: _
• ~ ~
~i
~ ~;A. ~~Blk+ ;O ~
;
*
~ • ~
0i , z
fy {
I
~ .
b ~ .
~
Parry, Ed i
From: Hemmings, Bill
Sent: Tuesday, December 19, 2000 8:43 AM
To: Stronks, Randy; Parry, Ed .
Cc: Johns, Bill
Subject: FW: Shelly Acres Addition
Ed
Please get warranty bond and have Randy start the establishment once the bond is in place. Thanks
Bill
Original Message
From: Lennemann, Paul
Sent: Tuesday, December 19, 2000 7:39 AM
To: Hemmings, Bill
Subject: Shelly Acress Addition
All items of construction on this plat have been completed and verified. Please contact Mark McManus (9240968) to
coordinate the warranty bond.
D - f "I Z
~
060
6"7 AU4.Ad
~ ~%v~. ~~~►~i ~
~
~
/
, ^ - .
Parry, Ed
From: Parry, Ed .
Sent: Thursday, December 21, 2000 9:12 AM
To: 'zmcmanus@aol.com'
Subject: P1773 - Sheiley Acres; Warranty Bond - Savings Assignment
Mark:
Here's the form we talked about this morning. It is in Word 6.0/95 format. Please fill in the blanks and adjust the
notary statements as appropriate. Please note that the Developer and the Bank should both notarize their signatures.
Please call me at 477-3600 if there are any problems opening the attachment. When the Commissioners have
passed a resolution to establish the roads, we will be abte to release the remainder of the construction bond.
Thanks
Ed Pa
Warranty Bond -
Savings Assign..
1
r ~ -
ASSIGNMENT FOlt CONSTRUCTION WARRANTY BOND
For security purposes only, ,("Developer") hereby assigns to
SPOKANE COUNTY, a political subdivision of the State of Washington, the following:
Savings Certificate Number •
in the face amount of $10,940.00 (Ten T6ousand lYine Hundred Forty and NO/100 USDollars)
and held in and by •
• san6 xamc
Bank of •
Branch (the "Bank") -
For improvements related to:
COUNTY PROJECT # P1773
PROJECT NAME: Shellev Acres ("Project")
Said asSIGNMEtvT Fo[t wAtRAtvTV BoxD puttPOSEs is made as secwity for the full and faithful performance by the Developer of a
guarantee against all defects in workmanship and materials which may become apparent during a period of one (1) year after the
County's establishment of the improvements constructed under this project as public facilities.
The County Engineer may request payment from the Bank for the purposes of remedy of such defects in materials and workmanship
become apparent dwing the warranty period, by providing documentation to the Bank. The County Engineer's documentation shall
indicate that the work done contains defects in materials or workmanship in the construction of the improvements for the Project and
therefore the purposes of said savings assignment have not been fully and faithfully performed as required. The County Engineer's
documentation shall also include a statement of the amount of money that the County deems necessary to complete such obligation.
Upon the Bank's receipt of such wrirten documentation, the Developer hereby authorizes the Bank to release to Spokane County that
amount of money requested, up to the maximum amount in the savings certificate.
The County Engineer shall provide a copy of all such documentation and correspondence with the Bank to the Developer at the
address noted below.
BANK:
ADDRESS:
CITY, STATE, ZIP:
PHONE:
PRESIDENT:
SECRETARY:
DEVELOPER
ADDRESS:
CITY, STATE, ZTP:
PHONE:
DATED this day of , 200
~
State of ~ )
)ss
County ofl , )
~
I certify that I know or have satisfactory evidence that is the erson wfio appeared before me, and said person
acknowledged that ~ signed this instrument and acknowledged it to be free and voluntary act for the uses and
purposes mentioned in the instrument.
Dated
Notary Public in and
for the State of
My Appointment Expires:
~
I
A Corporation
By:
its:; ,
State of )
)ss
County of )
I certify that I irnow or have satisfactory evidence that ~ iai erson who appeared before me, and said person
aclrnowledged tl~at ' si ed this instrument, on oath stated that was authorized to execute the instrument and
acknowledged it as the ofl ~ to
be the free and voluntary act of such party for the uses and purposes mentioned in the instrument.
Dated
Notary Public in and
for the State of I.
. My Appointment Expires:
J0 j
1 I !
S P O K A N E C O U N T Y
DNISION OF ENGINEERING AND ROADS A DMSION OF THE PUBLIC WORKS DEPARTMENT
William A. Johns, P.E., County Engineer
.YUly 20, 2000
Mr. Bob Jorgensen
Bank of Fairfield
PO Box 189
Spangle, WA 99031
RE: Shelley Acres Addition (P 1773)
Savings Certificate Number 28779
Dear Bob:
We have received a request to reduce the above referenced savings certificate to
reflect the current status of construction. Although Spokane County is under no
obligation to .reduce any savings certificate it holds, we have elected to allow a
reduction of this savings certificate from t6e original'amount of $ 218,800.00 to $
99,400.00. Consideration of any further reductions to this savings certif cate will
likely be based on continuous construction progress toward completion and
acceptance of the public roads.
If you have any questions, please call me.
Sincerely,
v
Bill Hemmings, PE
Development Services Engineer/Manager
1026 W. Sroadway Ave. • Spokane, WA 99260-0170 9 (509) 477-3600 FAX: (509) 477-7655 (2nd F1oor) 477-7478 (3rd Floor) • TDD: (509) 477-7133
.
~ 07/11/2000 23:06 9268438 MARK MCMANUS - - PAGE 61
To: Scott Enge art 12 - Oc>
Spokaae C umty Engineers , Fax:477 703 .
Reference: She Acres ,Addition (PE 1773-95) . ~
We have mpleted curb, sub grade prep for road, site evacuarion
including road y cut and fill, and items required to acconnplish the above ,
(Shelly Acres A dition) ot~ 12" and Steen Ct. We have rough cut Courtney
Lane. It would appreciated if you would send us a bond reduction. 4ur
bond is by CD d reductiom will allow us to pay our contractor. Your quick
response will be appreciated. . .
. Thank You, .
~
- Mark McMauus - General Partner
Shelly. Acres Subdivision
-7
~
~ ?e~ ►
. / . , ,
~ . ,
, .
. ~
~
~
BOND ESTIMATE
PROJECT P1773 - Steen Court by Ed Parry, P.E. DATE 13-Ju1-00
DRAINAGE ITEMS N~ UNITS a QUANTITY • PRICE COST
1) Drywell - Type A EA 1.00 1200.00 1200.00 V070 y0d
2) Drywell - Type B EA 3.00 1700.00 5100.00, l1070 ► Q►l0
3) Grate - Type 5 EA 0.00
4) C3rate Type 2 EA 0.00
5) Grate - Type 4 EA 4.00 300.00 1200.00 1 DQ
6) Backrill For DW CY 150.00 17.25 2587.50 ! vo
7) Drainage Structures, instelled
Plan callout EA
Plan callout EA
n Concrete Inlet Box, Type I EA 800.00 0'do
7a) Sidewalk Inlet, Type 1 EA 0.00 0.00
7b) WSDOT Inlet Box & Grate EA 0.40 1300.00 0.00
8) CPEP Pipe 1(" Dia. LF 0.00
9) ADS n-12 Pipe 12" Dia. LF 0.00 18.00 0.00
9a) CMP Pipe 12" Die. LF 0.00 20.00 0.00
10) CPEP Pipe 15' Dia. (ADS n-12) LF 0.00 0.00
11) CPEP Pipe 18" Dia. LF 0.00
12) Precast Manhole EA 0.00
13) Solid lid EA 325.00 0.00
14) Ditch and Pond Excavation CY 559.81 12.00 6717.67 }p~
15) Sod SF 5307.00 0.70 3714.90 1 at>
16) Rlpap outfall pad LS 1.00 500.00 500.00
NON STANDARD ORAINAGE ITEMS
1) Wilbert Vautt Curb Inlet EA 0.00 250.00 0.00 ~
2) Erosion Protection • silt fence LS 1.00 1000.00 1000.00~!~GO
3) Eroslon Proteclion - Rock entry lS 1.00 2000.00 2000.00 lap
4) Type 1 curb cut inlet EA 9.00 200.00 1800.00 ipo
5) 0.00
6) 0.00
DRAINAGE SUBTOTAL 25820.07
16) Nbnuments EA 4.00 185.00 ~ 740.00
17) Bamcade LF 35.00 0.00
18) Street Signs EA 1.00 90.00 90.00
- -
OTHER SUBTOTAL 830.00
- -
GRADING, SURFACING, CURB, AND SIDEWALK
19) Rough Grade CY 6705.05 10.00 67050.48 10~O b~S
20) Top Gourse CY 15.50 0.00
21) Base Course CY 1332.12 15.50 20647.91
22) Asphalt Concrete Tons 449.59 46.00 20681.22
23) Curb TYPB A LF 7.50 0.00 lDo
24) Curb Type B LF 8.50 0.00
25) Curb Type R LF 2678.90 8.50 22770.65 20
26) Sfdewalk SQ YD 0.00 17.50 0.00
NON-STANDARD ROAD ITEMS
1) ___~w~ .
0.00
2)
0.00
3)
0.00
4)
0.00
- - - -
GRADING AND SURFACING 131150.26
$157,800.33
CONSTRUCTION TOTAL, INCLUDING MULTIPLIER OF 1.10 $173,580.36
use $173,600.00
1980 standards lnspection $0.00
use $0.00
.
. .
f
BOND ES7IMATE
r~ PROJECT P1773 - Courtney Lane by Ed Parry, P.Er~ DATE 13-Ju1-00
DRAINAGE fTEMS UNITS QUANTITY PRICE COST
1) Drywell - Type A EA 1.00 1200.00 1200.00100
2) Drywell - Type B EA 1700.00 0.00
3) Grate - Type 5 EA 0.00 0.00
4) Grate Type 2 EA 345.00 0.00
5) Grate - Type 4 EA 1.00 300.00 300.00 100
6) BaCkfill For DW CY 40.00 17.25 690.00 100
7) Drainage Structures, installed
Plan callout EA
Plan callout EA
Plan callout EA
Plan callout EA
Plan callout EA
7a) Cancrete Inlet Box, Type I EA 800.00 0.00
7b) Concrete Inlet Box, Type 2 EA 800.00 0.00
8a) Curb Inlet Type 1(Detail B-8) EA 0 00 150.00 0.00
8b) Sldewalk Inlet, Type 2(Detail B-9, WilbeR vautt) EA 0.00 250.00 0.00
8c) WSDOT Inlet Box 8 Grate EA 1.00 1300.00 1300.00 100
8) CPEP Pipe 10" Dia. LF 0.00
9) ADS n-12 Pipe 8" Dia. LF 54.00 12.00 648.00 r~
9a) CMP Pipe 12" Dia. LF 0.00 20.00 0.00
10) CMP 24" Oia. LF 0.00 38.00 0.00
11) CPEP Pipe 18" Oia l.F 0.00
12) Precast Manhole EA 0.00
13) Solid lid EA 325.00 0.00
14) Ditch and Pond Excavation CY 12.00 0.00
15) Seed SF 1010 00 0.03 30.30
16) Ripap outfall pad CY 0.00 50.00 0.00
NON STANDARD ORAINAGE ITEMS
1) Wilbert Vault Curb Intei (detail B-9) EA 250.00 0.00
2) Erosion Protection LS 1.00 1500.00 1500.00160
3) Erosion Protection - Rock entry LS 1.00 2000.00 2000 UO (oo
4) Type 1 inlet pad EA 1.00 200.00 200.00
5) 0.00
6) 0.00
ORAINAGE SUBTOTAL 7868.30
16) Monuments EA 2.00 185.00 370.00 ~00
17) Barricade LF 0.00 35.00 0.00
18) Street Signs EA 1.00 90.00 90.Q0 (00
- - - -
OTHER SUBTOTAL 460.00
GRADING, SURFACING, CURB, AND SIDEWALK
19) Rough Grade CY 2380.37 10 00 23803.70,f6e SO 70
20) Top Course CY 15.50 0.00
21) Base Course CY 247.30 15.50 3833.09 /00
22) Asphalt Goncrete Tons 111.28 46.00 5119.03 r~0
23) Curb Type A LF 7.50 0.00
24) Curb Type B LF 8.50 0.00
25) Curb Type R LF 0.00 8.50 0.00
26) Sidewalk SO YD 0.00 17.50 0.00
NON-STANDARD ROAD ITEMS r
1) Cross-gutters SQ YD 0.00 17.50 0.00
2) 0.00
3) 0.00
4) 0.00
GRADING AND SURFACING 32755.83
$41,084.13
CONSTRUCTION TOTAL, INCLUDING MULTIPLIER OF 1.10 $45,192.54
use $45,200.00
1980 standards lnspection $0.00
use $0.00
9 0
OFFICE OF THE COUNTY ENGINEER
SPOKANE COUNTY, WASHINGTON
TO: BILL HEMMINGS
FROM: DAVE BERTO
DATE: May 9, 2000
SUBJECT: BOND ITEMS P1773 SHELLEY ACRES
The bond for the above mentioned project is for the
following items:
1) All the items on the approved road and drainage plans.
RECEiVED
MAY 0 V% 2000
SAV.INGS ASSIGNMENT FOR CONSTRUCTION SPOKANE C4UNTY ENGINEER
For security purposes only, Developer, as "PRLNciPat,", hercby assigns to SPOKANE COUNTY, a
political subdivision of the State of Washington, the following:
Savings Certificate Number 28779
in the facc amount of US Currency $218,800
Two Hundred Eighteen Thousand Eigbt Hundred and N01100 Dollars
Bank of Fairf%e~d, le , r.anch
and held in and by _(insert Bank name. an...,. ranc. ~~~1vx ~ ttemtzed as follows:
Steen Court US Currency $173,600
One Hundrecl Seventy-Three Thoasand Siac Hundred and NO/100 Dollars
Courtney Laae US Currency $45,200
Forty-Five Thousand 'I`wo Hundred and NO/100 Dollars
This Assignment is made as security for the full and faithful performance by the PRINCIPAL of tlie
construction of certain roads, monumenls and drainage facilities for P1773 - Shelley Acres (the "Project"), as
specificd in the typical section and roadway improvements specifications for said project, accepted November 5,
1999 on filc in ttie Officc of the Spokane County Engincer. Said work is to be complcted, a.nd the work is to be
accepted by the County Engineer, no later than two years &om the date of plan acceptancc.
Failure by the PRINCIPAL to obtain the County Engineer's acceptance of the work by the expiration date
of the plan aoceptance shall consiitute a material breach, and shall be grounds for immediatc demand by the
Spokane County Engincer for full payment of the entire amount of this Assignmcnt. The proceeds of this
Assignmcnt shall be uscd by the County Engineer to complete the reuiaining work. Any surplus shall bc refundod
to the PRINCIPAL upon the County Engineer's acceptance of the completed work. The PRINCIPAL shall
reimburse the County EnginEer's Office for any costs in excess of the amount of the total amount of the financial
guarantEe incurred by the County, including but not linuted to construction, inspection, administration, collection
agency fees, and legal ex-penses incurred in securing the financial guarantoe and complcring the work.
Any interest benefits accruing under said savings certificate shall remain the properiy of the PRINCIPAL.
Thc funds encumbered by this Assignment are to be releasEd to thc PRINCIPAL or other duly designated party
only with the prior written consent and agreemcnt of the SpokanE County Engineer.
PROVIDED, FURTHER, the undersigned PRINCIPAL does hercby authorizc the Bank to
pay over to the Spokane County Engiacer all or a sufficient portion of the monies in the savings certificate
rcferenced hercinabove, upon written documentation bEing received from the Spokanc County Engineer indicating
that the purposes for which the savings certificate was assigncd have not been fully and faithfully performed as
required and a statement of that amount of money which the County Engineer deems ne.cessary to eomplete such
obligation. Upon receipt of such written documentation, the PRINCIPAL hereby authorizes the Bank to release to
the Spokane County Enginecr that amount of money requested up to the maxiinum amount in the savings
certificate.
DATED this 4th day of May 2000
BANK : Bank of Fairf ield
ADDRESS : P 0 Box 189
CITY, STATE, ZIP : Spangle, WA 99031-0189 ,
4p
PHONE : 509-245-3226 •
AUTHORIZED Bob Jorgensen
REPRESENTATIVE : .
TITLE : Assistant Vice President
v~NTuil.~
SHECGY l9G/ZeS' suISA/C//SianJ 7D/N7-
C~~ yrf
PRINCIPAL : Gvl CL~A ~ s L✓ . M,¢X'iv 5r
l,57 i~~i.~'/l~,~'j/
ADDRESS :
&MY
i I' ~
CITY, STATE, ZIP :_'F_ Z'qd/ O'VD 2/9
PHONE : _!5~067l~f~/V416
q0? a-3 oc~ c~
PRINCIPAL:
Shelly Acres Subdivision Joint Venture
Dcvclopcr
A Wa~n
00 ~ _
By: (typedName) M k 0. McManus, General Partners
Its: (Title) Wi liam W. Main IV, General Partners
State of Washington )
)ss
County of Spokane )
W b&orPWand
I certify that I know or have sarisfactory evidence that (nam~c~irin~.r~on)Ms ~Iie person waho hW&
said person acknowledged that (htMo signed this instnuncnt,~on oath stated that (h01R~ was ~~te .~ec~r e s
c~e MUNWIRo t~ie ipotru~eQlt anc~clctuwedged -it as the lt~i~~ah~.~t&icer. trustec, etc.l of (name o pa
onm ~ ri~umF~ w~s executod) to be the frce and voluntary act of such parly for the uscs and
purposcs mentioned in the insow1!/it
May 4, 2000 ~~n~•~,'~4~~~i~
Dated te; *W° fi,qVP 9~
i ° . Notary Public in and
puBLtC :2 ~ for the State of Washington.
My Appointment Erpires: March 1, 2004
I' ~
htftw
BANK: 7/~//111111a
Bank of Fairf ield, Spangle Branch
(Bank Name)
poration
A W s ' 7)'
By: (typed Bo
b Jorgensen ~
Its: (Title)Assistant Vice President
State of Washington )
)ss
County of Spokane )
I certify that I know or have satisfactory evidenc;e that ~name oi ~~on ~e person who appearod before me, and
said person acknowledgod that (hekft signed this instrument, on oath statcd that (he*ft) was authorized to
1
♦ ~
execute the instrument and ac~owledgcd it as the (tvvc o~' au$ioriYv e~.Po~icc d~ ustee, ctc.) of ( namne o~narty
ou 17&W tg 4om instrument was executed) to be the free a.nd voluntary act of such party for the uscs and
purposes mentioned in the inst```n
Dated May 4, 2000 ``~~,Q,~G- AI oM . ~Y i
♦ P ~ ~~~`~s8 ~ A&~~ ~?~Da
~ Q: ~h
e
' i , ~
v NOTARy WO; sma Notary Public in and
for the State of Washington.
i~►'. pIUBLIC : p2~ M y A p pointment Expires: March 1, 2004
ii'9j''• ~ T~'
wAS; ~%%N
/llltt1
i
. . .r
P1773 - Shelley Acres
Bond Summary
Steen Court construction $173,600.00
inspection $0.00
Courtney Lane construction $45,200.00
inspection $0.00 total $218,800.00
Note: 1980 standards, so County inspects
~
BOND EST[MATE
PROJECT P1773 - Steen Court by Ed Pany, P.E. DATE 03-Nov-99
ORAINAGE ITEMS UNffS QUANTfTY PRICE COST
1) Orywell - Type A EA 1.00 1200.00 1200.00
2) Drywell - Type B EA 3.00 1700.00 5100.00
3) Grate - Type 5 EA 0.00
4) Grate Type 2 EA 0.00
5) Grate - Type 4 EA 4.00 300.00 1200.00
6) BacM'iJl For DW CY 150.00 17.25 2587.50
7) Orainage Sbvctures, installed
Plan callout EA
Pian callout EA
7) Concrete Intet Box, Type I EA 800.00 0.00
7a) Sidewalk Inlet, Type 1 EA 0.00 0.00
7b) WSDOT Inlet Box & Grate EA 0.00 1300.00 0.00
8) CPEP Pipe 10" Oia. LF 0.00
9) ADS n-12 Pipe 12" Dia. LF 0.00 18.00 0.00
9a) CMP Pipe 12" Dia. LF 0.00 20.00 0.00
10) CPEP Pipe 15" Dia. (ADS n-12) LF 0.00 0.00
11) CPEP Pipe 18" Dia. LF 0.00
12) Precast Manhole EA 0.00
13) Solid lid EA 325.00 0.00
14) Ditch and Pond Exaavabon CY 558.81 12.00 8717.67
15) Sod SF 5307.00 0.70 3714.90
16) Ripap outfall pad LS 1.00 500.00 500.00
NON STANDARD DRAINAGE ffEMS
1) Wilbert Vautt Curb Iniei EA 0.00 250.00 0.00
2) Erosion Protectian - sllt fence LS 1.00 1000.00 1000.00
3) Erosion Protecbon - Rock entry LS 1.00 2000.00 2000.00
A) Type 1 curb Cut inlet EA 9.00 200.00 1800.00
5) 0.00
g) 0.00
DRAINAGE SUBTOTAL 25820.07
16) MonumeMs EA 4.00 185.00 740.00
17) Bamcade LF 35.00 0.00
18) Street Signs EA 1.00 90.00 90.00
OTHER SUBTOTAL 630.00
GRADING, SURFACING, CURB, AND SIDEWALK
19) Rough Grade CY 6705.05 10.00 67050.48
20) Top Course CY 15.50 0.00
21) Base Coutse CY 1332.12 15.50 20847.91
22) Asphalt Concrete Tons 449.59 46.00 20881.22
23) Curb Type A LF 7.50 0.00
24) Curb Type B LF 8.50 0.00
25) Curb Type R LF 2678.90 8.50 22770.65
26) Sidewalk SQ YD 0.00 17.50 0.00
NON-STAIdOARD ROAD ItEMS
1) 0.00
2) 0.00
3) 0.00
4) 0.00
GRADiNG AND SURFAC(NG 131150.28
$157,800.33
CONSTRltCT10N TOTAL, INCLUDING MULTIPLIER OF 1.10 S173,580.36
use $173,600.00
1980 standards frrspection $0.00
use $0.00
.
•
Steen Cowt Quantitlea
Grading
Swales tap ftoor avg depth Volume
Pond A 2875.00 1800.00 2.00 4675.00
Pond B 2500.00 936.00 2.00 3436.00
Pond C 3584.00 1886.00 1.00 2735.00
Pond D 2730.00 685.00 2.50 4268.75
15114.75 cubic ft
559.81 cubic yards
L W T
Roadside 300.00 30.00 2.00 9000.00
333.33 CY
sodlseed 5307.00 sf sod
589.67 sy
stop staR width
Road 1206.00 0.00 37.00
Steen Court 1206.00 44622.00 sf
tangerrt depth
earthwork 3.50 156177.00 cf 6117.67 cy
base 8.00 0.67 28748.00 cf 1101.78 cy
acp 2.00 0.17 7437.00 cf 371.85 tons
sum
Cui-de-sac area ex 6705.05
depth 9329.00 sf base 1332.12
earthwork 1.70 15859.30 cf 587.38 cy acp 449.59
base • 8.00 0.67 6219.33 cf 234.35 cy
acp 2.00 0.17 1554.83 cf 77.74 tons
curb length Type R # sides
tangent 1206.00 2.00 2412.00
returns 18.45 2.00 36.90
Cul-de-sac 230.00 230.00
tatal 2678.90
sidewalk tangent 0.00 1980 standards
retum 0.00
cul-de-sac 0.00
0.00 0.00 sf
0.00 sy
inspection 12.06 stations 500.00 per station 6030.00
CMP pipe 12"
•
~ #ESTIMATE
PROJECT P1773 - Courbney Lane by Ed Perry, P.E. DATE 03-Nov-99
DRAINAGE ITEMS UNITS QUANTIIY PftICE COST
1) DryWell - Type A EA 1.00 1200.00 1200.00
2) Drywell - Type B EA 1700.00 0.00
3) Grate - Type 5 EA 0.00 0.00
4) GraRe Type 2 EA 345.00 0.00
5) 6rete - Type 4 EA 1.00 300.00 300.00
8) Badcfill For DW CY 40.00 17.25 690.00
7) Dreinage Strudures, installed
P12n callout EA
Plan calEovt EA
Plan callout EA
Pian catlout EA
Plan callout EA
7a) Conctete Intet BoX Type I EA 800.00 0.00
rb) Concrete Intet Bmc, Type 2 EA 800.00 0.00
6e) Curb Iniet Type 1(Detail B-8) EA 0.00 150.00 0.00
8b) Sidewallt Inlet, Type 2(Detail B-9, WilDart vault) EA 0.00 250.00 0.00
8c) WSDOT Inlet Box & Grate EA 1.00 1300.00 1300.00
S) CPEP Pipe 10" Dia. LF 0.00
9) ADS n-12 Pipe 8" Dia. lF 54.00 12.00 648.00
8a) CMP Pipe 12" Dia LF 0.00 20.00 0.00
10) CMP 24" Dia. LF 0.00 38.00 0.00
11) CPEP Pipe 18' Dia. LF 0.00
12) Precast MBnhole EA 0.00
13) Sdid tid EA 325.00 0.00
14) Oitch snd Pand Excavation CY 12A0 0.00
15) Seed SF 1010.00 0.03 30.30
16) Ripap outfall ped CY 0.00 50.00 0.00
NON STANpARD DRAINAGE ITEMS
1) WiIbert Vault Gurb InteA (dela1 B-9) EA 250.00 0.00
2) Erosfon Ptotedion LS 1.00 1500.00 1500.00
3) Erosion Protedion • Rock entry LS 1.04 2000.00 2000.00
4) Type 1 inlet pad EA 1.00 200.00 200.00
5) 0.00
g) 0.00
ORAINAGE SUBTOTAL 7868.30
16) MonumeMs EA 2.00 185.00 370.00
17) Barricede LF 0.00 35.00 0.00
18) StrBet Signs EA 1.00 90.00 90.00
OTHER SUBTOtAL 460.00
GRADING, SURFACING, CL1RB, AND SIDEWALK
19) Rough Grade CY 2380.37 10.00 23803.70
20) Top Cautse CY 15.50 0.00
21) Base Course CY 247.30 15.50 3833.09
22) Asphalt Concrete Totts 111.28 46.00 5119.03
23) Curb Typs A LF 7.50 0.00
24) Curb Type B LF 8.50 0.00
25) Curb Type R LF 0.00 8.50 0.00
26) Sidewalk SQ YO 0.00 17.50 0.00
NON-STANDARD ROAD 17EMS
1) Cross-gutters 5Gl YD 0.00 17.50 0.00
2) 0.00
3) 0.00
q) 0.00
GRADIPIG AND SURFACING 32785.83
$41,084.13
CONSTRUCTION TOTAL, INCLUDING MULTtPLiER OF 1.10 $45,192.54
use $45,200.00
1980 staedaMs lnspectfon $0.00
use i4.00
y , .
♦ ~
~ COUrtrwy Lal'1@ QU8libti@3
Grading
tap floor avg depth Volume
Swale 2385.00 1010.00 3.00 5092.54 cf
188.61 cy
3od 1010.00 sf
112.22 sy
L W 1 W2 T qty
Riprap at pipe outfalt 0+39 8.00 6.00 6.00 1.00 1.78
1.78 cy
stop start width
Road 775.00 18.50 16.00
Courtney Lane 756.50 12104.00 sf
tangent depth
earthwork 5.00 60520.00 cf 2241.48 cy
base 6.00 0.50 6052.00 cf 224.15 cy
acp 2.00 0.17 2017.33 cf 100.87 tons sum
ex 2380.37
Hammertead area base 247.30
depth 1250.00 sf acp 111.28
earthwork 3.00 3750.00 cf 138.89 cy
base 6.00 0.50, 625.00 cf 23.15 cy
acp 2.00 0.17 208.33 cf 10.42 tons
curb length Type R
tangent 0.00 2.00 0.00
returns 0.00 0.00
Cu We-sac 0.00 0.00
total 0.00
Inspection 7.57 stations 500.04 per station 3782.50
6
~BOND ESTIMATE
- - - - - - - -
PROJECT P1773 - Steen Court by Ed Parry, P.E. DATE 21-Ju1-00
- - - - - -
DRAINAGE ITEAAS UNITS QUANTITY PRICE COST
1) Drywefl - Type A 4096 EA 1.00 1200.00 480.00
2) Drywell - Type 8 4096 EA 3.00 1700.00 2040.00
3) C3rate - Type S EA 0.00
4) Grate Type 2 EA 0.00
5) Grate - Type 4 EA 4.00 300.00 1200.00
6) Backrill For DW CY 150.00 17.25 2587.50
7) Drainage Structures, installed
Plan callout EA
Plan callout EA
7) Concrete Inlet Box, Type I EA 800.00 0.00
7a) Sidewalk Inlei, Type I EA 0.00 0.00
7b) WSDOT Inlet Box 8 Orate EA 0.00 1300.00 0.00
8) CPEP Pipe 10" Dia. LF 0.00
9) ADS n-12 Pipe 12" Dia. LF 0.00 18.00 0.00
9a) CMP Pipe 12' Dia. LF 0.00 20.00 0.00
10) CPEP Pipe 15" Die. (ADS n-12) LF 0.00 0.00
11) CPEP Pipe 18" Dia. LF 0.00
12) Precast Manhole EA 0.00
13) Solid lid EA 325.00 0.00
14) Ditch and Pond Excavation CY 559.81 12.00 6717.67
15) Sod SF 5307.00 0.70 3714.90
16) Ripap outfall pad LS 1.40 500.00 500.00
NON STANDARD DRAINAGE ITEMS
- - - -
1) Wilbert Vault Curb inlet EA 0.00 250.00 0.00
2) Erosion Protection - sitt (ence LS 1.00 1000.00 1000.00
3) Erosion Protection - Rock entry LS 1.00 2000.00 2000.00
4) Type 1 curb cut inlet EA 9.00 200.00 1800.00
5) 0.00
6) 0.00
- - - - - - -
DRAINAGE SUBTOTAL 22040.07
16) Monuments EA 4.00 185.00 740.00
17) Barricade LF 35.00 0.00
18) Street Signs EA 1.00 90.00 90.00
- -
OTHER SUBTOTAL 830.00
- - - -
GRADING, SURFACING, CURB, AND SIOEWALK
19) Rough Grade 1045 CY 6705.05 10.00 6705.00
20) Top Course CY 15.50 0.00
21) Base Course 3096 CY 1332.12 15.50 6194.00
22) AsphaR Concrete Tons 449.59 46.00 20681.22
23) Curb Type A LF 7.50 0.00
24) Curb Type B LF 8.50 0.00
25) Curb Type R 2096 LF 2678.90 8.50 4554.00
26) Sidewalk SGl YD 0.00 17.50 0.00
- - -
NON-STANDARD ROAD ITEMS
- - - - - -
1) 0.00
2) 0.00
3) 0.00
4) 0.00
GRADING AND SURFACING 38134.22
$61,004.28
CONSTRUCTION TOTAL, INCLUDING MULTIPLIER OF 1.10 $67,104.71
use $67,200.00
1980 srandards Inspection $0.00
use $0.00
jA
tle
BOND ESTI MATE
PROJECT P1773 - Courtney Lane by Ed Parry, P.E. DATE 21-Jul-00
- -
ORAINAGE ITEMS UNITS GlUANTITY PRICE COST
1) Drywell - Type A EA 1.00 1200.00 1200.00
2) Drywell - Type B EA 1700.00 0.00
3) Grate - Type 5 EA 0.00 0.00
4) Grate Type 2 EA 345.00 0.00
5) Grate - Type 4 EA 1.00 300.00 300.00
6) Backfill For DW CY 40.00 17.25 690.00
7) Orainage Structures, installed
Plan callout EA
Plan caltout EA
Plan callout EA
Plan callout EA
Plan callout EA
7a) Concrete Inlet Box, Type I EA 800.00 0.00
7b) Cancrete Intet Box, 7ype 2 EA 800.00 0.00
Sa) Curb Inlet Type 1(Oetail B-8) EA 0.00 150.00 OAO
8b) Sidewalk Inlet, Type 2(Detail B-9, Wdbert vault) EA 0.00 250.00 0.00
8c) WSDOT Inlet Box & Grate EA 1.00 1300.00 1300.00
8) CPEP Pipe 1(Y" Dia. lF 0.00
9) AOS n-12 Pipe 8" Dia. LF 54.00 12.00 648.00
9a) CMP Pipe 12" Oia. LF 0.00 20.00 0.00
10) CMP 24" Dia. LF 0.00 38.00 0.00
11) CPEP Pipe 18" Dia. LF 0.00
12) Precast Manhola EA 0.00
13) Solid tid EA 325.00 0.00
14) Ditch and Pond Excavation CY 12.00 0.00
15) Seed SF 1010.00 0.03 30.30
16) Ripap outfall pad CY 0.00 50.00 0.00
NON STANDARD DRAINAGE ITEMS
1) Wilbert Vault Curb Inlet (detail B-9) EA 250.00 0.00
2) Erosion Protection LS 1.00 1500.00 1500.00
3) Erosion Protection - Rock entry LS 1.00 2000.00 2000.00
4) Type 1 inlet pad EA 1.00 200.00 200.00
5) 0.00
6) 0.00
- - - - - - - -
DRAINAGE SUBTOTAL 7868.30
16) Monuments EA 2.00 185.00 370.00
17) Barricade LF 0.00 35.00 0.00
18) Street Signs EA 1.00 90.00 90.00
- - -
OTHER SUBTOTAL 460.00
GRADING, SURFACING, CURB, ANO SIDEWALK
19) Rough Grade 50% CY 2380.37 10.00 11902.00
20) Top Course CY 15.50 0.00
21) Base Cours2 CY 247.30 15.50 3833.09
22) Asphalt Concrete Tons 111.28 46.00 5119.03
23) Curb Type A LF 7.50 0.00
24) Curb Type B LF 8.50 0.00
25) Curb Type R LF 0.00 8.50 0.00
26) Sidewalk SO YD 0.00 17.50 0.00
NdN-STANDARD ROAD ITEMS
1) Cross-gutters SQ YD 0.00 17.50 0.00
2) 0.00
3) 0.00
4) 0.00
GRADING AND SURFACING 20854.13
$29,182.43
CONSTRUCTION TOTAL, INCLUDING MULTIPLIER OF 1.10 $32,100.67
use $32,200.00
1980 standards lnspection $0.00
use $0.00
J r
DEVELOPER BOND REVIEW FORM
~
Project Name: ~►~~-E`~ ~ ~ ~ ~~~5 14P
Project Number:, 1773 ~
Location: ocEQ s4+
~
Originai Bond Arnount: A2, 1 ~ ~ 800 Original Bond Date: 5Ad~/~~
Bond Balance: i~ ~~p
. ~ ~v ~ 01
Bond #
REVIEW
Last Review Date or Punch List Date: 90 Work Remaining to be Completed: AVO,,462)7Is 6,66 alVke-15-
~
r"► IlI A /Cr Reviewed by: Date:
Findings: RECMMENDED ACTION:
Fcirc-le Action)
1. Release Bond 2. Reduce Bond 3. Continue Bond
By. , Date:
Action Taken:
(Circle Action)
1. Release Bond Letter 2. Reduce Bond Letter 3. Continue Bond 4. None
gy: Date: ,
FOLLOW UP -
Follow up Scheduled: Comments: Files Updated Comments: Date: By:
Files Updated Comments: , Date: BY: A~
G
Files Updated Comments: , Date: By:
Files Updated Comments: , Date: , By:
Files Updated Comments: . Date: By:
~
-
•
DEVELOPER BOND REVIEW FORM
Project Name:
Project Number: 177~
Location:
Originai Bond Amount: 1&2,i
Original Bond Date:
Bond Balance: /o X
Bond # .
REVIEW
Last Review Date or Punch List Date:
~
Llv~ 94 e,,, g
Work Remaining to be Completed: ~~X--76V715 , A i,ciAG~- 7
'
Reviewed by: Date:
Findings: -
RECOMMENDED ACTION:
(Circle Action)
1. Release Bond 2. Reduce Bond 3. Continue Bond
gy: Date:
Action Taken:
(Circle Action)
1. Release Bond Letter 2. Reduce Bond Letter 3. Continue Bond 4, None
gy: , Date:
FOLLOW UP .
~ ~ ~v
d
Fol(ow up ScheduIed: Q ,~o tl`~1
Comments:
Files Updated Comments: Date: By:
Files Updated Comments: Date: By:
Files Updated Comments: Date: By:
Files Updated Comments: Date: By:
Files Updated Comments: Date: By:
~
ASSIGNMENT FOR CONSTRUCTION WARRANTY BOND
For security purposes only, SHELLY ACRES SUBDIVISION JOINT VENTURE , hereby assigns to SPOKANE COUNTY, a
political subdivision of the State of Washington, the following:
Savings Certificate Number 28779 .
in the face amount of $32,820.00 (Thirly two thousdnd eight hundred twenty dollars and NO/100 US Dollars)
and held in and by
sank Name
BANK OF FAIRFIELD , SPANGLE Branch.
For improvements related to:
COUNTY PROJECT # P1773
PROJECT NAME: Shellev Acres ("Project")
Said ASStGtvMEN1' FOrt wARRA1vTY BOtvD puxPOSES is made as security for the full and faithful performance by the Developer of a
guarantee against all defects in worlmanship and materials which may become apparent during a period of one (1) year after the
County's establishment of the improvements constructed under this project as public facilities.
The County Engineer may request payment from the Bank for the purposes of remedy of such defects in materials and workmanship
become apparent during the warranty period, by providing documentation to the Bank. The County Engineer's documentation shall
indicate that the work done contains defects in materials or workmaaship in the construction of the improvements for the Project and
therefore the purposes of said savings assignment have not been fully and faithfully performed as required. The County Engineer's
. documentation shall also include a statement of the amount of money that the County deems necessary to complete such obligation.
Upon the Bank's receipt of such written documentation, the Developer hereby authorizes the Bank to release to Spokane County that
amount of money requested, up to the maximum amount in the savings certificate.
The County Engineer shall provide a copy of all such documentation and correspondence with the Bank to the Developer at the
address noted below.
BANK: BANK OF FAIRFIELD ADDRESS: P.O. BOX 189
CITY, STATE, ZIl' : SP.4NGLE, WA 99031 .
PHONE: (509) 245-3226 .
AUTHORIZED REPRESENTATIVE: BOB JORGENSEN .
TITLE: assistant vice president .
PRINCIPAL: SHELLYACRES SUBDIVISION JOINT VENTURE
WILLIAM W. N1,4IN IY
MARK O. McMANUS
ADDRESS: E. 12810 NORA SPOKANE, WA 99216
.
PHONE: (509) 922-3000
DATED this 27 day of DECEMBER , 200 0.
PRINCIPAL:
Shelly Acres Subdivision Joint venture
Developer:
A Washington Pardlership
,
r
~
~
~
By: (typed name) Mark O. McManus, General Partner
Williarm W. Main IY, General Partner
State of Washington )
)ss
County of Spokane )
I certify that I know or have satisfactory evidence that MARK O. McMANUS and WILLIAM W. MAIN IV are said persons
who appeared before me, and said persons acknowledged that they signed this instrument, on oath stated that they were authorized to
execute the instrument and acknowledged it as the General Partners of Shelly Acres Subdivision Joint Venture
to be the free and voluntary act of such party for the uses a3 urposes mentioned in the instrument.
Dated 12/27/00
. ~
Nota~y Public in and
~ for the State of Washin on
- , . - . MY Appointment Expires: - ,
_ ~ANV.f~HK. WALLER
- ' NOTARY PUBLiC
STA7E OF WASHINGTON
COMMISSION FXPIRES
BANK: OCTOBER 19, 2002
.~R , . w....,......
Bank of Fairfreld, Spangle Branch ,
(Bank Name) .
A:(typedC' ' Corporation
<e)Bob Jorgensen
Its: (Title) Assistant Vice President
State of Washington ) )ss
County of Spokane )
I certify that I know or have satisfactory evidence that BOB JORGENSEN is the person who appeared before me, and said
person acknowledged that he signed this instrument, on oath stated that he was authorized to execute the instrument and
acknowledged it as the assistant vice president of BANK OF FAIRFIELD to be the free and voluntary act of
such party for the uses and purposes menrioned in the instrument.
Dated I2127100
No Public in and
,o;~, for the State of Washington.
ioo
~ N o Tq R y ; ~ My Appointment Expires:
= • -
- : • -
~
%v',►: PUBLIC
. .
. ~
.
,2,
l~~~~ 1ti1111~ .
.
rn •
, • . < , ~ ; ~ ;..a : ?
~A,~~
f f t} li
•
r , ~
SAVINGS ASSIGNNI_ENT FOR COIVSTRUCTION,
SFOt<t,~i~ CC~~.~:~~`~ c~:~.~:l~:R
For sccurity purpascs onlNI. Dcvcloper, as PRI~CiZ~:~L", hcrcb}• assigns to SPOItAVE COUTNITY. a
political subdix•ision of the Slatc of Wastungton. tlic followinv:
Saviiles Ccrtificatc Numbcr 28779
.
in thc facc 3mount of US Currency 5213,300
Twu Hundred EighteLn Thuus:tnci Ei-vnt Hunclred and NO/100 IDallars
Bank of Fairiie~d, S~~( ~;le jr.azc.h
and hcld in and b~' _(i~?sert. Iiank.,rrc~nre, anc rn~~c,..__ ":~Nh' , itcini-_cd as follw%-s:
Steen Court US Currency 5173,600
One Hundrecl Seventy-Three Thuusand Six Hundred and N01100 Dollars
Courtncy Lane US Currency S45,200
Fortv-Five Thousand Ttivo Hundred and N01100 Doilars
Tltis Assignmcnt is madc as sccuritv for tlic Cull and faitlLful pcrfonnancc bv tlic PR[i\Cl:PAL of tllc
construction oC ccrlain roads, monumenls and drainage facilities for P1773 - Shelley Acres (the "Projeet"). as
spccired in the hpical section and roadNvay improvements specilicalions for said project. accepted Novembet 5.
1999 on filc in t'lie OfFicc oC the Spokanc Countv Enginccr. Said work is to bc coniplcted. and thc work is to bc
accepted bNl the Countti- Engineer, no later than two years from the date aP plan acceptancc.
Failure bv the PRINCIPA.[. to obtain the Counly Enginecr's acceptance of the work bv the expiration datc
of tlie pian acceptance shall constitute a material breach, and shall be grounds for immediate dernand b%- the
Spokailc Couritv EnQinccr for full pavmcnt of tlic cniirc amount of tlus 4ssignment. Tlie pracceds of t}tis
Assio7ltnent sliall be used bv the Countv Enginecr to complcle the remaining work. Amt surpius shall hc rcfundrd
to thc PRINCIPaL. upon 1hc Countv Enginccr's acceptancc of the complcted work. Thc P.RItiCIPAL shail
rcimbursc the Counn• Enginecr's Of~ficc for an%• costs in cxccss of tlic amount of the total amount of the financial
guarantcc incurred by the County. including but not limitcd to construction. inspcction, adnunistration. collcctian
agcncy fccs. and lcgal expenscs incuncd in securing the financial guarantee and completinQ the work.
.
Anv interest benefits accruing under said savings ccnificate shall remain the propertAl of the PRIiNCEPAL.
The funds cncuinbcrcd bv this Assignmcnt arc lo bc relcascd to the PRItiTCIPAL or othcr duly designatcd partNonly AN-ith the prior Nvrittcn conscnt and agarcecncnt of the Spokanc County Enginecr.
PROVTDED. F[JR7-HER. ilic undcrsigncd PRIIVCTPAL. cioes hcrcbN.- authorize the Bank lc
pay ovcr to the Spokane Counn• Enginccr a11 or a sufficient portion of the inonies in the savin-s ccrtificate
rcfcrenccd hcrcinabovc. upon «-rittcn docunicntation bcing rcccivcd from the Sgokanc Counn- Enpinccr indicatincy
thal the purpases for which the sa\•-ings certi.ficatc was assianed havc not been fully and faithfulh- perforned as
required and zi statement of that amount of money \vhich the Couiily EnQincer deems necessaix to coniplete sucti
ebliQation. Lpoti reccipt of suc}i writtcn documentation. the PRINCIPAL herebv authorizes the Bani: lo rcleasC !o
the Spokane Countv Enainccr tliat amouilt of inonc}' rcqucsicd up to lhc maxii,lum alnount in tlic savinws
ccrti(`icatc. ~
DATED tlus 4th da`• of `lay 2000
SA `TK : Bank of Fairf ield
A.DDkESS : P 0 BoY 189
CITY. STATE. ZIP : Spangle, 61A 99031-0189
~
i
~
t
S P O K A N E
C O U N T Y
41
DMSION OF ENGINEERING AND ROADS A DIVISION OF THE PUBLIC WORKS DEPARTMENf
William A. Johns, P.E., County Engineer
December 21, 2000
Mr. Bob Jorgensen
Bank of Fair6eld
P.O. Box 189
Spangle, WA 99031 .
Re: Reduction of Construction Performance Surety
Savings Certificate No. 28779
Spokane County Project #P 1773 - Shelley Acres ~
Dear Mr. Jorgensen:
The County is starting the process to establish the roads constructed in this project. This
Savings Certificate may now be reduced from the original amount of $218,800.00 to
$21,880.00 (Twenty Thousand Eight Hundred Eighty and NO/100 USDollars.
If you have any questions, feel free to call our office at 477-3600.
Sincerely,
William A. Johns, P.E.
Spokane County Engineer
~ .
William H. Hemmings, P.E. Development Services EngineerlManager
r
1026 W. Broadway Ave. • Spokane, WA 99260-0170 •(5{19) 477-3600 FAX: (509) 477-7655 (2nd Flnor) 477-7479 (Ird Floor) 9 TT)D: (509) 477-7133
S P O K A N E C O U N T Y
DNISION OF ENGIIVEERWG AND ROADS A DCVISION OF THE PUBI.IC WORKS DEPARTMENT
William A. Johns, P.E., Counry Engineer
July 20, 2000
Mr. Bob Jorgensen
Bank of Fairfieid
PO Box 189
Spangle, WA 99031
RE: Shelley Acres Addition (P 1773)
Savings Certificate Number 28779
Dear Bob:
We have received a request to reduce the above referenced savings certificate to
reflect the current status of construction. Although Spokane County is under no
obligation to .reduce any savings certificate it holds, we have elected to allow a
reduction of this savings certificate from the original'amount of $ 218,800.00 to $
99,400.00. Consideration of any further reductions to this savings certiticate will
likeIy be based on continuous construction progress toward completion and
acceptance of the public roads.
If you have any questions, please call me.
Sincerely,
&v- V ~
Bill Hemmings, PE
Development Services Engineer/Manager
1026 W. Broadway Ave. • Spokane, WA 99260-0170 •(509) 477-3600 FAX: (509) 477-7655 (2nd Floor) 477-7478 (3rd Floor) • TDD: (509) 477-7133
_ • ~ • .
. ~ ~
PHO-NE : 509-245-3226
AUTMORIZED Bob Jorgensen
REPRESENTATIVE :
TITLE : Assistant Vice President
PRI~iCIPr~.L ~+'~.4 F"~/
ADDRESS : 411fl/c~~r
i• ~
CITY. STATE, ZIP /VU 2"9
pHOiNE
PRivi CIPAL:
Shelly Acres Subdivision Joint Venture
Dcvclopcr
P-
A Was ' n n
~ .~'-Z•L Z
Bv: (typcd Namc) ti1 k 0. McManus, General Partners
Its: (7'itlc) 131liam W. tilain IV, General Partners
Statc of `Vashington )
)ss
County of Spokane )
I cerlif~j that I kno~v or havc satisfacton, cvidcncc that lnani(,~c~ir~ ron)Ms ~ie pcrsoin~tlo ap~~arc~ bcFPor~ n~~and
said person acknowledged that (AM~) signcd ttus instrumcnt. on oath statcd that (h~ARM was gRely~`edAc° res
c~e MilaYfl&1NHom Gti~e i~stru~ettt anc~ckno~~~ledged it as the ~~rbFI"icer, trustee. etc.) of (name o~Aart%~
u1 1nsn.~mcn~t i~s cxcculcd) to be thc frcc and voluntan. - act of sucli pam~ for thc uses and
.
purposcs mcntioned in thc inst~,
~G%A M. y~Y /~i
Datcci May 4, 2000 `AN ~Q'.•~ss~o'nF~.9,9 . .
# ,o • ,
~Q'TA ~ ~~L~.GC'.~~.~~- CG~Q~r t.._-
.
N Nolarv Public in and
~ for 1hc Statc of Washineton.
PUBOG : 0: Mv APPoinlmcnl Expires: March 1, 2004
~ '~s~ ~ ~ .
~
~i~F'~ ~
BA~: /~z7~ ~ yy ~ S~ ~~\\N~
Bank of Fairfield, Spangle Branch
(Bank Name)
A W• s~ i ~ . orporation
B~•: (t~pcd ~~amc) gob Jorgensen
Its: (Tillc)Assistant Vice President
State of WasiunLyton )
)ss
COLIIIIV OF Sp0kaI1e ~
Bob Jor ense
f ccrtifi~ tliat I.o« or havc satisfactorv c\-idtnce ihat (namc oi ncAon) is t~lc pcrson who appcared tiefore me. and
said pcrson ackno%iledecd that (hck;k) sigmcd this instnimcni. on oatli statcd that (hc'PAz) %tias autho:iz-1d to
. •
. ~ ~ .
~ ~ssi~sta t.~ice Prsident Bank f
cxccutc lhc instniitlent and ackno%~•lcd cd it as thc -oc o au~~vric.~.. o zccr, trustcc. ctc.) of (narnc opoartv
on t~W tg ~6Oltl lI1SLTU111Ci1t «-as cxccuted) to be tlle frce and voluntaR- act of such partv for the uses and
purposcs mcntioncd in thc inst ``l,101»
Dated `'iay 4, 2000 `~~~~~Q•~G1 SioM'. ~~050 • .
C-CJ~Z2d~--
~ Q;•oa`~~5 •~fi°%'=90 ~
Q
NOTAR y`~ rNotary Ptiblic iri and
for the Statc of Wasliington.
PU6LIC , p~ M\- Appointmenl Expires: March 1, 2004
i ,4!
'A.',~!
0 ;ly~ A c,1
' , - , t`. ` _
P1773 - Sheliey Acres
Bond Summary
Steen Court construction $173,600.00
inspection $0.00
Courtney Lane construction $45,200.00
inspection $0.00 total $218,800.00
Note: 1980 standards, so County inspects
1 • T •
, • • t 9
80ND ESTIMATE
PROJECT P1773 - Steen Court by Ed Parry, P.E. QATE 03-Nov-99
ORAINAGE ITEMS UNffS QUANTfTY PRICE COST
1) Drywell - Type A EA 1.00 1200.00 1200.00
2) Drywell - Type B EA 3.00 1700.00 5100.00
3) G rate - Type 5 EA 0.00
4) Grate Type 2 FA 0.00
5) Grate - Type 4 EA 4.00 300.00 1200.00
6) Baclcfiil For DW CY 150.00 17.25 2587.50
7) Orainage Structures, installed
Plan callout EA
Plan callout EA
7) Concrete Iniet Box. Type I EA 800.00 0.00
7a) Sidewalk Inlet, Type I EA 0.00 0.00
7b) WSQ07 Inlet Bflx 8 Grate EA 0.00 1300.40 0.00
8) CPEP Fipe 10" Dia. LF 0.00
9) ADS n-12 Pipe 12" Dia. LF O.QO 18.00 0.00
9a) CMP Pipe 12" Dia. LF 0.00 20.00 0.00
10) CPEP Pipe 15" Dia. (ADS n-12) LF 0.00 O.dO
11) CPEP Pipe 18" Dia. LF 0.00
12) Precast Manhoie EA 0.00
13) Solid lid EA 325.00 0.00
14) Ditch and Pond Excavation CY 559.81 12.40 6717.67
15) Sod SF 5307.00 0.70 3714.90
16) Ripap autfall pad LS 1.00 500.00 500.00
NON STANDARD DRAINAGE ffEMS
1) Wilbert Vauft Curb inlet EA 0.00 250.00 0.00
2) Erosion Protection - silt fence LS 1.00 1000.00 1000.00
3) Erosion Protection - Rock entry LS 1.00 2000.00 2000.00
4) Type 1 cLrb cvt infet EA 9.00 200.00 1800.00
5~ 0.00
6) 0.00
DRAINAGE SUBTOTAL 25820.07
16) Monumertts EA 4.00 185.00 740.00
17) Barricade LF 35.00 0.00 .
18) Street Signs EA 1.00 90.00 50.00
OTHER SUBTOTAL 830.00
GRADING, SURFACING, CURB, AND SIDEWALK
19) Rough Grade CY 6705.05 10.00 67050.48
20) Top Course CY 15.50 0.00
21) Base Course CY 1332.12 15.50 20647.91
22) Asphatt Concrete Tons 449.59 46.00 20881 22
23) Curb Type A LF 7.50 0.00
24) Curb Type 8 LF 8.50 0.00
25) Curb Type R LF 2678.90 8.50 22770.65
26) Sidew8lk SO YD 0.00 17.50 0.00
NON-STANDARD ROAD fTcMS
1} 0.00
2~ 0.00
3~ 0.00
4) 0.00
GRADING AND SURFACING 13115026
$157,800.33
CONSTRUCTION TOTAL, INCLUdING MULTIPLIER OF 1.10 $173,580.36
use $173,600.00
1980 standards fnsaection $0.00
use $0.00
, • ~ -
Steen Court Quarrtities
Grading
Swales top fioor avg depth Volume
Pond A 2875.00 1800.00 2.00 4675.00
Pond B 2500.00 936.00 2.00 3436.00
Pond C 3584.00 1886.00 1.00 2735.00
Pond D 2730.00 685.00 2.50 4268.75
15114.75 cubic ft
559.81 cubic yards
L W T
Roadside 300.00 30.00 2.00 9000.00
333.33 CY
sodlseed 5307.00 sf sad
589.67 sy
stop start width
Road 1206.00 0.00 37.00
Steen Court 1206.00 44622.04 sf
tangern depth
earthwork 3.50 156177.00 cf 6117.67 cy
base 8.00 0.67 29748.00 cf 1101.78 cy
acp 2.00 0.17 7437.00 cf 371.85 tons
sum
Cui-de-sac area ex 6705.05
depth 9329.00 sf base 1332.12
earthwork 1.70 15859.30 cf 587.38 cy acp 449.59
base 8.00 0.67 6219.33 cfi 230.35 cy
acp 2.00 0.17 1554.83 cf 77.74 tons
curb length Type R # sides
tangent 1206.00 2.00 2412.00
returns 18.45 2.00 36.90
Cui-de-sac 230.00 230.00
total 2678.90
sidewalk tangent 0.00 1980 standards
return 0.00
cul-de-sac 0.00
0.00 0.00 sf
0.00 sy
inspectian 12.06 stations 500.00 per station 6030.00
CMP pipe 12"
• , , ,
6--..v0 ESTiMATF
PROJECT P1773 - Courtney Lane by Ed Parry, P.E. DATE 03-Now99
DRAINAGE ITEMS UNITS QUANTITY PRICE COST
1) Orywell - Type A EA 1.00 1200.00 1200.00
2) OrywP.il - Type 8 EA 1700.00 0.00
3) Grate • Type 5 EA 0.00 OAO
4) Grate Type 2 EA 345.00 0.00
S) Grate - Type 4 EA 1.00 300.00 300.00
8) Bactdp Fot OW CY 40.00 17.25 690.00
n Drainage Sirudures, installed
Plan callout EA
Plan callout E.1
Plan cailout EA
P4an callout EA
Plan caltout EA
7a) Concrete Intei Box Type 1 EA 800.00 0.00
7b) Concrete Inlet Box, Type 2 EA 8C0•00 0.00
8a) Curb Inlef Type 1(Qeta+l B-8) EA 0.00 150.00 0.00
Sb) SidewaNc Intet, Type 2(Qetail B-9, WilbeR vault) EA OAO 250.00 0.00
8c) WSDOT tnld Box 8 Grate EA 1.00 1300.00 1300.00
8} CPEP Pipe 10" Dia. LF 0.00
8) ADS n-12 Pipe 8" Qia. LF 54.00 12.00 648.00
9a) CMP Pipe 12' Dia LF 0.00 20.00 0.00
10} CMP 24' Dia. LF 0.00 38.00 0.00
11) CPEP Pipe 18" Dia. LF 0.00
12) Precast Manhde EA 0.00
13) Solid tid EA 325.00 0.00
14) Ditch and Pond Excavation CY 12.00 0.00
15) Seed SF 1010.00 0.03 30.30
16) Ripap outfdl pad CY 0.00 50.00 0.00
NON STANDARD DRAINAGE ITEMS
1) WiibPrt Vautt Curb Inlet (de4aii &9) EA 250•00 0.00
2) Erosion Protection LS 1.00 1500.00 1500.00
3) Erosion Protectian - Roclc entry LS 1.a0 2000.00 2000.00
4) Type 1 iMet pad EA 1.00 200.00 200.00
5) 0.00
6) 0.00
DRAINAGE SUBTOTAL 7868.30
16) Monumerrts EA 2.00 185.00 370.00
17) Barricade LF 0.00 35.00 0.00
18) Street Signs EA 1.00 90.00 90.Q0
OTHER SUBTOTAL 460.00
GRADING, SURFACING CURB, AND SIDEWALK
19) Rough Grade CY 2380.37 10.00 2380.3.70
20) Top CAurse CY 15.50 0.00
21) Base Course CY 247.30 15.50 3833.09
22) Asphalt Concrete Torts 111.28 46.00 5119.03
23) Curb Type A LF 7.50 0.00
24) Curb Type B LF 8.50 0.00
25) Curb Type R LF 0.00 8.50 0.00
26) Sidewalk SQ YD 0.00 17.50 0.00
NON-STANDARD ROAD ITEMS
1) Cross-gutters SQ YD 0.00 17.50 0.00
2) O.tiO
3) 0.40
4) 0.00
GRADING AND SURFACING 32755.83
$41,084.13
CONSTRUCTION TOTAL, INCLUDING Br1ULTIPLIER aF 1.10 345,192.54
use $45,200.00
1980 standards lnspection $0.00
use $0.00
. ' Y • , ' .
Courtrcey Lane Quarrtities Grading
top floor avg depth Volume
Swale 2385.00 1010.00 3.00 5092.50 cf
188.61 cy
Sod 1010.00 sf
112.22 sy
L W1 W2 T qry
Riprap at pipe outfall 0+39 8.00 6.00 6.00 1.00 1.78
1.78 cy
stop start width
Ruad 775.00 18.50 16.00
Courtrt8y Lane 756.50 12104.00 sf
tangerrt depth
earthwork 5.00 60520.00 cf 2241.48 cy
base 6.00 0.50 6052.00 cf 224.15 cy
acp 2.00 0.17 2017.33 cf 100.87 tons sum
ex 2380.37
Hammerttead area base 247.30
depth 1250.00 sf acp 111.28
earthwork 3.00 3750.00 cf 138.89 cy
base 6.00 0.50 625.00 cf 23.15 cy
acp 2.00 0.17 208.33 cf 10.42 tons
curb length Type R .
tangent 0.00 2.00 0.00
returns 0.00 0.00
CuWe-sac 0.40 0.00
total 0.00
Inspection 7.57 stations 500.00 per station 3782.50
- '
. SHELLEY ACRES ADDITION
CONSTRUCTION COST ESTIMATE Date: 21-Jun-99
Prepared by Metro Engineering, Inc.
By: JKO
Project No. 97-035 Checked: JGL
i .
UNIT ESTIMATED
ITEM NO. JESCRIPTION QUANTI UNITS COST ~
SANITARY SEWER
1 PVC SDR 35 incl. trench exc. 914 LF $20.00 $18,280,00
2 Manhole Type III-48 1 EA $1,500.00 31,500.00
3 Manhole Type 1-48 3 EA a2,000,00 $6,000.00
4 Side Sewer p+pe 4" dia. 612 LF a20.00 a12,240,00
5 4" Side Sewer C.O. 3 EA a100.00 a3pp.00
Sut}Total a38,320.00
WATER LINE
6 Backfill & Compact Ex. Wabeftine (apprrnc 3' depth) 1LS $2,000.00 $2,000.00
7 Water Servtce 2 EA $200.00 a400.00
8 Valve Box on Ejasting Wateriirte Vahres 4 EA $125,00 a500.00
9 8" C9rJ0 Cfass 150 PVC ind. trench exc. 233 LF $18.00 b4,194,00
10 8" FL x MJ Adapbef 2 EA $100.00 y200.00
11 8" FL x FL x FL Tee 1 EA a360,00 $350_00
12 8" FL x MJ Gabe Valve 1 EA a700,00 a700,00
13 8"MJ x 8"MJ x 6"FL Tee 1 EA 3350.00 a350.00
14 8" MJ Plug 1 EA $100.00 $100.00
15 5' FL Vera Standard Fire Hydrartt Assembly 1 EA $2,000.00 $2,000.00
16 Thrust Block 4 EA a100,00 $400.00
Sub-Total $11,194.00
STREET AND DRAINAGE
17 Clearing & Grubbing 1 -LS $1,000.00~ $1,000.00"
18 Erosion & Sedtrnent Corttrd 1 LS $1, 000.00 $1,000.00
19 Excavatian, Induding Haul (See Nobe 1) 1,551 CY $5.00 $7,755.00
20 EmbankmeM (See Nube 1) 1,460 CY $2.00 $2,920.00
21 Subgrade Preparaton 6,576 SY $1.00 a6,576.00
22 Type "R" Concrete Curb 8 Gutber 2,018 LF $7.00 $14,126.00
23 Concrebe Curb Inlets (See Note 2) 7 EA $75.00 $525.00
24 Asphait Paving - 2" A.C. on S" rock (12th Ave.) 1,175 SY $10.00 $11,750.00
25 Aspfialt Paving - 2" A.C. on S" roclc (Sbeen Ct) 3,915 SY $10.00 $39,150.00
26 Asphatt Paving - 7' AC. on 5' rock (Courfiey) 1,486 SY $9.00 $13,374.00
27 Type"A:' Drywe{l 2 EA $1,750.00 $3,500.00
28 Type "8" Drywell 3 EA $2,000.00 $6,000.00
29 W.S.D.O.T. Grate Inlet Type 2 1 EA $1,500.00 $1,500.00
30 8" CPEP, ADS N-12 Corrugated Pipe 58 LF $18.00 $1,044.00
31 Rip-Rap Pad 1 Eq a300.00 $300.00
32 "208" Swale Construction (5 swales) 236 CY $10.00 $2,360.00
33 Off-Site Interception Dftch 1,555 LF $2.00 $3,110.00
34 Turf ReirTforcement Matting 347 SY $5.00 $1,735.00
35 Hydroseeding 38,500 SF $0.07 $2,502.50
36 Street Name Sign 2 EA g200,00 S400.00
Sut-Total $120627.5p
GRAND TOTAL (ESTIMATE) $170,141.50
Notes: 1) Courtney Lane only, Steen Caurt assumed to be rough graded. Quantities do not include lot grading.
2) The quantities and estimate are not guaranteed to be accurate and are fumished without any liability
on the part of the Engineer.
OFFICE OF THE COUNrrY ENGINEER
SPOKP,NE COUNTY, WASHINGTON
TO: BILL HEMMINGS
FROM: DAVE BERTO
DATE: May 9, 2000
SUBJECT: BOND ITEMS P1773 SHELLEY ACRES
The bond for the above mentioned project is for the
following items:
1) All the items on the approved road and drainage plans.
. .
~ '
• ~
PROJWT NAM&- .4121,17-IW
INSpECtbR: ~Go r;[>4w!!~ DA?8: -7 f/ 3/0 0
CONTRACTOR ANDIOR sUBCONTRACTURS: a,0DA7ZV 101Z&1Oe)
~ L ~2 f u]iu~LFJ2
~
;
t-mis: eD,c15 i 2acT PP,A 1A.i4 PaAi,05 f Q1
~ ~ ~,5
LVf~~1ni~ iz~. A~p~2v ~5r~ P~~l~✓~ . l6f/ob .
2) P&4 cZ A LL
;
4 .q 5~f-,~- 4-7
O~t..,i RO~~r~J.1~17~ dl ~
~
4 Ct5' /Q 0A 12 HUkJ"GL14e5~-1 i 5 . ,
iQo A-04A)II ~ av A-rpr,6-rE
~
. .
glPP,419 oa r~=~~L- /2Ar~ e,414P /ofz'.4oa I
~
q)R6PAie- A&c. ARZ4y dic~' eu46 1?41r4&o6V -7114i~gz612 a&tjra :
. , _
6AZ*~-V! c.uA!(o ~41/40
~r
. ,
,
SBWEIt INFORhiA?ION:
emA~E rC~~~ECT' ~}it,/
. . . : ~ . ~ ~ .
--r:I
,
AIR~ : ~ DATS: D PAS3 - o FAIL
Dri~1N'D~BLt; DATB: o pAST o pAji,
~ • /~Y ~ATEk r •
~ ~ .
~ A'9 31aNAZ'tJRB:
. . .
• • . r»..~ ,
• y.. , • . ~ • : ~ .
~ • • • ' . l. . •
~ ~ • 1 - • ~
• ~ ~t♦ 1• • w 1~ ~r , ~r.•` , ..r
~ T
~ ~ ~ • ` S
-70
.
• • • • ~ . • . , . ~ 1 ~ • . ~ . ~ ~ r
1
. . . ~y •1.~ ~r~+w ~
..i •
~ ~ .
oIr war~ im~
• o
Cr c Q~~ec s.qv>>> i ~o,cJ
I~SpECi'OR: p~GD r;v~,t~5 DATB: 7/j 31ri0
~ C~Ni'RACTOR ANDlOR 3UBCONR"RACTORS: 1
;
G L 662 f u)iA.i,Q, 64-71
.
,r~i~Ai~v4 66 , PotirO5 ~A,6, G, ff~i
,
~ t~LVROIAA., 77-0. AAOr2Oi45D PL~lit/5 , c~~-t P 16fZ.Zj1oe ~
z) Pc 4 t~ A 1,L ~ ; ,e6~5: f Rv/-l0/rr.l,ev LI~26aAif>
~-t.
~ ~ - ;
~ ~LA LE CS i G ~4 &jO i4 OA.1
.l
4 Ci5 /7 HV,vUjA-ee5~ v r,5 . ~
60,'..JD4Zu A klWO ZWAIit1A665 i 2~5% vrtlGE . ,
. ,
- /QO!a 04,C)/I A-tP L"c TE
! GQ ~.E~-tE,u ~ ~~-lR i E,2i•4 L s ~P~eltI47-e ioifMEc.rraAel)
r
. .
Or:( Tt'~LL ~~1~ (~MP ID/c~DG ~
, -
. ~
~4#40 eUO'~7 .
1 ~ I
r
~
1
~ f ~
~ .
sEWEt WFORD►zATioK:
--~-Tl~
,
AIR- : DA?F; o pAS3 'oPAII,
.
~tAI~tD ~ DA►T8: o pA33' p PAIL
'1Y ~ N ~EQVBSI: DA'I'S: • • .
~ . .
• • ~
. . • ~ .
• y~ . ~ ? • ~ . • • ~ ' i ~ '
• • ~ • • ~ _ l . « , .
•
i . ~ • • • • • • ' • • ~ • • ~ ~ • ~~r
N~.• . •
~ ~ •
~ ' ~r. , . . ~ ~ , , ~ ~ , 'L1?~~~f
• ' ~y
I.~•~I
M
~
Spokane County Public Works
Division of Engineering & Roads
1026 West Broadway Avenue
T Spokane, WA 99260-0170
www.spokanecounty.org
SPOM~ COLT~ Phone 509/477-3600
Fax 509/477-7478
Date /n 7 - oc~'
Fax No. ~ C--, ~ 1 3 3 2
Pages (including cover sheet) 2
TO
~
From ~ ~ Message
~
ELLER CORPORATION
P.O. BOX 117
NEWMAN LAKE, WASHINGTON 99025
PHONE: 509-226-0333 FAX: 509-226-1332
ANEQUAL OPPORTUNITYEMPLOYER
EL-LE-RC*242C3 DI3E ll D2F3909032
December 12, 2000 ~SC~I
VSD
Paul Lenneman DFC ~ 3
Public Works Dept. sqpk"
Spokane County Engineers E ~~UNTy E
1026 W. Broadway Avenue N~f~EFR
Spokane, WA 99260-0170
RE: SHELLY ACRES ADDITION
We have been in contact with Penny Flowers concerning the punch list items for this project. At
this time, all the items are completed and accepted by Penny Flowers except for the "road drainage
test". Miss Flowers said the road drainage would be checked after the next rainstorm, which may
be several months away. However, in order to release the Owner's bond before this test, Miss
Flowers said that Spokane County would accept a written guarantee from Eller Corporation that the
deficiencies would be conected if the roadway did not drain conectly. Enclosed is said guarantee
from Eller Corporation.
The new pavement is also dirty from the current home building. Penny Flowers also requested a
statement that the pavement would be cleaned, if necessary, next spring. Enclosed is said guarantee
from the Project Owner, Shelly Acres Subdivision L.L.C.
Penny Flowers could not confirm that the road monuments had been installed because of the ice on
the roadway. The Project Owner has told us that all the monuments have been installed.
Please contact the Project Owner representative, Mr. Mark McManus, at 509-924-0968 or Eller
Corporation if there is anything that would hold up the release of the bonding.
Sincerely,
ELLER CORPORATI4N
Michael D. Wilson, P.E.
Proj ect Manager
cc: Mark McManus
enclosures
Spokane Co.-Lenneman-2.doc
t
r . '
ELLER CORPORATION
. P.O. BOX 117
NEWMAN LAKE, WASHINGTON 99025
PHONE: 509-226-0333 FAX: 509-226-1332
ANEQUAL OPPORIZIMTYEMPLOYER
~ EL-LURC*242C3 DBE # D2F3909032 !
December 12, 2000 .
To: SPOKANE COUNTY ENGINEERS
AND
SHELLY ACRES SUBDIVISION L.L.C.
RE: SHELLY ACRES ADDITION
ROAD DRAINAGE GUARANTEE
Eller Corporation warrants and guarantees to Spokane County and Shelly Acres Subdivision L.L.C.
that the roadway will drain per the Construction Drawings. If, after the drainage test performed by
Spokane County, it is determined that the roadway does not drain properly, Eller Corporation will
correct the deficiencies to meet Spokane County's specifications.
Sincerely,
ELLER CORPORATION
~
Helen M. Eller
President
Shelly Acres DrainAge Warranty.doc
12/ 11 / 2000 23 : 22 9268436 _ MARK MCMAN~IS PAGE 01
_ . . . _
.
. .
12-t 3-00
Spokac►e County Engineers:
She]ley Acres subdivision roads and stonm water facilities are camplete except foT
cteaning the roads. At the present time the roads are covered with snow which malces it
diffiGUh to clean the mads. This letter is imended to be a cvmmitment for the
uRdexsigned Lo assume responsibility to clean the roads in tht spring of200j. We
appreciate your patience with this.
Thank you,
~
. .
/&/Wrke u
GeneralPartne,r Shelley Acres Subdxvision L.L.C.
~
-1
~
i
'
i ) +
~
S P O K A N E
s' C O U N T Y
-
,
DNISION OF ENGINEERING AND ROADS A DMSIOtv OF TxE PUBi.IC WORKS DEPARTMENT
William A. Johns, P.E., County Engineer
July 13, 1999
Mr. Joel Lee, PE
Metro Engineering, Cnc.
S. 324 Sherman St.
Spokane, WA 99242
RE: P-1733 - Shelly Acres Addition Plan Submittal #1 / Rcview Comments
Dear Joel:
I received your plan submittal on June 18, 1999 and I have suspended review until the following
comments are addressed:
1. There is a problem with your plan to intercept the off site drainage with the ditch you have
snown. We allow this to be done when the flow is conveyed back to a drainage channcl where it
naturally went or you can handle the flows on site with a treatment and ciisposal system that is
approved. In this case there is no definecl drainage that I can see on the topo drawing to
redirect the watcr back to. The Spokane County Guidelioes for Stormwater Management do
not allow you to concentrate water in a place w6ere the water sheet flowed before.
2. T6e ditch can not be built in the easement that is shown with out going outside the plat in one
area. The cut slopes will extend bcyond the property iine in at least one area.
3. The private drive will ueed additional easement areas where the cut and fill slopes will catch the
exisling ground slope. Please revise.
4. The ditch ivill have at least three hydraulic jumps that vvill have to be controlled if it is built.
Please provide calculations anci erosion protection for thcse areas if you still want to build the
ditch.
5. The 208 lot plan do not have any cross section drawiogs for the swales. Please provide.
As a suggestion, you may want to consider allowing the off site flows to come into the lots as they -
have in the past. If you were to decidc to do this you would then design the 208 ponds for the 50
year storm and there appears to be sufficient area in the lots to provide larger ponds if necessary.
T6is would simplify the construction and reduce costs and mainten:ince.
If you 6ave any questions, pleasc call me.
Sincerely,
r
e~.) ~
Bill Hemmings, PE
Development Services Engineer/Manager
cc: File
1026 W. Broadway Ave. • Spokane, WA 99260-0170 •(509) 477-3600 FAX: (509) 324-3478 TDD: (509) 324-3166
OPERATION A.ND MAINTENACE MANUAL
FOR
SHEL- LEY ACRES ADDITION
Metro Engineering, Inc.'s
Pro j ect No. 97-035
06/ 18/99
04 wAs,rir
e~ . o
,
~p ;,~►,p~:~• :;{*N'-WOUMENT
4 ti. r i-
~~'cps QIJTB OFFICE
~I~NAL 8~ •
LEXPIRES 2/21IOf - 177,_ ~ .
~ SU13i~I77~k~~r . . . . o... ~
RETURN,,TQ;
Prepared By:
Metro Engineering, InG
S. 324 Sherman St.
Spokane, WA 99202
Ph.: (509) 624-93 51
Fax: (509) 624-8153
SHELLEY ACRES
OPERATION AND MAINTENANCE MANUAL
TABLE OF CONTENTS
PAGE
INTRODUCTION 1
OPERATION AND MAINTENANCE 2
FINANCIAL CONSIDERATIONS 4
APPENDED MATERIAL
MAINTENANCE CHECKLIST/REPORT APPENDIX A
POST CONSTRUCTION DRAWIINGS POCKET 1
i
,
INTRODUCTION
This Operation and Maintenance Manual is for the stormwater collection and disposal
system which serves Shelley Acres Addition.
The Shelley Acres Homeowners Association is responsible and liable for the ma.intenance
and operation of the stormwater facilities within Shelley Acres Addition. The record
drawings which give the specifics of the drainage facilities are located in the attached
pockets.
The Homeowners Association shall designate an individual or group of individuals (herein
referred to as the operator) to be responsible for the operation and maintenance of the
stormwater facilities. The operator shall be familiar with the facilities and have an
understanding of the intent of the facilities. They shall also be familiar with general good
operating practices for stormwater collection and disposal. They must keep the interest of
the public and the homeowners as the highest priority during their operation and
maintenance.
RESPONSIBILITY
It is the responsibility of Shelley Acres Homeowners Association to provide effective,
efficient, and continuous operation and maintenance of the stormwater facilities and
related appurtenances.
DESCRIPTION OF TI-E SYSTEM
Please refer to the record drawings in the atta.ched pockets.
The stormwater system is comprised of offsite interception ditches, collection system (i.e.
catch basin and pipe), `208' ponds and drywells.
1
e _
MAINTENANCE AND OPERATION
The ponds, ditches, catch basin and drywells sha11 be visually inspected once each month.
Visual inspections should increase to twice per month during the winter and spring
months. A visual inspection should follow all major storm events. The ponds and ditches
should be maintained per the outline below and as listed on the maintenance checklist
(Appendix A). Sediment deposits in the bottom of the ponds shall be removed regularly in
order to maintain the design volume. The drywells shall be kept free of obstructions, _
including sediment. MAINTENANCE TASK FREOUENCY
1. Summer lMarch-Octoberl
V'isual Inspection Monthly and after major rain events
Ponds:
Weeding/weed control As necessary, remove noxious weeds as they
appear
Raking and litter control As necessary, primarily at the end of autumn
Mowing As necessary
Remove sediment As necessary
Drywells:
Clear debris (including excess vegetation) As necessary to keep overflow clear
from overflow
Cleanout drywells As necessary to keep capacity
Offsite Interception Ditches:
Weeding/weed control As necessary, remove noxious weeds as they
appear
Raking and litter control As necessary, primarily at the end of autumn
Storm Pipe:
Clean and flush lines Annually or as necessary to keep pipe clean
2
s '
II. Winter (November-Februarv)
Visual Inspection and litter control Semi-monthly and after major rain events
Clear snow & ice from grates and As necessary to keep grates and inlets
inlets clear
GENER.AL NOTES:
1. Generally the ponds should be watered to keep the grass green and healthy. Precautions
shall be taken to not over water the soil. Do not over water.
2. Grass clippings and other debris from maintenance of the pond, ditches and common
areas shall not be dumped in the ponds. Rubbish, litter and materials removed during
maintenance shall be disposed of in an approved manner.
3. The `208' ponds are intended to handle typical residential strength stormwater runoff.
Hazardous materials, such as, but not limited to, oil, fertilizers,_paint, battery acid,
antifreeze, fuel oil, and other materials commonly recognized as deleterious to water
quality shall not be discharged into the stormwater system. Precautions should always be
taken to prevent these items from entering the stormwater system. If hazardous materials
accidentaUy enter the stormwater system they sha11 be removed and disposed of
immediatelv by approved methods.
4. All stormwater facilities within Shelley Acres Addition sha11 be maintained by the
Homeowners Association.
This maintenance plan and schedule is only a rough guide; the intent is to keep the
stormwater facilities fully functional and maintained as a neighborhood asset. The schedule
may need to be adjusted after the stormwater facilities have been in operation and their
performance observed.
3
.
FnvAvcIAL coNSmExATloNs
The design life of the drainage system (assuming minimal maintenance) could be anywhere
from 20 to 50 years. The service life of the facilities depends almost entirely on how well
the facilities have been maintained.
The annual maintenance cost to repair and maintain the stormwater system is estimated at
$500.
The annual replacement cost set-aside for the stormwater system is calculated at $596.
Figuring the annual cost and the replacement cost amortized over 20_ years the annual
amount to be set aside to operate and maintain the system shall be $1096.
The Shelley Acres Homeowners Association shall create a"sinkirig-fund" to account for
maintenance and replacement of the drainage facilities. The above annual amount shall be
added to the account annually. Expenses to maintain the system will come out of this
account. However, the fund should grow annually by the amortized replacement cost.
Liability insurance shall be camed by the Homeowners Association, per the Spokane
County Code. This liability insurance needs to cover all pond easement areas and interests
held by the Homeowners Association.
Sinking Fund Reserve Account
Calculation for Operation and Mai.ntenance Costs plus Replacement Costs
For Annual Cost per Lot
Annual Operation and Maintenance Costs $500
Present Value of Drainage System, PV $207000
Assume 50% replacement of pond and structures in 20 yrs. PV/2 =$10,000
Future Value to replace in 20 years, FV FV=PV/2(F/P, 4%, n=20)
assuming inflation = 4%, n=20 FV=$10,000(2.1911 )=$21,911
Annual Set-aside for future replacement, A A=$2131911 (A/F,6%,n=20)
assume conservative investment; interest=6% A=$211911 (0.0272)=$596 .
Tota1 charges per Lot Tota1 Annual Charge =(O&1V)+(A)
13 lots Total Annual Charge =$1096
Annual ChargeJLot =(Anriual Costs) + Annual Charge/Lot =$1096/13 lots
(anriual set-aside amount, A) _ $84.30 (use $SS)
4
~A
~►I
EN
A~'p
~
NoTE: SHELLEY ACRES ADDITON
,
Pu, dote of inspection/ MAINTENANCE CHECKLIST
mcinlenance in oox ond initiol. YEAR:
COMPONENT/TASK FREQUENCY JAN FEB MAR APR MAY JUN JUL AUG SEP OCT NOV JEC
"208" PONDS '
VISUAL INSPECTION SUMMER MONTHLY #
VISUAL INSPECTION WINTER SEMI-MONTHLY*
WEED/LITTER CONTROL AS NECESSARY
RAKING AS NECESSARY
IviOW AS NECESSARY
RkMOVE SEDIMENT ANNUALLY OR !
AS NECESSARY
DRYWLLLS & CA7CH BASIN
CLFAR DEBRIS FROM GRATE AS NECESSARY
CLEANQUT CATCH F3ASIN & PIPING AS NECESSARY
CLEAN OUr ORY WELLS AS NECESSARY
PIPE FROM CATCN BA51N TO POND
VISUAL INSPECTION MONTHLY *
CLEAN PIPE AS NECESSARY
OFFSITE INTERCEPTION DITCHES VISUAL INSPECTION MONTHLY *
WfED/LITTER CONTROL/RAKING AS NECESSARY
. . , r . . . . . .
COMMENTS: " AND AFTER EACH MAJOR RAIN EVENT
7035-ON.OWC 06/18/99
f .
G. L - - - I
F w~.Syf~~ ;
o
~0 30891 L~/~' r~•..
t~'ssI GISTER 2 5 50 100
ONAL
, SCALE: 1 50'
' EXPIRES 2-21-01
I
_j
C
Z
wl
LLI
w~
s
-
L=274_29 -~10~
L~
.
w+
N,~ zl
so
0 0 °o• ol
DRYWELL D 70
~ \ I
T.O. G. - 2042. 7 1
~ 1 0~ r z IoN
30,
° m PRIVATE ROAD 4
o~ EASEMENT ~
m \ o \ ~N °
„208" POND "D"
BOTTOM EL.=2042.2
E- ~ ~ 1 ►
loool
Z > > I
O 30' ~ DRAINAGE I I
~ I
cr EASEMENT I ,
S 85'10'79" E
234.26'
~ LL,
LLJ U ' I I I
LLJ I I
if
` 7035-208.DWG XREF: 70358ASE.OWG V: BK1-LT6 ~
~ METRO ENGINEERING, INC. SHEL~LE1' ACRES ADDITON ~
S. 324 SHERMAN LOT 6, BLOCK 1
SPOKANE. WA 99202 DRAWN BY: JKO ~ DATE: 06/04/99
~ (509) 624-9351 CHECKED BY: JGL ~ PROJECT No.: 97-035 ~
/ \ \
S
~ 62.
6s6~ 0 25 50 100
SCALE: 1 50'
\
DRAI NqGE
EASE~~Nr ~ - DRYWELL, T.O.G.=2081.5
15 '~T=52.
p.00 49'
/ R p -38 34'27"
~ i O~ gg S 39' J4 26 : w
95.91 r
i 30'
PRIVATE ROAD ~ . ` in10 / O \
~ i EASEMENT ~t C-; h \
W F-
\ W
1 ^?uj
\ ~Q
c)W
PRIVqTE ROAD
~SEMENT ~ 3p'~ ,
~ "208" ~
~ -
~
~ pRqINAGE ~ ~ POND „E,.
BOTTOM EL.
EASEMENT V' ~
2081.0 ~
N M . ~ LLI
(V pp
`V
~
~
LC) .
~o
\ ~~P
\
. . ~ .
. ~
SETBACK L.lNE
- \
UTILITY EASEMENT
`,----"--o L=12s.oo'~ ~LG.L
ti
C~R6
~ - CU'ER
~
-~Ef9 COU1~T= ~ ~
S ~ Ook ,Q 30691 ~
-CISTER G1'~
f0NAL
' EXPIRES 2-21-01 ~
~ 7035-208.DWG XREF: 7035BASE.DWG V: BK1-LT4 ~
~ METRO ENGINEERING, INC. SHEL~LEY U CRES ADDIT o►v \
S. 324 SHERMAN LOT 4, BLOCK 1
SPOKANE. WA 99202 DRAWN BY: JKO ~ DATE: 06/04/99
~ (509) 624-9351 CHECKED BY: JGL ~ PROJECT No.: 97-035 ~
.
/ - - ~
.
~
N -0-0'26'34 'j E
747.>>. ~
0 25 50 100
SCALE: 1 50'
z
~ ~ S~ oF wa~r~~'
. 4~
oo
+ Z
m
rn b
. ~ . ,p • .
~ Z_ OA ~ 30891 ~y
. • ~ N_ S CISTE41'~
~ j0 NAL ~
I EXPIRES 2-21-01 ~
~ Ll NE
PG~ ~
~
o_ EASEME/VT ~
J j\~ L~14S>j
~0 " \ 117 51.
~RAINqGE
I ~ ~ L 1 ~SEME~IT
~ ~ . DRYWELL
T.O.G.=2034.7
3. ~
, 05.6
• 33. 26"NPl - ~ z
N24 C ~ W
,.E
143,41
\URB 116.58; ns~" cQ~\iV n ~,C~~
LV V
BOTTOM EL.=2034.2
~ . ~
~ 7035-208.DWG XREF: 70358ASE.OWG V: 13K2-LT5 ~
~ METRO ENGINEERING, INC. SHEL~LEY U CRES AODITON ~
S. 324 SHERMAN LOT 5, BLOCK 2
SPOKANE, WA 99202 DRAWN BY: JKO ~ DATE: 06/04/99
~ (509) 624-9351 CHECKED BY: JGL ~ PROJECT No.: 97-035 /
.
. •
G. L
0, 30891 ~w
c~s GISTER
SrONAL
~ EXPIRES 2-21-01 ~
. ~
O
O
~
~0
N 0 2s 50 100
0
o - . .
z ~rp.! E: 1 50,
2s'
o~INACE ~S
EtyENr .
~ ~ .
~
"208" POND "B"
BOTTOM EL.-2032.7 2
ry ~ CIO
.O.DRYWELL ~RAD
T ~4SE ACK ~ ~
c 2033 2 ~ ~ ~ ,MENr s~rB .
UTILiTY EASEMEN~ 1 > ~
o
- ~
L=226.29,
& Gv~ER ~
~
f ~ - R~
~
STE EN Cov
` 7035-208.DWG XREF: 7035BASE.DWG V: BK2-LT1
/
~ METRO ENGINEERING, INC. SHEL~ILEY ACRES ADDITON \
S. 324 SHERMAN LOT 1, BLOCK 2
SPOKANE, WA 99202 DRAWN BY: JKO ~ DATE: 06/04/99
~ (509) 624-9351 CHECKED BY: JGL ~ PROJECT No.: 97-035 ~
.
GO\.l
T ~
~ ~ CURg i
~PS~MEN~ /
+ ' o
- - - - L=14
DRYWELL ROAD EASEMENT
T.O.G.=2033.2 I f ~
- I - SETgACK ~1NE
^ + w ~ -
- a
o
Q I
11208" POhD "A.,
BOTTOM EL.=2032.7
I ~
DRAINAGE 25'
. EASEMENT I ~ N
r
~ Ul
~ .
w (
o ~
N I
LD o
N(D I
or-o ~
. 0 ~z .
w
Z I~
w
~cn
w
= 60' ~
¢
l~ .
o
G. SV,t,~~ i
.
o.
oS, G 30891 STE~ 1 I ~~6 ~Og `N
NAL
' EXPIRES 2-21-01
0 25 50 100
~ i
rv89'33'26"w SCALE: i 50'
~ 7035-208.DWG XREF: 70358ASE.OWG V: BK1-LT1 J
~ INDIVIDUAL LOT PLAN ~
METRO ENGINEERING, INC. SHELLEY ACRES ADDITION
S. 324 SHERMAN LOT 1, BLOCK 1
SPOKANE, WA 99202 DRAWN 8Y: JKO
(509) 624-9351 ~ DATE: 06/04/99
\ CHECKED BY: JGL I PROJECT No.: 97-035 ~
/
Submittal Checklist
~ for Road & Drainage Projects in Spokane County - Plats/Short Plats
This Submittal Checklist is to be completed and signed by the Sponsor's Engi»eer, and included with each plan
submittal into the Spokane County Engineers Office. If this form is not fully completed and signed, do not
submit plans and calculations to Spokane County for review and acceptance. Incomplete submittals will be
returned and will cause unnecessary delays for your client.
Project Name: e flel A c,.-~.s A &d
,
Pf~- / 773 -9~ Date: ~ ~f g ~y 7
Spokane County Project No.
.
Project Engineer: M e~~nq e e~'~,~n 3"lG"ge~ phone: 4 2- y- 935~
~
Project Sponsor: ^ Go''~o'_"4l °ii . Phone: 92 2--3° o0
A. Preliminary Process
Prior to Submittal of Road and Drainage Plans, the following events are to have already occurred:
(By checking each item ofjrshown below, you are stating that you have verified these events/items have been completed.)
Adoption of a Hearing Examiner's Report for tlus long plat, or a Planning Report for this short plat.
At least one Pre-Design Meeting has been held with County staff at the Enoeers Office.
An "Agreement to Pay Fces" has been signed by the project sponsor, and submitted to the County
~ Engineers Office.
ML A Channelization Plan (e.g. signing and striping plan) of public roadway improvements, has been
coordinated and discussed with the County Enoeers Office. ,
B. Road and Draioage Plan Submittal
The items listed below are to be provided as a minimum with a road and drainage plan submittal. Additional
inforcnation may be required to demonstrate that the plans meet all applicable standards.
(By checking "yes" for each item shown below, you are verifying that these items have been completed and are included
in this submittol. For any box checked "n/a a written justification oJ arry omissiorrs at the end oj this section is
required.)
Item Description
Vhes . Road and drainage plans, two print sets. (Certification statement on cover of plans)
IY Fes O n/a One set of plans on 24" x 36" mylar media, or CAD electronic fileyeDWG or .XF format 1V,yes Each Plan Sheet of record is signed and dated by the project sponsoZ: ~
21 yes The road and drainage design meets the requirements of State law, WAC 196-27 regarding
"conformity with accepted standards"; that is, the design reflects the "state of the practice"
for the proposed concept. ,
~ ye The plans, Drainage Report, basin map(s), and any other calculations are stamped, signed
and dated by an engineer licensed in the State of Washin,gtoo.
OV yes Q n/a Drainage Report, two sets. To include: basin map(s), time of coacentration routes in basin
map, and Certification statement on cover of report and basin map.
0hes n/a Geotechnical Report, one set. (Include all soil test pit/boring logs.)
9 yes 0 nVZ Structural Pavement Calculations, one set
0 yes &Kn/a Cross-slope grade calculations for road widening projecis.
i -
Item Description
~ ye ~ ❑ n/a Maintenance Manual and Sinking Fund calculations for drainage facilities located outside of ~
County road rit-of-way. CRo ~i tia~- -R`~►q J-fo be ,v:~W 4~- ~'~,e d~
:
yes 0 n/a Written explanation of who/what entity will be responsible for maintairung drainage facilities
which are located outside of ublic road right-of-way, d that the plan is acceptable to the
/ County Engineers Office. t Se~ rna..,
P~ yes 0 n/a Channelization Plan, or signing and striping information provided in the road plans. To be
~ included in road and drainage plan set.
Vyes 0 n/a I have read the Hearing Examiner's Report (long plat), or Planning Dept. Findings and
/ Conditions (short plat), for this project. The design meets the conditions in the report.
0~s 5( n/a Copy of Approved Design Deviations.
Cr~` /es 0 n/a Fire District Approval, for private roads.
yes 0 nla Lot Plans. Required for any lots with draina.ge easements and which front a public road, or
/ for lots which receive and treat runoff from a public riot-of-way.
yes 0 n/a Any applicable Staie and Federal pernuts have been obtained. (i.e. HPA, JARPA, etc.). For
Permits with conditions, a copy of the permit and conditions are included in the plan
submittal.
1, • yes Vgla Inspection Agreement between the sponsor and its engineer.
0 yes (9~ n/a For off-site easements to be grwted to Spokane County, the following items shall be
Z included: legal description, exhibit, and proof of ownership.
0 yes 0` n/a Erosion Control Plaa, required for "Major Land-Disturbing Activity." To be included in the
road and draiuage plan set. ( 5-~-~i~ d.4,~ -~C, /10~~ Y•►~(ude~ ~~c„ ~~..,~.e~,~~, 6o..,C,~
Explanation for any items listed above which are not included in this submittal:
~ (Note: an insufficient justificalion of why an item was not included in ihe submitted, or incomplete documenis, may result
in the submittal being returned without review or without acxeptance. Provide attachments if necessary.)
By signing below, the engineer is staiing thai the information provided in the submittal is complete, that the
inforniation provided in the Submittal Checklist is accurate, and the plans and calculations are in accordance with
the Spokane County Standards for Road & Sewer Construction, and the Guidelines for Stormwater
Management, except where an approv Design Deviation allows otherwise.
Engineer's Signature: Date:
r~ r
Engineer's Name: 4e 16,. Ze. c-
(please print) ,
If there are any questions about this form or appropriate procedures, please call Development Services,
Spokane County Public Works, at (509) 456-3600.
For Spokane County Use Only
Submittal No: County Plan Reviewer:
0 Accepted in for Review or Consiruction
11 Returned to the engineer without review and/or acceptance, See attached letter of explanation.
Processing Date:
Submittal Checklist 2
Spokane County Public Works; April 29, 1998
, - - '
- METRO ENGINEERING, INC-- -
S. 324 Sherman LETTER OF TRANSMITTAL
~ . Spokane, WA 99202
, - (509) 624-9351 Fax:-(509) 624-8153
~ TO: ~ Date:. 06/18/99 . Job No: 91-035
- ~ - ~ . -
Spokane County Engineers ~ Attention: Bill Hemmings, P.E.
Re: Shelley Acres Addition
~ 1026 W. Broadway . . . . . ~
~ -Spokane, WA-99260 ~ , . . . ~
WE ARE SENDING YOU:
Attached ~ Under separate cover via the following items: _
~Shop Drawings - Prints Plans . Samples
~ . Copy of L,etter . Change Order. _ ~ Specifications Mylar
Copies D,ate ~ No. ( - Description
l . . 1 Subrruttal Checklist
1 Drainage Report
. ~ ~ . . ~
- 1 ~ 1 Pavement Design
1 ~ Street and Drainage Plans (Blueprints) and, ACAD File ~
,1 Draft Operation and Ma.intenance Manual ~
1 ~ 4 Individual Lot Plans
RECE'VEDTHESE ARE TRANSMITTED AS CHECKED .BELOW: - i U N 1$ 1999
' ~ ~ , • - SPOKANE COUNTY ENGINEER
, X For approval ~ .~Approveti as submitted - Resubmit copies for approval ~
~ For your use . Approved as noted Submit ' copies for distribution ~ -
As requested Returned for correction Return conected prints ~
- For review and comment ~ For bids due Prints returned after loan to us ~
' . . ,
COMMENTS: ~ ~ - • - " ~ ~ -
If you have any questions please call.. Thank you!
~ . . . , .
_ COPY TO: Bill Main, Jr.; Main Corporation SIGNED: . ~ -
- . - . - J .Lee,P.
~ . . - . . . - ,
, . ~ • ,
~
Pre-Design Meeting Notes
Spokane County Engineers Office
Project Name: Project Number: ~h 7.~
Project Sponsor:
Sponsor's Engineer:
Design
Firm: 1~~i Pax-> Engineer:~~"L.
Meeting Date: 1. 8' Meeting Time: ~ p A
County Sta.ffPresent at Meeting: _Zoce~,
Other Meeting Attendees:
naine/representing name/representing
name/represeneing name/representing
The Following Ttems need to be Discussed w/ the Design Engineer
General Items
1 a. List certain special requirements listed in the Conditions of Approval, EIS, or MDNS. This is
not an all-inclusive list. The Engineer and Sponsor is responsible for adhering to all Conditions and
design criteria.
descriptioit reference
dcscription reference
12
description reference
~
/ .2O
description reference
1b. Does the Engineer have a copy of the Examiner's/Staff Conditions of Approval? 3
2. 7nclude Standard Plan notes in the Road and Drainage Plans.
Pre-Design Meeting Notes for Project: Page: 2
Spokane County Public Works
Road Plans l. Road Classifications and Design Criteria.
;
#1 #2 #3 #4
Street Name
Classification L.A. .
~ , _--__....W~..__~~.
Roadway Width, W 5~'
c~Cv t 11 ~
7-6 ~ • •
Minimum right-of-way width
see note (1) C~ l~
C:> v H
- ~
Min. Horiz. Curve w/ super ` t
i
, ~
Nlin. Horiz. Curve w/o super
. ~
General Land Slope/Terrain s
:Design Speed, mph ~
, t
t
Curb Type & Clear Zone
(see Sec. 3.15)
a
~
Sidewalk required? (yes/no) /00 Note (1) Additional right-of-way may be given by the Sponsor.
Discussion: '
2. According to the Design Engineer, what is the maximum number of units which will have
access from a single roadway? . What is the max. allowed per Sec.1.03?e2~:-
3. Minimum intersection spacing is 300' for along a Principal or Minor Arterial (per Sec. 3.04),
and 150' for a Collector or Local Access street. What spacing is provided for this project?
~
,
Prc-Design Meeting Notes for Project: Page: 3
Spokane County Public Works
4. Are any off-site slope easements needed, or off-site right-of-way acquisitions needed? If so,
describe.
~~o.•~ ~e. r ~ ti./1~-~-.
5. What type of turn-arounds are needed? (i.e. cul-de-sac, hammerhead, etc.)
Street Name Turn-around Type Location
ca* S ~•Ju5
6. Road Surfacing Requirements (Sec. 3.16)
a) What method in determining road surfacing requirements does the Design Engineer propose
to use (i.e. AASHTO Design Method, County thickness table, or other)?
~ - ~Lrcc
b) Provide the Design Engr. a copy of the Soil Sample Procedures, Design Report Format &
Alternate Pavement Design Table.
7. Does the Engineer plan on applying for any Design Deviations? If so, briefly describe below.
Please note that approval of all Design Deviation's must be obtained prior to construction
plan submittal.
Storm Drainage
l. Basin Map
a) Did the Design Engineer bring to the meeting a basin map? If so, does the basin
map show topography and sufficient information to be useful?
b) Does the basin map depict any contributing off-site runoff flowing onto the property? !F~~
Does it appear to be correct?,1AF_5. If not, explain.
c) Is a site visit needed to verify the basin limits? Schedule for: .
{Note: Concurrence with County Eilgineer's on basin limits is required prior to plan submittal. }
2. Is the site located within the Aquifer Sensitive Area (ASA)? . What type of water quality treatment is proposed by the Design Engineer?
Si ^
L
Fre-Uesign Meeting Nates For Praject:: Page: 4
Sp0kLTl~ Coli]lt.Y PllblIC WoI`k-S
3, What subsurface inves#igatiorrs, if any, are needed VA'th this praject to rnake sure the
proposed disposal process will.functivn as planned. _
4e
4. Are there dawnstream conditions which will affect the design of drainage facilities. If so
describe possible mitigative measures.
It-)6 .
5. Is mai-ntenance access pravided to each GPA swale or drainage pond? Yf there is somethin,
unusual, what r-equixements were given to the Design F-ngr.?
6 What does the Dev+eloperlEngr. propose for providing for perpetual maintenance of the
drainage facilities? Please briefly describe prapased mechanism, and what is needed to
accomplish this. '
7a. What Design Starm(s) should be used in the course ofanalysis (i_e. 10-yr, 50-yr, etc.).
7b. Is a Detention or Retention systern proposed? Plea.se describe.
02G:5? '_~--e~
8. Are :Erosion Cantrol M.easures required with this project? If sa, bri~fly describe applica.ble
requiretnents.
~
~ .
9. Is a second Pre-Design Meeting needed?
~ .
Pre-Desigii Meeting Notes for Project: Page: 5
Spokane Counry Public Works
List of Documents Provided to the Sponsor's Engineer:
a)
b)
c)
d)
e)
Any ea,sement.s needed outside of the plat boundary, for• drainage or other, ar•e to be acquired pr•ior•
to road and draincrge plan submittal.. The S'pansay or Spvnsvr's Engineer• shall pj•ovide separ•ately .
a legal descyiption and litle Commitment (or- similar• proof vf ownershrp) of'the affected parcel(s)
for propo.sed easement.s.
The S'uhnzittcr.l Checklist, completed artd signed hy the Sporlsor•'s Fngineer•, shaT.l be pi-ovid.ed with
each plan submittal.
Note: Provide a copy of this completetl clocume`zt to tlte Design Engineer rct the end of the pre-
design meeting.
filenamc:PreDesign mceting
~ J
SHELLEY ACRES ADDITION,
~
DRAINAGE REPORT
- Project No. 97-035
June 17, 1999
aASXf~
~
0
~
Q 3089 1
1348~
~ssloNAL
, - EXPIRE8 2/211a, -
' ENGINEER'S STATEMENT:
The design improvements shown in this set of calculations conform to the applicable
, editions of the Spokane County Standards For Road And Sewer Constriiction and the
Spokane County C'ruidelines For Stormwater Mcmagement. All design deviations have
been approved by the Spokane County Engineer. I approve these calculations.
Prepared By:
Metro Engineering, InG pFFIC►AL FUBLie D4CUMENT
S. 324 Sherman St. SpOKANE ('dflUNTY ENGINE-ER'S OFFtCE
Spokane, WA 99202 OR ~
.
t
Ph.. (509) 624-9351 PROJECT#
Fax: (509) 624-8153 SUBMITTAL # ~ RETURN TO COUNTY ENGINEER
DRAINAGE REPORT
Project DescriQtion
The project is Shelley Acres Addition, a proposed thirteen (13) lot plat, located in the
Spokane Valley. The lots will be approximately an acre in size. The project will consist
of one (1) public street (Steen Court) and one (1) private drive (Courtney Lane). Steen
Court will be an extension of 12~' Avenue. Please reference the on-site drainage basin
map, which follows on page B-1, and the design plans.
Drainage Calcutations
Offsite Drainage . There are two (2) offsite drainage basins, labeled A and B(see page A-1). The offsite
flows will be intercepted by ditches that will run along the south and east perimeters of the
plat. Offsite drainage flow was calculated using the SCS TR-55 Method. A 50-year ~
storm event was used for the calculation of runoff. The offsite flow is relatively small.
The calculations for sizing the offsite interception ditches are included in the report (see ~ I
. page A-11 thru A-18) ~
On-Site Drainage
The project urill have five (5) on-site drainage basins (see page B-1). The drainage basins
will drain to standard `208' ponds. Stormwater will infiltrate out of the ponds. Larger
storm events will overflow into the drywells for discharge. The ponds were sized using
the Rational and Bowstring methods, with a 10 yr. storm event. Calculations for sizing
the `208' ponds and drywells are included in the report.
The site is located in Gamson and Phoebe soils per the SCS soils survey (see the soils map
~ located on page B-2), therefore, the use of standard drywells will be allowed. .
The drainage from the streets will be intercepted by curb inlets or catch basins. The
calculations for sizing the inlets, grate and storm sewer line are included in the report.
~
OFFS~
~
r
~ j°~~ • w~~' ~.3
a
x64
,r~,~"'~~.'~ • - - ~ ~
t ~ • ~ . ~ ~z
.
. ~ • ~ ~ ' , ` - •
. • ~ r;k;y . . , xoo .
f ~ . ` - ~ i
~ . ~ {
. " ♦ . , M * ~ ` . .
' ~ t t ' ' ~ ~
_ ~ • • ` •
01 °D
3 ~ • '
,
,
. ~ M 3t
~
, j.
~ -
• ♦ 1` ~ ~ ~
~ •ti ~ ~
1 ~
~4 1 ~ x~Z . , rit ~
•'b••f
f
~ ~ ~ • ' •'t . '
. ti ~ . .
qiw
i
• t
. ! - . .
tt ~ .
;
. . , ;
.
, ; -
' • ~ ~ ' , „ 4e
i
• - .
. ' , r • ~ !
~ o°
. , . ,
. G
.
Qw ' r
T;EI o .
o P,.S
~ - !
~ • "r . ~
SPOKAN E COU NTY, WA'H I NGTON -
R. 44 E. ~ R. 45 E.
• h~ ~ ~ ; s ` _
a• i.~^ ~A, o v ' > ! ~.X4 ' ' "~t. <d'
• , ~ ' ~ i. - I ;~~i+. : , ; , S ` ~ s r► ~ - r.` ' t. ~ r ~ 'Y `'t " ..s~'`~ ~ e ~ r~
' : 5 ~ ~ . • ~ :f , t~.c+~! "t6>' . : ~ ' t ,;i; y`" ~
'si~,i ~ A d„ i„ ♦~~~~e ~ ~ ' ~3! b - ~ K•~' ~
IG
ry't.,' 't d. ' ~ x,~~r; w i:.~:;X~ ,$'J,.°•3, . y. ~ q
'KL~~• y ~ y ~;~:~,..~f' 4" 3 AGl
.~T
~
. ~ ~ • . ~'t~',y ~ ~ • °
~
[~~^y . ti.3 ~ L . , F ff g , T. Y.
T•~ ' CS ` ` ~ ~ ~ • • N. • • ~ y+ j' ~
.~~2 ,y~~~• i:' , Y ~ V , . ~y fJ . , ~~:n`~ ^ ~ 6 Y?v ~<r ~ • .P
Z M..o-, . . ' . ~'r r . . . . •t, , .1~.^e'r
~f~~t, w4,•. ,..t~~,3!1NyI,: ~ w. f ' ' Aa " ~ > . • ' v ' ?,c`':
~/~wt „j„' r " ' • . ' - s ~ t •''P- . t.`^ a ,c,>».a:3
' 1`.a~'^L,w C vf v y ~ ; , d.:«^ Y , ~ ~•rs• ~'t Ng
~ ~i P~ ~ b;.~C+i~t' . ~ , ~ ^?~°(<~S ~ .~~,~Zk•. ~ "t;~<•~. ~?t,.t"-'Y.
~ ~j :'~t: ~ 2, ~ , e . • ' ~ ~ ' a ~~;i.~~ :j'~'~.
m g
. ! ~ ' , ' • iCD ' ~ _ ' ~ . ~
i P' , ♦ ~ ~ d i ' s
; ; . . , , ~ ' • 1C I~ , . . . .
• f` . , ' i. . : , . •
ke .
.6- 14
` ~ • _ ~
, ~ , , ~ . . ` / 4 ~ s~ w~ , , s s . •
~ ~1
: ` , ; . ' ~ N../ ^ ~ `
~ ; •.y. i.:R. S$~ ; • ~
J • Pt~'~r ~
~ ` ~,~C +E.
~ ' ~ `^'~x'. • :'o~~r~~3i'.•y ~ - .~'y~ ~ k' ~ <a~ , ?r • ~ :,~i ' ~ ~ s,~'
1 ~~a t 24' + ~ ~ ~ ~ °~fl• ~ ' •
. ~s- . ~ ~ r:~en~ral Valley
` y `e Y'~~~ ~ " ,"C . p A~ ~ i~~~ •q~~ "
. ~ ~ wCh0 Ol
~'•y_ i ,e~. _ :h 4 # ~ . a4'... p~ ~
• • Fti" ~
~ r• ~ x - ~.~'Y~ ~~4~^~ ~ ~ . .~a t~`.S.' n ~Or'.'Ai ~k . • T~ ~ ~ .Y
~♦w . , ~ ~ - ";b~z~ ' . ~3,~ ,ti<. S. ' f2;• ' . 'O
S ' .~~;:'tt.y. •.y • '~3'*t^.
RN • ; r . , .r . c.'' . ~`3~:.
. ' :.a~• ;~~,j
9 ,F„~y • o ' . :~4~ V,. ~ y. ' ~ - ' • -
~.y;Hf~~ ^ . . y~9"'. ` ~ ~r•~.y .r: A
. , ' Y -a:"~ - ~ r ,a°.~ r.~''.. ' • . ~ ~ -
• . .'f~'~f ~,w>>~• c~--'y ' ' ♦ . !
~
i Jg
" ,.:9~"" f • : K 3 .
~i• ' ' '~`a. •a '
i ' - ~ A~ r~^s~; • ,~i ~x~ w .
.,as . ~
v¢ X - "'~;.~~~;fv • ~ ~xti„ 3.a- ~
HS
~~dt+rfs• . ' `l•~M~~ . 1.?'.~£'~ ' ~ ~`~~in ~ :5. t
~t':~,,,,,~~ ' ~ ` . , ~ T •
V' -v%^zi y~`3~w'~ c^ r~eti. ~;~.45! .y'• ..f~7 ' f
~ ' - . ~ x ; . 74~~ ti W ~~,3T~'•S•S :`,¢'r°' `i ~•.t. f~ . • ,C ' f i ~
~ ~ 5 x f: a..,~~';''~ ~"'~Y'~•i. .
\rVV
\/1
,,~a~,"'~ + < . .'1 .S.>>' •;`,~~~.rE~ ' . 7 ~~r~",.
UhV PSA
~ . , ~ A • ♦ . l ~~Ci{ ~ •~~V
~,,~5 <~~~;^Q~. ~r ~ ' ' . ✓ ' . M~s.,~ ,~,kq ' `~a;,,F . _
i;~~ .~x.- , . • . , , ; - , x .$y~~e~;{ ; ~i- '
A~" ~ ~2~i0 ' `y~ . ' ' : . . ~ i ~ 'S , `4~~a..4" ~~'•l, S ~
. ~r.R~ ~ • ~o:.~ 'i;rn '4i2°ta~ ~S : ~ ~~~~Y .
~ • , v , ,
L
aB
V f/ Y~jS ~ J~• x•~
-+7et~°~ • ~ ~-~j` is` , • 'y'itr i
B • r . y~?' ~7►,'y~ ti"&
UhV
• i~"' Y ~ ~E ' :~wz*: 4"~
s .tr ~ \ . ~ ' ' _ r ; ; . • ,
. . .N~\ • B k Cp 8
\ • p`A ~ ~iY.
! _gA~\
M
o z,
f8 7, . Bf~ SOILS
" tB . " , . ~
. ~
" • .
. .
MAP
A-2.
R c R - • _ . ?~ii1l M = t 11~.-~~`.~rt
~ _
A►S~ A
Si~~, B
pFF
I .
~
-
. V
Quick TR-55 Ver.5.46 S/N:
' Executed: 13:35:29 06-03-1999
'
Of f site Basin A
RUNOFF CURVE NUMBER DATA
.
. .
Composite Area:
AREA CN
SURFACE DESCRIPTION (acres)
~o~r-- -
Forrest (medium stand) q A 3.21 35
Forrest (medium stand) T'y~e! B 7.49 60
COMPOSITE AREA 10.70 52.5 ( 53
,
'
/ I
Quick TR-55 Ver.5.46 S/N:
Executed: 13:51:19 06-03-1999 shelle_y\BASIN A..TCT
Tc calc f.or Basin A
'
TC COMPUTATIONS FOR:
SHEET FLOW (Applicable to Tc only)
Segment ID
Surface description
Manninq'_s roughness coeff., n 0.4000
Flow length, L(total < or = 300) ft 200.0
Tao-yr 24-hr rainfall, p2 in ~.400
Land slope, s ft/ft 0.1500
0.8
.007 * (n*L)
T = hzs_ 0.42 = 0.42
0.5 0.4
P2 * S .
SHALLOW CONCENTRATED FLOW
Segment ID
Surf ace (paved, or VnpavecU ? UnRaved -
_ Flow length, L - ft 1800.0 .
Watercourse slope, s ft/ft Q.1400
0.5
Avg. V = Qs f* (s l f t,( s 6.0370
, where: Unpaved Csf = 16.1345
Paved Caf = 20.3282
T= L /(3600*V) hrs 0.08 = 0.08
CHANNEL- FLOW
' Segment ID CrQss Sectional F1,ow Area, _ a sq.ft 0.00
Wetted perimeter, Pw ft 0.00
' Hydraulic radius, z= a/Pw ft Q..000
Channel slope, s ft/ft 0.0000 Manning's roughness coeff., n 0,0000
, 2/3 1/2
1.49 * r
V = ft/s 0.0000
n
Flow lerlgth, L, f t 0
T= L/ (3600*V) hrs 0.00 = 0.00
• . :
TOTAL T3NiE ('hrs T Q: 5 0
. ~ -s
Quick TR-55 Version: 5.46 S/N: Page 1
Return Freguency: 50 years
TR-55 TABULAR HYDROGR.APH METHOD
- Type II. Distribution
(24 hr. Duration Stonn) ~
Fxecuted: 06-03-1999 13:51:39
Watershed file: SHELLEY\BASIN A MOP ~
Hydrograph file: SHELLEY\BASIN A.HYD
Offsite Basin A
Input Parameters Used to Compute Hxdrograph
U-Subarea AREA CN- Tc - - gt- - Prec~ig. ~ Runof f-- - Fa~p
Descript ion (acres ) _ (hrs Chrs ) . . ( in) _ . (in) -input/used
r0-Te.ao 53.e 0:50 0.00 , Z:s-o F 0.11 1.63 - .so
* Traver t-ime f-rom subarea- outfall- tro composite- wate-rshed au-tfa~l1-point.
I-- Subarea where user specified interpolation-between Ialp tables..
Total area = 1070.00 acreq or 1.6719 sq.mi
Peak discharge = 42 cf s=p p-` p, yZ c-FS
Computer Modifications of Input Parameters
Input Values Rounded- Values - Ia/-p
Subarea Tc * Tt Tc * Tt Interpolated 'Ia/p
Description (hr) (hrZ (hr) (hr) (Yes/No) Messages
0 . 50 Q . " No ~ Eontputed fa/p,> .5
~
* Travel time from subarea outfa:11- to comgosite watershed outfall point.
Tc & Tt are available in the hxdXograph tables.
/`1"~0
v
O-Fvs
I
~
~
QulCk rl'R-55 VE.'r.5.46 SIN;
t ExeGllted: 13:47:36 06=03-1999
.
Offsite baszn B
RLTNOFF CURVE N[JNlBER DA"TA
.
. .
..............~..............................................o~,..
Composi t e Area : _
~ AREA CN
SURFA,CE DESCRIPTION (acres)
Fnrres~ (medium'stand) 'Iype B 1.20 60 ,
~ . . . . . . . . . . , cOMpOs rTE AREA r - _ > 1.20 60.0 4 60
-
} 4 # f i i ~ ~ ~ ~ • ~ • i • Y Y Y
~ •
1 •
~
. ' A-8
.
'
Quick TR-55 Ver.5.46 S/N:
, Executed: 13:46:23 06-03-1999 shelley\BASIN B.TCT
Offsite basin 8
Tc COMPUTATIONS FOR:
SHEET FLOW (Applicable to Tc only)
Segment ID
Surface description Manning's roughness coeff., n 0.4000
Flow length, L(total < or = 300) ft 100.0
T~vo-yr 24-hr rainfall, P2 : in 1.400
Land slope, s ft/ft 0.2DOD
0.8 .
.007 * (n*L)
T = hrs 0.22 = 0.22
0.5 0.4
` P2 * s
SHALLOW .C.ONCEN'I'kATED FLDSq
Segment ID
Surface (paved or unpaved).? Unpaved Flow length, L ft '100.0
Watercourse slope, s ft/ft 0.2000
0.5
Avg.V - Csf * (s) ft/s 7.2156
~ where : Unpaved Csf = 16.1345
Paved Csf = 20.3282
T = L / (3600*V) hrs 0.00 10.-00
CHLANNEL FLOW
~ Segment ID
Cross Sectional Flow Area, a sq.ft 0.00
Wetted perimeter, Pw ft 0.00
' Hydraulic radius, r= a/Pw ft 0.000
Channel slope, s ft/ft 0.0000
Manning's roughness coeff., n 0.0000
.2/3 1/2 1.49 * r * s
V = ft/s 0.0000
n
Flow length, L ft 0
T= L/ (3600*V) hrs 0.00 = 0.00
; ; ; • .
.
TOTAL TIME (hrs) 0.22 ✓
. A- 1
Y
Quick TR-55 Version: 5.46 S/N: Page 1
Return Frequency; 50 years
TR-55 TABULAR HYDROGRAPH METHOD
Type II. Distribution
~ (24 hr. Duration Storm)
EXQcuted: 06-03-1999 13:49:59
Watershed file: SHELLEY\BASINB MOP
Hydrograph file: SHELLEY\BASIN B.HYD
Offsite Basin B
' -
Input Par4meters Used to Compute Hxdrogra2h
t--Subarea AREA CN Tc * Tt Precip. Runoff Ia/p
Description (,acres,) (hrs) (hrs) (in) ` Cin) input/used
120.00 601-.0 0.20 *.00 ~ g.ao ~ ~ e.26 17.4~s :48
* Travel t ime f rom subarea out-f a3 l t-o compos ite watershed- out f-al l pcrirrt
~ I-- Subarea where user specified interpolation between Ia/p tables.
Total area = 12'*0:00 acres or 0.1875 sq.mi
. Peak di's charge = 20 c f s ' v C~S
. lO o = D- 2
Computer Modifications of Input Parameters
1`nput Va•lues - Rotiaded-Valnes I-a/p- .
Subarea Tc * Tt Tc * Tt Znterpolated Za/p
Description (hr) (hr) (hr) (hr) (Yes/No) Messages
0-. 22- 6- . 8 0 0.20 0. 6 0-- Ye s-
* Traver timer f rom subarea out-fa31 to- comrpasit~e- wa~tershed- out-f a-1 I go-int.
~
A- (0
~
~~~~~~E INTERCEPTION
DITCH CALCULATIONS
~ .
~ -
~
A-11
Triangular Channei Anaiysis & Design
Open Channel - Uniform flow
Worksheet Name:
Comment : Intercept ion -Di,.tch. - praining. Bas in A (54,,4--',,, (1 ~ tS• e3~ t o 7+00)
Solve ForDepth
Given Input Data: .
Left Side Slope,, 2,00;1 CH:V)
Right Side Slope. -2. 00 :1 (H : V)
Marining' s n. . . Q ,.Q26
Channel 'Slope . . . . 0 .1842-ft/f t~ S ~,~~5 a ~fa
Pi&.Charge._~• k Q,42 cfs ~i,Co.,tc-~..~~►~%ve -~S ~
~aS' n f~
Computed Results : .Fv rl9
Pe-P.th-• QI2I ft o~~•~,'+y I f~
velocity . . . . . . . . . 4.-99 -fps 4v •
E1-Qw Are-a_. Q.,Q8 sf
Flow Top Width. . . '0.-82 ft O K - le ss ~c ~ S~PS •
Ppri mPt Pr 0.2? f t -
Critical "Depth. . . ' 0 . 3 1-ft
Qriti`cal S1Qpe, ~ 0._Q214 f_t/ft
Froude Number.... '2.75 (flow is-Supercr'itical-)
~
~ .
Qp-ejl~ Qbannel FI.Qw Kodul.e, Version. 3..11 Cc.) .1990
Haestad Methods, Inq. * 37 Brookside Rd *-Waterbury, Ct 06708
A-J7
Triangular Channel Analysis & Design
Open Channel - Uniform flow
~ Worksheet Name:
CommeLLt * ItitexCeption DitCh - Draining Basin B(S~4APAP, $4-9~ /y + z8
Solve For Depth
Given Input Data:
Lef t Si.~e S-lope. 2 . 00 :1 (H : v)
Right Side Slope. 2.00:1 (H:V)
Manning' s n...... O...026
Channel Slope.... 0.2500 ft/ftt
Discharge........ 0.20 cfs
Computed Results: Depth . . . . . . . . . . . . 0 L5 f t
Velocity 4.65 fps L S-~ps 0 0,. Q 4 s f ~
Flow Top Width... 0.59 ft
W2t-t-eLL PPri mPt Pr - 0. _.6.6 f t
Critical Depth... 0.-23 ft
Critical SlopLe..._. 0._.Q236 ft/ft
Froude Number.... . 3.02 -(flow--is Supercritical)
~ l,rDs;D /i Y1+G~ N1'iI b(? l.l.Sed Sl oPPs e>et!F'd_ /0 '0J.
~
~
OR~~ Claann-el Flo_w Module, Versian 3.11 (c) 1_990
Haestad Methods t- Inc.* 37 Brookside Rd Waterbury,, Ct 067-08
13.
V
~
Triangular Channel Analysis & Design
Open Channel - Uniform flow
Worksheet Name:
Comment : Interception Ditch - Draining Basin B~5-~-a~;o~ 7foo +0 8~9Y
Solve For Depth
Given Input. pata :
I~ef-t &icle Slope . . . 2 . QQ ;.1 (H : v)
Right Side Slope. 2. 00.:1 (H : V)
Manning's n. . . 0,.026 ~
, Channel Slope.... 0.2800 ft/ft
g. 0. 2 0_ c f s >~,o•,s~,.,/a ~'fie~ Dbes #1o4-
.
Computed Results:
pepth . ~ . _ 0 ,1,4 f t a K
velocity . . . . . . . . . 4.85 fps 4S f'ps
Flow Area . . . . . . . . 0.: 0.4 sf
Flow Top Width . . . -0 . 57: ft
Wetted Perimeter,- Q_Ez.4 f t
Critical Depth... '0.-23 ft
Critical Slope.. . O..Q236 ft/,ft
Froude -Number 3.1-9 ( f 1 ow is Supercrit i cai )
~c 6cse' ~ Slur PS ex<P,-d /o
,
' Qpe-n Channe-I Fjow MQdule,,. Version 3..11 1990 Haeqtad Methods,,. Iur,.. * 3.7.Brookside Rd.* ,Waterbury,. Ct 0-6708 .
A-~~
. v
~
H~'I E CU. • - - - • - - - . . r . c-
f;~,.ri 1~.~.~ ~::~,fc r►~Q. ~aA~.rc~~ ~~~d .r~ r8, ~R ~ Z.
• 7 • 1 A (A)
Exhibit 7-3; !'ermissible velocity for vageiation-lines waterways and
oUtlets. 1/ (wAShington State Supplemcnt) -
1:ros lon ~ F,rosion
rest.stunt susceptible
. . S1oPe?~ soils sails
Cover " rr~~e
"K" less than .31 areater than .33
tMsec) M7 s e c
. )
bentgrass-I 0-5 8 6
mcadow foxteil 5-30 7
S-
- creeping foxtail over 10 6 4•
^ chewings, red, herd and sheep
~y fescues ~ Kentucky bluegrass . ~ smooth brome p_S . 7 S
~ tall fescue 5•10 6 q
-p timathy , over 10
Q6 orchardgre'ss
k
~ pube9cent, ntermediete.,N tN.,4~wl vK~-~- abv~-e,
thickspike, streamban~
, . ,
reed canarygrass 0-5 3` S
`-'5-10 q 3
,
~ crested wheatgrass .
Siberian wheatgrass r
~ perennial ryegrass 3 '
annual ryegrass a/ 0-5- 3,5 2,g
sudangra9s 4/ .
small grains d/
,
. t '
w
1/ Use velocities exceeding S feet per second only rrhere good,stands and
praper mainteriance can be obtained..
, 1/ Do not use on slopes steeper thnn 10 percent except for revegetated side
slopes in combination with n stone or concrete center section,
3! po not use on slopes steeper than S percent except'for vegetated side
slopes in combination with a stone, concrete, or hi.ghly resistant
vagetative center section.
4/ Annuals--use on less than S Percent slopes or as temporary cover until
~ permanent cover is established.
. - l~
~ -3-
~
~ WIND
SOIL SURFACE :SLOPE :CAP. :EROD.
SYMBOL ~ SOIL NAME ~ TEXTURE :RANGE :NIRR ~ K~ T:GROUP
GgA ;GARRISON ;GR-L ; 0- 5: 3S : 0.17; 2: 6
G96 :GARRISON ;GR-L ~ 5-20: 3E : 0.17: 2: 6
Gm8 ;GARRISON :GRV-L ; 0- 8; 3E : 0.15: 2; 7
GnB ; GARR I SON :STV-L ~ 0-20: 6S : 0. 10 : 2: 7
GpA ;GLENROSE ;SII. ~ 0- 5: 2C : 0.32: 5: 5
G p6 ; GI.ENROSE :S I L ~ 5-241; 3E : 0. 32 : 5: 5
GpC :GLENROSE :SIL ; 20-30: 4E ; 0.32: 5: 5
GpD :GLENROSE :SII. : 30-40: 6E : 0.32: 5: 5
GpD :GLENROSE :SIL ~ 40-55; 7E ; 0.32: 5: 5
rr6 ;GLENROSE ;GR-SIL ~ 5-20: 3E : 0.24: 5: 6
Gr0 ;GLENROSE :GR-SIL ~ 30-40: 6E : 0.24: 5; 6
Gr0 ;GLENROSE :GR-SIL ~ 40-55: 7E : 0.24: 5: 6
G s D ; GLENROSE ; ST-S I L : 20-40: 6E : 0. 32 : 5:- 6
GsD :GLENROSE :ST-SIL : 40-55; 7E : 0.32: S: 6
G tA ; GREEN BLUFF - ':S I L ~ 0- 5: 2C ; 0. 32 : 5; 5
G t6 :GREEN BLUFF :S I L ~ 5-20 ; 3E : 0. 3z : 5: 5
~ Hf C ; HAGEN :LFS ~ 0_30 : 4E : ~1. 32 : 5: 2
Hg8 :HAGEN :SL ~ 0 20: 3E : 0.24: 3: 3
-#4 HhA ; HAROESTY ; SJ-L ~ 0- 5 ; 2W : 0. 43 : 5 : 5
*ItNmA :HAROESTY ;S I L 0- 5; 3S : 41. 43 : 2: 5
HnB :HESSELTINE :SIL ~ 0-10: 3E ; 0.37: 2: 5
H oB :HESSELT I NE ~ S I L ; 0- 8; 3E - : 0. 37 ; 2: 5
Nr6 :HESSELTINE :GR-SIL ~ 0-10: 3E : 0 24: 2; 6
H sB : HESSELT I NE :ST-S I L ~ 0-20 : 4S VQf . 24'; 2: E
44 H tB :HESSELT I NE ; ST-S I L ~ 0- 6; 6S 24 : 2: 6 Ht6 :HESSELTINE :SIL . ~ 0- S: 6E : 0.32: 2: S
44HvC :HESSELTINE :SIL ~ 0-10: 6E : 0.32: 2: 5
*-WHvC , ; ROCKLY . :STX-L ~ 2-30: 7S : 0. 10 : 1; 8
HvD. ;HESSELTINE :SIL ; 30-50; 7E : 0.32: 2; 5
HvD :ROCK OUTCROP ;UWB : 30-50: 6S
~ HvD :ROCKLY ;STX-L : 30-55; 7S ; 0.10: 1: 8
44HxC :ROCK'OUTCROP :UWB ; 0-341; BS
4*HxC :ROCKLY :STX-L ~ 2-30 : 7S ; 0. 141 : 1 ; 8
t*H xC :HESSELT I NE :S I L ; 0-1 Q1 : 6E ~ 0. 32 : 2: 5 -t-Y Kc :KONNER ; S I CL ~ 0- 2: 6W ~ 0. 28 ; 5; 7
iCiVKd ; K(1NNER, DRA I NED :S I CL ~ 0- . 2: 3W :'0. 28 ; 5: ?
~ LaB :LAKESOL :SII. ; 2-20; 3E ; -0 ..32~ 5; 5
L aD :LAKESOL - :S I L ; 341-40 : 6E ~ . ' 5. . 5
La0 :LAKESOL :SIL ; 40-55: 7E ; .3 V, 5; 5 LeA :LAKETON :SIL ; 0- 5; 2E ~0.37; 5; 5
Le8 :LAKETON :SIL ; 5-20: 3E ~0.37: 5; 5
LfA ;LAKETON :FSL ;0- 5: 2E ~0.32: 5; 3
LmC :LANCE :SIL ~ 0-30: 4E ~ 0.55: 5; 4L
LmC3 ;LANCE ;SIL ~ 0-30: 4E ~ 0.55;* 5: 4L LnA?_ :LARKIN :SIL ~ 0- 5: 2C ~ 0.32 : 5; '
Ln82 :LARKIN :SIL ~ 5-20: 4E ~ 0.32; 5:
Ln02 :LARKIN ;SIL : 20-30: 6E ~ 0.32; 5;
LnD2 :LARKIN :SIL : 30-45: 6E ~ 0.32: 5: , •
L t :LATAH :S I L ~ QS- 3: 6W ; Q) . 32 : 5: 6
f~,et/ 114 ve 1' lit~,E~f ~ 3- 8G
~di~t~c ' 1NGt ~lliv,v'~' 4/- 86
Co - y8
!4_
WIND .
~GROup
~
, SLppE , NIRR
~ ,
R A~GE Cpp
4
SURFA
T y~TURE ' 0 'Zo 51, E , q~ , Z
~
~ 4E ~ ' 24S, ~ ~ : 3
0_30
50JL -34~ . 0, 24% , 5
SYMgOL 0 _ ~E ' 37 ~ 5~ 5
•
MARgLE ' ~'co S ' 0 ; W ' 0
, 0, 37 ~ 2 ~ 5
b Z 30: Z4E ~,0.37 ' 2; 5
M aC ~ MARgLE V AR I AST IL _
E . , _4E
0.37 5
I MARB '
4
t4ONppV I S~L ~~-55 ~ 7E ; W • 37; 5
,
d , MascOW S 6E 5
MmC ~ 05CpW S Z ~ 0 ~ ~ 6E ; ~ . 37 % S
~
Mmp I M ; t- - : 30
os _55 ; 7 E ; 0, 37 % 1 • .
m~ ; M gCW aW . . ~ L ~ 4~
M°C Mvsc°W - ~-34~ ~ 8s ~ g)•37
MoO ; MOSC~~ T 31 ~-65 ! . g5 ; 5.4 6
- MOO . ; MOS~ cROP , L , 30-65 ~S .37 ; ~
- MsC -RpCK W ; ~W ; o_ 5 % ZC ; 0~}.3'~ ; 5 ; 6
B 2
M 5~ ; MOSK ~V.~CRflp SZL 5 ; , 37 s 5
3E ; 3? ~
M RpC , ~,~L , 5_~5► 0.
! { F
MSE ; NAFF 30 4E ` 0. 37 ~ ; 6
NaA ~ NpFF ; SIL ; 1 5_30% 4E. ~ 00 ~7 ' 55 ; fi
NaA2 ; %AFF ~ SI~,. ~~y-15 ~ ~E ; 0.37s 6
,
NaC ' NA FF . .5I~' ' 15__34~45, ~ 6E 1 ; ~y,37%
~ +
NaC2 ~ NpFF ;SI` ; 30~_ 5 ~ ~W ; Q~ .3~ ; s %
; .
NaC3 NAFF 51~" _ 5; 3E`E 0 ,37 5 1,
2r._24~ : ~ ~ ~ ,37 ~ ~5
' IyaG3 ~ NpFf E SY,.
J Naa2 ; NARCI's E 'IL ~ 5_2q~ % 3E 0, e~3 ~ Z. 5
N~~ PE RCE - ; SIL ; 0,20% ; 4E . ; 0. 43 s , 5' s
A , ~ 32
PE 6
NP , NEZ ERCE , SIL , ZQ~-3~ ~ 3E ; • , 5;
N PB NEZ P - 15 ~ . ; {~'32 ~ , 5
E
N P83 ; p a~~~~' ~-3~ ~ aE
p aB , PaLQUSE '~Z~' 15 _30 ; 4E
, S 1 • 4~
F' a CZ P aLaU SE g~i 1.,, 4 2--34~ $S . r; 3~ Z;
$
PA LpuSE 0,30' ?E ~ ~ 4~.4 1
gbC2 '
C , P A ~ UWB , 3Q~ -65 ~ ? s ; ~ • ~ ~
P GC '~ROc LK ~VTCR~P ' SIt" _ i' ~J ~ $s ~ .37 ' S : 15
5
~ R gv L ' 3~ ~ 0 •
P~C ;
ppLOUSE ',CB , 0- 5', 4W 3
~ ~d✓~~';~~
P aE ; RQCKLY ' UW ` 5~ 3W
K ~uT CROP ; s I 1.. ' _ 5~ ZE , 0.2
4
FJ
pCE '•Ro pNE ED ' SIL ~ 0 o ~ ~ .37 ~ 3r; 6
~PeA PE pRAIN 0_
6
~P 5; ZC 0,37 ~ 3 ~4
~PEpNE~
BE • ~L ~ 3E 3
oA PHaE -20-, , Q~ . 3 4 ,
3; 6
p s A . ;PHpEBE ~-2{~ ; 3E 0. 37'
8
.
Psg S RF-ARppN 3~ 4E . ,
N ~SIL ~ 2o- 1SW
RdA ►REARDA _ 3,
~
R dS . 3 ; REAROAN GRy -Cas 0-60 1a5 4 ; QS . 32 3 ; 5
~N 5
RdB2 aEARa
R dGZ : ~JERW~`SH :'~WB ; +~-2~~ ; 3~ ; ~ • 3Z`~ ~ ;
~Rh ; RpCK OuTCROP ' SIL ' ~ 34~,~ 4E 0 . a~,fi ~ 3 r $ G
R o sCNUMa~H ER ; s I1- ; 2~ 1
J Sag .SCHVMa lo
c SI ' _~lg
SaB2 ~SCHUMACHER
l~
S aC
" Gu/S✓
klYOR/c
■ „ W4
r
' -5
. ~
WINO
SOIL ; : SURFACE :SLOPE :CAP. ; ; ;EROD.
SYMBOL ~ SOIL NAME : TEXTURE :RANGE :NIRR : K~ T;GROUP
SaC2 ; SCHUMACHER :SIL : 20-30; 4E : 0.32 : 3: 5
SaD :SCHUMACHER :S I L : 341-40: 6E : 0. 32 : 3: 5
Sa0 ;SCHUMACHER ;SIL : 40-55: 7E : 0.32: 3: 5
ScC :SCHUMACHER :GR-S Il. ~ 5-30; 4E : 0. 241 : 3: 6
ScC2 :SCHUMACHER :GR-SIL ~ 5-341: 4E ; 0.20; 3: 6
ScD .:SCHUMACHER :GR-SIL ► 30-40; 6E : 0.20: a: 6
ScD :SCHUMACHER :GR-SIL : 40-55: 7E : 0.20; 3: 6
ScD2 :SCHUMACHER ;GR-SIL,' : 30-40: 6E : 0.20: 3: 6
Sc02 :SCHUMACHER ' :GR-SIL : 40-55: 7E : 0.20; 3; 6
*S e ; SEM I AHM00 ' :MUCK ; o- 1 : "SW : 0 . 00; 5 : .
tcS k :SEM I ANM0O , :MUCK ; 0- 2; 2W : 0. 410 ; 5;
: DRAINEO 11 • ,
-ieSm :SEMIAHM009 OR., :MUCK ; 0- 2; 3W ; 0,00; 2: 2
: MOD. SHALLOW
SnA :SNOW ;SIL ; 0- 5; 2C ~ 0.32: 5: 5
SnC :SNOW :SIL ~ 5-15; 3E ~ 0.32:. 5: 5
SnC :SNOW :S I L ~ 15-30; 4E ; 0. 32 : 5: 5
~ S oE :SPE I GLE :STV-S I! ; 30-70: 7S ; 0. 20 ; 5; 7
SpC :SNOKANE ;L ~ 0-30; 4E ; 0.28; 2: 5
SpD :SPOKANE ; L ; 30-40:-6E : 0. 28; 2: 5
S p0 ;SPOKANE :L ~ 4 0- 5 5: 7 E ; Q t. 2 8; 2; 5 .
SrC ;SPOKANE :ST-l. ; 0-30: 6S ' : 0.24; 2: 6
SrE :SPOKANE :ST-L : 30-40; 6E : 0.24: 2: 6 S rE :SPOKANE :ST-L : 40-65 ; 7E 41. 24 : 2: 6
SsC :SPOKANE ;L ; 0-30; 4E : 0.28; 2; 5
SsC ;SKANID :L ~ 0-30: 6E : 0.37; 1; 5
SsE :SPOKANE :L- ; 30-65; 7E : 41.28; 2; 5
SsE :SKANID :L ; 30-65: 7E : 0.37; 1•: 5
StC :SPOKANE :ST-l. ~ 0-30; 6S ~ 0.24; 2; 6
Str ;ROCK OUTCROP ;Uw6 ; 0-30; 8S
~ StE :SPOKANE ;ST-L ; 30_65; 7E ~ ~J.24; 2; 6
S tE ; ROCK OUTCROP ; UWB ; 30 7(d ; 8S
SuE ;ROCK OUTCROP ;UWB ; 20-741; 8S
SuE :SPOKANE* ;ST-L : 20-65; 7E ; 0.24; 2; 6
~ Sw8 :SPR I NGDALE ; GR-SL ~ 0-20 ; 4E ~ 0. 15 1!: 4
Sx6 ;SPRINGDALE :GR-SL ; 0-20; 4E ~ 0.15: .2: 1 4
Sy8 ;SPRINGDALE ;CB-SL ; 0-20; 6E 1; 4
# 5; 2
SzE :SPRINGOALE :GR-LS ; 40-741: 7S ;.10
' ~ ~ , TeB ,TEKOA
,GR-SIL 5-20: 4E ; 0.24: 2; 6
TeC ;TEKOA :GR-SIL ~ 20-30: 4E : 0.24; 2; 6
TeD ;TEKOA :GR-SIL ; 30-40; 6E ; 0.24; 2; 6
Te0 ;TEKOA :GR-SIL ~ 40-55: 7E ; 0.24: 2: e
Tk0 ;TEKOA :GR-SIL ~ 30-55: 7E 0.24: 2; 6
Tk0 ;ROCK OUTCROP :UWB ~ 25-55: 8S
UhA ;UHLIG :SIL ~ 0- 5~ 2C 5; 5
j UhB ; UHLIG :SIL ~ 5-20, 3ET~ ; 0.37 5~ 5~
UmC ;UHLIG VARIANT :SIL ~ 5-15: 3E : 0.37; 2; 5
UmC ;UHLIG VARIANT :SIL ~ 15-30: 4E ; 0.37; 2: 5 VaC :VASSAR ; SIL ~ 5-15 : 6E : 0.32 : 3 ~ Z/J.. i.:. '
litl64: 3- SG . '
y- SG .~S- 5G _
ys A- l8
~
~1A~~
. ~►N-51
l
-
~ • • V'a : Q)
M ~ C'~? C7 ' :
- . . a o ~ O Z
~ ' . c~ z ~ ~ i ~
. - 200 U ~ , L 0 U
~oa ~ ~ . ~o w . c 4 ~ ~ ~a
- Q ~ r . „ p Q~ _ ~o 0 A
, 1 p ~ A~E~. . SC
/ ~
. AT~ ~
~P . ~ ~ ~ ~ . ~ , , . ~
. . • , s . R . E ~ E . _Ul 1 ~
I ~ _ . , ~ . ~ . R . . , . E , , , , P . . o - ~ ~
N ~ ~ ~ , - . . _ . . A: . B ~ CD
' ~ ` ` Q 0~' n . ~ q : ) ' % ~ r ~i ~ ~ ~
' y~~ „ ..i , . . 1 ' / ~o • ` ti , . ~ , . i Y y~G► R' , ~ ~ ~ , ~l , ' Z m
~ , . ~~u✓~e`~ , r- , . _ . / . ~ . ~ % q~ \
' ' . , / ~ ~ , . ' ~ ''V \ ~ . ~ , • . Q m ~1
4 ~ . , . . . , . . ' ~ ~ ~ . . ' . . ~ , . • ~ ao~ . , ,
. , ~ ~ _ , ~ ~ - ! 9 . . . . , . ~t ~ , .
, ~ . , no ~ . ' ' } ~ . ~ ':~a ' . ~
~ < < . . ~y~ ~ . . ~ , . , . , ~ ~n . . .
, ~I ~a ~ ~ ~ ~ . . ~ ''n ~ ` , ~ ~ a • es . . i • , , , , • ~ , . ~ ~
li ~ ' • ' y. . . • • • ~ . . `ti`n `
' I•~~7 , ' i , . • ~''J ~ . ~ . Y p, 1 ~ ~ .
p . ' . ~ . ~ap':p~ . , ' ` ~p~' ~ ~ ' , ~ „ ' ~
. . , . . . ~ • ° . . . . • . . . . vpGS • ~ . , ~~^c ~ . ~
~ , ._.r, ~~,~j►. . . . . . ~ • , I~"~4 e2+'i . . ~ •?oba~ • ~ , ~ • ~ , . ' ' ~ . ~ ; . ~ ~ , . ~ ~ . ~ . . .
~ ~,J~`~ ~ ~ "rQoS . , i . ~ , . . ~ ~ ~ ' ~o ♦ ~ ~ ~ ~ ~ ~w . , • ~ r
, . . ;r • . ,opK? • , , • . . • • ' , . , ' .
' ~ ' . . . , ~ V ' - ' ~ ' , . • ,RQ„~h ~ . . ~ . . . . . . ' ~ " . . , , ~ ' C8 ~
' ' . . „ N,` . , ~ . , . F.. ~ . Yr ~ . . ..7~i . _ . ~ / ~N CP rt)
, , , ' W . . . , , , . 0) cv)
. . ~ . ~ , . .
• , , , ~ ' , ~ r . . 3 - 0 LO ►
. ~ ' < < ' . t~ ~
. . ~ ..........-:~:4•.....• ~ - _ _ t--•' N Z ~ ~ ~Q~
. ~ . . + 4 f . tt , ~ . ~ ~
• A ~ ~ • 1N _gAS ~ b. ~ B ~ tJj 0..~..~
. S~ reet o ~ ' St r , aed ~n pnd o ~ ~ 41►1
inclu in P . . ot ~ dea , N ~clv ~ . ~ . , hvt . . w
- w, 1 . . f~o . - c~ ~ ' x X (D
~ ~o:,~ . c.~ . . . . _ . . ?rl C) C .
0 R . ~p E N ~ T N ~
3s ,cco'• IV ~ t ~ Z . . ~ E . P ~ Z ~
. . ~ m I ~ . ~ . _ A , ~ CD Ln r~
. . B ~ . o . . . , , , ~ O
- ~
~ ~ , a ~ ~
~ . ~ ~ ' . ~
. / ~ /
r
rv'~~ ~
~ '
~ ~ 1
r ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ i ~ ~
SHELLEY ACRES ADDITION
POST DEVELOPMENT BASIN DATA
BASIN BASIN AREA BASIN AREA 208 TOTAL PERVIOUS COMPOSITE
SQ. FEET ACRES IMPERVIOUS IMPERVIOUS , AREA C-VALUE
AREA AREA ACRES ' SQ.FEET ACRES
SQ. FEET SQ. FEET
A 192,535 4.42 11,660 21,654 0,50 170,885 3,92 0.2
B 86,249 1.98 11,186 16,186 0.37 70,063 1.61 0,3
C 142,877 3.28 22,428 32,428 0.74 110,449 2.54 0,3
D 47,045 1.08 8,523 11,023 0.25 36,022 0.63 0.3
E 36,284 0.81 6,063 8,563 0.20 26,731 0.61 0.3
Notes; ' • 1} 208 impervlous area includes the streets and 600 s.L for each driveway.
2) Total impervious area includes the street, driwvay and 2500 s.f. home on each lot. '-W
l
N
'
BOWSTRING METHOD (TEN YEAR STORM DESIGN) PROJECT: SHELLEY ACRES
DETENTION BASIN DESIGN BASIN: A
DESIGNER: JGL
DATE: 4-Mar-99
Total Area (calc. )(see H 1) 4.42 -
Time of Conc. (calc.) (see H1) 5.00
Composite "C" (calc.) (see 1-11) 0.23
Time of Conc. (min) 5.00
Area (Acres) 4.42 /
C' Factor 0.23 ~
208 Impervious Area (sq. ft. ) 11650 972 Pond floor area
Volume Provided (cu. ft. ) 208: 782 storm (total): 1300
surface: 1300
u/g: 0
Outflow (cfs) 1 0.00
Area • C" Factor 1.04
#1 #2 #3 #4 #5 #fi #7
Time Time Intensity Q dev. V in V out Storage
Inc. Inc.
(min. ) (sec. ) (in./hr. ) (cfs) (cu. ft. ) (cu. ft. ) (cu. ft. )
(#1 t60) (A•C*#3) (Outf.`#2) (#5-#6)
5.00 300.00 3.18 3.30 1327 300.00 1027
5 300 3.18 3.30 1327 300.00 1027
10 600 2.24 2.33 1632 600.00 1032
15 900 1.77 1.84 1841 . 900.00 941
20 1200 1.45 1.51 1960 1200.00 760
25 1500 1.21 1.26 2012 1500.00 512 -
30 1800 1.04 1.08 2053 1800.00 253
35 2100 0.91 0.94 2080 2100.00 -20
40 2400 0.82 0.85 2130 2400.00 -270
45 2700 0.74 0.77 2152 2700.00 -548
50 3000 0.68 0.71 2190 3000.00 -810
' 55 3300 0.64 0.66 2264 3300.00 -1040
60 3600 0.61 0.63 2344 3600.00 -1256
' 65 3900 0.60 0.62 2492 3900.00 -1408
70 4200 0.58 0.60 2590 4200.00 -1610
• 75 4500 0.56 0.58 2675 4500.00 -1825
80 4800 0.53 0.55 2697 4800.00 -2103
85 5100 0.52 0.54 2808 5100.00 -2292
90 5400 0.50 0.52 2856 5400.00 -2544
95 5700 0.49 0.51 2951 5700.00 -2749
100 6000 0.48 0.50 3040 6000.00 -2960 •
"208" CALCULATIONS
Required grassy swale pond storage volume
= Impervious Area x.5 in./ 12 in./ft. = 485 cu. ft.
provided: 782 cu. ft. OK!
10 YEAR DESIGN STORM-STORAGE CALCULATION
Maximum storage required by Bowstring = 1032 cu. ft.
provided: 1300 cu. ft. OK!
5-3
' PROJECT: SHELLEY ACRES
RATIONAL EQUATION (FLOW CALCULATION) . BASIN: A
DESIGNER: JGL
DATE: 04-Mar-99
Tc (overland) Tc (gutter) Areas °C' A'C
Ct = 0.15 L2 = 550,/ 0.50 0.90 0.45
Z1 = 50.0 3.92 0.15 0.588
L1(A) = 100 j Z2 = 3.0 0.00 0.90 0
N(A) = 0.4 B= 0 0.00 0.00 0
S(A) = 0.2 ~ n= 0.016 0.00 0.00 0
' s= 0.4001 0.00 0.00 0
Tc (A) = 2.22 d= 0.119 0.00 0.00 0
. . , Total A Comp "C"
L1(B) = 0 Tc (gu) = 1.03 4.42 0.23
N(B) = 0
S(B) = 0 Tc(A+B) = 2.22
Q=C*I"A= 3.30
Tc (B) = 0.0
Tc(tot.) = 5.00 Q(est.) = 3.31 .
Intensity = 3.18
A = 0.372119625
WP = 6.3009
' R = 0.0591
V = 8.90
Tc (total) = Tc (overland) + Tc (gutter) Tc(gu) = 1.03 Tc (overland) = Ct'(L1'N/S"0.5)^0.6) Q(est) = 3.31
Ct = 0.15
L1 = Length of Overiand Flow Holding = 19.60
N= friction factor of overland flow (.4 for average grass cover)
S= average slope of overland flow
Tc (gutter) = Length (ft.)Nelocity (ft./sec.)/60 B= Bottom width of gutter or ditch
21 = inverse of cross slope one of ditch
Z2 = inverse of cross-slope two of ditch -
d= depth of flow in gutter (estimate, check estimate with Flow) .
Area = d'B+d^2/2'(Z1+Z2)
~ Wetted perimeter_ B*d+(1/sin(atn(121))+1/sin(atn(122)))
Hydraulic Radius - R- Area/Wetted Penmeter
Velocity = 1.486/n"R^.667's^.5
Flow = Velocity'Area
n = 0.016 for asphalt
s= longitudinal slope of gutter ~ .
. 13
1 '
~ BOWSTRING METHOD (TEN YEAR STORM DESIGN) PROJECT: SHELLEY ACRES
DRAINAGE SWALE DESIGN BASIN: B
DESIGNER: JGL
DATE: 4-Mar-99
Total Area (calc.) (see H1) 1.98
Time of Conc. (calc.) (see H1) 6.69
Composite "C" (calc.) (see 1-11) 0.29
Time of Conc. (min) 6.69
Area (Acres) . 1.98
~ C' Factor 0.29 ~
208 Impervious Area (sq. ft) 11186 936 Pond floor area
Volume Provided (cu. ft.) 208: 62$ storm (total): 1255
surface: 1255
- , u/g: 0 -
-Outflow (cfs) . . 1 0.00
Area ' C" Factor 0.57
#1 #2 #3 #4 #5 #fi #7
Time Time Intensity Q dev. V in V out Storage
Inc. Inc.
~ (min.) (sec.) (in./hr.) (cfs) (cu. ft_) (cu. ft.) (cu. ft.)
(#1'60) (A*C'#3) (Outf.'#2) (#S-#S)
6.69 401.40 2.86 1.64 884 401.40 483
5 300 3.18 . 1.83 734 300.00 434 10 600 2.24 1.29 948 600.00 348
15 900 1.77 1.02 1054 900.00 154
20 1200 1.45 0.83 1113 1200.00 -87
25 1500 1.21 0.70 1138 1500.00 -362
30 1800 1.04 0.60 1157 1800.00 -643
35 2100 0.91 0.52 1169 2100.00 -931
40 2400 0.82 0.47 1195 2400.00 -1205
45 2700 0.74 0.43 1206 2700.00 -1494
50 3000 0.68 0.39 1225 3000.00 -1775
55 3300 0.64 0.37 1264 3300.00 -2036
60 3600 0.61 0.35 1309 3600.00 -2291
65 3900 0.60 0.34 1391 3900.00 -2509
70 4200 0.58 0.33 1445 . 4200.00 -2755
75 4500 0.56 0.32 1492 4500.00 -3008
80 4800 0.53 0.30 1503 4800.00 -3297
85 5100 0.52 0.30 1564 5100.00 -3536
90 5400 0.50 0.29 1590 5400.00 -3810
95 5700 0.49 0.28 1643 5700.00 -4057
100 6000 0.48 0.28 1692 6000.00 -4308
~
"208" CALCULATIONS
Required grassy swale pond storage volume
= Impervious Area x.5 in./ 12 in.ift. = 466 cu. ft.
provided: 628 cu. ft. OK!
10 YEAR DESIGN STORM-STORAGE CALCULATION
Maximum storage required by Bowstring = 483 cu. ft.
provided: 1255 cu. ft. OK!
~ -S
~ .
PROJECT: SHELLEY ACRES
RATIONAL EGlUATION (FLOW CALCULATION) BASIN: B
DESIGNER: JGL
DATE: 04-Mar-99
Tc (overland) Tc (gutter) Areas "C" A'C
Ct = 0.15 L2 = 5501 0.37 0.90 0.333
Z1 = 50.0 1.61 0.15 0.2415
L1(A) = 100' Z2 = 3.0 0.00 0.90 0
N(A) = 0.4 B= 0 0.00 0.00 0
S(A) = 0.01 n= 0.0164 0.00 0.00 0
s= 0.400 ~ 0.00 0.00 0
Tc (A) = 5.46 d= . 0.091 0.00 0.00 0
• Total A Comp "C"
L1(B) = 0 Tc (gu) = 1.23 1.98 0.29
N(B) = 0 S(B) = 0 Tc(A+B) = 5.46
Q=C'I'A= 1.64
Tc (B) = 0.0
Tc(tot.) = 6.69 Q(est) = 1.64
Intensity = 2.86
A = 0.2194465
WP = 4.8387
R = 0.0454
. V = 7.46
Tc (total) = Tc (overland) + Tc (gutter) Tc(gu) = 1.23
Tc (ovedand) = Ct'(L1'N/S^0.5)^0.6) Q(est) = 1.64 '
Ct = 0.15
L1 = Length of Overland Flow Holding = 19.60
N= friction factor of overland flow (.4 for average grass cover)
S= average slope of overland flow •
Tc (gutter) = Length (ft.)Nelocity (ft./sec.)/60
B= Bottom width of gutter or ditch
Z1 = inverse of cross slope one of ditch
Z2 = inverse of cross slope two of ditch .
d= depth of flow in gutter (estimate, check estimate with Flow) Area = d'B+d"22"(Z1+Z2) .
Wetted perimeter = B'd+(1/sin(atn(121))+1/sin(atn(1/Z2)))
Hydraulic Radius = R= Area/Wetted Perimeter
Velocity = 1.486/n•R".667's".5
Flow = Velocity'Area
n = 0.016 for asphalt
s= longitudinal slope of gutter
13~b
'
BOWSTRING METHOD (TEN YEAR STORM DESIGN) PROJECT: SHELLEY ACRES
DETENTION BASIN DESIGN BASIN: C
DESIGNER: JGL
DATE: 5-Mar-99
Total Area (calc.) (see H1) 3.28
Time of Conc. (calc.) (see H1) 6.16
Composite "C" (calc.) (see H1) 0.32
Time of Conc. (min) 6.16
Area (Acres) 3.28 -
C' Factor 0.32
208 Impervious Area (sq. ft.) 22428 1686Pond floor area
Volume Provided (cu. ft.) 208: 1122 storm (total): 2245
surface: 2245
. . _ , u/g: 0
Outflow (cfs) 1 0.00
Area * C" Factor 1.05
#1 #2 #3 #4 #5 #6 #7
Time Time Intensity Q dev. V in V out Storage
Inc. Inc.
(min.) (sec.) (in.lhr.) (cis) (cu. ft.) (cu. ft.) (cu. ft.)
(#1 "60) (A`C-#3) (Outf.*#2) (#5-#6)
6.16 369.69 2.96 3.10 1536 369.69 1166
5 300 3.18 .3.33 1338 300.00 1038
10 600 2.24. 2.35 1702 600.00 1102 .
' 15 900 1.77 1.85 1901 900.00 1001
20 1200 1.45 1.52 2013 1200.00 813
25 1500 1.21 1.27 2060 1500.00 560
30 1800 1.04 1.09 2097 1800.00 297
35 2100 0.91 0.95 2121 2100.00 21
40 2400 0.82 0.86 2168 2400.00 -232
45 2700 0.74 0.77 2189 2700.00 -511
50 3000 0.68 0.71 2225 3000.00 -775
55 3300 0.64 0.67 2295 3300.00 -1005
60 3600 0.61 0.64 2379 3600.00 -1221
65 3900 0.60 0.63 2529 3900.00 -1371
70 4200 0.58 0.61 2627 4200.00 -1573
75 4500 0.56 0.59 2712 4500.00 -1788
80 4800 0.53 0.55 2733 4800.00 -2067
85 5100 0.52 0.54 2845 5100.00 -2255
' 90 5400 0.50 0.52 2893 5400.00 -2507
95 5700 0.49 0.51 2989 5700.00 -2711
100 6000 0.48 0.50 3079 6000.00 -2921
"208" CALCUTATIONS Required grassy swale pond storage volume = Impervious Area x.5 in./ 12 in.fft. = 935 cu. ft.
provided: 1122 cu. ft. OK!
10 YEAR DESIGN STORM-STORAGE CALCULATION
Ma)amum storage required by Bowstdng = 1166 cu. ft.
provided: 2245 cu. ft. OK!
a-7
~ - -
r PROJECT: SHELLEY ACRES
RATIONAL EQUATION (FLOW CALCULATION) BASIN: C
DESIGNER: JGL
DATE: 05-Mar-99
Tc (overland) Tc (gutter) Areas "C" A'C
Ct = 0.15 L2 = 400 ~ 0.74 0.90 0.666
Z1 = 50.0 2.54 0.15 0.381
L1(A) = 100 ~ Z2 = 3.0 0.00 0.90 0
N(A) = 0.4 B= 0 0.00 0.00 0
S(A) = 0.01 ~ n= 0.016 / 0.00 0.00 0
s= 0.500✓ 0.00 0.00 0
Tc (A) = 5.46 . d= 0.111 0.00 0.00 0
. Total A Comp "C"
- L1(B) = 0 Tc (gu) = 0.70 3.28 0.32
N(B) = 0 .
S(B) = 0 Tc(A+B) = 5.46
Q=C*I*A= 3.10
Tc (B) = 0.0 ~
Tc(tot.) = 6.16 ~ Q(est.) = 3.11
intensity = 2.96
A = 0.3265065
WP = 5.9021
R = 0.0553
V = 9.53
Tc (total) = Tc (overland) + Tc (gutter) . Tc(gu) = 0.70
Tc (overland) = Ct*(L1*N/S^0.5)110.6) Q(est) = 3.11
Ct = 0.15
L1 = Length of Overiand Flow Holding = 14.25
N= friction factor of overland flow (.4 for average grass cover)
S= average slope of overiand flow
Tc (gutter) = Length (ft.)Nelocity (ft./sec.)/60
B= Bottom width of gutter or ditch
Z1 = inverse of cross slope one of ditch
Z2 = inverse of cross slope two of ditch
d= depth of flow in gutter (estimate, check estimate with Flow)
Area = d'B+d"22"(Z1+Z2) Wetted perimeter= B'd+(1/sin(atn(121))+1/sin(atn(1/Z2)))
Hydraulic Radius = R= Area/Wetted Perimeter
Velocity = 1.486/n'R^.667's^.5
Flow = Velocity'Area
~ n = 0.016 for asphalt
s= longitudinal slope of gutter
-
~
BOWSTRING METHOD (TEN YEAR STORM DESIGN) "PROJECT: SHELLEY ACRES
DETENTION BASIN DESIGN BASIN: D
DESIGNER: JGL
DATE: 3-lun-99
Total Area (calc.) (see H1) 1.08
Time of Conc. (calc_) (see H1) 5.81
Composite "C" (caic.) (see H1) -0.32
Time of Conc. (min) 5.81
Area (Acres) 1.08
C' Factor 0.32
208 Impervious Area (sq. ft.) 8523 - 686 Pond floor area
Volume Provided (cu. ft.) 208: 403 storm (total): 805
surface: 805
. . u/g: 0
Outflow (cfs) 0.3 0.00
Area " C" Factor 0.35
#1 ' #2 #3 #4 #5 #t6 #7
Time Time intensity Q dev. V in V out Storage
Inc. Inc.
(min.) (sec.) (in./hr.) (cfs) (cu. ft.) (cu. ft.) (cu. ft.)
(A•c-#3) EOutf.'#2) (#5-")
5.81 348.47 3.03 1.06 494 104.54 390
5 300 3.18 1.11 447 90_00 357
10 600 2.24 0.78 _562 1150.00 382
15 900 1.77 0.62 630 270.00 360
20 1200 1.45 0.51 668 360.00 308
25 1500 1.21 0.42 684 450.00 ' 234
30 1800 1.04 0_36 697 540-00 157
~ 35 2100 0.91 0.32 706 630.00 76
.40 2400 0.82 0.29 722 720.00 2
45 2700 0.74 0.26 729 810.00 -81
50 3000 0.68 .0.24 741 _90_00 -159
55 3300 0.64 0.22 765 990.00 -225
.60 3600 0.61 0.21 793 1080.00 -287
65 3900 0.60 0.21 843 1170.00 -327 70 4200 0.58 -0_20 .875 12.M00 -385
75 4500 0.56 0.20 904 1350.00 -446
80 4800 0.53 0.19 911 1440.00 -529
' 85 5100 0.52 0.18 948 1530.00 -582
' 90 5400 0.50 _0. 17 964 1620_00 -656
95 5700 0.49 0.17 996 1710.00 -714
100 6000 0.48 0.17 1026 1800.00 -774
"208" CALCULATIONS '
. Required grassy swale pond storage volume
= Impenrious Area x.5 in./ 12 in.fft. = 355 cu. ft.
provided: 402.5 cu. ft. OK!
- 10 YEAR DESIGN STORM-STORAGE CALCULATION
Maximum storage required by Bowstring = 390 cu. ft. .
provided: 805 cu. ft. OKl
1
! -
PROJECT: SHELLEY ACRES
RATIONAL EQUATION (FLOW CALCULATION) BASIN: D
DESIGNER: JGL
~ DATE: 05-Mar-99
Tc (overiand) Tc (gutter) Areas "C" A'C ,
Ct = 0.15 L2 = 450 0.25 0.90 0.225
Z1 = 50.0 0.83 0.15 0.1245
L1(A) = 50 Z2 = 50.0 0.00 . 0.90 0
N(A) = 0.4 B= 0 0.00 0.00 0
S(A) = 0.01 n= 0.016 0.00 0.00 0
s= 0.100 0.00 0.00 0
Tc (A) = 3.60 d-~ 0.079 0.04 0.00 0
. Total A Comp "C"
L1(B) = 0 Tc (gu) = 2.20 1.08 0.32
N(B) = 0
S(B) = 0 Tc(A+B) = 3.60
Q=C*I*A= 1.06
Tc (B) = 0.0
Tc(tot.) = 5.81 Q(est.) = 1.06 Intensity = 3.03
A = 0.31205
WP = 7.9016
R = 0.0395
. V = 3.40
, Tc (total) = Tc (overland) + Tc (gutter) Tc(gu) = 2.20 Tc (overland) = Ct'(L1 "N/S^0.5)^0.6) Q(est) = 1.06
Ct = 0.15
L1 = Length of Overland Flow Holding = 16.03
N= friction factor of overland flow (.4 for average grass cover)
S= average slope of overfand flow _
Tc (gutter) = Length (ft.)Nelocity (ft./sec.)/60
B= Bottom width of gutter or ditch
Z1 = inverse of cross slope one of ditch
Z2 = inverse of cross slope two of ditch d= depth of flow in gutter (estimate, check estimate with Flow) .
Area = d'B+d^y2*(Zl+Z2)
Wetted perimeter = B'd+(1/sin(atn(1/Z1))+1/sin(atn(1/Z2)))
Hydraulic Radius = R= Area/Wetted Perimeter
Velocity = 1.486/n"R^.667*s^.5 -
Flow = Velocity"Area
~ n = 0.016 for asphatt ,
s= longitudinal slope of gutter ,
Q-l0
BOWSTRING METHOD (TEN YEAR STORM DESIGN) PROJECT: SHELLEY ACRES
DETENTION BASIN DESIGN BASIN: E
DESIGNER: JGL
DATE: 5-Mar-99
Total Area (calc.) (see H1) 0.81
Time of Conc. (calc.) (see 1-11) 6.09
Composite "C" (calc.) (see H1) 0.34
Time of Conc. (min) 6.09
Area (Acres) 0.81
C' Factor 0.34
208 Impervious Area (sq. ft.) 6053 500 Pond floor area
Volume Provided (cu. ft.) 208: 326 storm (total): 653
surface: 653
- ulg: . 0
Outflow (cfs) . 0.3 0.00 Area * C" Factor 0.27
#1 #2 #3 #4 #5 #fi #7
Time Time Intensity Q dev. V in V out Storage
Inc. Inc.
(min.) (sec.) (in./hr.) (cfs) (cu. ft.) (cu. ft.) (cu. ft.)
(#1 *60) (A*C"#3) (Outf.*#2) (#5-#6)
6.09 365.26 2.98 0.81 395 109.58 286
5 300 3.18 '0.86 347 90.00 257 10 600 2.24 0.61 440 180.00 260
15 900 1.77 0.48 492 270.00 222
20 1200 1.45 0.39 521 360.00 161
25 1500 1.21 0.33 534 450.00 84
30 1800 1.04 0.28 543 540.00 3
35 2100 0.91 0.25 550 630.00 -80
40 2400 0.82 0.22 562 720.00 -158
45 2700 0.74 0:20 567 810.04 -243
' 50 _ 3000 0.68 0.18 577 900.00 -323
55 3300 0.64 0.17 595 990.00 -395
• 60 3600 0,61 0.17 617 - 1080.00 -463
65 3900 0.60 0.16 656 1170.00 -514
70 4200 0.58 0.16 681 . 1260.00 -579
75 4500 0.56 0.15 703 1350.00 -647
80 4800 0.53 0.14 709 1440.00 -731 '
85 5100 0.52 0.14 738 1530.00 -792
90 5400 0.50 0.14 754 1620.00 -870
95 5700 0.49 0.13 775 1710.00 -935
100 6000 0.48 0.13 798 1800.00 -1002
,
"208" CALCULATIONS
Required grassy swale pond storage volume
= Impervious Area x.5 in./ 12 in./ft. = 252 cu. ft.
provided: 326 cu. ft. OK!
10 YEAR DESIGN STORM-STORAGE CALCULATION
Maximum storage required by Bowstring = 286 cu. ft.
provided: 653 cu. ft. OK!
PROJECT: SHELLEY ACRES
RATIONAL EQUATION (FLOW CALCULATION) BASIN: E
DESIGNER: JGL
DATE: 05-Mar-99
Tc (ovedand) Tc (gutter) Areas "C" A'C
Ct = 0.15 L2 = 200 0.20 0.90 0.18
Z1 = 50.0 0.61 0.15 0.0915
L1(A) = 50 Z2 = 50.0 0.00 0.90 0
N(A) = 0.4 B= 0 0.00 0.00 0
S(A) = 0.01 n= 0.016 0.00 0.00 0
s= 0.010 0.00 0.00 0
Tc (A) = 3.60 d= . 0.110 0.00 0.00 0.
• Total A Comp "C"
L1(B) = 0 Tc (gu) = 2.48 0.81 0.34
N(B) = 0 •
S(B) = 0 Tc(A+B) = 3.60
Q=C'I'A= 0.81
Tc (B) = 0.0
Tc(tot.) = 6.09 Q(est) = 0.81 Intensity = 2.98
A = 0.605
WP = 11.0022
R = 0.0550
' V= 1.34
Tc (total) = Tc (overland) + Tc (gutter) Tc(gu) = 2.48
~ Tc (overland) = Ct'(L1 •N/S^0.5)^0.6) Q(est) = 0.81 Ct - 0.15
L1 = Length of Overland Flow Holding = 7.13
N= friction factor of overiand flow (.4 for average grass cover)
' S= average slope of overland flow •
Tc (gutter) = Length (ft.)Nelocity (ft./sec.)/60
B= Bottom width of gutter or ditch
Z1 = inverse of cross siope one of ditch
Z2 = inverse of cross slope two of ditch .
d= deptfi of flow in gutter (estimate, check estimate w'rth Flow)
Area = d`B+d^22'(Z1+Z2) .
Wetted perimeter= B*d+(1/sin(atn(1/Z1))+1/sin(atn(1/Z2)))
Hydraulic Radius = R= Area/Wetted Perimeter
Velocity = 1.486/n'R^.667's".5
Flow = Velocity'Area
~ n = 0.016 for asphaft
s= longitudinal slope of gutter
I~ ~ ~ 7i
TE A~
GRA S
A.'fipl~
A.~~~L -
INL~
I
~
v
S+a• 3+37. so, R+.
OEPTH OF FLOW - FEET Cc..rb 3; le~ ~ I
.01 .02 .03 04 .05 .06 .08 .10 .3 .4 .5 .6 .7 .e .9 1.0
~ ~ . ~ ,--~--T--~ ~ 1.o
I ~ I ~ ~ I i I ~ .6
.5
4 ~
,
1- L
~ .3
4
L
La i
U13 la~= !7•2
-
~ r--L-~--i o ~ .10 "L- 11-5
•t~A'C) p
.os ~ 8,
6c- .06 VI" .os ~
~
sF G~r.b• p~~,.~ II ! ~ ~ ~ ~ .os
.03
oz
~
G►-eA~~ a I I I I I~
~
ax 1--~---~-
,i~l
oi
I I ~ 1.0
'8 o.TZ
( a) DISCHARGE PER FOOT OF
LENGTH OF CURB OPENING ' '6 0.5:5,
-t- -
INLETS WHEN INTERCEPTING ~ •s
100 % OF GUTTER FLOW
,
- - - - - - L Q
~ . ~ 1 - ~ I I I I -
o6
( b) PARTIAL 1NTERCEPTION ~
RAT10 FOR INLETS OF
' LENGTN LESS THAN _ La 2
oer
O L~- ~2Y D
y
a 9C 0•1 = 1
RyQ~ss = 2.s'- l = /.s .io
.os .os .oe .10 .2 a .4 .5 .s .e 1.0
a
~ = 5 ~l• r o , ~3 L/La D (D (9
CAPACITY OF CURB OPENING INLE iAle.,~
0•93= 0•b7 c~s ON CONTINUOUS GRADE ,(,~S.L '"`b ,
S 6-39 FI GURE 1
Pass la.'e ~
QL ILA = 5,'Q.1~ = D, !o I ,~=1e~.cc~~ II 1e~- by
r w '
Q;~ p.~ z. _ 0 PJ ~ t~7 c~'s - 0•`f g Seer' Ko+e Gbow-
R7Pa ss- .
,
Triangular Channel Analysis & Design
Open Channel - Uniform flow
Worksheet Name:
+o
Comment: Initial gutter depth at curb inlet 1 C
O
Solve For Depth
Given Input Data:
Left Side Slope.. 50.00:1 (H:V)
Right Side Slope. 3.00:1 (H:V)
Manning's n...... 0.01"6
Channel Slope.... 0.0129 ft/ft ~
, . Discharge........ . 2.50 cfs e, Fl~w wfoµ~- Sk1►"b~s;~
Computed Results: 3'3 C,
Depth............ 0.20 ft
Velocity.. , . . . . . . 2.29 fps Su~-h~.s~~ ~ _ (3•~~~(l,yoa~~(.~g~_ 0•90
Flow Area........ 1.09 sf
Flow Top Width. 10 . 76 ft ~.30 - 0•~~
Wetted Perimeter. 10.79 f t So crs
Critical Depth... 0.22 ft
Critical Slope... 0.0078 ft/ft
Froude Number.... 1.27 (flow is Supercritical)
, -
Open Channel-Flow Module, Version 3.11 (c) 1990
Haestad Methods, Inc. * 37 Brookside Rd * Waterbury, Ct 06708
C Z
Triangular Channel Analysis & Design
Open Channel - Uniform flow
Worksheet Name: shelley
~
Comment : Initial gutter depth at curb inlet 1 C~v~'or -~v ~ C4,.,b
Solve For Depth
Given Input Data:
Left Side Slope.. 50.00:1 (H:V)
Right Side Slope. 3.00:1 (H:V)
Manning's n...... 0.016
Channel Slope.... 0.0129 ft/ft .
, Discharge.......... 1.50 cfs
Computed Results:
Depth............ 0.17 ft
Velocity......... 2.02 fps
Flow Area........ 0.74 sf
' Flow Top Width... 8.88 ft
wetted Perimeter. . 8.91 f t
Critical Depth... 0.18 ft
Critical Slope... 0.0083 ft/ft-
Froude Number.... 1.23 (flow is Supercritical)
'
Open Channel Flow Module, Version 3.11 (c) 1990
Haestad Methods, Inc. * 37 Brookside Rd * Waterbury, Ct 06708
C~3
Triangular Channel Analysis & Design
' Open Channel - Uniform flow
~ Worksheet Name: shelley
Comment : Initial gutter depth at curb inlet 1 (pr''ai 3-G""~ °Pp^^~~
.
Solve For Depth
Given Input Data:
Left Side Slope.. 50 . 00 :1 (H : V)
Right Side Slope. 3.00:1 (H:V)
Manning's n...... 0.016
~ Channel Slope.... 0.0129 ft/ft
Discharge........ . 0.67 cfs
Computed Results:
Depth............ 0.12 ft
Velocity......... 1.65 fps
Flow Area........ 0_41 sf
Flow Top Width... 6.57 ft
Wetted Perimeter. 6.59 ft
Critical Depth... 0.13 ft
Critical Slope... 0.0093 ft/ft
~ Froude Number.... 1.17 (flow is Supercritical)
~
~ .
~
~ . .
' Open Channel Flow Module, Version 3.11 (c) 1990 Haestad Methods, Inc. * 37 Brookside Rd * Waterbury, Ct 06708
C- I
L~ C~ U
' S+e4• 3+37 so) ~t.
OEPTH OF FLaW - y- FE T C„ vb _rl le Z,
.01 .02 .03 .04 .05 .06 .00 .10 .2 .3 .4 .5 .6 .7 .8 .9 1.0
1.0
. ~
~ .8
I ~ I ~ i I I I ~ I .6
7. fi- -7
4---L -E-r I ~ r j _.1_
-rt
~ .4
j~~1_i_~_ ~ ~ ~
~ I t I I i ~ I I I a
.2
~ I~L i i I t IL
~ t._J_..~ O• 10
5 o9S La, Lz 4-e~
' ~ ~ ~.....~:T..~
G~Al ~ oe
I i i' I f I I °
.06 •obs 3 ~
~ ' ` • H.05 ~S E 5
.o.
C4,4,-t
, .o
~ 1 I I~ I 1 , I I I~ .o ~Sw~
L l I I I ~ .01
I I ~ i.o \
.e
( a) DISCHARGE PER FOOT OF i Ol .6
~ LENGTH OF CURB OPENING `
INLETS WHEN INTERCEPTING
100 °to OF GUTTER FLOW ' - - - ~ - - - t ~
~ .s
- L 0
00
I . . ~
(b) PARTIAL INTERCEPTI ON 3 Qa
. RAT10 FOR INLETS OF
LENGTH LESS TMAN Lo / ~ -4-+ ••2
ti -
o, L/t.,= - ~'31 ;
•r~.a,cep~Q-- ~ ~ ~
•Q X 0.4jS- 0.79
jO
D, 4~ y cf:s .os .06 .oe .10 .L .a \ .4 .s s e 1.0
/
~ L~a : s/.$H - ~
x~$ ` Q 57 CAPACITY OF CURB OPENING INLETS
Q ON CONTINUOUS GRAOE
f3yp~.ss s c~. ~ o- 57 ` a- 2e cpS 6_39 FI GURE 16
C
3 'Q. 2(o GTS 1 w4e✓Ltf4e(~ • •
~ ~ `
Triangular Channel Analysis & Design
Open Channel - Uniform flow
Worksheet Name:
r i O r 4'D
~
Comment : Initial gutter depth at curb inlet 2 Or-~ ;~9 (
Solve For Depth
Given Input Data:
Left Side Slope.. 50.00:1 (H:V)
Right Side Slope. 3.00:1 (H:V)
Manning's n...... 0.016
Channel Slope.... 0.0129 ft/ft
Discharge......... 1.64 cfs _
Computed Results:
~ Depth............ 0.17 ft
Velocity......... 2.06 fps
Flow Area........ 0.80 sf
Flow Top Width... 9.18 ft
wetted Perimeter. 9.21 ft .
Critical Depth... 0.19 ft
Critical Slope... 0.0082 ft/ft
Froude Number.... 1.23 (flow is Supercritical)
' -
Open Channel Flow Module, Version 3.11 (c) 1990
Haestad Methods, Inc. * 37 Brookside Rd * Waterbury, Ct 06708
~
Triangular Channel Analysis & Design
Open Channel - Uniform flow
, Worksheet Name :
Comment : Initial gutter depth at curb inlet 2 2 d p~~,',~9) ~2
Solve For Depth Given Input Data:
Left Side Slope.. 50.00:1 (H:V)
Right Side Slope_ 3.00:1 (H:V)
Manning's n...... 0.016
Channel Slope.... 0.0129 ft/ft
Discharge......... 0.84 cfs
Computed-Results: -
Depth............ 0.13 ft '
Velocity.......... 1.74 fps
Flow Area........ 0.48 sf
Flow Top Width... 7.15 ft .
Wetted Perimeter. 7.17 ft
Critical Depth... 0.14 ft
Critical Slope... 0.0090 ft/ft
Froude Number.... 1.18 (flow is Supercritical)
' . '
Open Channel Flow Module, Version 3.11 (c) 1990
Haestad Methods, Inc. * 37 Brookside Rd * Waterbury, Ct 06708
C-7
~
Triangular Channel Analysis & Design
Open Channel - Uniform flow
Worksheet Name:
Q„;~. ~
Comment : Initial gu. tter depth at curb inlet 2 '=d D
3 f
l
Solve For Depth
Given Input Data:
~ Lef t Side Slope.. 50 . 00 :1 (H : V) -
Right Side Slope. 3.00:1 (H:V)
Manning's n...... 0.016
Channel Slope.... 0.0129 ft/ft
. Discharge......... 0.26 cf s
Computed Results:
- Depth............ 0.09 ft
Velocity......... 1.30 fps
Flow Area........ 0.20 sf
Flow Top Width... 4.60 ft
Wetted Perimeter. 4.62 ft
Critical Depth... 0.09 ft
Critical Slope... 0.0105 ft/ft
Froude Number.... 1.10 (flow is Supercritical)
~ -
~ Open Channel Flow Module, Version 3.11 (c) 1990
Haestad Methods, Inc.,* 37 Brookside Rd * Waterbury, Ct 06708
. C-~
k..-il= '-).I v L,---j' t'o✓ U~,,L aro~
_ O' 45 I O
X _
o.y3 - .
1.0iz +yb.y 9 - c,i-a, - sn c
C~.
s
11 c~-
.9 8
10 3 . '
O•9 D' ~ 6 '
9 2
4
.r s vsE 3.50~ LA.
~
~.s ~
f-
.s T ~ 2 ~
I ~
6.5 W a ' i .0 ~
a G i 710-
- .S 6
I.0 Z4j S .8
v
Z i .s
.e ~ z
I~ W
S O .7
~
~ .4 p ~i•4 U.
W s.s 0 L.6
LL ~i
C9 =
2 Z
L s O
o .
0 3 , r.• U. t ~
2
3.S i~ . 0
n ~-.4
1 w = 2
i
~ de~~
0 TS ~ 3 J .OA ~
F„ ~ . O 6 Q .3
_
W
i o .os a zs
z.s U. . 3
.Z ~ U.
W O
a
_
} .02 a .2
W
~ 2 tj ~ O -
a o
~ Q
U
.oi ° .is
~ a
i , ~ • ` •
~ ' : : r . • MT.
I. S , M • _ CtJRB ,
o~► 1 ' ~
(~LOCAL OEPRESSIOM (o)
~
¢ .
<
~
~ 1•2 NOMOGRAPH FOR CAPACITY OF CURB
euREAu OF PUSLic aoAos OPENING INLETS AT LOW POINTS
OIVISION TwO, wASMINGTON, O.C.
FIGURE 17
6-41
. C
UUS p o~ ~
~3as
' (GRATING IN PLANE OF PAVEMENT )
WATER RFA ~s}~+%o•~ O~S~
~ su cE
r
xS . .
dov = d 2 5
d j ~ S1N~
_ Wq ~
r• W= WIDTH OF FLOW T
0 10 20 30 40 5 50 60 TO 80 90 100
100 "
Wq ; W =°/a WIDTH OF FLOW
40 90' Op . . . . . . . .
80
70• ~
60-
N OTE :
The curve is bosed on povement with
° 50-
uniform rote of rlse from curb to crown.
ao- . ' ~ .
30.
Cross- s~oPe _ - d Z
D . ~V' X = ~ ~ *0
.20. \),j;
41 P ~,v~ S~ d
,
• 10. I
~A)3 q 1.
f I ~ ~ ^ er P.~T r
0 0. ,,,5~
. ~
~e_lyb cP-s w 4e--c
-
EXAMPLE S D Y
Given : Q= 10 cfs d= 0.5 5x = 5% W= 0.5' - 0.05 = 10 t'
With Wg = W= o= 20%, Groting 2' wide takes 44.5 % Q= 4.45cf3 And Gratin9 4' wide takes 75 % Q= 7.50 cf
ci 1 4- oq ~
""i/I. pow p✓<~(u.~ dJ C_7 a~ r~
GRATE ON A CONTINUOUS GRAO E •
FIGURE 15
6-37 C-1 d
'
Triangular Channel Analysis & Design
Open Channei - Uni f onn f 1 ow
Worksheet Name:
Comment: Depth of flow on private drive at CB4
Solve For Depth
Given Input Data:
t Left Side Slope.. 50.00:1 (H:V)
Right Side Slope. 50.00:1 (H:V)
Manning' s n...... 0.016 Cu ~v e-
Channel Slope.... 0.0700 ft/ft Z---A'11e"A
Discharge........ 1.00 cfs
Computed Results .
Depth.....:...... 0.08 ft~
Velocity......... 2.93 fps
Elow Area........ 0.34 sf
Flow Top Width... . 8.. 2 6 f t
Wetted Perime_te.r _ S..26 f t Critical Depth... 0.12 ft
Critical Slope... 0.0095 ft/ft
' . Froude Number . . . . -2.515 (flow is Supercritical )
' ' .
' -
,
Open Channel Flow Module,_ Version 3.11 (c) 1990
Haestad Methods, Inc.* 37 Brookside Rd * waterbury,
'
C -11
~ Circular Channel Analysis & Design
Solved with Manning's Equation
Qpen Charinel - Uni f orm f 1 ow
Worksheet Name:
Comnnent : Pipe f rQm. C84._ .to PQ~id D
,
Solve For F'ull Flow Capacity
Given Input.Data:
Diam4ter.......... 0.67 ft
Slope............. 0.0066 ft/ft
Manning.'.s. n..... : . Q.011 :
Discharge......... 1.18 cfs
Computed Results:
Fu11. Fl.ow. Capaci.tX.. < < 1.18 _ cf s > o~ c~s
Full Flow Depth........ 0.67 ft
Velocity.. . . 3,33 fps
Flow Area......... 0.35 sf
Cr~~~~al- Depth._ . 0.51 f t
Critical Slope.... 0..0076 ft/ft
Per-c.ent._ Eu1I - _ _ - lQ.Q -00- % . .
Full Capacity.. . . 1.118 cfs
QMA.X ~ C ,94D . , ~ 1,26 c f s
Fr-oude Number..... FULL
' Qpe-n..Charvrxe1, F1Qw. K-odule R , Versiorx 3 .11 (cl. 1990
Haest.ad_Methods,. Inc. * 37 Brookside Rd * Waterbury,,Ct 06708
~-~Z
U- r'JI Lf3as~~ ~S r~ow)
9r~Va~ D"iVe-,
(Ap,~)c, s~. 71-3o
~
Q p. Z7 s CU~~
-
" ` p. g i 10 4
.s
L- a ! 8
Z~ 0, 27 3
10 - 6
. ,e I
L~ 3 Z
9 4
~ ~
('se. Z 1~e~ ^j
~ -~'la,.~d e-s . ~
~
~.s En ;,"S o 2 " Z
JaI e~, 0p ~ ~ .40
.
a~e Q4 e✓ a:
6.5 v a ~t zi. 0
i t
.S 6 N 1.0 = .9
U. v
~ s.s z ~~~'~►1 Z .e -
.s ~ z .
/ W
5 O
.s ~ .s 4,
W i~ 0 L.6 .
W
U. LX Q _ ~
2 • i~ 2 ~ L ~
^ 4 QVj.~ W 2 - 2
` 0;p~i 'b p .
-
r U.
. - ~ ? 3.5 ~ Z ~-.s
~ a .
W .oe . o
o .zs s ~ u. .06 Q .3
O m
~ W
W 0 .04 3 .2S
2
U.
.2 . . ~
W
a
' H .2
~
r .02 (L
t~
, ~ -
2 a ° LL.
a
" o
.15 .oi .~s
~ a
m
L
i
; • .:r..'•• , v~ MT.
M CURB
~ LO.1
~ IOCAL OEPRESSION (o)
r
ac
~
~
z
4d 1.2 NOMOGRAPN FOR CAPACITY OF CURB
OPENING INLETS AT LOW POINTS
9UpE/►U OF PUBLIC ROA05 '
OIVISION TWO, WASMiNGTOM, O.C.
FIGURE 17
6-41
C,_' )3
A
SHELLEY ACRES ADDITION
STEEN COURT
PAVEMENT DESIGN ,
Project No. 97-035
June 17, 1999
04 aAs&f~
p~
• x
:
~ ,p 30891
~`A~ ~Q18 TBS
~I~NAL
O1 ~
IEXPIRES Z/211
Prepared By: •
Metro Engineering, InG
S. 324 Sherman St.
Spokane, WA 99202
`IJKi~ ~UN`ENI Ph.: (509) 624-9351
~~CKA`.~ ENGiNEER'S ORF;~~.
• Fax: (509) 624-8153 G N A.,
~^1L -
~0UNTY ENGIRl~IF. _
.
.
PAVEMENT DESIGN
This project is the development of a 13 lot plat, located in the Spokane Valley.
Approximately 1000 feet of Steen Court and 800 feet of Courtney Lane will be constructed
as part of this project. Curb and gutter will also be constructed as part of this project
(Steen Ct. only).
All the roads, both within the plat and offsite, are local access roads.
The pavement sections were designed based on the design matrix from the Spokane County
Guidelines for Pavement Design. The design matrix is attached to this report.
On the foUowing page is a spreadsheet used for the design of the pavement sections. It
includes the location, design traffic volume, soil classification, minimum design section and
the pavement section used.
Four samples were given to Budinger and Associates for analysis (two from each roa.d).
They tested the least desirable sample from each road.
REFERENCES
• Parameters for pavement design Spokane County Engineering Department
• Sub-grade Soils report, dated March 9, 1999 Prepared by Budinger & Assoc., Inc.
(ATTACHED)
.
SHELLEY ACRES
PAVEMENT DESIGN
ROAD SAMPLE ADT SUBGRADE SOIL MIN. DESIGN SECTION USEDLOCATION SECTION
STEEN CT. ~ 4+05 200-600 ~ SM 211/8" 211/8"
STEEN CT. 10+40 200-600 SM 278" 2"/8" -
COURTNEY 4+10 0-200 GW 211/6" 2"/6"
COURTNEY 7+25 0-200 GW 2"/6" 211/6"
:21p~~e o
~ . _ ~Y
a ~'x ~
~ r~- • .
+
O
~ j ~ ~ o
u N -~!i~ i. . • ~ ~ ~ ~~r
L-! : .
~
° ~ ~ ^ ~ ' ~ i . i
~ ~
I=
w .
~
~ ~ ~i a~ 2 S r •y . / ~ ' o i
~ •
~ ~ ~ • ~ .
d _ : • ~ + : .
~ s~ • ~ ~ / _
~1~~~~~ ~ ~~~:T•~~~' ~ ~ :
-
~ ~ ~ ~ .f- ; ♦ ~
• ; ~ .
0001 `
ap fa ~s. ~ :
In
,
~ 4 ~ ♦ ~
9. o:
~1 f o :
Q
~1h
` a~ - ~ Q b~~ " _ •
o • • •act
'0
~
8 F3 8 ~ ~ ~ A ~W 3~~j" ~ Et ~ •
P m In - ~
y < ~ ~ O I § ~
q
D ~ F R
Z
0
0
~ N
/
.
~ ~ . .
~ CZ oF op •
~
7
.c •
~ a
. ~P. . . i 4~nn • . . . . . ~ r.Hy, ~ Nu'S~ '~n ~ Y ..6 ;i So S2
~qff•
, ~ n~ •~Y~Su` a~ j~
cmr
7~ M~ eQ ~ ~ V o
~ ~ ~ r C ~ d' J a
o w y'
d
&
. ~ ~ y ^ • ~ /
• ~ ~ ~ /
i ~ ~ ~ . ~ /y~_' ~ \ ~ . ♦ O
' ~ . ~ • rj - ~i ~ ~ ,.n
; _ .
l~ ' ~ ~ ■ t, ~ ~
. ~7~
. ot•i~: rauW ~ ~ ..Q... . ...~i . • ^
•
• 1 • v~ ~ ~ , , Q~J ~~a
~ ~ .
n
.
arj cr
: ' ; : ts~ ~ ~ , : o ~ •
: •
. y ........~►.i...............E........cruas+~s+-.+o! •F + 'n -
er
.
~ ~ .
~
, . ~ 4 ~
~d
aa•c..~i ue
'n . •i:
: g ~ ~ ~ ~c:~ ~ -
: • ` ~ . ~d ~ .
' u'[soi a f!'sro¢•--_. ~ . itz~ot. + ~ ~
~cz+o~-...... " u+o~
,A,~,~*~•'
i......i-........_.... W..
~ oD'tt~C► ]A4/w ~ +
• -01 ~ ~ • .
o
♦
..s_.----•=----..._ . - .
.s. ~
.s.---- ' ~ . •
~ . W. ,
Cl
,
:
. ~ :
.
. +
i~ . ~
( ~ ~
~
. .
-
; +
m . .
. . ~ .c
. N
. . . . .
~ sv~~u[...~..:...
~y+ot •
...t ~A! OrLf+t aAe ~ : , • . ' ol
~ t • ~ ~ ~
: : ; . : oo : d ~
. . . : .
, , q.... . ......1.......' . ♦ \
, p . \ ~ ~~r /
; ~ : ~ : ~ ^ ~ ~
• j • ♦ ~ l'`'.~~.: . 1 W • y{j ri
~ Y ' MO
\ y ~ r~
~ : :
02 lLOL I ' 6f ECOL . O ~ ~ a.. ~ O
' aVow ud xao•s w
•I ~ ~ ' a~ccos ~ uxot ~ ~ ~ ia
• KLt9t ' I {[7fCC ~ ~ ~ ~ ~ ~
- I ~ 00'H K IA! ~ i OOYNC Nd ~ ♦ / L I
ti'~
f
' aVM u~i
cco[ ~ , •
os ►►~0 w I oa ►a•• ~e ~ ~ ~
j ~ o
3820 E. Broadway Spokane, Washington 99202
budinger & associates, inc.
geotechnical & materiat engineers
. Y~ Qi
Jcel Lee March 9, 1999
Meiro, Engineering -
S. 324 Sherman
Spokane, WA 99202 Project Number L99040
PROJECT: Shelly Acres Project Spokane, WA
SiJRJECT: Results of I.aUoratory TAqmg
Report #1 Dear Mr. I,ee,
At your request, we have providing laboraiory testing services for the subject project. Our services
'are limited to the performance of specific laboratory tests, seleded at your discretion.
For this period our involvement was limited to laboratory 'testing on 2 samples delivered to our .
laboratory on March 1, 1999. .
. At your request, the following tests were conducted on Samples #1 and #3 in general accordance
with the methods listed:
1. Particle Size Analysis (w/o hydrometer) ASTM D-422
2. Atterberg Limits ASTM D-4318
Resuhs are presented on the attached Laboratory Summary. If you have any questions regarding
this report, please call.
Respectfully Submitted:
^ER & ASSCCIA''ES
BUBIN -
,
,
'.7
• ~ ~ •
Soatt L. Wahers
Mgr. Construction Services .
SLW/sa
Addressee - 2
Auadunerts
• Laboratorv Summary
Page 1 of 2 F.C. Budinger PE
Stephen D. Burchett PE
(509) 535-8841 John E. Finnegan PE
FAX (509) 535-9589 Scott L. Walters
4
, ♦
Shelly Acres Project Number L99040
Spokane, WA
LA.BORATORYSUMMARY
i]NITS .
LABORATORY NUMBER 99-0112 99-0114
SAMPLE NUMBER 1 3
SAMPLED BY Client Client
SAMPLE TYPE Bulk Bulk -
DATE RECIEVED 3/1/99 31/99
LIQUID LIlVIIT 40 57
PLASTIC LIlvIIT 32 24
PLASTIC'TY INDEX 8 33
UNIFIED SOII. CLASSIFICATION SM GW-GG
6" 100 S 3" % 87 I 1'/z" 100 56
E 1" P 99 43
- V 3/4" A 98 35 E 1/2" S 94 29 3/8" S 88 24 S #4 I 78 21
I #10 N 66 18
Z #16 G 59 16
E #30 53 15
#40 52 14
#100 49 12
#200 43 11
budinger & associates, inc.
geotechnicai & material engineers
0
• ~
r
LOCAL ACCESS PAVEMENT STRIJCTURES
AVERAGE DAILY i'RAFFIC
SOIL TYPE 0- 200 200-600 600 +
~
'
GW CZ76. 217611 211/61'
.o >
GP 211i6" 211n10 21I7"
.
GM 211/61' 211R" 211/81#
GC 2~1/711 2fl/81' 3'76"
SW 2'1/61' 211~701 2~1/711
SP 2176" 2~1/71' 2"/8"
SM 211/711 r2"1811 31016„ .
SC Pavement Design .
~ ML 311/6's 3,11811 4111641
CL Pavement Design
O L 4"17" 511/7" 511/8"
MH Pavement Design ,
OH Pavement Design
PT Pavement Design-
,
1) Soil type is ciassifed by the Unified Soil Classification System.
2) Required thickness is given as inches of asphalt concrete pavement over
inches of crushed surfacing.
SPOKANE COUNTY ALTERNATE PAVEMENT DESIGN
. (INTERIM) _ . '