2014, 01-29 Permit: SW-14000042 SewerSPOKANE COUNTY UTILITIES
PERMIT
Application Number: SW -14000042 Permit Issued Date: 01/29/2014
Expiration Date: 01/29/2015
Project Description:
Project Name:
Primary Contact:
Phone:
SEWER CONNECTION
S GREENACRES
BERG, RA&JI
Applicant BERG, RA & J I
Address: 18313 E RIVERWAY
GREENACRES, WA 99016
Phone:
Email:
SITE INFORMATION:
Site Address:
Parcel Number:
18313 E RIVERWAY AVE
55075.2912
Assessor's Description: 7-25-45, PTN OF E 1/2 DAF: PARCEL "A" SP 91-
703 TOG W/ PARCEL LYG ELY & ADJ TO DAF;
BEG MOST ELY COR OF PARCEL "A", TH N
36'59'40" W ALG ELY LN OF "A" 90.52 FT TO
NELY COR, TH N 60'31'30" E 50.00 FT
Inspection Area: : (509)-477-3675
Owner BERG, R A & J I
Address: 18313 E RIVERWAY
GREENACRES, WA 99016
Phone:
Email:
Water District: Consolidated Irrigation Fire District: Spokane Valley Fire
District #19
Zoning: Land Area: 0.79 Acre(s)
CONTRACTOR INFORMATION:
OWNER, Exp. 12/31/2015
OWNER PERFORMING THE WORK
SAME AS SITE ADDRESS SAME, WA 00000
509-218-7562
DETAILS:
Class
Type
Quantity Unit Charge Value
SEWER SEWER CONNECTION 1 $125.00 $125.00
FEE DETAIL.
Processing - Utilities
Utilities Permit
Total Fee:
$26.64
$125.00
$151.64
$125.00
CONDITIONS:
Possible Shoreline On Site
Plan review fee is required for all site plan reviews conducted by Spokane Valley Fire.
Possible FEMA Flood Zone
Inside Public Transit Benefit Area
Possible Floodplain
Date Printed: 01/29/2014 12:11:48 Project Coordinator: Dawn Dompier
SPOKANE COUNTY UTILITIES
PERMIT
Application Number: SW -14000042 Permit Issued Date: 01/29/2014
Expiration Date: 01/29/2015
CALL 1-800-424-5555 BEFORE YOU DIG --AT LEAST 2 WORKING DAYS IN ADVANCE. SPOKANE COUNTY CODE REQUIRES THE
INSTALLER COMPLY WITH ALL REQUIREMENTS OF THE WA STATE DEPT OF LABOR & INDUSTRIES, INCLUDING THOSE
RELATED TO TRENCH SAFETY.
SEWER PERMITS ARE VALID FOR ONE (1) YEAR FROM THE DATE OF ISSUANCE. FOR SEWER INSPECTIONS CALL THE UTILITIES
DEPT AT (509) 477-3604 FROM 8:30-5:00 MONDAY -FRIDAY PRIOR TO COVER. ONE WORKING DAY NOTICE REQUIRED. PERMIT
ALLOWS FOR A 30 -MINUTE INSPECTION. ADDITIONAL INSPECTION FEES APPLY AFTER 30 MINUTES.
INSTALLER IS RESPONSIBLE TO INSURE ALL WASTEWATER DRAINS ARE CONNECTED TO THE SEWER AND MAY BE REQUIRED
TO PERFORM TESTS FOR VERIFICATION. INSTALLER IS TO FIELD LOCATE AND CONFIRM THE ELEVATION AND POSITION OF
SEWER STUB PRIOR TO ANY OTHER EXCAVATION.
SEWER STUBS AND DRY SIDE SEWERS ARE TO BE CHECKED PRIOR TO CONNECTION TO ENSURE THAT THEY HAVE
ACCEPTABLE GRADE AND ARE CLEAR AND UNOBSTRUCTED. SEWER LINES SHOULD BE CONSTRUCTED TO ALLOW FOR
GRAVITY FLOW FROM THE LOWEST LEVEL OF THE STRUCTURE.
THE INSTALLER AND THIS PERMIT MUST BE PRESENT AT THE JOB SITE AT THE SCHEDULED INSPECTION TIME. BOTH STATE
LAW RCW 19.122 AND COUNTY CODE REQUIRES THE INSTALLER TO GIVE NOTICE OF EXCAVATION TO OWNERS OF
UNDERGROUND FACILITIES.
Date Printed: 01/29/2014 12:11:48 Project Coordinator: Dawn Dompier